HomeMy WebLinkAbout1302 P Street Address:
1302 P Street
dR
PREPARED 7/08/15, 13:03:12 INSPECTION TICKET PAGE 1
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 7/08/15
------------------------------------------------------------------------------------------------
ADDRESS . : 1302 P ST SUBDIV:
CONTRACTOR : PHONE
OWNER RAYMOND LEE/NANCY KAY SILCOX PHONE
PARCEL 06-30-01-8-0-0150-0000-
APPL NUMBER: 15-00000371 RES ACCESSORY BUILDING
------------------------------------------------------------------------------------------------
PERMIT: BPR 00 BUILDING PERMIT - RESIDENTIAL
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
-—-—----------------------—-------—----- ---------------------—---------------------
BLFW O1 5/01/15 JLL BLDG FOUND FTG/STEM WALL
5/01/15 AP May 1, 2015 8:38:38 AM jlierly.
477-4889 ray
May 1, 2015 4:41:14 PM jlierly.
BL3 01 5/18/15 JLL BLDG FRAMING
5/18/15 AP May 15, 2015 12:42:44 PM Jlierly.
ray 477-4889
May 18, 2015 3:53:00 PM jlierly. \
BL99 01 7/08/15 BLDG FINAL
July 8, 2015 1:06:32 PM jlierly.
Ray 477-4889
-------------------------------------- COMMENTS AND NOTES --------------------------------------
CITY OF PORT ANGELES
®r DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION '
�0 321 EAST 5TH STREET, PORT ANGELES, WA 98362
�i
Application Number . . . . . 15-"OMM371 Date 4/27/15
Application pin number . . . 847194
Property Address . . . . . 1302 P ST
ASSESSOR PARCEL NUMBER: 06-30-01-8-0-0150-0000- REPORT SALES TAX
Application type description RES ACCESSORY BUILDING
Subdivision Name . . . . . . On your state excise tax form
Property Use . . . . . . . to the City of Port Angeles
ProAppprty licationnvaluation . . . . RS9 R150 OL SINGLE FAMILY (Location Code 0502)
Application desc
NEW 400SF GARAGE
-----------------------------------------------------------------------------
Owner Contractor
------
RAYMOND LEE/NANCY KAY SILCOX OWNER
1302 P ST
PORT ANGELES WA 98363
-----------------------------------------------------------------------
Permit . . . . . . BUILDING PERMIT -RESIDENTIAL
Additional desc . . NEW 400SF GARAGE
Permit Fee . . . . 277.75 Plan Check Fee 180.54
Issue Date . . . . 4/27/15 Valuation . . . . 15000
Expiration Date 10/24/15
Qty Unit Charge Per Extension
BASE FEE 95.75
13.00 14.0000 THOU BL-2001-25K (14 PER K) 182.00
Special Notes and Comments
The Fire Department has reviewed the project application and
has no comments
Electrical load calculations and electrical permits are '~
required.
1. Establishing Construction Access.
2. Install sediment controls BMPs.
3. Stabilize exposed soils.
4. Protect slopes from erosion. T
5. Protect drain inlets.
6. Control pollutants including but not limited to spills,
concrete wash out, exposed aggregate processes, concrete
grinding and saw cut waste water.
7. Maintain temporary and permanent erosion control BMPS
during project.
All disturbed area's on site not covered by new improvements �R
should meet the attached soil quality and depth standard.
No downspouts shall shall be connected to sanitary sewer.
Use existing driveway.
----------------------------------------------------------------------------
Other Fees . . . . . . STATE SURCHARGE 4.50
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Stemwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-in
Water Line Meter to Bldg)
Gas Line
Back Flow/Water FINAL Date Accepted b
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders/Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall Interior Braced Panel Only)
T-Bar
INSULATION:
• Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pum /Furnace/FAU/Ducts
Rough-in
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts FINAL Date Accepted b
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parkin /Lighting ESA:
Landscaping SHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction- R.W. PW I Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
T:Forms/Building Division/Building Permit
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
r
Page 2
Application Number . . . . . 15-00000371 Date 4/27/15
Application pin number . . . 847194
---- ------------- --- ------ ---- ---------- REPORT SALES TAX
Fee summary Charged Paid Credited Due
--------_ ---------- -- ---------- -- on your state excise tax form
Permit Fee Total 277.75 277.75 .00 .00 to the City of Port Angeles
Plan Check Total 180.54 180.54 .00 .00
Other Fee Total 4.50 4.50 .00 .00 (Location Code 0502)
Grand Total 462.79 462.79 .00 .00
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
- PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
�.
Footings
Stemwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-In
Water Line Meter to Bldg)
Gas Line
Back Flow/Water FINAL Date Accepted b
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders/Under Floor
Shear Wall/Hold Downs
Walls/Roof_L_Ceilin
Drywall Interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pum /Furnace/FAU/Ducts
Rough-in
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts FINAL Date Accepted b
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
Skirting
PLANNING DEPT. Separate Permit#s SEPA.
Parkin /Lighting ESA:
Landscaping SHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction-R.W. PW /Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
T:Forms/Building Division/Building Permit
THE
CITY ofP'111_�_;o
TANGELES_ For City Use
Permit# �
W A S H 1 1d G �T o N, U. S. Date Received: d"
321 E Sch Street ate Approved
Port Angeles,WA 9836
P:360-417-4817 F:360-417-4711
Email:permits(@cityofpa.us BUILDING PEIZMI PLICATION
Project Address: )302 3T
Phone: 0360) y�7- cf 93,9
Primary Contact: Email: Vc.y w c&L, Sticox ��y McA'A. co"
Name (�A. C Phone (3 0) y77-q 89�c1
Property Mailing Address f S0Z ST Email
Owner rCAyl VVIA s, ww:`1. C-0 V11
City PO�-i UylbeJes
State i zipV93 r,
Name Phone
Contractor Address Email
Information city State zip
Contractors License# Exp.Date:
Legal Description: Zoning: Tax Parcel # Project Value: (materials and labor)
�S—11 $ ISS ovo
Residential ® Commercial ❑ Industrial ❑ Public ❑
Permit Demolition ❑ Fire ❑ Repair ❑ Reroof(tear off/lay over) ❑
Classification For the following, fill out both pages of permit application:
(check New Construction ® Exterior Remodel ❑ Addition ❑ Tenant Improvement ❑
appropriate) Mechanical ElPlumbing 11Other ElFire Sprinkler System? Irrigation System? Proposed Bathrooms Proposed Bedrooms
Yes 0 No Yes No 19 r —Eng-
Project Description ColnS'�-crt�c s ,tf. Oe_+ucLed W)OA'I vo�:1 e
Is project in a Flood Zone: Yes ® NoM Flood Zone Type:
If in a Flood Zone, what is the value of the structure before proposed improvement? $
I have read and completed the application and know it to be true and correct. I am authorized to apply for
this permit and understand that it is my responsibility to determine what permits are required and to
obtain permits prior to work. I understand that plan review fees are not refundable after review has
occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is
issued. I understand that if the permit is not picked up/issued within i8o days of submittal,the application
will be considered abandoned and the fees will be forfeited.
q —Iq IS tic, mokJ Ln cox
Date Print flame Signature QJ 41�
Residential Structures
For Office Use
Area Description(SQ FT) Existing Proposed $$value
Basement
First Floor
Second Floor �O
Covered Deck/Porch/Entry
Deck(over 30"or z° floor)
Garage 5 7 10
Carport
Other(describe) S� q670
Area Totals Z--7-I& q00
Commercial Structures
For Office Use
Area Descriptions(SQ FT) Existing Proposed $$Value
Existing Structure(s)
Proposed Addition
Tenant Improvement?
Other work(describe)
Site Area Totals
Lot/Site Coverage Calculations
Lot Size(sq ft) Lot Coverage(sq ft) %Lot Coverage(Total lot coverage_lot size)
ZO j
Site Coverage(Sq Ft of all impervious) %of Site Coverage(total site coverage-- lot size)
3274 - I9
Mechanical Fixtures
Indicate how many of each type of fixture to be installed or relocated as part of this project.
Air Handler Size: # Haz/Non-Haz Piping Outlets:
Appliance Exhaust Fan # Heater(Suspended,Floor,Recessed wall) #
Boiler/Compressor Size: # Heating/Cooling appliance #
repair/alteration
Evaporative Cooler(attached,not # Pellet Stove/Wood-burning/Gas #
portable) Fireplace/Gas Stove/Gas Cook Stove/Misc.
Fuel Gas Piping #of Outlets: Ventilation Fan,single duct #
Furnace/Heat Pump/ Size: # Ventilation System #
Forced Air Unit
Plumbing Fixtures
Indicate how many of each type of fixture to be installed or relocated
Plumbing Traps # Fuel gas piping #of Outlets:
Water Heater # Medical gas piping #of Outlets:
Water Line # Plumbing Vent piping #
Sewer Line # Industrial waste pretreatment
interceptor Grease Trap) Size
Other(describe):
T:\BUILDING\APPLICATION FORMS\Current BP Application\Building Permit 4-17.13.docx
f j / ��♦s
f - EXISTING u / 7
f f l DRAINAGE SWALE � /f
'j\ ♦ 1 � f f
f IIGHTLINETIED TO
:., DOWNSPOUTS� ,�b �',y� N, ♦ / t ,
/ riG DRAIN p �_ ♦ �b-
W EW, 0RAJ.t4Lf f,2
61
cb
L J 1`i
CoNc
DRIVE&
1 L3 a1DEVJALK
{
• f \\j
CULVERT `
j
SITE PLAN
SCALE. F=30-0'.
t1 ;
J UTUCA' BLUFFS
1 1 302 R STREET
PORT ANGELES, WA 93363
AST -alt",e L .
� I.
'E:"I
i .
- Doo R
. � A�i-Phlr4 L I SN
7/� s
l-,4 �iL�vF�-i`loN srtii�t� wr H..t=, ncc-sr�
ar,t
M:� vAA. t�tz I "
---- ------- = -------- lcxT :� iz 30
631M
)4o WIP5
-
J `
_ i t
i ox3 _
3••I — —
CGt166:,Gv f - r s-- -- _.—___ -- __......_ _ _ —.. —
- }- I DcbjZ
f
I2 -
i
i
WAST F! �vfi-f`i r= IS " Sul n ti
i ND L 6 H a7H I 1,i&1
F T1 L... 1 l�J
l/ `l.la.,nrict kor2 I?�LTS r+
i I _ 4' s h co�hGFr2 ; 5 �o 1 4'-�°
\ ua ---- ----- ----
r- ,yam u, n poiV SEHr_N I
r°-itt'
:
lio..
4, ?--Az- r I
,
:
i
---- -- - ... — ---- I \A/A I :ZD
lL 77
N O,'ZTi-F �i:Ct1 T;G f CITY OF PORT AWGELE RE@The Issuance of thisrmit Wt ed ui=dem 1O� r j
Pe
,2 specifications and othea data Ohall=PM
7 W —
\'�-1 S building official froth 3berGa&0 s�Phlpr t - ;i
�.-. MARDI PANEL�1�iN� ti,3
P correction of errors in said pl ]s,ski e'eti
other data,or from�reventins buNding® do
au1•t 1 r tc being carried on thereunder vuben im ereolzs8u (9 02 �I t," �v v=r-- Er,
SLAB aN E ��
Vi
codes and ordinances of this jtrrisdaetrao�>
ALL S -
,f h
,1
_ - cl i
Bate - — wr w`i - _7'o FL
O l� I I
ate : e ,
__._...__...___.._.------------_.___...,..__..,._.___.___._.. Na,�nl �La:>`itK-�Ir..n+•l� � � Oxo DFk-•I�.:,.�o
l2� �
AND 4" S c-t_----- --
x�u>az...
__._........- ... _.....__.._..._._......:. a -- ----._ .'-. " _.-...----------
STREET
---S I IACCT FLOOR PLA,i,I N�
SU+J-1"l; E_j_ V0..'pCDJf t/4,l= I, tel,
U
��ItF:tA �..cDM l-a�.�.c��ie +.It(�i i� �,jf••i<S,i .y •:�
.. �'u'17.�ta�N��.'LxcILS�::��i:,i�,}'d�'y�� :%; Q '•� r.9�a ar'�:F}
��xii�d'�.FG�fJ ��SF;.•1;4jS:3,a3"„�Y.f;�S�. ;r.:.c? ..
f
BMP T5.13 Post-Construction Soil Quality and Depth
Purpose and Definition
Naturally occurring(undisturbed)soil and vegetation provide important
stormwater functions including:water infiltration;nutrient,sediment,and
pollutant adsorption;sediment and pollutant biofiltration;water interflow
storage and transmission,and pollutant decomposition. These functions
are largely lost when development strips away native soil and vegetation
and replaces it with minimal topsoil and sod. Not only are these important
stormwater functions lost,but such landscapes themselves become
pollution-generating pervious surfaces due to increased use of pesticides,
fertilizers and other landscaping and household/industrial chemicals,the
concentration of pet wastes,and pollutants that accompany roadside litter.
Establishing soil quality and depth regains greater stormwater functions in
the post development landscape,provides increased treatment of
pollutants and sediments that result from development and habitation,and
minimizes the need for some landscaping chemicals,thus reducing
pollution through prevention.
Applications and Limitations
Establishing a minimum soil quality and depth is not the same as
preservation of naturally occurring soil and vegetation. However, _
establishing a minimum soil quality and depth will provide improved on-
site management of stormwater flow and water quality.
Soil organic matter can be attained through numerous materials such as
compost,composted woody material,biosolids,and forest product
residuals. It is important that the materials used to meet the soil quality
and depth BMP be appropriate and beneficial to the plant cover to be
established. Likewise,it is important that imported topsoils improve soil
conditions and do not have an excessive percent of clay fines.
Design Guidelines
• Soil retention. The duff layer and native topsoil should be retained in
an undisturbed state to the maximum extent practicable. In any areas
requiring grading remove and stockpile the duff layer and topsoil on
site in a designated,controlled area,not adjacent to public resources
and critical areas,to be reapplied to other portions of the site where
feasible.
• Soil quality. All areas subject to clearing and grading that have not
been covered by impervious surface,incorporated into a drainage
facility or engineered as structural fill or slope shall,at project
completion,demonstrate the following:
1. A topsoil layer with a minimum organic matter content of ten
percent dry weight in planting beds,and 5%organic matter content
in turf areas,and a pH from 6.0 to 8.0 or matching the pH of the
February 2005 Volume V—Runoff Treatmenf BMPs 5-13
original undisturbed soil. The topsoil layer shall have a minimum
depth of eight inches except where tree roots limit the depth of
incorporation of amendments needed to meet the criteria. Subsoils
below the topsoil layer should be scarified at least 4 inches with
some incorporation of the upper material to avoid stratified layers,
where feasible.
2. Planting beds must be mulched with 2 inches of organic material
3. Quality of compost and other materials used to meet the organic
content requirements:
a. The organic content for"pre-approved"amendment rates can
be met only using compost that meets the definition of
"composted materials"in WAC 173-350-220. This code is
available online at:
http://www.ecy.wa.gov/programs/swfa/facilities/350.html
The compost must also have an organic matter content of 35%
to 65%,and a carbon to nitrogen ratio below 25:1.
The carbon to nitrogen ratio may be as high as 35:1 for
plantings composed entirely of plants native to the Puget
Sound Lowlands region.
b. Calculated amendment rates may be met through use of
composted materials as defined above;or other organic
materials amended to meet the carbon to nitrogen ratio
requirements, and meeting the contaminant standards of Grade
A Compost.
The resulting soil should be conducive to the type of vegetation to be
established.
• Implementation Options: The soil quality design guidelines listed
above can be met by using one of the methods listed below
1. Leave undisturbed native vegetation and soil,and protect from
compaction during construction
2. Amend existing site topsoil or subsoil either at default"pre-
approved"rates,or at custom calculated rates based on specifiers
tests of the soil and amendment
3. Stockpile existing topsoil during grading,and replace it prior to
planting. Stockpiled topsoil must also be amended if needed to
meet the organic matter or depth requirements,either at a default
"pre-approved"rate or at a custom calculated rate.
4. Import topsoil mix of sufficient organic content and depth to meet
the requirements.
5-14 Volume V-Runoff Treatment BMPs February 2005
4
More than one method may be used on different portions of the same
site. Soil that already meets the depth and organic matter quality
standards,and is not compacted,does not need to be amended
PlanningIPermitting/Inspection/Verification Guidelines&Procedures
• Local governments are encouraged to adopt guidelines and procedures
similar to those recommended in Guidelines and Resources For
Implementing Soil Qualily and Depth BMP T5.13 in WDOE
Storrawater Management Manual for Western Washington. This
document is available at:littp: luti�nnr:soilsfoisalirion.or�.
Maintenance
• Soil quality and depth should be established toward the end of
construction and once established, should be protected from
compaction, such as from large machinery use,and from erosion.
• Soil should be planted and mulched after installation.
• Plant debris or its equivalent should be left on the soil surface to
replenish organic matter.
• It should be possible to reduce use of irrigation,fertilizers,herbicides ,
and pesticides. These activities should be adjusted where possible,
rather than continuing to implement formerly established practices.
Flow Reduction Credits
Flow reduction credits can be taken in runoff modeling when BMP T5.13
is used as part of a dispersion design under the conditions described in:
BMP T5.10 Downspout Diversion
BMP T5.11 Concentrated Flow Dispersion
BMP T5.12 Sheet Flow Dispersion
Chapter III,Appendix III-C, Section 7.5:Reverse Slope Sidewalks
Chapter III,Appendix III-C, Section 7.2.4:Road projects
February 2005 — ^- Volume V-Runoff Treatment BMPs 5-15