HomeMy WebLinkAbout1802 Harborcrest Place Address:
1802 Harborcrest Place
10 2-
PREPARED 5/04/15, 10:17:53 INSPECTION TICKET PAGE 5
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 5/04/15
------------------------------------------------------------------------------------------------
ADDRESS . : 1802 HARBORCREST PL SUBDIV:
CONTRACTOR COZI HOMES CONSTRUCTION INC PHONE (360) 452-9906
OWNER BLAETTLER, EUGENE & JEANNE PHONE (717) 468-9059
PARCEL 06-30-00-9-6-0003-0000-
APPL NUMBER: 15-00000095 RES REMODEL
------------------------------------------------------------------------------------------------
PERMIT: BPR 00 BUILDING PERMIT - RESIDENTIAL
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
BL99 01 5/04/15 LL BLDG FINAL
May 4, 2015 9:55:30 AM jlierly.
Ken 460-0039 call first
PERMIT: ME 00 MECHANICAL PERMIT
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
ME6 01 3/12/15 PB MECHANICAL GAS LINE
3/16/15 AP March 12, 2015 12:06:37 PM pbarthol.
Ken 460-0036
March 16, 2015 1:08:23 PM pbarthol.
ME99 01 5/04/15 J L MECHANICAL FINAL
May 4, 2015 9:56:02 AM jlierly.
_____________________N�"__ ________--_________-_______________-___________---_____-_____
PERMIT: PL 00 PLUMBING PERMIT
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
________________________________________________________________________________________________
PLSP O1 2/27/15 JLL PLUMBING SHOWER PAN
2/27/15 AP February 27, 2015 11:22:05 AM pbarthol.
Ken 460-0036
February 27, 2015 4:20:44 PM jlierly.
PL99 01 5/04/15 J L PLUMBING FINAL
May 4, 2015 9:56:18 AM jlierly.
--------------------- --- ----------- COMMENTS AND NOTES --------------------------------------
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362 U
e
Application Number . . . . . 15-00000095 Date 2/12/15
Application pin number . . . 517165
Property Address . . . . . . 1802 HARBORCREST PL
ASSESSOR PARCEL NUMBER: 06-30-00-9-6-0003-0000- REPORT SALES TAX
Application type description RES REMODEL
Subdivision Name . . . . . . on your state excise tax form
Property Use . . . . . . . .
Property Zoning . . . . . . . RS7 RESDNTL SINGLE FAMILY to the City of Port Angeles
Application valuation 23650 (Location Code 0502)
----------------------------------------------------------------------------
Application desc
REMODEL BATHROOM/MOVE KITCHEN/ADD GAS FP&RANGE
Owner Contractor
------------------------ ------------------------
BLAETTLER, EUGENE & JEANNE COZI HOMES CONSTRUCTION INC
PO BOX 2729 324 E 9TH ST
PORT ANGELES WA 983629032 PORT ANGELES WA 98362
(717) 468-9059 (360) 452-9906
-----------------------------------------------------------------------------
Permit . . . . BUILDING PERMIT -RESIDENTIAL
Additional desc INTERIOR REMODEL
Permit Fee . . . . 403.75 Plan Check Fee 262.44
Issue Date . . . . 2/12/15 Valuation . . . . 23650
Expiration Date 8/11/15
Qty Unit Charge Per Extension
BASE FEE 95.75
22.00 14.0000 THOU BL-2001-25K (14 PER K) . 308.00
----------------------------------------------------------------------------
Permit . . . . . . MECHANICAL PERMIT
Additional desc REMODEL MECHANICAL
Permit Fee . . . . 92.60 Plan Check Fee .00
Issue Date . . . . 2/12/15 Valuation . . . . 0
Expiration Date 8/11/15
Qty Unit Charge Per Extension
BASE FEE 50.00
1.00 10.6500 EA ME-HOOD/DUCT-MECH. EXHAUST 10.65
1.00 10.6500 EA ME-STOVE/FIREPLACE/MISC. APP. 10..65
2.00 - 10.6500-EA ME-FUEL GAS PIPING,_1-5 OUTLETS 21.30
- A
------------------I---------------- `J
Permit . . . . . . PLUMBING PERMIT
Additional desc . . REMODEL PLUMBING PERMIT
Permit Fee . . . . 92.00 Plan Check Fee .00
Issue Date . . . . 2/12/15 Valuation . . . . 0'
Expiration Date . . 8/11/15 1
\i
Qty Unit Charge Per Extension
BASE FEE 50.00 A
4.00 7.0000 EA PL-PLUMBING TRAP 28.00
2.00 7.0000 EA PL-DRAIN VENT PIPING 14.00
----------------------------------------------------------------------------
Other Fees . . . . . . . STATE SURCHARGE 4.50
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized isnot commenced within.180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating constr ction or the performance of
constructio .
Ze
Date r',�rint Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
we
BUILDING PERMIT INSPECTION RECORD
PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Stemwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-In
Water Line Meter to Bldg)
Gas Line
Back Flow/Water FINAL Date Accepted b
AIR SEAL:
Walls
. Ceiling
FRAMING:
Joists/Girders/Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall Interior Braced Panel Onl
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pump/Furnace/FAU/Ducts
Rough-in
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts FINAL Date Accepted b
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parkin /Lighting ESA:
Landscaping SHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction- R.W. PW /Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
T:Forms/Building Division/Building Permit
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION
® 321 EAST 5TH STREET, PORT ANGELES, WA 98362
Page 2
Application Number . . . . . 15-00000095 Date 2/12/15
Application pin number . . . 517165
----------------------------------------------------------------------------
Fee summary Charged Paid Credited Due
REPORT SALES TAX
---------- ---------- ---------- on your state excise tax form
Permit Fee Total 588.35 588.35 .00 .00 to the 9
Plan Check Total 262.44 262.44 .00 .00 e City of Port Angeles
Other Fee Total 4.50 4.50 .00 .00 (Location Code 0502)
Grand Total 855.29 855.29 .00 .00
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
a.n Y l
BUILDING PERMIT INSPECTION RECORD
PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS--
Building Inspections 417-4815 Electrical Inspections 417-4735
Public
Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL,TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Stemwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-In
Water Line Meter to Bldg)
Gas Line
Back Flow I Water FINAL Date Accepted b
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists l GirGirders/Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall Interior Braced Panel Onl
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pump/Furnace/FAU/Ducts
Rough-in
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts FINAL Date Accepted b
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parkin /Lighting ESA:
Landscaping SHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction- R.W. PW /Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
T:Forms/Building Division/Building Permit
THE
CITY OF l�IOFLES, For City Use
Permit#
w A s H I N G T o N . U . S. Date Received: J /�
321 E 51h Street Date Approved A/of
Port Angeles,WA 9836
P:360-417-4817 F:360-417-4711
Email:permits@cityofpa uS BUILDING PERMI Iy' Ai' I,ICATION
Project Address:
41l c,! C. � P�
Phone: D ��
Prima Contact: �K 7"- Email:
NamePh
r _
one J(��
Property Mailin Addrels Email (!
Owner •o. ��r }'Pol�
City �� cie e S State Zi
Name t� I / j Phone OG 3 b
Contractor Address Email
Information city � � state
1 � n r Kce) �f�-�
� 'f� Lt-111 yi� zip eb _
Contractors License# �.-� ,f'(/ Exp.Date:
Legal Description: Zoning: Tax Parcel # =Projt Value: (materials and labor)�sv 23 ("5-0
Residential 7� Commercial ❑ Industrial ❑ Public ❑
Permit Demolition ❑ Fire ❑ Repair ❑ Reroof(tear off/lay over) ❑
Classification For the following fill out both pages of permit application:
(check New Construction ❑ Exterior Remodel ❑ Addition ❑ Tenant Improvement =Qf
appropriate) Mechanical ❑ Plumbing ❑ Other ❑
Fire Sprinkler System? Irrigation System? Proposed Bathrooms Proposed Bedrooms
Yes ❑ No Yes�D�No [3
Project Description 4 c 1 v q J� ��,�,,Y,
v ,
V �
Is project in a Flood Zone: Yes ❑ 1V f® Flood Zone Type:
If in a Flood Zone, what is the value of the structure before proposed improvement? $
I have read and completed the application and know it to be true and correct. I am authorized to apply for
this permit and understand that it is my responsibility to determine what permits are required and to
obtain permits prior to work. I understand that plan review fees are not refundable after review has
occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is
issued. I understand that if the permit is not picked up/issued within 18o days of submittal, the application
will be considered abandoned and the fees will be forfeited.
Date ;:�rint Name Signature ,,�'
Residential Structures
Existing Proposed Construction For Office Use
Area Descriptions (SQ FT) Floor area Floor area $ Value new
area
Basement
First Floor
Second Floor
Covered Deck/Porch/Entry
Deck (over 30" or i" floor)
Garage
Carport
Other(describe)
Area Totals /
Commercial Structures
Construction For Office Use
Area Descriptions (SQ FT) Existing Proposed $Value new
Floor area Floor area area
Existing Structure (s)
Proposed Addition
Tenant Improvement?
Other work(describe)
Site Area Totals J
Lot/Site Coverage Calculations
Lot Size (sq ft) Lot Coverage (sq ft) %Lot Coverage (Total lot cov_lot size) Max Bldg Height
Site Coverage (Sq Ft of all impervious) %of Site Coverage (total site cov-lot size)
Mechanical Fixtures
Indicate how many of each type of fixture to be installed or relocated as part of this project.
Air Handler Size: # Haz/Non-Haz Piping Outlets:
Appliance Exhaust Fan # Heater(Suspended, Floor, Recessed wall) #
Boiler/Compressor Size: # Heating/Cooling appliance #
repair/alteration
Evaporative Cooler (attached,not # Pellet Stove/Wood-burning/Gas #
portable) Fireplace/Gas Stove/Gas Cook Stove/Misc.
Fuel Gast.Piping #of Outlets Ventilation Fan, single duct #
Furnace/Heat Pump/ Size: # Ventilation System #
Forced Air Unit
Plumbing Fixtures
Indicate how many of each type of fixture to be installed or relocated
Plumbing Traps # Ll Fuel gas piping #of Outlets:
Water Heater # Medical gas piping #of Outlets:
Water Line # Plumbing Vent piping #
Sewer Line # Industrial waste pretreatment
interce for Grease Tra Size
Other(describe):
T:\BUILDING\APPLICATION FORMS\Current BP Application\Building Permit 4-17-13.docx
r �
!
4464
p, --S V1
Al
NAL
' -r-
'Ole
r- 1
��
�;
. � ,
:��
7 gipp.'• - ,�^
.. _..
_ _.
..,_�
- -- � ��� �1 rte` �'���„��r � � ��,�� c,��--� ��, _ _ _ -_
_ .
_ __
®Boise Cascade Single 5-1/4" x 14" VERSA-LAM® 2.0 3100 DF Roof Beam\RB01
Dry 1 1 span I No cantilevers 10/12 slope Monday, October 27, 2014
BC CALC®Design Report
Build 3272 File Name: BC CALC Project
Job Name: Description: Designs\RB01
Address: Specifier:
City, State,Zip: , Designer:
Customer: Company:
Code reports: ESR-1040 Misc:
�0
12
15-00-00
BO 131
Total Horizontal Product Length =15-00-00
Reaction Summary (Down / Uplift) (lbs)
Bearing Live Dead Snow Wind Roof Live
B0, 3-1/2" 2,088/0 2,981 /0
B1, 5-1/2" 3,190/0 4,663/0
Live Dead Snow Wind Roof Live Trib.
Load Summary
Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125%
2 ridge beam load Conc. Pt. (lbs) L 09-00-00 09-00-00 4,995 7,644 n/a
Disclosure
Controls Summary Value %Allowable Duration Case Location Completeness and accuracy of input must
Pos. Moment 43,682 ft-lbs 87.2% 115% 4 09-00-00 be verified by anyone who would rely on
End Shear 7,823 lbs 48.7% 115% 4 01-05-08 output as evidence of suitability for
Total Load Defl. L/322 (0.535') 55.9% n/a 4 07-10-08 particular application.Output here based
on building code-accepted design
Live Load Defl. L/540 (0.319") 44.4% n/a 5 07-10-08 properties and analysis methods.
Max Defl. 0.535' 53.5% n/a 4 07-10-08 Installation of BOISE engineered wood
Span/Depth 12.3 n/a n/a 0 00-00-00 products must be in accordance with
current Installation Guide and applicable
building codes.To obtain Installation Guide
Allow %Allow
BearingSupports Dim.(L x W Value Su (8 ask questions,please call
pp ) Support Member Material (800)232-0788 before installation.\n\nBC
BO Post 3-1/2"x 3-1/2" 5,068 lbs n/a 55.2% Unspecified CALC®,BC FRAMER®,AJSTM,
B1 Post 5-1/2"x 3-1/2" 7,854 lbs 48% 54.4% Douglas Fir ALLJOIST®,BC RIM BOARDT"^ BCI®,
BOISE GLULAMTM'SIMPLE FRAMING
Cautions PLUS@,VERSA-RIM®M®,VERSA-RIM
Member is not fully supported at post B0. A connector is required at this bearing. VERSA-STRAND®,VERSA-STUD®are
Member is not fully supported at post B1. A connector is required at this bearing. trademarks of Boise Cascade wood
For roof members with slope (1/4)/12 or less final design must ensure that ponding instability Products L.L.C.
will not occur.
For roof members with slope(1/2)/12 or less final design must account for Rain-on-Snow
surcharge load.
Notes
Design meets Code minimum (L/180)Total load deflection criteria.
Design meets Code minimum (L/240) Live load deflection criteria.
Design meets arbitrary(1") Maximum total load deflection criteria.
Calculations assume Member is Fully Braced.
Design based on Dry Service Condition.
Deflections less than 1/8"were ignored in the results.
Page 1 of 1
Boise Cascade Single 3-1/2" x 18" VERSA-LAM@ 2.0 3100 DF Roof Beam\R1301
Dry 1 span No cantilevers 10/12 slope Monday, October 27, 2014
BC CALCO Design Report
Build 3272 File Name: BC CALC Project
Job Name: Description: Designs\RB01
Address: Specifier:
City, State, Zip: , Designer:
Customer: Company:
Code reports: ESR-1040 Misc:
"_�o
12
2
15-00-00
BO B1
Total Horizontal Product Length =15-00-00
Reaction Summary (Down / Uplift) (Ibs)
Bearing Live Dead Snow Wind Roof Live
BO, 3-1/2" 2,068/0 2,981 /0
B1, 5-1/2" 3,170/0 4,663/0
Live Dead Snow Wind Roof Live Trib.
Load Summary
Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125%
2 ridge beam load Conc. Pt. (Ibs) L 09-00-00 09-00-00 4,995 7,644 n/a
Disclosure
Controls Summary Value %Allowable Duration Case Location Completeness and accuracy of input must
Pos. Moment 43,616 ft-lbs 81.3% 115% 4 09-00-00 be verified by anyone who would rely on
End Shear 7,802 lbs 56.7% 115% 4 01-09-08 output as evidence of suitability for
Total Load Defl. L/458(0.377') 39.3% n/a 4 07-10-08 particular application.Output here based
on building code-accepted design
Live Load Defl. L/766(0.225") 31.3% n/a 5 07-10-08 properties and analysis methods.
Max Defl. 0.377' 37.7% n/a 4 07-10-08 Installation of BOISE engineered wood
Span/Depth 9.6 n/a n/a 0 00-00-00 products must be in accordance with
current Installation Guide and applicable
building codes.To obtain Installation Guide
%Allow %Allow or ask questions,please call
Bearing Supports Dim.(L x W) Value Support Member Material (800)232-0788 before installation.\n\nBC
BO Post 3-1/2"x 3-1/2" 5,048 lbs n/a 54.9% Unspecified CALCO,BC FRAMER@,AJSTM,
B1 Post 5-1/2"x 3-1/2" 7,833 lbs 47.9% 54.3% Douglas Fir ALLJOISTO,BC RIM BOARD TM BCI@,
BOISE GLULAMTM,SIMPLE FRAMING
SYSTEM@,VERSA-LAM@,VERSA-RIM
Cautions PLUS@,VERSA-RIM&,
For roof members with slope(1/4)/12 or less final design must ensure that ponding instability VERSA-STRAND@,VERSA-STUD@ are
will not occur. trademarks of Boise Cascade Wood
For roof members with slope(1/2)/12 or less final design must account for Rain-on-Snow Products L.L.C.
surcharge load.
Notes
Design meets Code minimum (L/180)Total load deflection criteria.
Design meets Code minimum (L/240) Live load deflection criteria.
Design meets arbitrary(1") Maximum total load deflection criteria.
Calculations assume Member is Fully Braced.
Design based on Dry Service Condition.
Deflections less than 1/8"were ignored in the results.
Page 1 of 1
®Boise Cascade Single 3-1/8" x 19-1/2" BOISE GLULAW 24F-V4/DF Roof Beamn\RB01
Dry 1 span No cantilevers 10/12 slope Monday, October 27, 2014
BC CALCO Design Report
Build 3272 File Name: BC CALC Project
Job Name: Description: Designs1RB01
Address: Specifier:
City, State, Zip: , Designer:
Customer: Company:
Code reports: ANSI 117-2010 Misc:
�o
12
15-00-00
BO B1
Total Horizontal Product Length =15-00-00
Reaction Summary(Down / Uplift) (lbs)
Bearing Live Dead Snow Wind Roof Live
BO, 3-1/2" 2,058/0 2,981 /0
B1, 5-1/2" 3,160/0 4,663/0
Live Dead Snow Wind Roof Live Trib.
Load Summary
Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125%
2 ridge beam load Conc. Pt. (Ibs) L 09-00-00 09-00-00 4,995 7,644 n/a
Disclosure
Controls Summary Value %Allowable Duration Case Location Completeness and accuracy of input must
Pos. Moment 43,582 ft-lbs 95.7% 115% 4 09-00-00 be verified by anyone who would rely on
End Shear 7,792 lbs 62.9% 115% 4 01-11-00 output as evidence of suitability for
Total Load Defl. L/468 (0.369") 38.5% n/a 4 07-10-08 particular application.Output here based
on building code-accepted design
Live Load Defl. L/782 (0.22") 30.7% n/a 5 07-10-08 properties and analysis methods.
Max Defl. 0.369" 36.9% n/a 4 07-10-08 Installation of BOISE engineered wood
Span/Depth 8.8 n/a n/a 0 00-00-00 products must be in accordance with
current Installation Guide and applicable
%Allow %Allow building codes.To obtain Installation Guide
or ask questions,please call
Bearing Supports Dim.(L x W) Value Support Member Material (800)232-0788 before installation.\n\nBC
BO Post 3-1/2"x 3-1/8" 5,038 lbs n/a 70.9% Unspecified CALCO,BC FRAMER@,AJST""
131 Post 5-1/2"x 3-1/8" 7,823 lbs 53.5% 70% Douglas Fir ALLJOISTO, BC RIM BOARD T-,BCI&,
BOISE GLULAMT ,SIMPLE FRAMING
SYSTEM@,VERSA-LAMO,VERSA-RIM
Cautions PLUS@,VERSA-RIM@,
For roof members with slope (1/4)/12 or less final design must ensure that ponding instability VERSA-STRAND&,VERSA-STUD&are
will not Occur. trademarks of Boise Cascade Wood
For roof members with slope (1/2)/12 or less final design must account for Rain-on-Snow Products L.L.C.
surcharge load.
Notes
Design meets Code minimum (L/180)Total load deflection criteria.
Design meets Code minimum (L/240) Live load deflection criteria.
Design meets arbitrary(1") Maximum total load deflection criteria.
Calculations assume Member is Fully Braced.
Design based on Dry Service Condition.
Deflections less than 1/8"were ignored in the results.
Page 1 of 1
®Boise Cascade Single 5-1/8" x 15" BOISE GLULAW 24F-V4/DF Roof BeamkRB01
Dry 1 span No cantilevers 0/12 slope Monday, October 27, 2014
BC CALC®Design Report
Build 3272 File Name: BC CALC Project
Job Name: Description: Designs\RB01
Address: Specifier:
City, State, Zip: , Designer:
Customer: Company:
Code reports: ANSI 117-2010 Misc:
�__10
12
2
v
15-00-00
BO 81
Total Horizontal Product Length= 15-00-00
Reaction Summary (Down/ Uplift) (lbs)
Bearing Live Dead Snow Wind Roof Live
BO, 3-1/2" 2,086/0 2,981 /0
B1, 5-1/2" 3,189/0 4,663/0
Live Dead Snow Wind Roof Live Trib.
Load Summary
Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125%
2 ridge beam load Conc. Pt. (lbs) L 09-00-00 09-00-00 4,995 7,644 n/a
Disclosure
Controls Summary Value %Allowable Duration Case Location Completeness and accuracy of input must
Pos. Moment 43,678 ft-lbs 98.8% 115% 4 09-00-00 be verified by anyone who would rely on
End Shear 7,820 lbs 50.1% 115% 4 01-06-08 output as evidence of suitability for
Total Load Defl. L/348(0.495') 51.7% n/a 4 07-10-08 particular application.Output here based
on building code-accepted design
Live Load Defl. L/584(0.295') 41.1% n/a 5 07-10-08 properties and analysis methods.
Max Defl. 0.495' 49.5% n/a 4 07-10-08 Installation of BOISE engineered wood
Span/Depth 11.5 n/a n/a 0 00-00-00 products must be in accordance with
current Installation Guide and applicable
building codes.To obtain Installation Guide
%Allow %Allow or ask questions,please call
Bearing Supports Dim.(L x W) Value Support Member Material (800)232-0788 before installation.\n\n BC
BO Post 3-1/2"x 3-1/2" 5,067 lbs n/a 63.6% Unspecified CALCO, BC FRAMER@,AJ STM,
B1 Post 5-1/2"x 3-1/2" 7,852 lbs 48% 62.8% Douglas Fir ALLJOISTO,BC RIM BOARD TM BCI@,
BOISE GLULAMT-,SIMPLE FRAMING
SYSTEM@,VERSA-LAM&,VERSA-RIM
Cautions PLUS@,VERSA-RIM@,
Member is not fully supported at post BO. A connector is required at this bearing. VERSA-STRAND@,VERSA-STUD@ are
Member is not fully supported at post B1. A connector is required at this bearing. trademarks of Boise Cascade Wood
For roof members with slope(1/4)/12 or less final design must ensure that ponding instability Products L.L.C.
will not occur.
For roof members with slope (1/2)/12 or less final design must account for Rain-on-Snow
surcharge load.
Notes
Design meets Code minimum (L/180)Total load deflection criteria.
Design meets Code minimum (L/240) Live load deflection criteria.
Design meets arbitrary(1") Maximum total load deflection criteria.
Calculations assume Member is Fully Braced.
Design based on Dry Service Condition.
Deflections less than 1/8"were ignored in the results.
Page 1 of 1
Boise Cascade Single *-1/8" x 15" BOISE GU UU F Roof BeamIRBOI
Ory1span | Nocantilevers 10/12 slope Monday,October 27.2O14
BCCALCODesign Report
Build 3272 File Name: BC CALC Project
Job Name: OeonhpUon: Oeo/gno\RBO1
Address: Specifier:
Cdy, State,Zip: . Designer:
Customer: Company:
Code reports: ANSI 117-2010 [Nion:
12
�
15-00-00
BO 131
Total
Horizontal Product Le5-00-00
Reaction Summary(Down/ Uplift) (|uo)
Bearing Live Dead Snow Wind Roof Live
B1, 5'1/%" 3.189/0 4.663/0
Live Dead Snow Wind Roof Live T,iu.
Load Summary
Tag Description Load Type Ref. Start End 100% 90% 115% 160% 125%
2 ridge beam load Conc. Pt. (Ibs) L 09-00-00 09-00-00 4,995 7,644 n/a
Disclosure
Controls Summary Value %Allowable Duration Case Location Completeness and accuracy ofinput must
Pos. Moment 43,678 ft-lbs 98.8Y6 11596 4 09-00'00 uoverified uyanyone who would rely vn
End Shear 7,820 lbs 50.196 11596 4 01'06'08 output aoevidence ofsuitability for
particular application.Ov�u��omboved
Total Load D*O. L/348(0.495") 51.7% n/a 4 07-10'08 vnuui|dmouvde-a-'pteddesign
Live Load DeO. L/584(0.295") 41.196 n/a 5 07-10'08 properties and analysis methods.
K4axOeO. 0.495" 4&596 n/a 4 07'10'08 Installation ufBOISE engineered wood
Span/Depth 11.5 n/a n/a O 00-00'00 products must be in accordance with
current Installation Guide and applicable
building codes.Tbobtain Installation Guide
Y6Allow %miow v,ask questions,please call
Bearing Supports (8Oo)232-O7uubefore instal anon.mmoC
BO Post 3-1/2^x3'1/2" 5,067 lbs n/a 63.6% Unspecified oALmm.aCFRAMsR@.*uS`°.
81 post 5'1/2''n3'1/2^ 7,852 lbs 4896 62.8% Douglas Fir xLLJO|8m9.oCRIM BOARD`°.aCmy.
BOISE GLuL«MTM'SIMPLE FRAMING
SYSTEM@.vsnG*.LAM@.VERSA-RIM
Cautions pLuSm.vsRSA'n|M@.
Member ianot fully supported otpost BO. Aconnector iorequired atthis bearing. vERS/+STRAmD@.vEeS/+STuDmare
Member\onot fully supported otpost B1. Aconnector iorequired mt this bearing. oauemameo,Bo/ooCaoomuaNmvung� Products L�L�C�
For roof members vvithslope(1/4V12orless final design must ensure that ponding in��abi|ity
will not occur.
For roof members with slope(1/2)/12 or less final design must account for Rain-on-Snow
surcharge load.
Notes
Design meets Code minimum(L/180)Total load deflection criteria.
Design meets Coda minimum(U340) Live load deflection criteria.
Design meets arbitrary(1^)Maximum total load deflection criteria.
Calculations assume Member ioFully Braced.
Design based onDry Service Condition.
Deflections less than 1/8''were ignored inthe results.
Page 1of1