DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
TO: Planning Commission
FROM: Scott K. Johns, Associate Planner
DATE: April 8, 2009
RE: Conditional Use Permit - CUP 09-01
APPLICANT: Propane Northwest Inc.
OWNER: Gary Bear
LOCATION: 2358 Highway 101
REQUEST: Temporarily site a 12,000 gallon propane storage tank during closure of
Hood Canal Bridge
RECOMMENDATION: The Planning Division recommends that the Planning
Commission approve CUP 09-01 with 3 conditions, citing 10 findings and 2 conclusions in
support of that action as listed in Attachment A.
EXISTING CONDITIONS IN AREA:
The subj ect property is located at 23 5 8 Highway 10 1 with its sole access from Highway
10 1. The site is 107,3 3 3 square feet in size which equals a total site area of 2.46 acres. The
property is level, developed with three large structures, and surfaced with either asphalt or
gravel. The property contains no environmentally sensitive areas. The application and site maps
are attached as Attachment B.
Development in the area is generally rural, with several industrial uses scattered along the
Highway 10 1 frontage. Zoning in the area is Industrial Heavy on the south side of Highway 10 1,
with the zoning being Clallam County Manufacturing on the north side of Highway 10 1.
DEPARTMENT COMMENTS:
City Departments reviewed the proposal and provided the following comments:
The Fire Departinent commented:
1. The tank is allo,,N,,e,-1 only for the temporary time clIctermined to be just prior to the
closing of the Hood Canal Bridge and until just after it is reopened.
'ne Northwest
bg-kjgj Page 2
'April 8,2009
2. Weeds, grass and brush must be kept 10' away from the tank.
3. "NO SMOKING" signs shall be posted within 25' of the tank in all directions.
4. Concrete blocks shall be used to protect from vehicular damage. (Ecology Block
or Jersey Barriers)
The Public Works and Utilities Department commented that compliance with fire
protection and safety as addressed by the Fire Marshall is required. There are no right-of-way
issues.
The Building Division of DCD had no comments.
STATE ENVIRONMENTAL POLICY ACT (SEPA) REVIEW:
A Determination of NonSignificance was issued for this proposed action on march.3 1,
2009, per WAC 197-11-355.
PUBLIC COMMENT:
Notification of the proposed action was placed in the Peninsula Daily News on March 13,
2009, posted on the subject property on March 10, 2009, and mailed to property owners within
300 feet of the subject property on March 10, 2009. The public Comment period closed on
March 30, 2009. One comment letter was received during the public comment period. The letter
writer was concerned that the propane tank would be used for some purpose that would generate
noise, and seemed unsure as to the location the tank would occupy. The handwritten letter (and a
transcribed copy) are attached.
DEPARTMENT OF COMMUNITY and ECONOMIC DEVELOPMENT ANALYSIS:
The entire Comprehensive Plan and Port Angeles Municipal Code were reviewed with
regard to the proposal, and the references listed in Attachment C were found to be the most
relevant to the proposal. In addition to the Comprehensive Plan goals and policies, development
regulations in the Industrial Heavy zone are also included in Attachment C to this staff report.
The City's Comprehensive Plan and Land Use Map identify the area as being located in
the Southwest Planning Area with the site designated as Industrial on the Comprehensive Plan
Land Use Map.
The site is zoned Industrial Heavy (11-1). The storage of gas for illuminating and heating
purpose is allowed by conditional use permit in the IH zone, PAMC 17.34.040(D). No minimum
lot size requirement is listed as a condition of approval. The site plan identifies the proposed
storage tank, location as the southeast comer of the site. The proposed use will not increase the
impervious surface coverage at the site, as the tank will occupy an area currently paved with
gravel. As the bulk of the area is paved with asphalt or gravel, adequate area for parking and
operations of the facility currently exist and no additional parking is required.
The proposed use is temporary in nature as typically Propane Northwest delivers propane
from an area where access to the Olympic Peninsula relies on the Hood Canal bridge. During the
anticipated closure of that bridge, delivery of propane to the peninsula would become more
difficult, resulting M increased costs to the ultimate customer. Once the bridge is reopened, the
temporary tank will be removed and service will return to the condition currently in place.
CUP 09-01 Propane Northwest Page 3
April 8,2009
In consideration of a conditional use permit application, the Planning Commission may
impose whatever restrictions or conditions are considered to be essential to protect the public
health, safety, and welfare, and to prevent depreciation of neighboring property. Uses developed
by conditional use permit must remain in continual compliance with the conditions of approval
or the use may be revoked. A similar use exists at 704 Marine Drive in the same zone.
Consideration is also given to the impacts on traffic patterns, the physical circumstances
of the subject property, other uses in the neighborhood, schools, and needed public
improvements.
Attachments: A - Conditions, Findings, and Conclusions
B - Application materials
C - Public comment letter
D - Zoning Ordinance, Comprehensive Plan, and Other Municipal Code
References
CUP 09-01 Propane Northwest Page 4
April 8,2009
ATTACHMENT A
RECOMMENDED CONDITIONS, FINDINGS, AND CONCLUSIONS
The Planning Division recommends the Planning Commission approve Conditional Use
Permit CUP 09-01 subject to 3 conditions and based on the following 10 findings and 2
conclusions in support of the action:
Conditions:
I. The proposed tank shall be removed from the site by July 1, 2009. If additional time at
the location is required, an amendment to CUP 09-01 shall be submitted and approved.
Also, if the applicant wishes to make the use more permanent at the subject location, a
new Conditional Use Permit requesting such action shall be submitted for review by the
City.
2. The applicant shall meet all of the Fire Department conditions prior to gaining final
approval of the use at the site.
3. Use of the propane tank, shall cease within 2 weeks of the reopening of the Hood Canal
- Bridge.
Findings:
Based on the information provided in the Community Development Staff Report for CUP
09-01 dated April 8, 2009, including all information in the public record file, comments and
testimony presented during the public hearing, the Planning Commission discussion and
deliberation, and the above listed conditions of approval, the City of Port Angeles Planning
Commission hereby finds that:
I. Propane Northwest submitted Conditional Use Permit application CUP 09-01 to locate a
12,000 gallon propane storage tank on the site at 23 5 8 Highway 10 1, parcel number
063007340225, for a period of 6 to 8 weeks, during the time the Hood Canal Bridge will
be closed for construction.
2. The site is zoned Industrial Heavy.
3. The Comprehensive Plan designates the site as Industrial... Adjacent designations are
also Industrial. The site is located in the City's Southwest Planning Area. Development
in the surrounding area includes other industrial uses, agriculture, large lot residential,
and some commercial.
4. Per 17.96.050 PAMC, the Planning Commission shall consider applications for
conditional use permit uses as specified in the applicable Chapter of the Zoning
Regulations. The Planning Commission may grant said permits which are consistent and
compatible with the purpose of the zone in which the use is located, consistent with the
Comprehensive Plan, and not contrary to the public use and interest. In each application
the Planning Conii-nission may impose whatever restrictions or conditions are considered
essential to protect the public health, safety, welfare, and to prevent depreciation of
neighboring property. Conditional uises shall be evaluated to detern-.);ne if the
characteristics of the intended use as related to the specific proposed site woLdd defeat the
purpose of the City's Zoning Regulations by introducing incoropatible, detrimental, or
hazardous conditions. The Planning Commission may refuse to jssLie la conditional use
CUP 09-01 Propane Northwest Page 5
April 8,2009
permit if the characteristics of the intended use would defeat the purpose of the City's
zoning regulations.
5. The City's Comprehensive Plan was reviewed for consistency with the proposal. Land
Use Element Industrial Goal H, Policy HA, and Policy H.5 were found to be most relevant to
the proposal.
6. A development that is approved through the conditional use permit process must remain
in continual compliance with specific conditions of approval or may be revoked.
7. Reviewing City Departmental comments were considered in the review of this
application.
8. Notification of the proposed action and conditional use permit application was placed in
the Peninsula Daily News on March 13, 2009. Public notice was mailed to property
owners within 300 feet of the subject property on March 10, 2009. Notice of the proposal
was posted on the site on March 10, 2009. One public comment was received.
9. A Determination of Non-Significance was issued for this proposed action on March 3 1,
2009.
10. The Planning Commission opened a public hearing on the proposal at the April 8, 2009,
regular meeting.
Conclusions.-
Based on the information provided in the Department of Community Development Staff
Report for CUP 09-01 dated April 8, 2009, including all of the information in the public record
file, comments, and testimony presented during the public hearing, the Planning Commission's
discussion and deliberation, and the above listed conditions of approval and listed findings, the
City of Port Angeles Planning Commission hereby,concludes that:
I. The proposal is consistent with requirements for approvAl of a conditional use permit as
specified in PAMC 17.96.050, of the Port Angeles Municipal Code and, as conditioned,
the proposal is consistent with development standards for a conditional use in the 114
Zone per 17.34.040(D).
2. The proposal is consistent with PAMC Chapter 14.40 (Parking Ordinance).
ATTACHMENT C
PA Ph 117 Cam ni -S 0 'L�
Y-C)
/V LdcdA el'�e, e"-t
t,4e ki ex i door 1'"n k2c 6
7'
IS
more PL-01*jlr- Ar, ve
do r 6,p?c
liew�cr--s C�v r,
Il/ 07 e, de/ 0
I Wen 4, fLe r
OW mfec;.'&j
ye tJc,
o-Lie rtcj le,fee WL.S tdij I
w o e. e r- *,K e.re I ".it 0 /e ef ss.
e- A e r"Y e,-�.7 Lj Z;.5 to LJ c 1,;,
7
is. Jipyjcns -/e 4 a e e iwc of tn i fn-7
ate r J.T ie 1�2 I" j X- a C, k r-Y, a
e r cs' e J;7,z 0 C, a 5 a ed e,l r e
CUP 09-01 Propane Northwest Page 6
April 8,2009
ATTACHMENT D
COMPREHENSIVE PLAN GOALS, POLICIES, AND OBJECTIVES OF CUP 09-01:
Comprehensive Plan
The City's Comprehensive Plan establishes the long range goals and policies of the City, Any
project proposed in the City must be consistent with the goals and policies of the Comprehensive Plan.
The site is located in the City's East Planning Area. Tile Plan was reviewed in its entirety with regard to
the proposed application and several goals and policies were found to be relevant to the proposal. An
analysis of compliance with those policies is as follows:
The Comprehensive Plan Land Use Map designates the site as Industrial
Land Use Element Industrial Goal H. "To provide opportunitiesfor industrial development in a
manner, which efficiently uses the community's various attributes and natural resources, has minimal
impact on the environment, contributes to the City's quality of life, and is compatible with the desired
urban design of the City."
Policy H.4- "Industrial activity should be located in,three major areas.- adjacent to the harbor,
around the airport, and along Hwy 101 west of Benson Road."
Policy H.5— "Because they are hazardous to the community and detrimental to the general
environment of the area petroleum refineries, liquefied natural gas and liquefiedpetroleum gasfacilities,
energyfacilities, energy plants and their associatedfacilities and associated transmission facilities, as
defined in Chapter 80.50 RCW, should not be permitted outside the heavy industrial use area and without
conditional use review.
Zoning Ordinance
The Zoning Ordinance is the primary implementing ordinance for the Comprehensive Plan. The
Ordinance establishes what types of uses are permitted and where they may be located in the City. It also
establishes definitions and minimum design standards for such uses. Any project proposed in the City
must be consistent with specific regulations of the zone in which it is located.
The Zoning Map identifies the subject property and adjacent properties as Industrial Heavy(IH).
The purpose and intent of this zone is: "This is the least restrictive industrial zone intended to be the area
in which heavy industry could develop causing the least impact on other land uses. Significant adverse
impacts can be expectedftom permitted industrial uses tha't involve hazardous materials, noise, air and
water pollution, shift work around the clock, entertainment businesses with adult-only activities, and
outside storage yards and inanufacturing activities. This zone provides the basic urban land use pattern
for heavy industrial uses with direct access to major transportation facilities, design standardsfor
greater truck traffic, and buffersfor nonindustrial uses unless deemed impractical. "
The purpose of a conditional use permit is defined as "A Conditional Use Permit shall be to
assure that the maximum degreeOfCO177patibility between uses shall be attained The purpose of these
regulations shall be inaintained with respect to the particular us(,of the particular site and in
consideration of other existing andpolential uses within the general area in which such use is to be
located."
PAMC 17.96.050 specifies procedures forthe review and processing of conditional USC
applications, as follows:
CUP 09-01 Propane Nortliwest Page 7
April 8,2009
17.96 050 Conditional Use Permit
A. The Planning Commission shall consider applicationsfor Conditional Use Permits of
uses as specilied in the applicable Chapter of the Zoning Regulations. The Planning Commission n7ay
grant saidpermits which are consistent and compatible with the purpose of the zone in which the use is
located, consistent with the Comprehensive Plan, and not contrary to the public use and interest. The
Planning Commission inay refuse to issue a Conditional Use Permit if the characteristics of the intended
use as related to the specific proposed site are such as would defeat the purpose of these Zoning
Regulations by introducing incompatible, detrimental, or hazardous conditions.
B. In each application, the Planning Commission n7ay impose whatever restrictions or
conditions they consider essential to protect the public health, safety, and we�fare, and to prevent
depreciation of neighboring property.
ATTACHMENTB
APPL, ioNFEES
CUP: SAO &$350(SEPA)
Total$850 A
------- CITY 0:P;--`V0RT X -GEU
$200 & $125 SEPA C)NALLSE PERMIT
CONDITTI�,
Totol:$325
APPLIGZATION
_[Mp OR T,4 jyT PLE-4 SE REII-D
only completed applications will be,accepted. To be considered complete,aDaPPlicatiOn must include a 11 of the
following information: plicant and tile prop orty owner if different than the appli cant)
El A completed applicatioii signed by the ap
D A.completed SEPA Checklist signed by the applicant. '
D A vicinity map (showing the site in relation to surrounding properties)
D A site plan (accurately drawn at 1"=20' scale with complete dimensions showing all property lines,
existing and proposed structures and parking spaces, setbacks and significant vegetation).
D Interior floor plans for each floor of any structure to be used for tile proposed activity.
17 Exterior building elevations for each side of any building that will be constru.Gted I for the proposed use.
Mailing labels and list of proPePtY owners within 300af theproposed site. A list of tile property
owners inay be obtainedfrom the County Assessor Is Office.
D Application fee.
te with the information regarding all aspects of your PrOi eGt,
it is important to be accurate and comple ontaincd in
The Planning Commission's decision and staff recommendation will be based on the information c
ed to tile proposal as presented. Changes tv your proje.ct front What is
this application, and will be limit nch
subinittednzay result in the delay ofyourproject's review. Certain proposals are decided administratively s
(retail stand permits, home occupations, and bed and breakfast uses). These permits do not require a public
hearing process. firrie periods, or
Please do not hesitate to ask if you have any questions regarding the permit process,
restrictions of certain applications, Community Development Department personnel in ay be reached at
417-4750 between the hours of 8 a.m. and 5 p.m. Monday through Friday.
NOTES: (For your use)
MAR 2009
c j TY-6-1-P—OR T A—NG E I-Es
Dept.of cawuiunity Development
WNER INFORMATION.:.
A-PPLICANTLIJU WINEL I
Applicant:
DaytilnephoncM rCO-661-0 YOV
Address: 6* ;�-
A
Applicaiat'sropresentativc(ifotilertl-ialiapplicaiit): A.Ma
c-phoncM.
D aytim
Address: /ato
el,7�o;,c,7
prop erty owner(if other than applicalit): 0�C &
Address: 2 Daytime phone#:,7Z 0. - V4 0
PERTYINFO_ ON-
-VRO_ 14-ORMAT—I
Street address:
Legal description:
Zoning: comprehensive Plan designation:
sions: SGO .4 ),Z_ property area(total square feet):
property dimen
Physical charaGteristics(i.e.,flat,sloped,vacant,developed,etc.):
Please describe the proposed conditional use:
ca-
4:1, ai.-airy
12L ij�
S-rd
-7
S
-C
'Z oft,"
A
k -T-
Hours of Operation: 7!"0
Number of employees:
Nurnber of OD-SAC Parldlig spaces:
Building area (total square feet of floor area for the propoSO6 activ]tY):
S I GNATUREI S:.
Applicant:
e true and complete to the best ofm)�162owledge and acknowledge
I certjfi�that(111 ofthe above statements(17' licati077 in
rmation 14ii1l terMinale thisperMil CIPPlication- J have read this app
that wi�ful njiSrOpreSenzation of info tial will be reviewedfor con'Pleteness- Iffound to be COMPlete the
its entiretY and underStand that 717)) SUbmi lePlanning C0177772isSioll.Meeting. Ifnol co7j7plete, whenrequested
application will be scheduledforthe next availab
information has been received the aTTlication -H�gl be scheduledfOrthe next.available meeting.
Date
Signature—,k�
owner (if other than applicant):
I arn the owner of the subject PrOperO)identified herein a.nd approve of this application.
Date
signature
For Staff'Use OnlY:
Permit No.
Appl, coi"Plelc
Add. Infoll:cquestecl
iZ
TT
Ul
01K
N G- EWLT"
WASH I NGTON, U. S. A.
Community & Economic Development Department
ei
m<
A, April 9, 2009
al;
Propane Northwest
Mr. Donald Hutt
P.O. Box 949
Kingston, WA 98346
CUP 09-01
RE: Conditional Use Permit
Propane Northwest- 23 5 8 Highway 10 1 West
Dear Mr. Hutt:
As you know, following a public hearing conducted by the Port Angeles Planning Commission
on April 8, 2009, a conditional use permit was approved to enable the location of a 12,000 gallon
propane storage tank in the Industrial Heavy zone at 23 5 8 Highway 10 1 West. The conditional
use permit is approved with the following conditions:
Conditions:
1. The.temporary tank is allowed only for the temporary time determined to be just prior to
the closing of the Hood Canal Bridge(May, 2009) until just after it is reopened.
2. Weeds, grass, and brush must be kept at least 10' away from the tank.
3. "NO SMOKfNG" signs shall be,posted within 25' of the tank in all directions.
4. Concrete blocks (ecology blocks or jersey barriers) shall be used to protect from
vehicular damage.
If you have any questions regarding any of this information, please don't hesitate to contact this
office at 417-4750.
Sincerely,
Sue Roberds
Planning Manager
cc: Building Dept. files
Fire Dept.
GaryBear
--krrs. Pauline Cooper
Phone: 360-417-4750 Fax: 360-417-4711
Website: www.cityofpa.us/Email: smartgrowth @cityofpa.us
321 East Fifth Street- P.O. Box 1150/ Port Angeles, WA 98362-0217
NO. 1237
CITY OF PORT ANGELES
DETERMINATION OF NON SIGNIFICANCE
Description of Proposal: The installation of a 12,000 gallon propane tank to be used on a
temporary basis during the 6 to 8 weeks of the Hood Canal Bridge closure. The project is
located in an area zoned Industrial Heavy. A 32,000 GVW 2-axle truck will also be
intermittently stored on the site.
Location of Proposal (including street address, if any): The project is located at 2358 W.
Highway 10 1, Port Angeles, WA. The site is on the south side of the highway, and is zoned
Industrial Heavy.
APPLICANT: Propane Northwest, P.O. Box 949 Kingston WA 98346
Lead Agency: City of Port Angeles
The lead agency for this proposal has determined that it does not have a probable significant
adverse impact on the environment. An environmental impact statement (EIS) is not required
under RCW 43.21C.030(2)(c). This decision was made after review of a completed
environmental checklist and other information on file with the lead agency. This information is
available to the public on request.
This DNS is issued under WAC 197-11-340(2); the lead agency will not act on this
proposal for 14 days from the date of issuance. Comments must be submitted by_at
which time the DNS may be retained, modified, or withdrawn.
There is no comment period for this DNS.
X] This DNS is issued per WAC 197-11-355. There is no further comment period.
3131/�; ?
Date Nathan West, Director of Community and
Economic Development Department
You may appeal this determination to the Port Angeles City Council through the Department of
Community&Econornic Development, 321 East Fifth Street, Port Angeles, WA, 98362, by submitting
such written appeal to the Department no later than April 14, 2009. You should be prepared to make
specific factual objections.
Responsible Official: Nathan West, Director of Community and Economic Development, City of Port
Angeles, 321 East Fifth Street, P.O. Box 1150, Port Angeles, WA 98362, phone(360)417 - 475 1.
Pub: NA
Post: NA
Mail to DOE: March 31,2009
Planning Commission Minutes
April 8,2009
Page 2
CONDITIONAL USE PERMIT — CUP 09-01 — PROPANE NORTHWEST —
23 5 8 W. Highwgy 10 1: A proposal to install a 12,000 gallon propane storage tank for
a period of 6 to 8 weeks in the Industrial Heavy zone.
Associate Planner Scott Johns reviewed the Department Report recommending approval
of the conditional use permit with conditions, and identified the site location through the use of a
Power Point presentation.
Don Hutt P. 0. Box 949, Kingston WA, represented Propane Northwest and described
the compan's operations on the Olympic Peninsula and that they will use the tank to service
customers during closure of the Hood Canal Bridge during May and early June, 2009. No earth
disturbing activities or vegetation removal would occur on site and the operation as proposed
would not produce significant noise issues.
There being no further testimony, Chair Mathews closed the public hearing.
Following brief discussion, Commissioner Beier moved to approve conditional use
permit CUP 09-01 with thefollowing conditions,findings, and conclusions:
Conditions:
1. The proposed tank shall be removed from the site by July 1, 2009. If additional time at
the location is required, an amendment to CUP 09-01 shall be submitted and approved.
Also, if the applicant wishes to make the use more permanent at the subject location, a
new Conditional Use Permit requesting such action shall be submitted for review by the
City.
2. The applicant shall meet all of the Fire Department conditions prior to gaining final
approval of the use at the site.
3. Use of the propane tank shall cease within 2 weeks of the reopening of the Hood Canal
Bridge.
Findings:
Based on the information provided in the Community Development Staff Report for CUP 09-01
dated April 8, 2009, including all information in the public record file, comments and testimony
presented during the public hearing, the Planning Commission discussion and deliberation, and
the above listed conditions of approval, the City of Port Angeles Planning Commission hereby
finds that:
1. Propane Northwest submitted Conditional Use Permit application CUP 09-01 to locate a
12,000 gallon propane storage tank on the site at 23 5 8 Highway 10 1, parcel number
063007340225, for a period of 6 to 8 weeks, during the time the Hood Canal Bridge will
be closed for construction. -
2. The site is zoned Industrial Heavy.
3. The Comprehensive Plan designates the site as Industrial. Adjacent designations are also
Industrial. The site is located in the City's Southwest Planning Area. Development in
the surrounding area includes other industrial, agriculture, large lot residential, and some
commercial development.
4. Per 17.96.050 PAMC, the Planning Commission shall consider applications for
conditional use permit uses as specified in the applicable Chapter of the Zoning
Regulations. The Planning Commission may grant said permits which are consistent and
Planning Commission Minutes
April 8,2009
Page 3
compatible with the purpose of the zone in which the use is located, consistent with the
Comprehensive Plan, and not contrary to the public use and interest. In each application
the Planning Commission may impose whatever restrictions or conditions are considered
essential to protect the public health, safety, welfare, and to prevent depreciation of
neighboring property. Conditional uses shall be evaluated to determine if the
characteristics of the intended use as related to the specific proposed site would defeat the
purpose of the City's Zoning Regulations by introducing incompatible, detrimental, or
hazardous conditions. The Planning Commission may refuse to issue a conditional use
permit if the characteristics of the intended use would defeat the purpose of the City's
zoning regulations.
5. The City's Comprehensive Plan was reviewed for consistency with the proposal. Land
Use Element Industrial Goal H, Policy H.4, and Policy H.5 were found to be most
relevant to the proposal.
6. A development that is approved through the conditional use permit process must remain
in continual compliance with specific conditions of approval or may be revoked.
7. Reviewing City Departmental comments were considered in the review of this
application.
8. Notification of the proposed action and conditional use permit application was placed in
the Peninsula Daily News on March 13, 2009. Public notice was mailed to property
owners within 300 feet of the subject property on March 10, 2009. Notice of the proposal
was posted on the site on March 10, 2009. One public comment was received.
9. A Determination of Non-Significance was issued for this proposed action on March 3 1,
2009.
10. The Planning Commission conducted a public hearing on the proposal at the April 8,
2009, regular meeting and approved the conditional use permit.
Conclusions:
Based on the information provided in the Department of Community Development Staff Report
for CUP 09-01 dated April 8, 2009, including all of the information in the public record file,
comments, and testimony presented during the public hearing,the Planning Commission's
discussion and deliberation, and the above listed conditions of approval and listed findings, the
City of Port Angeles Planning Commission hereby concludes that:
I. The proposal is consistent with requirements for approval of a conditional use permit as
specified in PAMC 17.96.050, of the Port Angeles Municipal Code and, as conditioned,
the proposal is consistent with development standards for a conditional use in the IH
Zone per 17.34.040(D).
2. The proposal is consistent with PAMC Chapter 14.40 (Parking Ordinance).
The motion was seconded by Commissioner Reiss, and passed 5—0.
11 't P A
I- � I IG
[ 'T
N -'rELES
..... .....
H I NGTON, U. S. A.
W A S
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
TO: Planning Commission
FROM: Scott K. Johns, Associate Planner
DATE: April 8, 2009
RE: Conditional Use Permit - CUP 09-01
APPLICANT: Propane Northwest Inc.
OWNER: Gary Bear
LOCATION: 2358 Highway 101
REQUEST: Temporarily site a 12,000 gallon propane storage tank during closure of
Hood Canal Bridge
RECOMMENDATION: The Planning Division recommends that the Planning
Commission approve CUP 09-01 with 3 conditions, citing 10 findings and 2 conclusions in
support of that action as listed in Attachment A.
EXISTING CONDITIONS IN AREA:
The subj ect property is located at 23 5 8 Highway 10 1 with its sole access from Highway
10 1. The site is 107,3 3 3 square feet in size which equals a total site area of 2.46 acres. The
property is level, developed with three large structures, and surfaced with either asphalt or
gravel. The property contains no environmentally sensitive areas. The application and site maps
are attached as Attachment B.
Development in the area is generally rural, with several industrial uses scattered along the
Highway 10 1 frontage. Zoning in the area is Industrial Heavy on the south side of Highway 10 1,
with the zoning being Clallam County Manufacturing on the north side of Highway 10 1.
DEPARTMENT COMMENTS:
City Departments reviewed the proposal and provided the following comments:
The Fire Department commented:
1. The tank is allowed only for the temporary time determined to be just prior to the
closing of the Hood Canal Bridge and until just after it is reopened.
0 0
CUP 09-01 Propane Northwest Page 2
April 8,2009
2. Weeds, grass and brush must be kept 10' away from the tank.
3. "NO SMOKING" signs shall be posted within 25' of the tank in all directions.
4. Concrete blocks shall be used to protect from vehicular damage. (Ecology Block
or Jersey Barriers)
The Public Works and Utilities Department commented that compliance with fire
protection and safety as addressed by the Fire Marshall is required. There are no right-of-way
issues.
The Building Division of DCD had no comments.
STATE ENVIRONMENTAL POLICY ACT (SEPA) REVIEW:
A Determination of NonSignificance was issued for this proposed action on march.3 1,
2009, per WAC 197-11-355.
PUBLIC COMMENT:
Notification of the proposed action was placed in the Peninsula Daily News on March 13,
2009, posted on the subject property on March 10, 2009, and mailed to property owners within
300 feet of the subject property on March 10, 2009. The public Comment period closed on
March 30, 2009. One comment letter was received during the public comment period. The letter
writer was concerned that the propane tank would be used for some purpose that would generate
noise, and seemed unsure as to the location the tank would occupy. The handwritten letter (and a
transcribed copy) are attached.
DEPARTMENT OF COMMUNITY and ECONOMIC DEVELOPMENT ANALYSIS:
The entire Comprehensive Plan and Port Angeles Municipal Code were reviewed with
regard to the proposal, and the references listed in Attachment C were found to be the most
relevant to the proposal. In addition to the Comprehensive Plan goals and policies, development
regulations in the Industrial Heavy zone are also included in Attachment C to this staff report.
The City's Comprehensive Plan and Land Use Map identify the area as being located in
the Southwest Planning Area with the site designated as Industrial on the Comprehensive Plan
Land Use Map.
The site is zoned Industrial Heavy (11-1). The storage of gas for illuminating and heating
purpose is allowed by conditional use permit in the IH zone, PAMC 17.34.040(D). No minimum
lot size requirement is listed as a condition of approval. The site plan identifies the proposed
storage tank location as the southeast comer of the site. The proposed use will not increase the
impervious surface coverage at the site, as the tank will occupy an area currently paved with
gravel. As the bulk of the area is paved with asphalt or gravel, adequate area for parking and
operations of the facility currently exist and no additional parking is required.
The proposed use is temporary in nature as typically Propane Northwest delivers propane
from an area where access to the Olympic Peninsula relies on the Hood Canal bridge. During the
anticipated closure of that bridge, delivery of propane to the peninsula would become more
difficult, resulting in increased costs to the ultimate customer. Once the bridge is reopened, the
temporary tank will be removed and service will return to the condition currently in place.
CUP 09-01 Propane Northwest Page 3
April 8,2009
In consideration of a conditional use permit application, the Planning Commission may
impose whatever restrictions or conditions are considered to be essential to protect the public
health, safety, and welfare, and to prevent depreciation of neighboring property. Uses developed
by conditional use permit must remain in continual compliance with the conditions of approval
or the use may be revoked. A similar use exists at 704 Marine Drive in the same zone.
Consideration is also given to the impacts on traffic patterns, the physical circumstances
of the subject property, other uses in the neighborhood, schools, and needed public
improvements.
Attachments: A - Conditions, Findings, and Conclusions
B - Application materials
C - Public comment letter
D - Zoning Ordinance, Comprehensive Plan, and Other Municipal Code
References
CUP 09-01 Propane Northwest Page 4
April 8,2009
ATTACHMENT A
RECOMMENDED CONDITIONS, FINDINGS, AND CONCLUSIONS
The Planning Division recommends the Planning Commission approve Conditional Use
Per,mit CUP 09-01 subject to 3 conditions and based on the following 10 findings and 2
conclusions in support of the action:
Conditions:
I. The proposed tank shall be removed from the site by July 1, 2009. If additional time at
the location is required, an amendment to CUP 09-01 shall be submitted and approved.
Also, if the applicant wishes to make the use more permanent at the subject location, a
new Conditional Use Permit requesting such action shall be submitted for review by the
City.
2. The applicant shall meet all of the Fire Department conditions prior to gaining final
approval of the use at the site.
3. Use of the propane tank shall cease within 2 weeks of the reopening of the Hood Canal
Bridge.
Findings:
Based on the information provided in the Community Development Staff Report for CUP
09-01 dated April 8, 2009, including all information in the public record file, comments and
testimony presented during the public hearing, the Planning Commission discussion and
deliberation, and the above listed conditions of approval, the City of Port Angeles Planning
Commission hereby finds that:
I. Propane Northwest submitted Conditional Use Permit application CUP 09-01 to locate a
12,000 gallon propane storage tank on the site at 23 5 8 Highway 10 1, parcel number
063007340225, for a period of 6 to 8 weeks, during the time the Hood Canal Bridge will
be closed for construction.
2. The site is zoned Industrial Heavy.
3. The Comprehensive Plan designates the site as Industrial... Adjacent designations are
also Industrial. The site is located in the City's Southwest Planning Area. Development
in the surrounding area includes other industrial uses, agriculture, large lot residential,
and some commercial.
4. Per 17.96.050 PAMC, the Planning Commission shall consider applications for
conditional use permit uses as specified in the applicable Chapter of the Zoning
Regulations. The Planning Commission may grant said permits which are consistent and
compatible with the purpose of the zone in which the use is located, consistent with the
Comprehensive Plan, and not contrary to the public use and interest. In each application
the Planning Commission may impose whatever restrictions or conditions are considered
essential to protect the public health, safety, welfare, and to prevent depreciation of
neighboring property. Conditional uses shall be evaluated to determine if the
characteristics of the intended use as related to the specific proposed site would defeat the
purpose of the City's Zoning Regulations by introducing incompatible, detrimental, or
hazardous conditions. The Planning Commission may refuse to issue a conditional use
CUP 09-01 Propane Northwest Page 5
April 8,2009
permit if the characteristics of the intended use would defeat the purpose of the City's
zoning regulations.
5. The City's Comprehensive Plan was reviewed for consistency with the proposal. Land
Use Element Industrial Goal H, Policy H.4, and Policy H.5 were found to be most relevant to
the proposal.
6. A development that is approved through the conditional use permit process must remain
in continual compliance with specific conditions of approval or may be revoked.
7. Reviewing City Departmental comments were considered in the review of this
application.
8. Notification of the proposed action and conditional use permit application was placed in
the Peninsula Daily News on March 13, 2009. Public notice was mailed to property
owners within 300 feet of the subject property on March 10, 2009. Notice of the proposal
was posted on the site on March 10, 2009. One public comment was received.
9. A Determination of Non-Significance was issued for this proposed action on March 3 1,
2009.
10. The Planning Commission opened a public hearing on the proposal at the April 8, 2009,
regular meeting.
Conclusions:
Based on the information provided in the Department of Community Development Staff
Report for CUP 09-01 dated April 8, 2009, including all of the information in the public record
file, comments, and testimony presented during the public hearing, the Planning Commission's
discussion and deliberation, and the above listed conditions of approval and listed findings, the
City of Port Angeles Planning Commission hereby concludes that:
I. The proposal is consistent with requirements for approval of a conditional use permit as
specified in PAMC 17.96.050, of the Port Angeles Municipal Code and, as conditioned,
the proposal is consistent with development standards for a conditional use in the IH
Zone per 17.34.040(D).
2. The proposal is consistent with PAMC Chapter 14.40 (Parking Ordinance).
ATTACHMENT C
Ph (2,crm nj i's 0 it;
/M n,,rS Lre /c er,
A.Ali-3 te-ke ilex do 0" r",
Coo
-m are rL-Of-se. 6114C �lve, alp cc cl#d
-e Z,vs h -inoise or e—s-s,4� 6#?e et-01,5
,/Je VJ
,C."S c 0
Alme. del 0 e n 1741, J".Jbts, L/,j6p c In it/1-jej. p
Wicni 4a%)e" c,"d a ik'c J ;) fA-y a,.ii L.�J. j,-4., f4t r eta 0
a 0"0. ye .9 leell-2 Lj aj /a 0 ePC4 a I ,
rz-o
c.- 0-los a n,ri I&tv A-ail P"--'r4 IJ
m c J e. -'t 0%f er, r--Y*.K c,re I —it �0 ss eq
e- A e e-1 I Lj Z;.s to a
e4seAc is j iA"f,-S,&ns -/et4 ae �elcv-c
V. YO f-,va i"mklpt4s, x- ka Yv Jo zeyt c4 tAe, e
I'Ae r es' z J;7,z o& ��C,f a,5 t a f 14 c ed zz re c 4as P .,t k�,a,,
1,4A I ys JC c-ol-iln RcJc1 �Ouj )c—7xz�k,
YAt2
74
CUP 09-01 Propane Northwest Page 6
April 8,2009
ATTACHMENT D
COMPREHENSIVE PLAN GOALS, POLICIES,AND OBJECTIVES OF CUP 09-01:
Comprehensive Plan
The City's Comprehensive Plan establishes the long range goals and policies of the City. Any
project proposed in the City must be consistent with the goals and policies of the Comprehensive Plan.
The site is located in the City's East Planning Area. The Plan was reviewed in its entirety with regard to
the proposed application and several goals and policies were found to be relevant to the proposal. An
analysis of compliance with those policies is as follows:
The Comprehensive Plan Land Use Map designates the site as Industrial
Land Use Element Industrial Goal H. "To provide opportunities for industrial development in a
manner, which efficiently uses the community's various attributes and natural resources, has minimal
impact on the environment, contributes to the City's quality of life, and is compatible with the desired
urban design of the City."
Policy H.4- "Industrial activity should be located in,three major areas: adjacent to the harbor,
around the airport, and along Hwy 101 west of Benson Road."
Policy H.5— "Because they are hazardous to the community and detrimental to the general
environment of the area petroleum refineries, liquefied natural gas and liquefiedpetroleum gasfacilities,
energyfacilities, energy plants and their associatedfacilities and associated transmission facilities, as
defined in Chapter 80.50 RCW, should not be permitted outside the heavy industrial use area and without
conditional use review."
Zoning Ordinance
The Zoning Ordinance is the primary implementing ordinance for the Comprehensive Plan. The
Ordinance establishes what types of uses are permitted and where they may be located in the City. It also
establishes definitions and minimum design standards for such uses. Any project proposed in the City
must be consistent with specific regulations of the zone in which it is located.
The Zoning Map identifies the subject property and adjacent properties as Industrial Heavy(IH).
The purpose and intent of this zone is: "This is the least restrictive industrial zone intended to be the area
in which heavy industry could develop causing the least impact on other land uses. Significant adverse
impacts can be expectedftom permitted industrial uses that involve hazardous materials, noise, air and
water pollution, shift work around the clock entertainment businesses with adult-only activities, and
outside storage yards and manufacturing activities. This zone provides the basic urban land use pattern
for heavy industrial uses with direct access to major transportation facilities, design standardsfor
greater truck traffic, and buffersfor nonindustrial uses unless deemed impractical. "
The purpose of a conditional use permit is defined as "A Conditional Use Permit shall be to
assure that the maximum degree of compatibility between uses shall be attained. The purpose of these
regulations shall be maintained with respect to the particular use of the particular site and in
consideration of other existing andpotential uses within the general area in which such use is to be
located."
PAMC 17.96.050 specifies procedures for the review and processing of conditional use
applications, as follows:
0 0
CUP 09-01 Propane Northwest Page 7
April 8,2009
17.96 050 Conditional Use Permit
A. The Planning Commission shall consider applicationsfor Conditional Use Permits of
uses as specified in the applicable Chapter of the Zoning Regulations. The Planning Commission may
grant saidpermits which are consistent and compatible with the purpose of the zone in which the use is
located, consistent with the Comprehensive Plan, and not contrary to the public use and interest. The
Planning Commission may refuse to issue a Conditional Use Permit if the characteristics of the intended
use as related to the specific proposed site are such as would defeat the purpose of these Zoning
Reg ulations by introducing incompatible, detrimental, or hazardous conditions.
B. In each application, the Planning Commission may impose whatever restrictions or
conditions they consider essential to protect the public health, safety, and we�fare, and to prevent
depreciation of neighboring property.
AN
-.mad
'ilk
��1 �1�2�09),Sc&ft S6f�ns- 1��- Op"Ob' 1 con a ib6ns
From: Ken Dubuc
To: Scott Johns
Date: 03/18/2009 2:25 PM
Subject: Re: CUP 09-01 conditions
Hi Scott-
Either ecology blocks or jersey barriers are fine.
thanks,
Ken
REC
EHED
MAR 2 7 2009
C'Ty 0'P AN
Dept.Of Commounit D e v e lEo pLmEeSn t
PA Ph n 4 i 117 (2'orM nj iS j 6 rL; SE
-rks p eelmotw;IIbe �,P-a,kd ;s gleltzk" Ic--+
,,r s L,rt u) /L lo t a-ti a n- I I'd c I k-t t pK I j d e-I'V e,�e eft
J,.Jn..r/tkc tb,k,--3 t4-�e 4" not�0
;t more rL-o r-sc., 6114c, s-iv k...S.Slacuscs cpet em cto,>P, -ata,j eded
V/J ZI-1 10�j, no i.5 e or Ysi 4� e ta. 6#?e t's etvk5
0 e n V 2,ts, V d t 0 n t 1-41,
We n 6 V er c,"� a-S kc fAL/ 34&.t 4, r e s t 0 Ae. 0
waj 0 fle,
-," r Of �, ro
tm 41. C'.suibi tdIj i
Idee, it to mc,/e. f D Ovee c I*were i-31 �. S/e ef/t ss.64eq
e. L-.,7V Ae Z Ljri to/d ;f Wei �dj.� to kc a Well'i,f 44
'* eeJc.J i.3- 3-7pc--� 4aJ A 4,44e- ;elerc
k Ifl of'e n" 7
rAA I 5e ys ic C-n-jc R"Jc/ a—7Xzik,
.V-3
CITY OF PORT ANGELES
NOTICE OF MAILING
REV",. u ')
A
I, SUE ROBERDS, state that on the day of 20091
I mailed said notice, a true copy of which is hereto attached and made part hereof
pursuant to Section 17.96.140 of the Port Angeles Municipal Code, to the persons
noted on the attached list. In addition, the notice was posted on the front lobby
bulletin board in the main lobby of City Hall.
AFFFANT
Subscribed to me this day of 2009.
OTA
03/01/12
NOTARY PUBLIC for the State of
B L%(-
Washington, residing in Port Angeles
Or WAS
T/forms/affidavitmailing
CITY OF.PORT ANGELES
NOTICE OF POSTING
RE:
I PAT BARTHOLICK, state that on the /a day of
2009) 1 posted said notice, a true copy of which is hereto attached and made part
hereof pursuant to Section 17.96.140 of the Port Angeles Municipal Code, on the
property proposed for a land use action.
t/,�-�AFFIANT
Subscribed to me this , day of. -44— 2009.
NOTARY PUBLIC for tve, State of
\NON Washington, residing in Port Angeles
S Ro&
It%OTA#q�.*. (p
C 'EXP. 02-24-2012.:
7A (1800 .:/0
0"*......
WAS
T/forms/affidavitpostingjim
CITY OF PORT ANGELES
NOTICE OF DEVELOPMENT APPLICATION
AND
PUBLIC HEARING
NOTICE IS HEREBY GIVEN that on March 5, 2009, the CITY OF PORT ANGELES received
an application to allow a 12,000 gallon propane tank (gas storage) in the Industrial Heavy zone as a
conditional use. The application was considered to be complete on March 10, 2009. The CITY OF
PORT ANGELES PLANNING COMMISSION will conduct a public hearing on APRIL 8, 2009, in
consideration of the conditional use permit application. Interested parties are encouraged to comment on
the request and to attend the public hearing that will begin at 6 p.m., City Hall, 321 East Fifth Street, Port
Angeles, Washington. Written comment must be submitted no later than March 30, 2009, to be included
in the staff report. Information may be reviewed at the City Department of Community & Economic
Development, City Hall, P.O. Box 1150, Port Angeles. City Hall is accessible to persons with
disabilities. Interested parties are invited to attend the meeting.
STATE ENVIRONMENTAL POLICY ACT: It is anticipated that a determination of non
signficance will be issued for the project following the required review period that ends on March
30, 2009.
APPLICANT: PROPANE NORTHWEST
LOCATION: 23 5 8 Highway 10 1 West
For further information contact: Sue Roberds, (360) 417-4750
PUB: 3/13/09
POST: 3/10/09
MAIL: 3/10/09
T:\NOTICES\PCpub1ichearing.wpd
Kurt Bruch Russell Bradow Will Smith
73 S. Jensen Road 2318 W. Highway 101 W. P.O. Box 907
Port Angeles, WA 98362 Port Angeles, WA 98362 Port Angeles, WA 98362
Amelia Schultz Merrill and Ring William Bradow
1454lAshworth Ave.N. P.O. Box 1058 357 Bishop Road
Seattle, WA 98133 Port Angeles, WA 98362 Port Angeles, W 98362
Ken Simpson Pauline Cooper
2425 Highway 101 West 2411 Highway 101 W.
Port Angeles, WA 98362 Port Angeles, WA 98362
Phil Sisson
c/o James Sisson Evan Bradow
472 Hanson Road
Port Angeles, WA 98362 Port Angeles, WA 98362
Affidavit of Publication
In the SuperioArt of the State of Washington for Clallarn/Jefferson County
Peninsula Daily News
CITY OF
PORT ANGELE&,,*
NOTICE OF..
DIEVELOPIVIENT-':,o:�-.
APPLICATIOK,-��-A'�
AND
PUBLIC HEARINq,�.'�,�,j�
NOTICE IS HER��
of that on Ma
cn,
CITY OF PORT ANGELES 5, 2009, the CITY rdF-'
LEGAL ACCT/CITY CLERK PORT ANGELE§�'
received an app ica,��,
PO BOX 1150 tion.to allow a 12,000
gallon propane taniW,
PORT ANGELES, WA 98362-0217 (gas storage) in -:th.g�
Industrial Heavy zdn',�'
as a conditional usd'.-�
The application was`�
considered to b4J
complete on M&6�'
10, 2009. The CITY,,,
OF PORT ANGELEgi
Reference: 4900481 PLANNING COMMI[S-,,"!
SION will conduct-,�a�
5033483 CITY OF PORT ANGELES public hearing., 6h��
APRIL 8,2009,in coK-.
sideration of the con7-1,
ditional use .4 ft...
application. Inter
ed parties are enco6
aged to com(nent,'on-
the request and�-Jd
attend the publlij��-
The undersigned being first duly sworn on oath, deposes and hearing that will bddiii�
says. at 6 p.m., City Hdll,�-
321 East.Fifth Stre6t,,��
That she/he is authorized to and does make this affidavit for and Port Angeles, Wath�.`
ington. written conh!4'�
on behalf of Peninsula Daily News, a corporation, and that the ment must be subrnitr�,�
following statements of fact are within her/his personal and ted no later thin
March 30,2009,t6--86
actual knowledge. included in the stiff
report. lnformatidh�
That said corporation is the owner and publisher of the may be reviewed.'&
Peninsula Daily News published in Clallarn/Jefferson Counties, the City Department,
of Community&Ebb-
and had been approved as a legal newspaper by order of the nomic Developmdht�,i'
City Hall PO :-B&
Superior Court of said Clallarn/Jefferson County of the State Of 115.0,. P�rt A' n'getai.
Washington. City Hall-is accessible
to persons with'AI84
That the annexed is a true copy of a legal insertion as it was abilities. Interested
published in regular issues (and not in the supplement form) of parties are invited-116,
said newspaper was regularly distributed to its subscribers attend the meeting.'i
during all of said period. The publishing date cited is the last STATE ENVIRON�
MENTAL POLICY
day of publication. ACT: It is anticipated
that a determination bf:
non signficance-'l wIll:
be issued for the pr6jl'I,L
ect following -1116
I Insertion in Pub PDN on 03/13/09 required review period
that ends on March,
30,2009.
14 R So
0
T.
PROPANE-
APPLICAN
0 1 A I?
NORTHWEST
LOCATION: 2358
08/oraw" Z Highway 101 West;.',-j�,�'
0
UB For further information,
contact:Sue Roberd
(360)417-4750
Ott N S Pub:March 13,20001
W P's",
---------------
Sworn to me on this 13th day of March 2009
NOTARY PUBLIC
Notary Public in and for the State of Washington residing in Port Angeles.
Peninsula Daily News P.O. Box 1330 Port Angeles, WA 98362
li--0/13/2009) Sue Roberds -C0P'0' 9'-'0'-1---' ......
From: Ken Dubuc
To: Sue Roberds
Date: 3/13/2009 4:12 PM
Subject: CUP 09-01
Sue,
The Fire Department has reviewed CUP 09-01 for Propane Northwest and we have the following comments:
The tank is allowed only for the temporary time determined to be just prior to the closing of the Hood Canal Bridge and
until just after it is reopened.
Weeds,grass and brush must be kept 10'away from the tank.
"NO SMOKING"signs shall be posted within 25'of the tank in all directions.
Concrete blocks shall be used to protect from vehicular damage.
Thanks,
Ken Dubuc,Fire Marshal
Port Angeles Fire Department
NGELES
P A
WASH INGTON, U. S. A.
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Date: March 12, 2009
To: -ffublic Works and Utilities MAR 13 2009
Ken Dubuc, Fire Department -
CITY OF PORT ANGELES
Dept.of Community Development
From: Sue Roberds, Planning Manager
Subject: Conditional Use Permit - CUP 09-01
Propane Northwest- 2358 Highway 101 W
Please review the attached conditional use permit to allow a 12,000 gallon propane tank in the
Industrial Heavy zone. Please review the information and forward your departmental comments
or conditions to this Department no later than March.20, 2009. Please let us know if you have
any questions.
Thank you!
44A5' AJO
LoogKs amd, UT1W
C'9mpi-IA46, For- FJL
FIKe"A"
63007340225 OWN—FIRST OWN—MI OWN—LAST OWN—ADDR1 OWN—ADDR2 OWN—CITY OWN—ST OWN—ZIP
063000road2O
063007330000 PAULINE COOPER 2411 W HIGHWAY 101 PORT ANGELES WA 98363
063007330025 KENNETH K SIMPSON 2425 W HIGHWAY 101 PORT ANGELES WA 98363
063007330100 WILLIAM F SMITH PO BOX 967 PORT ANGELES WA 98362
063007340000 L EVAN&MARLENE BRADOW 732 W 7TH ST PORT ANGELES WA 98363
063007340050 L EVAN&MARLENE BRADOW 732 W 7TH ST PORT ANGELES WA 98363
063007340075 PHILIP i SISSON C/O JAMES SISSON 916 S B ST PORT ANGELES WA 98362
063007340100 PHILIP i SISSON C/O JAMES SISSON 916 S B ST PORT ANGELES WA 98362
063007340150 RUSSELL V BRADOW 357 BISHOP RD PORT ANGELES WA 98363
063007340175 KURT A BRUCH 73 S JENSEN RD PORT ANGELES WA 98362
063007340225 B&D PROPERTIES LLC 933 KEY RD PORT ANGELES WA 98362
063018220000 MERRILL& RING FOREST PROD LP PO BOX 1058 PORT ANGELES WA 98362
063018220200 WILLIAM R BRADOW 357 BISHOP RD PORT ANGELES WA 98363
R E C E V E
MAR 13 2009
CITY OF PORT ANGELES
Dept.of Community Development
...'."ORT NGELES
P A
FEMME WASH INGTON, U. S. A.
DEPARTMENT OF COMMUNITY & ECONomic DEVELOPMENT
Date: March 12, 2009
To: Public Works and Utilities
Ken Dubuc, Fire Department
From: Sue Roberds, Planning Manager
Subject: Conditional Use Permit - CUP 09-01
Propane Northwest - 2358 Highway 101 W
Please review the attached conditional use permit to allow a 12,000 gallon propane tank in the
Industrial Heavy zone. Please review the information and forward your departmental comments
or conditions to this Department no later than March 20, 2009. Please let us know if you have
any questions.
Thank you!
0)RIT NGELES
�0 WASH I NGTON, U. S. A.
;�v�r
ZRINWA
DEPARTMENT
OF March 10, 2009
COMMUNITY
& To: Department of Ecology, SEPA Division
ECONOMIC
DEVELOPMENT From: Sue Roberds, Planning Manager
Nathan West
Director Subj: Environmental Checklist Review
417-4751 Propane Northwest—23 5 8 Highway 10 1 West
Sue Roberds,
Planning Manager Enclosed you will find a notice of development application in association with a
417-4750 conditional use permit proposal to allow a gas storage use in the Industrial Heavy
zone. The application materials are being forwarded to you for review during the
Scott Johns public comment period per WAC 197-11-355. The City will not issue a threshold
Associate Planner determination until after the comment period which will end on March 30, 2009.
417-4752 This may be your only opportunity to comment on potential impacts of the
Daniel Bialzik application.
Assistant Planner
417-4804 Please don't hesitate to contact this department if you have any questions.
Jim Lierly
Building Inspector Thank you.
417-4816
Linda Pangrie
Permit Technician Sue Roberds, Planning Manager
417-4712
Patrick Bartholick Enclosures
Code Enforcement
417-4815
Derek Beery
Archaeologist
417-4704
Page I of I
Sue Roberds - SEPA Notice
From: Sue Roberds
To: SEPA Register
Date: 3/10/2009 12:17 PM
Subject: SEPA Notice
Attachments:
Please find application for SEPA Reoister. Thank you.
,5u(f Eobf rds
Planning Manager
City of Port Angeles, WA
(360) 417-4750
sroberdsP—dtyofpa.us
file:HC:\Documents%20and%2OSettings\Sroberds\Local%2OSettings\Temp\XPGrpWise\4... 3/10/2009
FFIC
c
FOR OFFICE USE ONLY
APPLIC'�TION FEES Date Rec'd: 2�:E
ile er.
um
CUP: $5ob&$350(SEPA) File Number: CUP 0
-ANGELE H t---Q-5
Total$850 TE#
--P. ORT
-�ve CUP ----- CITY Ov Received by: k,
'X�sia -ILL
$200 & $125 SEPA CONDITIONALUA PERMI
Total:$325
APPIAGANION
*IMPORTANT * PLEASE READ
Only completed applications will be accepted.To be considered complete,an application must include all of the
following information: (if different than the applicant).
• A completed application signed by the applicant and the property owner
• A.completed SEPA Checklist signed by the applicant.
• A vicinity map (showing the site in relation to surrounding properties)
El A site plan (accurately drawn at I"=20' scale with complete dimensions showing all property lines,
existing and proposed structures and parking spaces, setbacks and significant vegetation).
1:1 Interior floor plans for each floor of any structure to be used for the proposed activity.
0 Exteri or building elevations for each side of any building that will be constructed for the proposed use.
Mailing labels and list ofproperty owners within 300' of the proposed site. A list of the property
owners may be obtainedfrom the County Assessor's office.
Application fee.
it is important to be accurate and complete with the information regarding all aspects of your project.
The Planning Commission's decision and staff recommendation will be based on the inforination contained in
this application, and will be limited to the proposal as presented. Changes to your project from what is
ect's review. Certain proposals are decided administratively such
submitted may result in the delay ofyourproj
(retail stand permits, home occupations, and bed and breakfast uses). These permits do not require a public
hearing process.
Please do not hesitate to ask,if you have any questions regarding the permit process, time periods, or
Development Department personnel may be reached at
restrictions of certain applications. Community
417-4750 between the hours of 8 a.m. and 5 p.m. Monday through Friday.
NOTES: (For your use)
E 14 E-
-5 2009
CITY OF PORTANGE S
Dept.of community Developmmlj
"R -
APPLICA T/oWNER INFORMATION:
Applicant:
Daytimephone#: X40- 1-0yov,
Address: go ,& 94
Applicant's representative(if other than applicant): Oa.14A�O Aurlr
Address: Daytime phone#: Sox .934. -Y-7ft)
Prop city owner(if other than applicant): A fVP
Address: 2 Daytime phone#:ZkP-LY-60 1�241
PRO 3v-Dgry-rwFo-RMAXION:
Street address:
Legal description:
Zoning: Comprehensive Plan designation:
s*ons: 'ILO 17 Property area(total square feet):
Property dimen 1 __j
Physical characteristics(i.e.,flat,sloped,vacant,developed,etc.):
,D,Dn,Priv,F.,n TTSR INFO TTON:
Please describe the proposed conditional use:
ST ZAZI�2
ks —1,100'�
Z"00 G
6-VW #AOL
A
k .540--K
Number of employees: Hours of operation:
Number of on-site parldrIg spaces: I -
Building area (total square, feet of floor area for the proposed activitY):
SIGN TURIE
Applicant:
I certify that all ofthe above statements are true and complete to the best oft),knowledge and acknowledge
presentation of information will terminate thispermit application. I haveread this application in
that wi�ful misre submittal will be reviewedfor completeness. Iffound to be complete the
its entirety and understand that my I eting. Ifnot complete, when requested
application will be scheduledfor the next available Planning Con mission me
information has been received the application will be scheduledfor the next available meeting.
Signature D ate
owner(if other than applicant):
I am the owner of the subject property identified herein and approve of this application.
Date
Signature
For Staff Use OnlY:
Permit No.
Appl. cc9nPlete
Add. info requested
iL
244",
.........
- ---------
ED
2346
2450 2358
2442
2358
74
-2358.
' -. 2358
.2358 .
ISLO(.(,S tV L-L 15
U-
A-4%7 R
TI , 4 e k-
lyv Saclvx-rq /leLrt-f /S Jo