HomeMy WebLinkAbout1129 W. 5th Street Address:
to
1129 W 5 Street
PREPARED 8/22/13, 9:40:23 INSPECTION TICKET PAGE 2
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 8/22/13
------------------------------------------------------------------------------------------------
ADDRESS . : 1129 W 5TH ST SUBDIV:
CONTRACTOR : PHONE :
OWNER NICHOLAS C BENGE PHONE : (360) 941-3537
PARCEL 06-30-00-0-1-1240-0000-
APPL NUMBER: 12-00000650 RES ADDITION
------------------------------------------------------------------------------------------------
PERMIT: BPR 00 BUILDING PERMIT - RESIDENTIAL
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------—-- --——----—--------—----------------------'
BL1 01 6/20/12 JLL BLDG FOUNDATION FOOTING
6/20/12 AP June 20, 2012 8:38:55 AM hcatuzo.
WENDY 928-699-7657
BAIR O1 9/17/12 JLL BLDG AIR SEAL
9/17/12 AP September 17, 2012 8:14:34 AM pbarthol.
Wendy 926-699-7657
September 17, 2012 4:16:35 PM jlierly.
BL3 01 9/17/12 JLL BLDG FRAMING
9/17/12 AP September 17, 2012 8:14:01 AM pbarthol.
Wendy 928-699-7657
September 17, 2012 4:16:35 PM jlierly.
BL99 01 8/22/13 JL BLDG FINAL
August 22, 2013 9:36:22 AM jlierly.
928-699-7657 Wendy
PERMIT: ME 00 MECHANICAL PERMIT
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
-------------------------------------------- -'
ME6 01 9/28/12 JLL MECHANICAL GAS LINE
9/28/12 AP September 28, 2012 8:29:21 AM pbarthol.
Wendy 928-699-7657
September 28, 2012 3:58:54 PM jlierly.
ME99 01 8/22/13 MECHANICAL FINAL
August 22, 2013 9:37:05 AM jlierly.
PERMIT: PL 00 PLUMBING P IT
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
-- -----—-—----- ---------- -------- ----
PL2 01 8/31/12 PB PLUMBING ROUGH-IN
8/31/12 AP August 31, 2012 9:34:06 AM hcatuzo.
WENDY 928-699-7657
August 31, 2012 4:28:42 PM pbarthol.
PL99 01 8/22/13 PLUMBING FINAL
August 22, 2013 9:37:24 AM jlierly.
--------------------------- --------- COMMENTS AND NOTES
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY& ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Application Number . . . . . 12-00000650 Date 5/30/12
Application pin number . . . 003900
Property Address . . . . . . 1129 W 5TH ST
ASSESSOR PARCEL NUMBER: 06-30-00-0-1-1240-0000- REPORT SALES TAX
Application type description RES ADDITION on your state excise tax form
Subdivision Name . . . . .
Property Use . . . . . . . . to the City of Port Angeles
Property Zoning . . . . . . . RS7 RESDNTL SINGLE FAMILY (Location Code 0502)
Application valuation . . . . 40000
Application desc
398 SQ FT ADDITION
----------------------------------------------------------------------------
Owner Contractor
------------------------ ------------------------
NICHOLAS C BENGE OWNER .
1129 W 5TH ST
PORT ANGELES WA 98363
(360) 941-3537
Other struct info . . . . . HARD SURFACE AREA
----------------------------------------------------------------------------
Permit . . . . . . BUILDING PERMIT -RESIDENTIAL
Additional desc . . ADDITION
Permit Fee . . . . 569.25 Plan Check Fee 370.01
Issue Date . . . . 5/30/12 Valuation . . . . 40000
Expiration Date 11/26/12
Qty Unit Charge Per Extension
BASE FEE 417.75
15.00 10.1000 THOU BL-25;001-50K (10.10 PER K) 151.50
----------------------------------------------------------------------------
P Permit . . . MECHANICAL PERMIT
Additional desc .
Permit Fee . . . . 179.15 Plan Check Fee .00
Issue Date . . . . 5/30/12 Valuation . . . . 0
Expiration Date . . 11/26/12
Qty Unit Charge Per Extension
BASE FEE 50.00
1.00 14.8000 EA ME-FURN/HP/FAU < OR' = 5 TON 14.80
2.00 7.2500 EA ME-VENT FAN (SINGLE DUCT) 14.50
1.00 10.6500 EA ME-HOOD/DUCT-MECH. EXHAUST 10.65
2.00 10.6500 EA ME-STOVE/FIREPLACE/MISC. APP. 21.30
1.00 10.6500 EA ME-FUEL GAS PIPING,1-5 OUTLETS 10.65
1.00 50.0000 HR ME-REINSPECTION FEE 50.00
1.00 7.2500 EA ME-INSTALL APPLIANCE VENT 7.25
-----------------------------------------------------------------------------
Permit . . . . . . PLUMBING PERMIT
Additional desc . .
Permit Fee . . . . 141.00 Plan Check Fee .00
Issue Date . . . . 5/30/12 Valuation . . . . 0
Expiration Date . . 11/26/12
Qty Unit Charge Per Extension
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction. / , Q
54�0
Date Print Name Signature of Contractor or Authorized Agent Signature of Ow r(if owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS--
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Stemwall
Foundation Drainage/Downspouts
Piers .
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-in
Water Line Meter to Bldg)
Gas Line
Back Flow/Water FINAL Date Accepted b
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders/Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall Interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pum /Furnace/FAU/Ducts
Rough-In
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts FINAL Date Accepted b
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parkin /Lighting ESA:
Landscaping SHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction- R.W. PW /Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
i
T'Fnrms/Riiilrlinn nivisinn/Ruilriinn Permit
• ., CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY& ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES,WA 98362
Page 2
Application Number . . . . . 12-00000650 Date 5/30/12
Application pin number . . . 003900
REPORT SALES TAX
Qty Unit Charge Per Extension on your state excise tax form
BASE FEE 50.00 to the Cit of Port Angeles
9.00 7.0000 EA PL-PLUMBING TRAP 63.00 Y 9'
' 1.00 7.0000 EA PL-WATER LINE 7.00 (Location Code 0502)
2.00 7.0000 EA PL-DRAIN VENT PIPING 14.00
.` 1.00 7.0000 EA PL-WATER HEATER 7.00
----------------------------------------------------------------------------
Special Notes and Comments
• The Fire Department has reviewed the project application and
has no comments
May 24, 2012 4:24:19 PM sroberds.
The proposal will allow a 298 sq.ft. addition to a residence
.for total lot coverage of 23% in the RS-7 zone. No land use
issues anticipated.
May 29, 2012 2:58:31 PM banders.
Electrical service will need to be altered prior to !J
commencing work. Plan to install temporary pole and service
for construction, and permanent service may be U/G or O/H.
Contact electrical inspector or myself with questions
regarding transition period.
MAINTAIN CLEARANCES FROM SERVICE WIRES
The existing building sewer may be located at the same
location of the proposed construction.. Any modification or
damage.to the existing.building sewer will require other
permits and inspections.
----------------------------------------------------------------------------
Other Fees . . . . . . . . STATE SURCHARGE 4.50
-------------------------------------
7 Fee summary Charged Paid Credited Due
Permit Fee Total 889.40 889.40 .00 .00
Plan Check Total 370.01 370.01 .00 .00
Other Fee Total 4.50 4.50 .00 .00
Grand Total 1263.91 1263.91 .00 .00
Separate Permits are required forelectrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if own e is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
- PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Stemwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-in �•
Water Line(Meter to Bldg)
Gas Line
Back Flow/Water FINAL Date Accepted b
AIR SEAL: .
Walls -1-7i/2—
Ceiling
i/
Ceiling
FRAMING:
Joists/Girders/Under Floor '
Shear Wall/Hold Downs —/
Walls/Roof/Ceiling
Drywall Interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pum /Furnace/FAU/Ducts
Rough-in
Gas Lines t _�
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts FINAL Date Accepted b
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parkin /Lighting ESA:
Landscaping SHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE
Inspection Type Date Accepted By
N
Electrical 417-4735
Construction- R.W. PW I Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
T Fnrmc/Ri iilriinn nivisinn/Ri tilrtinn Permit
PREPARED 9/17/12, 9:50:03 INSPECTION TICKET PAGE 3
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 9/17/12
------------------------------------------------------------------------------------------------
ADDRESS . : 1129 W 5TH ST SUBDIV:
CONTRACTOR : PHONE :
OWNER NICHOLAS C BENGE PHONE : (360) 941-3537
PARCEL 06-30-00-0-1-1240-0000-
APPL NUMBER: 12-00000650 RES ADDITION
------------------------------------------------------------------------------------------------
PERMIT: BPR 00 BUILDING PERMIT - RESIDENTIAL
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
BL1 01 6/20/12 JLL BLDG FOUNDATION FOOTING
6/20/12 AP June 20, 2012 8:38:55 AM hcatuzo.
WENDY 928-699-7657
BAIR O1 9/17/12 J. BLDG AIR SEAL
September 17, 2012 8:14:34 AM pbarthol.
Wendy 928-699-7657
BL3 01 9/17/12 JL BLDG FRAMING
September 17, 2012 8:14:01 AM pbarthol.
Wendy 928-699-7657
--------------------- --------- COMMENTS AND NOTES --------------------------------------
PREPARED 8/31/12, 9:33:38 INSPECTION TICKET PAGE 1
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 8/31/12
------------------------------------------------------------------------------------------------
ADDRESS . : 1129 W STH ST SUBDIV:
CONTRACTOR : PHONE :
OWNER NICHOLAS C BENGE PHONE (360) 941-3537
PARCEL 06-30-00-0-1-1240-0000-
APPL NUMBER: 12-00000650 RES ADDITION
------------------- -
PERMIT: PL 00 PLUMBING PERMIT
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS .
----—------------------—-------------------------------------------------------------------
PL2 01 8/31/12 JLL PLUMBING ROUGH-IN
' August 31, 2012 9:34:06 AM hcatuzo.
WENDY 928-699-7657
-- —------------ - ------ COMMENTS AND NOTES --------------------------------------
h
' THS ,
- TT For City Use
CITY CSF 01 GELES
PE
-� Permit # IZ lin R E C E I V [
W A S H I N G T O N , U . S .
Date Received: MAY 2,,4 201
321 East S1 Street
Port Angeles, WA 98362 Date Approved: CITY OF PORT ANGE LES
P: 360-417-4817 F: 360-417-4711 BUILDING DIVISION
hcatuzo@cityofpa.us
Building Permit Application
Site Address:
Main Contact: Phone #
Z -6q I - 76s
Property Name Phone
Owner �"CIc -1 360 _ %yl � �3s;37
Mailing Address Email
Z W 55 4L Email
6)'s 3 - C-Ow"
City PUNT State
Contractor/ Name OU Phone
Applicant Mailing Address Email
City State
Contractor License # Expiration:
Project Value: Zoning: Tax P rV
Lot#
$ �� ooa 5�' OL, 0 0 I ?J-kC� 13
Type of Residential Commercial ❑ Industrial ❑ Public ❑
Permit Demolition ❑ Fire ❑ Repair ❑ Reroof ❑
For the following,fill out both pages of permit application:
New Construction ❑ Remodel ❑ Addition lA Tenant Improvement ❑
Mechanical ❑ Plumbing ❑ Other ❑
Existing Fire Sprinkler System? Maximum height of structure Proposed Bedrooms Proposed Bathrooms
Yes ❑ No C& 1 2 7—
Project Project
Description ii
L�OIT "ON'\
I have read and completed the application and know it to be true and correct.I am authorized to apply for this
permit and understand that it is my responsibility to determine what permits are required,and to obtain
permits prior to working on projects.I understand the plan review fee is not refundable after review has
occurred.I understand that I will forfeit 20%of the review fee if I cancel or withdraw the application before
plan review has occurred.I understand that if the permit is not issued within 180 days of receipt,the
application will be considered abandoned,and the fees forfeit.
Date Print Name Signature
S z� lZ 0 -5 X4
Residential Structures
Area Description(SQ FT) Existing Proposed Minimum$ For Office Use
value
Basement �J'A
First Floor
Second Floor A
Covered Deck/Porch/Entry
Deck
Garage
Carport
Other(describe)
Area Totals
Commercial Structures
Area Description(SQ FT) Existing Proposed Minimum$ For Office Us
value
Structure(s)
Addition
Tenant Improvement
Other(describe)
Area To
Lot Site Coverage Calculations
Footprint(SQ FT) of all Structures: Lot Size: %Lot Cover---- D/ /
9 u0"t ���7 , X3. 0 ►/
SQ FT Site coveraalt�'mpervious+ %site.rn= raLyp
structures ���(�
Mechanical Fixtures
Indicate how many of each type of fixture to be installed or relocated as part of this project.
Air Handler Size: # Haz/Non-Haz Piping #of Outlets:
Appliance Vent # 1 Heater(Suspended,Floor,Recessed wall) #
Boiler/Compressor Size: # i Heating/Cooling appliance #
repair/alteration
Evaporative Cooler(attached,not # Pellet Stove/Wood-burning/ as #
portable) Fire la Gas Stove s ook Stove Misc. d�
Fuel Gas Piping #of bets: Ventilation Fan,single duct #
Furnace/Heat Pump/ Size: # Ventilation System #
Forced Air Unit L`on1
Plumbing Fixtures
Indicate how many of each type of fixture to be installed or relocated
Plumbing Traps # q Fuel gas piping #of Outlets: t4lp
Water Heater # ' Medical gas piping #of Outlets: NSA
Water Line # - Vent piping # 2-
Sewer Line # Industrial waste pretreatment #
interceptor N 14
Other(describe):
WK
2 VtAi-5 .
, r '
f•
r
I
r >��
MOAK"W"
bi,..
� ¢',�x".<. ^° � ;� res a
ns,
F,
j"M
An
Ask 0
f „�' �,' to ✓�x F�' c- d'# a';�.b'fid"`
� A At. l,��„
¢� F ♦ v, � �a °.
i ~
Lit,
a
10 lot
n
„, s ,r d�r � r+ ✓���reY
,7
Arl
w
SSP w
04 1
it
Nk
77
Nkh}', � � f °-°e,.�.�.niycr }'' \ ��: •M� .^y,G �.�M1^K� Y +�� 't
t t N
2a
" •P
+a
rj
�. t����``a r rAr�� � r � Ot "�:�� �•`.�,�alb. '� 'a��.#' _ • � n ,R,+ �M �.'�W ..ro p v
se
4
,a 6Y 3w k e '9A
p=
WIN
. � Y
\I 3
Y dw i. ey
jg
NO PUMM.
?' `{rK
,.i
Nov 41W W °
Now
' m ,•'� F Mgt6g '
+k
4�
zi ,
P
[Ci
K
1
L 39 1 }
p
I
t-10US-A-
r
Zo
L 50
�sv
GOMPOS`I T I ON RDO"r f tl� ___.
30P'BUILDit FELT 5,4~--LE, MAINTAIN
1/2" PLYWOOD ROOF SHEATHING 1" "[h. AIRSPACE
2X BIRD BLOCKING 14 pc c t4 R- INSULATION
W/ 2110 SCREENED
VENT, (2) PER RAF-—,=R F'RE-ENG.�D/I�'R'D
SPACE n. TI1155tS 4) 24" OL.
C NT. METAL OR
VINYL RA WSUTT ER
1� Gill— CEILli-s
�5 s 2X6 DBL. TOP PLATE
ceps
R- BATT. INSULATION
2X6 STUDS
2X6 CEDAR
FASCIA
3/4" T 4G
SHEATH WS COMPLY FLOOr2
SIDIW-s AS SELECTED R- . NSULATION
BY OWNER ,
APPP,Oveo HOUSE J01 STS PER
WRAP 'RAMNG PLAN
RIM JOIST t. 5LOCKIT�z
2>1 P.T. 511-L-PLATE
A N Ci4 6 R!Z -1/2"ip X 10" Aµ3. 48" O.G.
Z • 4 V' 0" FROM EA_ END w
FINISH GRADEru,� Y.i�sur=�5 I
Dove v 5pv-'jet i_ +4 VERT. -r-i t t.1---
TfCsHTLINE STORI'1
DRAIN IFQ'D. +4 NORIZ ►IWQ, t,AP,
(2) +4 CONT.
HREE DRAINING- Q 6 MIL. BLACK POLY
GRAVEL A&V `rc>p 6F Fie r,,� p � � 1 VAPOR BARRIER
4"0 PEFF RATED 12
FOOTING DRAIN
UNDISTUR3ED �� ;��� y5�
EARTH
_ +j
INTERNATIONAL BUILDING CODE
-J CONCRETE FOUNDATION WALL & FOOTING DETAIL
LOVER�M�
WALL THICKNESS
6"THICK FOR WALLS'UNDER 6' HIGH
�
8"THICK FOR WALLS OVER 6'HIGH ANCHOR BOLTS FOR 1•STORY @72"0.C.&2-STORY @49"C.C.
PLACE BOLTS WITHIN 12"OF EACH PLATE END&USE 3"X3"X114"SQ.WASHERS UNDER NUTS
PRESSURE TREATED SILL PLAT.
=S
#4 HORIZONTAL REINFORCEMENT PLACED WITHIN 12"OF TDP OF WALL
FINISH GRADE REINFORCEMEN I SCHEDULE
ANCHOR 6"MIN.TO
7"MIN.
UN-TREATE HEIGHT [VERTICAL HORIZONTAL
EMBEDMENT ! ,�« ATERIAL' IN FEET REINFORCEMENT REINFORCEMENT
CRAWL SPACE ZP
r *2' #4 @ 48" 0. C. (1) #4 TOP BAR
VERTICAL REINFORCEMENT �. DEPTH FOOTING *2'TO 4' #4,@ 48" O. C. #4 @,24" 0. C.
BEND=12 X BAR DIA.,. BELOW
#4 BAR=6"BEND GRADE INTO - '4'TO LESS
#4 @ 24" O. C, #4 @ 18" O. C.
UNDISTURBED THAN 6'
. . SOIL
3" CLEARANCE 1 1e"z-STORY
• saw_; ENGINEERS ANALYSIS WITH
�pf5i11f •,� ,�, —�t--- �'~���1- STAMPED&SIGNED PLAN REQUIRED
VERTICAL REINFORCEMENT MUST BE BENT 8 TIED TO FOOTING REINFORCEMENT.
BENT VERTICAL REINFORCEMENT
TIED IN PLACE TO HORIZONTAL
REINFORCEMENT #4 REINFORCEMENT "
FOOTING WIDTH .FOOTING THICKNESS
12"1-STORY 1-STORY 6"
15"2-STORY 2-STORYie"
23"3-STORY 3-STORY 8 1/2"
MONOLITHIC CONCRETE•FOUNDATION DETAIL
NO SCALE '/2"ANCHOR BOLTS(SAME AS ABOVE)
PRESSURE TREATED SILL PLATES
#4 REINFORCEMENT 1-PIECE CONTINUOUS
_ U
SLAi
1 • } � 'ANCHOR
17"MIN. 6•MIN.TO
EMBEDMEN • II MATERIAL-'
UN-TREATED
'7-17-- '
I
Im FINISH GRADE
IN.FOOTING
DEPTH BELOW
RADE INTO
UNDISTURBED
S ,J
s
12"1-STORY
18"2-STORY
w� I � , •R .. Z • LLL_
3" CLEARANCE
I>IVIDTH "• #4 REINFORCEMENT
12"1-STORY
15"2-STORY
23"3-STORY
7- g :l�a;��;%Ncnc�vuTs
a
-0100*0
S
CITY OF PORT ANGELES—Construction Plans
The Issuance of this permit based upon these plans,specifi-
cations and other data shall not p-went the building official
from thereafter requiring the correction of errors in said
plans, specifications and other data, or from preventing
building operations being carried on thereunder when in
violation of all codes and ordiitinces of this jurisdiction.
nn—mg G044 awls
Approval Date S as 21 By
At 1 tlt� s
ux.�
r
g
Y
Northwood Appraisal
SKETCH ADDENDUM File No. 1501
Borrower Nicholas C Benge
Propwly Address 1129 W 5th St
City Port Angeles County Clallam State WA Zip Code 98363
Lender/Client Cedar Coast Mortgage,Inc. Addiess 330 E First St Suite 5,Port Angeles WA 98362
160
a
17.0'
1 Car Garage §
zn 17.0'
fV
Dining Laundry
Bath
�fI
Room
Bedroom
Kitchen
160
3.5'
o
ui
N
O n '
Living Room .. -
Bedroom
Foyer
25.5' 2 2.0'
ti0B,
6.0'
s byA�
com roft
AREA CALCULATIONS SUMMARY LIVING AREA BREAKDOWN
Code Description Size Net Totals Breakdown Subtotals
GLAl First Floor 991.50 991.50 First Floor
GAR Garage 384.00 384.00 10.0 s 14.0 140.00
2.0 x 6.0 12.00
0.5 1 2.0 i 2.0 2.00
0.5 s 2.0 s 2.0 2.00
14.0 z 25.5 357.00
2.0 : 14.0 28.00
12.0 a 34.0 408.00
2.5 : 17.0 42.50
TOTAL LIVABLE (rounded) 992 8 Calculations Total(rounded) 992
ClickFORMS Appraisal Software 800-622.8727 Page 6 of 18
0000--,
t �
1
t I Z i s 441 s - PA- l-)A 7036.3 P ��� -�� Add,� �A
Egress Window
17�
rs, i z
22�
current 4" bthrm vent
a,— Smoke Detect
oa 48x34 shower
Gas Stove 16" prep sink
36"sink
DW °
Current 2" Sink Vent 60x30 tub
i _
no_ �� Smoke Detect 5
Smoke Detect
Gas Tank
CO Dectect
Gas Fireplace
0
Egress Window
(J JC 6
,
o'9Z
-r
tfa
CL
_o
c�
o�
�a
a�
f r ti
OL
--1
n I
T a�
N
fu
ci
CL
LA
CU
w
u
a
IT
� N
CIL
S 'h�
---- -------------- - --- ----- --------------- -- - - - - -- --------------------- --- - -
Water to Garage
f f
Sewer
space heaterlaundry Hot C
Laundry Cold (�
electrical panel Hot p BR Sink/Laund
Cold o Drain
Toilet Drain
ShowiE r
Drain
Vent
Cold Water
Hot Water
I +____________________LHotater Id
Hot
space heate
Kitchen Drain
Sink !
Kitchen Sink Vent
s
i
I
i
Water Main
space heater
0
r � �
Smoke Detect
o (�
�N 4804 shower
6" re si k
Gas Outdoor ��1- U
Tankless Water t.r 1 36"sink
�/
l I I"
Heater IF
Current 2"Sink Vent 60x30 tub
— Smoke DetectADWf
rs��ks
o.-- Smoke Detect
Propos';
Gas Tank
C'
r
CO:Dectect �^
Gas Fireplace
---------------- ----- -------
i
Egress Window
Izi
Gas Outdoor Gas Stove
Tankless Water
36"sink
Heater
�LT
DW -
Current 2"Sink Vent
O
Smoke;Detect
Smoke Detect
O_/—
ik
CO Dec>ect
Gas Fireplace
t
0
A R C H I C T S
• • �: 44:`•Mne� •`1 Yh.tl�si A...?is.iei�'� V •
319 s.peabody,suite b;port angeles,wa 98362 t
360.452.6116/fax 3 60.452.7064
Project: Project No.
S.ubLect; [�AtWZ to l� By;
Date: MAq 10/12, Sheet of
t'
FP.P-T-1 A.LL i (::�W C LO�bb^a `T f2m&I-L4 pT
.n evo
Y�pa o PST L v Y)1 p4,�
b I FYI I
r
tl§k E
'N
L I N D B E R.42VIITH
A R C H I -%,I� C T ' S.
319 S.Peabody,Suite B.,Port Angeles,WA 98362
3 60.452.6116/fax 360.452.7064
contactnlindarclr.com/www.lindarch.Com
Project- �.. � W J57f*
j Project No.
Subject: L4,r6 °a A L By:
Date: ►'y) u� O17 Sheet Z of
SHEAR WALL SUNEV ARY
W1 L I H I V V/L SW VH-WL/2 POST
�e `� 2.
`�b 110 26` � WL�it� -�r� . ;
1 ! 11446 J 2 2 Sel 4 150,2,a; .
2 � � ►�� 3 ��°:�� � � � �=� � ,�JOU�.. ��„���, �'
I/ALLOFIT/FMM \TO/FORMS/SI EARWAL
r I
SHEAR WALLS
2. MAXIMUM$WAR■200 PLP.
UK W'SWAIM-OPE 687E OF OWLL ML ALL EDCf6 UM 6d NAU
AT 6'O.C. FOR FRAMM U6E DF NO2. PROVIDE Vl'DIA ETER ANCHOR
8OLT6 AT 46'Oa MAX"SPACM6 AT THE FaMATIOPL
FOR TIE DO"AT EACH END OF THE U"SEE FRAMMOM PLAN
4v MAXIMUM SHEAR■315 PLP.
USE V2'6WA94-OPE SIDE OF AWLL NAIL ALL 02%UTW 6d NAILS
AT S'oa FOR FRAMINS,USE DF NO2 PROVIDE UJ'DIAMETER ANCHOR m
BOLTS AT 32'Oa.MAXIMUM 6PACMG AT M FOU NDATM L;
FOR TE D006 AT EACH END OF 1HE U&L,SEE FRAMMSCAR FLANS. O 01
6. MAXIMUM SHEAR■460 PLP. �" q
USE VA'64EATN6-ON!OW OF W4J- NAIL All MX&6 UITHI 6d"1.6
AT 3'OL. FORFRAMMUeE3XDPNOl DOUBLE EOTTOM PLATES ARE m
FWAUSED BOLT THROUSH BOTH ELATES USTH ANCHIOR 1501.79. PROVIDE o O
WS'DIAMETER ANCHOR BM16 AT 32'OG MAXIMUM SPACING AT THE
FOUNDATION FOR TTN DOW AT EACH END OF TIE UWLL,
SEE FRAMWG,SHEAR PLANS. GL
o La
cq
►0 2
DF
VF P10 2 DF 2 Uw"h'' a d.
GWAIR WALL
" 0
4 iy
1p
�a.
p DSQ
S Ws x n aLB ATT 6P�LA1t m-aDas
Uwu IN
ND 2` NMIMBEER 2 �.q �. y y pp N
P Q
OAR 3�VSIX�V!G
rLll
b
a � a C� �
}GOOF FRAC- IING FLAN 5I4r=AIR WALL PLAN
SCALE,1/4'•1'-0' SCALE,V4'•1'-0'
�.1
,IVO w -v tr - L)315/-bo.
4. �X� •2-
�?�P� �b�'Z.- �Xlo Nb•2
x
rz s
�24- D A
rz
Po,N Loho
�Ut-- I
Ar � r
C?->Zx+
Vel—.
4 2
d�Z.
6
page
Project: /
Location: Roof Rafter 1
Roof Rafter
[2009 International Building Code(2005 NDS)]
1.5 IN x 11.25 IN x 14.25 FT(14+0.2)@ 24 O.C.
#2-Douglas-Fir-Larch(North)-Dry Use
Section Adequate By:51.3% StruCalc Version 8.0.100.0 5/3/2012 10:42:50 AM
Controlling Factor:Moment LOADING DIAGRAM
DEFLECTIONS Center Right
Live Load 0.15 IN U1107 0.00 IN UMAX
Dead Load 0.09 in 0.00 in
Total Load 0.24 IN U692 0.00 IN Ulnfinity
Live Load Deflection Criteria:U240 Total Load Deflection Criteria: U180
RAFTER REACTIONS
LOADS REACTIONS
Upper Live Load @ A 175 plf 350 Ib
Upper Dead Load @ A 105 plf 210 Ib
Upper Total Load @ A 280 plf 560 Ib
Lower Live Load @ B 181 plf 363 Ib
Lower Dead Load @ B 109 plf 218 Ib 14 ft s ft
Lower Total Load @ B 290 plf 580 Ib
RAFTER SUPPORT DATA
A B RAFTER LOADING
Bearing Length 0.60 in 0.62 in Uniform Floor Loading
RAFTER DATA Interior Eave Roof Live Load: LL= 25 psf
Span Length 14 ft 0.25 ft Roof Dead Load: DL= 15 psf
Rafter Pitch 0 :12 Slope Adjusted Spans And Loads
Roof sheathing applied to top of joists-top of rafters fully braced. Interior Span: L-adj= 14 ft
Roof Duration Factor 1.15 Eave Span: L-Eave-adj= 0.25 ft
Peak Notch Depth 0.00 Rafter Live Load: wL-adj= 50 plf
Base Notch Depth 0.00 Eave Live Load: wL-Eave-adj= 50 plf
Rafter Dead Load: wD-adj= 30 plf
MATERIAL PROPERTIES Rafter Total Load: wT-adj= 80 plf
#2-Douglas-Fir-Larch(North) Base Values Adjusted Eave Total Load: wT-Eave-adj= 80 plf
Bending Stress: Fb= 850 psi Fb'= 1124 psi
Cd=1.15 CF=1.00 Cr-1.15
Shear Stress: Fv= 180 psi Fv'= 207 psi
Cd=1.15
Modulus of Elasticity: E= 1600 ksi E'= 1600 ksi
Min.Mod.of Elasticity: E_min= 580 ksi E_min'= 580 ksi
P
Com .1 to Grain: Fc-1= 625 psi Fc-1'= 625 psi
Controlling Moment: 1960 ft-Ib
7.0 Ft from left support of span 2(Center Span)
Created by combining all dead loads and live loads on span(s)2
Controlling Shear: -493 Ib
At a distance d from right support of span 2(Center Span)
Created by combining all dead loads and live loads on span(s)2,3
Comparisons with required sections: Reg'd Provided
Section Modulus: 20.92 in3 31.64 in3
Area(Shear): 3.57 in2 16.88 in2
Moment of Inertia(deflection): 46.28 in4 177.98 in4
Moment: 1960 ft-Ib 2964 ft-Ib
Shear: -493 lb 2329 lb
NOTES
page
Project:
Location: Roof Beam 1 "
Rnof Beam
[2009 International Building Code(2005 NDS)] or
(2) 1.5 INx3.5INx2.OFT
#2-Douglas-Fir-Larch(North)-Dry Use
Section Adequate By:237.8% StruCalc Version 8.0.100.0 5/3/2012 10:43:56 AM
Controlling Factor: Moment LOADING DIAGRAM
DEFLECTIONS Center
Live Load 0.01 IN U4158
Dead Load 0.00 in
Total Load 0.01 IN U2586
Live Load Deflection Criteria: U240 Total Load Deflection Criteria:U180
REACTIONS A B
Live Load 275 Ib 275 Ib
Dead Load 167 Ib 167 Ib
Total Load 442 Ib 442 Ib
Bearing Length 0.24 in 0.24 in
BEAM DATA
Span Length 2 ft eft Span
Unbraced Length-Top 2 ft
Unbraced Length-Bottom 0 ft
Roof Pitch 0 :12 ROOF LOADING
Roof Duration Factor 1.15 Side One:
MATERIAL PROPERTIES ' Roof Live Load: LL= 25 psf
#2-Douglas-Fir-Larch(North) Roof Dead Load: DL= 15 psf
Base Values Adiusted Tributary Width: TW= 9 ft
Bending Stress: Fb= 850 psi Fb'= 1463 psi Side Two:
Cd=1.15 C1=1.00 CF=1.50 Roof Live Load: .LL= 25 psf
Shear Stress: Fv= 180 psi FV= 207 psi Roof Dead Load: DL= 15 psf
Cd=1.15 Tributary Width: TW= 2 ft
Modulus of Elasticity: E= 1600 ksi E'= 1600 ksi Wall Load: WALL= 0 plf
Min.Mod.of Elasticity: E_min= 580 ksi E_min'= 580 ksi SLOPE/PITCH ADJUSTED LENGTHS AND LOADS
Comp.1 to Grain: Fc--L= 625 psi Fc-J-'= 625 psi Adjusted Beam Length: Ladj= 2 ft
Beam Self Weight: BSW= 2 plf
Controlling Moment: 221 ft-Ib Beam Uniform Live Load: wL= 275 plf
1.0 ft from left support Beam Uniform Dead Load: wD_adj= 167 plf
Created by combining all dead and live loads. Total Uniform Load: WT= 442 plf
Controlling Shear: 318 Ib
At a distance d from support.
Created by combining all dead and live loads.
Comparisons with required sections: Read Provided
Section Modulus: 1.81 in3 6.13 in3
Area(Shear): 2.31 in2 10.5 in2
Moment of Inertia(deflection): 0.75 in4 10.72 in4
Moment: 221 ft-Ib 747 ft-Ib
Shear: 318 lb 1449 lb
NOTES
page
Project: /
Location: Roof Beam 2 �
Roof Beam ' or
[2009 International Building Code(2005 NDS)]
(2) 1.5 IN x 3.5 IN x 2.5 FT
#2-Douglas-Fir-Larch(North)-Dry Use
Section Adequate By:682.1% StruCalc Version 8.0.100.0 5/3/2012 10:44:22 AM
Controlling Factor:Moment LOADING DIAGRAM
DEFLECTIONS Center
Live Load 0.00 IN U7806
Dead Load 0.00 in
Total Load 0.01 IN U4790
Live Load Deflection Criteria:U240 Total Load Deflection Criteria:U180
REACTIONS A B
Live Load 94 Ib 94 Ib
Dead Load 59 Ib 59 Ib
Total Load 153 Ib 153 Ib
Bearing Length 0.08 in 0.08 in
BEAM DATA J zs rt
Span Length 2.5 ft Q B
Unbraced Length-Top 2 ft
Unbraced Length-Bottom 0 ft
Roof Pitch 0 :12 ROOF LOADING
Roof Duration Factor 1.15 Side One:
MATERIAL PROPERTIES Roof Live Load: LL= 25 psf
#2-Douglas-Fir-Larch(North) Roof Dead Load: DL= 15 psf
Base Values Adiusted Tributary Width: TW= 1 ft
Bending Stress: Fb= 850 psi Fb'= 1463 psi Side Two:
Cd=1.15 C1=1.00 CF=1.50 Roof Live Load: LL= 25 psf
Shear Stress: Fv= 180 psi Fv'= 207 psi Roof Dead Load: DL= 15 psf
Cd=1.15 Tributary Width: TW= 2 ft
Modulus of Elasticity: E= 1600 ksi E'= 1600 ksi Wall Load: WALL= 0 plf
Min.Mod.of Elasticity: E_min= 580 ksi E_min'= 580 ksi SLOPE/PITCH ADJUSTED LENGTHS AND LOADS
Comp.-i-to Grain: Fc---= 625 psi Fc-1'= 625 psi Adjusted Beam Length: Ladj= 2.5 ft
Beam Self Weight: BSW= 2 plf
Controlling Moment: 95 ft-Ib Beam Uniform Live Load: wL= 75 plf
1.25 ft from left support Beam Uniform Dead Load: wD_adj= 47 plf .
Created by combining all dead and live loads. I Total Uniform Load: WT= 122 plf
Controlling Shear: -119 Ib
At a distance d from support.
Created by combining all dead and live loads.
Comparisons with required sections: Read Provided
Section Modulus: 0.78 in3 6.13 in3
Area(Shear): 0.86 in2 10.5 int
Moment of Inertia(deflection): 0.4 in4 10.72 in4
Moment: 95 ft-Ib 747 ft-Ib
Shear: -119 lb 1449 lb
NOTES
- page
Project: /
Location: Roof Beam 3 _
Roof Beam
[2009 International Building Code(2005 NDS)]
3.5 IN x 5.5 IN x 6.0 FT
#2-Douglas-Fir-Larch(North)-Dry Use
Section Adequate By:40.9% StruCalc Version 8.0.100.0 5/3/2012 10:45:11 AM
Controlling Factor:Moment LOADING DIAGRAM
DEFLECTIONS Center
Live Load 0.07 IN U1058
Dead Load 0.04 in
Total Load 0.11 IN U652
Live Load Deflection Criteria: U240 Total Load Deflection Criteria: U180
REACTIONS A B
Live Load 544 Ib 544 Ib
Dead Load 339 Ib 339 Ib
Total Load 882 Ib 882 Ib
Bearing Length 0.40 in 0.40 in
BEAM DATA —
Span Length 6 ft A Eft B
Unbraced Length-Top 2 ft
Unbraced Length-Bottom 0 ft
Roof Pitch 0 :12 ROOF LOADING
Roof Duration Factor 1.15 1 Side One:
MATERIAL PROPERTIES Roof Live Load: LL= 25 psf
#2-Douglas-Fir-Larch(North) Roof Dead Load: DL= 15 psf
Base Values Adjusted Tributary Width: TW= 0.3 ft
Bending Stress: Fb= 850 psi Fb'= 1268 psi Side Two:
Cd=1.15 C1=1.00 CF=1.30 Roof Live Load: LL= 25 psf
Shear Stress: Fv= 180 psi Fv'= 207 psi Roof Dead Load: DL= 15 psf
Cd=1.15 Tributary Width: TW= 7 ft
Modulus of Elasticity: E= 1600 ksi E'= 1600 ksi Wall Load: WALL= 0 plf
Min. Mod. of Elasticity: E_min= 580 ksi E_min'= 580 ksi SLOPE/PITCH ADJUSTED LENGTHS AND LOADS
Comp. r to Grain: Fc- I = 625 psi Fc-1'= 625 psi Adjusted Beam Length: Ladj= 6 ft
Beam Self Weight: BSW= 4 plf
Controlling Moment: 1323 ft-Ib Beam Uniform Live Load: wL= 181 plf
3.0 ft from left support Beam Uniform Dead Load: wD_adj= 113 plf
Created by combining all dead and live loads. Total Uniform Load: WT= 294 plf
Controlling Shear: -759 Ib
At a distance d from support.
Created by combining all dead and live loads.
Comparisons with required sections: Read Provided
Section Modulus: 12.52 in3 17.65 in3
Area(Shear): 5.5 in2 19.25 int
Moment of Inertia(deflection): 13.4 in4 48.53 in4
Moment: 1323 ft-Ib 1865 ft-Ib
Shear: -759 lb 2657 lb
NOTES
page
Project: /
Location: Roof Beam 4
Roof Beam
[2009 International Building Code(2005 NDS)]
3.5 IN x 5.5 IN x 5.5 FT
#2-Douglas-Fir-Larch(North)-Dry Use
Section Adequate By: 102.0% StruCalc Version 8.0.100.0 5/3/2012 10:46:03 AM
Controlling Factor:Moment LOADING DIAGRAM
DEFLECTIONS Center
Live Load 0.04 IN U1660
Dead Load 0.02 in
Total Load 0.06 IN U1020
Live Load Deflection Criteria: U240 Total Load Deflection Criteria: U180
REACTIONS A B
Live Load 413 Ib 413 Ib
Dead Load 259 Ib 259 Ib
Total Load 671 Ib 671 Ib
Bearing Length 0.31 in 0.31 in
.G
BEAM DATA
Span Length 5.5 ft A 5.5 ft B
Unbraced Length-Top 2 ft
Unbraced Length-Bottom 0 ft
Roof Pitch 0 :12 ROOF LOADING
Roof Duration Factor 1.15 Side One:
MATERIAL PROPERTIES Roof Live Load: LL= 25 psf
#2-Douglas-Fir-Larch(North) Roof Dead Load: DL= 15 psf
Base Values Adjusted Tributary Width: TW= 4 ft
Bending Stress: Fb= 850 psi Fb'= 1268 psi Side Two:
Cd=1.15 C1=1.00 CF=1.30 Roof Live Load: LL= 25 psf
Shear Stress: Fv= 180 psi Fv'= 207 psi Roof Dead Load: DL= 15 psf
Cd=1.15 Tributary Width: TW= 2 ft
Modulus of Elasticity: E= 1600 ksi E'= 1600 ksi Wall Load: WALL= 0 plf
Min. Mod.of Elasticity: E_min= 580 ksi E_min'= 580 ksi SLOPE/PITCH ADJUSTED LENGTHS AND LOADS
Comp.-L to Grain: Fc-1= 625 psi Fc--L'= 625 psi Adjusted Beam Length: Ladj= 5.5 ft
Beam Self Weight: BSW= 4 plf
Controlling Moment: 923 ft-Ib Beam Uniform Live Load: wL= 150 plf
2.75 ft from left support Beam Uniform Dead Load: wD_adj= 94 plf
Created by combining all dead and live loads. Total Uniform Load: wT= ' 244 Of
Controlling Shear: -564 Ib
At a distance d from support.
Created by combining all dead and live loads.
Comparisons with required sections: Read Provided
Section Modulus: 8.73 in3 17.65 in3
Area(Shear): 4.09 int 19.25 in2
Moment of Inertia(deflection): 8.56 in4 48.53 in4
Moment: 923 ft-Ib 1865 ft-Ib
Shear: -564 Ib 2657 Ib
NOTES
' page
Project:
Location: Roof Beam 5w
Roof Beam ,
[2009 International Building Code(2005 NDS)] or
3.5 IN x 7.25 IN x 9.5 FT
#2-Douglas-Fir-Larch(North)-Dry Use
Section Adequate By: 17.0% StruCalc Version 8.0.100.0 5/3/2012 10:46:46 AM
Controlling Factor:Moment LOADING DIAGRAM
DEFLECTIONS Center
Live Load 0.15 IN 0738
Dead Load 0.10 in
Total Load 0.25 IN U451
Live Load Deflection Criteria:U240 Total Load Deflection Criteria:U180
REACTIONS A B
Live Load 713 Ib 713 Ib
Dead Load 453 Ib 453 Ib
Total Load 1166 Ib 1166 Ib
Bearing Length 0.53 in 0.53 in
BEAM DATA
Span Length 9.5 ft A s.s n B
Unbraced Length-Top 2 ft
Unbraced Length-Bottom 0 ft
Roof Pitch 0 :12 ROOF LOADING
Roof Duration Factor 1.15 Side One:
MATERIAL PROPERTIES Roof Live Load: LL= 25 psf
#2-Douglas-Fir-Larch(North) Roof Dead Load: DL= 15 psf
Base Values Adjusted Tributary Width: TW= 4 ft
Bending Stress: Fb= 850 psi Fb'= 1267 psi Side Two:
Cd=1.15 C1=1.00 CF=1.30 Roof Live Load: LL= 25 psf
Shear Stress: Fv= 180 psi Fv'= 207 psi Roof Dead Load: DL= 15 psf
Cd=1.15 Tributary Width: TW= 2 ft
Modulus of Elasticity: E= 1600 ksi E'= 1600 ksi Wall Load: WALL= 0 plf
Min.Mod.of Elasticity: E_min= 580 ksi E_min'= 580 ksi SLOPE/PITCH ADJUSTED LENGTHS AND LOADS
Comp.-L to Grain: Fc-1= 625 psi Fc--L'= 625 psi Adjusted Beam Length: Ladj= 9.5 ft
Beam Self Weight: BSW= 5 plf
Controlling Moment: 2768 ft-Ib Beam Uniform Live Load: wL= 150 plf
4.75 ft from left support Beam Uniform Dead Load: wD_adj= 95 plf
Created by combining all dead and live loads. Total Uniform Load: WT= 245 plf
Controlling Shear: 1026 Ib
At a distance d from support.
Created by combining all dead and live loads.
Comparisons with required sections: Read Provided
Section Modulus: 26.22 in3 30.66 in3
Area(Shear): 7.43 in2 25.38 int
Moment of Inertia(deflection): 44.37 in4 111.15 in4
Moment: 2768 ft-Ib 3238 ft-Ib
Shear: 1026 lb 3502 lb
NOTES
page
Project: /
Lo
cation: Roof Beam 6
Roof Beam of
[2009 International Building Code(2005 NDS)]
(2) 1.5 INx3.5INx3.OFT
#2-Douglas-Fir-Larch(North)-Dry Use
StruCalc Version 8.0.100.0 5!3/2012 10:47:21 AM
Section Adequate By: 174.1%
Controlling Factor:Moment LOADING DIAGRAM
DEFLECTIONS Center
Live Load 0.02 IN U2259
Dead Load 0.01 in
Total Load 0.03 IN U1399
Live Load Deflection Criteria:U240 Total Load Deflection Criteria:U180
REACTIONS A B
Live Load 225 Ib 225 Ib
Dead Load 138 Ib 138 Ib
Total Load 363 Ib 363 Ib
Bearing Length 0.19 in 0.19 in a,P
BEAM DATA 3 ft
Span Length 3 ft A B
Unbraced Length-Top 2 ft
Unbraced Length-Bottom 0 ft
Roof Pitch 0 :12 ROOF LOADING
Roof Duration Factor 1.15 Side One:
MATERIAL PROPERTIES Roof Live Load: LL= 25 psf
#2-Douglas-Fir-Larch(North) Roof Dead Load: DL= 15 psf
Base Values Adjusted Tributary Width: TW= 4 ft
Bending Stress: Fb= 850 psi Fb'= 1463 psi Side Two:
Cd=1.15 C1=1.00 CF=1.50 Roof Live Load: LL= 25 psf
Shear Stress: Fv= 180 psi Fv'= 207 psi Roof Dead Load: DL= 15 psf
Cd=1.15 Tributary Width: TW= 2 ft
Modulus of Elasticity: E= 1600 ksi E'= 1600 ksi Wall Load: WALL= 0 plf
Min. Mod.of Elasticity: E_min= 580 ksi E_min'= 580 ksi SLOPE/PITCH ADJUSTED LENGTHS AND LOADS ,
Comp.-L to Grain: Fc--L= 625 psi Fc--L = 625 psi Adjusted Beam Length: Ladj= 3 ft
Beam Self Weight: BSW= 2 plf
Controlling Moment: 273 ft-Ib Beam Uniform Live Load: wL= 150 plf
1.5 ft from left support Beam Uniform Dead Load: wD_adj= 92 plf
Created by combining all dead and live loads. Total Uniform Load: WT= 242 plf
Controlling Shear: 298 Ib
At a distance d from support.
Created by combining all dead and live loads.
Comparisons with required sections: Read Provided
Section Modulus: 2.23 in3 6.13 in3
Area(Shear): 2.16 int 10.5 in2
Moment of Inertia(deflection): 1.38 in4 10.72 in4
Moment: 273 ft-Ib 747 ft-Ib
Shear: 298 lb 1449 lb
NOTES
page
Project: /
Location:Roof Beam 7 n ;�
Roof Beam of
[2009 International Building Code(2005 NDS)]
3.125 IN x 10.5 IN x 14.0 FT
24F-V4-Visually Graded Western Species-Dry Use StruCalc Version 8.0.100.0 5/11/2012 2:03:55 PM
Section Adequate By:42.9% LOADING DIAGRAM
Controlling Factor:Moment
DEFLECTIONS Center
Live Load 0.36 IN U469
Dead Load 0.24 in
Total Load 0.60 IN U282
Live Load Deflection Criteria:U240 Total Load Deflection Criteria:U180
REACTIONS A B
Live Load 1575 Ib 1575 Ib
Dead Load 1046 Ib 1046 Ib
Total Load 2621 Ib 2621 Ib
Bearing Length 1.29 in 1.29 in °
BEAM DATA 14 ft B
Span Length 14 ft A
Unbraced Length-Top 2 ft
Unbraced Length-Bottom 0 ft
Roof Pitch 4 :12 ROOF LOADING
Roof Duration Factor 1.15 1 Side One:
MATERIAL PROPERTIES Roof Live Load: LL= 25 psf
24F-V4-Visually Graded Western Species Roof Dead Load: DL= 15 psf
Base Values Adjusted Tributary Width: TW= 8 ft
Bending Stress: Fb= 2400 psi Controlled by: Side Two:
Fb_cmpr= 1850 psi Fb'= 2739 psi Roof Live Load: LL= 25 psf
Cd=1.15 C/=0.99 Roof Dead Load: DL= 15 psf
Shear Stress: Fv= 265 psi Fv'= 305 psi Tributary Width: TW= 1 ft
Cd=1.15 Wall Load: WALL= 0 Of
Modulus of Elasticity: E= 1800 ksi E'= 1800 ksi SLOPE/PITCH ADJUSTED LENGTHS AND LOADS
Min.Mod.of Elasticity: E_min= 930 ksi E_min'= 930 ksi Adjusted Beam Length: Ladj= 14 ft
Comp.-L to Grain: Fc-1-= 650 psi Fc--L'= 650 psi Beam Self Weight: BSW= 7 plf
Beam Uniform Live Load: wL= 225 plf
Controlling Moment: 9173 ft-Ib Beam Uniform Dead Load: wD_adj= 149 plf
7.0 ft from left support Total Uniform Load: WT= 374 plf
Created by combining all dead and live loads.
Controlling Shear: 2306 Ib
At a distance d from support.
Created by combining all dead and live loads.
Comparisons with required sections: Reo'd Provided
Section Modulus: 40.18 in3 57.42 in3
Area(Shear): 11.35 in2 32.81 int
Moment of Inertia(deflection): 192.61 in4 301.46 in4
Moment: 9173 ft-lb 13109 ft-Ib
Shear: 2306 lb 6666 Ib
NOTES
page
Project: /
Location:Multi-Loaded Multi-Span Beam 7
Multi-Loaded Multi-Span Beam ' of
(2009 International Building Code(2005 NDS)]
3.125 INx10.5INx14.OFT
24F-V4-Visually Graded Western Species-Dry Use StruCalc Version 8.0:100.0 5/11/2012 2:27:54 PM
Section Adequate By:28.1% LOADING DIAGRAM
Controlling Factor:Deflection
DEFLECTIONS Center
Live Load 0.33 IN L/503
Dead Load 0.21 in
Total Load 0.55 IN U307
Live Load Deflection Criteria: U360 Total Load Deflection Criteria: U240
REACTIONS A B a
Live Load 1403 Ib 1423 Ib
Dead Load 893 Ib 906 Ib
Total Load 2296 Ib 2329 Ib
Bearing Length 1.13 in 1.15.in
BEAM DATA Center 14ft B
Span Length 14 ft
Unbraced Length-Top 2 ft
Unbraced Length-Bottom 14 ft
Live Load Duration Factor 1.00 UNIFORM LOADS Center
Camber Adj. Factor 1 Uniform Live Load 188 plf
Camber Required 0.21 Uniform Dead Load 113 plf
Notch Depth 0.00 Beam Self Weight 7 plf
MATERIAL PROPERTIES Total Uniform Load 308 plf
24F-V4-Visually Graded Western Species POINT LOADS-CENTER SPAN
Base Values Adjusted Load Number Three
Bending Stress: Fb= 2400 psi Controlled by: Live Load 194 Ib
Fb_cmpr= 1850 psi Fb'= 2385 psi Dead Load 117 Ib
Cd=1.00 CI=0.99 Location 7.75 ft
Shear Stress: Fv= 265 psi Fv'= 265 psi
Cd=1.00
Modulus of Elasticity: E= 1800 ksi E'= 1800 ksi
Min. Mod.of Elasticity: E_min= 930 ksi E_min'= 930 ksi
Comp.-1-to Grain: Fc-1-= 650 psi Fc-1-'= 650 psi
Controlling Moment: 8552 ft-Ib
7.42 Ft from left support of span 2(Center Span)
Created by combining all dead loads and live loads on span(s)2
Controlling Shear: -20701b
At a distance d from right support of span 2(Center Span)
Created by combining all dead loads and live loads on span(s)2
Comparisons with required sections: Read Provided
Section Modulus: 43.03 in3 57.42 in3
Area(Shear): 11.72 in2 32.81 int
Moment of Inertia(deflection): 235.3 in4 301.46 in4
Moment: 8552 ft-Ib 11411 ft-Ib
Shear: -2070 lb 57971b
NOTES
page
Project: /
Location: Roof Beam 8 # �'
Roof Beam
[2009 International Building Code(2005 NDS)]
5.5 IN x 11.25 IN x 13.5 FT
#2-Douglas-Fir-Larch(North)-Dry Use
Section Adequate By:28.0% StruCalc Version 8.0.100.0 5/3/2012 10:54:47 AM
Controlling Factor:Moment LOADING DIAGRAM
DEFLECTIONS Center
Live Load 0.18 IN U920
Dead Load 0.12 in
Total Load 0.29 IN U552
Live Load Deflection Criteria:U240 Total Load Deflection Criteria:U180
REACTIONS A B
Live Load 1350 Ib 1350 Ib
Dead Load 899 Ib 899 Ib
Total Load 2249 Ib 2249 Ib
Bearing Length 0.65 in 0.65 in
BEAM DATA 13.6 ft
Span Length 13.5 ft A B
Unbraced Length-Top 2 ft
Unbraced Length-Bottom 0 ft
Roof Pitch 0 :12 ROOF LOADING
Roof Duration Factor 1.15 Side One:
MATERIAL PROPERTIES Roof Live Load: LL= 25 psf
#2-Douglas-Fir-Larch(North) Roof Dead Load: DL= 15 psf
Base Values Adjusted Tributary Width: TW= 7 ft
Bending Stress: Fb= 875 psi Fb'= 1005 psi Side Two:
Cd=1.15 CI=1.00 CF=1.00 Roof Live Load: LL= 25 psf
Shear Stress: Fv= 170 psi Fv'= 196 psi Roof Dead Load: DL= 15 psf
Cd=1.15 Tributary Width: TW= 1 ft
Modulus of Elasticity: E= 1300 ksi E'= 1300 ksi Wall Load: WALL= 0 plf
Min. Mod.of Elasticity: E_min= 470 ksi E_min'= 470 ksi SLOPE/PITCH ADJUSTED LENGTHS AND LOADS
Comp.1-to Grain: Fc--L= 625 psi Fc--t-'= 625 psi Adjusted Beam Length: Ladj= 13.5 ft
Beam Self Weight: BSW= 13 plf
Controlling Moment: 7589 ft-Ib Beam Uniform Live Load: wL= 200 plf
6.75 ft from left support Beam Uniform Dead Load: wD_adj= 133 plf
Created by combining all dead and live loads. Total Uniform Load: WT= 333 plf
Controlling Shear: -1979 Ib
At a distance d from support.
Created by combining all dead and live loads.
Comparisons with required sections: Read Provided
Section Modulus: 90.66 in3 116.02 in3
Area(Shear): 15.18 in2 61.88 int
Moment of Inertia(deflection): 212.76 in4 652.59 in4
Moment: 7589 ft-Ib 9712 ft-Ib
Shear: -1979 Ib 8064 Ib
NOTES
• page
Project: /
Location:Multi-Loaded Multi Span Beam 9
Multi-Loaded Multi-Span Beam Y i
[2009 International Building Code(2005 NDS)] °f
5.125 IN x 9.0 IN x 15.5 FT
24F-V4-Visually Graded Western Species-Dry Use
Section Adequate By:91.2% StruCalc Version 8.0.100.0 5/11/2012 2:23:51 PM
Controlling Factor: Deflection LOADING DIAGRAM
DEFLECTIONS Center
Live Load 0.23 IN U798
Dead Load 0.17 in
Total Load 0.41 IN U459
Live Load Deflection Criteria:L/360 Total Load Deflection Criteria: U240
REACTIONS A B f 2
Live Load 561 Ib 561 Ib
Dead Load 433 Ib 433 Ib
Total Load 993 Ib 993 Ib
Bearing Length 0.30 in 0.30 in
BEAM DATA Center
Span Length 15.5 ft A 15.Sft B
Unbraced Length-Top 2 ft
Unbraced Length-Bottom 15.5 ft
Live Load Duration Factor 1.00 UNIFORM LOADS Center
Camber Adj. Factor 1 Uniform Live Load 25 plf
Camber Required 0.17 Uniform Dead Load 15 plf
Notch Depth 0.00 Beam Self Weight 10 plf
MATERIAL PROPERTIES Total Uniform Load 50 plf
24F-V4-Visually Graded Western Species POINT LOADS-CENTER SPAN
Base Values Adjusted Load Number One Two
Bending Stress: Fb= 2400 psi Controlled by: Live Load 367 Ib 367 Ib
Fb_cmpr= 1850 psi Fb'= 2395 psi Dead Load 239 Ib 239 Ib
Cd=1.00 C/=1.00 Location 7.5 ft 8 ft
Shear Stress: Fv= 265 psi Fv'= 265 psi
Cd=1.00
Modulus of Elasticity: E= 1800 ksi E'= 1800 ksi
Min. Mod.of Elasticity: E_min= 930 ksi E_min'= 930 ksi
Comp.-L to Grain: Fc--I-= 650 psi Fc--L = 650 psi
Controlling Moment: 6047 ft-Ib
7.75 Ft from left support of span 2(Center Span)
Created by combining all dead loads and live loads on span(s)2
Controlling Shear: 962 Ib
At a distance d from left support of span 2(Center Span)
Created by combining all dead loads and live loads on span(s)2
Comparisons with required sections: Read Provided
Section Modulus: 30.29 in3 69.19 in3
Area(Shear): 5.45 in2 46.13 in2
Moment of Inertia(deflection): 162.81 in4 311.34 in4
Moment: 6047 ft-Ib 13811 ft-Ib
Shear: 962 Ib 8149 lb
NOTES
page
Project:
Loy;ation: Multi-Loaded Multi-Span Beam 9
Multi-Loaded Multi-Span Beam
[2009 International Building Code(2005 NDS)]
5.125 IN x 10.5 IN x 15.5 FT
24F-V4-Visually Graded Western Species-Dry Use
StruCalc Version 8.0.100.0 5/11/2012 2:26:12 PM
Section Adequate By: 154.5%
GRAM
Controlling Factor:Deflection LOADING DIA
DEFLECTIONS Center
Live Load 0.18 IN U1056
Dead Load 0.13 in
Total Load 0.30 IN U611
Live Load Deflection Criteria: U360 Total Load Deflection Criteria: U240
REACTIONS A B f z
Live Load 658 Ib 658 Ib
Dead Load 504 Ib 504 Ib
Total Load 1162 Ib 1162 Ib
Bearing Length 0.35 in 0.35 in
BEAM DATA Center 15.5ft B
Span Length 15.5 ft A
Unbraced Length-Top 2 ft
Unbraced Length-Bottom 15.5 ft
Live Load Duration Factor 1.00 UNIFORM LOADS Center
Camber Adj.Factor 1 Uniform Live Load 25 plf
Camber Required 0.13 Uniform Dead Load 15 plf
Notch Depth 0.00 Beam Self Weight 12 plf
MATERIAL PROPERTIES Total Uniform Load 52 plf
24F-V4-Visually Graded Western Species POINT LOADS-CENTER SPAN
Base Values Adjusted Load Number One Two Three
Bending Stress: Fb= 2400 psi Controlled by: Live Load 367 Ib 367 Ib 194 Ib
Fb_cmpr= 1850 psi Fb'= 2395 psi Dead Load 239 Ib 239 Ib 117 Ib
Cd=1.00 C1=1.00 Location 7.5 ft 8 ft 7.75 ft
Shear Stress: Fv= 265 psi Fv'= 265 psi
Cd=1.00
Modulus of Elasticity: E= 1800 ksi E'= 1800 ksi
Min.Mod.of Elasticity: E_min= 930 ksi E_min'= 930 ksi
Comp.-L to Grain: Fc-1-= 650 psi Fc-1'= 650 psi
Controlling Moment: 7302 ft-Ib
7.75 Ft from left support of span 2(Center Span)
Created by combining all dead loads and live loads on span(s)2
Controlling Shear: 1122 Ib
At a distance d from left support of span 2(Center Span)
Created by combining all dead loads and live loads on span(s)2
Comparisons with required sections: Read Provided
Section Modulus: 36.59 in3 94.17 in3
Area(Shear): 6.35 in2 53.81 int
Moment of Inertia(deflection): 194.24 in4 494.4 in4
Moment: 7302 ft-Ib 18793 ft-Ib
Shear: 1122 Ib 9507 lb
NOTES
PREPARED 6/20/12, 8:42:22 INSPECTION TICKET PAGE 3
CITY OF PORT ANGELES INSPECTOR: PAT BARTHOLICK � DATE 6/20/12
---------------------—---—-----------------------------------------—------------------------
ADDRESS . : 1129 W STH ST SUBDIV:
CONTRACTOR : - PHONE :
OWNER NICHOLAS C BENGE PHONE : (360) 941-3537
PARCEL 06-30-00-0-1-1240-0000-
APPL NUMBER: 12-00000650 RES ADDITION
------------------------------------------------------------------------------------------------
PERMIT: BPR 00 BUILDING PERMIT - RESIDENTIAL
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
---------------------------—--------------—----
BL1 01 6/20/12 BLDG FOUNDATION FOOTING
June 20, 2012 8:38:55 AM hcatuzo.
WENDY 928-699-1657
---
..... ....
—----......
——--- ------------ COMMENTS AND NOTES ----------------—-------------------
PREPARED 9/28/12, 9:36:22 INSPECTION TICKET PAGE 1
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 9/28/12
------------------ -----------
ADDRESS . : 1129 W 5TH ST SUBDIV:
CONTRACTOR : PHONE :
OWNER NICHOLAS C BENGE PHONE : (360) 941-3537
PARCEL 06-30-00-0-1-1240-0000-
APPL NUMBER: 12-00000650 RES ADDITION
------------------------------------------------------------------------------------------------
PERMIT: Moa 00 MECHANICAL PERMIT
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
ME6 01 9/28/12 J MECHANICAL GAS LINE
September 28, 2012 8:29:21 AM pbarthol.
Wendy 928-699-7657
COMMENTS AND NOTES --------------------------------------