HomeMy WebLinkAbout1109 W. 5th Street Address:
1109 W 511 Street
PREPARED 8/02/16, 8:06:54 INSPECTION TICKET PAGE 3
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 8/02/16
------------------------------------------------------------------------------------------------
ADDRESS . : 1109 W 5TH ST SUBDIV:
CONTRACTOR : PHONE
OWNER WEBSTER, TTE FRANK E PHONE r .
PARCEL 06-30-00-0-1-1265-0000-
APPL NUMBER: 15-00001042 SIDING
------------------------------------------------------------------------------------------------
PERMIT: BNOP 00 BUILDING PERMIT - NO PR FEE
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
---------------------- --- -—------—----------------------—--------------------—------—--
BL99 01 8/02/16 BLDG FINAL
August 2, 2016 8:08:34 AM jlierly.
Burke
------------------------ - ----Burke COMMENTS AND NOTES
%w. CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY&ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES,WA 98362
Application Number . . . . . 15-00001042 Date 8/17/15
Application pin number . . . 290252 REPORT SALES TAX
Property Address . . . . . . 1109 W 5TH ST
ASSESSOR PARCEL NUMBER: 06-30-00-0-1-1265-0000- on your State excise tax form
Application type description SIDING to the City of Port Angeles
Subdivision Name . . . . . .
Property Use . . . . . . . . (Location Code 0502)
Property Zoning . . . . . . . RS7 RESDNTL SINGLE FAMILY
Application valuation . . . . 2400
----------------------------------------------------------------------------
Application desc
New siding
----------------------------------------------------------------------------
Owner Contractor
------------------------ ------------------------
WEBSTER, TTE FRANK E OWNER
1109 W 5TH ST
PORT ANGELES WA 983632003
----------------------------------------------------------------------------
Permit . . . . . . BUILDING PERMIT - NO PR FEE
Additional des . . NEW � �ICAr
Permit Fee . 109109.75 Plan Check Fee .00 "
Issue Date . . . . 8/17/15 Valuation . . . . 2400 % .
Expiration Date x/13/16
. . k
Qty /
Q y Unit Charge Per Extension
BASE FEE 95.75
1.00 14.0000 THOU BL-2001-25K (14 PER K) 14.00
---------------------------------------------------------------------------- 0
Other Fees . . . . . . . STATE SURCHARGE 4.50
----------------------------------------------------------------------------
Fee summary Charged Paid Credited Due
----------------- ---------- ---------- ---------- ----------
Permit Fee Total 109.75 109.75 .00 .00
Plan Check Total .00 .00 .00 .00
Other Fee Total 4.50 4.50 .00 .00
Grand Total 114.25 114.25 .00 .00 (x,
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized isnot commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced,or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
15 '--\j ,
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS--
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL.TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Stemwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-In
Water Line Meter to Bldg)
Gas Line
t Back Flow/Water FINAL Date Accepted b
+� AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders/Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall Interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pum /Furnace/FAU/Ducts
Rough-In
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts FINAL Date Accepted b
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parkin /Lighting ESA:
Landscaping SHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction-R.W. PW I Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
T:Form s/Building Division/Building Permit
THE P1'
ORT NGELES For City Use /v ysCITY O
P rmit#
W A S H I N G� T O N, U . S.
ate Received:
321 E 51h Street Date Approved
Port Angeles,WA 9836
P:360-417-4817 F:360-417-4711
Email:permitsOcityofpa.us BUILDING PERMIT A PLICATION
Project Address:
ilk � 5
Phone:
Primary Contact: gv Email:
Name Phone L't
Property Mailing Ad ress Email
Owner '
City State Zip
Name Phone
Contractor Address Email
Information city State Zip .i
Contractor License# Exp.Date:
Legal Description: Zoning: Tax Parcel # Woject Value: (materials and labor)
i vio . - a-J4M b
Residential Commercial ❑ Indut al ❑ Public ❑
Permit Demolition ❑ Fire ❑ Repair ❑ Reroof(tear off/lay over) ❑
Classification For the following, fill out both pages of permit application:
(check New Construction ❑ Exterior Remodel 0 Addition ❑ Tenant Improvement ❑
appropriate) Mechanical ❑ Plumbing ❑ Other ❑
Fire Sprinkler System Proposed Irrigation System Proposed or Proposed Bathrooms Proposed Bedrooms
or Existing? Yes 0 No V Existing? Yes 0 No
In addition to standard hard copy submittals please send a PDF copy of all Stormwater plans and Engineering to
www.stormwaterocityofpa.us
Project Description S'rp
Is project in a Flood Zone: Yes 0 NoJ9 Flood Zone Type:
If in a Flood Zone,what is the value of the structure before proposed improvement? $
I have read and completed the application and know it to be true and correct. I am authorized to apply for
this permit and understand that it is my responsibility to determine what permits are required and to
obtain permits prior to work. I understand that plan review fees are not refundable after review has
occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is
issued. I understand that if the permit is not picked up/issued within i8o days of submittal,the application
will be considered abandoned and the fees will be forfeited.
Date Print Name Signature
Residential Structures
Existing Proposed Construction For Office Use
Area Descriptions(SQ FT) Floor area Floor area $Value new area
Basement
First Floor
Second Floor
Covered Deck/Porch/Entry
Deck(over 30"or i" floor)
Garage
Carport
Other(describe)
Area Totals
Commercial Structures
Area Descriptions(SQ FT) Existing Proposed Construction For Office Use
Floor area Floor area $Value new area
} Existing Structure (s)
Proposed Addition
Tenant Improvement?
Other work(describe)
Site Area Totals
7-
Lot/Site Coverage Calculations
Lot Size(sq ft) Lot Coverage(sq ft)foot print of %Lot Coverage (Total lot cov_lot size) Max Bldg Height
all structures sq ft
Site Coverage(Sq Ft of all impervious) %of Site Coverage (total site cov_lot size)
Mechanical Fixtures
Indicate how many of each type of fixture to be installed or relocated as part of this project.
Air Handler Size: # Haz/Non-Haz Piping Outlets:
Appliance Exhaust Fan # Heater(Suspended,Floor,Recessed wall) #
Boiler/Compressor Size: # Heating/Cooling appliance #
repair/alteration
Evaporative Cooler(attached,not # Pellet Stove/Wood-burning/Gas #
portable) Fireplace/Gas Stove/Gas Cook Stove/Mise.
Fuel Gas Piping #of Outlets: Ventilation Fan,single duct #
Furnace/Heat Pump/ Size: # Ventilation System #
Forced Air Unit
Plumbing Fixtures
Indicate how many of each type of fixture to be installed or relocated
Plumbing Traps # Water Heater #
Plumbing Vent piping # Medical gas piping #of Outlets:
Water Line # Fuel gas piping #of Outlets:
Sewer Line # Industrial waste pretreatment
interceptor Grease Trap) Size
Other(describe):
T:\BUILDING\APPLICATION FORMS\Current BP Application\Building Permit 4-17-13.docx
I:. CITY OF PORT ANGELES `
DEPARTMENT OF COMMUNITY& ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Application Number . . . . . 15-00000125 Date 2/11/15 ✓�
Application pin number . . . 705500 I
Property Address . . . . . . 1109 W 5TH ST
ASSESSOR PARCEL NUMBER: 06-30-00-0-1-1265-0000-
Application type description RES MECHANICAL PERMIT REPORT SALES TAX
Subdivision Name . . . . . . on your State excise tax form
Property Use . . . . . . . .
Property Zoning . . . . . . . RS7 RESDNTL SINGLE FAMILY to the City of Port Angeles
Application valuation 5700 (Location Code 0502)
PP . .
Application desc
WOOD BURNING FIREPLACE INSERT
------------------------------------------------------=---------------------
Owner Contractor
------------------------ ------------------------
WEBSTER, TTE FRANK E EVERWARM INC.
1109 W 5TH ST 257151 HWY101
PORT ANGELES WA 983632003 PORT ANGELES WA 98362
(360) 452-3366
-------------------------------- -------------------------------------------
Permit . . . . . . MECHANICAL PERMIT
Additional desc WOOD STOVE INSERT
Permit Fee 60.65 Plan Check Fee .00
Issue Date . . . . 2/11/15 Valuation . . . . 0
Expiration Date 8/10/15
Qty Unit Charge Per Extension
BASE FEE 50.00
1.00 10.6500 EA ME-STOVE/FIREPLACE/MISC. APP. 10.65 r`
----------------------------------------------------------------------------
Special Notes and Comments
Per Washington State Code 51-51-315, j
installation of Carbon Monoxide
detector(s) is required if you are
installing or replacing a fuel burning
appliance (wood, pellet., gas)and must be
in place prior to the final inspection
of this permit. They are required to be
place directly outside of each sleeping ,
area and at least one on each floor of
the house.
--------------------------=--------------------------------------------- ---
Fee summary Charged Paid Credited Due \�
----------------- ---------- ---------- --------`- ----------
Permit Fee Total 60.65 60.65 .00 .00
Plan Check Total .00 .00 .00 .00 t*
Grand Total 60.65 60.65 .00 .00
Ul
V\
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for aerlod of 180 days after the work has commence
p y d, or if required inspections have not been q p e n requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
— PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Stemwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-In
Water Line Meter to Bldg)
Gas Line
Back Flow/Water FINAL Date Accepted b
AIR SEAL:
.� Walls
Ceiling
FRAMING:
Joists/Girders/Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall Interior Braced Panel Onl
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pum /Furnace/FAU/Ducts
Rough-in
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts FINAL Date Accepted b
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parkin /Lighting ESA:
Landscaping SHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction-R.W. PW I Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
T:Forms/Building Division/Building Permit
THEy
For City U
pise
CITY OF
f LE$�
-
Permit# /16 125
W ASH I NGTON, U. S. Date Received:
321 E 5th Street Date Approved
Port Angeles,WA 9836
P:360-417-4817 F:360-417-4711
Email:permitsMcitj F-- — BUILDING PERMIT APPLICATION
Project Address: i i C 1:,-) S+-\.
Phone:
Primary Contact: &0AyQ
Email:
Name Phone
Property —mailing Ad&ess Email
Owner I r
UOCG� (0,4-,,
City State Zip
Pop,,T Afo! Lit �,Ao(',. '--)?A(c:�
4
Name — Phone
Contractor Address Email
Information cit. State Zip
Contractors License# Exp.Date:
Legal Description: Zoning: Tax Parcel # Project Value: (materials and labor)
$
Residential Commercial 11 Industrial 11 Public 11
Permit Demolition ❑ Fire 1:1 Repair 0 Reroof(tear off/lay over) 0
Classification For the following, fill out both pages of permit application:
(check New Constru ti n 13 Exterior Remodel 11 Addition 11 Tenant Improvement ❑
appropriate) Mechanical XPIumbing 1:1 Other 0
Fire Sprinkler System? Irrigati6n System? Proposed Bathrooms Proposed Bedrooms
Yes 0 No A Yes 13 No PL
Project Description
Is project in a Flood Zone: Yes [3 No13 Flood Zone Type:
If in a Flood Zone, what is the value of the structure before proposed improvement? $
1 have read and completed the application and know it to be true and correct. I am authorized to apply for
this permit and understand that it is my responsibility to determine what permits are required and to
obtain permits prior'to work. I understand that plan review fees are not refundable after review has
occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is
issued. I understand that if the permit is not picked up/issued within i8o days of submittal,the application
will be considered abandoned and the fees will be forfeited.
Date Print Name Signature
Residential Structures
Existing Proposed Construction For Office Use
Area Descriptions(SQ FT) Floor area Floor area $Value new
area
Basement
First Floor
Second Floor
Covered Deck/Porch/Entry
Deck(over 30" or i" floor)
Garage
Carport
Other(describe)
Area Totals
Commercial Structures
Construction For Office Use
Area Descriptions(SQ FT) Existing Proposed $Value new
Floor area Floor area area
Existing Structure (s)
Proposed Addition
Tentint Improvement?
Other work(describe)
Site Area Totals
Lot/Site Coverage Calculations
Lot Size (sq ft) Lot Coverage(sq ft) %Lot Coverage(Total lot cov_lot size) Max Bldg Height
Site Coverage (Sq Ft of all impervious) %of Site Coverage(total site cov_lot size)
Mechanical Fixtures
Indicate how many of each type of fixture to be installed or relocated as part of this project.
Air Handler Size: # Haz/Non-Haz Piping Outlets:
Appliance Exhaust Fan # Heater(Suspended,Floor,Recessed wall) #
Boiler/Compressor Size: # Heating/Cooling appliance #
repair/alteration
Evaporative Cooler(attached,not # Pellet Stove/Wood-burning/Gas #
portable) Fireplace/Gas Stove/Gas Cook Stove/Misc.
Fuel Gas Piping ( #of Outlets: Ventilation Fan,single duct #
Furnace/Heat Pump/ Size: # Ventilation System #
Forced Air Unit
Plumbing Fixtures
Indicate how many of each type of fixture to be installed or relocated
Plumbing Traps # Fuel gas piping #of Outlets:
Water Heater # Medical gas piping #of Outlets:
Water Line # Plumbing Vent piping #
Sewer Line # Industrial waste pretreatment
interceptor Grease Trap) Size
Other
scribe):
T:\BUILDING\APPLICATION FORMS\Current BP Application\Building Permit 4-17-13.docx;A