HomeMy WebLinkAbout1307 Maple Street Address:
1307 Maple Street
3-.-)— E) -? C4 er ja— S �-
PREPARED 8/19/15, 8:13:54 INSPECTION TICKET PAGE 2
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 8/19/15
------------------------------------------------------------------------------------------------
ADDRESS . : 3207 MAPLE ST SUBDIV:
CONTRACTOR : PHONE
OWNER EPSTEIN,ROBERT/WHARTON,E.E. PHONE
PARCEL 06-30-15-5-0-1100-0000-
APPL NUMBER: 14-00001529 RES ACCESSORY BUILDING
------------------------------------------------------------------------------------------------
PERMIT: BPR 00 BUILDING PERMIT - RESIDENTIAL
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS "
------------------------------------------------------------------------------------------------
BL1 01 1/30/15 JLL BLDG FOUNDATION FOOTING
1/30/15 AP January 30, 2015 9:39:38 AM jlierly.
betsy 461-0866
January 30, 2015 3:34:41 PM jlierly.
BL2 01 2/04/15 JLL BLDG FOUNDATION STEM WALL
2/04/15 AP February 4, 2015 8:36:59 AM jlierly.
AM vern 460-8591
February 4, 2015 12:11:19 PM jlierly.
BLFD O1 2/13/15 JLL BLDG FOUNDATION DRAINAGE
2/13/15 AP February 13, 2015 10:05:55 AM pbarthol.
Betsy 461-0866
February 13, 2015 4:08:39 PM jlierly.
DSD O1 2/13/15 JLL BLDG DOWN SPOUT DRAINS
2/13/15 AP February 13, 2015 10:05:26 AM pbarthol.
Betsy 461-0866
February 13, 2015 4:08:39 PM jlierly. -
BL3 01 3/12/15 PB BLDG FRAMING
3/16/15 DA March 12, 2015 12:08:02 PM pbarthol.
March 16, 2015 1:08:33 PM pbarthol.
not ready
BLI O1 4/27/15 JLL BLDG INSULATION
4/27/15 AP April 27, 2015 10:11:20 AM jlierly.
April 27, 2015 4:05:33 PM jlierly.
BL3 02 4/27/15 JLL BLDG FRAMING
4/27/15 AP April 27, 2015 10:10:35 AM jlierly.
betsey 461-0866
April 27, 2015 4:05:33 PM jlierly.
BL99 01 8/19/15 cth BLDG FINAL
August 19, 2015 8:12:23 AM jlierly.
Betsey 461-0866
---------------
PERMIT: PL 00 PLUMBING PERMIT
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
PL6 01 2/13/15 JLL PLUMBING WATER SUPPLY
2/13/15 AP February 13, 2015 10:04:54 AM pbarthol.
Betsy 461-0866
February 13, 2015 4:08:50 PM jlierly.
PL2 01 2/17/15 PB PLUMBING ROUGH-IN
2/18/15 AP February 17, 2015 11:15:14 AM pbarthol.
Betsy 461-0866
February 18, 2015 10:05:10 AM pbarthol.
PL2 02 3/12/15 PB PLUMBING ROUGH-IN
3/16/15 AP March 12, 2015 12:08:14 PM pbarthol.
March 16, 2015 1:08:23 PM pbarthol.
----------------------------- CONTINUED ONTO NEXT PAGE -----------------------------------
PREPARED 8/19/15, 8:13:54 INSPECTION TICKET PAGE 3
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 8/19/15
------------------------------------------------------------------------------------------------
ADDRESS . : 3207 MAPLE ST SUBDIV:
CONTRACTOR PHONE
OWNER EPSTEIN,ROBERT/WHARTON,E.E. PHONE
PARCEL 06-30-15-5-0-1100-0000-
APPL NUMBER: 14-00001529 RES ACCESSORY BUILDING
---- -- --------------
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
PL99 01 8/19/15L PLUMBING FINAL
SAugust 19, 2015 8:12:51 AM jlierly.
------------------------- - ---------- COMMENTS AND NOTES
7z-or7 mlrl-- qtr
PREPARED 8/31/15, 9:22:13 INSPECTION TICKET PAGE 6
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 8/31/15
------------------------------------------------------------------------------------------------
ADDRESS . : 3207 MAPLE ST SUBDIV:
CONTRACTOR : PHONE
OWNER EPSTEIN,ROBERT/WHARTON,E.E. PHONE
PARCEL 06-30-15-5-0-1100-0000-
APPL NUMBER: 14-00001529 RES ACCESSORY BUILDING
------------------------------------------------------------------------------------------------
PERMIT: BPR 00 BUILDING PERMIT - RESIDENTIAL
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT ' RESULTS/COMMENTS
------------- ------------------------------------------------------------------
BL1 01 1/30/15 JLL BLDG FOUNDATION FOOTING
1/30/15 AP January 30, 2015 9:39:38 AM jlierly.
betsy 461-0866
January 30, 2015 3:34:41 PM jlierly.
BL2 01 2/04/15 JLL BLDG FOUNDATION STEM WALL
2/04/15 AP February 4, 2015 8:36:59 AM jlierly.
AM vern 460-8591
February 4, 2015 12:11:19 PM jlierly.
BLFD O1 2/13/15 JLL BLDG FOUNDATION DRAINAGE
2/13/15 AP February 13, 2015 10:05:55 AM pbarthol.
Betsy 461-0866
February 13, 2015 4:08:39 PM jlierly.
DSD O1 2/13/15 JLL BLDG DOWN SPOUT DRAINS
2/13/15 AP February 13, 2015 10:05:26 AM pbarthol.
Betsy 461-0866
February 13, 2015 4:06:39 PM jlierly.
BL3 01 3/12/15 PB BLDG FRAMING
3/16/15 DA March 12, 2015 12:08:02 PM pbarthol.
March 16, 2015 1:08:33 PM pbarthol.
not ready
BLI O1 4/27/15 JLL BLDG INSULATION
4/27/15 AP April 27, 2015 10:11:20 AM jlierly.
April 27, 2015 4:05:33 PM jlierly.
BL3 02 4/27/15 JLL BLDG FRAMING
4/27/15 AP April 27, 2015 10:10:35 AM jlierly.
betsey 461-0866
April 27, 2015 4:05:33 PM jlierly.
BL99 01 8/19/15 JLL BLDG FINAL
8/19/15 DA August 19, 2015 8:12:23 AM jlierly.
Betsey 461-0866
August 19, 2015 4:15:51 PM jlierly.
Exposed wire for extrerior light near door/ finish and call
for an electrical fibnal before building/ This inspection
would pass if not for electrical issue/final still
pending/jll
BL99 02 8/31/15 BLDG FINAL
�. August 31, 2015 9:25:36 AM jlierly.
betsy
--------------------- --------------------- COMMENTS AND NOTES --------
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Application Number . . . . . 14-00001529 Date 1/13/15
Application pin number . . . 910974
Property Address . . . . . . 3207 MAPLE ST
ASSESSOR PARCEL NUMBER: 06-30-15-5-0-1100-0000- REPORT SALES TAX
Application type description RES ACCESSORY BUILDING
Subdivision Name . . . . . . on your state excise tax form `V
Property Use . . . . . . . . to the City of Port Angeles
Property Zoning . . . . . . .
Application valuation . . . . 15000 (Location Code 0502)
----------------------------------------------------------------------------
Application desc
New Shop Storage elect/water
----------------------------------------------------------------------------
Owner Contractor
------------------------ ------------------------
EPSTEIN,ROBERT/WHARTON,E.E. OWNER
3207 MAPLE ST
PORT ANGELES WA 98362
Other struct info . . . . . HARD SURFACE AREA
----------------------------------------------------------------------------
Permit . . . . . . BUILDING PERMIT -RESIDENTIAL
Additional desc . . SHOP/STORAGE ATTACHED
Permit Fee . . . . 277.75 Plan Check Fee 180.54
Issue Date . . . . 1/13/1.5 . Valuation . . . . 15000
Expiration Date 7/12/15
Qty Unit Charge Per Extension
BASE FEE 95.75
13.00 14.0000 THOU BL-2001-25K (14 PER K) 182.00
----------------------------------------------------------------------------
Permit . . . . . . PLUMBING PERMIT
Additional desc .
Permit Fee . . . . 86.00 Plan Check Fee .00
Issue Date . . . . 1/13/15 Valuation . . . . 0
Expiration Date 7/12/15
Qty Unit Charge Per Extension
BASE FEE 50.00
2.00 7.0000 EA PL-PLUMBING TRAP 14.00
1.00 15.0000 EA PL-SEWER LINE 15.00
1.00 7.0000 EA PL-WATER HEATER 7.00 A ,
----------------------------------------------------------------------------
Special Notes and Comments
January 6, 2015 3:36:57 PM tamiot.
ELECTRICAL PERMIT AND LOAD CALCULATIONS REQUIRED.
January 6, 2015 10:01:14 AM sroberds.
The proposal will result in a storage addition to an
attached garage in the RS-7 zone for total lot coverage of
10%. No land use issues anticipated.
Public Works Utility Engineering has no requirements for
this plan review.
Other Fees STATE SURCHARGE 4.50 ` ^
v�
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local.law regulating construction or the performance of
construction.
Date Print Name Signature of Contractor or Authori'z d Agent Signature Owner(i owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Stemwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-In
Water Line(Meter to Bldg)
Gas Line
Back Flow/Water FINAL Date Accepted b
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists 7-Girders/Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall(Interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pum /Furnace/FAU/Ducts
Rough-In
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts FINAL Dale Accepted by
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parkin /Lighting ESA:
Landscaping SHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction - R.W. PW /Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
T:Forms/Building Division/Building Permit
CITY OF PORT ANGELES
® DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Page 2
Application Number . . . . . 14-00001529 Date 1/13/15
Application pin number . . . 910974
----------------------------g---------------------- ---------------- REPORT SALES TAX
Fee summaryCharged Paid Credited Due
----------- ----------
---------- --- on your state excise tax form
Permit Fee Total 363.75 363.75 .00 .00 to the Cit of Port Angeles
Plan Check Total 180.54 180.54 .00 .00 Y
Other Fee Total 4.50 4.50 .00 .00 (Location Code 0502)
Grand Total 548.79 548.79 .00 .00
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
- PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS-
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Stemwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-in
Water Line(Meter to Bldg)
Gas Line
Back Flow/Water FINAL Date Accepted b
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders/Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall(Interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pum /Furnace/FAU/Ducts
Rough-in
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts FINAL Date Accepted by
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parkin /Lighting ESA:
Landscaping SHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction- R.W. PW /Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
T:Forms/Building Division/Building Permit
CITY OF ✓-�J��A %—➢l.iB,tJIT�V
ilp/pLICATION
ermit#
W A S H 1 N G T O N , U . S .
ate Received: 1 Az- 2i�.
321 E 5th Street ate Approved _
Port Angeles,WA 9836
P:360-417-4817 F:360-417-4711
Email:peermits@cllyofiia.us BUILDING PE
Project Address:
Phone: (p
Primary Contact: 3 2-0 Email: y, &-;-) Q Q1,4 WA4 , Wr'k-1
Name �C � Phone
Property Mailing Address Email
Owner :)2-c)-? S -�✓�q ' }�
city`s fi P C State Zip
TT�Y CSI
Name J Phone 3(PC)
Contractor Address Email
Information city state zip
Contractors License# Exp.Date:
Legal Description: Zoning: Tax Parcel# Project Value: (materials and labor)
$ l5" vc)
Residential Commercial ❑ Industrial ❑ Public ❑
Permit Demolition ❑ Fire ❑ Repair ❑ Reroof(tear off/lay over) ❑
Classification For the following.fill out both pages of permit application:
(check New Construction ❑ Exterior Remodel ❑ Addition ❑ Tenant Improvement ❑
appropriate) Mechanical ❑ Plumbing ❑ Other ❑
Fire Sprinkler System? Irrigation System? Proposed Bathrooms Proposed Bedrooms
Yes ❑ No Yes ❑ No l,$ (`J
Project Description A) V-' / 0
Is project in a Flood Zone: Yes ® Nol0 Flood Zone Type:
If in a Flood Zone, what is the value of the structure before proposed improvement? $
I have read and completed the application and know it to be true and correct. I am authorized to apply for
this permit and understand that it is my responsibility to determine what permits are required and to
obtain permits prior to work. I understand that plan review fees are not refundable after review has
occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is
issued. I understand that if the permit is not picked up/issued within i8o days of submittal,the application
will be considered abandoned and the fees will be forfeited.
Residential Structures
For Office Use
Area Description(SQ FT) Existing Proposed S$value
Basement
First FIoor O�
Second Floor
Covered Deck/Porch/Entry e
Deck(over 3o"or 2.nl floor) Y
Garage
Carport
Other(describe)
Area Totals
Commercial Structures
For Office Use
Area Descriptions(SQ FT) Existing Proposed Ss Value
Existing Structure(s)
Proposed Addition
Tenant Improvement?
Other work(describe)
Site Area Totals
Lot/Site Coverage Calculations
Lot Size(sq ft) Lot Coverages ) %Lot Coverage(Total lot coverage_lot size)
as �o
Site Coverage(Sq Ft of all impervious) %of Site Coverage(total site coverage=lot size)
Mechanical Fixtures
Indicate how many of each type of fixture to be installed or relocated as part of this project.
Air Handler Size: # Haz/Non-Haz Piping Outlets:
Appliance Exhaust Fan # Heater(Suspended,Floor,Recessed wall) #
Boiler/Compressor Size: # Heating/Cooling appliance #
Boiler/Compressor —?�
repair/alteration
Evaporative Cooler(attached,not # Pellet Stove/Wood-burning/Gas #
portable) Fireplace/Gas Stove/Gas Cook Stove/Misc.
Fuel Gas Piping #of Outlets: Ventilation Fan,single duct #
Furnace/Heat Pump/ Size: # Ventilation System #
Forced Air Unit
Plumbing Fixtures
Indicate how many of each type of fixture to be installed or relocated
Plumbing Traps # —2 Fuel gas piping #of Outlets:
Water Heater # Medical gas piping #of Outlets:
Water Line # Plumbing Vent piping #
Sewer Line # Industrial waste pretreatment
interceptor Grease Trap) Size
Other(describe):
.1
1�
UTILITY
t
\-7.r)L-(TY POL4�
ONY F PORT ANGELES-ConstWction Plans
?lie Is tanee of this permit based uj`m thel"Alans
oildf W:;and other data shall n�t pre�•c7' the WATap- METE;F-. {�
JW:;
from thereafter requiring :ne
C 'Mb o1Fwas In said plans.specil.cations 1
Cwt'W i a4@,W Ikom preventing building operations j
ting aM@d oa thereunder when in viola on of a
W ordina m of this jurisdiction. tv 1
10=VS BJECD'TO FIELD APPROVAL 5K
Ily
� t i
N-W 4NOP/��rQ
�2 W
r era
j 1
L
10
o 10
TA Sk��YES a�
3 i S
rV
s. _P _ 77 . -_AGe.
t(N - UN N � IONEd - O
V l •`� 3 _O
(rf
U
�s-w51' 22'
X I
ST-I_Q GA 12 A G-
UNGoND+TIoN P }"
F'I�AN
a �.
r7 � D
"GoNe,- wA�!-�. d-
G-c7NG
n u
� u 12 Gt�t 'i• I -
r-OOTIWCo wl
! I -
XI�rTI�� Cook PA% l�
7i'f nD.G�
fi
O
2 x to Lf<IX��R Int?,
�,� 1,2"„
►2
4
Ig
w��T E4-
VENT
2 x 10 LEDGER BD
w/1/2"LAG BOLT @ 16"oc
* METAL ROOFING
* #30 FELT
* 5/8" PLYWD
2x10
RAFTER 12
@ 24"OC AIR BAFFLE
R-38 — H2.5 CUP @ EACH RAFTER
BATT
5/8" GW
w/ V. B.PAINT 2x6 STUD @ 16"o.c.—
w/ R21 BATT 1'2
1/2"GYPSUM BD
w/ VAPOR;
BARRIER PAINT * SIDING AS SELECTED
Eo r BY OWNER
/ * TYVEK
7/16" PLYWD
2 x 6 PTS
P l
1/2") 10"ANCHOR BOLT
@ 6'- " OC
z
#4 @i 6" FROM GRADE
TOP&BOTTOM 9
6 MIL POLY N
4" CONC. SLAB
2„ SAND ---–�
4" GRAVEL R 1'0
#4 @ 48"OC VERT.
2 #4 CONT.Nn sprl;