HomeMy WebLinkAbout1718 Lambert Ln - Engineering
of:~tRT.v"
t::"'~~t;.
, <;;r_____ '"
." ,. '&ii
... --
""<~
CITY OF PORT ANGELES
PUBLIC WORKS - UTILITIES DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
05-00
Application Number
Pin number
Property Address
ASSESSOR PARCEL NUMBER:
Application description
Subdivision Name
Property Use
Property Zoning .
Application valuation
05-00000006 Date
.484896
1718 LAMBERT LN
06-30-14-6-5-0190-0000-
RES NEW SFR
RESIDENTIAL HIGH DENSITY
112130
Owner
Contractor
JONES, SHIRLEY L ANDERSON HOMES LLC
5114 PT. FOSDICK DR. N. W. 618 SOUTH PEABODY
GIG HARBOR WA 98335 PORT ANGELES
(253) 851-5346 (360) 452-4641
Structure Information NEW 1459 SF SFR WiATT GARAGE
Construction Type TYPE V NON-RATED
Occupancy Type SINGLE FAM & CONGREGATES
Other struct info TOTAL % LOT COVERAGE
CONSTRUCTION TYPE V-N
NUMBER OF STORIES
EXISTING LOT COVERAGE
LOT SIZE
PROPOSED LOT COVERAGE
TOTAL LOT COVERAGE
NUMBER OF UNITS
Permit
Additional desc
Permit Fee
Issue Date
Expiration Date
DRIVEWAY INSTALLATION
145.00
1/14/05
7/13/05
Plan Check Fee
valuation
1/14/05
JI18~~
:s:~
WA 98362
37.91
1. 00
1. 00
5035.00
1909.00
1909.00
1. 00
\'<^
~
"~ O~ J'\
,n~ I\~ ~
(}lV (; rxDVJ
~Ol
S jf)
o/1( \0 1
~
r\~ Jf
.00
o
_________Qt~_._un~:_~~::~:__:::__B~:~_~~~______________________ ~t~:;i~
Permit PUBLIC WORKS RES WATER SERV
Additional desc DROP IN METER
Permit Fee 150.00 Plan Check Fee .00
Issue Date 1/14/05 valuation 11213034
Expiration Date 7/13/05
_________~:~___u~~:_~~::~:__:::__~~:~_~~~_________________________~~~~i~~
Permi t SANITARY SEWER HOOK UP
Additional desc
Permit Fee
Issue Date
Expiration Date
95.00
1/14/05
7/13/05
plan Check Fee
Valuation
Qty Unit Charge Per
1.00 95.0000 EA SAN SEWER HOOKUP
Special Notes and Comments
Building address sign shall not be less than 6" & not more
than 12" in height. Numbers colors must contrast with wall
color they are mounted on. (Ord. 14.36.050-E)
.00
11213034
Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned
for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last
inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. AIi provisions of
laws and ordinances governing this type of work wili be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Signature of Contractor or Authorized Agent
Date
T:\Policies\1102.15R [1/05]
Signature of Owner (if owner is builder)
Date
<1fl':llT~
,.i~~~
r~
.. --
'toi;;Oii"
CITY OF PORT ANGELES
PUBLIC WORKS - UTILITIES DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Application Number . . . . . 05-00000006
Pin number . . .484896
Page
Date
2
1/14/05
Special Notes and Comments
when roof gutters are installed, drains will located in dry
wells or piped to approved storm drain locations.
New subdivision outside the four minute response time shall
be equipped with a residential sprinkler system that is
installed and maintained in accordance with Uniform Fire
Code (UFC) and National Fire Protection Association(NFPA)
standards.
Proposal is for a single family residence w/attached garage
in the RHO in a PRO. The PRO allows an increase in lot
coverage for this property. No land use issues are noted.
Public.works electrical engineering has no requirements for
this plan review. Electric Service Connection Fee Applies.
sanitary sewer connection inspection is required by
Public Works prior to back fill of ditch.
---------------------------------------------------------------~--
Other Fees . . . . . . . . . SEWER SYSTEM DELV CHARGE 745.
STATE SURCHARGE 4.5!L
PW WATER SYSTEM USE FEE ~1025.00 ~
Fee summary Charged Paid Credited Due
----------------- ---------- ---------- ---------- ----------
Permit Fee Total 390.00 390.00 .00 .00
Plan Check Total .00 .00 .00 .00
Other Fee Total 1774.50 1774.50 .00 .00
Grand Total 2164.50 2164.50 .00 .00
Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes
nu!l and void.if ""ork l1!:f9nstruction authorized is not commenced IVithin 180 days, if construction or work is suspended or abandoned
for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last
inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of
laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Signature of Contractor or Authorized Agent
Date
Signature of Owner (if owner is builder)
Date
T:\PoJicies\II02.15R {I/OS]
f*.~-.R.T~~.
rY'~~
r.
~--
~<<:~
CITY OF PORT ANGELES
PUBLIC WORKS - UTILITIES DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Application Number
pin number . . . .
Property Address
ASSESSOR PARCEL NUMBER:
Application description
Subdivision Name
Property Use
Property Zoning . . .
Application valuation
05-00000006 Date
.484896
1718 LAMBERT LN
06-30-14-6-5-0190-0000-
RES NEW SFR
1/14/05
RESIDENTIAL HIGH DENSITY
112130
Owner
Contractor
JONES, SHIRLEY L
5114 PT. FOSDICK DR. N. W.
GIG HARBOR WA 98335
(253) 851-5346
Structure Information
Construction Type
Occupancy Type
Other struct info
ANDERSON HOMES LLC
618 SOUTH PEABODY
PORT ANGELES
(360) 452-4641
NEW 1459 SF SFR WiATT GARAGE
TYPE V NON-RATED
SINGLE FAM & CONGREGATES
TOTAL % LOT COVERAGE
CONSTRUCTION TYPE
NUMBER OF STORIES
EXISTING LOT COVERAGE
LOT SIZE
PROPOSED LOT COVERAGE
TOTAL LOT COVERAGE
NUMBER OF UNITS
WA 98362
37.91
V-N
1. 00
1. 00
5035.00
1909.00
1909.00
1. 00
Permit
Additional desc
Permit Fee
Issue Date
Expiration Date
DRIVEWAY INSTALLATION
145.00
1/14/05
7/13/05
Plan Check Fee
Valuation
.00
o
BASE FEE
Extension
145.00
Qty
Unit Charge Per
Permit
Additional desc
Permit Fee
Issue Date
Expiration Date
PUBLIC WORKS RES WATER SERV
DROP IN METER
150.00 Plan Check Fee
1/14/05 Valuation
7/13105
.00
11213034
BASE FEE
Extension
150.00
Qty
Unit Charge Per
Permit SANITARY SEWER HOOK UP
Additional desc
Permit Fee 95.00 Plan Check Fee .00
Issue Date 1/14/05 Valuation 11213034
Expiration Date 7/13/05
Qty Unit Charge Per Extension
1. 00 95.0000 EA SAN SEWER HOOKUP 95.00
Special Notes and Comments
Building address sign shall not be less than 6" & not more
than 12" in height. Numbers colors must contrast with wall
color they are mounted on. (Ord. 14.36.050-E)
Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned
for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last
inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of
laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
constructlon r
~f\ f !~( -/4-c0
Signature of Contractor or Authorized Agent Date Signature of Owner (if owner is builder) Date
T:\Policies\1102.l5R [1/05]
PERMIT INSPECTION RECORD
CALL 417-4807 FOR UTILITY INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. IT IS UNLAWFUL TO COVER,
INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCA nON.
KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE
INSPECTION TYPE DATE ACCEPTED COMMENTS
YES NO.
PW UTILITIES (Engineering Division)
WATERLINE I METER
SEWER CONNECTION
SANITARY
STORM
SITE DRAINAGE
SITE EROSION CONTROL
PARKING
SIDEWALK
CURB & GUTTER
DRIVEWAY APPROACH
BACK-FLOW DEVICE I I
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/uSE
RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED
YES NO
CONSTRUCTION R.W.I PWI CONSTRUCTION - R.W.
ENGINEERING 417-4807 PW I ENGINEERING
FIRE 417-4653 FIRE DEPT.
PLANNING DEPT. 417-4750 PLANNING DEPT.
BUILDING 417-4815 BUILDING
T:\Policies\1102.l5R [1105]
";'.ll"RT ~
~
~--
~<<:~
CITY OF PORT ANGELES
PUBLIC WORKS - UTILITIES DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Application Number . . . . . 05-00000006
Pin number . . . . . . .484896
Page
Date
2
1/14/05
Special Notes and Comments
When roof gutters are installed, drains will located in dry
wells or piped to approved storm drain locations.
New subdivision outside the four minute response time shall
be equipped with a residential sprinkler system that is
installed and maintained in accordance with Uniform Fire
Code (UFC) and National Fire Protection Association(NFPA)
standards.
proposal is for a single family residence wlattached garage
in the RHD in a PRD. The PRD allows an increase in lot
coverage for this property. No land use issues are noted.
Public works electrical engineering has no requirements for
this plan review. Electric Service Connection Fee Applies.
Sanitary sewer connection inspection is required by
Public Works prior to back fill of ditch.
Other Fees
SEWER SYSTEM DELV CHARGE
STATE SURCHARGE
PW WATER SYSTEM USE FEE
745.00
4.50
1025.00
Fee summary Charged Paid Credited Due
----------------- ---------- ---------- ---------- ----------
Permit Fee Total 390.00 390.00 .00 .00
plan Check Total .00 .00 .00 .00
Other Fee Total 1774.50 1774.50 .00 .00
Grand Total 2164.50 2164.50 .00 .00
Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned
for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last
inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of
laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Signature of Contractor or Authorized Agent
Date
Signature of Owner (if owner is builder)
Date
T:\Policies\1102.l5R [1/05]
PERMIT INSPECTION RECORD
...
~
CALL 417-4807 FOR UTILITY INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. IT IS UNLAWFUL TO COVER,
INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCATION.
KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE
INSPECTION TYPE DATE ACCEPTED COMMENTS
I YES I NO
PW UTILITIES (Engineering Division)
WATERLINE I METER
SEWER CONNECTION
SANITARY
STORM
SITE DRAINAGE
SITE EROSION CONTROL
PARKING
SIDEWALK
CURB & GUTTER
DRIVEWAY APPROACH
BACK-FLOW DEVICE I
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCYIUSE
RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED
YES NO
CONSTRUCTION R.W. I PWI CONSTRUCTION - R.W.
ENGINEERING 417-4807 PW I ENGINEERING
FIRE 417-4653 FIRE DEPT.
PLANNING DEPT. 417-4750 PLANNING DEPT.
BUILDING 417-4815 BUILDING
T:\Policies\ll02.15R [1105]