HomeMy WebLinkAbout5.591 Original Contract
v~ -
5.SqJ
.' .
NET ENERGY METERING CONNECTION AGREEMENT
for
CUSTOMER FUEL CELL, SOLAR, WIND, or HYDROPOWER
ELECTRIC GENERATING FACILITIES
of NOT MORE THAN 25 KILOWATTS
This Net Energy Metering Connection Agreement is executed in duplicate this ;),,1 \"ft day of
t; c.-tab.ef , 200 L between D D~ .tl-l1 WI" 11 '" (hereinafter referred to as
"Customer"), and the City of Port Angeles, Electric tIhty, a MUnIcIpal CorporatIOn of the State of
Washington (hereinafter referred to as the City). Both parties, who may be herein further referred to
collectively as "Parties" and individually as "Party", agree as follows:
1. CUSTOMER ELECTRIC GENERATING FACILITY
1.1 Customer has elected, in accordance with RCW 80.60 et seq., to operate either a net
energy metering fuel cell, solar, wind or hydropower electric generating facility, with a
generating capacity of not more than twenty-five kilowatts, in parallel with the City's
transmission and distribution facilities. This generating facility is intended to offset
either part or all of the Customer's electrical requirements.
1.2 Customer's Application for Net Metered Electrical Generation, including the location of
the electrical generating installation and details on the electrical generating unites) is
hereby incorporated into this agreement as Appendix A.
1.3 The installation is identified by the City with the following designators: Transformer No.
7.5' · { h
(feeder and phase) J If Sf 5 I ~ e... p if se , Customer Utility Account No.
1').4 '^ 00 OOt
1.4 A separate agreement shall be entered into for each Customer's electrical service
location(s).
1.5 The electrical generating system used by the Customer shall be located on the
Customer's premises. It shall include all equipment necessary to meet applicable safety,
power quality, and connection requirements established by the National Electrical Code
(Articles 690 and 705), National Electrical Safety Code, the Institute of Electrical and
Electronics Engineers, Underwriters Laboratories, and the City's Connection Standards,
as set forth in Appendix B, which is attached hereto.
1.6 The City shall have the sole authority to determine which connection requirements set
forth herein are applicable to Customer's proposed installation.
2. PAYMENT FOR NET ENERGY
2.1 The City shall measure the net electricity produced or consumed by the Customer during
each billing period, in accordance with normal metering practices.
2.2 If the electricity supplied by the City exceeds the electricity generated by the Customer
and fed back to the City during the billing period, or any portion thereof, then the
Customer shall be billed for the net electricity supplied by the City together with the
appropriate customer charge paid by other customers of the City in the same rate class.
1201_01 wpd{5/3/01}
Page 1 of 5
c'
r' .
NET ENERGY METERING CONNECTION AGREEMENT
2.3 If the electricity generated by the Customer and distributed back to the City during the
billing period, or any portion thereof, exceeds the electricity supplied by the City, then
the Customer shall be:
a) billed for the appropriate customer service charge as other customers of the City in
the same rate class; and
b) credited for the net excess kilowatt-hours generated during the billing period, with
this kilowatt-hour credit appearing on Customer's bill for the following billing
period.
2.4 At the beginning of each calendar year, any remaining unused kilowatt-hour credit
accumulated by the Customer during the previous year shall be granted to the City
without any compensation to the Customer.
2.5 Customer shall pay any amount owing for electric service provided by the City in
accordance with applicable rates and policies. Nothing in this Section 2 shall limit City's
rights under applicable Rate Schedules, Customer Service Policies, and General
Provisions.
3. INTERRUPTION OR REDUCTION OF DELIVERIES
3.1 The City may require Customer to interrupt or reduce deliveries as follows:
a) when necessary in order to construct, install, maintain, repair, replace, remove,
investigate, or inspect any of its equipment or part of its system; or
b) if it determines that curtailment, interruption, or reduction is necessary because of
emergencies, force or compliance with prudent electrical practices.
3.2 Whenever possible, the City shall give Customer reasonable notice of the possibility that
interruption or reduction of deliveries may be required.
3.3 Notwithstanding any other provision of this Agreement, if at any time the City
determines that either:
a) the facility may endanger City personnel, or
b) the continued operation of Customer's facility may endanger the integrity of the
City's electric system,
The City shall have the right to disconnect Customer's facility from the City's electric
system. Customer's facility shall remain disconnected until such time as the City is
satisfied that the condition(s) referenced in (a) or (b) of this section 3.3 have been
corrected.
4. CONNECTION
4.1 Customer shall deliver the excess energy to the City at the City's meter.
4.2 Customer shall pay for designing, installing, inspecting, operating, and maintaining the
electric generating facility in accordance with all applicable laws and regulations and
shall comply with the City's Connection Standards set forth in Appendix B, which is
attached hereto.
4.3 Customer shall pay for the City's standard watt-hour meter electrical hook-up, ifnot
already present.
4.4 Customer shall not commence parallel operation of the generating facility until written
approval of the connection facilities has been given by the City. Such approval shall not
be unreasonably withheld. The City shall have the right to have representatives
present at the initial testing of Customer's protective apparatus.
1201_01 wpd{5/3/01}
Page 2 of 5
.'
NET ENERGY METERING CONNECTION AGREEMENT
5. MAINTENANCE AND PERMITS
5.1 Customer shall:
a) maintain the electric generating facility and connection facilities in a safe and prudent
manner and in conformance with all applicable laws and regulations,
including, but not limited to, the City's Connection Standards, Appendix B,
and
b) have the system inspected by a qualified technician after 5, 8, 10 years of operation
and every two years thereafter, the latest inspection and test report to be available for
review by the City on request.
c) obtain any governmental authorizations and permits required for the construction and
operation of the electric generating facility and connection facilities. Permit
requirements, for this project, include:
o Electrical permit
o Building permit
o Clearing and grading permit
o SEP A
o Joint Aquatic Resources Permit.
5.2 Customer shall reimburse the City for any and all losses, damages, claims, penalties, or
liability it incurs as a result of Customer's failure to obtain or maintain any
governmental authorizations and permits required for construction and operation of
Customer's generating facility or failure to maintain Customer's facility as required
in (a) of this Section 5.
6. ACCESS TO PREMISES
The City may enter Customer's premises or property to:
a) inspect, with prior notice, at all reasonable hours, Customer's protective devices;
read meter; and
b) disconnect at the City's meter or transformer, without notice, the connection facilities
if, in the City's opinion, a hazardous condition exists and such immediate action is
necessary to protect persons, or the City's facilities, or property of others from
damage or interference caused by Customer's electric generating facilities, or lack of
properly operating protective devices or inability to inspect the same.
7. INDEMNITY AND LIABILITY
7.1 The Customer assumes the risk of all damages, loss, cost and expense and agrees to
indemnify the City, its successors and assigns, and its respective directors, offiyers,
employees and agents, from and against any and all claims, losses, costs, liabilities,
damages and expenses including, but not limited to, reasonable attorney fees, resulting
from or in connection with performance of the agreement or which may occur or be
sustained by the City on account of any claim or action brought against the City for any
reason including but not limited to loss to the electrical system ofthe Customer, caused
by or arising out of an electrical disturbance.
7.2 Such indemnity, protection, and hold harmless includes any demand, claim, suit or
judgement for damages, death or bodily injury to all persons, including officers,
employees or agents, and subcontractors of either Party hereto including payment made
under or in connection with any Worker's Compensation Law or under any plan for
employees' disability and death benefits or property loss which may be caused or
1201_01 wpd{5/3/01}
Page 3 of 5
!
.'
NET ENERGY METERING CONNECTION AGREEMENT
contributed to by the connection, maintenance, operation, use, presence, or removal of
Customer's equipment. The only exception will be liability occasioned by the sole
negligence or willful misconduct of the City or its employees acting within the scope of
their employment and liability occasioned by a partial negligence of the City or its
employees acting within the scope of their employment to the extent that such partial
liability is fixed by a court of competent jurisdiction.
7.3 The provisions of Section 7 shall not be construed to relieve any insurer of its obligations
to pay any insurance claims in accordance with the provisions of any insurance policy.
7.4 The City shall have no liability, ownership interest, control or responsibility for the
Customer's Electric Generating Facility or its connection with the City's electric system,
regardless of what the City knows or should know about the Customer's Electric
Generating Facility or its connection.
7.5 Customer recognizes that it is waiving immunity under Washington Industrial Insurance
law, Title 51 RCW, and further agrees that this indemnification clause has been mutually
negotiated. This indemnification shall extend to and include attorney's fees and the costs
of establishing the right of indemnification hereunder in favor of the City.
8. INDEPENDENT CONTRACTORS
The Parties hereto are independent contractors and shall not be deemed to be partners, joint
venturers, employees, franchisees or franchisers, servants or agents of each other for any
purpose whatsoever under or in connection with this Agreement.
9. GOVERNING LAW
This Agreement shall be interpreted, governed, and constructed under the laws of the State of
Washington as if executed and to be performed wholly within the State of Washington.
Venue of any action arising hereunder or related to this agreement shall lie in Clallam
County, Washington.
10. AMENDMENTS, MODIFICATIONS OR WAIVER
Any amendments or modifications to this Agreement shall be in writing and agreed to by
both Parties. The failure of any Party at any time or times to require performance of any
provision hereof shall in no manner affect the right at a later time to enforce the same. No
waiver by any Party of the breach of any term or covenant contained in this Agreement,
whether by conduct or otherwise, shall be deemed to be construed as a further or continuing
waiver of any such breach or waiver of the breach of any other term or covenant unless such
waiver is in writing.
11. APPENDICES
The Agreement includes the following appendices attached and incorporated by reference:
Appendix A:
Customer's Application for Net Metered Electrical Generation to City of Port
Angeles.
Appendix B:
City's Connection Standards for Customer Electric Generating Facilities of25
Kilowatts or Less.
1201_01 wpd{5/3/01}
Page 4 of 5
J .
NET ENERGY METERING CONNECTION AGREEMENT
12. NOTICES
All written notices shall be directed as follows:
City of Port Angeles:
Electrical Engineering Manager
321 East 5th Street
P.O. Box 1150
Port Angeles, W A 98362
Customer:
DOUj/q,S A-h f)'ltH111
Name
15/1 w. /O'f11 Sf.
Address
POf\t tPt~e!-eSJ WJJ. 1'63b3-/2D J
City, State & Ziif
Customer notices to the City, pursuant to this Section 13, shall refer to the Service Address
set forth in Appendix A.
14. TERM OF AGREEMENT
This Agreement shall be in effect when signed by the Customer and the City and shall
remain in effect thereafter month to month unless terminated by either Party on thirty (30)
days' prior written notice in accordance with Section 13.
15. SIGNATURES
IN WITNESS WHEREOF, the Parties hereto have caused two originals of this Agreement to
be executed by their duly authorized representatives.
This Agreement is effective as of the last date set forth below.
Si~~ ~
Doualo_~ A-h t11~ 11V1
~e
CITY OF PORT ANGELES:
~-/r/~
JAM cS L tI",;f.Pe"1'f
Print name
CUSTOMER:
Title
EJ.,Et:iIfIC ENt:INe-5~/A/t:. dllJA/""'GII?.
Title
16/1-~/OI
,
Date
I~ /J/ /0/
Date/ /
1201_01 wpd{5/3/01}
Page 5 of 5
I '
APPENDIX A
Application for Net Metered Electrical Generation
Thank you for your interest in establishing a renewable energy or fuel cell connection with
City of Port Angeles, Electric Utility. Please note generation systems must meet certain
requirements to be considered.
. The project must be not morea than 25 kilowatts (kW) in size.
. Generation must be fueled by solar, wind, hydropower or be a fuel cell.
. Owner provides power conditioning, connection, and safety equipment.
. Projects will be considered on a first come first served basis.
Please complete Customer and Installer Information and the appropriate section for the type
of generation proposed to be installed. In addition, include a one-line diagram and
description of protection equipment. Please allow at least ten working days for processing
your application. Questions may be directed to Electrical Engineering Manager, at telephone
number (360) 417-4702.
Customer Information
Owner Name:
Mailing Address:
City, State & Zip:
Email Address:
Service Address:
DOLl~ 11 #1t001
A5 II W. 10 tit -st.
P.rt II'ljef~ WA
4~WlQ"'1? @ -/:en t'w4W/.
'1 ~3 63
CDVI1
(If different than Mailing Address)
Daytime Telephone: war/::. (tOoUi'S,,..,) '-!t7-/3Sj
Electric Utility Account No.: (1410D 001
Expected System Operational Date: (0 /2.f I~ I
hlJJ,t1e 'f~7- <096,6
Installer Information (If dIfferent from Customer InformatIOn)
Installer Name: ~ Al1V11fln'1 4~J Bob (jl{dje/I (8065 K/ed-r/c)
Mailing Address:
City, State & Zip:
Email Address:
Daytime Telephone:
Drawings Attached:
o one line, 0 manufacturers literature, 0 design drawings.
1201_02 wpd{4/20/01}
10f3
, '
Fuel Cell Information
Fuel Cell Manufacturer:
Fuel Cell Model Number:
Fuel Cell's Rated Power Output (kW):
Inverter Manufacturer:
Inverter Model Number:
Inverter's Power Rating (kW):
(AC continuous)
(AC continuous)
.
Describe the protection equipment to be used and the physical location of the installation:
Drawings Attached:
D one line, D manufacturers literature, D design drawings.
Photovoltaic Solar System Information
PV Module Manufacturer: It.stY'b{JO Wer-
PV Module Model Number: A P I 'J.. 01,
PVPowerRatingperModule: I~O DC Watts
Inverter Manufacturer: Tf't:ll.e- El1jil1eeY','~
Inverter Model Number: pp - 5 w S-S'i~ I s
I
Inverter's Power Rating (kW): 5.5" k w
Number of Modules: g
Total Output: q6a DC Watts
(AC continuous)
Describe the protection equipment to be used and the hysical location of the installation:
~ e..... "8-1 wi#! i 11 Ver't--e.Y' is rn tt'te. Yll ,/I S h ~ mtJ4tft dn ' e d'J4t'ilje
t=/ec:tY'Ol1jc. a.utD ~f-{c.. au.'f; - is/qt( ll1~ pf'tJ1e.c::h'trn
A UfD 111~ tho A c tMtf~fer roe/a. y
Al.,to hta-h'c off a Cfyeu l.Y rej l.t.{,,1 /rvl
t~;::~~c tl;~~~~~ ~t1~~;
Drawines Attached:
D one line, J8( manufacturers literature, D design drawings.
1201_02 wpd{4/20/01}
20f3
.l 3 ~
Wind System Information
Wind Turbine Manufacturer: Sou+n We5 f W;~JjJOUIe'f"
,
Wind Turbine Model Number: Ai,.. l{03 }.1QY'lt/i!..
Wind Turbine Tower Height: -0- feet
Wind Turbine Rated Power Output (kW): .'i kw (Peak at 12 mph wind speed, or specify)
AC Source ( check one): ~ Inverter 0 Synchronous Generator 0 Induction Generator
Inverter Manufacturer (if using): .see. ptlje :A
Inverter Model Number:
Rotor Diameter:
q
feet
('I'")
<.ct""""
(AC continuous)
(AC continuous)
Inverter's Power Rating (kW):
System Rated Output (kW):
Describe the protection equipment to be used and the physical location of the installation:
s~ j1Q!1e '"
Drawings Attached:
o one line, pq manufacturers literature, 0 design drawings.
Small Hydro Power Information
Turbine Manufacturer:
Turbine Model Number:
Turbine Power Output (kW):
AC Source (check one): 0 Inverter 0 Synchronous Generator
Inverter Manufacturer (if using):
Inverter Model Number:
Inverter's Power Rating (kW):
System Rated Output (kW):
(AC continuous)
o Induction Generator
(AC continuous)
(AC continuous)
Describe the protection equipment to be used and the physical location of the installation:
Drawings Attached:
o one line, 0 manufacturers literature, 0 design drawings.
1201_02 wpd{4/20/01}
30f3
( .. . ~
APPENDIX B
CONNECTION STANDARDS
for
CUSTOMER ELECTRIC GENERATING FACILITIES
of not more than 25 KILOWATTS
A. General
This Appendix sets forth the requirements and conditions for interconnected non-utility-
owned electric generation where such generation may be connected for parallel operation
with the service of City of Port Angeles, Electric Utility (the City). For purposes of this
Appendix, the interconnecting entity shall be designated Customer.
B. Connection Requirements
1. Customer shall conform to all applicable National Electric Code (NEe) requirements
[NEC Articles 690 and 705] and bUilding codes, and shall obtain electrical permit(s) for
the equipment installation.
2. Customer shall have a dedicated lockable disconnect device between sources of
alternating-current, (Le. between inverter(s) or other power conditioning unit(s)) and the
City's distribution system.~ The lockable disconnect must be accessible tolhe City at all
times and only the City's lock may be used on it.
3. Customer's over current device at the service panel shall be marked to indicate power
source and connection to the City's distribution system.
4. Customer's power production control system shall comply with NEC Articles 690 and
705, Institute of Electrical and Electronics Engineers (IEEE) Standard P929 minimum
specifications, and standards for parallel operation with the City. In particular, the:
a. Power output control system shall automatically disconnect from the City's source
upon loss of the City's voltage and not reconnect until the City's voltage has been
restored by the City.
b. Power output control system shall automatically disconnect from the City's source if
Customer's voltage fluctuates beyond plus or minus 10 percent.
c. Power output control system shall automatically disconnect from the City's if
Customer's and the City's frequency fluctuates plus or minus 2 cycles per second
(Hertz).
d. Inverter output distortion shall meet IEEE Standard 519.
C. Safety
All safety and operating procedures for joint use equipment shall be in compliance with the
Occupational Safety and Health Administration (OSHA) Standard 29, CFR 1910.269, the
NEC, WAC rules, the Washington Industrial Safety and Health Administration (WISHA)
Standard, the City Service Requirements, and equipment manufacturer's safety and
operating manuals.
1201_03 wpd{4/20/01}
Trace Sinewave Multifunction Inverters
The Trace smewave mverters provIde smewave output wIth hIgh effIcIency, hIgh surge and low Idle current. WIth three
mIcro-processors and bI-dIrectIOnal power topology, It IS over 90% effIcient through most of ItS load range. peakmg at 96%
efficIency The "soft start" system allows the mverter to run heavIer loads wIth Improved relIabIlIty. The SW mverters
can be programmed to perform automatIc generator start and stop, automatIc load sensmg and generator support, and
mcludes protectIVe cIrcUItry whIch guards agamst downtIme IndIcators show over-current, over-temperature, short
cIrcUIt, and low and hIgh battery voltage condItIOns All Trace SW mverters mclude a bUIlt-m, fully automatIc, three-
stage battery charger, desIgned for maXImum chargmg and mmunum generator tIme and fuel 2 year warranty,
ETL lIsted to UL standards. SW Senes dimensIOns are: 15" X 22.5" X 9"
The PS Series is a hIgh-effIcIency mverter lIke the SW senes wIthout some of the "bells and whIstles" and at a lower
pnce Factory pre-set mverter and charger functIOns make thIS senes super-simple to operate Settmg adJustment and
field momtormg can be accomplIshed with the optIOnal Smewave Remote Control (SWRC) or Smewave Communications
Adapter (SWCA). The PS senes transfer relay IS rated at 50 Amps and IS
UL listed. PS Senes dImensions are 15.25" x 22.5" x 6.5"
SW SERIES AND PS SERIES INVERTERS
Trace Model
Batter
Volts
AC Volts/Hz
Continuous Charge
Watts Amps
150
120
60
75
130
65
Inventory
ID
30-303-027
30-303-028
30-303-029
30-303-030
30-303-047
30-303-050
I
1111111111111111 .
..
~ ~/{d 1 Ji_ ..,
',:.~-::a~
.. -
..
SW & PS SERIES ACCESSORIES
a
Trace Model Description Inventory ID Price
SWRC Remote Control for SW or PS with 25' cable 30-304 -031 $295
SWRC/50 Remote Control for SW or PS With 50' cable 30-304-032 $329
RC8/10 Remote Control for PS With 10" cable 30-304-046 $38
RC8/25 Remote Control for PS With 25" cable 30-304-047 $55
RC8/50 Remote Control for PS with 50" cable 30-304-028 $69
PSCB CondUit Box for PS serIes 30-304-041 $94
SWCB CondUit Box for SW serIes 30-304-043 $94
SWI Stackmg Cable for SW 01 PS 30-304-030 $45
SWI/PAR Smewave Parallel Stackmg Interface 30-303-032 $345
SWI/PARlE Smewave Parallel Stackmg Interface - export "E' & "W" models 30-300-038 $345
SWODE Outdoor Enclosure 30-304-0 I 0 $371
SWCA SW and PS CommUnicatIOns Adapter 30-303-031 $175
SW-D Display SW serIes mverter (non-operatIOnal) 30-304-044 $175
~
''''>,.~
lry,
, 43"-
~
4_-"~.'$':~::~_''ffl<__
"'" " " ~
, "
;y' ,,,, ^
><, ~ ~ ~ " -
A ,<?<,. \
I,~; ;>;
. . . . . ,>'~
. ,
, ,t
. . . I~
~
/, <; ~ :,,~ // ~> >> ; .~<< f;< %,
Trace Power Panels "' '" ;">J'~ *" 'Y.:-";V
. , ;~ ,. '"'2
The Power Panel System from Trace Engmeermg IS a preassembled, integrated
"balance of system" panel with a range of mverter capacitIes, charge controls, t
DC input voltages and AC output configuratIOns. The Trace Power Panel ;0$#
includes all National Electric Code reqUIred components, wirmg and safety
circuitry and is ETL Listed to UL standards. The inverter(s) and all AC and
DC safety equipment are mounted on a powdercoated steel backplate. Simply
mount the power panel on a wall, connect your batterIes, AC and DC inputs,
and AC loads and the system is operatIOnal. Input terminals for generator and PP-SW4024/D
utility power are easy to access. All of the systems are on the same size back-
plate. They differ in mverter power output, waveform and battery voltage. Dual inverter umts have 120/240
VAC output. Charge control(s) and battery cables are not mcluded. Order them below. A smgle charge
control can ~egulate a PV array of up to 1.4 kW @ 12 volts, 2.8 kW @ 24 volts and 5.6 kW @ 48 volts.
POWER PANELS
Model # ~uantity of Inverter Continuous Inf.ut Waveform Output Battery Inventory Price Power Panels are
nverters Power Vol age Charger ID for indoor use only.
PP-DRI512/S I DRI512 IS kW 12 VDC Modified SlOe 120 VAC 70 Amp 30-306-0 IS $1979 Because of their large
PP-DRI512/D 2 DRI512 3 kW 12 VDC Modified Sine 120/240 VAC 140 Amp 30-306-003 $3637 size. they will be
PP-DRI524/S I DRI524 15kW 24 VDC Modified Sine 120 VAC 35 Amp 30-306-006 $1879 shipped by truck.
PP-DRI524/D 2 DRI524 3 kW 24 VDC Modified SlOe 120/240 VAC 70 Amp 30-306-008 $3529 freight collect. They
PP-DR2412/S I DR2412 24kW 12 VDC Modified SlOe 120 VAC 120 Amp 30-306-018 $2295 come in a wood crate.
PP-DR24I 2/D 2 DR2412 48kW 12 VDC Modified Sine 120/240 VAC 240 Amp 30-306-004 $4337 or an optional plastic
PP-DR2424/S I DR2424 24kW 24 VDC Modified Sine 120 VAC 70 Amp 30-306-019 $2295 shipping box. Please
PP-DR2424/D 2 DR2424 48kW 24 VDC Modified SlOe 120/240 VAC 140 Amp 30-306-009 $4337 call for accurate I
PP-DR3624/S I DR3624 36kW 24 VDC Modified SlOe 120 VAC 70 Amp 30-306-007 $2529 delivery time
PP-DR3624/D 2 DR3624 72kW 24.VDC Modified Sine 120/240 VAC 140 Amp 30-306-0 10 $4795
PP-SW2512/S I SW2512 25 kW 12 VDC SlOe 120 VAC ISO Amp 30-306-002 $4089
PP-SW2512/D 2 SW2512 5kW 12 VDC SlOe 120/240 VAC 300 Amp 30-306-031 $7237
PP-SW4024/S 1 SW4024 4 kW 24 VDC Sine 120 VAC 120 Amp 30-306-034 $4995 Power Panels are
PP-SW4024/D 2 SW4024 8kW 24 VDC SlOe 120/240 VAC 240 Amp 30-306-033 $8995 custom made with
PP-SW4048/S I SW4048 4kW 48 VDC SlOe 120 VAC 60 Amp 30-306-012 $4995 your choice of options.
PP-SW4048/D 2 SW4048 8kW 48 VDC SlOe 120/240 VAC 120 Amp 30-306-035 $9137 Please allow 4 to 6
-4 I1'P-SW5548/S I SW5548 55 kW 48 VDC SlOe 120 VAC 70 Amp 30-306-013 $5695 weeks for delivery
.1 -"'''JA8/D 2 SW5548 II kW 48 VDC SlOe 120/240 VAC 140 Amp 30-306-037 $9995 on non-stock units.
POWER PANEL OPTIONS
Model # Description Inventory ID Price
PPO-C40 C40 DC charge or load controller lOstalled, lOcludes prewlred 60 amp DC breaker 30-306-026 $258
PPO-DVM/C40 Digital meter with LCD display lOstalled on the front of the C40 30-306-030 $99
PPO-CD IS IS amp DC load breaker prewlred and installed in the DC disconnect 30-306-027 $59
PPO-CD20 20 amp DC load breaker prewlred and lOstalled 10 the DC disconnect 30-306-028 $59
PPO-CD60 60 amp DC load breaker prewired and installed 10 the DC disconnect 30-306-029 $59
PPO-BC5-2/0 5 foot 2/0 AWe battery cable pair With flng termlOals (battery side only) and fleXible condUit 30-306-024 $83
PPO-BCIQ-2/0 10 foot 2/0 AWe battery cable pair With flng terminals (battery side only) and fleXible conduit 30-306-00 I $132
PPO-BC5-4/0 5 foot 4/0 AWe battery cable pair with ring termlOals (battery side only) and fleXible condUlt 30-306-025 $115
PPO-BCIQ-4/0 10 foot 4/0 AWe battery cable pair With flng termlOals (battery side only) and fleXible conduit 30-306-022 $182
PPO-BCI5-4/0 15 foot 4/0 AWe battery cable pair With flng termmals (battery side only) and fleXible condUit 30-306-023 $220
PPO-SB Heavy-duty plastic shippmg container, excellent as a battery box (ID 24"H X 46"L X 42"W) 30-304-025 $359
30
J~al U)~J
".
iJA.. c: ;1/1 ~~
-------------------------, r -.
r-- T81 0 D~TILlTY
0
LNO. 0 METER
-f~-~ AC IN I I
I <:~ .-"
AC IN 2 0 =
----, T <:
: t.- NO: w Q( w
NEU IN I I III ..... III
<: => <:
L.. I Z W z
NEU IN 2 0 ll. Z c..
I I @ MA~~
NEU OUT : [@] [5
I "V~TER I[ I PAlNllEl
I
AC OuT I ~ -
- ..., o MAIN 0
60 AMP 0
0
CLASS T I I 0
0
t H 60 A 01 10 30 A f-- 0
TB2 ELECTRIC
AUX RELAYS 00
IOAHP 1200VAC FURNACE H60 B 01 r030 B f-
RESISTIVE 00
- 10 I
0 RYIO NO C H 30 A 01 0
Leg ELECTRIC 0
0
0 I STOVE H 30 B 0 I 10 I
0
I COM 0 ~ J r
I
.. 0 NON CRITICALr- -j 15 A 0 I 10 I I
.. I
< RYI\ NO HOT TUB
..J I
... [ NC H 20 B 0 I 10 I
........ '" NON CRITICALf-
.. .~
'" 60AoI r030A I ELECTRIC I
<
..J
0 ..J HOT \JATER
;c
Z ::> RY9 NO I 60 B 0 I 10 30 B HEATER
<
I ~ LG
I COM
I W
0 -;;
0 f- RY7 NO
0 ~ L NC
I ~
I
I W ~ . r-;;
I
I > ::c
<
I -; RYB
I Z NO
I
I ~ [ Nt: S~IEL
0 ..........
0 ~ . H;::
0
$ 0 300 AMP @ @ Q)
0
r REMOTE 0.-+-- CLASS T T220 A 01
I STACKING 0 ! ~TTERY DEEP \JELL 11/ I 15 00
I PUMP <240V)
r BAT TEMP DISCONNECT 00
I I -. 0
0 20 A 01
BAT .. +1 TABLE SA\J r 00
:- I I I -
0 BAT - I I ] SHOP PO'w'ER r 00
0 0
I 0
: DC GND AC GND : COMPUTER. 15 A 01 /~
L___:~~-------~-------J -= OUTLETS.
SECURITY .
REFRIGERA TOR 20 A 01
~ PELLET STOVE
I GAS HEAT F'AN
GARAGE DOORS
oC] 0000
0000 a- - <: => Z
Z .....=> a Q( a Cl
o c:::J c::J a aU U ..... ~20V /Arc ~ ~H/ASfE SVSrE
x x~ z" ~..... >-
6 o:U s:t: ~ ~ t;
U ww..... a L.. G~~lO rcOlN][NlfECrfElO W~rH
~L:J -, <t
0:<: Zz '"
~~ !::9 G[E[N]fE~/ArO[R [B3/ACCKU~
"'w ELECTRIC START
120VAC GENERA TOR SCSVIN$3.OVG
PUBLIC PO\JER
r
I
I
I
I
1M
7. SPECIFICA TIONS
7.1 Technical Specifications
Rotor Diameter:
Weight:
Start up wind speed:
Rated Power:
Regulator Set Range:
Recommended Fuse Size:
Yaw Wire Size:
Pole Dimensions:
Minimum Battery Bank:
,h
'i,
I
"
"
;,
jl
I:
J
i
I,
r
I
I
I'
/.
:\
I
I
1
I
i
I'
i
II
I:
.!l
46 inches (1. 17 meters)
13 lb. (6kg)
7 mph (3.0 m/s)
400 watts at 28 mph (12.5 m/s)
12v 13.8v - 17.8v preset to 14 1v
24v 27.6v - 35.6v preset to 28 2v
36v 41.4v - 53.4v preset to 42.3v
48v 55.2v - 71.2v preset to 56 4v
12v - 100 amps slow-blow
24v - 50 amps slow-blow
36v - 35 amps slow-blow
48v - 25 amps slow-blow
#10 A WG (American Wire Gage) stranded.
1 % Schedule 40 pipe (outside diameter 1.875 inch, 48mm)
400 amp hours (12v)
200 amp hours (24v)
AIR marine Power Curve
900.00
800.00
700.00
600.00
~ 500.00
C'G 400.00
3: 300.00
200.00
100.00
0.00
o
---- -
~ ~--- -
/
)
/
I
i/
./
~ " -\.
. ~
~ ~ H-I-~-t
I "
ii,
,111
, L
I
:'
'1
5 10 15 20 25 30 35 40 45 50 55 60
Wndspeed at Sea Level (Miles Per Hour)
26