HomeMy WebLinkAbout1617 E 3rd Street Address:
1617 E 3rd Street
PREPARED 5/30/17, 13:23:40 INSPECTION TICKET .�_ PAGE 5
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 5/30/17
--' ----
ADDRESS . : 1617 E 3RD ST SUBDIV:
CONTRACTOR VAUGHAN'S CONSTRUCTION PHONE (360) 477-2626
OWNER TANNER STEPHENS PHONE (206) 769-1285
PARCEL 06-30-00-6-9-0127-0000-
APPL NUMBER: 17-00000663 RESIDENTIAL RE-ROOF
--------------- ---------------------------------------------1---------------------
PERMIT: BNOP 00 BUILDING PERMIT - NO PR FEE
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
BL99 01 5/30/17L BLDG FINAL
Denver 477-2626
------------------------- ----------- COMMENTS AND NOTES
CITY OF PORT ANGELES
DEPARTMENT'1P TMENT OF COMMUNITY & ECONOMIC DEVELOPMENT-
,�. EUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Application Number . . . . . 17-00000663 Date 5/23/17
Application pin number . . . 313156
Property Address . . . . . . 1617 E 3RD ST D �+ v
ASSESSOR PARCEL NUMBER: 06-30-00-6-9-0127-0000- REPORT SALES TMA
Application type description RESIDENTIAL RE-ROOF
Subdivision Name . . . . . On your state excise tax form
Property Use to the City of Port Angeles
Property Zoning . . . . . . . RS7 RESDNTL SINGLE FAMILY
Application valuation . . . . 4000 (Location Code 0502)
----------------------------------------------------------------------------
Application desc
- TEAR OFF/INSTALL COMP
-------------------------------------------------------------------
VJ Owner Contractor
------------------------ ------------------------
TANNER STEPHENS VAUGHAN'S CONSTRUCTION
540 W WASHINGTON ST 2512 E RYAN DRIVE
III SEQUIM WA 98382 PORT ANGELES WA 98362
(206) 769-1285 (360) 477-2626
----- --------------- -----
Permit . . . . . . BUILDING PERMIT - NO PR FEE
Additional desc . . TEAR OFF/INSTALL COMP
Permit Fee . . . . 123.75 Plan Check Fee .00
Issue Date 5/23/17 Valuation 4000
•pJ�� Expiration Date 11/19/17
Qty Unit Charge Per Extension
BASE FEE 95.75
2.00 14.0000 THOU BL-2001-25K (14 PER K) 28.00
----------------------------------------------------------------------------
Other Fees . . . . . . . . STATE SURCHARGE 4.50
----------------------------------------------------------------------------
Fee summary Charged Paid Credited Due
----------------- ---------- ---------- ---------- ----------
i Permit Fee Total 123.75 123.75 .00 .00
Plan Check Total .00 .00 .00 .00
Other Fee Total 4.50 4.50 .00 .00
Grand Total 128.25 128.25 .00 .00
1V I
I'
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized isnot commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
�LkC&n
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Stemwal I
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-In
Water Line Meter to Bldg)
Gas Line
Back Flow/Water
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders/Under Floor
Shear Wall/Hold Downs w.
Walls/Roof/Ceiling
Drywall Interior Braced Panel Only)
T-Bar
INSULATION: n
Slab
Wall/Floor/Ceiling
MECHANICAL: '
Heat Pump/Furnace/FAU/Ducts
Rough-in
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parkin /Lighting ESA:
Landscaping SHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction - R.W. PW /Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
T F- ' ' G_ IfLi For City Use
COY t3 /
Permit# 17-lT��
Ul A S H I N G T 0 N , U . S.
Date Received:
321 E 5th Street Date Approved S 7-3, ' /7
Port Angeles,WA 9836
P:360-417-4817 F:360-417-4711
Email:permJts@citvofna.us 3 ei1
BUILDING PERMIT APPLICATION
Project Address: (� �[ -
Phone: 6(-a.0 -7 2-(o
Primary Contact: Email: o-ec
Phone
Property Mailmi Address / Email
Owner D+ � �11.11t/ �V.4
City Stat y�' Z' p
C 1� �J�oZ
Name Phone
CSS] d
Contractor Add r s QL Z Email
Information city State Zi s
P
Contractor License# \ Exp.Date:
Legal Description: Zoning: Tax Parcel# Project Value: (materials and labor)
OOQv—'�
Residential Commercial ❑ Industrial ❑ Public ❑
` Permit Demolition ❑ Fire ❑ Repair ❑ Reroof(tear off/lay over)
�Classification For the following,,fll out both pa es of permit application:
(check New Construction ❑ Exterior Remodel ❑ Addition ❑ Tenant Improvement ❑
appropriate) Mechanical ❑ Plumbing ❑ Other ❑
Fjre Sprinkler System Proposed Irrigation System Proposed or Proposed Bathrooms Proposed Bedrooms
or Existing? Yes ❑ No ❑ Existing? Yes ❑ No ❑
In addition to standard hard copy submittals please send a PDF copy of all Stormwater plans and Engineering to
www.stormwater ci o a.us
h
Project Description t3yV��
- I til
Is project in a Flood Zone: Yes ❑ No❑ Flood Zone Type:
If in a Flood Zone, what is the value of the structure before proposed improvement? $
I have read and completed the application and know it to be true and correct.I am authorized to apply for
this permit and understand that it is my responsibility to determine what permits are required and to
obtain permits prior to work. I understand that plan review fees are not refundable after review has
occurred. I understand that.I will forfeit review fees if I withdraw the application before the permit is
issued. I understand that if the permit is not picked up/issued within i8o days of submittal,the application
will be considered abandoned and the fees will be forfeited.
Date
krinName kiggna(:)e(—