HomeMy WebLinkAbout1107 Georgiana Street Address:
1107 Georgiana Street
( c 9 ,� G0-0 7-C e--4, S�
PREPARED 6/11/15, 11:08:04 INSPECTION TICKET PAGE 2
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 6/11/15
------------------------------------------------------------------------------------------------
ADDRESS . : 1107 GEORGIANA ST SUBDIV:
CONTRACTOR : PHONE
OWNER CL CNTY PUBLIC HOSPITAL DIST 2 PHONE
PARCEL 06-30-00-8-1-0135-0000-
APPL NUMBER: 15-00000600 RE-ROOF
------------------------------------------------------------------------------------------------
PERMIT: BNOP 00 BUILDING PERMIT - NO PR FEE
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
--------------------- ---------------------------------—------------------------—- ---
BL99 01 6/11/15 J BLDG FINAL
June 11, 2015 11:11:31 AM jlierly.
ROB GALE 460-1284
i
-------------------------------------- COMMENTS AND NOTES
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Application Number . . . . . 15-00000600 Date 5/28/15
Application pin number . . . 455400
AddressProperty
ASSESSOR PARCELNUMBER: 06o30G00RA
8I1N--0135-0000- REPORT SALES TAX
Application type description RE-ROOF on your state excise tax form
Subdivision Name . . . . . .
Property Use . . . . . . . . to the City of Port Angeles
Property Zoning . . . . . . . COMMERCIAL OFFICE (Location Code 0502)
Application valuation . . . . 3600
Application desc
tear off comp single
----------------------------------------------------------------------------
Owner Contractor
CL CNTY PUBLIC HOSPITAL DIST 2 OWNER
DBA OLYMPIC MEDICAL CENTER
939 CAROLINE ST
PORT ANGELES WA 98362
--------------------------------- ------------------------------------------
Permit . . . . . . BUILDING PERMIT - NO PR FEE
Additional desc . . TEAR OFF COMP SHINGLE
Permit Fee . . . . 123.75 Plan Check Fee .00
Issue Date . . . . 5/28/15. Valuation . . . . 3600
Expiration Date . . 11/24/15
Qty Unit Charge Per Extension
BASE FEE 95.75
2.00 14.0000 THOU BL-2001-25K (14 PER K) - 28.00
\ - ---------------------- -
Other Fees . . . . . . . . . STATE SURCHARGE 4.50
-------------- -----------------------------
Fee summary Charged Paid Credited Due
---------- ---------- ---------- ---------- ----------
Permit Fee Total 123.75 123.75 .00 .00
Plan Check Total .00 .00 .00 .00
Other Fee Total 4.50 4.50 .00 .00
Grand Total 128.25 128.25 .00 .00
t\
N
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
Oof laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
Q construction.
\ Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
f
}
BUILDING PERMIT INSPECTION RECORD
— PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS —
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Stemwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-in
Water Line Meter to Bldg)
Gas Line
Back Flow/Water FINAL Date Accepted b
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders/Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall Interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pum /Furnace/FAU/Ducts
Rough-In
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts FINAL Date Accepted b
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parkin /Lighting ESA:
Landscaping SHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction- R.W. PW /Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
T:Forms/Building Division/Building Permit
THE 1 'ORT
LGELES
For City Use
CITY OF j\ j 1
Permit# &OD
WASH I N G T O N, U. S. Date Received: -Lail e—'
321 E 5th Street Date Approved 1 C0--
Port Angeles,WA 9836
P:360-417-4817 F:360-417-4711
Email:permits@cityofpa.us BUILDING PERMIT A PLICATION
Project Address: 1107 eos � S4
Phone: .3 bo L468 - 12QL/
Primary Contact: 206 (9 4I Email: ,e of ,z wt`c-4� • ��
Name U Phone (9 3
( t (o
Property Mailing Addrest Email
Owner 231 C-Ld-ol'oteSl-
City State Zip
Name Phone
Contractor Address Email
Information city State Zip
Contractor License# Exp.Date:
Legal Description: Zoning: Tax Parcel # Project Value: (materials and labor)
$ 3�
Residential ❑ Commercial Industrial ❑ Public ❑
Permit Demolition ❑ Fire ❑ Repair ❑ Reroof(tear off/lay over)
Classification For the following, fill out both pages of permit application:
(check New Construction ❑ Exterior Remodel ❑ Addition ❑ Tenant Improvement ❑
appropriate) Mechanical ❑ Plumbing ❑ Other ❑
Fire Sprinkler System Proposed Irrigation System Proposed orProposed Bathrooms Proposed Bedrooms
or Existing? Yes 0 No 13 Existing? Yes 0 No O
In addition to standard hard copy submittals please send a PDF copy of all Stormwater plans and Engineering to
www.stormwaterPcityofpa.us
Project Description ec , 0-F - la er 0,P AS-j--,
6 r: 46co. CCl at 61., k �� i 4� S-
Is project in a Flood Zone: Yes ❑ NoEL Flood Zone Type:
If in a Flood Zone, what is the value of the structure before proposed improvement? $
I have read and completed the application and know it to be true and correct. I am authorized to apply for
this permit and understand that it is my responsibility to determine what permits are required and to
obtain permits prior to work. I understand that plan review fees are not refundable after review has
occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is
issued. I understand that if the permit is not picked up/issued within i8o days of submittal,the application
will be considered abandoned and the fees will be forfeited.
Date -57/Zl Print Name )2a5 (Oct L Si nature �.
a
Residential Structures
Existing Proposed Construction For Office Use
Area Descriptions(SQ FT) Floor area Floor area $Value new area
Basement
First Floor
Second Floor
Covered Deck/Porch/Entry
Deck(over 30" or z" floor)
Garage
Carport
Other(describe)
Area Totals
Commercial Structures
Area Descriptions(SQ FT) Existing Proposed Construction For Office Use
Floor area Floor area $Value new area
Existing Structure (s)
Proposed Addition
Tenant Improvement?
Other work(describe)
Site Area Totals
Lot/Site Coverage Calculations
Lot Size(sq ft) Lot Coverage (sq ft)foot print of %Lot Coverage (Total lot cov_lot size) Max Bldg Height
all structures sq ft
Site Coverage(Sq Ft of all impervious) %of Site Coverage (total site cov_lot size)
Mechanical Fixtures
Indicate how many of each type of fixture to be installed or relocated as part of this project.
Air Handler Size: # Haz/Non-Haz Piping Outlets:
Appliance Exhaust Fan # Heater(Suspended,Floor, Recessed wall) #
Boiler/Compressor Size: # Heating/Cooling appliance #
repair/alteration
Evaporative Cooler(attached,not # Pellet Stove/Wood-burning/Gas #
portable) Fireplace/Gas Stove/Gas Cook Stove/Misc.
Fuel Gas Piping #of Outlets: Ventilation Fan,single duct #
Furnace/Heat Pump/ Size: # Ventilation System #
Forced Air Unit
Plumbing Fixtures
Indicate how many of each type of fixture to be installed or relocated
Plumbing Traps # Water Heater #
Plumbing Vent piping # Medical gas piping #of Outlets:
Water Line # Fuel gas piping #of Outlets:
Sewer Line # Industrial waste pretreatment
interceptor Grease Trap) Size
Other(describe):
T:\BUILDING\APPLICATION FORMS\Current BP Application\Building Permit4-17-13.docx