HomeMy WebLinkAbout225 E. 11th Street Address:
1 11h Street
PREPARED 10/24/14, 13:54:41 INSPECTION TICKET PACE 1
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 10/24/14
------------------------------------------------------------------------------------------------
ADDRESS . : 225 E 11TH ST SUBDIV:
CONTRACTOR : PHONE
OWNER Daniel R Clawson PHONE
PARCEL 06-30-00-0-3-2975-0000-
APPL NUMBER: 13-00001121 RES ACCESSORY BUILDING
------------------------------------------------------------------------------------------------
PERMIT: BPR 00 BUILDING PERMIT - RESIDENTIAL
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
BLFO 01 10/24/13 JLL BLDG FOUNDATION
10/24/13 AP October 24, 2013 4:02:41 PM jlierly.
October 24, 2013 4:02:55 PM jlierly.
201 ufr installed for future elec panel/jll
BL3 01 1/03/14 PB BLDG FRAMING
1/08/14 AP January 3, 2014 8:41:24 AM pbarthol.
Danny 775-97G9
January 8, 2014 10:OS:07 AM pbarthol.
BL9 01 1/03/14 PB BLDG SHEARWALL
1/08/14 AP January 3, 2014 8:42:13 AM pbarthol.
Danny 775-9769
January 8, 2014 10:05:07 AM pbarthol.
BL99 01 10/24/14 BLDG FINAL
Ct October 24 2014 1:19:03 PM pbarthol.
Daniel 77;_9769
--------------------- --------- COMMENTS AND NOTES --------------------------------------
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY& ECONOMIC DEVELOPMENT BUILDING DIVISION
321 FAST 5TH STREET, PORT ANGELES, WA 98362
Application Number . . . . . 13-00001121 Date 10/21/13
Application pin number . . . 693757
Property Address . . . . . . 225 E 11TH ST
ASSESSOR PARCEL NUMBER: 06-30-00-0-3-2975-0000-
Application type description RES ACCESSORY BUILDING REPORT SALES TAX
Subdivision Name . . . . . . on your state excise tax form
Property Use . . . . . . . . to the City of Port Angeles
Property Zoning . . . . . . . RS7 RESDNTL SINGLE FAMILY
Application valuation . . . . 19800 (Location Code 0502)
----------------------------------------------------------------------------
Application desc
DETACHED GARAGE
----------------------------------------------------------------------------
Owner Contractor
------ - -------
Daniel R Clawson OWNER
225 E llth st
PORT ANGELES WA 98362
Other struct info . . . . . .HARD SURFACE AREA
------------------------------------
------------------------------------------
Permit . . . . . . BUILDING PERMIT -RESIDENTIAL
Additional desc . . NEW 660 SF GARAGE
Permit Fee . . . . 347.75 Plan Check Fee 226.04
issue Date . . . . 10/21/13 Valuation . . . . 19800
Expiration Date 4/19/14
Qty Unit Charge Per Extension
BASE FEE 95.75
18.00 14-0000 THOU BL-2001-25K (14 PER K) 252.00
----------------------------------------------------------------------------
Special Notes and Comments
October 4, 2013 3:44:03 PM tamiot.
electrical permit will be required for all electrical work.
The Fire Department has reviewed the project application and
has no comments
October 16, 2013 11:23:17 AM sroberds.
Proposal will result in new garage in rear area of site for
total lot coverage of 30%. No land use issues anticipated.
APPLICANT RESPONSIBLE FOR EROSION & SEDIMENT CONTROL AND
SURFACE RESTORATION.
consider applying for the City Green Infrastructure Rebate
Of UP to $500.00 towards the materials to install rain
garden to control roof and driveway runoff. Contact Jonathan
Boehme at 360 417-4811
No attachment to sanitary sewer of stormwater roof leaders,
foundation drains, yard drains, or any other CSO
contribution is allowed.
-----------------------------------------------------------------------------
Other Fees . . . . . . . . . STATE SURCHARGE 4.50
----------------------------------------------------------------------------
Fee summary - Charged Paid Credi ted Due
----------------- ----7----- ---------- ---------- ----------
Permit Fee Total 347.75 347.75 , .00 .00
Separate Permits are required forelectrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit b ecomes
null and void if work or construction authorized is-no-t commenced within,180 days,if constructi-on or work is suspended or abandoned
for a period of 180 days after the work'has commenced,or if requiredInspectiorns have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or canceLthe provisions of a state r local law regulating construction or the performance of
construction.
Date Print N)Me Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
TForms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections. 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Sternwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-in
Water Line(Meter to Bldg)
Gas Line
Back Flow/Water FINAL Date Accepted by
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists I Girders/Under Floor
Shear Wall/Hold Downs
Walls/Roof I Ceiling
Drywall(interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall I Floor/Ceiling
MECHANICAL:
Heat Pump/Furnace/FAU/Ducts
Rough-In
73;�as Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts FINAL Date Accepted by
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parking/Lighting ESA:
Landscaping ISHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction-R.W. PW Engineering 417-4831
Fire 417-4653
Planning 417-4750
L Building 417-4815
T:Forms/Building Division/Building Permit
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY& ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Page 2
Application Number . . . . . 13-00001121 Date 10/21/13
Application pin number . . . 693757
Plan Check Total 226.04 226.04 .00 .00 REPORT SALES TAX
Other Fee Total 4.50 4.50 .00 * .00
Grand Total 578.29 578.29 .00 .00 on your state excise tax form
to the City of Port Angeles
(Location Code 0502)
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is-,not commenced within 180,days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, 'or if req'uired:inspecti6ns have'not been.requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections, 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type 7 Date Accepted By Comments
FOUNDATION:
Footings
Stemwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
ough-In
Water Line(Meter to Bldg)
Gas Line
Back Flow/Water FINAL Date Accepted bV
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders/Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall(Interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor I Ceiling
MECHANICAL:
Heat Pump/Furnace/FAU/Ducts
Rough-In
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts FINAL Date Accepted bV
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parking/Lighting ESA:
Landscaping SHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction-R.W. PW /Engineering 417-4831
Fire 417-4653
Planning 417-4750
L Building 417-4815
T:Forms/Building Division/Building Permit
THF-
For City Use
CITY OF RT ANGE LES-
Permit# -3
V�� A S H I N G-T 0 N , U . S . Oate Received: /V-� –21
321 E 51h Street Pate Approved
Port Angeles,WA 9836 A
P:360-417-4817 F:360-417-4711
Email: VermitsPcitvofXa.us BUILDING PERMIT AlPfLICATION
Proj ect Address:
Phone: J&D
Primaa Contact: C1 Email:
Nam Phone
Property Mailing Address Email
Owner 2- &,g
State
cityn
'W61V
Name Phone
—Contractor— Address Email
Information city State Zip
rcontractor License# Exp.Date:
Legal Description: Zoning: Tax Parcel # Project Value:-(matPr;n1c—412bor)
/91
Residential EY Commercial � Industrial Public
Permit Demolition El Fire 11 Repair 0 Reroof(tear off/lay over)
Classification For the following, fill out both pages of permit application:
.(check New Constructiori q Exterior Remodel 11 Addition El Tenant Improvement 11
appropriate) I Mechanical 11 Plumbing D Other 11
Will a fire sprinkler system be installed Irrigation System? Proposed Bathrooms Proposed Bedrooms
or modified? Yes 13 No 13 � Yes 0 No 0
Project Description �)e-Lk-') FrO P��,J �-Td V'a!�
Is project in a Flood Zone: Yes 1:1 No1v Flood Zone Typ e:
If in a Flood Zone, what is the value of the structure before proposed improvement? $ 4F
I have read and completed the application and know it to be true and correct. I am authorized to apply for
this permit and understand that it is my responsibility to determine what permits are required and to
obtain permits prior to work. I understand that plan review fees are not refundable after review has
occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is
issued. I understand that if the permit is not picked up/issued within 18o days of submittal, the application
will be considered abandoned and the fees will be forfeited.
Date Print Name Signaturk
Residential Structures
For Office Use
Area Description(SQ FT) Existing Proposed
ss value
Olt
First Floor e)-2-
=S ec o n&F-166F &0"d
Covered Deck/Porch/Entry :??7
Deck(over 30"or 2"floor)
Garage
Carport
Other(describe)
Area Totals VY/9 z' 0
Inme, actures
Proposed For Office Use
Area Descriptions(SQ FT) Existing Proposed ss Value
-Existing-Structure-(s
Proposed Addition
Tenant Improvement?
Other work(describe)
Site Area Totals
Lot/Site Coverage Calculations
Lot Size (sq ft) Lot Coverage (sq ft) %Lot Coverage (Total lot coverage lot size)
*70c--)o
Site Coverage (Sq Ft of all impervious) %of Site Co erage total site coverage-- lot size)
3
Mechanical Fixtures
Indicate how many of each type of fixture to be installed or relocated as part of this project.
Air Handler I Size: # Haz/Non--Haz Piping Outlets:
Appliance Exhaust Fan # Heater(Suspended,Floor,Recessed wall) #
# Heating/Cooling appliance #
Boiler/Compressor—7i� repair/alte ration
Evaporative Cooler(attached, not # Pellet Stove/Woo d-burning/Gas #
portable) Fireplace/Gas Stove/Gas Cook Stove/Misc.
Fuel Gas Piping #of Outlets: Ventilatio.n Fan,single duct #
Furnace/Heat Pump/ Size: # Ventilation System #
Forced Air Unit I I I
Plumbing Fixtures
Indicate how many of each type of flxture to be installed or relocated
Plumbing Traps # Fuel gas piping #of Outlets:
Water Heater # Medical gas piping #of Outlets:
Water Line # Plumbing Vent piping #
Sewer Line # Industrial waste pretreatment
I interceptor(Grease Trap) Size
Other(describe):
T:\BUILDING\APPLICATION FORMS\Current BP Application\Building Permit 4-17-13.docx
NOP-TH- -----------
ALL I- Ew
30
uj
ol
31
5 T R'p
��i Ilk
OT -ro
Pit 9
IUiI,7 A/Va
co"
corre of"
lylolatiOO Pe/-at'0117S atlly
f be-ot Other Of
Odft ate, Or f erl-o,,S fi� IlCiw
c OWniad r,
47a orc," 0'7 t,6 or" Or
k— A'001-OLWDge Css 6%nor,
Of this er Wbe,7
111risvi 117
ct,
AQ
Vj
j)
4��s-"�"Iz
Ut
ILI
SSTI�, I(o AP,
A
Ott.)
't
or,
o o
mo-K3 R- DST'
PCT F-VJ
A A