HomeMy WebLinkAbout1421 E. 2nd Street Address:
1421E 2nd Street
I` ;� 1 C--- . '2 Sfi
PREPARED 7/31/15, 9:31:37 INSPECTION TICKET PAGE 6
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 7/31/15
-—-------------------------------------—-----------------------------------------------------
ADDRESS . : 1421 E 2ND ST SUBDIV:
CONTRACTOR POWER TRIP ENERGY CORP PHONE : (360) 643-3080
OWNER DAVID C COWAN, TTE PHONE (360) 450-3767
PARCEL 06-30-00-5-6-0105-0000-
APPL NUMBER: 15-00000694 RES SOLAR PROJECT
------------------------------------------------------------------------------------------------
PERMIT: BSOL 00 BUILDING PERMIT - SOLAR
REQUESTED INSP DESCRIPTION .
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
-----------------—---A-—------------—-----------------------------------------------—-----
BL99 01 7/31/15 BLDG FINAL
July 31, 2015 9:18:26 AM jlierly.
bobbie 643-3080
--------------------------N4--------- COMMENTS AND NOTES --------------------------------------
' CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Application Number . . . . . 15-00000694 Date 6/18/15
Application pin number . . . 533912
Property Address . . . . . . 1421 E 2ND ST REPORT
ASSESSOR PARCEL NUMBER: 06-30-00-5-6-0105-0000- OnRoPO ate ALEexcS tax Aform
Application type description RES SOLAR PROJECT
Subdivision Name
Property Use . . to the City of Port Angeles
Property Zoning . . . . . . . RS7 RESDNTL SINGLE FAMILY (Location Code 0502)
Application valuation . . . . 31496
-----------------------------
Application desc
ROOF MOUNTED GRID TIE PV SOLAR ARRAY
----------------------------------------------------------------------------
Owner Contractor
------------------------ ------------------------
DAVID C COWAN, TTE POWER TRIP ENERGY CORP
1421 E SECOND ST 83 DENNY AVE
PORT ANGELES WA 98362 PORT TOWNSEND WA 98368
(360) 450-3767 (360) 643-3080
----------------------------------------------------------------------------
Permit . . . . . . BUILDING PERMIT - SOLAR
Additional desc . . ROOF MOUNTED SOLAR ARRAY
Permit Fee . . . . 130.00 Plan Check Fee .00
Issue Date . . . . 6/18/15 Valuation . . . . 31496
Expiration Date 12/15/15
Qty Unit Charge Per Extension
BASE FEE 130.00 1_
----------------------------------------------------------------------------
Special Notes and Comments
June 17, 2015 3:57:54 PM pbarthol. `
Permit is approved per contractor Irtr
attesting to the project meeting the
requirements of WAC 51.51.2300
Pb----------------------------------------------------------------------------
/
Fee summary Charged Paid Credited Due
Permit Fee Total 130.00 130.00 .00 .00 ` !
Plan Check Total .00 .00 .00 .00 j
Grand Total 130.00 130.00 .00 .00
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within.180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
— PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
-Footings
Stemwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-In
Water Line Meter to Bldg)
Gas Line
Back Flow/Water FINAL Date Accepted b
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders/Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall Interior Braced Panel Only)__
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pum /Furnace/FAU/Ducts
Rough-In
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts FINAL Date Accepted b
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parking/Lighting ESA:
Landscaping SHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction- R.W. PW /Engineering 417-4831
Fire 417-4653
Plannin 417-4750
Building 417-4815
T:Forms/Building Division/Building Permit
' CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY&ECONOMIC DEVELOPMENT-BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES,WA 98362
Application Number 15-00000694 Date 6/18/15
Application pin number 533912
Property Address . . . . 1421 E' 2ND ST
ASSESSOR PARCEL NUMBER: ' 06-30-00-5-6-0105-0000- REPORT SALES TA
Application type description RES SOLAR PROJECT
Subdivision Name On your State eXC/Se tax form
Property use . . , . : . to the City of Port Angeles
s
Property Zoning . . . .. RS7 RESDNTL SINGLE FAMILY (Location Code 0502)
Application valuation 31496
---------------------------------------------------
Application desc
ROOF MOUNTED GRID TIE PV SOLAR ARRAY
----------------------------------------------------------------------------
Owner Contractor
DAVID C COWAN, TTE POWER TRIP ENERGY CORP
1421 E SECOND ST 83 DENNY AVE
PORT ANGELES WA 98362 PORT TOWNSEND WA 98368
(360) 450-3767 (360) 643-3080
----------------------------------------------------------------------------
Permit BUILDING PERMIT - SOLAR
Additional desc ROOF MOUNTED SOLAR ARRAY
Permit Fee 130.00 Plan Check Fee . .00
Issue Date 6/18/15 Valuation 31496
Expiration Date 12/15/15
Qty Unit Charge Per Extension
BASE FEE 130.00
---------------------------------------------------
Special Notes and Comments
June 17, 2015 3:57:54 PM pbarthol.
Permit is approved per contractor
attesting to the project meeting the
requirements of WAC 51.51.2300
pb
------------------------------------------------- --------------------------
Fee summary Charged Paid Credited Due
---- ---------- ---------
Permit Fee Total 130.00 130.00 .00 .00
Plan Check Total .00 .00 .00 .00
Grand Total 130.00 130.00 00 .00
e
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements.This permit becomes
null and void if work or construction authorized isnot commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced,or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Date Print Name Signature o ontractor or Au rued Agent Signature of Owner(if owner is builder)
T:Forms/Building DMsioNBuilding Permit
THSFor City Use
Y, • GELSk.i
C{TY OF b
Permit#TAI
5
W A S H { N GT o N. U. S. Date Received:
321 E Slh Street Date Approved 1p-1,;7/S
Port Angeles,WA 4836
P:360-417-4817 F:360-417-4711
Email:permitsOcityofua.us BUILDING PERMIT APPLICATION
Project Address: 6f 7-1 P 5 C -2"Q 517 ; F 6p-T
Tow E�---TF{p ESLrA49 GE,- Phone:
Prim Contact: .Vogt-, FLCrtig� Email: �X&H,N e FCWt:R-TXi{ GWt✓=7Z4y.Later
Name DAq t b �, Go WA J Phone..7 b O _ T 7-5 _b6Z17
Property Mailing Address Email
Owner t�{Zi EASE vJD S 1 P4V{D660WA-�JO4re.AHL.ah-1
City r CT ELC::5 State 4vh Zip
NaPow Tib+P EN t~-.l. Phonep
Contractor Address Email
Information. City State W,rt zip 19 bs(2
Contractors License# POW E A-T E 93 4 Q ff Exp.Date:
Le�sal escrigtion;i xg1,445 Zoning: Tax Parcel#d6-3o-cv- Project Value materials and labor
Gdtzt�R-� 5utb7VfS{GW E �i1 or S 56o i vs � • ( )
�wc�rlti gw izi P_R- �
Residential ® Commercial ❑ Industrial ❑ Public ❑
Permit Demolition ❑ Fire 11Repair ❑ Reroof(tear off/lay over) CM 50►At
Classification For the following fill out both pages of permit application:
(check New Construction ❑ Exterior Remodel ❑ Addition ❑ Tenant Improvement ❑
appropriate) Mechanical ❑ Plumbing ❑ Other ❑
Fire Sprinkler System? Irrigation System? Proposed Bathrooms Proposed Bedrooms
Yes 0 No ILYes 0 No
Project Description A60fi I`' cutaTE6 Pi-tocoV0LMic5 -5ce.AiL
Is project in a Flood Zone: Yes ® NoW Flood Zone Type:
If in a Flood Zone,what is the value of the structure before proposed improvement? $
I have read and completed the application and know it to be true and correct. I am authorized to apply for
this permit and understand that it is my responsibility to determine what permits are required and to
obtain permits prior to work. I understand that plan review fees are not refundable after review has
occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is
issued. I understand that if the permit is not picked up/issued within i8o days of submittal,the application
will be considered abandoned and the fees will be forfeited.
ui
Date Print Name Signature
Rec'd —
HTE
Apply'd -/
$130 Fee
Application and Checklist for Roof Mounted Residential Solar Panels
Project Information:
Property Owner DA,i0 Caw A-J
Name:
P roj ect Ad d re ss: li7.i �k5`r- v-D �'T, Phone: !;Go aC,7_1?
Contractor Name �o"Mep— �N Registration#pow ff f (-E
Contractor Phone: 3(0p 643-30$0
PV system Roof Mvk*-JT M- C?R.i9 'ne p .7.Z,5- Mfg/model#of major equip:
description14obW-E-5, 3T 1414a OiNVEKTWSXV 5u►-�P�� 7-So cvAZT Pti�'t
yJJTB gul+Trt-+ rNviErereg5
Per WAC 51-51-2300, If the answer to the following questions is"yes" a building permit will be
issued for simple(10-15kw output) PV systems without further engineering.
Section M2302.2.1-Where solar panels are installed on roofs,the roof structure shall be deemed adequate to
support the load of the rooftop if all of the following are met:
Yes No
1. PV system is designed and proposed for a single family or detached accessory structure Ix ❑
2. The photovoltaic panels and modules and supporting structure shall be constructed of ❑
noncombustible materials or fire-retardant treated wood equivalent to that required for the
roof construction. The installation shall meet the requirements of the International Fire Code
as amended by WA State. PV modules are listed and labeled with a fire classification in
accordance with UL 1703
3. The PV system is designed for the wind speed of the local area and will be installed per the
manufacturer's specifications.
4. The ground snow load does not exceed 70 pounds per square foot.The PV system is designed ❑
for the wind speed of the local area,and will be installed per the manufacturer's specifications.
5. Total dead load of modules,supports, mountings, raceways and all other appurtenances weigh 1�f ❑
no more than four pounds per square foot. Enter total dead load of system (lbs/ft ). $J7 PSfr
6. Supports for solar modules are installed to spread the dead load across as many roof-framing ❑
members as needed to ensure that no point load exceeds fifty(50)pounds. Modules are
mounted no higher than 18"above the surface of the roofing to which they are affixed and do
not exceed the highest point of the roof unless approved by the local jurisdiction.
NOTE: If site inspection indicates a concern that the roof structure is not adequate to
support the PV module(s), engineering may be required prior to final of the permit.
As the property owner or authorized representative of the above listed property, I attest that all
information in this checklist is accurate to the best of my knowledge.
Applicant Signature: Date: 7,0[�j
Applicant Name(Please Print): -T_e'1{Nj _ FLt:Mj k1' / Fpw In?- 'rR j•,Ci2 C�
Relationship to Property Owner:
T:\BUILDING\APPLICATION FORMS\SOLAR PERMIT CHECKLIST.DOCX
a
wt A t
t �X
�„�., x, s�x� "« .� ��, _ � �f �• ... '�`", +Cir �_�?
°+`� �� . ��,• �� ,�, "fir
6-1
ANN
wo
kl N
• i
,
s
7i r
`
•
•g� a
I •�
S fl --ArR- f04-- '3:>R V ib CO w A-P
( Sr'Idr Cr I. 72 MpnCCrl•St811t IP Ni
Rtin--
Monnnal Powe,(pnornt '50 W ( h .er ipared•,lass with
---- ---— - nan�miss
---. --- -i Fran:Glass
Poorer Tc lerance(n) ar i-!e ecu e(AM co tang
__ ...
\% Panel F iclencv, ! Er.!corn ar, Ratingi I65
r - - -- - - ----- ( ------ -..
Railed er1 olwga( t l,) 4 Is'r Frame Class r Wck an u! ed h pe r n A aang)
- I - --- - - ............ ................ -
Rated ,.t;, rt(Irr pp) t;...; -...�
i _)pPn-OptV Ita.��4^,;.) .,. _... .,, 3T GE•C nln.k,.`JP-
_. rrm nr
�a ii�•:rrr:.t( n P,]r;ru; o.i(I A - 1 Module!le sna in.
Power'remperature Coehrr,-ients(P) I
Voltage Temperature Coefficients(V,.)', -25=^,1'i-'V i
rurre.^t Teroerdture JeffCen (I } S n1rV1( ^+ r r,,
- I
Tj
Thr
qI ade Tolaranc raP rdtErly rP J +lr 1 n, a00 50 v iE 1 7 n)frons z•pad
�._ P i _: 11 ax.,c.a.i j
__ ....._. .. _____.__ —.-----. _ _. ....._...__-__._ Snow Or)?. 2os. 50k:,W)•.ont
-- ---- — - ---- d
Irrmaact Resistance 1 inch(25 mm)di meter nail et 5.'_ iq)n(73 m:3s
)ucuut-a 41)v(min./nom irraz.; � 111240,,26.4 V
G!tPLr ,b 208,/(mm,nom ,ar i 1 u %2087229 t•'
UN rar n_Fi c-Guencq(m n -593/60.0/60J-6G 5 r^ ---
,t!]u,Power 3aor n n} 0:
ag ` 4;;n'anties 25-year lin:ta pj,s r.r_?rranP
_-_ .5 rar I-r[ec F.ca.,�tw'a;rartf
d< fort u:Put Cur,ent Cu'•=0 V ,.99 A
I AC rv4,.Cort :.pui ur.ar N I;V i t i4 A UL ; - n cud.:,g wmpl+ar_e.•;tl-.Pol- i
1
rPgt,ama..t,of IEEE 1' 37 and IEEE _
i
::C Cr; r,icr Il.!enC• ^a t -
� � t-£w_!`,tcLC•n:, T,.np c Fizz R;;[gr:
ala !4r Br.3ncr «u' ` 2
1, 4:) i ;single phase)
a
Un:--z Per t,rai l--.r,.0c•20S V 2 r_h a Hole)], !1 a� itemat:ng Currenr(p,Cj Module:designation errrkla-
• N Pi
. ..-.__...... ._ .....__..__..._ ....._ .._..._ .. ..... ....- _-__-_._ -- ..____.._... ate__ ,,,,c_M -
--.. � I ir,5rali L-0n n �•C"t�w'r^`�ttC"91i-'
MM(IN) (A)-MOUNI NG HOLES '! 12'471
12X .
(.261 -45 181 ----180(7 07; 0 -y '
B)-I]RAINAINAGE HOLES � (+-52'2.06'
4X 04A(19)
--77 &W - ! 3221112.691 f I -41 161
' 236 19.251 I 1. - 91-5136.02 A'
-� 1559:61.39 ! � 22..87_ 1I _ -,}\t
I
�
r
4-
r c .fns x �t'��" M,n �,��3"', ..a�'t�F �'�`��� ��::.�fiS'a�'., �'i`•�•'" G* rr�'r�! ��R���w
i - ,„�.,�,,, •fid'..rw• `c r•;�u�.. ''i('�I�
r
• • >• iA r
Design-Driven Advantages
#1 module aesthetics and efficiency °. RIF �X
i`
Reliabih-focused design,which enables
25-year wan,arity ;r
Maximum value for- Roof
Size.systern for rcmf,not str in;inverter
Optimize performance of each module
Expand Acess to solar
• CorYst;lex ro:�fs
• Partial shading
solali systems
Systern expandability
Simple£x Fast installation
t A x:.
Factory-integrated rnicroinvertei
Robust-double-locking AC connectors
AC architecture allows onsite design flexibility
No DCstringsizingprocess Optimize System and Installation Efficiency
Fewer steps than than competing DC-ciptimizer
and non-factory-integrated AC systems Factory-integrated SunPc.ver"AC Modules provide a revolutionari
•
Simple ccimnTissicning -
tcmc rination of high efficiency,Fel=1'r'eliabiiity1,. ~.nodule-level DC-to-AC
Core of Superior System ?ower conversion.Designed$J^rIC81:ly f011Se'",i:t,SUnP, P:.if,JiSiVrlrt'a
• Built for use with SunPower tmisilMOLPIt""
Best-in-•la's$systern reliability antj aesthetics reSlUfr?t nl^?Ount:ng sy:si'erT--.Sur)Povver AC Modules also achieve rapid
AC system means fewer parts,sirnipler desigl itT>lcrllail nand hest In dJSS SySt4tT?aesthetics..All this Ci)rY?t'S with art
Pair with Sr_tnPower monitoring app For
systern data
industry-ieading 2-5-year AC.if ioc uh warranty.
Sunpower.com
• r, l r$
Pe•,�L -
r D
-ighest of _over 3, CI siWoii;olar Panels',Photon Module
t
SUN P ,,.. r
Friday,January 31,2014
Snalr:l _ :,rack-
SnapNrack
No r m a n 775 Fiero Lane,Suite 200
San Luis Obispo,CA 93401
"Series 100 Roof Mount" Cover Letter
cheel
To Whom It May Concern,
We have performed calculations for the 100 series roof mount PV system based on
Ntructural the information provided by SnapNrack. Included with this letter are the report and
calculations. We did the calculations in accordance with the 2012 IBC, ASCE 7-10,
2012 NDS, and guidelines stated in the Solar America Board for Codes and
Standards.
n g i n e e r Some of the components in the SnapNrack test data were used to determine the
capacity and section properties of materials. We collected the test data using the
Fair Oaks,
95 procedures outlined in the 2012 IBC Chapter 17.
Fair Oaks,CA 95628
(916)536-9585
(916)536-0260(fax) We included the following types of load combinations and building parameters into
our calculations:
1989-2013
24 years of excellence _
• ASCE 7-10 wind speeds from I10 mph to 190 for B and C exposure
categories
• ASCE 7-10 Seismic Design Category E
• ASCE 7-10 Snow Loads up to 120 psf ground snow
• Buildings with mean roof heights up to 60 foot tilt angles / roof pitches
Norman Scheel,S.E. from 0 degrees to 60 degrees.
LEER AP BD+C
LEED AP Homes The calculations have also been completed in accordance with the 2006 IBC,2009
Fellmv—SEAOC IBC and ASCE 7-05. To use the data contained in this packet for projects that are
Fellow-ASCE p h
E-mail:normTnsse.com being evaluated to the older ASCE 7-05 wind speeds,refer to Appendix A for a
wind speed conversion chart. Find the ASCE 7-05 (IBC 2006/2009)wind speed in
Rob Coon the Chart in Appendix A, identify the corresponding ASCE 7-10(IBC 2012 wind
General Manager pp � p g ( )
E-mail:rnbconnQnsse.com speed value,and proceed with using the charts contained in this packet with the
Steve Smith P.E. adjusted wind speed value.
Project Manager
E-mail:stevesmith(arnssc.com In our opinion, the mounting system, outlined by SnapNrack Series 100 PV
Mounting System Code Compliance Installation Manual, is acceptable and meets
Steven Cooksey the loading requirements as staffed above. See the report and calculations included
CAD supervisor
E-mail:stcve(a�nsse.com with this letter for more information.
Jackie Winslow
If there are any further questions,please contact Norm Scheel. l J. �(;►
�• � fy
OfceManager tr7+
E-mail:iackie(dnsse.com Norman Scheel PE, SE
LEED-AP BD+C,LEED-AP Homes +~ O
Fellow S OC
Fellow C.E.
No.2828A�
��iSTBR�
EXPIRES 4ECEMBER 2G. LO
SnapNrack Series 100 Snap', rack-
Project info:
Dealer: Plower Trip Energy Project Name:1 Cowan
Create Dater 2015-06-16715:56:05-0700 BOM#:1 33706
PV Module Data:
Module Brand SunPower Length 61.39 inches
Modell SPR-250-BLK-B-AC ^� Width 31.42 inches
Depth 1.81 inches
Environmental Requirements: Weight 33.10 pounds
Topographic Condition Standard Rated power @ STC 245.00 W
Standard IBC 2012 1 Rail Color. Black
Snow Load 21-30 psf Item 4 checklist Racking Color Black
Wind Speed 130 mph Item 4 checklist
Rafter Spacing 24 inches
Roof Attachment Flashed L-Foot
System Style:
Rail Finish Black Anodized
End Clamp Type Universal
Grounding Method UL 2703 Listed
Micro Attachment Kits No
Edge Screen Trim? No I if"Yes",4"or 8"screen? Screen Height� inches
Tilt Up?l No
Sub-Arrays: UL2703 Yes Premium Alloy Rai-1 No Bulk Customer No
Sub-Array Sub-Array 122"Rail 162" Rail Rail Mid End Edge Roof
Modules Splices Clamps Clamps Screen Attachments
1 17 20 2 10 22 24 0 56
2
TOTALS 17 20 2 10 22 24 0 56
Page 1 of 3
Cowan Solar Racking
Snaphlrack Series 100 Calculator
Proposed Bill of Materials
Part Number Description qty
015-09822 SNAPNRACK,STANDARD RAIL SET,1221N,BLACK,6 PC 3
015-09816 SNAPNRACK,STANDARD RAIL SET,1221N,BLACK,2 PC 1
015-09818 SNAPNRACK,STANDARD RAIL SET, 1621N,BLACK,.2 PC 1
242-04015 SNAPNRACK, BONDING STANDARD RAIL SPLICE ASSEMBLY,BLACK 10
242-02055 SNAPNRACK,BONDING MID CLAMP ASSEMBLY, 1.50-`2.00IN,BLACK 22
242-02063 SNAPNRACK,BONDING UNIVERSAL END CLAMP ASSEMBLY 24
232-01023 SNAPNRACK RAIL END CAP,STANDARD,BLACK 24
242-02700 SNAPNRACK,BONDING L-FOOT KIT W/BASE AND FLASHING,CLEAR L-FOOT 56
242-02101 SNAPNRACK,GROUNDING LUG ASSEMBLY 6
Total Weight: 228.08 lbs
System Total Weight: 866.00 lbs
Array Area=17 modules x(31.4"x 61.4"/144 sq.inch per sf)=228 sf
Pounds per Square Foot of Array=860 lbs/228 sf=3:77 psf Item 5 checklist
Pounds per attachment=860 lbs/56=15 lbs.perattachment Item 6 checklist
Page 2 of 3
Modules Per 7 Array Pitch(degrees) 18 Sub-Array Modules 17
Row
Module 6 Building Height(ft) 15 Edge Screen(ft) 0
Rows
Orientation Landsca a Attachment Spacing Attachment Spacing
p inches 72 Override inches 48 Array Power(kW) 4.165
The maximum recommended rail span for this sub-array is 72 inches.The rail span for modules located in edge zones is reduced by 24 inches to 48 inches
Group 1 Rail Group 2 Rail Group 3 Rail Group 4 Rail Group S Rail 122"Rail 162"Rail Row Mid Row End Row Attach- Module Rail
Length Length Length Length Length Qtv Clams Clams Splices ments Sondin —Bonding
122.78 0 2 2 4 0 6 0 1 ❑❑❑Q❑
185.17 4 0 4 4 2 10 0 1 ❑❑❑Q
185.17 4 0 4 4 2 10 0 1 ❑❑❑
185.17 4 0 4 4 2 10 0 1 ❑C]0 0 El❑❑
185.17 4 0 4 4 2 10 0 1 0❑Q00Q
185.17 4 0 4 4 2 10 0 1 ❑�❑❑ ❑Q
Sub-Array 20 2 22 24 10 56 0 6
Totals
Cowan Solar Racking Page 3 of 3
yYV.y�a
Power TrIp (EnvgM Corp
83 Denny Ave
Port Townsend, WA 98368
(360) 643-3080
powertripenergy.com
lic # POWEF TE964JN
June 17,2015
Pat Bartholick
Code Compliance Officer
321 E 5th Street
P.O. Box 1150
Port Angeles,WA 98362
codecompliance@cityofpa.us
Dear Mr. Bartholick,
Enclosed please find a building permit for work to be done at 1421 East 2°d St,Port Angeles for David Cowan. Our
company(Power Trip Energy)will be installing a 9.25 kW solar array on the south&east roofs of his house.
I am using the Application and Checklist for Roof Mounted Residential Solar Panels,same as the last permit.
Power Trip Energy will be happy to pay for the plan check fee by credit card as soon as you request payment.
If you have any additional questions please do not hesitate to call the office at 360-643-3080.
Sincerely,
+- � �
John Fleming,PE
Solar Engineer
Power Trip.Energy
Attachments:
Application and Checklist for Roof Mounted Residential Solar Panels,site plan,&support documents
1