HomeMy WebLinkAbout3105 Grants View Lane Address:
3105 Grants View Lane-
PREPARED 9/IG/14, 12:29:47 INSPECTION TICKET PAGE 1
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 9/16/14
------------------------------------------------------------------------------------------------
ADDRESS . : 3105 GRANTS VIEW LN SUBDIV:
CONTRACTOR : PHONE :
OWNER ROBERT IAN / AVRIL ELAINE SYKE PHONE : (720) 935-1924
PARCEL 06-30-15-5-1-2802-0000-
APPL NUMBER: 13�00000890 RES ADDITION
------------------------------------------------------------------------------------------------
PERMIT: BPR 00 BUILDING PERMIT - RESIDEWrIAL
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
BL6 01 2/24/14 JLL BLDG POST/COLUMN FTG
2/24/14 AP February 24, 2014 9:26:42 AM pbarthol.
Ian 360-779-1612
February 24, 2014 4:24:01 PM jlierly.
CLean out pier before pour. Excessive dirt and rain/jll
BL99 01 9/16/14 BLDG FINAL
September 16, 2014 9:35:18 AM pbarthol.
Ian 360-797-1812
-------------------- ------ COMMENTS AND NOTES --------------------------------------
q p,
s,
2�4 ql_
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY& ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Application Number . . . . . 13-00000890 Date 8/21/13
Application pin number . . . 323830
Property Address . . . . . . 3105 GRANTS VIEW LN
ASSESSOR PARCEL NUMBER: 06-30-15-5-1-2802-0000-
Application type description RES ADDITION REPORT SALES TAX
Subdivision Name . . . . . . on your state excise tax form
Property Use . . . . . . . .
Property Zoning . . . . . . . RS9 RESDNTL SINGLE FAMILY to the City of Port Angeles
Application valuation . . . . 1344 (Location Code 0502)
----------------------------------------------------------------------------
Application desc
ADD STAIRS TO EXISTING SECOND STORY DECK
----------------------------------------------------------------------------
Owner Contractor
------------------------ ------------------------
ROBERT IAN / AVRIL ELAINE SYKE OWNER
3105 GRANTS VIEW LN
PORT ANGELES WA 98362
(720) 935-1924
--------------------m--------------------------------------------------------
Permit . . . . . . BUILDING PERMIT -RESIDENTIAL
Additional desc . . STAIRS TO EXISTING 2ND STORY D
Permit Fee . . . . 77.45 Plan Check Fee 50.34
Issue Date . . . . 8/21/13 Valuation . . . . 1344
Expiration Date 2/17/14
Qty Unit Charge Per Extension
BASE FEE 50.00
9.00 3.0500 HND BL-501-2K (3.05 PER C) 27.45
----------------------------------------------------------------------------
Special Notes and Comments
August 19, 2013 5:08:35 PM sroberds.
The proposal will result in outside stairs.from an existing
deck to ground in the RS-9 zone. No land use issues
anticipated.
----------------------------------------------------------------------------
Other Fees . . . . . . . . . STATE SURCHARGE 4.50
---------------------------------------------- ------------------ .....
Fee summary Charged Paid Credited Due
--- ------- ------- ---- --------
Permit Fee Total 77.45 77.45 .00 .00
Plan Check Total 50.34 50.34 .00 .00
Other Fee Total 4.50 4.50 .00 .00
Grand Total 132.29 132.29 .00 .00
Separate Permits are required forelectrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Sternwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-In
Water Line(Meter to Bldg)
Gas Line
Back Flow/Water FINAL Date Accepted by
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders/Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall(interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pump/Furnace/FAU/Ducts
Rough-In
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts FINAL Date Accepted by
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
[Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parking/Lighting ESA.
Landscaping ISHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction- R.W. PW /Engineering 417-4831
Fire 417-4653
Planning 417-4750
L Building 417-4815
T:Forms/Building Division/Building Permit
THE For City Use
CITY OF111-j."UR GELES.
TAIN Permit# /3 — 0110
W A S H I N G T 0 N , U . S . Date Received:
321 E 5th Street Date Approved QJ!Z] JzS
Port Angeles,WA 9836
P: 360-417-4817 F: 360-417-4711
Email: VermitsPcitvofpa.us BUILDING PERMIT APPLICATION
ProjectAddress:
Phone: ?09- 209 -3?�Sq
Primary Contact: Email: &,n- !,I @ Stage-�n�.ne�
Name Phone
Property Mailim,Address Email
0 '0
Owner 3 w�- (!�"q 4"v-Is V/FZ-) Lmt�' 9f,41?e 9(-4 Sqpe -A*,�I- WL
City State zip ?R�3r"?
Name Phone
�-n
Address Email
Contractor
Information city State
Fcontractors License# Exp.Date:
Legal Description: Zoning: Tax Parc I # Project Value: (materials and labor)
Pal"
$ IV-r I
Residential IN Commercial 11 Industrial 11 Public El
Permit Demolition 11 Fire El Repair El Reroof(tear off/lay over) El
Classification For the following, fill out both pages of permit application:
(check New Construction 11 Exterior Remodel El Addition 0 Tenant Improvement
appropriate) Mechanical El Plumbing El Other El
Fire Sprinkler System? Irrigation System? Proposed Bathrooms Proposed Bedrooms
Yes 0 No 11 � Yes 13 No 0
Project Description -PT) S--fFp-s -r-0
Is project in a Flood Zone: Yes El NoEl Flood Zone Typ e:
If in a Flood Zone, what is the value of the structure before proposed improvement? $
1 have read and completed the application and know it to be true and correct. I am authorized to apply for
this permit and understand that it is my responsibility to determine what permits are required and to
obtain permits prior to work. I understand that plan review fees are not refundable after review has
occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is
issued. I understand that if the permit is not picked up/issued within 18o days of submittal, the application
will be considered abandoned and the fees will be forfeited.
X, S�ygr3-
�t 3 X�-)7��
Date Print Name Signature
Residential Structures
For Office Use
Area Description (SQ FT) Existing Proposed $$value
Basement
First Floor
Second Floor
Covered Deck/Porch/Entry
Deck(over 30"or 2' floor)
Garage
Carport
Other(describe)
Area Totals
Commercial Structures
Proposed For Office Use
Area Descriptions (SQ FT) Existing Proposed ss Value
Existing Structure (s)
Proposed Addition
Tenant Improvement?
Other work(describe)
Site Area Totals
Lot/Site Coverage Calculations
Lot Size (sq ft) Lot Coverage (sq ft) %Lot Coverage (Total lot coverage lot size)
Site Coverage (Sq Ft of all impervious) %of Site Coverage (total site coverage�lot size)
Mechanical Fixtures
Indicate how many of each type of fixture to be installed or relocated as part of this project.
Air Handler Size: # Haz/Non-Haz Pipino, Outlets:
Appliance Exhaust Fan # Heater(Suspended,Floor, Recessed wall) #
Boiler/Co mpresso r Size: # Heating/Cooling appliance #
I repair/alteration
Evaporative Cooler(attached,not # Pellet Stove/Wo od-b urning/Gas #
portable) Fireplace/Gas Stove/Gas Cook Stove/Misc.
Fuel Gas Piping #of Outlets: Ventilation Fan,single duct #
F Forced Air Unit # Ventilation System #
urnace/Heat Pump
Plumbing Fixtures
Indicate how many of each type of fixture to be installed or relocated
Plumbing Traps # Fuel gas piping #of Outlets:
Water Heater # Medical gas piping #of Outlets:
Water Line # Plumbing Vent piping #
Industrial waste pretreatment
Sewer Line
Other(describe):
T:\BUILDING\APPLICATION FORMS\Current BP Application\Building Permit 4-17-13.docx
316
'Illy
--4 Aw
10
3105
I wrlw
3 3109
109
16
31611
sting Deck (16" x 10') 2x12 2x6 f At
>L4 Jq
P
14-
3) 61Y
2x6
k2
4-,
a4l�
15�0 21
44 PA-15<�
FILL T"
CITY OF PORT ANGELES—11tion PIP not
The issuance of this Dermn to."d vW these p!ans,s-c
cations and other dab shol;not preyed be building ok, All pressure treated lumber
from thereafter the correr!*q of errors in said
plans, specificatlim and other data, w fron, preventing Match existing deck handrails and balusters
building operation be;ng carried on tbmnder when in
violation of all codes 3nd orlm;;rices of this jurisdiction. 3105 Grants View Lane, Port Angeles
Approval Date k� 8Y
7Y -
71RA P- ove'-OwdA
Plan View; 3105 Grants View Lane, Port Angeles
House Wall
101, Existing Deck
161
3161r
VU El�
City of Port Angeles 3105 Grants View Lane
Dept. of Community and Economic Development Port Angeles
Building Division WA 98362
321 East 5th Street
Port Angeles, WA 98362 29 January 2014
Re: Application No. 13-890
Dear Sir/Madam,
This is to request an extension on the above referenced building permit to install
steps on my existing second story deck. The permit was issued on August 21, 2013 but I
have been unable to start work due to travelling back to the East Coast several times and
to Denver. I am travelling again next week, but I fully intend to get started on the project
after I return on February 12. We plan to get the concrete footings in during the week
after I return, weather permitting, and expect to complete the project by the end of March.
Sincerely
Ian Sykes