HomeMy WebLinkAbout2236 W 10th Street Address:
2236 W jolh Street
Uity of Port Angeles
Correction Notice
Building Division
Job Located at C;Q2(o U) i io
Inspection of your work revealed that the following is
not in accordance with the codes governing the work in
this jurisdiction:
Qp
CL-A
These corrections must be made and are not to be
covered until reinspection is made. When oorrections
have been made, please call 360-4 7-4815 for inspection.
Date 7W z
0 uilding Division
DO NOT REMOVE THIS TAG
PREPARED 5/31/17, 9:58:16 INSPECTION TICKET PAGE
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 5/31/17
------------------------------------------------------------------------------------------------
ADDRESS . : 2236 W 10TH ST SUBDIV:
CONTRACTOR TUFF SHED INC PHONE (425) 640-9933
OWNER ERIC BUCH AND VIRGINIA DIMICK PHONE (360) 609-6151
PARCEL 06-30-00-1-0-5410-0000-
APPL NUMBER: 17-00000470 RES ACCESSORY BUILDING
------------------------------------------------------------------------------------------------
PEaZMIT: BPR 00 BUILDING PERMIT - RESIDENTIAL
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
BEXS 01 5/31/17 JLL A BLDG EXTERIOR SHEETING
Eric ?
------------ ------- ------------- COMMENTS AND NOTES --------------------------------------
PREPARED 6/20/17, 13:16:33 INSPECTION TICKET PAGE 3
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 6/20/17
------------------------------------------------------------------------------------------------
ADDRESS . : 2236 W IOTH ST SUBDIV:
CONTRACTOR TUFF SHED INC PHONE (425) 640-9933
OWNER ERIC BUCH AND VIRGINIA DIMICK PHONE (360) 609-6151
PARCEL 06-30-00-1-0-5410-0000-
APPI, NUMBER: 17-00000470 RES ACCESSORY BUILDING
------------------------------------------------------------------------------------------------
PEaZMIT: BPR 00 BUILDING PEaZMIT - RESIDENTIAL
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
BEXS 01 5/31/17 JLL BLDG EXTERIOR SHEETING
5/31/17 DA Eric ?
Bottom cord of truss is broken and machine gusset plate is
stamped and then over stamped. Attic storage space does not
allow for trusses with bottom cord broken or spit replace
trusses or obtain a fix from an engineer.JLL
BL3 01 JL�41 BLDG FRAMING TIME: 17:00
BL99 01 JLLn BLDG FINAL TIME: 17:00
Eric 360 609-6151
--------- ------------------- COMMENTS AND NOTES --------------------------------------
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY Sr- ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 99362
Application Number . . . . . 17-00000470 Date 4/28/17
Application pin number . . . 509150
Property Address . . . . . . 2236 W 10TH ST
ASSESSOR PARCEL NUMBER: 06-30-00-1-0-5410-0000- REPORT SALES TAX
Application type description RES ACCESSORY BUILDING
Subdivision Name . . . . . . on your state excise tax foun
Property Use . . . . . . . . to the City of Port Angeles
Property Zoning . . . . . . . RS9 RESDNTL SINGLE FAMILY
Application valuation . . . . 6326 (Location Code 0502)
---------- -----------------------------------------------------------------
Application desc
DETTACHED 160SF STIRAGE SHED W/64SF PORCH
----------------------------------------------------------------------------
Owner Contractor
------------------------ ------------------------
ERIC BUCH AND VIRGINIA DIMICK TUFF SHED INC
2236 W 10TH ST 17500 W VALLEY HWY STE 100
PORT ANGELES WA 9836314OG TUKWILA WA 98188
(360) 609-6151 (425) 640-9933
Other struct info . . . . . HARD SURFACE AREA
----------------------------------------------------------------------------
Permit . . . . . . BUILDING PERMIT -RESIDENTIAL
Additional desc TUFF SHED
Permit Fee . . . . 165.75 Plan Check Fee 107.74
Issue Date . . . . 4/28/17 Valuation . . . . 6326
Expiration Date 10/25/17
Qty Unit Charge Per Extension
4A BASE FEE 9S.75
70.00
5.00 14.0000 THOU BL-2001-25K (14 PER K)
-------------------------------------------------------------------------
Special Notes and Comments
April 28, 2017 2:22:04 PM pbarthol.
Project will result in the addition of a 224sf storage shed.
no land use problems anticipated.
April 21, 2017 2:S7:58 PM banders.
OK
Public Works Utility Engineering has no requirements for
this plan review.
----------------------------------------------------------------------------
Other Fees . .. . . . . . . . STATE SURCHARGE 4.50
----------------------------------------------------------------------------
Fee summary Charged Paid Credited Due
----------------- ---------- ---------- ---------- ----------
Permit Fee Total 165.75 165.75 .00 .00
Plan Check Total 107.74 107.74 .00 .00
Other Fee Total 4.50 4.50 .00 .00
Grand Total 277.99 277.99 .00 .00
N
Separate Permits are required forelectrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or loc law regulating construction or the performance of
construction.
D�t e Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
— PLEASE PROVIDEA MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Stemwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-In
Water Line(Meter to Bldg)
Gas Line
Back Flow/Water
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders/Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall(Interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pump/Furnace/FAU/Ducts
Rough-In
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parking/Lighting ESA:
Landscaping ISHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction - R.W. PW /Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
THF— For City Use
CITY OF Rl" ANGFL E S
P11fo— Permit#
ASH I NGTON, U . S. Date Received:
321 E 51h Street Date Approved
Port Angeles,WA 9836
P:360-417-4817 F:360-417-4711
Email:permits0cityofpa.us BUILDING PERMIT IPPLICATION
Project Address: 2'2 36 ZO -5;�- 7--
IPhone:
Primary Contact: 16�-FF lFmail-
Name Phone
'Li .111 C I t'
Property Mailing Address Email
Owner
Cit SL Zip
Name Phone
7�/
Contractor Address' Email
Information city State
Contractor License# Exp.Date:
Legal Description: Zom*ng: Tax Parcel# Project Value: (materi Is and labor)
$ 67-3
Commercial Industrial Public
Residential
Permit Demolition El Fire 11 Repair 11 Reroof(tear off/lay over) 0
Classification For the following,fill out both pages of permit application:
(check New Construction�:ff Exterior Remodel El Addition -ff Tenant improvement El
appropriate) I Mechanical 11 Plumbing El Other El
Fire Sprinkler System Proposed Irrigation System Proposed or oposed Bathrooms osed Bedrooms
or Existing? Yes 13 No [3 Existing? Yes [3 No 0 _':4� 1 Prop
I I Vr
In addition to standard hard copy submittals please send a PDF copy of all Stormwater plans and Engineering to
www.stormwaterAcitvo a.us
Project Descri tion 67-042�?irle-_
-�4 rrZ -C
Is project in a Flood Zone: Yes 13 No;ff Flood Zone Type:
If in a Flood Zone,what is the value of the structure before proposed improvement? $
I have read and completed the application and know it to be true and correct. I am authorized to apply for
this permit and understand that it is my responsibility to determine what permits are required and to
obtain permits prior to work. I understand that plan review fees are not refundable after review has
occurred. I understand thatJ will forfeit review fees if I withdraw the application before the permit is
issued. I understand that if the permit is not picked up/issued within 18o days of submittal,the application
will be considered abandoned and the fees will be forfeited.
Date Print Name Signatuer-e
Residential Structures
Existing Proposed Construction For Office Use
Area Descriptions 4S T Floor area Floor area $Value new area
Basement
First Floor
Second Floor
Covered Deck/Porch/Entry
Deck(over 30"or 2d floor)
Garage
Carport
Other(describe) L-) r4t4�e 5Z
Area Totals
Commercial Structures
Area Descriptions(SQ FT) Existing Proposed Construction For Office Use
Floor area Floor area $Value new area
Existing Structure(S)
Proposed Addition
Tenant Improvement?
Other work(describe)
Site Area Totals
Lot/Site Coverage Calculations
Lot Size(s�ft) I Lot Coverage(sq ft)foot i t of %Lot Coverage(Total lot cov lot size) Max Bldg Height
V,Vl.'M
all structures sq ft
Site Coverage(Sq Ft of all impervious) %of Site Coveragd(total site cov�lot size)
Mechanical Fixtures
Indicate how many of each type of fixtur to be installed or relocated as part of this project.
Air Handler I Size: # Haz/Non-Haz Piping Outlets:
Appliance Exhaust Fan # Heater(Suspended,Floor,Recessed wall) #
Boiler/Compressor Size: # Heating/Cooling appliance #
repair/alteration
Evaporative Cooler(attached,not # Pellet Stove/Wood-burning/Gas #
portable) Fireplace/Gas Stove/Gas Cook Stove/Misc.
Fuel Gas Piping #of Outlets: Ventilation Fan,single duct #
Furnace/Heat Pump/ Size: # Ventilation System #
Forced Air Unit I
Plumbing Fixtures
Indicate how many of each type of fixtu. e to be installed or relocated
Plumbing Traps # Water Heater #
Plumbing Vent piping # Medical gas piping #of Outlets:
Water Line # Fuel gas piping #of Outlets:
Sewer Line # Industrial waste pretreatment
interceptor(Grease Trap) Size
Other(describe):
T:\Forms\2015 CED Form Updates\Building&Permitting\BP\Building Permit 20150415.docx
From: Erica Barker<EBarker@TUFFSHED.COM>
Subject: TUFFSHED
Date: April 11,2017 1225:30 PM PDT
To: "ginericgwavecable.com"<ginericgwavecable.com>
7 Attachments, 519 KB
Hi Eric,
Here is generic drawing for your I OX1 6 TR-800 w/4' sidewall porch
Erica Barker
Off/ce Administrator
TUFFSHED' p:425-251-8833 f:425-251-9795
a: 17500 West Valley Hwy, Tukwila, WA 98188
v 0 C 0 w:tuffshed.com e: EbarkerCaNuffshed.corn
OPTIONAL TRrrRD-800 SHED 10'to16'WIDE x UP TO 24'LO
G TO THE TRUSS DESIGN FOR
UPTOI ��M!E�117,.f�ATE SIZE,11 #8 x r FLAT HEAD
2- SUNDANCE SERIES SELF-TAPPING SCREWS
NOTES: SPACED @ 24'O.0
4 12 REQUIRED FOR 14'&16' 1
SHUSSS I. BU LONG CODE:2013 CBC AND 2013 CRC 314'APAORTECO
RATED T&G
DOUBLE TOP 2. 13ESIGN LOADING: FLOOR DECKING
WIND SPEED&EXPOSURE:100C
r x T STEEL
TRUSS NAIL PLATES AREz ROOF LIVE LQAD1.40 PSF JOISTS a ze D.C.
EAGLE METAL PLATES WALL FRAMING TO BE 2A ROOF DEAD LOAD:10 PSF (6005137-051)
([CC OESR-1082) HF STUD GRADE OR BETTER
3. FOR SHEDS WHICH OTHERWISE MEET THE PRESCRIPTIVE #10 xV4'PAN I
REQUIREMENTS OF THE 2013 CEIC AND 2013 CRC HEAD SELF-TAPPING
!E RAFTER MANUFACTU D 16,D.C.
C, BY TUFF-SHED
M EARTH ANCHORS FORTHIS ALL SHEDS CO. UCTED ACCORDING TO STANDARD SCREWS(2 PER TAB)
UI.I.G ARE OPTIONAL IF CONVENTIONAL CONSTRUCTION METHODS. VENT HOLES @ Z4.O.0
REQUIRED BY YOUR LOCAL —KA'UNG:
MUNICIPALITY,ANCHOR ROOF: OPTIONAL LEVELING
AREAVAJLAB ATTUFF ATrACH 7/16*OSO SHEATHING TO TRUSSES WITH: BLOCKS
S
STEEL SHED BASE:SEE DETAIL 4 SHED.SEE SALESPERSON Ed NAI 8 @ 4-D.C.AT EDGES Z'xS'STEEL TRACK EACH
Bd NAILS @ 12'D.C.IN FIELD END(60OT125-054)
WALLS:
- E
SdNAI 012-O.C.INFIELD
1014rto B'-0*WIOE ATTACH 3fir SMARTSIDE 70VVALL FRAMING WITH:
SdNAI @4'0,C.AT DOES.
BUILDING SECTION HEADER LS e
ATrACH EADERTOSMDWrrH:
4-8d TOENAIL OR�15:1 END NAIL DOUBLED HEADER-16:1 G 1.STE L SHED FOUNDATION:
DOUBLE TOP PLATE r.W-16 GAUGE STEEL TRACKS G140 ZINC COATED
DOUBLE TOP PLATE 18'STAGGERED FACE NAIL r x W-16 GAUGE STEEL JOISTS G140 ZINC COATED @ 2V D.C.
1/2'PLYWOOD SPACER (SUPPLIER:ALLIED STUDCO(JOIST,GOOSI 31-0541 TRACK
11r PLYWOOD SPACER WOT125054)ICCER4MP.
2.314'APA OR TEOD RATED TONGUE AND FLOOR
CRIPPLES(IF RED.) CRIPPLES(IF REQ.) CRIPPLE STUD DECKING.24-MA"PANELSPAN.STAGGER PANEL LAYOUT.
KING STUD 3.FASTEN FLOOR DECKING TO JOIST&TRACKS USING
HEAD FOR HEADERSFOR #8 x 1�fiffi'Ml]MUM LONG SELF-DRILLING SCREWS @ 12'CC.
OPENINGS UP TO 3W OPENINGS UP T04�-V NO BLOCKING REQ IRED.ALL EDGES SHALL UE ON FLOOR
USE(2 2.4HF#2 USE(2)2.4 HF#2 JOISTS.STAGGERUMFL LAYO TPERAPACONDRION 1.
OPENINGS 4''V TO 8'-V 4.FASTEN SOLE THROUGH FLOOR DECKING INTO JOISTS
2.4 WINDOW SILL USE(2)24 HF#2 OR TRACKS WITH x 3r GALVANIZED SELF-DRILLING SCREWS
KING STUD @ 2�4'D.C.
TRIMMERS 5.ALLOWABLE FLOOR LIVE LOAD.75 PEP FOR STEEL JOISTS
TRIMMER CO TINUO SLY SUPPORTED.50 PEP FOR JOISTS ON BLOCKS
FLOO DECKING 1�q AS SHOWN.
BAS PLATE BASE PLAT. a U E OPTIONAL CONCRETE BLOCKS AS REQUIRED TO LEVEL
'D BUILDING:
KING STUD FLOOR DECKII ERB F 3R: [MER STUD
OPENINGS UPTO 6.0" SUGGESTED SIZES;2'x 8'x 18',4'x 8�x 1r,OR 8'x S*x fir.
FOR WINDOW OPENING U TO T�O' FOROPFNINGSUPTOF-VON USE 2.4HF#2 BLOCKS UNDER JOISTS SPACED @ V.V D.C.MAXIMUM.
8 1 P SU OPEAGS W-l'TO&4r BLOCKS UNDER TRACK SPACED 0 4.0-D.C.MAXIMUM.
ON SUNDANCS SERIES 8 DE WALLS NDANCE SERIES SIDE WALLS USE(2)24 HF#2
WINDOW HEADER DETAIL DOOR HEADER DETAIL HEADER DETAIL FOR NOW SHED BASE DETAIL
FOR LOAD BEARING WALLS FOR LOAD BEARING WALLS LOAD BEARING WALLS—
P.O.# DRAWINGS BY: TITLE DRAIIIIING NO.
DESIGN WE M� TUFF SHED,INC. TR/TRD800-02
Customr. D—By.SJ OF THE E
TUFF SHED O'd"# - 111111A BUILDING SECTIONS
Stantge Buildings&Ganages B.Ad—iTaw-12JI6114 BUILDING TO BE SUPRUMID IN HOUSE DRAFrM DEPARTMENT
TuFF SHED,INC. d— 1777 S.HARRISON Frium SHED BASE DETAILS REV.LEVEL 01
— Chduld By: DENVER.COLORADO 90210 HEADER FRAMING DETAILS SMEET
Building Siza:...7 D.I.: FORECCEN EY TUFFSH-ED " C303)753-TUFF
$111. N.T.S. NOTES-20
CITY OF PORT ANGELESfonlEE
The Issuance of t1lis permit based upon these plans
SPCCifications and other data shall not prevent the
building offlcial from thereafter requiring the 10 ox--
correction or errors in said plans,specifications and
Other data, or from preventing building operations
being carried on thereunder when in violation of 8H
codes and ordinances of this jurisdiction.
ALL WORK SYBJECT TO FIELD
6 PROVAL
Date By X
BUILDING PERMIT - STORMWATER
Department of Community & Economic Development
321 E. 5th Street, Port Angeles, WA 983 62 CITY USE ONLY
360.417.4750 1 www.cityof pa.us I ced@cityofpa.us Permit#: Z 7—VZO.
Received:
Approved:
TORMW��EfR_QUIESTIONNAIIRE
'S,
To determine the stormwater requirements that apply to your project, please answer the following questions:
1. What is the parcel size of the property to be developed? ffal(9 sq.ft.
2. What is the total area of already existing impervious surfaces? sq.ft.
3. What is the total land area that will be disturbed during this project? sq.ft:
4. What is the total area of new hard surfaces? sq.ft.
5. What is the total area of to-be replaced hard surfaces? sq.ft.
6. How much vegetation will be converted to la\�n/landscaped area? 6 sq.ft.
7. How much native vegetation will be converted to pasture? 6 sq.ft.
8. Does the site have 35% or less existing impervious coverage?
4ul YES: This project is considered a "new development" project, proceed to question 9
NO: This project is considered a "re-development" project, proceed to question 13
NEW DEVELOPMENT
9. Does the project result in 5,000 sq.ft. or greater of new+ replaced hard surface?
0 YES: A Large Project Stormwater Plan is required
NO: Proceed to question 10
10. Does the project convert%acre (32,670 sq.ft.) or more of vegetation to lawn or landscaped area, or
convert 2.5 acres or more of native vegetation to pasture?
0 YES: A Large Project Stormwater Plan is required
)KI NO: Proceed to question 11
11. Does the project result in 2,000 sq.ft. or greater of new plus replaced hard surface area?
0 YES: A Small Project Stormwater Plan is required
0 NO: Proceed to question 12
12. Does the project have land disturbing activities greater than 7,000 sq.ft.,but less than an acre?
0 YES: A Small Project Stormwater Plan, is required.
;Q NO: Only Minimum Requirement 2 applies
REDEVELOPMENT
13. Does the project add 5,000 sq. ft. or more of new hard surfaces?OR Convert 32,670 sq. ft. acre) or
more of vegetation to lawn or landscaped area? OR disturb greater than 1 acre of land? OR Convert 2.5
acres or more of native vegetation to pasture?
0 YES: A Large Project Stormwater Plan is required
0 NO: Proceed to question 14
14. Does this project result in 2,000 sq. ft., or more, of new plus replaced hard surface area? OR Is the land
disturbing activity greater than 7,000 sq. ft. but less than 1 acre?
0 YES: Minimum Requirements 1 —5 apply. Proceed to question 15
0 NO: Only Minimum Requirement 2 applies
15. Is the total of new plus replaced hard surfaces 5,000 sq. ft. or more,AND does the value of the proposed
improvements—including interior improvements—exceed 50% of the assessed value (or replaced value)
of the existing site improvements?
• YES: A Large Stormwater Plan is required
• NO: A Small Project Stormwater Plan is required
BUILDING PERMIT - STORMWATER
Upon completion of the stormwater questionnaire, please use Tablel and Table 2 to determine the required
stormwater management practices, and provide the appropriate materials with submission of your completed
building permit application.
Please indicate the level of Stormwater Management your project is required to meet:
(tMR#2 Only 0 Small Project(MR#1-5) 0 Large Project (MR#11-9) 0 Exempt
Table hington State Department of Ecology Minimum Requirements (MR)
MR#11: Preparations of stormwater site plans MR#6: Runoff treatment
MR#2: Construction Stormwater Pollution Prevention Plan (SWPPP) MR#7: Flow Control
MR#3: Source control of pollution MR#8: Wetlands protection
MR#4: Prevention of natural drainage systems and outfalls MR#9: Operation and maintenance
MR#5: On-site stormwater management
Table 2: Stormwater Management Information
Requirement Description Required
A complete Construction SWPPP does not need to be prepared and COPA Factsheet B
MR#2 Only submitted to meet this requirement. However,the project proponent Additional Resources
must consider all 13 Elements of Construction Stormwater Pollution USSG 6.05.03
Prevention and develop controls for all elements of the project.* SWMMWWVol.1-2.5.5
Small projects are required to meet Minimum.Requirements 1-5. COPA Factsheet A
Small project These projects are generally less impactful and therefore require less COPA Worksheets:
stormwater stormwater protection and mitigation efforts. These projects have '.A,B,C,D,E
plan the option to use the City's pre-engineered worksheets, templates, Additional Resources
MR 1-5) and forms to construct an a Small Stormwater Management Plan. USSG 5.04.01.1
SWMMWWVol.1-Ch.2
Large projects are required to meet all Minimum Requirements
Large Project (1-9). These projects are either impactful by design or are being Contact a Licensed
Stormwater developed in an environmentally sensitive and/or critical area. The Engineering Firm
Plan project proponent is required to retain professional, engineering Additional Resources
(MR 1-9) services to prepare and submit a detailed report that addresses site USSG 5.04.01.2
specific stormwater concerns and engineered solutions that meet SWMMWWVol.1-Ch.2
WA State specifications.
USSG:City of Port Angeles Urban Services and Standards Guidelines,2017 updated edition.Available free-of-charge at hftps://wa-
portangeles.civicplus.com/277/urban-services-standards-guidelines
SWMMWW:.WA State Dept. of Ecology's Stormwater Management Manual for Western Washington,2014 updated edition
k
C�
1003
61007 ,
1011
2243
QC2230
30
Wa er main E�—
WWater main Feet
�.d�"".Ph,Wp I I— h—Th",
P—*.�d�,�,�'Y f'— ,,—.�P�— Swater main
Elacin.,distnbution aaaaa, I VI