HomeMy WebLinkAbout309 S Vine Street Address:
309 S Vine Street
PREPARED 10/11/16, 9:13:59 INSPECTION TICKET PAG; 6
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 10/11/16
------------------------------------------------------------------------------------------------
ADDRESS . ; 309 S VINE ST SUBDIV:
CONTRACTOR : PHONE : I
OWNER JEFFERY A / MARGARET M MORFITT PHONE : (425) 736-9676
PARCEL 06-30-00-5-2-6538-0000-
APPI, NUMBER: 16-00001292 RES REMODEL
------------------------------------------------------------------------------------------------
PERMIT: BPR 00 BUILDING PERMIT - RESIDENTIAL
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
BL3 01 10/10/16 JLL BLDG FRAMING
10/10/16 AP October 10, 2016 8:19:08 AM jlierly.
Jeff 425-736-6976
October 10, 2016 4:23:38 PM jlierly.
BL99 01 10/11/16 BLDG FINAL
October 10, 2016 4:28:35 PM jlierly.
--------------------- --------- COMMENTS AND NOTES --------------------------------------
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY& ECONOMIC DEVELOPMENT- BUILDING DIVISION
c9 ) 321 EAST 5TH STREET, PORT ANGELES, WA 98362
Application Number . . . . . 16-00001292 Date 9/14/16
Application pin number . . . 594324
Property Address . . . . . . 309 S VINE ST
ASSESSOR PARCEL NUMBER: 06-30-00-5-2-6538-0000- REPORT SALES TAX
Application type description RES REMODEL
Subdivision Name . . . . . . on your state excise tax form
Property Use . . . . . . . . to the City of Port Angeles
Property Zoning . . . . . . . RS7 RESDNTL SINGLE FAMILY
Application valuation . . . . 800 (Location Code 0502)
----------------------------------------------------------------------------
Application desc
enlarge window and framing from 59"x1711 to 591lx2911
----------------------------------------------------------------------------
Owner Contractor
---------------------- ------------------------
JEFFERY A / MARGARET M MORFITT OWNER
2833 MORRIS AVE S
V\ RENTON WA 98055
(425) 736-9G76
Permit BUILDING PERMIT -RESIDENTIAL
Additional desc
Permit Fee . . . . 59.15 Plan Check Fee 38.45
Issue Date . . . . 9/14/16 Valuation . . . . 800
Expiration Date . . 3/13/17
Qty Unit Charge Per Extension
BASE FEE 50.00
3.00 3.0500 HND BL-501-2K (3.05 PER C) 9.15
----------------------------------------------------------------------------
Other Fees . . . . . . . . . STATE SURCHARGE 4.50
--------------------------------------------------------------------
Fee summary Charged Paid Credited Due
----------------- ---------- ----------- ---------- ----------
Permit Fee Total 59.15 59.15 .00 .00
Plan Check Total 38.45 38.45 .00 .00
Other Fee Total 4.50 4.50 .00 .00
Grand Total 102.10 102.10 .00 .00
Separate Permits are required forelectrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Par
Date Print Name Signature of Contractor or Authorized Agent of Owner(if owner is builder)
T:Forms/Buiiding Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Stemwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-In
Water Line(Meter to Bldg)
Gas Line
Back Flow/Wate
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders/Under Floor
Shear Wall/Hold.Downs
Walls/Roof/Ceiling
Drywall(Interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pump/Furnace FAU Ducts
Rough-In
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
ISkirting
PLANNING DEPT. Separate Permit#s SEPA:
Parking/Lighting ESA:
Landscaping ISHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction - R.W. PIN I Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
T.H For City Use
C�171 0Ftj0RTANGELES
-JL- -L k Permit#
WASH ] NGTON, U- S. Date Received:
321 E 51h Street Date Approved c-4 !!!7
Port Angeles,WA 9836 tp
P:360-417-4817 F:360-417-4711
Email:permi[ts(&ciW_ofpa.us BUILDING PERINN/H PLICATION
Project Address: C)q 6, V-))e
P,,^+ AnA�,-Ic-6
Phone: J( 6q 7
Primary Conta t. Je- Email:
Name n A Ynara-e-e-6)- A6�u'c CAII-e'k On
4 Phon
i-Manace Hor4 �k 77nL2-5)
Property MailingAddress Email —) 5) 7 z-7/5
jz :/::1 3
Owner �OA 1E, IL
City Stafe V
A zip q g�3&2
Name Phone
Contractor Address Email
Information city State
Contractor License#
Exp.Date:
Legal Description: arcel# P i�iD> �Project Vajlupe:(materials and labor)
4
0 L'o+)7" '03M> 5200/617&g $ Lf,0 J
WT &dential 1�3 Commercial 11 Industrial El Public 1:1
1S
Permit Demolition 1:1 Fire El Repair 11 Reroof(tear off/tay over) 0
Classification For the following,fill out both pages of permit application:
(check New Construction 1:1 Exterior Remodel 11 Addition 0 Tenant Improvement 11
appropriate)
I Mechanical El Plumbing 1:1 Other
Fire Sprinkler System Proposed Irrigation System Prop;o:sr:edo�rPr�oposed B�athroom�spioposed�Bedroom�s
orExisting? Yes 0 No X Existing? Yes f0N:o11L
In addition to standard hard copy submittals pleas send a PDF copy of all Stormwater plan andEfigineering to
www.stormwater c o a.us
Project Description
4X'�7-ft)(; WIN126W 4:'A,41Y1N6- 13Y e.UT7-1,V& XNI)
'2EA AA),2 Vz'-x 7 ZQ d6,M,41A) aM4-&AAL-.
lf6lol—'q C-6 ov 7,—&A 10/Z AW 2�q Al. EAILARC
16 HdLg jj-�im,
Is project in a Flood Zone: Yes 13 NoML Flood Zone — Type:
If in a Flood Zone,what is the value of the structure before proposed improvement? $
I have read and completed the application and know it to be true and correct.I am authorized to apply for
this permit and understand that it is my responsibility to determine what permits are required and to
obtain permits prior to work. I understand that plan review fees are not refundable after review has
occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is
issued. I understand that if the permit is not picked up/issued within i8o days of submittal,the application
will be considered abandoned and the fees wW be forfeited.
112
Date Print ame S�gnature
tAiVr,HAA1&f-P
N
Iti
171
't4
.4 !ry
44 lt-�
)b I-
\A
Leaving existing header and vertical double studs intact,enlarge window framing vertically from
t3
approximately 59 by 17 inches to S9 by 30 incpes by cutting two center studs off approximately
13 inches lower and reinstalling lower sill. Ahim boards to vertical double studs on right and
add longer framing on left to maintain width of opening. Trim existing siding and insulation.
Add interior finish pieces to set window installation depth. Framing in preparation for
Mathews Glass installation of new sliding window with low e,argon filled double panes.
Exterior trim to be replaced as needed at that time along with caulking. Install new sheetrock.
THE ][�R For City Use
CITY OF �GE�LE�S
X—TA Permit#
WASH [ NGTON. U. S. Date Received:
321 E 51h Street
Date Approved g54- 1!!:)
Port Angeles,WA 9836 tp
P-360-417-4817 F:360-417-4711
Email:permitsPciWf12a,us BUILDING PERINVU14PLICATION
Project Address: 6, VM&-- Anoe-lc-'� 73t C(
Phone: J( 6q7&
Primary Contact: Je4 Y--I�4� Email: nA mC&t2,
W"-e-cdll '0M
larn� Ph..
L,r(V2,p ( q-23 5)
Property Mailing Address ma i
Owner — -),- Vi n e,
City State zip
Name Phone
Contractor Address Email
Information City State
Contractor Ucense#ru Exp.Date:
Legal Description: Z -ng-. Tax Parcel# po Project Value:(materials and labor)
��6 4 �Vw 19-Al I W 10occo '5'Z�-g'gh'17&J $ -17M (f 0 ()
S to AN-]-- N ential 1,3 Commercial 0 Industrial El Public 11
Permit Demolition El Fire 11 Repair El Reroof(tear off/lay over) 11
Classification For the following.fill out both pages of permit application:
(check New Construction 11 Exterior Remodel El Addition El Tenant Improvement
appropriate) Mechanical El Plumbing 11 Other
Fire Sprinkler System Proposed rigation System Proposed or Proposed Bathrooms Proposed Bedrooms
or Existing? Yes 0 No JK sting? Yes E3 No 11L
In addition to standard hard copy submittals please send a PDF copy ofall Stormwater plans and Efigineering�to
www.stormwaterO-Ciqo,a.us
Pro ect Description gi?I-A C67 'A&A OK 7"��AIL7&,(Z Vl;rH
10INdow �UM,11& 4NI)
#—&-A17,'z*A AA19 &X7-le-AL
E1%),LAR0z5. )E->e7,6k0A -32-01A H64
Is project in a Flood Zone: Yes 13 NoML FloodZone — Type:
Ifin a Flood Zone,what is the value of the structure before proposed improvement? $
I have read and completed the application and know it to be true and correct. I am authorized to apply for
this permit and understand that it is my responsibility to determine what permits are required and to
obtain permits prior to work. I understand that plan review fees are not refundable after review has
occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is
issued. I understand that if the permit is not picked up/issued within i8o days of submittal,the application
will be considered abandoned and the fees will be forfeited.
112—
re�4
�)!e v
Lvar&& T
D Print ame tu
30
a7l e6A
Oe
46
c, lowe,,P-
so vA - e�-+ of ho use-
Chad Theismann
From: Margaret Morfitt <jeffandmargee@wavecable.com>
Sent: Monday, August 29, 2016 9:56 AM
To: Chad Theismann
Subject: Re: Site map for 309 S.Vine
We are doing the work ourselves, and I think my husband valued his labor low, so I think$800 is a more accurate
valuation.
Thanks!
Sent from my Pad
On Aug 29, 2016, at 9:43 AM, Chad Theismann<Ctheisma@citvofpa.us>wrote:
Hi Margaret,got the site map. I need to verify valuation of your project. Does this include materials and
labor? If you are doing the work yourselves, double the cost of materials to get an estimate of the labor
cost. Thanks,Chad
From: Margaret Morfitt [mailto:ieffandmargee@wavecable.com]
Sent: Friday,August 26, 2016 3:15 PM
To: Chad Theismann <Ctheisma@citvofpa.us>
Subject:Site map for 309 S.Vine
ive,HANGEP
7.
0
i 7777P-
1�j
K1
171
N
%A
U%
Leaving existing header and vertical double studs intact,enlarge window framing vertically from
approximately S9 by 17 inches to 59 by 30 in es by cutting two center studs off approximately t3
13 inches lower and reinstalling lower sill, Ahim boards to vertical double studs on�r�and
add longer framing on left to maintain width of opening. Trim existing siding and ins, atio
r
Add interior finish pieces to set window installation depth. Framing in preparation for
Mathews Glass installation of new sliding window with low e,argon filled double panes. 41
'(V'�
Exte;-ior trim to be replaced as needed at that time along with caulking. Install new sheetrock.P/Z' ..-i4p
CITY OF PORT ANGELES—Construction Plans
The ISSUalICC of this permit based upon these plans
specifications and wher data shall not prevent the
building official ftorn thereafter requiring the
correction oferrors in said plans,specifications and
other data. or froin preventing building operations
being carried on thereunder when in violation of W
codes and )r(knanc-.N-ol'this Wi5djtion.
'' , r' ' _.
ALL WOR SU �-CT TO APPROVAL
y zl�7
V t
t 7�1;4--