PREPARED 11/05/13, 9:3 7:0 8 INSPECTION TICKET PAGE 4
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 11/05/13
------------------------------------------------------------------------------------------------
ADDRESS . : 401 ORCAS AVE SUBDIV:
CONTRACTOR HOCH CONSTRUCTION PHONE (360) 452-5381
OWNER NORTH OLYMPIC LIBRARY SYSTEM PHONE
PARCEL 06-30-10-5-0-9090-0000-
APPI, NUMBER: 13-00000539 COMM NEW CONST
------------------------------------------------------------------------------------------------
PERMIT: BPC 00 BUILDING PERMIT - COMMERCIAL
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
BL1 01 7/22/13 JLL BLDG FOUNDATION FOOTING
7/22/13 AP July 22, 2013 8:31:05 AM pbarthol.
Tommy 477-0778
AM
July 22, 2013 10:27:18 AM jlierly.
20,ufr installed/jll
BL2 01 7/23/13 JLL BLDG FOUNDATION STEM WALL
7/23/13 AP July 23, 2013 8:33:05 AM pbarthol.
Tommy 477-0778
AM
July 23, 2013 12:15:38 PM jlierly.
BLIS 01 8/02/13 JLL BLDG INSULATION/SLAB
8/02/13 AP August 2, 2013 8:24:10 AM pbarthol.
Kyle 460-0043
August 2, 2013 4:10:34 PM jlierly.
BLSH 01 8/23/13 JLL BLDG SHEATHING
8/23/13 AP August 23, 2013 10:40:56 AM jlierly.
August 23, 2013 3:15:22 PM jlierly.
BL3 01 9/04/13 JLL BLDG FRAMING
9/04/13 DA September 4, 2013 8:39:42 AM pbarthol.
Kyle 460-0043
September 4, 2013 4:02:08 PM jlierly.
Truss brace per BCSI manual/jll
BL3 02 9/05/13 JLL 13LDG FRAMING
9/05/13 AP September 5, 2013 3:51:35 PM jlierly.
September 5, 2013 3:S2:05 PM jlierly.
BAIR 01 9/10/13 JLL BLDG AIR SEAL
9/10/13 AP September 10, 2013 8:23:00 AM pbarthol.
Kyle 461-0043
September 10, 2013 3:57:46 PM jlierly.
BLI 01 9/10/13 JLL BLDG INSULATION
9/10/13 AP September 10, 2013 8:23:30 AM pbarthol.
Kyle 461-0043
September 10, 2013 3:57:46 PM jlierly.
PW99 01 10/18/13 RV PUBLIC WORKS FINAL
10/18/13 AP
BL99 01 11/05/13 BLDG FINAL
JU November 5, 2013 9:26:28 AM pbarthol.
1� Kyle 461-0043
------- -- -- ---------- --
PERMIT: ME---00-MECIIANICAL�I-IT---------------------------------------------------------------
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
ME99 01 11/05/13 JLL MECHANICAL FINAL
----------------------------------- CONTINUED ONTO NEXT PAGE -----------------------------------
PREPARED 11/05/13, 9:3 7:0 8 INSPECTION TICKET PAGE 5
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 11/05/13
------------------------------------------------------------------------------------------------
ADDRESS . : 401 ORCAS AVE SUBDIV:
CONTRACTOR HOCH CONSTRUCTION PHONE (360) 4S2-5381
OWNER NORTH OLYMPIC LIBRARY SYSTEM PHONE
PARCEL 06-30-10-5-0-9090-0000-
APPI, NUMBER: 13-0000OS39 COMM NEW CONST
------------------------------------------------------------------------------------------------
REQUESTED INSP DESCRIPTION
RE U
TYP/SQ COMPLETED A RESULTS/COMMENTS
------------------- --- --------------------------------------------------------------------
November 5, 2013 9:27:13 AM pbarthol.
Kyle 461-0043
---------------------------- ------------------------------------------------------------------
PERMIT: PL 00 PLUMBING PERMIT
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
PL1 01 8/01/13 JLL PLUMBING UNDER SLAB
8/01/13 AP August 1, 2013 8:16:59 AM pbarthol.
Mike
August 1, 2013 4:28:11 PM jlierly.
PL2 01 9/04/13 JLL PLUMBING ROUGH-IN
9/04/13 DA September 4, 2013 8:40:03 AM pbarthol.
Kyle 460-0043
September 4, 2013 4:02:29 PM jlierly.
Repair leak in 90 DWV at rear door/jll
PL2 02 9/05/13 JLL PLUMBING ROUGH-IN
9/05/13 AP September 5, 2013 11:01:52 AM jlierly.
mike 640-4443
September 5, 2013 3:50:33 PM jlierly.
PL99 01 11/05/13 JL PLUMBING FINAL
November 5, 2013 9:27:27 AM pbarthol.
Kyle 461-0043
---------------------- -------- COMMENTS AND NOTES --------------------------------------
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY& ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Application Number . . . . . 13-00000539 Date 6/18/13
Application pin number . . . 142328
Property Address . . . . . . 401 ORCAS AVE
ASSESSOR PARCEL NUMBER: 06-30-10-5-0-9090-0000-
Application type description COMM NEW CONST REPORT SALES TAX
Subdivision Name . . . . . . on your state excise tax form
Property Use . . . . . . . .
Property Zoning . . . . . . . COMMERCIAL OFFICE to the City of Port Angeles
Application valuation . . . . 100000 (Location Code 0502)
----------------------------------------------------------------------------
Application desc
1536 sq ft office w/160 sq ft carport
----------------------------------------------------------------------------
Owner Contractor
------------------------ ------------------------
NORTH OLYMPIC LIBRARY SYSTEM HOCH CONSTRUCTION
2210 S PEABODY ST 4201 TUMWATER TRUCK RT
PORT ANGELES WA 983626536 PORT ANGELES WA 98363
(360) 452-5381
----------------------------------------------------------------------------
Permit . . . . . . BUILDING PERMIT - COMMERCIAL
Additional desc 1536 SQ FT OFFICE W/160 SQ FT
Permit Fee . . . . 1020.25 Plan Check Fee 663.16
Issue Date . . . . 6/18/13 Valuation . . . . 100000
Expiration Date 12/15/13
Qty Unit Charge Per Extension
BASE FEE 670.25
50.00 7.0000 THOU BL-50,001-100K (7.00 PER K) 350.00
----------------------------------------------------------------------------
Permit . . . . . . MECHANICAL PERMIT
Additional desc . . OFFICE/STORAGE SPACE
Permit Fee . . . . 79.30 Plan Check Fee .00
Issue Date . . . . 6/18/13 Valuation . . . . 0
Expiration Date 12/15/13
Qty Unit Charge Per Extension
BASE FEE 50.00
1.00 14.8000 EA ME-FURN/HP/FAU < OR = 5 TON 14.80
2.00 7.2500 EA ME-VENT FAN (SINGLE DUCT) 14.50
----------------------------------------------------------------------------
Permit . . . . . . PLUMBING PERMIT
Additional desc . . BATHROOM AND UTILITY ROOM
Permit Fee . . . . 114.00 Plan Check Fee .00
Issue Date . . . . 6/18/13 Valuation . . . . 0
Expiration Date . . 12/15/13
Qty Unit Charge Per Extension
BASE FEE 50.00
3.00 7.0000 EA PL-PLUMBING TRAP 21.00
1.00 7.0000 EA PL-WATER LINE 7.00
2.00 7.0000 EA PL-LAWN SPRNKLR BCKFLW PREV 14.00
1.00 15.0000 EA PL-SEWER LINE 15.00
1.00 7.0000 EA PL-WATER HEATER 7.00
Separate Permits are rquired for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction orwork is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
/-ntractnr or Authorized A
Date Print Name Signatu gent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Stemwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-in
Water Line(Meter to Bldg)
Gas Line
Back Flow/Water FINAL Date Accepted by
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders I Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall(interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pump/Furnace/FAU/Ducts
Rough-In
Gas Line
Wood Stove/Pellet I Chimney
Commercial Hood/Ducts FINAL Date Accepted by
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
,Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parking/Lighting ESA:
Landscaping ISHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction-R.W. PW I Engineering 417-4831
Fire 417-4653
1 Planning 417-4750
1 Building 417-4815
T:Forms/Building Division/Building Permit
4
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY&ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES,WA 98362
Page 2
Application Number . . . . . 13-00000539 Date 6/18/13
Application pin number . . . 142328
----------------------------------------------------------------------------
Special Notes and Comments REPORT SALES TAX
May 28, 2013 8:32:50 AM tamiot. on your state excise tax form
ELECTRICAL PERMIT WILL BE REQUIRED. COORDINATE SERVICE
REQUIREMENTS WITH PORT ANGELES ELECTRICAL ENGINEERING. ANY to the City of Port Angeles
CHANGES TO CITY FACILITIES REQUIRED FOR NEW ELECTRICAL LOAD
WILL BE AT THE COST OF THE OWNER. (Location Code 0502)
May 22, 2013 8;46:59 AM rbecker.
Are you installing a fire system or lawn sprinkler system?
If you are contact Ron Becker at 360/417/4886,
Fax:3GO/452/4886, or E-mail: rbecker@cityofpa.us
Address numbers shall be plainly visible from the street.
Address numbers shall be a minimum of six inches high and be
of contrasting color from the background.
A minimum 2A-10BC fire exinguisher is required.
Extinguishers must be mounted, with the top no more than 5'
off the floor. Suggested extinguisher placement is
adjacent to an exit.
May 23, 2013 4:04:08 PM sroberds.
The proposal will result in construction of an
office/storage structure in the CO zone for total lot
coverage of 13%. No land use issues are anticipated as
designed.
Trench safety per applicable laws. temp erosion control and
surface restoration responsibility of applicant. Contact
City inspector prior to start of work @ 360 417-4831. No
attachment of stormwater leaders, foundation drains, yard
drains, or any other CSO contribution is allowed.
A separate Right of Way Construction permit is required for
all work in the right of way, application must include all
contractors and sub-contractors, each must provide the City
with a certificate of insurance listing the City as an
additional insured.
All connections to City storm drain facilities require an
inspection by Public Works and Utilities Engineering prior
cover. Notice will be given 48 hours in advance of
commencing work.
Sanitary sewer connection inspection is required by
Public Works prior to back fill of ditch. 24 hour advance
notice is required. Public Works Inspection request line
417-4831
Construct driveway and Sidewalks to City Standards.
Concrete with exposed aggregate or other non-standard
finishes(including colors or dyes)are not allowed in the
City road right of way. Broom finish only. An inspection by
Public works Engineering is required prior to pouring
concrete. Public Works inspection request line 417-4831
----------------------------------------------------------------------------
Other Fees . . . . . . . . . STATE SURCHARGE 4.50
----------------------------------------------------------------------------
Fee summary Charged Paid Credited Due
----------------- ---------- ---------- ---------- ----------
Separate Permits are required forelectrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backfiow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Sternwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-In
Water Line(Meter to Bldg)
Gas Line
Back Flow/Water FINAL Date Accepted by
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders I Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall(Interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pump/Furnace/FAU/Ducts
Rough-in
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts FINAL Date Accepted by
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
,Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parking/Lighting ESA:
'Landscaping ISHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction-R.W. PW I Engineering 417-4831
Fire 417-4653
Planning 417-4750
1 Building 417-4815
T:Forms/Building Division/Building Permit
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY&ECONOMIC DEVELOPMENT- BUILDING DIVISION
3 21 EAST 5TH STREET, PORT ANGELES, WA 983 62
Page 3
Application Number . . . . . 13-00000539 Date 6/18/13
Application pin number . . . 142328
Permit Fee Total 1213.55 1213.55 .00 .00
Plan Check Total 663.16 663.16 .00 .00 REPORT SALES TAX
Other Fee Total 4.50 4.50 .00 .00 on your state excise tax form
Grand Total 1881.21 1881.21 .00 .00 to the City of Port Angeles
(Location Code 0502)
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/B uilding Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS–
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type —F Date Accepted By Comments
FOUNDATION:
Footings
Stemwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole BIcIgs.)
PLUMBING:
Under Floor/Slab
Rough-in
Water Line(Meter to Bldg)
Gas Line
Back Flow/Water FINAL Date Accepted by
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders/Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall(Interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pump/Furnace/FAU I Ducts
Rough-In
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts FINAL Date Accepted by
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
,Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parking/Lighting ESA:
Landscaping ISHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction-R.W. PW /Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
T:Forms/Building Division/Building Permit
THE
For City Use
'CIT- y OP 16'"LES
A -
Permit#
W A S H I N G T 0 N . U . S.
ateReceived:
321 East Slh Street
Port Angeles, WA 98362 ate Approved
P: 360-417-4817 F: 360-417-4711
permits@cityofpa.us
Building Permit Application
Project Address:
40t Cq fo+ 0
Main Contact: Phone # 4(1-0s-ol
E-Mail:
Property Name PhoneAQ )K
Owner NOVA 01�JVAPIC LA6ft" SVC-I-ewl TZ A3
Mailing Address I Email
'ZI It) so "k Pe4 1004V S4- b 0)!�' itIPS&Mot .0,-C-
City State zi�
P WA
0--'+ Avinwd-kc- '�
GefttrartDr Name Phone
:;-L,e ta Q\j t A&5.oe i -t c -
e4Aj i k�e-e-1 Mailing Address Email
-3. 1 c--- - IA S-V I
cit State I zip
WA- 2
Contractor License # Expiration:
Project Value: Zoning: Tax Parcel # Lot#
$ too I 06D ec) C-.-)g D
Type of Residential 11 Commercial Industrial Public
Permit Demolition Fire 1:1 Repair 1:1 Reroof(tear off/la'y over) 0
For the following, fill out both pages of permit appl,ication:
New Construction 2' Remodel 11 Addition 11 Tenant Improvement
Mechanical 1:1 Plumbing El Other 0
Existing Fire Sprinkler System? Maximum height of structure Proposed Bedrooms Proposed Bathrooms
Yes 11 No W*
Project
Description 'VIO�J'A'W, W'3A, P, at t&J
I %
-A -4-
I have read and completed the application and know it to be true and correct.I am authorized to apply for this
permit. I understand that it is my responsibility to determine what permits are required and to obtain permits
prior to working on projects. I understand that the plan review fee is not refundable after plan review has
occurred. I understand that I will forfeit the review fee if I cancel or withdraw the application before the
permit is issued. I understand that if the permit is not issued within 180 days of receipt,the application will be
considered abandoned and the fees forfeit.
Date Print Name Signature
c' U,U
6116113 1(.-
Residential Structures
For Office Use
Area Description (SQ FT) Existing Proposed $$value
Basement
First Floor
Second tloor
C6vered,be6ktPbrch/Entry
Deck
Garage
Carport
Other(describe)
Area Totals
Commercial Structures
For Office Use
Area Descriptions (SQ FT) Existing Proposed $$Value
Existing Structure(s)
Proposed Addition
Tenant Improvement?
Other work(describe) CA-ppl+ 0
Area Totals
1044
Lot/Site Coverage Calculations
Footprint(SQ FT) of all Structures: Lot Size: %Lot Coverage
IE03LP I 1-1(0 1 C.F 111-19 1
SQ FT Site coverage (all impervious+ %Site Coverage
structures) SZ8S '-4'- A5
Mechanical Fixtures
Indicate how many of each type of fixture to be installed or relocated.as part of this project.
Air Handler Size: # Haz/Non-Haz Piping #of Outlets:
Appliance Vent # Heater(Suspended,Floor,Recessed wall) #
Boiler/Compressor Size: # Heating/Cooling appliance #
repair/alteration
Evaporative Cooler(attached,not # Pellet Stove/Wood-burning/Gas #
portable) Fireplace/Gas Stov6/Gas Cook Stove/Misc.
Fuel Gas Piping #of Outlets: Ventilation Fan,single duct #
FurnacC�eat Pumpo Size: # Ventilation System #
Forced Air unit -Z 4.v-- I
Plumbing Fixtures
Indicate how many of each type of fixture to be installed or relocated
Plumbing Traps # ;I Fuel gas piping #of Outlets:
Water Heater # Medical gas piping #of Outlets:
Water Line # Vent piping #
Sewer Line # Industrial waste pretreatment #
interceptor
Other(describe):
T:\BUILDING\APPLICATION FORMS\BUILDING PERMIT 081212.DOCX
7p
7
aLlr'dsen
lit
402
2210
408
mom
low
1 Mi
N
422
426
413
01
0
i MOM..
r7
Orcas Ave
7�
4p*
406 408 428
414
420
m0s
2309
lit" '4
��4�,
Ott)
Y- 24
7 P
24- L�?, -)
Av-c -
to
t3 ol
ate S, a.
%14AS
be
44-
t 4 Igo Ir-e-
ASA
S7�?3 Ake
Qy
V-;i6)
Don
57 2yl-
...........
vL
f r
Too
it
4el
2009 Washington State Energy Code Compliance Forms for Nonresidential and Mukhmily
W_ E�_rnl_velope SurnrnarV; Zone 1 Non-Residential ENV-SUM
2OD9 Washlnglon State Energy Code Compliance Forms for Nonresidential and Muftbrrdly Residential PaWd D 2010
Project Info Project Address am=01mme-inn SUM Date 5/16/2013
2210 so=rZIUMM sl� For Building Department We
PM& , M 90362
Applicard Norm: sawnc 6 Jutsoczalas, =C.
AWftM Ad,I � ;: Sol a. M�, SUM#1
Applicant Phone: 417-0501
Project Description 21 New Building 0 Addlilon 0 Alteration El Change of Use
0 [1 Component Performance 0 Seattle ErvSw
Compliance Option (See Decision Flowchart(over)for qualifications) 0 Syst—Anallysis
Occupancy Group QD Nonresidential 0 Multifamily Residential
Climate Zone @ Climate Zone 1 0 C8MteZwe2 (See WSEC 302.3 for county bt)
Fenestration Area Calculation Total Fenestration Electronic version:these values are autornatice"en from ENV-UA.
(rough opening) Grow E)ftdor
(vertical&overhd) divided by Wall Area fimes 100 equals %Fenestration
42.0 + 1600.0 X 100 2.614
0 yes Alimml)W IF Pr0j@d we afl nxMmMft 05 6 1 in*KOM 13102-only *5 preso"m p9M&W wAld be
Senti-Heated Path calculalmd sepandely ftm ottw condboned spam.Unked to well kwulshon levels.Rs**os cam W homft
0 Ito ow Guallf0ft
Envelope R*Wremwft(wW values as applimble) Envelop Re*&wnwft(continued)
Mlrdnwm Insulation R4Wuss Afaidniurn U49ows
Root-insulation Above Deck Vw9cal FiDms&Bftn
Root-Metal Building Non4ftlsl Frame iO.32
Roofs-Single POW metal Frame
Roofs-Aft and AD Others R-49 Entrance Dow 0.2
Waft-mass ftylights-Without Curb
Walls-Metal Building Skftft-With Curb
Walls-Steel Fromed Opaque Doors-Swinging 0.2
Welts-Wood Framed and Other R-21 Opaque Doors-Non4winging I
10.2
Room-Mass Ataximum SHGC(or SQ)
Rom-Steel AM Velftel Fenestrabon
Roors-Wood Framed am Dow Non4iorth
AftWaxim F41acftws North
,S[sim-on4loade-Unhealed �R-10
JSWr.-onGrsd9-Heated
Notes:
zl�!7_ 2009 Washington State Energy Code Compliance Form for Nonresidential and Multifamily Residential
InfeHor Lighting Surnmary-
LTG-INT'
2009 Washington State Energy Code Complianoe Forms for Nonresidential and Multifamily Residential Revised November 2010
Project Info Project Address ZMTR OLMVIC LXWJUU SYSTEM Date 5/17/2013
2210 SOUTH PEABODY STREET For Building Department Use
PORT ANGELES, WA 98362
Applicant Name: ZENOnc & ASSOCIATES, INC
Applicant Address: 301 E. GTE STREET, SMTE #1, PORT Amwass
Applicant Phone: 417-0501
Project Description 2] New Building Addition E] Alteration [I Plans Included
Refer to WSEC Section 1513 for controls and commissioning Ira quirements.
Compliance Option 0 Prescriptive @)Lighting Power Allowance 0 Systems Analysis
(See Qualification Checklist(over).Indicate Prescriptive&LPA spaces Clearly on plans.)
Alteration Exceptions No changes are being made to the lighting and space use�not changed
(check appropriate box-sec.1132.3) LJ Less than 60%of the fixtures n�ew,installed wattage not increased,&space use not changed.
Maximum Allowed Lighting Wattage
Location Allowed Gross Interior
(floor plan/room Occupancy Description Watts per ft2 Am In fe Allowed x Am
OFFICE 0.91 92 84
R.R. 0.60 66 S3
[WORKSHOP 1 1.201 13761 1654
4
From Table 15-1(over)-document all exceptions on form LTG-LPA Total Allowed Wafts 1 17990
Proposed Lighting Wattage
Location Number of Watts/ Watts
(floor plan/room Fixture Description Fixtures Fixture Proposed
OFFICE V-3 TUBE FLOURESCWT 1 96 96
RR 41-2 TUBE FLOURESCENX 1 64 64
WORKSHOP 41-2 TUBE PLnHREscEmT 12 64 768
F
Total Proposed Watts may not exceed Total Allowed Watts for Interior Total Proposed Wafts —9218
Notes:
1.For proposed Fixture Description,Indicate fixture type,lamp type(e.g.T-8),number of lamps In the fixture,and ballast type(If
Included). For track lighting,list the length of the track(in feet)In addition to the fixture,lamp,and ballast Information.
2.For proposed Watts/Fixture,use manufacturees listed maximum Input wattage of the fixture(not simply the lamp wattage)and
other criteria as specified In Section 1530. For line voltage track lighting,list the greater of actual luminalre wattage or length of track
multiplied by 50,or as applicable,the wattage of current limiting devices or of the transformer. For low voltage track lighting list the
transformer rated wattage.
3.List all fixtures.For exempt lighting,note section and exception number,and leave Watts/Fixture blank.
2009 Washington State Energy Code Compliance Form for Nonresidential and Multifamily Residential
"UtdHor Lighting Summary- LTG-EX
2W9 wasVdngton State Energy Code Compliance Forms for Nonresidential and Multifamily ke—sidential Revised November 2010
Project Info PrqJ Addres:KORTH OLYMPIC LIBRARY SYSTEM Date 5/17/2013
2210 SOUTH PEASO1W STREET For Building Department Use
PORT AMIELES, IM 98362
Name: ZENOVIC G ASSOCIATES, XNC
Appl.Name 301 E. GTH STREET, SUITE #1, PORT ANGELES
JAPPI.Phone 417-0503.
Project Description New El Addition Afteration Plans Included
TZefer to WSEC Section 1513 for controls and commissioning requirements.
Lipoffing Zone 0 7^na I 7nno 9 0 7o%na q 7nna A
(as specified by Jurisdiction) 1 0
Icompliance Option I Ughting Power Allowance 0 Systems Analysis
Building Grounds Efficacy>60 lumens/W Controlled by motion sensor
(luminaires>100 Watts)
Exemption(list)
Alteration Exceptions E]No changes are being made to the lighting and space use not changed.
(check appropriate box-sec.1132.3) 0 Less than 60%of fixtures are new,Installed wattage not Increased.&space use not changed.
Tradable Maximum Allowed Lighting Wattage Base Site Allowance: 600
AJlowed Watts Area(ft),perimeter AJIOwed W8ttS
Tradable Surfaces Description per fe or per If (1f)or#of Items fe(or x If)
Total Allowed Tradable Watts:
Tradable Proposed Lighting Wattage (use mfgr listed maximum Input wattage for luminalre.)
Number of Watts/ Watts
Surface Fixture Description Fixtures Fixture Proposed
Total proposed tradable watts may not exceed the sum of total allowed tradable watts plus Total Proposed Tradable Watts:
the base site allowance. Any base site allowance not needed to make tradable watts
comply can be applied to Individual non-tradable categories.
Non-Tradable Maximum Allowed Lighting Wattage Base Site Allowance Remaining: 600
Aflowed Watts Area(ft),perimeter AJlowed Watts
Non-Tradable Surfaces DescriptIon per fe or per If (1f)or#of Items x fe(or x It)
Bldg.Fagade(by Perim) jwxLDnw FAME 2.5 W/If ISO 400
Non-Tradable Proposed Lighting Wattage
Number of watts/ watts
Surface Fixture Description Fixtures Fixture Proposed
Bldg.Fagade(by perim) 13 WATT WALLPACK 1 13 13
Bldg.Fagade(by perim) 7OWWALLPACK 1 70 70
,Bldg.Fagade(by perim) IOOW LIGHTS IN CANOPY 1 21 1001 2001
Non-tradable proposed wafts may not exceed allowed watts for any Individual Total excess Non-Tradable watts: 0
surface unless the total excess watts for all non-tradable surfaces are less than the
remaining site allowance. 600
Site Allowance Balance.
95.99'
\,EXISTING GRAVEL
DRIVEWAY
EDGE OF GRAVEL
25'
------------
----------------------
PROPOSED FACILITIES
DEPARTMENT ANNEX .28'± f
BUILDING 32' X 48'
W/ 10' X 16' CARPORT
SLAB ELEV: 231.7b'
INSTALL H.C.
ST SIGN PER B/I
IN ALL
q CONCRETE F,,,,0 uNTED TO �'114"O PVC TIGHTLINE
BuILDI� FROM DOWNSPOUTS
NG
SIDEWALK
PROVIDE HANDICAP
PARKING STALL PER
INSTALL -GRAVEL
DET AIL A/1 rACCFSS
'W L"L
C <
1 4"0 PVC TIGHTLINE
0 OU� -,�-5' CLEAR
I
FROM DOWNSPOUTS
2 SPACES WALKING AREA
INSTAi L DETENTION1 es Da
SYSTEM PER
DRAINAGE PLANS
-----------
7-------------
--- --------------
:H]
lt�,STALC CONCRE E
DRIVEEW,�Y AND
PARKING AREA
5.3 2'\,
2
85.05
Job:
wrlightsoft- Project Summary Date: May 17,2013
Entire House Or.
Air Flo Heating Co.
221WW=dW9l,G6Wr%WAW= Emil:JWQWffldMftX=Web:WW"dmft=n
31=1 In MIT R- 1
For Tracy Gudgel
IN%mp v c-
Notes:
RF
Weather Port Angeles Intl,WA,US
Winter Design Conditions Summer Design Conditions
Outside db 27 OF Outside db 75 OF
Inside db 70 OF Inside db 75 OF
Design TD 43 OF Design TI) 0 OF
Daily rapgurrildity M
Rehittive so %
Moist ire rilffprenoe il gr/lb
Heating Summary Sensible Cooling Equipment Load Sizing
Structure 19170 Btuh Structure 12000 Btuh
Ducts 0 Btuh Ducts 0 Stuh
Central vent(0 cfm) 0 Btuh Central vent(0 dm) 0 Btuh
Humidification 0 Stuh Blower 0 Stuh
Piping 0 Stuh
Equipment load 19170 Btuh Use manufacturers date n
Ratellewing it* 1" 0.80
Equ�r,�,d=r
Infiltration load 9676 Btuh
Method Simplified Latent Cooling Equipment Load Sizing
Construction quality Average
Fireplaces 0 Structure 5372 Btuh
Ducts 0 Btuh
Heafig Coolina Central vent(0 cfm) 0 Btuh
Area(fe) 1 1635 Equipment latent load 5372 Btuh
Volume(ft) 15350 15350
Air chan§ei/hour 0.80 0.40 Equipment total load 14948 Btuh
Equiv.AVF(cfm) 205 102 Req.total capacity at 0.70 SHR 1.1 ton
Heating Equipment Summary Cooling Equipment Summary
Make Mitsubishi Make Mitsubishi
Trade Trade
Model Cond
ARI ref no. coil
ARI ref no.
Efficiency 0 HSPF Efficiency 0 SEER
Heating input Sensible cooling 0 Btuh
Heating output 0 Btuh @ 47OF Latent cooling 0 Btuh
Temperature rise 0 OF Total coolin 0 Btuh
fi gw
Actual air flow 519 cfrn Actual air a 619 cfm
Air flow factor 0.027 cftn/Muh Air flow factor 0.043 cfm/Btuh
Static pressure 0 in H20 Static pressure 0 in H20
Space thermostat Load sensible heat ratio 0.69
Printout certified by ACCA to meet all requirements of Manual J 7th Ed.
RV&8Lft*U*WW71MRWMM 201341Ay617 1111A11:116
Pf0)8WJW CalcuMfl OdWOUM-N P"e I
wrightsoft. Load Short Form Job:
Date: May 17,2013
Entire House By;
Air Flo Heating Co.
221 was[ceder*L SeciLdm,WA WM Ewmll:joelQWrfloheaVrtgAmWbWwwwjOffmMMIMmn
WIN -3 N M-
For Tracy Gudgel
Htg Cig Infiltration
Outside db(OF) 27 75 Method Simplified
Inside db,(OF) 70 75 Construction quality Average
Design TD,(OF) 43 0 Fireplaces 0
Daily range - M
Inside humidity 30 50
Moisture difference(grAb) 16 11
HEATING EQ-UIPMENT COOUNG EQUIPMENT
Make Mitsubishi Make Mitsubishi
Trade Trade
Model Cond
ARI ref no. coil
ARI ref no.
Efficiency 0 HSPF Efficiency 0 SEER
Heating Input Sensible cooling 0 Btuh
Heating output 0 Btuh @ 47OF Latent cooling 0 Btuh
Temperature rise 0 OF Total cooling 0 Btuh
Actual air flow 519 cfrn Actual air flow 619 drn
Air flow factor 0.027 chn/Btuh Air flow factor 0.043 cftntBtuh
Static pressure 0 in H20 Static pressure 0 in H20
Space thermostat Load sensible heat ratio 0.69
ROOM NAME Area Ht9 load Cig load Htg AVF Cig AVF
(f t2) (Btuh) (Btuh) (Cfm) W01)
Ubraray 1635 19170 12000 519 619
Entire House d 1535 19170 12000 519 519
Other equip loads 0 0
Equip.@ 0.80 RSM 9576
Latent cooling 5372
TOTALS 1535 19170 14M 619 619
Printout certified by ACCA to meet all requirements of Mahual J 7th Ed.
-Orp-Wrightgott— RW-W"LWVWW 7.122 RGUMM 2M34Aey-1711A1:16
PrqjwhjW Csk=MJT Odontftn-N Page I
fPX4A=(A4MOf!M&V"
PKA HEAT PUMP
ea-a—mooest R Ow-flon
6wh 18.0m 200 XPO 34MO
T bw"d
_P�w F_Ff-�� " "
12PO-UM
w 72Z.240 2= 4,130 .5,030
7
Enww Efficiency 153 17.0 15.5 14.D
Moisture Plamoval With 15.2 5.0 8.1 92
Sanalble HW Faclor 0.68 m" 0.71) 0.70
Rated Np* em 19.000 26.000 32,000 37AM
Heeling at 47-F-2 Range m — 8PO-20,000 ZOND �IW)-3�4A IZODMAW
TOW Input w IA70 Z330 USO 3910
HSPF 9.6 84 0.3
m AODD 23000 25.00D
Hedngatl7'F*3— 6—UMAL
C ToW Input w 1,670 Z200 2.8150
POW Supply Phase.Cmvofte 1phmGOH7,2D8/230V*4
Indoor-Oubloor$1-82 AC208/23DY
VMF bwoor-Oubloor$2-S3 DC24
MCA A
Fen Motor FA.A Om US OR
Fan MOW OutpPA w 30 56 .56
DKfP% M370.425 US-705-775 705-810-M
MUP% 290-33540 5704IW700 635-7304M
lndwgnft somi Pmmn Lem dBW 36-40-0 3942-45 4348-49
External lift Color MURN11110.1092/02
V.IR. 46-IAS
Dknmsion Unft Vln. 9-13116 11-m
In. 14-0
welghttink Lbs. 29 46
Reld DrW*p Sim O.D. 5/8
MCA A 13 18 25
POOWWWnd0d FUSSISFOOlowShe A 15 25 30
MDCP A 20 30 40
FLA 0.35 L75
FanMowOOd w 40 75
IDG UMMIR-Olm Ub Notary
RLA. 12
17.5
LRA. 14
Outdoor UrIt AbIlaw CFM -T 11940
pAft%WBM control Lkw Bmffdm vsm
Dekost MeM
RMMQJ*
Soled Pressure Level at Cooling*1 sw 46
SOUIHI ftmn Lad at Heeling 12 OR 47 T EOD
Exlernal PAM Color mumwi No.SY 7.8
VtkL 31-19 37-M
Dhensions Min. 11-13116+718
I.In. 23-0 37-1/8
W*ht LbL 91
Ty" -IMOA
PAMOOMA cb8me LU4,aL
V2 6.10
011 Type OL to Rm ca Pim
Gas Skle O.D. In. 1/2 6/8
I'lefflgavat Pipe U A 318
OD. 1/4
Height DWasm Pwj FL IGO
Adige . Foatimp
I Length Ow FL 100 165
Camecrion melbod kdooefOublaor FbvdMmW
3,
Tial bassif
An" W F Pr GjW&,W (Ing DA
F
Cr.
X
77i.
*an pift
Ow
_WW.4V
STORMWATER REPORT
FOR
NORTH OLYMPIC LIBRARY SYSTEM
Date: March 16th, 2013
Project: Facilities Department Annex Building— North Olympic Library System
401 East Orcas Avenue, Port Angeles, WA
Prepared by: Zenovic&Associates, Inc.
301 East 6th Street, #1
Port Angeles, WA 98362
M.
WA
0
4V
cw�
3594
PURPOSE
The purpose of this report is to address how the proposed stormwater design meets the
requirements of the City of Port Angeles Urban Services Standards and Guidelines. The
report will provide existing site conditions, proposed development, City of Port Angeles
stormwater requirements, drainage area summary, flow control calculations and a
maintenance schedule.
EXISTING SITE CONDITIONS
The project site is located at 401 East Orcas Avenue., Port Angeles, WA; parcel number
06-30-10-509090. The total area of the parcel is 11,761 square feet. The site currently
has three existing outbuildings and a gravel driveway crossing a portion of the site. The
remainder of the site is lawn and landscaping. The site also included a 1,321 square
foot home which was demolished in preparation for this project. The parcel is bordered
to the north by parcel 06-30-10-509080, to the east by parcels 06-30-10-502120 and 06-
30-10-502130, to the south by Orcas Avenue and to the west by South Peabody Street.
The parcel and surrounding properties are zoned CO- Commercial Office.
The topography of the site and surrounding properties slopes consistently down to the
northeast at approximately 4-5%. The on-site soil is classified as Clallam - Hoypus
according to the Custom Soil Resource Report for Clallarn County Area, Washington
(2006). Clallarn - Hoypus soil is a gravely sandy loam, but generally has a restrictive
glacial till layer found between 20 to 40 inches below the surface. Ground water is
typically perched above this restrictive layer during the winter months.
PROPOSED DEVELOPMENT
The proposed development will construct a 1,536 square foot storage building with an
attached 160 square foot carport, and add approximately 1,563 square feet of concrete
to the parking lot and approximately 182 square feet of concrete sidewalk. In total the
development Will convert approximately 2,275 square feet of pervious lawn and
landscaping surface to impervious roof, asphalt and concrete surface. See drainage
area summary below for additional information.
CITY OF PORT ANGELES STORMWATER REQUIRMENTS
The proposed project disturbs less than 1 acre of land and therefore falls under the
requirements of Section 5.05.02 (Small Project Drainage Plans)of the City of Port
Angeles Urban Service Standards and Guidelines.
Section 5.05.02 requires a flow control system, to be designed in accordance with
Section 5.04.07, if the site drains to a storm system which is already at capacity.
According to Section 5.04.07 the development of the site doesn't meet any of the criteria
that would require flow control, but a flow control facility is still being proposed due to
consistent flooding that occurs during large storm events along Lauridsen Boulevard.
Section 5.05.02 requires a runoff treatment facility, designed in accordance with Section
5.04.06, if it is likely the project Will have a negative impact on water quality in a local
stream, wetland or salt water body. The addition of Pollution Generating Impervious
Surface(PGIS) is small enough as to not meet any of the thresholds listed within Section
5.04.06, so a treatment facility is not required or proposed. See drainage area summary
below for PGIS area.
DRAINAGE AREA SUMMARY
ITEM PRIEDIEVELOPED DEVELOPED
Total project area 11,761 S.F. 11,761 S.F.
Area of off-site basins 0 0
combining w/on-site runoff
Impervious area(%of site) 26% 45%
Areas of impervious PGIS 1,350 S.F. 3,562 S.F.
surfaces(roads, sidewalks,
driveways, ponds, etc.)
Areas of impervious NPGIS 1,660 S.F. 1,723 S.F.
(roofs, patios,etc.)
Converted pervious surfaces 0 0
(forest to lawn)
FLOW CONTROL CALCULATIONS
Flow control is not required for this project according to Table 2 in Section 5.04.07.02,
but a detention/flow control system is being proposed due to the overloaded storm
system along Lauridsen Boulevard. The predeveloped and develop site conditions were
modeled using the Rational Method based on the areas shown in the drainage area
summary above. The detention pipe and outlet structure were sized so the developed
outfall from the site matches the predeveloped outfall for the 2 year and 25 year storm
events. Drainage calculations can be found in Appendix A.
OPERATION AND MAINTENANCE
A maintenance schedule for the on-site drainage facility has been completed to satisfy
the requirements within Section 5.05.02 of the City of Port Angeles Urban Services
Standards and Guidelines. The maintenance schedule is included in Appendix B.
APPENDIX A
FLOW CONTROL CALCULATIONS
PORT ANGELES DRAINAGE DESIGN ZENOVIC&ASSOCIATES
PROJECT: FACILITES DEPARTMENT ANNEX BUILDING,NOLS 301 EAST 6TH STREET,SUITE I
LOCATION: 401 EAST ORCAS AVENUE,PORT ANGELES,WA PORT ANGELES,WA 98362
PARCEL NO: o6-3o-lo-5ogogo DATE: 5/16/2013
JOB NO. 13038
AUTHOR: SJR
Mean Recurrence Interval= Years
Rainfall Durati,Dn'T)= Minutes
Cit
Design ity=
I= 1.207 Inches/Hour m/(TAn)
M= 7.370
n= 0.532
BEFORE DEVELOPMENT RUNOFF
AREA ACRE COEFF.*
SO.FT. w C. Q=C*I*A
1 0.05 0.015
2 0.14
0.050
3 0.01 0.006
4
0.04 0.041
5
0.03 E 0.019
TOTALS 11761 0.27 0.131 CFS
INCREASED 10%FOR 25 YEAR STORM(.90 MAX)
AFTER DEVELOPMENT RUNOFF
AREA ACRE COEFF.*
SQ.FT.- w C. Q=C*I*A
0.0396 OW
0.043
2
0.0336 0.020
3
0.0081 0.005
4
[f-45 0.0401 0.044
10,
6
0.0723 0.022
0*064M 0.023
8 0.0124 0.005
TOTALS 11761 027 0.162 CFS
INCREASED 10%FOR 25 YEAR STORM(.90 MAX.)
INCREASE IN SITE RUNOFF= 0.032 CFS
ALLOWABLE INCREASE= % 0.000 CFS
REQUIRED ON SITE RETENTION/DISPOSAL 0.032 CFS
REQUIRED VOLUME FOR 30 MIN.STORM 57.0 CU.FT.
CONTROLLED RUNOFF AREA % R.O. CONTROLLED
AREA CONTROL FACTOR RUNOFF
I Proposed Building 0.0396 0.90 0.0430 CFS
2 Gravel Access(0-2%) 0.0336 0.50 0.0000 CFS
3 Gravel Access(2-10%) 0.0081 0.50 0.0000 CIPS
4 Pavement(2-10%) 0.0401 0.55 0.0213 CFS
6 Grass(0-2%) 0.0401 0.90 0.0000 CFS
0.0642 CFS
MINIMUM CONTROLLED R.O. REO'D DETENTION/DISPOSAL 0.0642 CFS<-OK
13038-RATIONAL METHOD Page I of 1 (25Y)Intensity
PORT ANGELES DRAINAGE DESIGN ZENOVIC&ASSOCIATES
PROJECT: FACILITES DEPARTMENT ANNEX BUILDING,NOLS 301 EAST 6TH STREET,SUITE 1
LOCATION: 401 EAST ORCAS AVENUE,PORT ANGELES,WA PORT ANGELES,WA 98362
PARCEL NO: 06-30-10-509090 DATE: 5/16/2013
JOB NO. 12030
AUTHOR: SJR
Mean Recurrence Interval Years
Rainfall Duration M Minutes
Design City
1 0.711 Inches/Hour m/(TAn)
M= 4.310
n= 0.530
BEFORE DEVELOPMENT RUNOFF
AREA ACRE COEFF.*
SO.FT. w C. Q=C*I*A
1 161 0.0494 0'008
0.1377
2 0.027
3 0.0138 0.003
4 0.0381 0.022
5 0.0310 0.010
TOTALS 11761 0.27 0.070 CF3
INCREASED 10%FOR 25 YEAR STORM(.90 MAX.)
AFTER DEVELOPMENT RUNOFF
AREA ACRE COEFF.*
SO.FT. *A" C. 0--C*I*A
i17
1,46
�54
7 4�
0.0396 0.025
2 V=j'
0.0336 0.011
a ravel.
0.0081 0.003
.4
0.0401
0.026
6 wrmaps' �0 0.0723
0.014
7 6
78 0.014
8
0.000
TOTALS 11761 0.27 0.079 CFS
INCREASED 10%FOR 25 YEAR STORM(.90 MAX.)
INCREASE IN SITE RUNOFF= 0.009 CFS
ALLOWABLE INCREASE= ROMM"01% 0.000 CFS
REQUIRED ON SITE RETENTION/DISPOSAL 0.009 CFS
REQUIRED VOLUME FOR 30 MIN.STORM 16 CU.FT.
CONTROLLED RUNOFF AREA % R.O. CONTROLLED
AREA CONTROL FACTOR RUNOFF
1 Proposed Building 0.0396
0.90 0.0263 CFS
2 Gravel Access(0-2%) 0.0336
0.45 0.0000 CFS
3 Gravel Access(2-10%) 0.0081
0.50 0.0000 CFS
4 Pavement(2-10%) 0.0401 0.90 0.0205 CFS
6 Grass(0-2%)
0.0723 0.27 0.0000 CFS
0.0458 CFS
MINIMUM CONTROLLED R.O. REQ`D DETENTION/DISPOSAL 0.0458 CFS<-OK
13038-RATIONAL METHODIle Page 1 of 1 (2Y)INTENSITY
DETENTION PIPE CALCULATIONS
DETENTION PIPE
REQUIRED VOLUME = 57.00 C.F.
REQUIRED ON-SITE DISPOSAL = 0.032 C.F.S.
PIPE DIMENSIONS
PIPE DIAMETER=��IN. F T
PIPE# 1 AREA/L.F. = 3.142 SQ. FT.
ESTIMATED PIPE LENGTH = 18.1 FT. USE FT.
PIPE VOLUME 62.8 CU. FT.
ORIFICE #1
2 YEAR STORM Head 0.596
FLOWRATE (Ql) = 0.0371 CFS
ORIFICE#1 DIAMETER= 1.341 IN. -->USE IN. ORIFICE
ORIFICE#2
25YRSTORM
H2 (TOTAL HEIGHT ABOVE ORIFICE#1) = 1.703 FT.
FLOWRATE (Q out 2yr orifice) = 0.0196 CFS
FLOWRATE (Q out 25yr orifice)= 0.0130 CFS
H25(HEIGHT ABOVE ORIFICE#2) 1.1071
ORIFICE#2 DIAMETER 0.679 IN. —>USE IN. ORIFICE
ORIFICE#2
61-125
I F
H2
H,
ORIFICE#1
APPENDIX B
STORMWATER MAINTENANCE SCHEDULE
STORMWATER MAINTENANCE REPORT
FOR
NORTH OLYMPIC LIBRARY SYSTEM
Date: March 16th, 2013
Project: Facilities Department Annex Building — North Olympic Library System
401 East Orcas Avenue, Port Angeles, WA
Prepared by: Zenovic&Associates, Inc.
301 East 6th Street, #1
Port Angeles, WA 98362
North Olympic Library Systen4 Stormwater Maintenance Report,Page I of 7
PURPOSE
The purpose of this report is to provide stormwater facility operation and maintenance protocols
for the stormwater facilities at 401 East Orcas Avenue. The maintenance report provides
background information for the development, identifies all stormwater facilities to be maintained,
names the entity legally responsible for maintenance, grants City of Port Angeles personnel
access for annual inspections, details requirements for maintaining records and provides a
maintenance checklist and log.
BACKGROUND
The total area of the parcel is 11,761 square feet. The parcel currently has three existing
outbuildings and a gravel driveway with the remainder of the site being lawn and landscaping.
The site did include a 1,321 square foot home which was removed in anticipation of this project.
The project consists of constructing a 1,536 square foot storage building with an attached 160
square foot carport, construction of concrete sidewalk, construction of a concrete driveway, and
the installation of an 18" diameter stormwater detention pipe with an outlet control structure and
associated 6" diameter piping. The project site is located at 401 East Orcas Avenue, Port
Angeles, WA; parcel number 06-30-10-509090.
STORMWATER FACILITIES
List of facilities to be maintained:
9 Parking Area
0 (1)Type 1 Catch Basin
0 (1)Type 2 Catch Basin
(1) OPt Control Structure
diameter X 20' long Detention Pipe
Refer to tt n-r Maintenance Plan on page 7 to see locations of storm facilities.
MAINTENANCE RESPONSIBILITY
The North Olympic Library System will be the sole entity legally responsible for the continual
operation, maintenance and repair of the on-site stormwater facilities.
The City of Port Angeles will be the sole entity legally responsible for the maintenance of the
newly installed type 2 catch basin located in Peabody Street.
CITY INSPECTIONS
The City of Port Angeles shall be allowed access to the site for an annual inspection of all
permitted stormwater facilities.
RETENTION OF RECORDS
The person legally responsible for the facilities shall maintain all records of maintenance
inspections, repairs, warning letters, and notices of Violations. These records shall be made
available for viewing to the City of Port Angeles within 7 days of request.
North Olympic Library System, Stormwater Maintenance Report� Page 2 of 7
MAINTENANCE
Proper maintenance is vital for adequate functioning of the stormwater facilities. The
stormwater facilities will have biannual inspections. See Table on pages 4 and 5 for an
inspection checklist. Make photocopies of the checklist as necessary keeping the attached
sheets as a clean original copy.
MAINTENANCE AND REPAIR LOG
Record any required maintenance or repair on the log sheet on page 6. Make photocopies of
the log sheet as necessary keeping the attached sheet as a clean original copy.
MAINTENANCE TIMELINE
This covenant requires that when defects to the stormwater system are found during the
biannual inspection the needed repair shall be completed within 6 months.
North Olympic Library System, Stormwater Maintenance Report,Page 3 of 7
BIANNUAL MAINTENANCE INSPECTION CHECKLIST
Drainage X Maintenance/Inspection To Be Performed
Feature
Inspect pavement surface of accumulated sediment and debris.
Parking -Pavement sweeper to sweep parking lot clear of accumulated sediment and
debris.
Remove lid and inspect sumps.
-Rernove excess silt, debris and vegetation.
-Look for any evidence of oil, gasoline, contaminates or pollutants.
Coordinate removal/cleanup with local water quality response agency.
Inspect basin for any defects.
-Repair any defects that could allow water in or out of basin in any way other
than as designed. Repair any cracks or holes. Significant damage may
Catch Basin require basin to be replaced.
Inspect frame and grate.
-Frame should be sifting flush on the riser rings or top slab and firmly
attached.
-Check lid to make sure that it can be removed by one maintenance person
by applying normal lifting pressure. Cleanout frame of sediment and debris.
Check inlet and outlet pipes.
-Pipes should be securely grouted to catch basin wall without cracks or
holes. Regrout pipes to catch basin wall to eliminate all cracks and holes.
Remove lid and inspect sumps.
-if more than 4"of sediment accumulated on bottom, employ vacuum truck to
remove standing water, excess silt, debris and vegetation.
-Look for any evidence of oil, gasoline, contaminates or pollutants.
—Coordinate removal/cleanup with local water quality response agency.
Inspect orifice holes.
-Rernove any sediment, vegetation, or debris that is or could soon block flow
Outlet through orifice holes.
Control Inspect Overflow Pipe.
Structure -Remove any trash and/or debris blocking (or having the potential of
blocking)the overflow pipe.
Inspect structure for any defects.
-Repair any defects that could allow water in or out of control structure.
Significant damage may require control structure to be replaced.
Check inlet and outlet pipes.
-Pipes should be securely connected to structure. If, by visual inspection, it
can be seen that the pipes aren't connected properly than the pipes W411 need
to be reconnected to the bell fittings and sealed with grout or joint sealant.
North Olympic Library System, Stormwater Maintenance RepoM Page 4 of 7
Remove outlet structure lid and inspect pipe.
-if more than 4" of sediment accumulated on bottom, employ vacuum truck to
remove standing water, excess silt, debris and vegetation.
-Look for any evidence of oil, gasoline, contaminates or pollutants.
--Coordinate removal/cleanup with local water quality response agency.
Detention Inspect pipe for any defects.
Pipe -Repair any defects that could allow water in or out of pipe in any way other
than as designed. Repair any cracks or holes.
Check inlet and outlet pipes.
-Pipes should be securely grouted to catch basin wall without cracks or holes.
Regrout pipes to catch basin wall to eliminate all cracks and holes.
General Document observations of the presence of floating materials, suspended solids,
oil and grease, discoloration, turbidity and odor in stormwater discharges.
General Update Stormwater Maintenance Manual to reflect current conditions.
Inspect the entire site to determine whether there is/are any unpermitted
General non-stormwater discharge to storm drains or receiving waters. Report non-
permitted discharges to the City Stormwater Hotline at(360)417—4830.
-See page 7 for site plan of facilities to be maintained.
INSPECTION CERTIFICATION
"I certify that this report is true, accurate, and complete, to the best of my knowledge and belief."
Inspection completed on: by: (print+ signature)
Title/Qualification of Inspector.
North Olympic Library System, Stormwater Maintenance RepoM Page 5 of 7
MAINTENANCE LOG
Date Item/Facility Description Performed Comments
by
MAINTENANCE CERTIFICATION
"I certify that this maintenance log is true, accurate, and complete, to the best of my knowledge
and belief."
Inspection completed on: by: (print+ signature)
Title/Qualification of Inspector
North Olympic Library System, Stormwater Maintenance Report, Page 6 of 7
IMEND:(uNms oTHERymE mpicA=
NOLS ...NORTH OLYMPIC LIBRARY SYSTEM
V)
COPA ...CITY OF PORT ANGELES 0)
-PROPERTY LINE
- - - - - - - - ---GRADE BREAK aA
...EXISTING STORMWATER PIPE o
9L
...PROPOSED STORMWATER PIPE 0 Li
...PROPOSED TYPE 1 C.B. PER DETAIL B/C302 z
< ...SURFACE RUNOFF FLOW DIRECTION
ROPERTY LINE
E-
DOWNSPOUT
CONNECTION;
PROPOSED FACILITIES NOLS TO
DEPARTMENT ANNEX MAINTAIN
BUILDING 32' X 48'
1EQ W/10' X 16- CARPORT
z
w
35 L.F. 4-0 PVC
DOWNSPOUT
ONNECTIONS RAIN LINE-
NOLS TO MAINTAZIWN\ NOLS TO WAINTAIN Z
4- - -
PVC
DRAIN LINE, C4
NOLS TO MAINTAIN
18 L.F. 4"0
30 L.F. 4"0 PVC
RAIN LINE;
w
NOLS TO MAINTAIN
&'CL
4
24 L.F. 6" PVC f
STORM DRAIN LINE -4 — 1 -230
NOLS TO MAINTAIN N
STORM DRAI 4
DETENTION PIPE AND hif 4 TYPE 1 C.B.; z (L
CONTROL STRUCTURE; NOLS TO MAINTAIN
NOLS TO MAINTAIN 18 L.F. 6" PVC
-DRAIN LINE;
EXISTING 8"o CONCRETE_//� NOLS TO MAINTAIN R
STORMWATER MAIN
1* - 10'
231 nm
MAINTENANCE PLAN
JOB 1401.
41 232 13038
DAM'Moy 16, 2013
PERMIT SET
IL
ORCAS AVE.
SITE PLAN SHEET
Scale: I" - 10,