HomeMy WebLinkAbout404 Eclipse IND Parkway Address:'
404 Eclipse IND Parkway
-4wp"
PREPARED 10/19/16, 10:19:59 INSPECTION TICKET PACE; 1
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY 'DATE, 1.0119116
------------------------------------------------------------------------------------------------
ADDRESS 404 ECLIPSE IND PKWY SUBDIV:
CONTRACTOR C ANDERSON HOMES & DEV INC PHONE (425) 770-1477
OWNER BLUE MOUNTAIN LEASING PHONE
PARCEL 06-30-18-1-1-0000-0000-
APPL NUMBER: 16-00000837 COMM NEW CONST
------------------------------------------------------------------------------------------------
PERMIT: BPC 00 BUILDING PERMIT - COMMERCIAL
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
BLl 01 7/05/16 PB BLDG FOUNDATION FOOTING
7/06/16 AP July 5, 2016 9:56:17 AM pbarthol.
Wilson 670-8062
July 6, 2016 11:09:28 AM pbarthol.
BL2 01 7/08/16 PB BLDG FOUNDATION STEM WALL
7/11/16 AP July 8, 2016 11:04:39 AM pbarthol.
John 775-9361
July 11, 2016 8:20:48 AM pbarthol.
2 ufr grounds in place
BFF 01 7/19/16 JLL BLDG FLOOR FRAMING
7/19/16 AP July 19, 2016 9:14:31 Am jlierly.
John 775-9361 AM inspection
July 19, 2016 4:36:43 PM jlierly.
BEXS 01 8/08/16 JLL BLDG EXTERIOR SHEETING
8/08/16 AP August 8, 2016 8:38:37 AM jlierly.
John 775-9361
August 6, 2016 4:26:41 PM jlierly.
BAIR 01 8/19/16 JLL BLDG AIR SEAL
8/22/16 AP August 19, 2016 8:37:47 AM jlierly.
August 22, 2016 10:19:13 AM jlierly.
BL3 01 8/19/16 JLL BLDG FRAMING
8/22/16 AP August 19, 2016 8:38:30 AM jlierly.
August 22, 2016 10:19:13 AM jlierly.
BLI 01 8/26/16 JLL BLDG INSULATION
9/01/16 AP August 26, 2016 10;51:32 AM jlierly.
John 755-9361
September 1, 2016 9:52:04 AM jlierly.
BL99 01 10/10/16 JLL BLDG FINAL
10/10/16 DA October 10, 2016 8:15:26 AM jlierly.
John W CA homes
October 10, 2016 4:24:37 PM jlierly.
Pave parking lot and provide ADA parking space and signage
and required parking spaces/ Address numbers on face of
building/ Provide signage on bathrooms/ insulate WH piping
per code/ hand rails on ramp and stairs per code ( both
sides of ramp and stairs 1211 extention beyond to and bottom
/ jil
BL99 02 10/19/16 BLDG FINAL
J&O October 19, 2016 10:23:40 AM jlierly.
John 775-9361
-------------------------------------- COMMENTS AND NOTES --------------------------------------
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 983fi,2 1
ILI " V
Application Number . . . . . 16-00000837 Date 7/01/16
Application pin number . . . 464711
Property Address . . . . . . 404 ECLIPSE IND PKWy REPORT SALES TAX
ASSESSOR PARCEL NUMBER: 06-30-18-1-1-0000-0000-
Application type description COMM NEW CONST on your state excise tax form
Subdivision Name . . . . . .
Property Use . . . . . . . . to the City of Port Angeles
Property Zoning . . . . . . . UNKNOWN (Location Code 0502)
Application valuation . . . . 284035
----------------------------------------------------------------------------
Application desc
3150 office space 1760 sq unfinished space
----------------------------------------------------------------------------
Owner Contractor
------------------------ ------------------------
BLUE MOUNTAIN LEASING C ANDERSON HOMES & DEV INC
-2095 BLUE MOUNTAIN RD 1400 W. WASHINGTON ST.
' PORT ANGELES WA 983629203 STE. 104-178
SEQUIM WA 98382
(425) 770-1477
- -------------------------------- -------------------------------------------
Permit . . . . . . BUILDING PERMIT - COMMERCIAL
Additional desc NEW OFFICE COMMERCIAL 3150SF
Permit Fee . . . . 2056.25 Plan Check Fee 1336.56
Issue Date . . . . 7/01/16 Valuation . . . . 284035
Expiration Date 12/28/16
Qty Unit Charge Per Extension
BASE FEE 1020.25
185.00 5.6000 THOU BL-100,001-500K (5.60 PER K) 103G.00
----------------------------------------------------------------------------
Permit . . . . . . MECHANICAL PERMIT
Additional desc CNEW MECHANICAL
Permit Fee . . . . 97.20 Plan Check Fee .00
Issue Date . . . . 7/01/16 Valuation . . . . 0
Expiration Date 12/28/16
Qty Unit Charge Per Extension
BASE FEE 50.00
1.00 14.8000 EA ME-FURN/HP/FAU < OR = 5 TON 14.80
3.00 7.2500 EA ME-VENT FAN (SINGLE DUCT) 21.75
1.00 10.6500 EA ME-HOOD/DUCT-MECH. EXHAUST 10.65
- ----------------------------------------------------------------------------
Permit . . . . . . PLUMBING PERMIT
Additional desc CNEW PLUMBING
Permit Fee . . . . 156.00 Plan Check Fee .00
Issue Date . . . . . 7/01/16 valuation . . . . 0
Expiration Date 12/28/16
Qty Unit Charge Per Extension
BASE FEE 50.00
7.00 7.0000 EA PL-PLUMBING TRAP 49.00
1.00 7.0000 EA PL-WATER LINE 7.00
4.00 7.0000 EA PL-DRAIN VENT PIPING 28.00
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days fro n the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting.of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
te
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS —
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Sternwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rouqh-In
Water Line(Meter to Bldg)
Gas Line
Back Flow/Water
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders I Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall(Interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pump I Furnace I FAU/Ducts
Rough-In
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts
MANUFACTURED HOMES:
Footing I Slab
Blocking&Hold Downs
lSkirting
PLANNING DEPT. Separate Permit#s SEPA:
Parking/Lighti g ESA:
Landscaping ISHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction -R.W. PW I Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
CITY OF PORT ANGELES
—DEPARTMENT OF COMMUNITY& ECONOMIC DEVELOPMENT- BUILDING-DIVISION,
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Page 2
Application Number . . . . . 16-00000837 Date 7/01/16
Application pin number . . . 464711 REPORT SALES TAX
Qty Unit Charge Per Extension on your state excise tax form
1.00 15.0000 EA PL-SEWER LINE 15.00
1.00 7.0000 EA PL-WATER HEATER 7.00 to the City of Port Angeles
----------------------------------------------------------------------------
Permit . . . . . . SANITARY SEWER HOOK UP (Location Code 0502)
Additional desc . . I
Fee . . . . 135.00 Plan Check Fee .00
Issue Date 7/01/16 Valuation . . . . 284035
Expiration Date 12/28/1G
Qty Unit Charge Per Extension
BASE FEE 135.00
-------------------------------------------------------------------------------
Special Notes and Comments
Electrical load calculations and electrical permits are
required.
June 23, 2016 9:30:53 AM rbecker.
if you are installing a fire sprinkler system, you will need
to install a double check valve assembly, if it is a closed
system. If it is an open system, you do not need to install
a backflow.
If you have any questions call Ron Becker at
360-417-4886,fax:452-4972, or E-mail: rbecker@cityofpa.us
1% Establishing Construction Access.
2. Install sediment controls BMPs.
3. Stabilize exposed soils.
4. Protect slopes from erosion.
5. Protect drain inlets.
6. Control pollutants including but not limited to spills,
concrete wash out, exposed aggregate processes, concrete
grinding and saw cut waste water.
7. Maintain temporary and permanent erosion control BMPS
during project.
All disturbed area's on site not covered by new improvements
should meet the attached soil quality and depth standard.
Sanitary sewer connection inspection is required by
Public Works prior to back fill of ditch.. 24 hour advance
notice is required. Public Works Inspection request line
417-4831
Trench safety per applicable laws. Temp erosion control and
surface restoration responsibility of applicant. Contact
City inspector prior to start of work @ 360 417-4831. No
attachment, to sanitary sewer of stormwater roof leaders,
foundation drains, yard drains, or any other CSO
contribution is allowed.
Clallam County septic system decommission permit required
prior occupancy, provide copy to City when obtained.
Disconnect/cap or plug existing 4 inch PVC over flow pipe
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions,
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The-granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the,performance of
construction.
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
— PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backfiow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Sternwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-in
Water Line(Meter to Bldg)
Gas Line
Back Flow/Water
AJR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders/Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall(interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pump/Furnace/FAU/Ducts
Rough-In
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
lSkirting L
PLANNING DEPT. Separate Permit#s SEPA:
Parking/Lighti g ESA:
Landscaping ISHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction -R.W. PW /Engineering 417-4831
Fire 417-4653
Planning 417-4750
1 Building 417-4815
CITY OF PORT ANGELES
--DEPARTMENT OF COMMUNITY a ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Page 3
Application Number . . . . . 16-00000837 Date 7/01/16
Application pin number . . . 464711
REPORT SALES TAX
----------------------------------------------------------------------------
!,,, -special Notes and Comments on your state excise.tax.form-
from existing effluent pump chamber that is tied into 0-q
to the City of Port,A6.4eles'
I-- existing 12 inch stormwater pipe. Inspection by City is
required. (Location Cod&0502).',- 1
- -----------------------------------------------------------------------
Other Fees . . . . . . . . . STATE SURCHARGE 4.50
----------------------------------------------------------------------------
Fee summary Charged Paid Credited Due
----------------- ---------- ---------- ---------- ----------
Permit Fee Total 2444.45 2444.45 .00 .00
Plan Check Total 1336.56 1336.56 .00 .00 .... ..
Other Fee Total 4.50 4.50 .00
Grand Total 3785.51 3785.51 .00 .00
r
%
Separate Permits are required forelectrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within ISO days,if construction or work is suspended or abandoned,
for a period of 180 days after the work has commenced,or if required inspections have not been requested within 180 -days from the,
last inspection. I hereby certify that I have read and examined this application and know the same to be true-and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does,
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
-Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
— PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backfiow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Stemwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rouqh-In
Water Line(Meter to Bldg)
Gas Line
Back Flow I Water
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders I Under Floor
Shear Wall I Hold Downs
Walls I Roof/Ceiling
Drywall(Interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor I Ceiling
MECHANICAL:
Heat Pump I Furnace/FAU Ducts
Rough-in
Gas Line
Wood Stove/Pellet I Chimney
Commercial Hood I Ducts
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
jSkirting
PLANNING DEPT. Separate Permit#s SEPA:
Parking/Lighti g [ESA:
S
Landscaping SHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction -R.W. PW I Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
City of Port Angeles
Correction Notice
Building Division
Job Located at
Inspection of your work revealed that the following is
not in accordance with the codes governing the work in
this jurisdiction:
0%XVWA
D Sq X1
e
-A I IA2
- r
r"2
These corrections must be made and are not to be
covered until reinspection is made. When corrections
have been made, please all 36 1-417-4815 for inspection.
Date 10 /160
E2
71 loKec or Building D ion
DO NOT REMOVE T,HIS TAG
AF
PREPARED 10/10/16, 8:18:57 INSPECTION TICKET PAGE 5
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY -DATE 10/10/16
------------------------------------------------------------------------------------------------
ADDRESS 404 ECLIPSE IND PKWY SUBDIV:
CONTRACTOR C ANDERSON HOMES & DEV INC PHONE (425) 770-1477
OWNER BLUE MOUNTAIN LEASING PHONE
PARCEL 06-30-18-1-1-0000-0000-
APPL NUMBER: 16-00000837 COMM NEW CONST
------------------------------------------------------------------------------------------------
PERMIT: BPC 00 BUILDING PERMIT - COMMERCIAL
REQUESTED INSP DESCRIPTION
COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
BL1 01 7/05/16 PB BLDG FOUNDATION FOOTI14G
7/06/16 AP July 5, 2016 9:56:17 AM pbarthol.
Wilson 670-8062
July 6, 2016 11:09:28 A M pbarthol.
BL2 01 7/08/16 PB BLDG FOUNDATION STEM WALL
7/11/16 AP July 8, 2016 11:04:39 Am pbarthol.
John 775-9361
July 11, 2016 8:20:48 AM pbarthol.
2 ufr grounds in place
BFF 01 7/19/16 JLL BLDG FLOOR FRAMING
7/19/16 AP July 19, 2016 9:14:31 AM jlierly.
John 775-9361 AM inspection
July 19, 2016 4:36:43 PM jlierly.
BEXS 01 8/08/16 JLL BLDG EXTERIOR SHEETING
8/08/16 AP August 8, 2016 8:38:37 AM jlierly.
John 775-9361
August 8, 2016 4:26:41 PM jlierly.
BAIR 01 8/19/16 JLL BLDG AIR SEAL
8/22/16 AP August 19, 2016 8:37:47 AM jlierly.
August 22, 2016 10:19:13 AM jlierly.
BL3 01 8/19/16 JLL BLDG FRAMING
8/22/16 AP August 19, 2016 8:38:30 AM jlierly.
August 22, 2016 10:19:13 AM jlierly.
BLI 01 8/26/16 JLL BLDG INSULATION
9/01/16 AP August 26, 2016 10:51:32 AM jlierly.
John 755-9361
September 1, 2016 9:52:04 AM jlierly.
BL99 01 10/10/16 BLDG FINAL
October 10, 2016 8:15:26 AM jlierly.
John W CA homes
------------------- -------------------------------------------------------------------
PERMIT: ME 00 MECHANICAT PERMIT
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
ME1 01 8/19/16 JLL MECHANICAL ROUGH-IN
8/22/16 AP August 19, 2016 8:37:59 AM jlierly.
August 22, 2016 10:19:13 AM jlierly.
ME99 01 10/10/16 MECHANICAL FINAL
October 10, 2016 8:15:53 AM jlierly.
--------------------4------------------------------------------------------------------------
PERMIT: PL 00 PLUMBING PERMIT
,REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
PL2 01 8/19/16 JLL PLUMBING ROUGH-IN
----------------------------------- CONTINUED ONTO NEXT PAGE -----------------------------------
-k Aw
PREPARED 10/10/16, 8:18:57 INSPECTION TICKET PAGE 6
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 10/10/16
--------------------- ------------------------------------- - ---------------------------------
ADDRESS . ; 404 ECLIPSE IND PKWY SUBDIV:
CONTRACTOR C ANDERSON HOMES & DEV INC PHONE (425) 770-1477
OWNER . . BLUE MOUNTAIN.LEASING PHONE
PARCEL . . 06-30-18-1-1-0000-0000-
APPL NUMBER: 16-00000837 COMM NEW CONST
------------------------------------------------------------------------------------------------
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
8/22/16 AP August 19, 2016 8:38:16 AM jlierly.
^ August 22, 2016 10:19:13 AM jlierly.
PL99 01 10/10/16 PLUMBING FINAL
October 10, 2016 8:16:07 AM jlierly.
--------------- COMMENTS AND NOTES --------------------------------------
�T\-----------
THE: 7 For City Use
CtTY OF
Permit#
W A S H I N G T 0 N U S. Date Received: Ca 9 0 D 1(10
321 E 51h Street Date Approved
Port Angeles,WA 9836
P:360-417-4817 F:360-417-4711
Email:permits Ocityofpaxs
BUILDING PERMIT 1, L CATION
V
Project Address: 404 Eclipse Industrial Parkway
Phone:425-770-1477
Primary Contact: Chris Anderson Email: chris@cahomes.build
Name Phone 425-770-1477
Hermann Brothers
Property Mailing Address Email chris@cahomes.build
Owner 495 W.Spruce St Suite 3
City State WA Zip 98382
Sequim I I
Name Phone425-770-1477
CA Ho mes,Inc
Contractor Address Email chris@cahomes.build
495 W.Spruce St Suite 3
Information City Sequim State WA Zip 98382
Contractor License#CAHOMH1850QS Exp.Date:12/17/37
Legal Description: Zoning: Tax Parcel# Pr ject Value: (materials and labor)
Gov Lots 3 &4 REF: Sur o6-30-i8-11-0000 $284,035-00
V72 P 44
Residential 1:1 Commercial XE] Industrial Public EJ
Permit Demolition 11 Fire [:] Repair Reroof(tear off/lay over)
Classification For the following,fill out both pages of permit application:
(check New Construction XF-1 Exterior Remodel E] Addition [:] Tenant Improvement
appropriate) F-1
Mechanical E] Plumbing E] Other E]
Will a fire sprinkler system be installed Irrigation Sy F? Proposed Bathrooms Proposed Bedrooms
or modified? Yes El No El Yes E] No St
Project Description
New commercial building
-2
., I
h -760 U14^'�Jv�
Is project in a Flood Zone: Yes E] NoXF-1 Flood Zone Type:
If in a Flood Zone, what is the value of the structure before proposed improvement? $
1 have read and completed the application and know it to be true and correct. I am authorized to apply for
this permit and understand that it is my responsibility to determine what permits are required and to
obtain permits prior to work. I understand that plan review fees are not refundable after review has
occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is
issued. I understand that if the permit is not picked up/issued within i.8o days of submittal,the application
will be considered abandoned and the fees will be forfeited.
6-7-16 Chris Anderson
Date Print Name Si a
Residential Structures
For Office Use
Area Description(SQ FT) Existing Proposed ss value
Basement
First Floor
Second Floor
Covered Deck/Porch/Entry
Deck(over 30"or 2 nd floor)
Garage
Carport
Other(describe)
Area Totals
Commercial Structures
Proposed For Office Use
Area Descriptions(SQ FT) Existing Proposed ss Value
Existing Structure(s) 238,100-00
Proposed Addition 3150
A Tenant Improvement?
Other work(describe) t76o Unfinished area
Site Area Totals 4910
Lot/Site Coverage Calculations
Lot Size(sq ft) Lot Coverage(sq ft) %Lot Coverage(Total lot coverage-- lot size)
Site Coverage (Sq Ft of all impervious) %of Site Coverage(total site coverage�lot size)
Mechanical Fixtures
Indicate how many of each type of fixture to be installed or relocated as part of this project.
Air Handler: Size: # Haz/Non-Haz Piping: Outlets:
Appliance Exhaust Fan: # Heater(Suspended,Floor,Recessed wall): #
Boiler/Compressor Size: # Heating/Cooling appliance #
I repair/alteration
Evaporative Cooler(attached,not # Pellet Stove/Wood-burning/Gas #
portable): Fireplace/Gas Stove/Gas Cook Stove/Misc.
Fuel Gas Piping: #of Outlets: Ventilation Fan,single duct: # 3�
Furnace/Heat Pump/ Size: # Ventilation System: #
Forced Air Unit: I I I
Plumbing Fixtures
Indicate how many of each type of fixture to be installed or relocated
Plumbing Traps # Fuel gas piping #of Outlets:
Water Heater #1 Medical gas piping #of Outlets:
Water Line # Plumbing Vent piping # 4�-
Sewer Line # Industrial waste pretrealanent
interceptor(Grease Trap) Size
Other(describe):
T:\BUILDING\APPLICATION FORMS\Current BP Application\Building Permit 4-17-13.docx
FIX
tip
tk
4M
4,a
.1ut
-1
'd
1, 1 j
jr
7*�'�7
Eclipse Industrial Pkwy
T,f
jm&
Mb
7r
---------------
Twl
777-1-
T
77
i /All HAJ UA N
It
. ..............-
277-1
----------
7-7
"17 1
-------------
----------
-----------
----------
----------
-------------
---------- -1--------
-----------
-7v
-z6--
-------------
71 -
............
HH
p-f�-
lull
-------------
+T
----- ------
----------
I
-2Z-t-
-.001
..........
op
—----------
-17V r
-------------
17
——---------
ol
----------
L A
1-4------
----------
--------------......
-------—-------
--------—-
.... .......... 1.
----------
-----------
-77i
- ---------------
77-
- -----------
I A4
ELIE
...........
f
7
44
-----------------
- -----------
4
--------------
10 7
- WK ......
---------------
Et
...... I l2rl,;
oc,
6Z
to
al k2a
..........
7-1--------------
-------------------
17
--F j r
7----------r
Ij
-------------
A'.4
-------------
L-----------
.. ...........
zu:;-
-- ---------
----------
-----------
41
-------------- ........
-r-dr-
5 -15.22 .00
Note: A value of '0' indicates that the zone/load case is not applicable.
Norma - Normal to Ridge
Note (1) X= Along Building ridge, Y = Normal to Building Ridge, Z = Vertical
Note (2) MIN = Minimum pressures on Walls = 9.6 p3f and Roof = 4.8 psf
Note (3) Area* = Area of the surface projected onto a vertical plane normal to wind.
MWFRS Pressures for Wind Normal to 45 ft wall (Along Ridge)
WALL PRESSURES PER TABLE 27.6-1
L/B: Bldg Dim in Wind Dir / Bldg Dim Normal to Wind Dir 1.56
h: Height to top of Windward Wall 24.00 ft
ph: Net Pressure at top of wall (windward + leeward) 21.13 psf
pO: Net Pressure at bottom of wall (windward + leeward) 20.38 psf
ps: Side wall pressure acting away from wall = .6 * ph = -12.58 psf
pl: Leeward wall pressure acting away from wall .32 * ph = -6.74 psf
pwh: Windward wall press @ top acting toward wall ph-pl 14.39 psf
pwO: Windward wall press @ bot acting toward wall pO-pl 13.65 psf
ROOF PRESSURES PER TABLE 27.6-2
h: Mean Roof Height 16.500 ft
Lambda: Exposure Adjustment Factor 1.000
Slope: Roof Slope 33.69 Deg
Zone Load Casel Load Case2
psf psf
---- ---------- ----------
1 -8.35 9.44
2 -13.56 -6.46
3 -20.85 .00
4 -18.54 .00
5 -15.22 .00
Note: A value of 10' indicates that the zone/load case is not applicable.
Along - Along Ridge
Note (1) X= Along Building ridge, Y = Normal to Building Ridge, Z Vertical
Note (2) MIN = Minimum pressures on Walls = 9.6 psf and Roof = 4.8 psf
Note (3) Area* = Area of the surface projected onto a vertical plane normal to wind.
Total Base Reaction Summary
Description Fx Fy Fz MX MY MZ
Kip Kip Kip K-ft K-ft K-ft
--------------------------------------------------------------------------------------
Normal to Ridge Walls+Roof +GCpi .0 18.8 34.5 58.0 .0 .0
Normal to Ridge Walls Only +GCpi .0 13.3 .0 60.0 .0 .0
Normal to Ridge Walls+Roof -GCpi .0 30.0 -4.7 53.8 .0 .0
Normal to Ridge Walls Only -GCpi .0 13.3 .0 60.0 .0 .0
Normal to Ridge Walls+Roof MIN .0 .0 .0 .0 .0 .0
Along Ridge Walls+Roof +GCpi 15.5 .0 51.3 .0 -229.8 .0
Along Ridge Walls Only +GCpi 15.5 .0 .0 .0 -137.5 .0
Along Ridge Walls+Roof -GCpi 15.5 .0 .0 .0 -137.5 .0
Along Ridge Walls Only -GCpi 15.5 .0 .0 .0 -137.5 .0
Along Ridge Walls+Roof MIN .0 .0 .0 .0 .0 .0
Notes Applying to MWFRS Reactions:
Note (1) Per Fig 27.4-1, Note 9, Use greater of Shear calculated with or without roof.
Note (2) X= Along Building ridge, Y = Normal to Building Ridge, Z = Vertical
Note (3) MIN = Minimum pressures on Walls = 9.6 psf and Roof = 4.8 psf
Note (4) MIN area is the area of the surface onto a vertical plane normal to wind.
Note (5) Total Roof Area (incl OH Top) = 3785.83 sq. ft
Note (6) LC = Load Case (Some pressures can be zero, ref ASCE 7-10 Ch 27 Pt 2)
MecaWind Pro v2 . 2 . 6 . 1 per ASCE 7-10
Developed by MECA Enterprises, Inc. Copyright www.mecaenterprises.com
Date 5/19/2016 Project No. JobNo
Company Name ZENOVIC Designed By TDG
Address Address Description OFFICE
City City Customer Name C.ANDERSON
State State Proj Location PORT ANGELES
File Location: C:\Users\TRACY\AppData\Roaming\MecaWind\Default.wnd
Directional Procedure Simplified Diaphragm Building (Ch 27 Part 2)
Basic Wind Speed(V) 130.00 mph
Structural Category III Exposure Category C
Natural Frequency N/A Flexible Structure No
Importance Factor 1.00 Kd Directional Factor = 0.85
Alpha 9.50 Zg = 900.00 ft
At 0.11 Bt 1.00
Am 0.15 Bm 0.65
Cc 0.20 1 500.00 ft
Epsilon 0.20 zmin 15.00 ft
Slope of Roof = 8 : 12 Slope of Roof(Theta) = 33.69 Deg
h: Mean Roof Ht = 16.50 ft Type of Roof = GABLED
RHt: Ridge Ht = 24.00 ft Eht: Eave Height 9.00 ft
OH: Roof Overhang at Eave= .00 ft Overhead Type No Overhang
Bldg Length Along Ridge = 70.00 ft Bldg Width Across Ridge= 45.00 ft
Gust Factor Calculations
Gust Factor Category I Rigid Structures Simplified Method
Gustl: For Rigid Structures (Nat. Freq.>l Hz) use 0.85 = 0.85
Gust Factor Category II Rigid Structures - Complete Analysis
Zm: 0.6*Ht = 15.00 ft
lzm: Cc*(33/Zm)^0.167 0.23
Lzm: 1*(Zm/33)^Epsilon 427.06 ft
Q: (1/(1+0.63*((B+Ht)/Lzm)^0.63))AO.5 0.92
Gust2: 0.925*((1+1.7*lzm*3.4*Q)/(1+1.7*3.4*lzm)) 0.88
Gust Factor Summary
Not a Flexible Structure use the Lessor of Gustl or Gust2 0.85
Table 26.11-1 Internal Pressure Coefficients for Buildings, GCpi
GCPi Internal Pressure Coefficient +/-0.18
Topographic Adjustment
0.33*z 1.00
Kzt (0.33*z) : Topographic factor at elevation 0.33*z 1.00
Vtopo: Adjust V per Para 27.5.2: V * [Kzt(O.33*z)]^0.5 130.00 mph
MWFRS Diaphragm Building Wind Pressures per Ch 27 Pt 2
All pressures shown are based upon ASD Design, with a Load Factor of .6
MWFRS Pressures for Wind Normal to 70 ft wall (Normal to Ridge)
WALL PRESSURES PER TABLE 27.6-1
L/B: Bldg Dim in Wind Dir / Bldg Dim Normal to Wind Dir 0.64
h: Height to top of Windward Wall 9.00 ft
ph: Net Pressure at top of wall (windward + leeward) 21.18 psf
pO: Net Pressure at bottom of wall (windward + leeward) 21.18 psf
ps: Side wail pressure acting away from wall = .54 * ph = -11.44 psf
pl: Leeward wall pressure acting away from wall .38 * ph = -8.05 psf
pwh: Windward wall press @ top acting toward wall ph-pl 13.13 psf
pwO: Windward wall press @ bot acting toward wall pO-pl 13.13 psf
ROOF PRESSURES PER TABLE 27.6-2
h: Mean Roof Height 16.500 ft
Lambda: Exposure Adjustment Factor 1.000
Slope: Roof Slope 33.69 Deg
Zone Load Casel Load Case2
psf psf
---- ---------- ----------
1 -8.35 9.44 Ji5.1
2 -13.56 -6.46
3 -20.85 .00
4 -18.54 .00
1. - I
BRACED RETAINING WALL DESIGN 6/3/2016 ZENOVIC&ASSOCIATES, INC.
301 EAST 6TH STREET SUITE#1
PROJECT: 4' BRACED FOUNDATION WALL PORT ANGELES,WA. 98362
CLIENT: C.AN DE RSON-H ERMAN JOB#: 16200
SOIL PROPERTIES
DENSITY= 120 PCF INTERNAL FRIC.ANGLE 33 DEG.
COEF. FRICTION 0.4 X DL AT REST PRES.COEFF. (ko)= 0.46
BEARING CAPACITY= 1500 PSF PASSIVE COEFF. (kP)= 3.4
AT REST SP= 55 PCF ACTIVE COEFF. (k,,)= 0.29
PASSIVE SP= 407 PCF FAILURE PLANE(a)= 61.5 DEG.
ACTIVE SP= 35 PCF
DESIGN FOR ACTIVE(A)OR AT REST(0)SOIL PRESSURE? A
SURCHARGELOADS
UNIFORM 0 PSF Rq= 0 PLF
POINT 0 P DISTANCE (x) 0 FT Rq= 0 PLF
LINE 0 PLF DISTANCE (x) 0 FT Rq= 0 PLF
CONCRETE PROPERTIES
WALL DIMENSIONS
H STEM HEIGHT= 4 FT
HI RETAINED EARTH= 3.5 FT DENSITY 150 PCF
T STEM THICKNESS= 6 IN
FOOTING DIMENSIONS
A LENGTH OF TOE= 5 IN F KEY DEPTH= 0 IN
B LENGTH OF HEEL 5 IN G KEY WIDTH = 0 IN
C TOTAL WIDTH 16 IN H HEEL TO KEY 0 IN
D THICKNESS= 6 IN
E FOOTING DEPTH 0 IN DENSITY 150 PCF
ADDITIONAL GRAVITY LOADS TO WALL
MINIMUM VERTICAL LOAD TO WALL 0 PLF
MAXIMUM VERTICAL LOAD TO WALL 650 PLF
LATERAL FORCES REACTIONS
BASEFORCE= 217 TOP= 72 FLOORATTACHMENT
SURCHAGEFORCE= 0 BOTTOM 144 SLIDING FORCE
DEAD LOADS SLIDING:
COMPONEN1 WT FRICTION 232
BACKFILL 175 SP FOOTING&S.K.= 0
STEM 300
FOOTING 100 TOTAL 232
KEY 0
SLIDING FOS 1.61 OK
TOTAL 575d OK WITH SLAB
BEARING LOADS
MAX. 919 OK
MIN. 431 OK
MOMENTS AND SHEARS
MAX. WALL MOMENT 145 LB-FT
FOOTING MOMENT 408 LB-FT
c
B T A
SURCHARGE
7/1
/*
LL
G
H I Fl-/�,�/7`---:`\�[
CML EN6NHPdNG
LAND"VEM
G
I C(,)
Er�
V1 IT
301 East 6th Street,Suite I
& ASSOCIATES Port AngelesNashington 98362
I N C 0 R P 0 R A T E D (360)417-0501
Fax(360)417-0514
E-mail:zenovic@olympus.net
June 20, 2016
Mr. Lierly
City of Port Angeles Department of Community and Economic Development
321 East Fifth Street
Port Angeles, WA 98362
SUBJECT: Office Building For Herman —404 Eclipse Industrial Parkway, Port
Angeles, Washington
Dear Mr. Lierly:
This office has performed an inspection of the imported structural fill installed for
construction of the office building noted above. Based on the inspection I certify that the
structural fill is acceptable and has adequate bearing capacity to support the proposed
office building. The fill has a bearing capacity of 1500 psf and was properly installed and
compacted.
Please call me if you have any further questions on this matter.
Sincerely,
Tracy Gudgel, P.E.
Fc: JN 16176
Cc: Herman
3 777
Prescriptive Path, pg. 1 ENV-PRESCRIPTIVE
2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised'6=ct
Project Address 1 - Fill this line out on ENV-SUM Date 05/21/2013
Occupancy Group Acommercial 0 Group R For Building Department Use
Fenestration Area as%gross above-grade wall area Max.Target:
Skylight Area as%gross roof area Max.Target:
Vertical Fenestration Alternates: None Selected on ENV-SUM
Prescriptive compliance of envelope assemblies may be accomplished by providing insulation R-values per Table C402.2 or WactorslF-tactors
per Tables C-402.1.2 and C-402.3.A single project may comply via R-values for some envelope assemblies and WactorslF-factors for others.
Note compliance method taken for each assembly in spaces provided.
U-Factor/F-Factor for Alternative
Building Component R-Value for Prescriptive Compliance Prescriptive Compliance
Alternate Cl U-Factor Source
Continuous R-Value (Appendix A,Chapter 3
Cavity Ins. Ins.(CI) (Table C402.2 Assembly table,or approved
Provide page/plan#of assembly detail and ID. R-Value R-Value Footnote F)' U-Factor calculation method)
ID:
ID: qq
ID:
ID�
00 m ID:
ID:
ID:
ID:
0 ID!
ID�
ID:
ID:
ID:
ID:
ID:
ID:
aS 00 ID:
ID:
0 ID:
ID�
ID:
0 ID:
ID:
CO ID:
ID:
ID:
ID:
La 2
0 ID:
-2
LL S ID:
E ID:
LTL I D:
Perim. Ins. Full Slab Cl
R-Value R-Value F-Factor F-Factor Source
-0 ID:
ID:
E2
'T E) ID:
C ............
ID:
10
ID: .........
ID:
Note 1-Calculations are required.Ratio of cross-sectional area of metal penetration through otherwise continuous insulation shall be 0.04-0.08%.
Note 2-Thermal spacer blocking and liner system an-required for prescriptive R-Value compliance.
Note 3-Intermediate framing is required for prescriptive R-Value compliance in wood-framed wall assemblies.
Note 4-Proposed non-residential building CMU walls meeting Table C402.1.2 Footnote D requirements can enter the target U-value of 0.104.
Note 5-Refer to Table C402.2,Footnote E for prescriptive R-Value requirement for steel floorjoist assemblies.
Note 6-Prescriptive slab-on-grade insulation shall extend from top of slab to minimum length per an approved method as defined in C402.2.6.
I
Prescriptive Path, pg. 2 ENV-PRESCRIPTIVE
2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 Revisal 77=
Project Address 1 - Fill this line out on ENV-SUM Date 05/21/2013
Fenestration Area as%gross above-grade wall area Max.Target: For Building Department Use
Skylight Area as%gross roof area Max.Target:
Notes: 1:If vertical fenestration or skylight area exceeds maximum allowed per C402.3.1,then Target
Area Adjustment of all applicable envelope elements will be calculated by the compliance form.
Refer to Target Area Adjustment worksheet for this calculation.
2:Provide U-factor for the fenestration assembly,which is the combination of frame and glazing
I U-Factor/F-Factor for Alternative
Building Component R-Value for Prescriptive Compliance Prescriptive Compliance
Alternate Cl U-Factor Source
Continuous R-Value (Appendix A,Chapter 3
Cavity Ins. Ins.(CI) (Table C402.2 Assembly table,or approved
Provide page/plan#of assembly detail and ID. R-Value R-Value Footnote F) U-Factor calculation method)
ID:
"n,
gg,'.'n zm
0 ID:
0
U)0
ID�
CL ID:
..........
--51- 00 ID�
........
............
........ ......
IID:
Solar Heat Gain Coefficient(SHGC) U-Factor for Prescriptive Compliance
SHGC
Projection Adjustment U-Factor Source
factor(PF) Multiplier(if Assembly Assembly (NFRC,Appendix A,or
(if applicable) applicable) SHGC U-Factor Chapter 3 table)
ID:
20 ID: Po�
c�
0 ID:
Z ID:
'0 ID:
C
.2 ID�
76
2 ID:
ID:
ID:
0
ID:
ID:
ID:
ID:
2 ID:
ID�
ID:
ID:
ID:
ID:
<
I ID: - ---------
Note 1-SHGC Adjustment Multiplier based on calculated Projection Factor. Refer to Equation C4-2 Projection Factor Calculation and Table
C402.3.3.1 for corresponding SHGC Multiplier.
Refrigerated Spaces,Walk-in &Warehouse
Coolers Notes R-Values for Prescriptive Compliance Prescriptive U-Factor not allowed.
Walls
Ceiling
Doors
Freezers
Walls
F,
Ceiling
1IIII... .......
Doors
Floor
Interior Lighting Summary LTG- U
2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all RI Revised Jan 2014
Project Info Project Address I -This address line will copy onto other forms Date 5/21/2013
Compliance 2-This address line will copy onto other forms For Building Department Use
forms do not
require a 3-This address line will copy onto other forms
password to Applicant Name: 4-This address line will copy onto other forms
use.
Instructional and Applicant Address:
calculating cells ---I
are write- Applicant Phone:
Project Description ew Building [] Addition El Alteration Plans included
Lighting Complianc ighting Power Density Calculations 0 Total Building Performance
e Pat�_F (If Total Building Performance then only LGT-CHK is required.)
Lighting Power Allowance YEBuilding Area Method 0 Space-By-Space Method
Method Selection required to
enable LPA forms
Interior Lighting System C AJ
Description
Briefly describe lighting
system type and features.
Additions and Change of Space Use (CIO1.4.3 &C101.4.4)
1:1 Addition area or Change of Space Use area complies with all applicable provisions as stand alone project
o Addition area is combined with existing building lighting systems to demonstrate compliance with all applicable
provisions per C101.4.3
Provide Building Area Method(LTG-INT-BLD)or Space-By-Space Method(LTG-INT-SPACE)Compliance Form.Document maximum
allowed and proposed(including existing if applicable)lighting wattage of Addition or Change of Use space.Provide applicable lighting
controls per C405.2 and commissioning of lighting controls per C405.13.
Alterations, Renovations and Repairs (C101.4.3.1)
60%or more of luminaires in space replaced
Provide Building Area Method(LTG-INT-BLD)or Space-By-Space Method(LTG-INT-SPACE)Compliance Form.Document maximum
allowed wattage within the lighting retrofit space in Maximum Allowed Wattage table and proposed(including existing)lighting wattage in
Proposed Wattage table.Retrofit and non-retrofit spaces shall be documented separately using multiple forms.
El Less than 60%of luminaires in space replaced
Provide a separate Space-By-Space Method(L TG-INT-SPA CE)Compliance Form for this retrofit area.Document existing total wattage
within the lighting retrofit space in cell provided in the Maximum Allowed Wattage table.Document proposed(including existing)lighting
wattage in the Proposed Wattage table.
Lamp and/or ballast replacement within existing luminaires only—existing total interior building wattage not increased
F� New wiring installed to serve added fixtures and/or fixtures relocated to new circuit
Provide applicable manual lighting controls(C405.2.1),occupancy sensors(C405.2.2.2),daylight zone controls(C405.2.2.3),specific
application controls(C405.2.3),and commissioning of lighting controls per C405.13
New or moved lighting panel
Provide all applicable lighting controls as noted for New Wiring,automatic time switch controls(C405.2.2.1),and commissioning of lighting
controls per C405.13.
Space is reconfigured-luminaires unchanged or moved only
Provide all applicable lighting controls as noted for New Wiring and commissioning of lighting controls per C405.13.
No changes are being made to the interior lighting and space use not changed.
:interior Lighting Summary - Space-By-Space LTG-INT-SPACE
2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised Jan 2014
Project Address Fill this line out on LGT-SUM Date 5/21/2013
Lighting Alterations, Renovations & Building Additions For Building Department Use
0 Less than 60% 0 60%or more 0 Stand alone 0 Addition
Notes:
a.Lighting fixtures in a building addition may comply as a stand alone project,or they may be
combined with the overall existing bldg lighting to demonstrate compliance.Refer to C 10 1.4.3.
b.For retrofits and building additions,provide Space Types and gross interior areas in the
Maximum Allowed Lighting table. If a builidrig addition will comply as combined with the overall
existing builidng,include all applicable existing Space Types and gross interior areas.
c. Document new fixtures and al/existing to remain fixtures in the Proposed Lighting table.
d.If less than 60%of existing fixtures will be replaced,provide total existing lighting wattage
(prior to retrofit)in the space provided in the Maximum Allowed Lighting table.
Speciffy Co pliance Method on LGT-SUM Ma-fis Allowed
Location(plan Allowed Gross Interior
room Space Type* Wafts per ft2 Area in ft2 (waftSift2 x area)
Select Table C405.5.2(2)category from drop down menu. Area Allowed Wafts
For atriums,indicate height.Allowed wattage for first 40 feet is 0.03 WIft.ht., Total
above 40 feet is 0.02 WIft.lit
Specify Compliance Method on LGT-SUM
Location(plan#, Number of Wafts/ Wafts
room#) Fixture Description— Fixtures Fixture Proposed
Total Proposed Watts may not exceed Total Allowed Watts for Interior Lighting Total Proposed Waft
Include existing to remain lighting fixtures and exempt lighting equipment per notes below.
Notes:
1. Include ALL proposed lighting fixtures.
2.For proposed Fixture Description,indicate fixture type,lamp type(e.g. T-8),n umber of lamps in the fixture, and ballast type(if included). For
track lighting,list the length of the track(in feet)in addition to the fixture,lamp, and ballast infonnation.
3. For proposed WattslFixture,use manufacturers listed maximum input wattage of the fixture(not simply the lamp wattage)and other criteria
as specified in Section C405.5.1.For line voltage track lighting,list the greater of actual luminaire wattage or length of track multiplied by 50,
or as applicable, the wattage of current limiting devices of the transformer For low voltage track lighting list the transformer rated wattage.
4.For lighting equipment eligible for exemption per C405.5.1,note exception number and leave WattslFixture blank.
5.Document existing to remain fixtures in Proposed Lighting table in the same manner as new fixtures.Identify as existing in fixture description.
6. If#NA appears in Retail Display cells,information on L TG-INT-DISPLA Y is incomplete.
interior Lighting Power Allowance
Interior Display Lighting - Space-by-Space LTG-INT-DISPLAY
2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised Jan 2014
Proiect Info Project Address Fill this line out on LGT-SUM Date 5/21/2013
Fill this line out on LGT-SUM For Building Department Use
Fill this line out on LGT-SUM
Applicant Name: Fill this line out on LGT-SUM
Specify Compliance Method on LGT-SUM
Location(plan#, Allowed Gross Interior Wafts Allowed
room#) Retail Display Area Type* Wafts per ft2 Area in ft2 (wafts/ft2 x area)
Only retail sales areas that meet the requirements defined in Table C405.5.2(2) Area Area Wafts
footnote A may be entered here. Select retail sales areas form drop down menu. Total
**Wattages per Table C405.5.2(2)footnote A.
++Display light allowance per footnote A calculation. Display Lighting Base Allowance
++Total Display Allowance
Specify Compliance Method on LGT-SUM
J
Only separately controlled display fixtures independent of general area lighting per Table C405.5.2(2)footnote A may be entered here.
Location(plan#, Number of Watts/ Wafts
Display Area* room#) Fixture Description Fixtures Fixture Proposed
Select retail sales display area from drop down menu.
Total Proposed Waftsi
Proposed Display Retail 1 Retail 2 Retail 3 Retail 4
Lighting Totals
Notes:
1.For proposed Display Fixture Description,indicate fixture type,lamp type(e.g. T-8), number of lamps in the fixture, and ballast type(if
included). For track lighting,list the length of the track(in feet)in addition to the fixture,lamp, and ballast information.
2.For proposed WattslFixture, use manufacturer's listed maximum input wattage of the fixture(not simply the lamp wattage)and other
criteria as specified in Section C405.5.1. For line voltage track lighting,list the greater of actual luminaire wattage or length of track
multiplied by 50, or as applicable,the wattage of current limiting devices or of the transformer. For low voltage track lighting list the
transformer rated wattage.
3.List all display fixtures.
Interio r Lighting Summary - Building Area Method LTG-INT-BLU
2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised Jan 2014
Project Address Fill this line out on LGT-SUM Date 5/21/2013
Lighting Alterations, Renovations & Building Additions For Building Department Use
0 Less than 60% 0 60%or more 0 Stand alone 0 Addition
Notes:
a. Lighting fixtures in a building addition may comply as a stand alone project,or they may be
combined with the overall existing bldg lighting to demonstrate compliance. Refer to C 10 1.4.3.
b.For retrofits and building additions,provide Building Area types and gross interior areas in the
Maximum Allowed Lighting table.ff a builidng addition will comply as combined with the overall
existing builidng,include a/1 applicable existing Building Area types and gross interior areas.
c.Document new fixtures and all existing to remain fixtures in the Proposed Lighting table.
d. If less than 60%of existing fixtures will be replaced, use LTG-INT-SPA CE form.
Specify Compliance Method on LGT-SUM
Location(plan#, --Mowed Gross Interior Wafts Allowed
Building Area* room#,or ALL) Area Description Wafts per ft2 Area in ft2 (waftse x area)
Select Table C405.5.2(l)Building Area from drop down menu. Totall I
Specify Compliance Method on LGT-SUM
Location(plan#, Number of Wafts/ Wafts
Building Area* room#) Fixture Description— Fixtures Fixture Proposed
I I I I I I
Select Table C405.5.2(l)Building Area from drop down menu.
Include existing to remain lighting and exempt lighting equipment per notes below.
Compliance by Building Area
Total Allowed Total Proposed Interior Lighting Power
Building Area Warnings Wafts Wafts Allowance
Notes: Total
1.Proposed Wattage for each Building Area type shall not exceed the Allowed Wattage for that Building Area type. Trading wattage between
Building Area types is not allowed under the Building Area Method compliance path.
2.Proposed fixtures must be listed in the building area in which they occur Include ALL proposed lighting fixtures.
3.For proposed Fixture Description,indicate fixture type,lamp type(e.g. T-8),number of lamps in the fixture, and ballast type(ifincluded).For
track lighting,list the length of the track(in feet)in addition to the fixture,lamp,and ballast information.
4.For proposed WattslFixture,use manufacturer's listed maximum input wattage of the fixture(not simply the lamp wattage)and other criteria
as specified in Section C405.5.1. For line voltage track lighting,list the greater of actual luminaire wattage or length of track multiplied by 50,
or as applicable, the wattage of current limiting devices or of the transformer For low voltage track lighting list the transformer rated wattage.
5.For lighting equipment eligible for exemption per C405.5.1,note exception number and leave WattslFixture blank.
6.Document existing to remain fixtures in Proposed Lighting table in the same manner as new fixtures.Identify as existing in fixture
description.
Exterior Lighting Summary LTG-EXT
&R3 over 3 stories and all R1 Revised Jan 2014
2012 Washington State Energy Code Compliance Forms for Commercial Buildings including
Project Info Project Address: Fill this line out on LGT-SUM Date 5/21/2013
Fill this line out on LGT-SUM For Building Department Use
Fill this line out on LGT-SUM
Applicant Name: Fill this line out on LGT-SUM
Applicant Addr:
Project Description Applicant Phone:F-] New Building Addition Alteration El Plans included
Lighting Zone
As specified byjurisdiction. Zone selection 0 zone 1 0 zone 2 0 Zone 3 0 zone 4
required to enable LTG-EXT form
lCompliance Option 0 Lighting Power Density Calculations 0 Total Building Performance
Building Grounds Efficacy>60 iumensm Controlled by motion sensor
Applies to luminaires> 100 Watts El Exemption(list)
Exterior Lighting Alterations No changes are being made to the existing exterior lighting
New wiring installed to serve added fixtures and/or fixtures relocated to new circuit
Provide applicable exterior lighting controls per C405.2.4 and commissioning per
Tradable Maximum Allowed Lighting Wattage Base Site Allowance:
Allowed Wafts Area(T),perimeter Allowed Wafts
Tradable Surfaces Surface Description per fl?or per If (10 or#of items X ft2(or x If)
Total Allowed Tradable Wafts:
Tradable Proposed Lighting Wattage (Use mfgr listed maximum input wattage for luminaire.)
Number of Wafts/ Wafts
Tradable Surface Fixture Description Fixtures Fixture Proposed
Total proposed tradable watts may not exceed the sum of total allowed tradable Total Propos ed Tradable Wafts:
watts plus the base site allowance. Any base site allowance not needed to make
tradable watts comply can be applied to individual non-tradable categories.
Non-Tradable Maximum Allowed Lighting Wattage Base Site Allowance Remaining: 0
Allowed Wafts Area(ft),perimeter Allowed Wafts
Non-Tradable Surfaces Surface Descdption per ft2 or per If (1f)or#of items x ft2(or x If)
Non-Tradable Proposed Lighting Wattage
Number of Wafts/ Wafts
Non-Tradable Surface Fixture Description Fixtures Fixture Proposed
Non-tradable proposed watts may not exceed allowed watts for any individual Total excess Non-Tradable wafts:
surface unless the total excess watts for all non-tradable surfaces are less than Site Allowance Balance:
the remaining site allowance.
Exterior Lighting
Lighting, Motor, and Transformer Permit Documents Checklist LTG-CHK,
2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all R1 Revised Jan 2014
Project Address Fill this line out on LGT-SUM TDate 5/21/2013
The following information is necessary to check a permit application for compliance with the lighting,motor,and transformer requirements in the
Washington State Energy Code,Commercial Provisions.
Applicability Location in Building Department
-(yes,no,na)lCocle Sectioni Component lCompliance information required in permit documents Documents J Notes
LIGHTING CONTROLS(Section C405.2)
C405.2.1.1 Manual interior Indicate on plans the manual control type&locations served;
C405.2.1.2 lighting controls Indicate of plans the 50%lighting load reduction method
provided or identify exception taken
Indicate lighting system automatic shut-off capability-identify
Automatic ti lighting zone areas served on plans;
C405.2.2.1 switch controls and Indicate locations of override switches on plans and the areas
override switching served,include area sq.ft.;
Indicate locations where automatic shutoff is provided by other
methods(occupancy sensor,daylight controls,etc)
C405.2.2.2 Occupancy sensors Indicate on plans the locations served by occupancy sensors
Daylight zones- Indicate vertical fenestration primary and secondary daylight
C405.2.2.3 Vertical fenestration zone areas on plans,include sq.ft.;
and skylights Indicate skylight daylight zone areas on plans,include sq.ft.
Indicate on plans the locations served by daylight zone
C405.2.2.3.2 Daylight zone controls;
controls Indicate in plans the lighting load reduction(dimming)method-
stepped or continuous dimming
Specific application ndicate on plans the locations served by specific application
C405.2.3 lighting controls- !ighting controls
General
Indicate lighting control method for display and accent lighting,
C405.2.3- Display and accent and display case lighting;
Indicate these fixtures are controlled independently from both
Items 1&2 lighting general area lighting and other lighting applications within the
same space
C405.2.3- Hotel/motel guest Provide a lighting control device at each guest room entry for
Item 3 rooms all permanently installed fixtures in guest room;
Indicated whether lighting control is manual or automatic
C405.2.3- Supplemental task Provide automatic shut-off vacancy controls for supplemental
Item 4 lighting task lighting,including under-shelf or under-cabinet lighting
Identify eligible non-visual applications and method of lighting
C405.2.3- Lighting for n_n_ control;
Item 5 visual applications Indicate these fixtures are controlled independently from both
general area lighting and other lighting applications within the
same space
Indicate lighting control method for lighting equipment for sale
C405.2.3- Lighting equipment or demonstration;
Item 6 for sale or Indicate these fixtures are controlled independently from both
demonstration general area lighting and other lighting applications within the
same space
If egress lighting power density is greater than 0.05W/fe,
C405.2.3- Means of egress indicate method of automatic shut-off during unoccupied
Item 7 lighting periods;
Identify on plans the egress fixtures that function as both
normal and emergency means of egress illumination
C405.1 0 Cooler and freezer Provide vacancy device or timer to turn off fixtures within 15
C405.1 1 lighting minutes of unoccupancy for cooler and freezer lighting fixtures
with lamp efficacy less than 40 lumens per waft
C405.2.4 Exterior lighting Indicate on exterior lighting plans the automatic lighting control
controls method and locations served
Exterior building Provide motion sensor controls for building grounds fixtures
C405.6.1 grounds lighting rated at greater than 100 wafts with lamp efficacy less than 60
controls lumens,or identify exception taken
Identify applicable commissioning documentation requirements
per Section C408 or eligibility for exception;
C408.3 Lighting system Provide written procedures for functional testing of all automatic
functional testing controls and describe the expected system response;
Identify in construction documents the party responsible for
functional testing of automatic lighting controls
Lighting, Motor, and Transformer Permit Documents Checklist LTG-CHK
2012 Washington State Energy Code Compliance Forms for Commercial Buildings including R2&R3 over 3 stories and all RI Revised Jan 2014
Project Address Fill this line out on LGT-SUM I Date 5/21/2013
The following information is necessary to check a permit application for compliance with the lighting,motor,and transformer requirements in the
Washington State Energy Code,Commercial Provisions.
Applicability Location in Building Department
uments
(yes,no,na) Code Sectioni �omponent Documents Notes
lCompliance information required in permit doc
INTERIOR LIGHTING POWER&EFFICACY(Sections C405.5, C405.1 0,C405.1 1)
Provide fixture schedule with fixture types,lamps,ballasts,and
rated wafts per fixture;
C405.5.1 Identify spaces eligible for lighting power exemption on plans
C405.5.1.1 Total connected and in compliance forms;
C405.5.1.2 interior lighting power Identify lighting equipment eligible for exemption in fixture
C405.5.1.3
C405.5.1.4 schedule and in compliance forms;
Indicate that exempt lighting equipment is in addition to general
area lighting and is controlled independently
C405.4 Exit signs Provide exit sign types and rated wafts per fixture in fixture
schedule(maximum 5 wafts per fixture)
C405.10 Cooler and freezer For lighting in walk-in coolers and freezers,and refrigerated
C405.11 lighting warehouse coolers and freezers,provide rated lamp efficacy(in
lumens per waft)in fixture schedule
Lighting Power Calculation-Indicate compliance path taken
Complete required compliance forms—proposed wattage per
C405.5.2 Building Area building area does not exceed maximum allowed wattage per
Method building area.Identify locations of building areas on plans
Complete required compliance forms—total proposed wattage
C405.5.2 Space-By-Space does not exceed maximum allowed wattage.Identify locations
Method of space types on plans,including retail display areas as
applicable
EXTERIOR LIGHTING POWER&EFFICACY(Section C405.6)
Provide fixture schedule with fixture types,lamps,ballasts,and
Total connected rated wafts per fixture;
C405.6.2 exterior lighting Identify exterior applications eligible for lighting power
power exemption on plans and in compliance forms;
Indicate that exempt exterior lighting is controlled
independently from non-exempt exterior lighting
Table Exterior lighting zone Indicate building exterior lighting zone as defined by the AHJ
C405.6.2(l)
Exterior building For building grounds fixtures rated at greater than 100 wafts,
C405.6.1 grounds lighting provide rated lamp efficacy(in lumens per waft)in fixture
schedule
Exterior lighting Complete required compliance form—proposed wattage for
C405.6.2 power calculations exterior lighting plus base site allowed does not exceed
maximum allowed
MOTORS&TRANSFORMERS(Sections C405.8,C405.9)
C405.8 Electric Motors For motors not part of an HVAC system,provide electric motor
schedule on electrical plans with hp,rpm,and rated efficiency
C405.9 Transformers Provide distribution transformer schedule on electrical plans
with transformer size and efficiency
If"no" is selected for any question, provide explanation:
c;
proval Is made or Implied
By approval of these plans,no RP
ith the City's
regarding anything in these plans that confliCt w
%
niess
CO
current Urban Services Standards and Guidelines,u
explicitly stated and noted on the applicable sheet(s)or V5
approved separately in writing by the City EngineeE
Uj 0
E
U U
>
rn I LO t:
LLJ 0
00
LU
Scal e: 50' x
0
co
0 50' 100' 150'
a.
z
j C,
:k PROPOSED
0-
TREES OFFICE
DEES
PUMP CON TROL
A
PANEL
1000 GALLON
PUMP VAULT Q
CL
INSTALL CLEANOUT A
SANITARY CONNECTION 7�
r LLj oo Q Lj
r
ca
A
L L15
LU
�—Ij (—Z)
CL 0::
zi Uj
Q: Q- LLJ
2ZfSLOPE
Q-
><
EXIS77NG
MAINTENANCE
1-25" DIA. POLY PIPE INCA
FACILITY EXIST
IN A 4" DIA. SLEEVE BUILD
(SEE SPECIFICATIONS)
DA TE.
JUNE 14, -7016
JOB NUMBER:
2016-044
4 DRAWN By.
4
EXIS77NG SEWAGE PR SURE SEWER LINE JERRY L JACOBS
foRr PUMP STA77ON
A 4
Underground REWSIONS.
Utilities
Location SERWCE LINE ""j
Services coNNEcroN 12- rec�wraj
Call: TOLL FREE (SEE DETAIL)
1-800-424-5555
THREE WORKING DAYS BEFORE DIGGING
o f
24"0 PVC RISER WITH
SEPARATE CONDUIT WITH CORD GRIPS. 30"0 TRAFFIC–RATED LID 13ALL VALVE
00 NOT RUN SIGNAL CABLE IN THE SNORKEL
GENERAL CONSTRUCTION NOTES SAME CONDUIT AS POWER TO THE PUMP PVC SPLICE BOX PVC UNION
WITH CORD GRIPS
CONDUIT TO 27.1 (0
1. Construction materials and procedures shall be as set forth herein and in AQUAWORX CONTROL FINISH GRADE
conformance with: PANEL 10*1
<
LU
E
on
applicable Washington State Department of Health (WSDOH) Technical CD
Review Committee (TRC) publications, HIGH LEVEL 8_
INLET LO-t: 6
ALARM Uj 00
0 TRIGGER
WSDOH RS & G Pressure Distribution Standards (July, 2009).
1.25-0 TRANSPORT (0
V)
Washington Administrative Code chapter 246-272A, On-Site Sewage LINE TO SEWER LINE
Mm"
X U-1
STAINLESS STEEL BELL
Systems (July, 2007) a) 0
CLAMP OVER ASSEMBLY
0 applicable portions of the Standard Specifications for Road, Bridge, and NEOPRENE RUBBER
Boor (Typ'.) ell
Municipal Construction (Washington State Department of el 11 z CL
VETO., CLEAN NA77VE
0
Transportation/APWA, current edition), 6"— BACKFILL
0 National Electrical Code (NEC), (current edition), 4"0 PVC INLET TRANSDUCER READS 0.0--^�A
BAFFLE
0 Clallarn County Regulations, CHECK VAL Vff-�
0 Clallarn County Division of Environmental Health Policies, Grinder Pump
0 '..." -
along with all other applicable national, state and county codes. NEW TRAFFIC RATED
__j
CL
1000 GAL. SINGLE
COMPARTMENT PEA GRAVEL 4" MIN. LLI
(Z) :z-
DEPTH UNDER TANK LO LU
CONCRETE SEWAGE C):�
PUMP VAUL 1 0
SYSTEM INFORMATION &SPECIFICATIONS LQ
Pump Va 00
ult.. 1000 gallon, Single compartment concrete tank with CL
Traffic Rated Lid, (equal to Peninsula Tanks)
Pump Vault riser Orenco 24" 0 Ribbed Risers(or equal) NOT TO SCALE L
Li
c3
Riser Lids: Orenco 24"Orenco fiberglass lid FL24G4B or equal i_
Manhole Rings
_j z)
& Covers: Olympic Foundry Inc. Product. Cast Iron ASTM A48,
Ld
CL 30, 30" x 6" (part no. MH69) Q:
Pump: Liberty, LSG 200 Traffic rated lid ><
230V, Single Phase
Z
Control panel. Aquaworx IPC-1 pump control system with floatless 14 Go. Insulated 0
operation, programmable on/off timer, manualoff/auto Copper Toning Wire Traffic rated valve box
operation. The alarm must be on a seperate circuit from DATE-
june 13, 2016
the pump controls. Aqualified electrician must perform all Check Valve
wiring. Ba.11 Valve JOB NUMBER:
pe:
Gra vity pi Sewer Main 2016-044
(And Sleeve) 4"0 ASTM D-3034 PVC DRAMY BY.
Transport pipe.- 1.25"0 Sch 40 PVC Service Lateral JERRY L JACOBS
(within the pump REVISIONS.
chamber)
Transport
Piping: 1.25 0 (PE 3608 3408)Continuous poly pipe Service Connection
All service line connections shall be solvent welded. The only acceptable solvents and
2
cements are those that are recommended by the pipe manufacturer. All service laterals f
from the effluent sewer main to the property line shall be pressure tested' prior to any
backfilling.
On-Site Services L.L.C.
PO Box 1688
Port Angeles, WA. 98362 Email:jerry@onsite-service.net
Phone (360)-452--")905
Date: June 29, 2016 Customer No: 2016-044
COMMERCIAL OFFICE
Evergreen Fibre Inc.
DESIGN PARAMETERS
FACILITY
This sewage pump vault system will serve an office at 404 Eclips Industrial Park.
Employee restroom only.
TOTAL FLOW RATE (Design Flow)
6 employees x 16 GPD=96 gpd = 144 GPD
ORGANIC LOADING RATE
The estimated organic loading rate is expected to be within residential parameters
PROPOSED
The waste stream from the restroom (no floor drains) will flow into a 1000 gallon, concrete
pump vault. Sewage will be pumped via a sewage "Grinder"pump to the existing pressure
sewer line.
On-Site ServiceS LLC Jerry L. Jacobs
P.O. Box 1688 Phone (360)452-3905
Port Angeles,WA. 98362 Email jerry@onsite-service.net
Soil Analysis-Onsite Septic System Design
Client Name: Evergreen Fiber Customer#2016-044
Date: 06/29/2016
Pump sizing CaIcs
Head loss
1.25" dia. PE Pipe
10 gpM
Static=6'
Elevation =7'
Friction Loss Transport Pipe
Equivalent pipe length => Pipe 2501
1-90' =4'
I-GV =1'
I-CV= 11'
1-Union = 2'
268'
3.9'
Head Loss Transport=> 268 (10 gpm/98.3)'
Total Head Loss => 14.85' (1.25) 16.9'
SPEC PUMP AT 10-GPM AT 17'TDH
Dose Volume
Approx.. 120 gallons
LSG - SERIES
LSG-200-Series LS 200.,Series,
GAnd&,.P.tjMp arihillim, thp
Sin4le.StAge tane
1-S
fie]
...........
-----------
200 -87
PAT- .ENTED
GR20 Guide Rail'
190
WSLICEID
ISO,
1111:UT,T,
T!ECHiA--0-'dL- *--' GY 1170�
166
2.hPi:1..1/4"M*,dhar,ge
Features:, 140 '81
One-pieu,castiron,�ousing
130'
Dual shift seals 112-0
A 'acbdV-�SJidet.b6tb6rtechnoIogy
dva
#
made 6fhatde4dstainless steel for Cast Iron�construcfion
43
superi6rshred'ding. C
'i, go Olpe'design
25"GUick-discbnwt:power cord A[ Auto-alidnment46446 works
so
70 'Series'
Solid state stxting.circuit
A 60 Upper,ra'll s-uppoit'bracket,
Stainless,steel Impeller
(PR20'60tibn-iold sep-arat I
so y)
Panel-less design(extept3-phase)
40 17
Available Voltages: 30'
-208,23OV,Single Phase 20 9'
-208-23OV,&-Phase 10
-440-48OV,3-Phase 0
575V,3�Phase -10 0' 6�j, IS 10-25-30 3S 40� -46- 60
Gallons Per Minute
V-Slice"TechnologV
Recessed.cutter bolt Superior cutting-,syst6n.i.provides improved.shredditig
eiWinites Wadding performance ovOr'.r9dial cuft&�.-V-pattarri Or6id6i'Upi
.- I I " ' -' ..—
Exclusion ClOaC101,111 slots and to 101 alteriiated�cuts per.I revolutlom-Entlrercuttinq-,
system made of44b!.�stainles*�'ste'et'ha�d�66d'io�8-Rc,.
back relief clears debris
from under cutter Agaffiffiquil-i -
J
v pt* 2 —7
11-fivi-1p—
"Is
Certified Models A%�W;,ble ��,C n )
Address:
ipse IND Parkway
PREPARED 5/21/14, 14:26:40 INSPECTION TICKET PAGE 1
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 5/21/14
---------------------------------I---------------------------------------------------------------
ADDRESS . : 404 ECLIPSE IND PKWY SUBDIV:
CONTRACTOR : PHONE
OWNER BLUE MOUNTAIN LEASING PHONE
PARCEL 06-30-18-1-1-0000-0000-
APPL NUMBER: 13-00001445 COMM NEW CONST
---------------------------------------------------------------------------7--------------------
PERMIT: BPC 00 BUILDING PERMIT - COMMERCIAL
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
BL6 01 1/21/14 PB BLDG POST/COLUMN FTG
1/21/14 AP January 21, 2014 9:48:04 AM pbarthol.
Mike 460-1512
January 21, 2014 4:48:11 PM pbarthol.
south side footing rebar
BL6 02 1/24/14 JLL BLDG POST/COLUMN FTG
1/24/14 AP January 24, 2014 8:31:42 AM pbarthol.
mike 460-1512
AM
January 24, 2014 4:22:57 PM jlierly.
13L6 03 1/27/14 JLL BLDG POST/COLUMN FTG
1/27/14 AP January 27, 2014 8:47:33 AM pbarthol.
mike 460-1512
AM
January 27, 2014 4:12;S7 PM jlierly.
BL6 04 1/28/14 JLL BLDG POST/COLUMN FTG
1/28/14 AP January 28, 2014 10:13:38 AM pbarthol.
Mike 460-1512
January 28, 2014 3:49:32 PM jlierly-
BL99 01 5/21/14 BLDG FINAL
0�4 May 21, 2014 9:33:22 AM pbarthol.
14 %� Scott 461-4724
-------------------------------------- COMMENTS AND NOTES --------------------------------------
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY& ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES,.WA 98362
Application Number . . . . . 13-00001445 Date 1/10/14
Application pin number . . . 637450
Property Address . . . . . . 404 ECLIPSE IND PKWY
ASSESSOR PARCEL NUMBER: 06-30-18-1-1-0000-0000-
Application type description COMM NEW CONST REPORT SALES TAX
Subdivision Name . . . . . . on your state excise tax form
Property Use . . . . . . . .
Property Zoning . . . . . . . UNKNOWN to the City of Port Angeles
-----Application-valuation 150000--------------- (Location Code 0502)
----------- --------- - - - - ------
Application desc
METAL BUILDING TO ENCLOSE CHIPPER
----------------------------------------------------------------------------
Owner Contractor
------------------------ ------------------------
BLUE MOUNTAIN LEASING OWNER
2095 BLUE MOUNTAIN RD
PORT ANGELES WA 983629203
----------------------------------------------------------------------------
Permit . . . . . . BUILDING PERMIT - COMMERCIAL
Additional desc . . METAL BUILDING FOR CHIPPER
Permit Fee . . . . 1300.25 Plan Check Fee 845.1G
Issue Date . . . . 1/10/14 Valuation . . . . 150000
Expiration Date 7/09/14
Qty Unit Charge Per Extension
L
BASE FEE 1020.25
50.00 5.GOOO THOU BL-100,001-500K (5.60 PER K) 280.00
----------------------------------------------------------------------------
Special Notes and Comments
A minimum of 4 2A-10BC fire exinguishers are required.
Extinguishers must be mounted, with the top no more than 5'
off the floor. Suggested extinguisher placement is adjacent
to each exit.
January 7, 2014 2:24:34 PM kdubuc.
January 10, 2014 11:53:36 AM sroberds.
The proposal will result in an additional 4230 sq.ft.
industrial warehouse bldg in the IH zone, 1�o land use
issues are anticipated.
December 30, 2013 11:10:10 AM banders.
Equipment clearance must be maintained, Contact Trent for
any electrical alterations.
If fire sprinklers are required other permits, fee's or
conditions may apply.
Consider applying for the City Green Infrastructure Rebate
of up to $750.00 towards the materials to install rain
garden to control roof and driveway runoff. Also rebates
available for downspout disconnections.Contact Jonathan
Boehme at 360 417-4811
No attachment to sanitary sewer of stormwater roof leaders,
foundation drains, yard drains, or any other CSO
contribution is allowed.
----------------------------------------------------------------------------
Other Fees . . . . . . . . . STATE SURCHARGE 4.50
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
/4--i3 I
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL,TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Stemwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-in
Water Line(Meter to Bldg)
Gas Line
lTa-ck Flow/Water FINAL Date Accepted by
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists I Girders I Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall(interior Braced Panel Only
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pump/Furnace/FAU/Ducts
Rough-In
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood I Ducts FINAL Date Accepted by
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
ISkirting
PLANNING DEPT. Separate Permit#s SEPA:
Parking/Lighting ESA:
Landscaping ISHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction- R.W. PW Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Page 2
Application Number . . . . . 13-00001445 Date 1/10/14
Application pin number . . . G37450
----------------------------------------------------------------------------
Fee summary Charged Paid Credited Due REPORT SALES TAX
----------------- ---------- ---------- ---------- ---------- on your state excise tax form
Permit Fee Total 1300.25 1300.25 .00 .00
Plan Check Total 845.1G 845.16 .00 .00 to the City of Port Angeles
Other Fee Total 4.50 4.50 .00 .00
Grand Total 2149.91 2149.91 .00 .00 (Location Code 0502)
Separate Permits are required forelectrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMITIN CONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Stemwall
Foundation Drainage/Downspouts
Post Holes(Pole Bidgs.)
PLUMBING:
Under Floor/Slab
Rough-In
Water Line(Meter to Bldg)
Gas Line
Back Flow/Water FINAL Date Accepted by
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders I Under Floor
Shear Wall/Hold Downs
Walls I Roof I Ceiling
Drywall(Interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pump/Furnace/FAU/Ducts
Rough-In
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts FINAL Date Accepted by
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parking/Lighting ESA:
Landscaping ISHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction- R.W. PW Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
YL
i,4
If
4
AV-
it
11
__J
_4
_14----
I 01404P
0
L�_A_
+-
- ---------
___L__
43658'
_L__4
Ai
LA- -
Ll
VA-
-LIA
I t
i
+7-
2$S,
Hl i I I
I 'I to
kV40
.Y
Yl
Xf
-�tll
4j-1
4--
I
T-
J-4�
A
t
�--rl
4 A.
i-A
1. 4
7 7
-T f -T ------
4
I
'4-
T-T
7-"-7-- f4
7=-T- J Ll,
--4 1-
--4 --- ----- ---L-4
-4
J-
7f+ -T
en
-4
T-1
-A
1-4
F _7
-7
T
r
4
14-i
il-71-
L
t.-T
-4
t
i i ---
tA
-T-
44'
A 3
W L 1
--l-- F
it
jal L
7-r.
�4-
T
-LJ
4
if
7-4—
L
it
:-71 L
'04�
LHI
4- --i-L 1-4-4-1 1 1 1 1 1
-4 A- Ll
LOAD COMBINATIONS(ASCE 7-10) ASD MA)UMIN LOAD CALCULATION
1 D Zenovic&Associates,Inc.
2 D+L 301 E 6th Street,Suite 1
3 D+S Port Angeles,WA
3a D+S(UNBALANCED)
3b D+S(UNBALANCED) Job#: 13071
4 D+(W) Project: Metal Building Over�hlpper
5 D+(0.7 Client: Evergreen Fibre
6 D+0.75(L)+0.75(W)+0.75(S) 1D;t-e. 1111312013
7 D+0.7-5(L)+0.75(0.7E)+Q.75(S)
8 0.6D+W
9 0.60+0.7E
D Dead Load
E Seismic Load
L Seismic Load
S Snow Load
W WinTL--oad
FRAME LINE I FRAME LINE 2
COLUMN D B COLUMN D B
LOAD GROUP HL VL LNR HL VL LNR LOAD GROUP HL VL LNR HL VL LNR
7L 0.6 -0.6 DL 0.6 4.5 -0.6 5.7,
20.2
COLL 0.4 4.2 -0,4 2.5 COLL 0.4 2A -03
SNOW 3.2 35.2 -3.1. 21'2', SNOW 3 17.4 -2.8
ADW 0-1 2J -0.1 25.7,
ADW 0.1 1.4 -0A
AlDIL 0.2 2.5 -0.2 2.t,: A1D1L 02 2.5 -0.2 -2j,
�0.2 2.
AID1R 0.2 21 5�, AlDIR 01 2-1 -0.2 2,5'
Lr 2.5 28.1 -Z5 1:7
Lr 2.4 13.9 -2.3
AIVIL 0.4 7.4 -0.4 '2 5�,
A1V1L 0.4 7.4 -0.4 ",2.6,
8
A1H1R -0.6 -0.8 -0.6 0
A1H1R -0,6 -0.8 -0.6
0.6 0.8 0.6 �P,&,
A1H1L A11-111- 0.6 0.8 0-6 48
-0.4
A1V1R 0-4 2.5 -0.4 7.4
A1V1R 0.4 2.6
EQ -&8 -9.6 -6.9 EQ -3.2 -4.5 -3.6' 44,
RBUPEQ
EQ
RBUP 0A -13.5 -8.6 -0.1
WI-1 -10.6 49.5 -12.1 -66.1�-
-115
W1-1 -7.5 -26.1 -Ji4
WL2 -19�6 -15.1 -8.5 WL2 -14.8 -7.5
WL3 14.7 -3.2
-20.4 10.9 WI-3 10.6 -9.4 5.4 -29.4
WL4 5.8 14 14.5 WI-4 3.3 9.2 15.8 "'-10.8
LWLI 7.1 42.9 -3.6 LWL1 6
5.1 -23.3 -11.1 -24,
A
RBUPLW
RBUPLW 0.2 -17.6 -11.2 -0.2 .6
LWI-2 6.8 -39�9 -19 LWL2 4.8 -22.3 -11.4 -24.5
LWI-3 8 -30.5 -4.3 -16,7%'-,'-" LWL3 6.2 -17.1 -11.3 -16.7,
LWI-4 7.9 -29.2 4.4 �16 9 LWI-4 6.1 -16.7 -11.4 -,1 6,.ra
TWI-5 0.4 -8.4 LWI-5 -2.2 -4-7 -0.7
LWI-6
LWI-6 0.1 -5.4 -1.3 4A'
-2.5 -3.7 -1 -6.9",
-1.7 22 LWI-7 -1.1
LWI-7 1.4 4 1.5 -1
LWI-8 13 5.2
-1.8 LWL8 -1.2 1-9 -1.1
RS 2 15.1 -2 f2.9�, RS 1.9 7.5 -1.9 13
LS 2 26 -2 7�3
LS 1.9 13 -1.9
P2K1
03 2 -0.3 1
P2K1 0.3 1 -0.3
P2KR1 0 1 0.4 P2KR1 0 0
0 -4
SBAL 2A 26.6 -2,3 SBAL 2.3 13.1 -2.1 19A'
DSNW -0.1 DSNW -0.1 -0.1 0-1, *,6:
SSNW 1.9 SSNW 0 -0.1 01 3,6,
jRBDWLW
RBDWLW 0 17.6 0 2,
0 1,6
jRBDWEQ I -IRBDWEQ 0 13.5
LOAD COMBINATION FRAME LINE 1 LOAD COMBINATION FRAME L 77E 2 0
LC HL VL LNR HL VL LNR LC HL VL LNR HL VL LNR
-11- 1.
2 _q_. 29.6 0 -1.3, 12.2 0 1-� i-3 10.5 0 :1-2 12.7 0
11-4.4 0 73.2 *6L, 0 2 43 L�1�8 0 .-2ff -,4CFf- 0
-4- 33.4 0 3 4�3- 27:9--' 0 -4- 0
3 [_.-4.5 64.8 0 i-,
3a 3.3 44.7 0 -3.3 25.1 0 3a 3.2 18 0 -3.1 25.7 0
3b 3.3 55.6 0 -33 19.5 0 3b 3.2 23.5 0 -3.1 20.2 0
4(wLl- -9.3 -19.9 0 EIIA3 6.1 0 4(WL1) -6.2 -15.6 0 -14.7 0.3 0
4(WL2) -18.3 14.5 0 -9.8 25.2 0 4(WL2) -13.5 3 0 -4.4 18.9 0
4(WL3) 16 9.2 0 9.6 -22.9 0 4(WL3) 11.9 1.1 0 4-2 -16.7 0
4(WL4) 7.1 43.6 0 13.2 -3.8 0 4(WL4) 4.6 19.7 0 14.6 1.9 0
4(LWL1)- 8.4 -13.3 0 4.9 -10.9 0 4(LWL1)- 6.6 -30.4 0 -12.5 -33.5 0
4(LWL2)- 8.1 -10.3 0 -5.2 -11.5 0 4(LWL2)- 6.3 -29.4 0 -12.8 -33.4 0
4(LWI-3� 9.3 -0.9 0 -5.6 -4.5 0 4(LWL3)- 7.7 -24.2 0 -12.7 -25-6 0
4(LWL4)- 9.2 0.4 0 -5.7 4.7 0 4(LWL4y 7.6 -23.8 0 -12.8 -25.5 0
4(LWL5)- 1.7 21.2 0 -2.4 8 0 4(LWL5)- -0.7 -11.8 0 -2.1 -14.9 0
4(LWL6)- 1.4 24.2 0 -2.6 7.4 0 4(LWL6)- -1 -10.8 0 -2.4 -14.8 0
4(LWL7)- 2.7 33.6 0 -3 144 0 4(LWL7)- 0.4 -5.6 0 -2.4 -7 0
4(LWI-8� 2.6 34.8 0 -3.1 14.2 0 4(LWL8)- 0.3 -5.2 0 -2.5 -6.9 0
4(LWL1)+ 8.4 -13.3 0 4.9 -10.9 0 4(LWLI)+ 6.4 4.8 0 -12.3 9.7 0
4(LWL2)+ 8.1 -10.3 0 -5.2 -,1.5 0 4(LWL2)+ 6.1 5.8 0 -12.6 9.8 0
4(LWL3)+ 9.3 -0.9 0 -5.6 -4.5 0 4(LWL3)+ 7.5 11 0 -12.5 17.6 0
4(LWL4)+ 9.2 0.4 0 -5.7 -4.7 0 4(LWL4)+ 7.4 11.4 0 -12.6 17.7 0
4(LWL5)+ 1.7 21.2 0 -2.4 8 0 4(LWL5)+ -0-9 23.4 0 -1.9 28.3 0
4(LWL6)+ 1.4 24.2 0 -2.6 7.4 0 4(LWL6)+ -1.2 24.4 0 -2.2 28.4 0
4(LWL7)+ 2.7 33.6 0 -3 14.4 0 4(LWL7)+ 0.2 29.6 0 -2.2 36.2 0
4(LWL8)+ 2.6 34.8 0 -3.1 14.2 0 4(LWL8)+ 0.1 30 0 -2.3 36.3 0
5 -3.46 22.88 0 -6.13 18.92 0 5 -0.94 7.35 0 -3.72 15.78 0
5a 1.3 29.6 0 -1.3 12.2 0 5a 1.37 1.05 -6.02 -1.27 1.08 -7.35
5b 1.3 29.6 0 -1.3 122 0 5b 1.3 19.95 0 -1.2 24.32 0
6(WL1) -3.8 24.425 0 -12.25 29.075 0 6(WL1) -1.625 9.525 0 -12.975 28-225 0
[!6,�(W L 2-� -10.55 50.225 0 -9.55 D�14D 0 6(WL2) -7.1 23.475 0 -5.25 42A75 0
6(WL3) 15.175 46.25 0 5 7.325 0 6(WL3) 11.95 22.05 -6.45 1.2 15.475 -7.875
6(WL4) 8.5 72.05 0 7.7 21.65 0 6(WL4) 6.475 36 -6.45 9 29.425 -7.875
6(LWLI)- 9.475 29.375 0 -5.875 16.325 0 6(LWL1)- 7.975 -1.575 -8.4 -11.325 2.875 -10.275
6(LWL2)- 9.25 31.625 0 -6.1 15.875 0 6(LWL2)- 7.75 -0.825 0 -11.55 2.95 0
6(LWL3)- 10.15 38.675 0 -6.4 21.125 0 6(LWL3)- 8.8 3.075 0 -11.475 8.8 0
6(LWL4)- 10.075 39.65 0 -6.475 20.975 0 6(LWL4)- 8.725 3.375 0 -11.55 8.875 0
6(LWL5)- 4.45 55-25 0 -4 30-5 0 6(LWL5)- 2.5 12.375 0 -3.525 16.825 0
6(LWL6)- 4.225 57.5 0 -4.15 30.05 0 6(LWL6y 2.275 13.125 0 -3.75 16.9 0
6(LWL7)- 5.2 64+55 0 4.45 35.3 0 6(LWL7)- 3.325 17.025 0 -3+75 22+75 0
6(LWL8)- 5+125 65-45 0 4+525 35.15 0 6(LWL8)- 3-25 17+325 0 -3.825 22.825 0
6(LWL1)+ 9.475 29.375 0 -5.875 16.325 0 6(LWL1)+ 7.825 -1.575 0 -11.175 2.875 0
6(LWL2)+ 9.25 31.625 0 -6.1 15.875 0 6(LWL2)+ 7.6 -0.825 0 -11.4 2.95 0
6(LWL3)+ 10.15 38+675 0 -6.4 21.125 0 6(LWL3)+ 8.65 3.075 0 -11.325 8.8 0
6(LWL4)+ 10.075 39.65 0 -6.475 20.975 0 6(LWL4)+ 8.575 3.375 0 -11.4 8+875 0
6(LWL5)+ 4.45 55.25 0 4 30.5 0 6(LWL5)+ 2+35 12.375 0 -3.375 16.825 0
6(LWL6)+ 4.225 57.5 0 -4.15 30.05 0 6(LWL6)+ 2.125 13.125 0 -3.6 16.9 0
6(LWL7)+ 5.2 64.55 0 -4.45 35.3 0 6(LWL7)+ 3.175 17.025 0 -3.6 22.75 0
6(LWL8)+ 5.125 65.45 0 -4.525 35.15 0 6(LWL8)+ 3.1 17.325 0 -3.675 22.825 0
7 0.58 56.51 0 -6.7975 38.69 0 7 2.32 26.7375 0 4.74 39.835 0
7a 4.15 56.51 0 -3.175 38.69 0 7a 4.0525 26.7375 -4.515 -2.9025 39.835 -5.5125
7b 4.15 61.55 0 -3.175 33.65 0 7b 4 36.1875 0 -2.85 46.24 0
8(WL1) -9.82 -31.74 0 -12.88 1.22 0 E8(WLI) -6.72 -19+8 0 -14.22 4.78 0
8(WL2) -18.82 2.66 0 -9.28 20.32 0 8(?EL2:�) (_-1.4�02- -1.2 0 -3.92 13.82 0
C8'(,%kLL3)�j 15.48 -2+64 0 10.'12 L-27.783 0 6(WL3) 11.38 -3-1 0 4.68 -21.78 0
C8-(W:L�4)D 6.58 31.76 0 EI-17
�21 -8+68 0 -8(.WL4) 4.08 -15.51- _0 15.08 -3.18 0
8(LWL1)- 7.98 -25.14 0 A.38 -15.78 0 8(LW-L1) 6.08 -34.6 -1 nl.2 -12.02 -38.58 -13.7
8(LWL3)- -a( 5.78 -33.6 '0 -12.32 -38.48 0
8(LWL2)- 7-58 -22.14 0 -4.68 -16-38 0 1VVE2)n
8.78 -12.74 0 -5.08 -9.38 0 8(LWL3)- 7.18 -28.4 0 -12.22 -30.68 0
8(LWL4)- 8.68 -11.44 0 -5.18 -9.58 0 8(LWL4)- 7.08 -28 0 -12.32 -30.58 0
8(LWL5)- 1.18 9.36 0 -1.88 3.12 0 8(LWL5)- -1.22 -16 0 -1-62 -19.98 0
8(LWL6)- 0.88 12.36 0 -2.08 2.52 0 8(LWL6)- -1.52 -15 0 -1.92 -19.88 0
8(LWL7)- 2.18 21.76 0 -2.48 9.52 0 8(LWL7)- -0.12 -9.8 0 -1.92 -12-08 0
8(LWL8)- 2.08 22.96 0 -2.58 9.32 0 8(LWL8)- -0.22 -9.4 0 -2.02 -11.98 0
8(LWL1)+ 7.88 -25.14 0 -4.38 -15+78 0 8(LWL1)+ 5.88 0.6 0 -11.82 4.62 0
8(LWL2)+ 7.58 -22.14 0 -4.68 -16.38 0 8(LWL2)+ 5.58 1.6 0 -12.12 4.72 0
8(LWL3)+ 8.78 -12.74 0 -5.08 -9.38 0 8(LWL3)+ 6+98 6.8 0 -12.02 12.52 0
B(LWL4)+ 8.68 -11.44 0 -5.18 -9.58 0 8(LWL4), 6.88 7.2 0 -12.12 12.62 0
8(LWL5)+ 1.18 9.36 0 -1.88 3.12 0 8(LWL5)+ -1.42 19.2 0 -1.42 23.22 0
8(LWL6)+ 0.88 12.36 0 -2.08 2.52 0 8(LWL6)+ -1.72 20.2 0 -t72 23.32 0
8(LWL7)+ 2.18 21.76 0 -2.48 9.52 0 8(LWL7)+ -032 25.4 0 -1.72 31.12 0
8(LWL8)+ 2.08 22.96 0 -2.58 9.32 0 8(LWL8)+ 442 25.8 0 -1-82 31.22 0
9 -3.98 11.04 0 -5.61 14.04 0 9 -1.46 3.15 0 -3.24 10.7 0
9a 0.78 17.76 0 -0.78 7.32 0 9a 0.85 -3.15 -6.02 -0.79 -4 -7.35
9b 0.78 17.76 0 -0.78 7.32 0 9b 0.78 1 15.75 1 0 1 -0.72 1 19.24 0
mm 1 16 72.05 0 �l��72 43-4 0 MAX
LC 4(WL3) 6(WL4) (V L4) 6(WL2) 1 r,
MIN -18.82 -31.74 0 -la4 -27-78 0
8(WL1) 1 1 A(Wl
LC 8(WL2) ti±g 1N
srJOU3
31,S4- 4b, -1-9
01 ND W)N r
�)- 0 1
16,11 13
LOAD COMBINATIONS(ASCE 7-10) ASD MA)UMIN LOAD CALCULATION
Zenovic&Associates,Inc.
2 D-L 301 E 6th Street,Suite 1
3 D+S Port Angeles,WA
- 3a D+S(UNBALANCED)
- 3b D+S(UNBALANCED) Job#: 13071
4 D+(W) Y
5 D+(0.7E)
6 D+0.75(L)+0.75(W)+0.75(S) jDate: 11111312013
7 D+0.75(L)+0.75(0.7E)+0.75(S)
8 0.6D+W
9 0.6D+0.7E
D Dea L ad
E Seismic Load
L Seismic Load
S Snow Load
W Win ad
COLUMN FRAME LINE D 3 B COLUMN FRAME LINE D 4
LOAD GROUP HL VIL LNR HL VL LNR LOAD GROUP HL VL LNR HL VL LNR
DL 0.6 4.5 -0.6 5.7 DL 0.6 4.4 -0�6 5.6
COLL 0.4 2.1 -0,3 31 COLL 0A 2.1 -0.4 3.1
SNOW 3 17.4 -2.8 2'5'? SNOW 3.2 17.4 -31 25.7,
ADW 0.1 1A -0.1 i4 ADW
A1D1L 0.2 2.5 42 AID1L 0.3 3.9 -0.3 3.1 5'
AID1R 0.2 2.1 -0.2 AID1R 0.3 3.5 -0.3
3.9
Lr 2.4 13.9 -2.3 2016 Lr 2.6 13.9 -2.5 20.6
A1V1L 0.4 7.4 -0.4 2.6' A1V1L 0.6 8.8 -0-6 19
A1H1R
-0.6 -0.8 -0.6 0.8'
A1H1R -0.6 -0.8 -0.6 0.8
A11-111 0.6 0.8 O�6 -0.8 A11-111 0.6 &8 -0.6 -0.8
A1V1R
0.4 2.6 -0.4 7.4 A1V1R 0.6 3.9 -0.6
EQ -3.2 4.5 -3.6 4.4 EQ -3.2 -4.5 -15 4-4
RBUPEQ 0.1 -13.5 -10-5 -0.1 -16.6 1 0.1 0.1 -0.1 -13A
0,51:_ RBUPEQ
WLI -7-5 -261 -13.5 -12.4 WLI -7.5 -26 -13.5 -12.3,
WL2 -14.8 -7,5 -12 6.2 WI-2 -15 -7.5 -3
WI-3 6.2
1 0�6 -9-4 5.4 -29A, WI-3 10,8 -9-4 5.4 -A4
WI-4 3.3 9.2 15�8 -1G.8' WL4 3.1 9.2 15.9 -10
LWL1 5.1 -24.1 -10�9 LWLI 5.2 -23.3 -11.2 -24.5
RBUPLW 0-2 -17.6 -13.7
-0.2 21,6 RBUPLW 0.1 0.1 -0.1 -2
5W L-2 5 -22 -11.3 -�0.4
�23.1 LWI-2 4.9 -22.2 -11.5 -24.5
LWI-3 6.2 -17.4 -11.3 LWI-3 64 -17A -11.5 -18.6,
TWI-4
61 -16.5 -11.4 -16
LWI-5 -2.2 4.7 -01 LWL4 6.2 -16.6 -11.6 -'16.6
LWI-5 -2.2 -4.7 -0.7 -6'
LWL6 -2.5 -3-7 -1 -5.9 LWI-6 -2.5 -3.6 -1 -5.9
LWI-7 -1.1 1.5 -1 LWI-7 -1.1 1.5 1��
LWI-8 -1.2 1�9 -1.1 2 LWLB -1.2 1.9
RS
LS 1.9 7-5 -1.9 1'3 RS 2.1 7.5 -2,1 13
1.9 13 -1.9 7.5
LS 2-1 13 -2,1 7-5
P2K1 0.3 1 -0.3 1,
P2K1 0.3 1 -0.3 1
P2KR1 0 0
0 1 P2KR1 0 0 0 1
SBAL 2.3 13.1 -2.1 19A SBAL 2.4 13.1 -2-3 !�A',
DSNW -0.1 -0.1 0.1 4.6 DSNW -0.1 -0-1 0:1 4:.6:1,
SSNW 0 -0.1 0.1 16
SSNW -0.1 0.1 3.6
jRBDWLW 0 17.6 0 DWLW -0.1 0 20.8,
IRBDWEQ 0 13.5 0 16 INg -0.1 0 Q.4
V
LOAD COMBINATION FRAME LINE 3 LOAD COMBINATION FRAME LINE 4 0
LC HL VL LNR HL VL LNR LC HL L LNR HL VL LNR
1 1 1.3 10.5 0 -1.2 12.7 0 1 1.3 10.4 0 -1.3 12.6 0
8E: 0 C--2r5' r-46-7 0 2 4.5 33.1 0 -4.4 42 0
3 4.3 27.9 0 -4 36.4 0 3 4.5 27.8 0 4.4 38.3 0
3a 3.2 18 0 -3.1 25.7 0 3a 3.4 1T9 0 -3.4 25.6 0
3b 3.2 23.5 0 -3.1 20.2 0 3b 3.4 23A 0 -3.4 20.1 0
64(.W Ll -6.2 -15.6 0 C-1-4-73 0.3 0 4(WL1) -6.2 -15-6 0 -14.8 0.3 0
4(WL2) -13.5 3 0 -4.4 18.9 0 4(WL2) -13.7 2.9 0 -4.3 18.8 0
4(WL3) 11.9 1.1 0 4.2 -16.7 0 4(WL3) 12.1 1 0 4.1 -16.8 0
4(WL4) 4.6 19.7 0 14.6 1.9 0 4(WL4) 4.4 19.6 0 14.6 1.7 0
4(LWL1)- 6.6 -31-2 0 -123 -33.8 0 4(LWL1)- 6.6 -12.8 0 -12.6 -32.7 0
4(LWL2)- 6.5 -29.1 0 -12.7 -32 0 4(LWL2)- 6.3 -11.7 0 -12.9 -32.7 0
4(LWL3)- 7.7 -24.5 0 -12.7 -25.7 0 4(LWL3)- 7.8 -6.6 0 -12.9 -26.8 0
4(LWL4)- 7.6 -23.6 0 -12.8 -24.9 0 4(LWL4)- 7.6 -6.1 0 -13 -24.8 0
4(LWL5)- -0.7 -11.8 0 -2.1 -14.9 0 4(LWL5)- -0.8 5-8 0 -2.1 -14.2 0
4(LWL6)- -1 -10.8 0 -2.4 -14.8 0 4(LWL6)- -1.1 6.9 0 -2.4 -14.1 0
4(LWL7)- 0.4 -5.6 0 -2-4 -7 0 4(LWL7)- 0.3 12 0 -2.4 -6.3 0
4(LWL8)- 0.3 -5.2 0 -2.5 -6.9 0 4(LWL8)- 0.2 12.4 0 -2.5 -6.3 0
4(LWL1)+ 6.4 4 0 -12.1 9.4 0 4(LWLI)+ 6.5 -13 0 -12.5 8.9 0
4(LWL2)+ 6.3 6-1 0 -12.5 11.2 0 4(LWL2)+ 6.2 -11.9 0 -12.8 8.9 0
4(LWL3)+ 7.5 10.7 0 -12.5 17.5 0 4(LWL3)+ 7.7 -6.8 0 -12-8 14.8 0
4(LWL4)+ 7.4 11.6 0 AZ6 18.3 0 4(LWL4)+ 7.5 -6.3 0 -12.9 16.8 0
4(LWL5)+ -0.9 23.4 0 -1.9 28.3 0 4(LWL5)+ -0.9 5-6 0 -2 27.4 0
4(LWL6)+ -1.2 24.4 0 -2.2 28.4 0 4(LWL6)+ -1.2 6.7 0 -2.3 27.5 0
4(LWL7)+ 0.2 29.6 0 -2.2 36.2 0 4(LWL7)+ 0.2 11.8 0 -2.3 35.3 0
4(LWL8)+ 0.1 30 0 -2.3 36.3 0 4(LWL8)+ 0.1 12.2 0 -2.4 35.3 0
5 -0.94 7.35 0 -3.72 15.78 0 5 -0.94 7-25 0 -3.75 15.68 0
5a 1.37 1-05 -7.35 -1.27 1.08 -7.35 5a 1.37 10-47 0 -1.37 3.22 -6.09
5b 1.3 19.95 0 -1.2 24.32 0 5b 1.3 10.33 0 -1.3 21.98 0
6(WL1) -1.625 9.525 0 -12.975 28.225 0 6(WL1) -1.475 10.55 0 -14.2 29.25 0
6(WL2) -7.1 23.475 0 -5.25 42.175 0 6(WL2) -7.1 24.425 0 -6.325 43.125 0
6(WL3) 11.95 22.05 -7.875 1.2 15.475 -7.875 6(WL3) 12.25 23 0 -0.025 16.425 -6.525
6(WL4) 6.475 36 -7.875 9 29.425 -7.875 6(WL4) 6.475 36-95 0 7.85 30.3 -6.525
6(LWLI)- 7.975 -2.175 -10.275 -11.175 2.65 -10.275 6(LWL1)- 8.125 12.65 0 -12.55 4.5 -10.05
6(LWL2)- 7.9 -0.6 0 -11.475 4 0 6(LWL2)- 7.9 13.475 0 -12-775 4.5 0
6(LWL3)- 8.8 2.85 0 -11.475 8.725 0 6(LWL3)- 9.025 17.3 0 -12.775 8.925 0
6(LWL4)- 8.725 3.525 0 -11.55 9.325 0 6(LWL4)- 8.875 17.675 0 -12.85 10.425 0
6(LWL5)- 2.5 12.375 0 -3.525 16.825 0 6(LWL5)- 2.575 26.6 0 -4-675 18.375 0
6(LWL6)- 2.275 13.125 0 -3.75 16.9 0 6(LWL6)- 2.35 27.425 0 -4.9 18.45 0
6(LWL7)- 3.325 17.025 0 -3.75 22.75 0 6(LWL7)- 3.4 31.25 0 -4.9 24.3 0
6(LWL8)- 3.25 17.325 0 -3.825 22.825 0 6(LWL8)- 3.325 31.55 0 -4.975 24.3 0
6(LWLI)+ 7.825 -2.175 0 -11.025 2.65 0 6(LWL1)+ 8.05 12.65 0 -12.475 4�5 0
6(LWL2)+ 7.75 -0.6 0 -11.325 4 0 6(LWL2)+ 7.825 13.475 0 -12.7 4.5 0
6(LWL3)+ 8.65 2.85 0 -11.325 8.725 0 6(LWL3)+ &95 17-3 0 -12.7 8.925 0
6(LWL4)+ 8.575 3.525 0 -11.4 9.325 0 6(LWL4)+ 8.8 17.675 0 -12.775 10.425 0
6(LWL5)+ 2.35 12.375 0 -3.375 16.825 0 6(LWL5)+ 2.5 26.6 0 -4.6 18.375 0
6(LWL6)+ 2.125 13.125 0 -3.6 16.9 0 B(LWL6)+ 2.275 27-425 0 -4.825 18.45 0
6(LWL7)+ 3.175 17.025 0 -3.6 22.75 0 6(LWL7)+ 3.325 31.25 0 -4.825 24.3 0
6(LWL8)+ 3.1 17.325 0 -3.675 22.825 0 6(LWL8)+ 3.25 31.55 0 -4.9 24.3 0
7 2.32 26-7375 0 A.74 39.835 0 7 2.47 27.6875 0 -5.9125 40.785 0
7a 4.0525 26.7375 -5.5125 -2.9025 39.835 -5.5125 7a 4.2025 27.6875 0 -4.1275 40.785 4.5675
7b 4 36.1875 0 -2.85 46.24 0 7b 4.15 29.9975 0 -4.075 45.51 0
8(WL1) -6.72 -19.8 0 -14.22 -4.78 0 8(WLI) -6.72 -19.76 0 -14.28 -4.74 0
8(WL2) -14.02 -1.2 0 -3.92 13.82 0 8(WL2) -14.22 -1.26 0 -3.78 13.76 0
8(WL3) 11.38 -3.1 0 4.68 -21.78 0 8(WL3) 11.58 -3.16 0 4.62 -21.84 0
8(WL4) 4.08 15.5 0 15.08 -3.18 0 8(WL4) 3.88 15.44 0 15.12 -3.34 0
6.08 -35.4 -13.7 -11.82 C-�3�8,88 �- 3.77, 8(LWL1)- 6.08 -16.96 0 -12.08 -37.74 -13.4
8(LWL2)- 5.98 -33.3 0 -12.22 -37.08 0 8(LWL2)- 5.78 -15.86 0 -12.38 -37.74 0
8(LWL3)- 7.18 -28.7 0 -12.22 -30.78 0 8(LWL3)- 7.28 -10.76 0 -12.38 -31.84 0
8(LWL4)- 7.08 -27.8 0 -12.32 -29.98 0 8(LWL4)- 7.08 -10.26 0 -12.48 -29.84 0
8(LWL5)- -1.22 -16 0 -1.62 -19.98 0 8(LWL5)- -1.32 1.64 0 -1.58 -19.24 0
8(LWL6)- -1.52 -15 0 -1.92 -19.88 0 8(LWL6)- -1.62 2.74 0 -1.88 -19.14 0
8(LWL7)- -0.12 -9.8 0 -1-92 -12.08 0 8(LWL7)- -0.22 7.84 0 -1.88 -11.34 0
8(LWL8)- -0.22 -9.4 0 -2.02 -11.98 0 8(LWL8)- -0.32 8.24 0 -1.98 -11-34 0
8(LWL1)+ 5.88 -0.2 0 -11.62 4.32 0 8(LWLI)+ 5.98 -17.16 0 -11.98 3.86 0
8(LWL2)+ 5.78 1.9 0 -12.02 6.12 0 8(LWL2)+ 5.68 -16-06 0 -12.28 3.86 0
8(LWL3)+ 6.98 6.5 0 -12.02 12.42 0 8(LWL3)+ 7.18 -10.96 0 -12.28 9.76 0
8(LWL4)+ 6.88 7.4 0 -12.12 13.22 0 8(LWL4)+ 6.98 -10.46 0 -12.38 11.76 0
8(LWL5)+ -1.42 19.2 0 -1.42 23.22 0 8(LWL5)+ -1.42 1.44 0 -1.48 22.36 0
8(LWL6)+ -1.72 20.2 0 -1.72 23.32 0 8(LWL6)+ -1.72 2.54 0 -1.78 22.46 0
8(LWL7)+ -0.32 25.4 0 -1.72 31.12 0 8(LWL7)+ -0.32 7.64 0 -1.78 30.26 0
8(LWL8)+ -0.42 25.8 0 -1.82 31.22 0 8(LWL8)+ -0.42 8.04 0 -1.88 30.26 0
9 -1.46 3.15 0 -3.24 10.7 0 9 -1.46 3.09 0 -3.23 10.64 0
ga 0.85 -3-15 -7.35 -0.79 -4 -7.35 9a 0.85 6.31 0 -0.85 -1.82 -6.09
9b 0.78 15.75 0 -0.72 19.24 0 9b 0.78 6.17 0 -0.78 16.94 0
MAX 1 .95 36.1875 0 15.0 4624 0-----] MAX �12 25 3,W195 0 15. 0
7b 1 8(WL4) 7b 1 LC (V_- -_
L ( L
6(WL3T 3)46(WL4) I 8(WL4) 7b 1-
MIN -14.02 -35.4 -13.7 -14.7 1 -38-88 -13.7 1 -MIN 1 -14.22 1 -19.76 0 -14.8 -37.74 -17-4
LC
8(W-L2) '��(LWU)- 8�(LWU) 4(WL1) I 8(LWL1)- 18(LWL1)-I LC I 8(WL2) I 8(WLI) 1 1 1 QWLI) 18(LWL1)-18(LWLI)-
-Q,N 0--� spat,"
Ij
17
-76
CZ 7
_jW
-3 S
LO'AD COMBINATIONS(ASCE 7-10) ASD MAXIMIN LOAD CALCULATION
1 D Zenovic&Associates,Inc.
2 D+L 301 E 6th Street,Suite 1
3 D+S Port Angeles,INA
3a D+S(UNBALANCED)
3b D+S(UNBALANCED) Job#: 13071
4 D+(W) Project: Metal Building Over Chipper
5 D+(0.7E) Client: Evergreen Fibre
6 D+0-75(L)+0.75(W)+0.75(S) jDate� 11/5/2013
7 D+0.75(L)+0.75(0.7E)+0.75(S)
8 0.6D+W
9 0.6DTO,7E
D Dead oad
E Seismic Load
L Seismic Load
S Snow Load
W Wind Load
FRAME LINE 4 FRAME LINE
COLUMN C COLUMN
LOAD GROUP HL VIL LNR HL VL LNR LOAD GROUP HL VL LNR HL VL LNR
DL 4.4 DL
COLL 2.1 COLL
SNOW 17.8 SNOW
ADW ADW
A1D1L 0.9 A1D1L
A1D1R 0.9 A1D1R
Lr 14.2 Lr
A1V1L 1.5 A1V1L
A1H1R A1H1R
A11-111 A1H1L
A1V1R 1�5 A1V1R
EQ 0.4 EQ
RBUPEQ -0.1 RBUPEQ
WLI -8-6 WL1
WI-2 -7.5 WL2
WI-3 -8-3 WI-3
WI-4 -7.1 WI-4
LWL1 -3.4 14.6 LWL1
RBUPLW -0.1 RBUPLW
LWI-2 -3.4 14.6 LWI-2
LWI-3 1.3 -16.2 LWL3
LWL4 1.3 -16.2 LWL4
LWL5 -22 14.6 LWI-5
LWL6 2A 14.6 LWI-6
LWI-7 2.4 -16.2 LWI-7
TWI-8 11.6 -16.2 LWI-8
RS 11.6 RS
LS 1-1 LS
'P2K1 1.1 P2K1
P2KR1 13.4 P2KR1
SBAL SBAL
DSNW DSNW
SSNW SSNW
RBDWLW 4 RBDWLW
RBDWEQ -0.3 RBDWEQ
LOAD COMBINATION FRAME LINE 4 LOAD COMBINATION FRAME LINE 0 0
LC HL VL LNR HL_ VL LNR- LC HL VL LNR HL VL LNR
1 0 7.4 0 0 0 0 1 0 0 0 0 0 0
2 0 23.1 0 0 0 0 2 0 0 0 0 0 0
3 0 25.2 0 0 0 0 3 0 0 0 0 0 0
3a 0 19 0 0 0 0 3a 0 0 0 0 0 0
3b 0 8.5 0 0 0 0 3b 0 0 0 0 0 0
4(WLI) 0 -1.2 0 0 0 0 4(WL1) 0 0 0 0 0 0
4(WL2) 0 -0.1 0 0 0 0 4(WL2) 0 0 0 0 0 0
4(WL3) 0 -0.9 0 0 0 0 4(WL3) 0 0 0 0 0 0
4(WL4) 0 0.3 0 0 0 0 4(WL4) 0 0 0 0 0 0
4(LWL1)- 0 3.9 14.6 0 0 0 4(LWL1)- 0 0 0 0 0 0
4(LWL2)- 0 3.9 14.6 0 0 0 4(LWL2)- 0 0 0 0 0 0
4(LWL3)- 0 8.6 -16.2 0 0 0 4(LWL3)- 0 0 0 0 0 0
4(LWL4)- 0 8.6 -16.2 0 0 0 4(LWL4)- 0 0 0 0 0 0
4(LWL5)- 0 5.1 14.6 0 0 0 4(LWL5)- 0 0 0 0 0 0
4(LWL6)- 0 9.7 14.6 0 0 0 4(LWL6)- 0 0 0 0 0 0
4(LWL7)- 0 9.7 -16.2 0 0 0 4(LWL7y 0 0 0 0 0 0
4(LWL8)- 0 18.9 -16.2 0 0 0 4(LWLB)- 0 0 0 0 0 0
4(LWL1)+ 0 0 14.6 0 0 0 4(LWL1)+ 0 0 0 0 0 0
4(LWL2)+ 0 0 14.6 0 0 0 4(LWL2)+ 0 0 0 0 0 0
4(LWL3)+ 0 4.7 -16.2 0 0 0 4(LWL3)+ 0 0 0 0 0 0
4(LWL4)+ 0 47 -16.2 0 0 0 4(LWL4)+ 0 0 0 0 0 0
4(LWL5)+ 0 1.2 14.6 0 0 0 4(LWL5)- 0 0 0 0 0 0
4(LWL6)+ 0 5.8 14.6 0 0 0 4(LWL6)+ 0 0 0 0 0 0
4(LWL7)+ 0 5.8 -16.2 0 0 0 4(LWL7)+ 0 0 0 0 0 0
4(LWL8)+ 0 15 -16.2 0 0 0 4(LWL8)+ 0 0 0 0 0 0
5 0 7.68 0 0 0 0 5 0 0 0 0 0 0
5a 0 7.33 0 0 0 0 5a 0 0 0 0 0 0
5b 0 7.19 0 0 0 0 5b 0 0 0 0 0 0
6(WL1) 0 15.425 0 0 0 0 6(WLI) 0 0 0 0 0 0
6(WL2) 0 16.25 0 0 0 0 6(WL2) 0 0 0 0 0 0
6(WL3) 0 15.65 0 0 0 0 6(WL3) 0 0 0 0 0 0
6(WL4) 0 16.55 0 0 0 0 6(WL4) 0 0 0 0 0 0
6(LWL1)- 0 19.25 10.95 0 0 0 6(LWL1)- 0 0 0 0 0 0
6(LWL2)- 0 19.25 10.95 0 0 0 6(LWL2)- 0 0 0 0 0 0
6(LWL3)- 0 22.775 -12.15 0 0 0 6(LWL3)- 0 0 0 0 0 0
6(LWL4)- 0 22.775 -12.15 0 0 0 6(LWL4)- 0 0 0 0 0 0
6(LWL5)- 0 20.15 10.95 0 0 0 6(LWL5)- 0 0 0 0 0 0
6(LWL6)- 0 23.6 10.95 0 0 0 6(LWL6)- 0 0 0 0 0 0
6(LWL7)- 0 23.6 -12.15 0 0 0 6(LWL7)- 0 0 0 0 0 0
6(LWL8)- 0 30.5 -12.15 0 0 0 6(LWL8)- 0 0 0 0 0 0
6(LWL1)+ 0 19.25 10.95 0 0 0 6(LWL1)+ 0 0 0 0 0 0
6(LWL2)+ 0 19.25 10.95 0 0 0 6(LWL2)+ 0 0 0 0 0 0
6(LWL3)+ 0 22.775 -12.15 0 0 0 6(LWL3)+ 0 0 0 0 0 0
6(LWL4)+ 0 22.775 -12.15 0 0 0 6(LWL4)+ 0 0 0 0 0 0
6(LWL5)+ 0 20.15 10.95 0 0 0 6(LWL5)+ 0 0 0 0 0 0
6(LWL6)+ 0 23.6 10.95 0 0 0 6(LWL6)+ 0 0 0 0 0 0
6(LWL7)+ 0 23.6 -12.15 0 0 0 6(LWL7)+ 0 0 0 0 0 0
6(LWL8)+ 0 30.5 -12.15 0 0 0 6(LWL8)+ 0 0 0 0 0 0
7 0 22.085 0 0 0 0 7 0 0 0 0 0 0
7a 0 22.085 0 0 0 0 7a 0 0 0 0 0 0
7b 0 21.7175 0 0 0 0 7b 0 0 0 0 0 0
8(WL1) 0 -4.16 0 0 0 0 8(WL1) 0 0 0 0 0 0
8(WL2) 0 -3.06 0 0 0 0 8(WL2) 0 0 0 0 0 0
8(WL3) 0 -3.86 0 0 0 0 8(WL3) 0 0 0 0 0 0
8(WL4) 0 -2.66 0 0 0 0 8(WL4) 0 0 0 0 0 0
8(LWL1)- 0 0.94 14.6 0 0 0 8(LWL1)- 0 0 0 0 0 0
8(LWL2)- 0 0.94 14.6 0 0 0 8(LWL2)- 0 0 0 0 0 0
8(LWL3)- 0 5.64 -16.2 0 0 0 8(LWL3)- 0 0 0 0 0 0
8(LWL4)- 0 5.64 -16-2 0 0 0 8(LWL4)- 0 0 0 0 0 0
8(LWL5)- 0 2.14 14.6 0 0 0 8(LWL5)- 0 0 0 0 0 0
8(LWL6)- 0 6.74 14.6 0 0 0 8(LWL6)- 0 0 0 0 0 0
8(LWL7)- 0 6.74 -16.2 0 0 0 8(LWL7)- 0 0 0 0 0 0
8(LWL8)- 0 15.94 -16.2 0 0 0 8(LWL8)- 0 0 0 0 0 0
8(LWL1)+ 0 -2.96 14.6 0 0 0 8(LWL1)+ 0 0 0 0 0 0
8(LWL2)+ 0 -2.96 14.6 0 0 0 8(LWL2)+ 0 0 0 0 0 0
8(LWL3)+ 0 1.74 -16.2 0 0 0 8(LWL3)+ 0 0 0 0 0 0
8(LWL4)+ 0 1.74 -16.2 0 0 0 8(LWL4)+ 0 0 0 0 0 0
8(LWL5)+ 0 -1.76 14.6 0 0 0 8(LWL5)+ 0 0 0 0 0 0
8(LWL6)+ 0 2.84 14.6 0 0 0 8(LWL6)+ 0 0 0 0 0 0
8(LWL7)+ 0 2.84 -16.2 0 0 0 8(LWL7)+ 0 0 0 0 0 0
8(LWL8)+ 0 12.04 -16.2 0 0 0 8(LWL8)+ 0 0 0 0 0 0
9 0 4.72 0 0 0 0 9 0 0 0 0 0 0
9a 0 4.37 0 0 0 0 9a 0 0 0 0 0 0
9b 0 4.23 0 0 0 0 9b 0 0 0 0 0 0
MAX 0 30.5 14.6 0 0 0 MAX 0 0 0 0 0 0
LC 1 6(LWL8y 4(LWL1)- 1 1 1 LC 1 1 1 1 1 1
MIN 0 -4�16 -16.2 0 0 0 MIN 0 0 0 0 0
4(LWL3)-
LC 1 8(WL!) LC 1 1 1 1 1 1
ZENOVIC&ASSOCIATES,INC. PROJECT: METAL BUILDING OVER CHIPPER
301 EAST 6TH STREET, SUITE I CLIENT: EVERGREEN FIBRE
PORTANGELES, WA JOB#: 13071
DATE: 12/2/2013
SQUARE PIER FOOTING DESIGN COL.@ LINE I(D)
USERINPUT
WIDTH AND LENGTH OF PIER B(in) 108 O.T.M. MR(SNOW)(k-ft) 512 S.F.
WIDTH OF COLUMN/BASE PLATE Sl (in) 17 WO(SNOW)(kips) 114
LENGTH OF COLUMNIBASE PLATE Ll (in) 10 M,T(SNOW)(k-ft) 26 19.4 OK
HEIGHT OF PIER h(in) 24 MR(WIND)(k-ft) 76
DEPTH OF FOOTING D(in) 48 WO(WIND)(kips) 17
BTM.REINFORCING SIZE # 5 MOT�WIND)(k-ft) 59 1.3 NG
BTM.NUMBER OF BARS # 12 MR(PSOIL)(k-ft) 37 1.9 OK WITH Psp
TOP REINFORCING SIZE # 5 eSNOW(ft) 0.23 IN KERN
TOP NUMBER OF BARS # 9 ewIN0(ft) 3.49 O.S.KERN
CONCRETESTRENGTH Fc'(psi) 2500 BEARING f,,...(SNOW)(ksf) 1.62 0.9 OK
CONCRETE UNIT WEIGHT WCONC.(PSf) 150 fp,mi�(SNOW)(ksf) 1.19 1.3
ALLOWABLE SOIL BEARING SPALOW(ksf) 1.5 fp,m.(WIND)(ksf) 0.69 2.2 OK
SOIL COVER ON FOOTING z(ft) fp,min(WIND)(kso 0 OK
UNIT WEIGHT OF SOIL WSOIL(PSO 120 SLIDING FNSNOW)(kips) 75 16.9 qK
PASSIVE SOIL COEF KP 3 FR(WIND)(kips) 26 2.7 OK
ACTIVE SOIL COEF K� 0.33 BENDING SLOPE(ksf/ft) 0.05
CONCRETEISOIL FRICTION �l 0.5 F,(kip) 49
ADDITIONAL LOAD OVER FOOTING WADD(PSfl F2(kip) 3
(SNOKqLOAD V+ (kips) 65.1 mmax(SNOW)(k-ft) 101
H+ (kips) 4.4 M.-(WIND)(k-ft) 39
(WIND)LOAD V- (kips) -31.74
H- (kips) -9,82
LRFD CONVERSION FACTOR 1.4
REINFORCING GRADE(40 OR 60) 40
CALCULATED EFFECTIVE DEPTH OF FOOTING d(in) 44.38
LENGTH OF CRITICAL SHEAR PERIMETER bo(in) 231.50
WEIGHT OF FOOTING Fm(kips) 48.60
CRITICAL SHEAR (2-way) V.(kips) 131
Oc 2
SHEAR STRENGTH EQ.15-14 (2-way) Vc(kips) N.A.
SHEAR STRENGTH EQ.15-15 (2-way) Vc(kips) N.A.
SHEAR STRENGTH EQ.15-16 (2-way) Vc(kips) 2055
ALLOWABLE SHEAR (2-way) �Vc(kips) 1541 ok two-way shear
CRITICAL SHEAR (1-way) V.(kips) 2
ALLOWABLE SHEAR (1-way) �Vc(kips) 359 ok one-way shear
CRITICAL MOMENT(BTM.STEEL) M,(kip-ft) 141
AREA OF STEEL REQ'D As(in^2) 1.12
MINIMUM STEEL AREA As,MIN(in^2) 4.67 SIZE SPACING(O.C.E.W.1
STEEL PROVIDED As(in'2) 3.68 ok 5 9
a(in) 0.64
ALLOWABLE MOMENT(BTM.STEEL) �Mn(kip-ft) 4871kk
CRITICAL MOMENT(TOP STEEL) M�(kip-ft) 54
AREA OF STEEL REQD As(inA2) 0.43
MINIMUM STEEL AREA As,MIN(inA2) 4.67 J§IZE SPACING Q.C.E.W.
j
STEEL PROVIDED As(in^2)' 2.76 ok 5 13
JALLOWABLE MOMENT(TOP STEEL) �M�(kip-ft) 365 ok
ZENOVIC&ASSOCIATES,INC. PROJECT METAL BUILDING OVER CHIPPER
1
301 EAST 6TH STREET,SUITE 1 CLIENT: EVERGREEN FIBRE
PORTANGELES, WA JOB#: 13071
DATE: 12/2/2013
SQUARE PIER FOOTING DESIGN COL.@ LINE 1(B)
USERINPUT
WIDTH AND LENGTH OF PIER B(in) �98
O.T.M. MR(SNOW)(k-ft) 313 S.F.
WIDTH OF COLUMN/BASE PLATE Sl (in) W (kips) 77
O(SNOW)
LENGTH OF COLUMNIBASE PLATE Ll (in) MOT(SNOW)(k-ft) 16 19.6 OK
HEIGHT OF PIER h(in) M
R(WIND)(k-ft) 50
DEPTH OF FOOTING D(in) WO(WIND)(kips) 12
BTM.REINFORCING SIZE # MOT(WIND)(k-ft) 51 1.0 NG
BTM.NUMBER OF BARS # MR(P SOIL)(k-ft) 34 1.7 OK WITH Psp
TOP REINFORCING SIZE # eSNOW R 0.21 IN KERN
e
TOP NUMBER OF BARS # WIND(ft) 4.14 O.S.KERN
CONCRETE STRENGTH Fc'(psi) BEARING fp,.-(SNOW)(ksf) 1.33 1.1 OK
CONCRETE UNIT WEIGHT WCONC.(PSO -�"j fp,mm(SNOW)(kso 0.97 1.5
ALLOWABLE SOIL BEARING SP,Low(ksf) fp,.-(WIND)(ksq 0.74 2.0 OK
SOIL COVER ON FOOTING Z(ft) fp,ft�(WIND)(kso
0 OK
SLIDING F _T
UNIT WEIGHT OF SOIL WSOIL(PSf) R(SNOW)(kips) 54 17.0 OK
PASSIVE SOIL COEF. KP FR(WIND)(kips) 22 2.2 K
ACTIVE SOIL COEF K. BENDING SLOPE(ksf/ft) 0.04
CONCRETEISOIL FRICTION F,(kip) 33
ADDITIONAL LOAD OVER FOOTING WADE)(PSf) F2(kip) 2
(SNOM LOAD V+ (kips) M_(SNOW)(k-ft) 59
H+ (kips) Mmax(WIND)(k-ft) 28
(WIND)LOAD V_ (kips)
H- �(kips) 2
LRFD CONVERSION FACTOR
REINFORCING GRADE(40 OR 60) 40, j
CALCULATED EFFECTIVE DEPTH OF FOOTING d(in) 44.38
LENGTH OF CRITICAL SHEAR PERIMETER bo(in) 231.50
WEIGHT OF FOOTING Ft(kips) 40.02
CRITICAL SHEAR (2-way) V.(kips) 81
PC 2
SHEAR STRENGTH EQ.15-14 (2-way) VC(kips) N.A.
SHEAR STRENGTH EQ.15-15 (2-way) VC(kips) N.A.
SHEAR STRENGTH EQ.15-16 (2-way) VC(kips) 2055
ALLOWABLESHEAR (2-way) �Vc(kips) 1541 ok two-way shear
CRITICAL SHEAR (1-way) V.(kips) -5
ALLOWABLE SHEAR (1-way) �Vc(kips) 326 ok one-way shear
CRITICAL MOMENT(BTM.STEEL) M�(kip-ft) 83
AREA OF STEEL REQD As(in^2) 0.66
MINIMUM STEEL AREA As,MIN(in^2) 4.23 111ZE SPACING(O.C.E.W.1
STEEL PROVIDED As(inA2) 2.76 ok 1_2
a(in) 0.53
ALLOWABLE MOMENT(BTM.STEEL) Wn(kip-ft) 365jak
CRITICAL MOMENT(TOP STEEL) M�(kip-ft) 39
AREA OF STEEL REQD As(inA2) 0.31
MINIMUM STEEL AREA As,MIN(inA2) 4.23 15IZE SPACING(O.C.E.W.)
STEEL PROVIDED As(inA2) 2.76 ok 5 12
JALLOWABLE MOMENT(TOP STEEL) �M�(kip-ft) 365 ok
ZENOVIC&ASSOCIATES,INC. PROJECT: METAL BUILDING OVER CHIPPER
301 EAST 6TH STREET,SUITE I CLIENT: EVERGREEN FIBRE
PORTANGELES, WA JOB#.- 13071
DATE: 12/2/2013
SQUARE PIER FOOTING DESIGN COL.@ LINE 2(D)
USERINPUT
WIDTH AND LENGTH OF PIER B(in) 108 O.T.M. MR(SNOW)(k-ft) 362 S.F.
WIDTH OF COLUMN/BASE PLATE Sl (in) 15 WO(SNOW)(kips) 80
LENGTH OF COLUMNIBASE PLATE Ll (in) 8 MOT(SNOW)(k-ft) 26 14.0 OK
HEIGHT OF PIER h(in) 24 MR(WIND)(k-ft) 63
DEPTH OF FOOTING D(in) 48 WO(WIND)(kips) 14
BTM.REINFORCING SIZE # 5 MOT(WIND)(k-ft) 67 0.9 NG
BTM.NUMBER OF BARS # 12 MR(P SOIL)(k-ft) 37 1.5 OK WITH Psp
TOP REINFORCING SIZE # 5 eSNOW R 0.32 IN KERN
TOP NUMBER OF BARS # 9 eWIND R 4.80 O.S.KERN
CONCRETESTRENGTH Fc'(psi) 2500 BEARING fp,(SNOW)(ksf) 1.20 1-2 OK
CONCRETE UNIT WEIGHT WCONC.(PS� 150 fp,.i�(SNOW)(ksfl 0.78 1.9
ALLOWABLE SOIL BEARING SPALOW(ksf) 1.5 fP,...(WIND)(kso 0.73 2.1 OK
SOIL COVER ON FOOTING z(ft) fp,.m(WlND)(ks� 0 OK
UNIT WEIGHT OF SOIL WSOIL(PSO 120 SLIDING FNSNOW)(kips) 58 13.5 OK
PASSIVE SOIL COEF. KP 3 FNWIND)(kips) 25 2.3 OK
ACTIVE SOIL COEF. K� 0.33 BENDING SLOPE(ksf/ft) 0.05
CONCRETEISOIL FRICTION P 0.5 F,(kip) 36
ADDITIONAL LOAD OVER FOOTING WADD(PSO F2(kip) 3
(SNOM LOAD V+ (kips) 31.8 M(SNOW)(k-ft) 77
H+ (kips) 4.3 M.-(WIND)(k-ft) 41
(WIND)LOAD V_ (kips) -34.6
H- (kips) -11.2
LRFD CONVERSION FACTOR 1.4
REINFORCING GRADE(40 OR 60) 40
CALCULATED EFFECTIVE DEPTH OF FOOTING d(in) 44.38
LENGTH OF CRITICAL SHEAR PERIMETER bo(in) 223.50
WEIGHT OF FOOTING Fm(kips) 48.60
CRITICAL SHEAR (2-way) V.(kips) 100
PC 2
SHEAR STRENGTH EQ.15-14 (2-way) Vc(kips) N.A.
SHEAR STRENGTH EQ.15-15 (2-way) VC(kips) N.A.
SHEAR STRENGTH EQ.15-16 (2-way) Vc(kips) 1984
ALLOWABLE SHEAR (2-way) �Vc(kips) 1488 ok two-way shear
CRITICAL SHEAR (1-way) V.(kips) 3
ALLOWABLE SHEAR (1-way) �Vc(kips) 359 ok one-way shear
CRITICAL MOMENT(BTM.STEEL) M�(kip-ft) 108
AREA OF STEEL REQD As(inA2) 0.86
MINIMUM STEEL AREA As,MIN(inA2) 4.67 J�IZE �PACING(O.C.E.W.1
STEEL PROVIDED As(inA2) 3.68 ok 5 9
a(in) 0.64
ALLOWABLE MOMENT(BTM.STEEL) Wn(kip-ft) 4871Lk
CRITICAL MOMENT(TOP STEEL) M�(kip-ft) 57
AREA OF STEEL REQD As(in A2) 0.45
MINIMUM STEEL AREA As,MIN(inA2) 4.67 ja[ZE SPACING JQ.C.E.W.1
STEEL PROVIDED As(inA2) 2.76 ok 13
ALLOWABLE MOMENT(TOP STEEL) Wn(kip-ft) 365 ok
ZENO VIC&ASSOCIATES,INC. PROJECT: METAL BUILDING OVER CHIPPER
301 EAST 6TH STREET, SUITE I CLIENT: EVERGREEN FIBRE
PORTANGaEs, wA JOB#.- 13071
DATE: 12/2/2013
SQUARE PIER FOOTING DESIGN COL.@ LINE 2(B)
USERINPUT
WIDTH AND LENGTH OF PIER B(in) 114 O.T.M. MR(SNOW)(k-ft) 465 S.F.
WIDTH OF COLUMN/BASE PLATE Sl (in) 15 WO(SNOW)(kips) 98
LENGTH OF COLUMNIBASE PLATE Ll (in) 8 MOT(SNOW)(k-ft) 15 32.1 OK
HEIGHT OF PIER h(in) 12 MR(WINO)(k-ft) 74
DEPTH OF FOOTING D(in) 48 WO(WIND)(kips) 16
BTM.REINFORCING SIZE # 5 MOT(WIND)(k-ft) 69 1.1 NG
BTM.NUMBER OF BARS # 12 MR(P SOIL)(k-ft) 39 1.6 OK WITH Psp
TOP REINFORCING SIZE # 5 eSNOW(ft) 0.15 IN KERN
TOP NUMBER OF BARS # 10 eWIND(ft) 4.41 O.S.KERN
CONCRETESTRENGTH Fc'(psi) 2500 BEARING fP,(SN0W)(ksf) 1.19 1.3 OK
CONCRETE UNIT WEIGHT WCONC.(PSO 150 fp,.m(SNOW)(kso 0.98 1.5
ALLOWABLE SOIL BEARING SPALOW(ksf) 1.5 fp,.-(WIND)(ksf) 0.65 2.3 OK
SOIL COVER ON FOOTING Z(ft) fp,.m(WIND)(ks� 0 OK
UNIT WEIGHT OF SOIL WSOIL(PSO 120 SLIDING FR(SNOW)(kips) 68 23.3 QK
PASSIVE SOIL COEF. KIP 3 FR(WIND)(kips) 26 2.0 OK
ACTIVE SOIL COEF. K� 0.33 BENDING SLOPE(ksf/ft) 0.02
CONCRETEISOIL FRICTION 11 0.5 F,(kip) 43
ADDITIONAL LOAD OVER FOOTING WADD(PSO F2(kip) 2
(SNOIAqLOAD V+ (kips) 43.7 M.-(SNOW)(k-ft) 93
H+ - (kips) 2.9 M(WIND)(k-ft) 48
(WIND)LOAD V_ (kips) -38.6
H- (kips) -13.7
LRFD CONVERSION FACTOR 1.4
REINFORCING GRADE(40 OR 60) 40
CALCULATED EFFECTIVE DEPTH OF FOOTING d(in) 44.38
LENGTH OF CRITICAL SHEAR PERIMETER bo(in) 223.50
WEIGHT OF FOOTING Fvt(kips) 54.15
CRITICAL SHEAR (2-way) V�(kips) 114
PC 2
SHEAR STRENGTH EQ.15-14 (2-way) VC(kips) N.A.
SHEAR STRENGTH EQ.15-15 (2-way) VC(kips) N.A.
SHEAR STRENGTH EQ.15-16 (2-way) VC(kips) 1984
ALLOWABLE SHEAR (2-way) �Vc(kips) 1488 ok two-waV shear
CRITICAL SHEAR (1-way) V,(kips) 7
ALLOWABLE SHEAR (1-way) �Vc(kips) 379 ok one-way shear
CRITICAL MOMENT(BTM.STEEL) M�(kip-ft) 131
AREA OF STEEL REQD As(in^2) 1.03
MINIMUM STEEL AREA As,MIN(inA2) 4.92 JaIZE SPACING(O.C.E.W.1
STEEL PROVIDED As(in'2) 3.68 ok 10
a(in) 0.61
ALLOWABLE MOMENT(BTM.STEEL) Wn(kip-ft) 4871ok
CRITICAL MOMENT(TOP STEEL) M�(kip-ft) 68
AREA OF STEEL REQD As(inA2) 0.54
MINIMUM STEEL AREA As,MIN(inA2) 4.92 J§IZE SPACING(O.C.E.W.1
STEEL PROVIDED As(in A2) 3.07 ok 12
JALLOWABLE MOMENT(TOP STEEL) �M�(kip-ft) 406 ok
ZENOVIC&ASSOCIATES,INC. PROJECT: METAL BUILDING OVER CHIPPER
301 EAST 6TH STREET, SUITE I CLIENT: EVERGREEN FIBRE
PORTANGELES, WA JOB#: 13071
DATE: 12/2/2013
SQUARE PIER FOOTING DESIGN COL.@ LINE 3(D)
LISERINPLIT
WIDTH AND LENGTH OF PIER B(in) 98 O.T.M. MR(SNOW)(k-ft) 292 S.F.
WIDTH OF COLUMN/BASE PLATE Sl (in) .15 WO(SNOW)(kips) 72
LENGTH OF COLUMNIBASE PLATE Ll (in) MOT(SNOW)(k-ft) 26 11.1 OK
HEIGHT OF PIER h(in) 2� MR(WIND)(k-ft) 31
DEPTH OF FOOTING D(in) 48 WO(WIND)(kips) 7
BTM.REINFORCING SIZE # 5 MOT(WIND)(k-ft) 44 0.7 NG
BTM.NUMBER OF BARS # 10 MR(P SOIL)(k-ft) 34 1.5 OK WITH Psp
TOP REINFORCING SIZE # 5 eSNOW(ft) 0.37 IN KERN
TOP NUMBER OF BARS # eWIND(ft) 5.83 O.S.KERN
CONCRETE STRENGTH Fc'(psi) 2500 BEARING fp,.-(SNOW)(ksf) 1.36 1.1 OK
CONCRETE UNIT WEIGHT WCONC.(PSf) i5o fp,m(SNOW)(ksfl 0.78 1.9
ALLOWABLE SOIL BEARING SPALOW(ksf) 1.5 fp,.-(WIND)(ksf) 0.59 2.5 OK
SOIL COVER ON FOOTING z(ft) fp,.m(WIND)(ksf) 0 OK
UNIT WEIGHT OF SOIL WSOIL(PSf) 120 SLIDING FR(sNow)(kips) 52 11.8 QK
PASSIVE SOIL COEF KID 3 FFZ(WIND)(kips) 20 2.8 OK
ACTIVE SOIL COEF. K� 0.33 BENDING SLOPE(ksf/ft) 0-07
CONCRETEISOIL FRICTION P 1 0.5 F,(kip) 32
ADDITIONAL LOAD OVER FOOTING WADD(PSO F2(kip) 3
(SNOW)LOAD V+ (kips) 31.6 M.-(SNOW)(k-ft) 63
H+ (kips) 4�4 Mm-(WiND)(k-ft) 29
(WIND)LOAD V_ (kips) -32.52
H- (kips) 7.28
LRFD CONVERSION FACTOR 1.4
REINFORCING GRADE(40 OR 60) 40
CALCULATED EFFECTIVE DEPTH OF FOOTING d(in) 44.38
LENGTH OF CRITICAL SHEAR PERIMETER bo(in) 223.50
WEIGHT OF FOOTING Fwt(kips) 40.02
CRITICAL SHEAR (2-way) V.(kips) 86
PC 2
SHEAR STRENGTH EQ.15-14 (2-way) VC(kips) N.A.
SHEAR STRENGTH EQ.15-15 (2-way) VC(kips) N.A.
SHEAR STRENGTH EQ.15-16 (2-way) Vc(kips) 1984
ALLOWABLE SHEAR (2-way) �Vc(kips) 1488 ok two-way shea
CRITICAL SHEAR (1-way) V�(kips) -4
ALLOWABLE SHEAR (1-way) OVc(kips) 326 ok one-WAV shear
CRITICAL MOMENT(BTM.STEEL) M�(kip-ft) 88
AREA OF STEEL REQD As(in^2) 0.69
MINIMUM STEEL AREA As,MIN(i n^2) 4.23 SIZE SPACING(O.C.E.W.1
STEEL PROVIDED As(in'2) 3.07 ok 5 10
a(in) 0.59
ALLOWABLE MOMENT(BTM.STEEL) Wn(kip-ft) 406pk
CRITICAL MOMENT(TOP STEEL) M�(kip-ft) 41
AREA OF STEEL REQD As(inA2) 0.32
MINIMUM STEEL AREA As,MIN(inA2) 4.23 JaIZE SPACING(O.C.E.Wl
STEEL PROVIDED As(inA2) 2.76 ok 12
JALLOWABLE MOMENT(TOP STEEL) �M,(kip-ft) 365 ok
ZENOVIC&ASSIOCIA TES,INC. PROJECT: METAL BUILDING OVER CHIPPER
3 01 EA S T 6 TH S TR�!&T,S Ul TE I CLIENT: EVERGREEN FIBRE
PORTANGELES, WA JOB#.. 13071
DATE. 11/4/2013
SQUA PIER FOOTING DESIGN COL.@ LINE 3(B)
N., USER INP
WIDTH AND LENGTH OF PIER B',n) 98 O.T.M. MR(SNOW)(k-ft) 326 S.F.
WIDTH OF COLLIMN/BASE PLATE 1 (1 15 WO(SNOW)(kips) 80
LENGTH OF COLUMNIBASE PLATE Ll 8 MOT(SNOW)(k-ft) 12 28.1 OK
DEPTH OF FOOTING ND n . 48 MR(WIND)(k-ft) 5
BTM.REINFORCING SIZE #\5 WO(WIND)(kips) 1
BTM.NUMBER OF BARS # 10 MOT(WIND)(k-ft) 26 0.2 NG
TOP REINFORCING SIZE # 5 MNPSOIL)(k-ft) 34 1.5 OK WITH Psp
TOP NUMBER OF BARS # 8 eSNOW(ft) 0.15 IN KERN
CONCRETE STRENGTH Fc'(psi) 2500\ eWIND(ft) 20.11 O.S_.KERN
CONCRETE UNIT WEIGHT WCONC.(PSO 150 NG fP,._(SN0W)(lksq 1.32 1.1 OK
ALLOWABLE SOIL BEARING SPALOW(ks� 1.5 fP,.m(SN0W)(kso 1.07 1.4
SOIL COVER ON FOOTING z(ft) fp,max(WIND)(ksf) 0.31 4.9 OK
UNIT WEIGHT OF SOIL WSOIL(PS� 120 fpffin(WIND)(ksf) 0 OK
PASSIVE SOIL COEF. K, 3 SLIDN FR(SNOW)(kips) 56 19.3 OK
ACTIVE SOIL COEF. K� 0.33 1 FR(WIND)(kips) 17 2.6 2K
CONCRETEISOIL FRICTION �L 0.5 BENDING NOPE(ksf/ft) 0.03
ADDITIONAL LOAD OVER FOOTING WADD(PSf) F, ip) 34
(SNOW)LOAD V+ (kips) 39.7 F2 ki 2
M� \
H+ (kips) 2.9 -(SNh (k ft)
IN&k-- 63
(WIND)LOAD V_ (kips) -38.72 M�"(w D) k-ft) 29
H- (kips) -6.52
LRFD CONVERSION FACTOR 1'4
REINFORCING GRADE(40 OR 60) 40
CALCULATED EFFECTIVE DEPTH OF FOOTING d(in) 44.38
LENGTH OF CRITICAL SHEAR PERIMETER bo(in) 223.50
WEIGHT OF FOOTING Fwt(kips) 40.02
CRITICAL SHEAR (2-way) V.(kips) 84
PC 2
SHEAR STRENGTH EQ.15-14 (2-way) VC(kips) N.A.
SHEAR STRENGTH EQ.15-15 (2-way) Vc(kips) N.A.
SHEAR S TRENG TH EQ.15-16 (2-way) Vc(kips) 1984
ALLOWABLE SHEAR (2-way) �Vc(kips) 1488 ok two-way shea
CRITICAL SHEAR (I-way) V.(kips) -4
ALLOWABLE SHEAR (1-way) �Vc(kips) 326 ok one-way shear\
CRITICAL MOMENT(BTM.STEEL) M�(kip-ft) 88
AREA OF STEEL REQ'D As(in'2) 0.70
MINIMUM STEEL AREA As,MIN(in^2) 4.23 111ZE §PACINgNO.C.E.W.1
STEEL PROVIDED As(inA2) 3.07 ok 10-
a(in) 0.59
ALLOWABLE MOMENT(BTM. STEEL) �M,(kip-ft) 406pk
CRITICAL MOMENT(TOP STEEL) M�(kip-ft) 41
AREA OF STEEL REQD As(inA2) 0.32
MINIMUM STEEL AREA As,MIN(in A2) 4.23 J�IZE PACING(O.C.E.W
STEEL PROVIDED As(inA2) 2.61 ok 12
JALLOWABLE MOMENT(TOP STEEL) �M�(kip-ft) 345 ok
ZENOVIC&ASSOCIATES,INC. PROJECT: METAL BUILDING OVER CHIPPER
301 EAST 6TH STREET,SUITE I CLIENT: EVERGREEN FIBRE
PORTANGELES, WA JOB#.- 13071
DATE: 12/2/2013
SQUARE PIER FOOTING DESIGN COL.@ LINE 4(D)
USERINPUT
WIDTH AND LENGTH OF PIER B(in) 90 O.T.M. MR(SNOW)(k-ft) 251 S.F.
WIDTH OF COLUMN/BASE PLATE Sl (in) 15 WO(SNOW)(kips) 67
LENGTH OF COLUMNIBASE PLATE Ll (in) 8 MOT(SNOW)(k-ft) 27 9.3 OK
HEIGHT OF PIER h(in) 24 MR(WIND)(k-ft) 52
DEPTH OF FOOTING D(in) 48 WO(WIND)(kips) 14
BTM.REINFORCING SIZE # 5 MOT(WIND)(k-ft) 40 1.3 NG
BTM.NUMBER OF BARS # 8 MR(P SOIL)(k-ft) 31 2.1 OK WITH Psp
TOP REINFORCING SIZE # 5 eSNOW(ft) 0.40 IN KERN
TOP NUMBER OF BARS # 8 eWIND(ft) 2.88 O.S.KERN
CONCRETESTRENGTH Fc'(psi) '2500 BEARING fp,-(SNOW)(ksf) 1.57 1.0 OK
CONCRETE UNIT WEIGHT WCONC.(PSf) 150 fp,mm(SNOW)(ksf) 0.80 1.9
ALLOWABLE SOIL BEARING SPALOW(kso 1.5 fP,m..(WIND)(kso 0.82 1.8 OK
SOIL COVER ON FOOTING z(ft) fp,mi.(WIND)(ksq 0 OK
UNIT WEIGHT OF SOIL WSOIL(PSf) 120 SLIDING FR(SNOW)(kips) 48 10.7 OK
PASSIVE SOIL COEF KP 3 FR(WIND)(kips) 22 3.3 OK
ACTIVE SOIL COEF K. 0.33 BENDING SLOPE(ksf/ft) 0.10
CONCRETEISOIL FRICTION 9 0.5 F,(kip) 29
ADDITIONAL LOAD OVER FOOTING WADD(PSf) F2(kip) 4
(SNOM LOAD V+ (kips) 33.1 mmax(SNOW)(k-ft) 54
H+ (kips) 4.5 M.-(WIND)(k-ft) 22
(WIND)LOAD V- (kips) 719.76
H- (kips) 6.72
LRFD CONVERSION FACTOR 1.4
REINFORCING GRADE(40 OR 60) 40
CALCULATED EFFECTIVE DEPTH OF FOOTING d(in) 44.38
LENGTH OF CRITICAL SHEAR PERIMETER bo(in) 223.50
WEIGHT OF FOOTING Ft(kips) 33.75
CRITICAL SHEAR (2-way) V.(kips) 76
PC 2
SHEAR STRENGTH EQ.15-14 (2-way) VC(kips) N.A.
SHEAR STRENGTH EQ.15-15 (2-way) Vc(kips) N.A.
SHEAR STRENGTH EQ.15-16 (2-way) Vc(kips) 1984
ALLOWABLE SHEAR (2-way) OVc(kips) 1488 ok two-waV shear
CRITICAL SHEAR (1-way) V�(kips) -9
ALLOWABLE SHEAR (1-way) �V,(kips) 300 ok on2:WAy shear
CRITICAL MOMENT(BTM.STEEL) M�(kip-ft) 75
AREA OF STEEL REQ'D As(in^2) 0.59
MINIMUM STEEL AREA As.MIN(inA2) 3.89 ISIZE SPACING(O.C.E.W.1
STEEL PROVIDED As(inA2) 2.45 ok 5 12
a(in) 0.51
ALLOWABLE MOMENT(BTM.STEEL) �M.(kip-ft) 3251pk
CRITICAL MOMENT(TOP STEEL) M�(kip-ft) 31
AREA OF STEEL REQ'D As(in A2) 0.24
MINIMUM STEEL AREA As,MIN(inA2) 3.89 J§IZE aPACING(O.C.E.W.1
STEEL PROVIDED As(inA2) 2.45 ok 5 12
ALLOWABLE MOMENT(TOP STEEL) Wn(kip-ft) 325 ok
ZENOVIC&ASSOCIATES,INC. PROJECT: METAL BUILDING OVER CHIPPER
301 EAST 6TH STREET,SUITE I CLIENT: EVERGREEN FIBRE
PORTANGELES, WA JOB#: 13071
DATE: 12/2/2013
SQUARE PIER FOOTING DESIGN COL.@ LINE 4(B)
USERINPUT
WIDTH AND LENGTH OF PIER B(in) 112 O.T_M_ MR(SNOW)(k-ft) 440 S.F.
WIDTH OF COLUMN/BASE PLATE Sl (in) 15 WO(SNOW)(kips) 94
LENGTH OF COLUMNIBASE PLATE Ll (in) 8 MOT(SNOW)(k-ft) 22 20.0 OK
HEIGHT OF PIER h(in) 12 MR(WIND)(k-ft) 68
DEPTH OF FOOTING D(in) 48 WO(WIND)(kips) 15
BTM. REINFORCING SIZE # 5 MOT(WIND)(k-ft) 67 1.0 NIS
BTM.NUMBER OF BARS # 9 MR(P SOIL)(k-ft) 38 1.6 OK WITH Psp
TOP REINFORCING SIZE # 5 eSNOW(ft) 0.23 IN KERN
TOP NUMBER OF BARS # 9 eWIND(ft) 4.61 O.S.KERN
CONCRETE STRENGTH Fc'(psi) 2500 BEARING fP,.-(SN0W)(ksf) 1.24 1.2 OK
CONCRETE UNIT WEIGHT WCONC.(PSO 150 fP,.i,(SN0W)(kso 0.92 1.6
ALLOWABLE SOIL BEARING SPALOW(ksf) 1.5"': fP,.-(WlND)(ksf) 0.66 2.3 OK
SOIL COVER ON FOOTING z(ft) fP,.i,(WIND)(ksf) 0 OK
UNIT WEIGHT OF SOIL WSOIL(PSf) 120 SLIDING FR(SNOW)(kips) 65 14.9 qK
PASSIVE SOIL COEF. KP 3 FR(WIND)(kips) 26 2.0 OK
ACTIVE SOIL COEF. K� 0.33 BENDING SLOPE(ksf/ft) 0.03
CONCRETEISOIL FRICTION 9 0,5 F,(kip) 42
ADDITIONAL LOAD OVER FOOTING WADD(PSO F2(kip) 3
(SNOM LOAD V+ (kips) 42 M.-(SNOW)(k-ft) 91
H+ (kips) 4.4 M.-(WIND)(k-ft) 46
(WIND)LOAD V_ (kips) -37.74
H- (kips) -13.4
LRFD CONVERSION FACTOR 1.4
REINFORCING GRADE(40 OR 60) 40
CALCULATED EFFECTIVE DEPTH OF FOOTING d(in) 44.38
LENGTH OF CRITICAL SHEAR PERIMETER bo(in) 223.50
WEIGHT OF FOOTING Fm(kips) 52.27
CRITICAL SHEAR (2-way) V�(kips) 114
PC 2
SHEAR STRENGTH EQ.15-14 (2-way) Vc(kips) N.A.
SHEAR STRENGTH EQ.15-15 (2-way) Vc(kips) N.A.
SHEAR STRENGTH EQ.15-16 (2-way) Vc(kips) 1984
ALLOWABLE SHEAR (2-way) �Vc(kips) 1488 ok two-way shear
CRITICAL SHEAR (1-way) V.(kips) 6
ALLOWABLE SHEAR (1-way) �Vc(kips) 373 ok one-way shear
CRITICAL MOMENT(BTM.STEEL) M�(kip-ft) 128
AREA OF STEEL REQD As(inA2) 1.01
MINIMUM STEEL AREA As,MIN(in'2) 4.84 j§IZE SPACING(O.C.E.W.1
STEEL PROVIDED As(inA2) 2.76 ok 13
a(in) 0.46
ALLOWABLE MOMENT(BTM.STEEL) Wn(kip-ft) 3661gk
CRITICAL MOMENT(TOP STEEL) M�(kip-ft) 64
AREA OF STEEL REQD As(inA2) 0.51
MINIMUM STEEL AREA As,MIN(in A2) 4.84 111ZE �PACING(O.C.E.W.1
STEEL PROVIDED As(inA2) 2.76 ok 5 13
L ALLOWABLE MOMENT(TOP STEEL) Wn(kip-ft) 366 ok
ZENOVIC&ASSOCIATES,INC. PROJECT: METAL BUILDING OVER CHIPPER
301 EAST 6TH STREET,SUITE I CLIENT: EVERGREEN FIBRE
PORTANGELES, WA JOB#. 13071
DATE: 12/2/2013
SQUARE PIER FOOTING DESIGN COL.@ LINE 4(C)
USERINPUT
WIDTH AND LENGTH OF PIER B(in) t16,�,', O.T.M. MR(SNOW)(k-ft) 254 S.F.
WIDTH OF COLUMN/BASE PLATE Sl (in) 2016,"�" W,(SNOW)(kips) 64
-l"71;,1;'ll
LENGTH OF COLUMNIBASE PLATE Ll (in) ,,' MOT(SNOW)(k-ft) 1 508.8 OK
HEIGHT OF PIER h(in) M
R(WIND)(k-ft) 217
DEPTH OF FOOTING D(in) WO(WIND)(kips) 54
BTM.REINFORCING SIZE MOT(WIND)(k-ft) 81 2.7 OK
BTM.NUMBER OF BARS # MR(P SOIL)(k-ft) 33 3�1 OK
TOP REINFORCING SIZE # eSNOW(ft) 0.01 IN KERN
TOP NUMBER OF BARS # eWIND R 1.49 O.S.KERN
CONCRETE STRENGTH Fc'(psi) BEARING fp.—(SNOW)(ksf) 1.00 1.5 OK
CONCRETE UNIT WEIGHT WCONC.(PSf) f',.in(SNOW)(ksf) 0.99 1.5
ALLOWABLE SOIL BEARING SPALOW(ksf)
fp,mu(WIND)(ksfl 1.80 0.8 OK
SOIL COVER ON FOOTING z fp,.m(WIND)(ks� 0 OK
UNIT WEIGHT OF SOIL WSOIL(PSO 11�16�,,:.: SLIDING FR(SNOW)(kips) 47 475.0 qK
PASSIVE SOIL COEF. KP FR(WIND)(kips) 43 2.7 OK
ACTIVE SOIL COEF. K. BENDING SLOPE(ksf/ft) 0.00
CONCRETEISOIL FRICTION F,(kip) 25
ADDITIONAL LOAD OVER FOOTING WADD(W F2(kip) 0
(SNOM LOAD V+ (kips) M(SNOW)(k-ft) 39
H+ (kips) 0A, M(WIND)(k-ft) 24
(WIND)LOAD V_ (kips)
H- (kips) �,lt.2,
LRFD CONVERSION FACTOR
J-4
REINFORCING GRADE(40 OR 60) 40',
CALCULATED EFFECTIVE DEPTH OF FOOTING d(in) 44.38
LENGTH OF CRITICAL SHEAR PERIMETER bo(in) 235.00
WEIGHT OF FOOTING FA(kips) 38.40
CRITICAL SHEAR (2-way) V.(kips) 56
PC 3
SHEAR STRENGTH EQ.15-14 (2-way) Vc(kips) 1847
SHEAR STRENGTH EQ.15-15 (2-way) VC(kips) N.A.
SHEAR STRENGTH EQ.15-16 (2-way) VC(kips) N.A.
ALLOWABLE SHEAR (2-way) �Vc(kips) 1385 ok two-way shea
CRITICAL SHEAR (1-way) V.(kips) -6
ALLOWABLE SHEAR (I-way) �Vc(kips) 320 ok one-way shear
CRITICAL MOMENT(BTM. STEEL) M�(kip-ft) 55
AREA OF STEEL REQD As(in^2) 0.43
MINIMUM STEEL AREA As.MIN(in,12) 4.15 JaIZE aPAGING(O.C.E.W.1
STEEL PROVIDED As(inA2) 2.45 ok L3
a(in) 0.48
ALLOWABLE MOMENT(BTM.STEEL) �M�(kip-ft) 3251gk
CRITICAL MOMENT(TOP STEEL) M�(kip-ft) 33
AREA OF STEEL REQD As(inA2) 0.26
MINIMUM STEEL AREA As,MIN(inA2) 4.15 JaIZE aPACING(O.C.E.W.1
STEEL PROVIDED As(inA2) 2.45 ok L3
JALLOWABLE MOMENT(TOP STEEL) �M�(kip-ft) 325 ok
TM Company: Zenovic&Associates, Inc. te: 12/3/2013
Anchor Designer —
Engineer: SRH Page: 1/4
Software Project: 13071
Version 2.0.4896.20
Address: 301 East 6th Street,Suite 1
Phone: 360-417-0501
E-mail: scott@zenovic.net
1I.Promect information
Customer company: EVERGREEN FIBRE Project description:BUILDING OVER CHIPPER
Customer contact name:MIKE HERMAN Location:FRAME LINE 1 COL.D
Customer e-mail: Fastening description: 1"AB
Comment:
2.Inout Data&Anchor Parameters
General Base Material
Design method:ACI 318-11 Concrete: Normal-weight
Units: Imperial units Concrete thickness,h(inch):48.00
State: Non-cracked
Anchor Information: Compressive strength,fc(psi):2500
Anchor type:Cast-in-place W,v: 1.0
Material:F1554 Grade 36 Reinforcement condition:A tension,A shear
Diameter(inch): 1.000 Supplemental reinforcement:Yes
Effective Embedment depth,he(inch): 18.000 Do not evaluate concrete breakout in tension:Yes
Anchor category:- Do not evaluate concrete breakout in shear:Yes
Anchor ductility:Yes Ignore 6do requirement:Yes
hmin(inch): 19.75 Build-up grout pad: No
Cmm(inch): 1.44
S.in(inch):4.00 Base Plate
Length x Width x Thickness(inch): 10.00 x 17.00 x 0.75
Load and Geometry z
Load factor source:ACI 318 Section 9.2 6020 1b
Load combination: not set
Seismic design:No
Anchors subjected to sustained tension:Not applic
Apply entire shear load at front row:No
Anchors only resisting wind and/or seismi
160�1h
<Figure 1> ---y
-1b
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
Anchor Designer TM Company: Zenovic&Associates, Inc. Date7 112/3/20113
Engineer: SRH I Page: 12/4
Software Project: 13071
Version 2.0.4896.20 Address: 301 East 6th Street,Suite I
Phone: 360-417-0501
E-mail: scott@zenovic.net
<Figure 2>
C)
C>
N,
CD
C�
12.25 11.75
Recommended Anchor
Anchor Name: Heavy Hex Bolt-1"0 Heavy Hex Bolt, F1 554 Gr.36
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
Anchor Designer TM Company: Zenovic&Associates, Inc. TDate� 112/3/2013
Engineer: SRH I Page: 13/4
Software Project: 13071
Version 2.0.4896.20 Address: 301 East 6th Street,Suite 1
Phone: 360-417-0501
E-mail: scott@zenovic.net
3.Resulting Anchor Forces
Anchor Tension load, Shear load x, Shear load y, Shear load combined,
N..(lb) W�x(lb) V..,(I b) q(V�.X)1+(V..Y)2(lb)
1 15255.0 0.0 4015.0 4015.0
2 15255.0 0.0 4015.0 4015.0
3 15255.0 0.0 4015.0 4015.0
4 15255.0 0.0 4015.0 4015.0
Sum 61020.0 0.0 16060.0 16060.0
Maximum concrete compression strain(%o):0.00 <Figure 3>
Maximum concrete compression stress(psi):0
Resultant tension force(lb):0
Resultant compression force(lb):0
Eccentricity of resultant tension forces in x-axis,e'NX(inch):0.00
Eccentricity of resultant tension forces in y-axis,e'NY(inch):0.00 01 0
Eccentricity of resultant shear forces in x-axis,e'vx(inch):0.00
Eccentricity of resultant shear forces in y-axis,e'vy(inch):0.00 00-
04 03
XT
4.Steel Strength of Anchor in Tension(Sec.D.5.1)
N-(lb) 0 ON-(lb)
35150 0.75 26363
6.Pullout Strength of Anchor in Tension(Sec.Q.5.3)
ONpn=OV'cpNp=OV'c,p8Abrgf�(Sec. D.4.1, Eq. D-13&D-14)
T'�'P Abrg(in 2) FC(psi) 0 ONpn(lb)
1.4 1.50 2500 0.70 29UO
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility,
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
17TT"0 ,, Anchor Designer TM Company: Zenovic&Associates, Inc. _FDate7 12/3/2013
Engineer: SRH Page: 414
Software Project: 13071
Version 2.0.4896.20 Address: 301 East 6th Street, Suite 1
Phone: 360-417-0501
E-mail: scott@zenovic.net
8.Steel Strencith of Anchor in Shear(Sec.Q.6.11
V-(lb) Ogrout 0 Og�wOV�.(lb)
21090 1.0 0.65 13709
10.Concrete P!yout Strength of Anchor in Shear(Sec.Q.6.3)
OV�pg�Ok�^bg�ok�p(A-IANco)PecNPedNPcNV'cpNNb(Eq.D-41)
kp AN�(in2) ANc.(in2) %c,N V'e d,N �'c,N Kp,N Nb(I b) 0 OV�pg(I b)
2.0 784.00 600.25 1.000 0.988 1.250 1.000 26495 0.70 59819
11.Interaction of Tensile and Shear Forces(Sec.Q.7)
Tension Factored Load,N-(lb) Design Strength,oNn(lb) Ratio Status
Steel 15255 26363 0.58 Pass(Governs)
Pullout 15255 29420 0.52 Pass
Shear Factored Load,Vua(lb) Design Strength,oW(lb) Ratio Status
Steel 4015 13709 0.29 Pass(Governs)
Pryout 16060 59819 0.27 Pass
Interaction check N-1^ V../Ov� Combined Ratio Permissible Status
Sec. D.7.3 0.58 0.29 87.2% 1.2 Pass
1"0 Heavy Hex Bolt, F1554 Gr.36 meets the selected design criteria.
12.Warnings
-Minimum spacing and edge distance requirement of 6da per ACI 318 Sections D.8.1 and D.8.2 for torqued cast-in-place anchor is waived per
designer option.
-Concrete breakout strength in tension has not been evaluated against applied tension load(s)per designer option. Refer to ACI 318 Section
D.4.2.1 for conditions where calculations of the concrete breakout strength may not be required.
-Concrete breakout strength in shear has not been evaluated against applied tension load(s)per designer option.Refer to ACI 318 Section
D.4.2.1 for conditions where calculations of the concrete breakout strength may not be required.
-Designer must exercise own judgement to determine if this design is suitable.
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
Anchor Designer"' Company: Zenovic&Associates, Inc. -FDate: 111/5/2013
Engineer: SRH Page: 1/4
Software Project: 13071
Version 2.0.4896.21 Address: 301 East 6th Street, Suite 1
Phone: 360-417-0501
E-mail: scoft@zenovic.net
1.Prowect information
Customer company: EVERGREEN FIBRE Project description:BUILDING OVER CHIPPER
Customer contact name:MIKE HERMAN Location:FRAME LINE 2-B
Customer e-mail: Fastening description: 1"AB
Comment:
2.Input Data&Anchor Parameters
General Base Material
Design method:ACI 318-11 Concrete: Normal-weight
Units: Imperial units Concrete thickness,h(inch):36.00
State: Non-cracked
Anchor Information: Compressive strength,f c(psi):4000
Anchor type:Cast-in-place q)�,V: 1.0
Material:F1554 Grade 36 Reinforcement condition:A tension,A shear
Diameter(inch): 1.000 Supplemental reinforcement:Yes
Effective Embedment depth,he(inch): 18.000 Do not evaluate concrete breakout in tension:Yes
Anchor category:- Do not evaluate concrete breakout in shear:Yes
Anchor ductility:Yes Ignore 6do requirement:Yes
h.i�(inch): 19.75 Build-up grout pad: No
C.i�(inch): 1.44
S�m(inch):4.00 Base Plate
Length x Width x Thickness(inch):8.00 x 15.00 x 0.50
Load and Geometry z
Load factor source:ACI 318 Section 9.2 6490 lb
Load combination: U=0.9D+ 1.6W+ 1.6H
Seismic design:No
Anchors subjected to sustained tension:Not applica
Apply entire shear load at front row:No
Anchors only resisting wind and/or seismi s-
<Figure 1> -18840 1b
,-Y
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
Anchor Designer TM Company: Zenovic&Associates, Inc. jDate: 111/5/2013
Engineer: SRH Page: 2/4
Software Project: 13071
Version 2.0.4896.21 Address: 301 East 6th Street,Suite 1
Phone: 360-417-0501
E-mail: scott@zenovic.net
<Figure 2>
C�l
C11
12.25 11.75
Recommended Anchor
Anchor Name: Heavy Hex Bolt-VO Heavy Hex Bolt, F1554 Gr.36
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
E= Anchor Designer TIVI Company: Zenovic&Associates, Inc. JlDate� 111/5/2013
Engineer: SRH Page: 13/4
Software Project: 13071
Version 2.0.4896.21 Address: 301 East 6th Street,Suite I
Phone: 360-417-0501
E-mail: scott@zenovic.net
3.Resulting Anchor Forces
Anchor Tension load, Shear load x, Shear load y, Shear load combined,
Nu.(lb) V�..(lb) Vuay(lb) qMu)2+(V�ay)2(lb)
1 15622.5 5480.0 -4710.0 7226.0
2 15622.5 5480.0 -4710.0 7226.0
3 15622.5 5480.0 -4710.0 7226.0
4 15622.5 5480.0 -4710.0 7226.0
Sum 62490.0 21920.0 -18840.0 28903.8
Maximum concrete compression strain(%o):0.00 <Figure 3>
Maximum concrete compression stress(psi):0
Resultant tension force(lb):0
Resultant compression force(lb):0
Eccentricity of resultant tension forces in x-axis,e'Nx(inch):0.00 01 02
Eccentricity of resultant tension forces in y-axis,e'Ny(inch):0.00 Y
Eccentricity of resultant shear forces in x-axis,e'v�(inch):0.00
Eccentricity of resultant shear forces in y-axis,e'vy(inch):0.00 011111-
Q4
XT 03
4.Steel Strength of Anchor in Tension(Sec.Q.5.11)
N-(b) 0 ON..(lb)
35150 0.75 26363
6.Pullout Strength of Anchor in Tension(Sec.P.5.3
A
ONpn=OP.,PNP=OVI.,P8Abgf�(Sec. D.4.1, Eq. D-13&D-14)
T,P Abrg(in 2) F�(psi) 0 ONp�(lb)
1.4 1.50 4000 0.70 47071
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
TM Company: Zenovic&Associates, Inc. Date: 11/5/2013
OMMM Anchor Designer Engineer: SRH Page: 4/4
A I Software Project: 13071
Version 2.0.4896.21 Address: 301 East 6th Street,Suite I
Phone: 360-417-0501
E-mail: scott@zenovic.net
8.Steel Strength of Anchor in Shear(Sec.D.6.11
V-(lb) Og'-Ut 0 OgmutoVsa(lb)
21090 1.0 0.65 13709
10.Concrete P!yout Strength of Anchor in Shear(Sec.D.6.3)
OV.pg�Ok�^bg�Ok�p(AN.I AN..)'F,NVJedNT�,NP�P,NNb(Eq.D-41)
k, Aft(in 2) ANc.(in 2) P..,N %dN Vc,N V'cp,N Nb(I b) 0 OVpg(I b)
2.0 784.00 600.25 1.000 0.988 1.250 1.000 33514 0.70 75665
11.Interaction of Tensile and Shear Forces(Sec.Q.7)
Tension Factored Load, N-(lb) Design Strength,oNn(lb) Ratio Status
Steel 15623 26363 0.59 Pass(Governs)
Pullout 15623 47071 0.33 Pass
Shear Factored Load,V-(lb) Design Strength, oW(lb) Ratio Status
Steel 7226 13709 0.53 Pass(Governs)
Pryout 28904 75665 0.38 Pass
Interaction check N..I^ V_/Ov� Combined Ratio Permissible Status
Sec. D.7.3 0.59 0.53 112.0% 1.2 Pass
1"0 Heavy Hex Bolt,F1554 Gr.36 meets the selected design criteria.
12.Warnings
-Minimum spacing and edge distance requirement of 6da per ACI 318 Sections D.8.1 and D.8.2 for torqued cast-in-place anchor is waived per
designer option.
-Concrete breakout strength in tension has not been evaluated against applied tension load(s)per designer option.Refer to ACI 318 Section
D.4.2.1 for conditions where calculations of the concrete breakout strength may not be required.
-Concrete breakout strength in shear has not been evaluated against applied tension load(s)per designer option. Refer to ACI 318 Section
D.4.2.1 for conditions where calculations of the concrete breakout strength may not be required.
-Designer must exercise own judgement to determine if this design is suitable.
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
Anchor Designer TIVI Company: Zenovic&Associates, Inc. JDate: 111/5/2013
Engineer: SRH Page: 1/4
LimaSoftware Project: 13071
Version 2.0.4896.22 Address: 301 East 6th Street,Suite I
QD
Phone: 360-417-0501
E-maiL-1 scott@zenovic.net
I.Proiect information
Customer company: EVERGREEN FIBRE Project description:BUILDING OVER CHIPPER
Customer contact name:MIKE HERMAN Location:FRAME LINE 4-B
Customer e-mail: Fastening description: 1"AB
Comment:
2.Innut Data&Anchor Parameters
General Base Material
Design method:ACI 318-11 Concrete: Normal-weight
Units: Imperial units Concrete thickness,h(inch):48.00
State: Non-cracked
Anchor Information: Compressive strength,fc(psi):2500
Anchor type: Cast-in-place 4J.'V: 1.0
Material: F1554 Grade 36 Reinforcement condition:A tension,A shear
Diameter(inch): 1.000 Supplemental reinforcement:Yes
Effective Embedment depth,hef(inch): 18.000 Do not evaluate concrete breakout in tension:Yes
Anchor category:- Do not evaluate concrete breakout in shear:Yes
Anchor ductility:Yes Ignore 6do requirement:Yes
h.in(inch): 19.75 Build-up grout pad: No
C.in(inch): 1.44
S.in(inch):4.00 Base Plate
Length x Width x Thickness(inch):8.00 x 15.00 x 0.75
Load and Geometry z
Load factor source:ACI 318 Section 9.2 6!1140 tb
Load combination: U=0.9D+ 1.6W+ 1.6H
Seismic design:No
Anchors subjected to sustained tension:Not applic
Apply entire shear load at front row: No
Anchors only resisting wind and/or seismi
01b
<Figure 1> .-Y
0
ft-lb
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
Company: Zenovic&Associates, Inc. 1111/5/2013
E= Anchor Designer" Engineer: SRH Page: 2/4
Softwar Project: 13071
Version 2.0.4896.22 Address: 301 East 6th Street,Suite 1
Phone: 360-417-0501
E-mail: scoft@zenovic.net
<Figure 2>
-41
12.25
11.75
Recommended Anchor
Anchor Name: Heavy Hex Bolt-1"0 Heavy Hex Bolt, F1 554 Gr.36
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
Anchor Designer TIVI Company: Zenovic&Associates, Inc. jDate: 111/5/2013
Engineer: SRH Page: 13/4
Software Project: 13071
Version 2.0.4896-22 Address: 301 East 6th Street,Suite 1
Phone: 360-417-0501
E-mail: scott@zenovic.net
3.Resulting Anchor Forces
Anchor Tension load, Shear load x, Shear load y, Shear load combined,
N..(lb) Vuax(lb) W�y(lb) 4(vUaX)2+(VUay)2(lb)
1 15285.0 5360.0 0.0 5360.0
2 15285.0 5360.0 0.0 5360.0
3 15285.0 5360.0 0.0 5360.0
4 15285.0 5360.0 0.0 5360.0
Sum 61140.0 21440.0 0.0 21440.0
Maximum concrete compression strain(%o):0.00 <Figure 3>
Maximum concrete compression stress(psi):0
Resultant tension force(lb):0
Resultant compression force(lb):0
Eccentricity of resultant tension forces in x-axis,e'Nx(inch):0.00 01 02
Eccentricity of resultant tension forces in y-axis,e'Ny(inch):0.00 Y
Eccentricity of resultant shear forces in x-axis,e'vx(inch):0.00
Eccentricity of resultant shear forces in y-axis,e'vy(inch):0.00 D1111-
04y 03
X
4.Steel Strencith of Anchor in Tension(Sec.Q.5.11)
N�.(lb) 0 ON-(lb)
35150 0.75 26363
6. Pullout Strength of Anchor in Tension(Sec.Q.5.3)
ONpn=0 Vc,pNp=0 Pc,p8Abrgfc(Sec. DA.1, Eq. D-1 3&D-1 4)
��'p Abg(in 2) F�(psi) 0 ONp�(lb)
1.4 1.50 2500 0.70 29420
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
E= Anchor Designer TM Company: Zenovic&Associates, Inc. I Date7 111/5/2013
Engineer: SRH Page: 4/4
Software Project: 13071
Version 2.0.4896.22 Address: 301 East 6th Street,Suite 1
Phone: 360-417-0501
E-mail: scott@zenovic.net
8.Steel Strength of Anchor in Shear(Sec.D.6.11
V�.(I b) og�-f 0 OgroutoVsa(lb)
21090 1.0 0.65 13709
10.Concrete Pryout Strength of Anchor in Shear(Sec.D.6.3)
OV.pg=Ok�^bg=Okp(Aw IAN-)Tec,NTedNVJc,NTGPNNb(Eq. D-41)
k, AN�(in 2) AN,�(in 2) %�,N Ve d,N PC,N Vcp,N Nb(I b) 0 0 Vpg(I b)
2.0 784.00 600.25 1.000 0.988 1.250 1.000 26495 0.70 59819
11.Interaction of Tensile and Shear Forces(Sec.13.7)
Tension Factored Load,N-(lb) Design Strength,oNn(lb) Ratio Status
Steel 15285 26363 0.58 Pass(Governs)
Pullout 15285 29420 0.52 Pass
Shear Factored Load,V..(1b) Design Strength,oW(lb) Ratio Status
Steel 5360 13709 0.39 Pass(Governs)
Pryout 21440 59819 0.36 Pass
Interaction check N../^ V../Ov� Combined Ratio Permissible Status
Sec. D.7.3 0.58 0.39 97.1 % 1.2 Pass
1"0 Heavy Hex Bolt,F1 554 Gr.36 meets the selected design criteria.
12.Warnings
-Minimum spacing and edge distance requirement of 6da per ACI 318 Sections D.8.1 and D.8.2 for torqued cast-in-place anchor is waived per
designer option.
-Concrete breakout strength in tension has not been evaluated against applied tension load(s)per designer option. Refer to ACI 318 Section
D.4.2.1 for conditions where calculations of the concrete breakout strength may not be required.
-Concrete breakout strength in shear has not been evaluated against applied tension load(s)per designer option. Refer to ACI 318 Section
D.4.2.1 for conditions where calculations of the concrete breakout strength may not be required.
-Designer must exercise own judgement to determine if this design is suitable.
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
177176 M' Anchor Designer TIVI Company: Zenovic&Associates, Inc. Date7 11/5/2013
Engineer: SRH Page: 1/3
WOOSoftware Project: 13071
Version 2.0.4896.23 Address: 301 East 6th Street,Suite 1
Phone: 360-417-0501
E-mail: scott@zenovic.net
1I.Promect information
Customer company: EVERGREEN FIBRE Project description:BUILDING OVER CHIPPER
Customer contact name:MIKE HERMAN Location:FRAME LINE 4-C
Customer e-mail: Fastening description:1"AB
Comment:
2.Innut Data&Anchor Parameters
General Base Material
Design method:ACI 318-11 Concrete:Normal-weight
Units: Imperial units Concrete thickness,h (inch):48.00
State:Non-cracked
Anchor Information: Compressive strength,F�(psi):2500
Anchor type:Cast-in-place W,V: 1.0
Material: F1554 Grade 36 Reinforcement condition:A tension,A shear
Diameter(inch):0.750 Supplemental reinforcement:Yes
Effective Embedment depth,ho(inch): 12.000 Do not evaluate concrete breakout in tension:Yes
Anchor category:- Do not evaluate concrete breakout in shear:Yes
Anchor ductility:Yes Ignore 6do requirement:Yes
h.i�(inch): 13.50 Build-up grout pad:No
Cmm(inch): 1.22
Smi�(inch):3.00 Base Plate
Length x Width x Thickness(inch):8.00 x 20.75 x 0.75
Load and Geometry z
Load factor source:ACI 318 Section 9.2 01b
Load combination: U=0.9D+1.6W+ 1.6H
Seismic design:No
Anchors subjected to sustained tension:Not ap
Apply entire shear load at front row:No
Anchors only resisting wind and/or sei
25920 1b
<Figure 1> __y
-1b
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company InG. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
Anchor Designer TM Company: Zenovic&Associates,Inc. Date7 111/5/2013
Engineer: SRH Page: 2/3
Software Project: 13071
Version 2.0.4896.23 Address: 301 East 6th Street, Suite 1
Phone: 360-417-0501
E-mail: scott@zenovic.net
<Figure 2>
CD
q
CD
C�
13.25 14.75
Recommended Anchor
Anchor Name: Heavy Hex Bolt-3/4"0 Heavy Hex Bolt, F1554 Gr.36
L I
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
Tate7
Company: Zenovic&Associates, Inc. D 111/5/2013
Anchor Designer" Engineer: SRH Page: 13/3
Software Project: 13071
Version 2.0.4896.23 Address: 301 East 6th Street,Suite 1
Phone: 360-417-0501
E-mail: scott@zenovic.net
3.Resulting Anchor Forces
Anchor Tension load, Shear load x, Shear load y, Shear load combined,
N-(lb) V...(lb) Way(lb) q(Vuax)2+(Vuay)2(lb)
1 0.0 0.0 6480.0 6480.0
2 0.0 0.0 6480.0 6480.0
3 0.0 0.0 6480.0 6480.0
4 0.0 0.0 6480.0 6480.0
Sum 0.0 0.0 25920.0 25920.0
Maximum concrete compression strain(%o):0.00 <Figure 3>
Maximum concrete compression stress(psi):0
Resultant tension force(lb):0
Resultant compression force(lb):0
Eccentricity of resultant tension forces in x-axis,e'N.(inch):0.00
Eccentricity of resultant tension forces in y-axis,e'Ny(inch):0.00 01 0
Eccentricity of resultant shear forces in x-axis, e'vx(inch):0.00
Eccentricity of resultant shear forces in y-axis,e'vy(inch):0.00
03
8.Steel Strength Of Anchor in Shear(Sec.Q.61)
V-(lb) Ogrout 0 OgmutoVse(lb)
11625 1.0 0.65 7556
10.Concrete Pryout Strength of Anchor in Shear(Sec.Q.6.31
OV�pg�Ok�^bg�ok�p(ANc I A Nco)VecNPedJVVJcNWGp,NNb(Eq.D-41)
k, AN�(in 2) AN�.(in 2) Pec,N 'Fe d,N PcN P�p,N Nb(lb) 0 0 Vcpg(I b)
2.0 896.00 870.25 1.000 0.944 1.250 1.000 36107 0.70 61418
11.Interaction of Tensile and Shear Forces(Sec.Q.7)
Shear Factored Load,V-(lb) Design Strength,OW(lb) Ratio Status
Steel 6480 7556 0.86 Pass(Governs)
Pryout 25920 61418 0.42 Pass
3/4"0 Heavy Hex Bolt,F1 554 Gr.36 meets the selected design criteria.
12.Warnings
-Minimum spacing and edge distance requirement of 6da per ACI 318 Sections D.8.1 and D.8.2 for torqued cast-in-place anchor is waived per
designer option.
-Concrete breakout strength in tension has not been evaluated against applied tension load(s)per designer option. Refer to ACI 318 Section
D.4.2.1 for conditions where calculations of the concrete breakout strength may not be required.
-Concrete breakout strength in shear has not been evaluated against applied tension load(s)per designer option. Refer to ACI 318 Section
D.4.2.1 for conditions where calculations of the concrete breakout strength may not be required.
-Designer must exercise own judgement to determine if this design is suitable.
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
Anchor Designer TIVI Company: Zenovic&Associates, Inc. I Date: 112/5/2013
Engineer: SRH Page: 1/5
Software Project: 13215
Version 2.0.4896.24 Address: 301 East 6th Street,Suite I
Phone: 360-417-0501
E-mail: scott@zenovic.net
I.Proiect information
Customer company: EVERGREEN FIBRE Project description:BUILDING OVER CHIPPER
Customer contact name:MIKE HERMAN Location:WORST CASE LOAD EMB INTO FTNG
Customer e-mail: Fastening description: 1"AB
Comment:
2.Input Data&Anchor Parameters
General Base Material
Design method:ACI 318-11 Concrete: Normal-weight
Units: Imperial units Concrete thickness,h(inch):48.00
State: Non-cracked
Anchor Information: Compressive strength,fc(psi):2500
Anchor type:Cast-in-place LP.,v: 1.4
Material: F1554 Grade 36 Reinforcement condition:A tension,A shear
Diameter(inch): 1.000 Supplemental reinforcement:Yes
Effective Embedment depth,he(inch): 18.000 Do not evaluate concrete breakout in tension:No
Anchor category:- Do not evaluate concrete breakout in shear:No
Anchor ductility:Yes Ignore 6do requirement:Yes
hmin(inch): 19.75 Build-up grout pad:No
Cmin(inch): 1.44
S.in(inch):4.00 Base Plate
Length x Width x Thickness(inch):8.00 x 20.75 x 0.75
Load and Geometry
Load factor source:ACI 318 Section 9.2
Load combination: not set
Seismic design: No
Anchors subjected to sustained ten
Apply entire shear load at front
Anchors only resisting win
<Figure 1>
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
TM Company: Zenovic&Associates, Inc. 1112/5/2013
L7 MM"Ok Anchor Designer Engineer: SRH I Page: 12/5
Software Project: 13215
Version 2.0.4896-24 Address: 301 East 6th Street,Suite 1
Phone: 360-417-0501
E-mail: scott@zenovic.net
<Figure 2>
Recommended Anchor
Anchor Name: Heavy Hex Bolt-1"0 Heavy Hex Bolt, F1 554 Gr.36
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
E= Anchor Designer" Company: Zenovic&Associates, Inc. I Date: 112/5/2013
Engineer: SRH Page: 13/5
Software Project: 13215
Version 2.0.4896.24 Address: 301 East 6th Street,Suite 1
Phone: 360-417-0501
E-mail: scoft@zenovic.net
3.Resulting Anchor Forces
Anchor Tension load, Shear load x, Shear load y, Shear load combined,
N�.(lb) Vuax(lb) V..y(lb) 4(v..X)2+(V..Y)2(lb)
1 13600.0 0.0 4480.0 4480.0
2 13600.0 0.0 4480.0 4480.0
3 13600.0 0.0 4480.0 4480.0
4 13600.0 0.0 4480.0 4480.0
Sum 54400.0 0.0 17920.0 17920.0
Maximum concrete compression strain(%o):0.00 <Figure 3>
Maximum concrete compression stress(psi):0
Resultant tension force(lb):54400
Resultant compression force(lb):0
Eccentricity of resultant tension forces in x-axis,e'W(inch):0.00
Eccentricity of resultant tension forces in y-axis,e'Ny(inch):0.00 01 ()q
Eccentricity of resultant shear forces in x-axis,e'v.(inch):0.00
Eccentricity of resultant shear forces in y-axis,e'vy(inch):0.00
0 4 03
4.Steel Strength of Anchor in Tension(Sec.Q.5.11)
N-(I b) 0 ON..(lb)
35150 0.75 26363
5.Concrete Breakout Strength of Anchor in Tension(Sec.Q.5.21
Nb=16,1.4f�NPI(Eq. D-7)
Ae fc(psi) Nf(in) Nb(I b)
1.00 2500 18.000 98903
ONCbg=0(ANcIANco)V'OCNV'�dNV'�,NV'�p,NNb(Sec.D.4.11 &Eq. D-4)
Aft(in 2) AN��(in 2) �'e�,N V'�d,N PC,N V,p,N Nb(I b) 0 ^bg(lb)
3364.00 2916.00 1.000 1.000 1.25 1.000 98903 0.75 106967
6.Pullout Strength of Anchor in Tension(Sec.D.5.3)
ONp�=0 Vc,pNp=0 V'�,P8/lblgf�(Sec. D.4.1, Eq. D-1 3&D-1 4)
V'�,P Abrg(in 2) F.(psi) 0 (lb)
1.4 1.50 2500 0.70 29420
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
Anchor Designer TM Company: Zenovic&Associates, Inc. Date: 12/5/2013
Engineer: SRH Page: 4/5
Software Project: - 13215
Version 2.0.4896.24 Address: 301 East 6th Street,Suite 1
Phone: 360-417-0501
E-mail: scott@zenovic.net
8.Steel Strength of Anchor in Shear(Sec.Q.6.11
V-(lb) Ogmut 0 Og-4V��(lb)
21090 1.0 0.65 13709
9.Concrete Breakout Strenoth of Anchor in Shear(Sec.Q.6.2)
Shear perpendicular to edge in y-direction:
Vby=minl7(/,/d.)0_24d�A�qf,�C�,1_5;9A�qf�C�11.51(Eq. D-33&Eq.D-34)
/.(in) da(in) A� f�(psi) c.i(in) Vby(I b)
8.00 1.00 1.00 2500 32.00 81459
OV�bgy=0(Av�lAv_)%,vV'�dvV.,vTh,vVby(Sec.D.4.1 &Eq. D-31)
Av�(in 2) Aw�(in') V'.C,V V'�d,V V'C,V Th,V Vby(lb) 0 OVcbgy(I b)
3648.00 4608.00 1.000 0.925 1.400 1.000 81459 0.75 62634
Shear parallel to edge in y�direction:
Vb�=minl7(/./da)O 2qda11a_N1fcCa 11-5;9,1�qfcC�11.51(Eq.D-33&Eq.D-34)
1.(in) d.(in) Aa f�(psi) c.i(in) Vb�(I b)
8.00 1.00 1.00 2500 32.00 81459
oVcbgy=0(2)(AvclAvco)Tec,VPed,VVc,VV-h,VVbx(Sec. D.4.1 &Eq.D-31)
A w(in') Awo(in') %�,V T.dV V'C,V Vh,V Vb�(I b) 0 OVcbgy(I b)
3648.00 4608.00 1.000 1.000 1.400 1.000 81459 0.75 135425
10.Concrete P!yout Strength of Anchor in Shear(Sec.Q.6.3)
0 Wpg�Ok�^bg�Ok�p(A W/A Nw)T.,N Vj.dN V'�,N Vcp,NNb(Eq. D-4 1)
k, A W(in') ANco(in') T,N Ve d,N T�,N 'Pcp,N Nb(I b) 0 OVpg(lb)
2.0 3364.00 2916.00 1.000 1.000 1.250 1.000 98903 0.70 199672
11.Interaction of Tensile and Shear Forces(Sec.Q.7)
Tension Factored Load, %.(lb) Design Strength, oW(lb) Ratio Status
Steel 13600 26363 0.52 Pass(Governs)
Concrete breakout 54400 106967 0.51 Pass
Pullout 13600 29420 0.46 Pass
Shear Factored Load,V.a(lb) Design Strength,OW(lb) Ratio Status
Steel 4480 13709 0.33 Pass(Governs)
T Concrete breakout y+ 17920 62634 0.29 Pass
11 Concrete breakout x- 8960 135425 0.07 Pass
Pryout 17920 199672 0.09 Pass
Interaction check N..10M V_/Ov� Combined Ratio Permissible Status
Sec.D.7.3 0.52 0.33 84.3% 1.2 Pass
1"0 Heavy Hex Bolt,F1554 Gr.36 meets the selected design criteria.
12.Warnings
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
Company: Zenovic&Associates, Inc. Date: 112/5/2013
KITT�0 ', Anchor Designer"' Engineer: SRH I Page: 15/5
R Software Project: 13215
6119" M Version 2.0.4896-24 Address: 301 East 6th Street, Suite I
Phone: 360-417-0501
E-mail: scott@zenovic.net
-Minimum spacing and edge distance requirement of 6da per ACI 318 Sections D.8.1 and D-8.2 for torqued cast-in-place anchor is waived per
designer option.
-Designer must exercise own judgement to determine if this design is suitable.
Input data and results must be checked for agreement with the existing circumstances,the standards and guidelines must be checked for plausibility.
Simpson Strong-Tie Company Inc. 5956 W.Las Positas Boulevard Pleasanton,CA 94588 Phone:925.560.9000 Fax:925.847.3871 www.strongtie.com
Project: EVERGREEN FIBRE-CHIPPER BLDG Eng: SRH
Civiffla y . Job No: 13071 Chk 0
Doc No: COL @ 2-D Date 12/5/2013
Calculation Sheet Subject: Headed Anchor Bolt Design ACI 318-11 Rev 1
1 of 7
ANCHOR BOLT DESIGN Combined Tension and Shear
Anchor bolt design based on Code Abbreviation
ACI 318-11 Building Code Requirements for Structural Concrete and Commentary Appendix D ACI 318-11
PIP STE05121 Anchor Bolt Design Guide-2006 PIP STE05121
Code Reference
Assumptions ACI 318-11
1.Concrete is cracked D.5.2.6, D5.3.6, D.6.2.7
2.Condition A-supplementary reinforcement is provided D.4.3(c)
3.Load combinations shall be per ACI 318-11 9.2 D.4.3
4.Anchor reinft strength is used to replace concrete tension I shear breakout strength as per
ACI 318-11 Appendix D clause D.5.2.9 and D.6.2.9 D.5.2.9&D.6.2.9
5. For tie reinft,only the top most 2 or 3 layers of ties(2"from TOC and 2xY after)are effective
6.Strut-and-Tie model is used to anlyze the shear transfer and to design the required tie reinft
7.Anchor reinft used in structures with SDC—C shall meet requirements specified in D.3.3.7 D.3.3.7
8.Anchor bolt washer shall be tack welded to base plate for all anchor bolts to transfer shear AISC Design Guide I
section 3.5.3
Anchor Bolt Data set Nu=0 if it's compression
Factored tension for design N. =�
17-407[kips] = 242.0 [kN]
Factored shear VU = .92 [kips] = 79.7 [kNJ
Factored shear for design V� = 17.92 [kips] Vu 0 if shear key is provided
Concrete strength fc = [ksi] = 17.2 [MPal
Anchor bolt material = F1 554 Grade 36'
J
Anchor tensile strength futa = 58 [ksi] = 400 [MPa] ACI 318-11
Anchor is ductile steel element D.1
Anchor bolt diameter d,, =F-7-771: [in] = 25.4 [mm] PIP STE05121
Bolt sleeve diameter cl�, = 3.0 [in] Page A-1 Table 1
Bolt sleeve height hs = 10.0 [in]
min required
Anchor bolt embedment depth hef = 18.0 [in] 12.0 OK Page A-1 Table 1
Pedestal height h = 24.0 [in] 21.0 OK,
Pedestal width b, = 28.0 [in]
Pedestal depth d, = 28.0 [in]
min(0.5C1 0.3C2) min(0.5 C 1 0.3 C2)
�3 �3 �3
C/3 o 7�
t3�5*L
I Ld---J Q,
C4 IIS2,, C2 C 4 IS 2J/ C 2 J C 4 1,S 2,1, C 2 1
"\b. C
bc b
Ver.Reinft For Tension Hor.Ties For Shear-4 Legs Hor.Ties For Shear-2 Legs
Project: EVERGREEN FIBRE-CHIPPER BLDG Eng: SRH
CivilBal Ar Job No: 13071 Chk: 0
Y Doc No: COIL @ 2-D Date: 12/5/2013
Calculation Sheet Subject Headed Anchor Bolt Design ACI 318-11 Rev: 1
min required 2 of 7
Bolt edge distance cl cl 12.0 [in] 4.5 OK Code Reference
Bolt edge distance C2 c2 12.0 [in] 4.5 ok PIP STE05121
Bolt edge distance C3 C3 12.0 [in] 4.5 OK Page A-1 Table 1
Bolt edge distance G4 c4 12.0 [in] 4.5 OK
Outermost bolt line spacing s, si 4.0 [in] 4.0 OK Page A-1 Table 1
Outermost bolt line spacing S2 S2 =W0 [in] 4.0 OK
ACI 318-11
To be considered effective for resisting anchor tension,vertical reinforcing bars shall be located RD.5.2.9
within 0.5h�f from the outmost anchor's centerline.
Avg ver.bar center to anchor rod center distance dar = 5�O [in]
No of ver.rebar that are effective for resisting anchor tension nv =4
Ver.bar size No. 1 6 0.750 [in]dia single bar area As = 0.44 [in 2]
Ver.bar top anchorage option 180 Degree Hook or Hairpin --L::i ?
To be considered effective for resisting anchor shear,hor.reinft shall be located RD.6.2.9
within min(0.5cl,0.3c2)from the outmost anchor's centerline min(0.5cl,0.3C2) = 3.6 [in]
No of tie leg that are effective to resist anchor shear n�eg = ?
No of tie laver that are effective to resist anchor shear n ay = ?
Hor.tie bar size No. E 0.500 [in]dia single bar area A. = 0.20 [in 2]
For anchor reinft shear breakout strength calc 100% hor.tie bars develop full yield strength ?
suggest
Rebar yield strength-ver.bar fy-V = 60 [ksi] 60
Rebar yield strength-hor.bar fy-h = 60 [ksi] 60
No of bolt carrying tension nt = 4
No of bolt carrying shear n. = 4
r-nbl
For side-face blowout check use
No of bolt along width edge nbw = 2
No of bolt along depth edge nbd = 2,
C 4 IS 2J/ C 2 J
Anchor head type ? /� /i\
Anchor effective cross sect area Ase = 0.606 [in 2] bc
Bearing area of head Abrg = 1.501 [in 2] Bolt No Input for Side—Face
Ab, [in 2] not applicable Blowout Check Use
Bolt 1/8"(3mm)corrosion allowance ?
Provide shear key? Nio L±J ? ACI 318-11
Provide built-up grout pad? =No ? D.6.1.3
Seismic design category SDC C =1' ' 1-�i;�l ? D.3.3.1
�y
Anchor bolt load E—0.21J Tensile Ye"� ? D.3.3.4.1 &D.3.3.5.1
? Shear Y e,7�1
Project: EVERGREEN FIBRE-CHIPPER BLDG Eng: SRH
Civionsay Job No: 13071 Chk: 0
Doc No: COL @ 2-D Date 12/5/2013
Calculation Sheet Subject: Headed Anchor Bolt Design ACI 318-11 Rev 1
3 of 7
Code Reference
Strength reduction factors ACI 318-11
Anchor reinforcement 0.75 D.5.2.9&D.6.2.9
Anchor rod-ductile steel 0.75 0.65 D.4.3(a)
Concrete-condition A �t,c 0.75 0.75 D.4.3(c)
CONCLUSION
Anchor Rod Embedment,Spacing and Edge Distance 'OK 7,
Min Rquired Anchor Reinft.Development Length ratio = 0.48 OK* -12.5.1
Overall ratio = 0.99 OK
Tension
Anchor Rod Tensile Resistance ratio = 0.52 OK
Anchor Reinft Tensile Breakout Resistance ratio = 0.69 OK'�
Anchor Pullout Resistance ratio = 0.65 0 K--
Side Blowout Resistance ratio = 0.00 OK
Shear
Anchor Rod Shear Resistance ratio 0.33 -OK
Anchor Reinft Shear Breakout Resistance
Strut Bearing Strength ratio 0.40 OK.
Tie Reinforcement ratio 0.50 OK�,*-
Conc. Pryout Not Govern When h,,f 12d,, OK
Tension Shear Interaction
Tension Shear Interaction ratio 0.99 OK.
Seismic Design
Tension Not Applicable NA D.3.3.4
Seismic SDC<C or E-0.2LI additional seismic requirements in D.3.3.4.3 is NOT required,as per D.3.3.1 &D.3.3.4.1
Shear Not Applicable �''NA�,`F�'D.3.3.5
Seismic SDC<C or E-0.21-1 ,additional seismic requirements in D.3.3.5.3 is NOT required,as per D.3.3.1 &D.3.3.5.1
CACULATION
Anchor Rod Tensile t,s Nsa = �t,s nt Ase futa 105.44 [kips] D.5.1.2(D-2)
Resistance ratio = 0.52 > Nu OKI
Anchor Reinft Tensile Breakout Resistance
Min tension development length /d = straight bar case not applicable = 0.00 [in] 12.2.1, 12.2.2, 12.2.4
for ver.#6 bar /dh = 180 hook case applicable = 12.60 [in] 12.5.2, 12.5.3(a)
Actual development lenngth /a = h&-c(2 in)-dar x tan35 = 12.50 [in]
> 6.00 OK,- 12.5.1
Project: EVERGREEN FIBRE-CHIPPER BLDG Eng: SRH
Civifflay . Job No: 13071 Chk: 0
Doc No: COL @ 2-D Date: 12/5/2013
Calculation Sheet Subject: Headed Anchor Bolt Design ACI 318-11 Rev: 1
4of 7
0.5 he
Code Reference
8 in
�jn ACI 318-11
3 A5
�s Nn � �s x fy,x nv x As x(/a /d,if </d) 78.56 [kips] D.3.3.4.5&D.5.2.9
12.2.5
ratio = 0.69 > N,, OK
Anchor Pullout Resistance
Single bolt pullout resistance NP = 8 A,,f,' = 30.02 [kips] D.5.3.4(D-14)
t,.Npn t,nt W c,p Np = 84.06 [kips] D.5.3.1 (D-13)
Seismic design strength reduction = x 1.0 not applicable = 84.06 [kips] D.3.3.4.4
ratio = 0.65 > Nu OK
= 1 for cracked conc D.5.3.6
= 0.70 pullout strength is always Condition B D.4.3(c)
Side Blowout Resistance
Failure Alonq Pedestal Width Edge
Tensile load carried by anchors close to edge which may cause side-face blowout
along pedestal width edge Nb,,w = N.x nb,,/nt = 27.20 [kips] RD.5.4.2
c = min C1,C3 = 12.0 [in]
Check if side blowout applicable he = 18.0 [in]
< 2.5c side bowout is NOT applicable D.5.4.1
Check if edge anchors work as a S22 = 0.0 [in] S=S2 = 0.0 [in]
a group or work individually < 6c side bowout is NOT applicable D.5.4.2
Single anchor SB resistance �t.,Nsb = 0,,c (16 0 c x—.)A'Tc = 0.00 [kips] D.5.4.1 (D-16)
Multiple anchors SB resistance �t,Nsbg,w =
work as a group-not applicable = (1+s/6c)x�t,c Nsb = 0.00 [kips] D.5.4.2(D-17)
work individually-not applicable = nb.x�t,c Nsb X[1+(c2 or C4)/C1/4 = 0.00 [kips] D.5.4.1
Seismic design strength reduction = x 1.0 not applicable = 0.00 [kips] D.3.3.4.4
ratio = 0.00 < Nbuw OK
Failure Along Pedestal Depth Edge
Tensile load carried by anchors close to edge which may cause side-face blowout
along pedestal depth edge Nbud = Nu x nbd/nt = 27.20 [kips] RD.5.4.2
c = min(C2,C4 = 12.0 [in]
Check if side blowout applicable hg = 18.0 [in]
< 2.5c side bowout is NOT applicable D.5.4.1
Project: EVERGREEN FIBRE-CHIPPER BLDG Eng: SRH
Civifflay . Job No: 13071 Chk: 0
Doc No: COL @ 2-D Date 12/5/2013
Calculation Sheet Subject: Headed Anchor Bolt Design ACI 318-11 Rev 1
5 of 7
Code Reference
ACI 318-11
Check if edge anchors work as a S1, = 0.0 [in] S=s, = 0.0 [in]
a group or work individually < 6c side bowout is NOT applicable D.5.4.2
Single anchor SB resistance +t,c Nsb = 0,, (16 0 c xr—J A 0.00 [kips] D.5.4.1 (D-16)
Multiple anchors SB resistance +t,cNrbg,d =
work as a group-not applicable = (1+s/6c)x+t,c NSb 0.00 [kips] D.5.4.2(D-17)
work individually-not applicable = nbd x+t,c N.b X 11+(Cl or C3)/cl 4 = 0.00 [kips] D.5.4.1
Seismic design strength reduction = x 1.0 not applicable = 0.00 [kip sl D.3.3.4.4
ratio = 0.00 < Nbud OK
Group side blowout resistance +t,c N.bg = Ot,c min N.b�.nt , N.bg,�nt 0.00 [kips]
( n,, n,
Govern Tensile Resistance Nr = min Ns.,+Nn,+Npn,+Nrbg = 78.56 [kips]
Note:Anchor bolt sleeve portion must be tape wrapped and grouted to resist shear
Anchor Rod Shear +v,sVsa = 0 s ns 0.6 Ase futa = 54.83 [kips] D.6.1.2(b)(D-29)
Resistance
Reduction due to built-up grout pads = x 1.0,not applicable = 54.83 [kips] D.6.1.3
ratio = 0.33 > V� OK
Anchor Reinft Shear Breakout Resistance
Strut-and-Tie model is used to anlyze the shear transfer and to design the required tie reinft
STM strength reduction factor +Si 0.75 9.3.2.6
d
V,,12 Vu/2
00
T t T t -0 T t Tt
A/ \A
T t Tt
C�;\
C,
135
Od
Li, \J
0
Project: EVERGREEN FIBRE-CHIPPER BLDG Eng: SRH
Civiffla y . Job No: 13071 Chk: 0
Doc No: COL @ 2-D Date: 12/5/2013
Calculation Sheet Subject: Headed Anchor Bolt Design ACI 318-11 Rev: I
6 of 7
Code Reference
Strut-and-Tie model geometry d, = 9.250 [in] dh = 9.250 [in] ACI 318-11
6 = 45 dt = 13.081 [in]
Strut compression force Cc, = 0.5 V,� sinO = 12.67 [kips]
Strut Bearing Siren-jtfi
Strut compressive strength fce = 0.85 f,: = 2.1 [ksi] A.3.2(A-3)
•Bearing of anchor bolt
Anchor bearing length = min(8d,hef = 8.0 [in] D.6.2.2
Anchor bearing area Abrg =le x d. = 8.0 [in']
Anchor bearing resistance C, = n.,x �.t X fce x Abrg = 51.00 [kips]
> V� OK '
•Bearing of ver reinft bar
Ver bar bearing area Abrg = (fe+1.5 x dt-dJ2-db/2)x db = 20.1 [in']
Ver bar bearing resistance C, = �st X fce x Abrg = 31.97 [kips]
ratio = 0.40 > CS OK
Tie Reinforcement
•For tie reinft,only the top most 2 or 3 layers of ties(2"from TOC and 2xY after)are effective
•For enclosed tie,at hook location the tie cannot develop full yield strength fy, Use the pullout resistance in
tension of a single hooked bolt as per ACI 318-11 Eq.(D-1 5)as the max force can be developed at hook T h
•Assume 100%of hor.tie bars can develop full yield strength.
Total number of hor tie bar n = nieg(leg)x nl.y(layer) = 4
ACI 318-11
Pull out resistance at hook Th = �t,c,0-9 fr.'eh da = 1.90 [kips] D.5.3.5(D-15)
eh = 4.5 db = 2.250 [in]
Single tie bar tension resistance T, = �S X fy-h X AS = 9.00 [kips]
Total tie bar tension resistance �,V, = 1.0 x n x Tr = 36.00 [kips] D.3.3.5.4&D.6.2.9
ratio = 0.50 > Vu '-OK
Conc.Pryout Shear Resistance
The pryout failure is only critical for short and stiff anchors.It is reasonable to assume that for general
cast-in place headed anchors with hef>=12d.,the pryout failure will not govern
12dz, = 12.0 [in] h�f = 18.0 [in]
> 12da pi OK
Govern Shear Resistance Vr = min(�v,Vsa,�sVn) 36.00 [kips]
Project: EVERGREEN FIBRE-CHIPPER BLDG Eng: SRH
Civifflay . Job No: 13071 Chk: 0
Doc No: COL @ 2-D Date 12/5/2013
Calculation Sheet Subject: Headed Anchor Bolt Design ACI 318-11 Rev 1
7 of 7
Code Reference
ACI 318-11
Tension Shear Interaction
Check if Nu>0.2�Nn and Vu>0.2�Vn Yes D.7.1 &D.7.2
Nu/0 Nn+Vu/0 Vn 1.19 D.7.3(D-42)
ratio 0.99 < 1.2 OK,
Seismic Design
Tension Not Applicable NA
Steel nominal strength x 1.2 0.00 [kips]
Concrete-governed nominal NP, = 0.00 [kips] N,bg = 0.00 [kips]
strength
Nu/min(Npn,N,b,) = 0-00 N,,I 1.2Nsa = 0.00
> 0.00 NA
Not Applicable - Check Option 1 D.3.3.4.3(a)subsections 1-2
Seismic SDC<C or E0.2U ,additional seismic requirements in D.3.3.4.3 is NOT required,as per D.3.3.1 &D.3.3.4.1
Shear Not Applicable -'jNX�,-
Seismic SDC<C or E<=0.2U ,additional seismic requirements in D.3.3.5.3 is NOT required,as per D.3.3.1 &D.3.3.5.1
THE
i S-��,
'GELE ,�
it For City Use
CITY OF
Permit#
W A S H I N G T 0 N , U . S .
Date Received: 12- f3-13
321 East 51b Street
D
Port Angeles, WA 98362 Date Approved
P: 360-417-4817 F: 360-417-4711 Con I J
permitsPcityofpa.us
Project Address: Building Permit Appikil n
v
Main Contact: Phone # -3LC> q6c)
1�9 ' yevinl?i1v r-1 E-Mail:
Property Name Phone
Owner
Mailing Address Email
-'?O�J- MA,4- t �ermA--bi-vs. cL-vn
city State Zip
LAJA
Contractor Name Phone
.I /Mke
MailingAddress Email M L'ke- V41 04" L r-0 S,
city State Zip
WA ML2-
Contractor License # Expiration: _71-2-�'
H ER M A X ly- 2-3 T-
Project Value: Zoning: Tax Parcel# Lot#
$ HeAQ
Type of Residential 0 Comir Industrial K Public 13
Permit Demolition E3 Fire [3 Repair [3 Reroof(tear off/lay over)
For the following,fill out both pages of permit application:
New Construction Remodel 11 Addition El Tenant Improvement
Mechanical 0 Plumbing El Other 1:3
Existing Fire Sprinkler System? Maximum height of structure Proposed Bedrooms Proposed Bathrooms
Yes [3 No b I I I
Project NeW b)i*i(- C-)nippe, lZeckizL, A)c)(Srz-
De scription
-J
I have read and completed the application and know it to be true and correct.I am authorized to apply for this
permit. I understand that it is my responsibility to determine what permits are required and to obtain permits
prior to working on projects. I understand that the plan review fee is not refundable after plan review has
occurred. I understand that I will forfeit the review fee if I cancel or withdraw the application before the
permit is issued. I understand that if the permit is not issued within 180 days of receipt,the application will be
considered abandoned and the fees for-feit.
Date Print Name Signature
)13 I(Q� de VM A
Residential Structures
For Office Use
Area Description(SQ FT) Existing Proposed $$value
Basement
First Floor
Second Floor
Covered Deck/Porch/Entry
Deck
Garage
Carport
Other(describe)
Area Totals
Commercial Structures
For Office Use
Area Descriptions(SQ FT) Existing Proposed $$Value
Existing Structure(s) io-loco -b 1,50000
Proposed Addition
Tenant Improvement?
Other work(describe)
['71rea Totals
Lot/Site Coverage Calculations
Footprint(SQ FT)of all Structures: Lot Size: %Lot Coverage
SQ FT Site coverage(all*impervious+ %Site Coverage
structures)
Mechanical Fixtures
Indicate how many of each type of fixture to be installed or relocated as part of this project.
Air Handler , : I Size: # Haz/Non-Haz Piping #of Outlets:
Appliance Vent # Heater(Suspended,Floor,Recessed wall) #
Boiler/Compressor Size: # Heating/Cooling appliance #
repair/alteration
Evaporative Cooler(attached;not # Pellet Stove/Wood-burning/Gas #
portable) Fireplace/Gas Stove/Gas Cook Stove/Misc.
Fuel Gas Piping #of Outlets: Ventilation Fan,single duct #
Furnace/Heat Pump/ # Ventilation System #
Forced Air Unit
Plumbing Fixtures
Indicate how many of each type of fixture to be installed or relocated
Plumbing Traps # Fuel gas piping #of Outlets:
Water Heater # Medical gas piping #of Outlets:
Water Line # Vent piping #
Sewer Line # Industrial waste pretreatment #
interceptor
Other(describe):
T:\BUILDING\APPLICATION FORMS\BUILDING PERMIT 081212.DOCX
LEGEND D TA PROVIDED IS BASED CITY OF PORT ANGELES
AERIAL NAMING AND NGT BI A MILD LOCATE.
PROPER'LINE
EASEMENT UNE
U)
(E)BUILDING m
(P)BUILDING 0
——————— (E)�ATER LINE
(E)PA�.EW
FIR 063018110000
(E)nT-A�D 44.736 AC.
(E)DITCH FLO�LINE
699'±
(E)DEBARXER
(E)LIETAL
BUILDING (E)CONWYOFt AND
CHIP BIN
.75'8'(4,238
PROPMD IuDING OVER
SF) ETAL (E)ACCESS
(E)MIPPE R ROADWAY
CE
(E)MAINWNANCE
SHOP
(E)FIR
HYDRANT
sc.1, 1" Too,
o I DIX 2w
CEM Machine, Inc.
571 West End Avenue ,
Carthage, New York, 13619
Telephone: (315)493-4258 Fax.- (315) 493-4236
January 9, 2014
City of Port Angeles Fire Department
102 East Fifth Street
Port Angeles, WA 98362-3014
Attn: Mr. Ken Dubuc,Fire Chief
Ph: (360)417 4655
e-mail: pafire(a)cityofpa.us
Reference:Your Letter of December 31 to Zenovic and Associates
Subject: Hermann Brothers, Evergreen Chipping Operation
Proposed Building enclosure for heavy duty CEM Wood Chipper
Expected Concentrations and Characteristics of Wood Dust in building air
Dear Mr.Dubuc,
As per your request in letter of December 3 1,please consider the following:
As you have pointed out from the commentary of the IFC, the concern here is about whether a possibility exists
in normal operation of an enclosed structure accumulating an explosive mixture of air and a sufficiently fine and
combustible dust thereby causing an explosion hazard.
As a general rule, building enclosures for chippers are not fit with sprinklers, and I am also not aware of any of
our machines that have ever even been in a fire or a dust explosion.
The reasons for this are several:
• The weight of'finely divided'wood dust produced (i.e.,'wood dust produced which is smaller than 420
microns/0.0165") is quite small(typically less than 20 lbs/hr,wet weight),
Z�
• And has a high water content, typically greater than 40% (on a wet basis). As such, this wood dust is
certainly not very flammable and is also not explosive when mixed in air. Typically only wood dust at a
moisture content below 20% is considered to be an explosion or fire risk. The wood chipped seldom has
less than 30-35%wet basis water content, and typically has 42-50%water content.
• Because of the stickiness of the larger wet chips produced in great quantities at this facility, most of the
wood dust fines generated adhere to these larger chips and move with these chips on out to the plant's
next process equipment(the screen).
• Finally, the dust produced but that will not adhere to the chips rarely escapes to the building air through
leaks which would need to be in the outer sections of the chipper disc casing. In normal operation, these
areas are quite tight, and our chipper will instead draw air from the opening of the feed spout and from
around the disc casing at its fit to the shaft (inside the building) and move this air to the outside of the
building.
This air movement tends to result in removal of what small dust concentration may be in the air of the
building,thereby preventing any significant concentrations from developing in the building air.
Page I of 2
CEM Machine, Inc.
Herniann Brothers, Evergreen Chipping Operation
Dust in Proposed Building enclosure
In summary, while a very small amount of PM420 size wood dust is generated as a waste product and which is
separate from the chips produced, this material is sufficiently wet as to not present a fire or explosion hazard.
Furthermore, the constant natural exchange of air from the building results in fresh air constantly moving into
the building,replacing air already there and resulting in quite low wood dust concentrations.
I believe this supplies what you require. If you have any questions,please don't hesitate to contact me.
Sincerely,
Mark Robinson, P.E.
Zenovic and Associates
301 East 6th Street
Port Angeles, WA 98362
Attn: Mr. Scott Headrick
Cc: Herinaim Brothers
Evergreen Chipping Operation
2095 Blue Mountain Road
Port Angeles, WA 98362-9203
Attn: Mr. Mike Hermann
Ph: (360)452-3341
Cc: CEM,Carthage,NY: Tim Nettles,Dan McBride
/end
Page 2 of 2
P ORT NGELES' '
W A S H I N G T 0 N., U. S. A.
U- C=M
NOW Fire nep' ariment
December"31, 2014.
Scot Headr ck
Zenovi.eand Assomates
I E 6"' Street
Port Angeles.. W.A.'98362
Scott,
1 an-.i reviewing the plans for thes.tetl bVilding that is proposed at thel-lermana Brothers facilh.-V
ariding that this 4200 sf build-ii-ig is
located at 404'1.clipse Industnal Parkway. ltismy:widerstc
inxended to provide noise suppression aro.-Lind a wood..,chipper.
-rhL plans COIT&tly classif�y this strLicture as an'F-1 Occ-aparicy. 903.2.4.1 of-ft-fl'-"C* I-eCl.L111-CS
fiTe Sprink.l.er protectionfor all Gro4p F-1 occupancy fire areas diat:Qdritain woodwork-ing
operations in excess of 2500 s-f i.t.-hich generate-J"nel"y dh--ided cornbustible i-kis4e or 14--hich ase
fil7e/v dii.-ided con7bustible n7aterials-According to the I.FC Coinnientary.the 11itent o-l'tl--Ie
phrase -finely divided coin.bustible waste" is to describe particles that arein the explosive
range. IF-C I')02 dtfi-nes—"Flnely divided.s6lidmaterial'%-Nhich.is 420 nitc.rons:& les .
diameter and which, when dispersed in air in the proper proportiOns. could be ignited by d I
istible d6st will ass througha U'S'. No.
flani.e. spark-or other source of ignition, Cotribt 401
standard sleve."
Would gUeSS Ifliniat 4.wood chipp-el,does not produce^-fi nely divided" wasti-��.-. h O.N.vever I ani'llot
ClUalified to makc this deteim-�.natlon. In order to avoid the fire sprinkler requirement far tll.is
bLilldi.11g, We N-Vill-requi-re a letter fiorn a.qLiallfied engineer or froin the chlpoer manC1fk.1CtL11-.,r
stating that this machine does-not produce finely divided corob-astible waste that will prl�sent a-
al explosive hazard. Without such certi.-fication. �ve-w-illneed to rnove TbTward;withlth(t
potenti
fire sprinkler requirement. There may be other.aliernEitives that meet the intent oftherf C.,
Please do not hesitate to co.niact.me kf VOLI iie6d,addit-lo.t.ial..I..[.I.,Forin�iti.olI or cla�fflicat-.10.11.
Thanks.
A
Men Dubuc. ChiK
Phone:360-41*74655 Fax:360-417-4659 TTY:360-417-4645
Website:WWW.CityOfpa.LIS/Email: p�fire Gcdtyo-.fpa.us
'102 East Fifth Street Port Ar'igeles, WA 08362�30-14
7
GarcoBu Ming
. Systems ACCREDrTED
I i AC472
Wv1si'dri,6f koberfson.-Ceco 1.1 Corpotdfio'ni' -2291
Office:(800)941
(509)244-5611
2714 S.Garfield Road Fax:(509)244-2850
Airway Heights,WA 99001-9595 http://www.garcobuildings.com
August 02, 2013
J & J CONSTRUCTION OF PORT ANGELES I
233 ALICE RD
PORT ANGELES, WA 98363-9492
14-B-18415
BLUE MOUNTAIN LEASING
2095 BLUE MOUNTAIN ROAD
PORT ANGELES, WA 98362
MULTIPLE BUILDINGS
To Whom It May Concern:
This is to certify that materials for the subject structure have been designed in
accordance with the order documents, specifically as shown per the attached
Engineering Design Criteria Sheet.
Aspects of code compliance as related to use or occupancy, such as sprinkler
requirements, are not addressed by these documents.
These materials, when properly erected on an adequate foundation in accordance with
the erection drawings as supplied and using the components as furnished, will meet
the attached loading requirements.
This certification does not cover field modifications or the design of materials not
furnished by Garco Building Systems.
The attached design criteria and calculations are to remain with and form part of
this Letter of Certification.
The calculations and the metal building they represent are the product of Garco
Building Systems or a division of its affiliate NCI Building Systems. The engineer
whose seal appears hereon is employed by either Garco Building Systems or a division
of its affiliate NCI Building Systems and is not the engineer of record for this
project.
Cordially,
Garco Building Systems
Materials for Metal Buildings
An NCI Company
Daniel A. Rauscher, P.E.
Engineering Manager
14-B-18415
Mailing Address: Office:(800)941-2291
Garcoo Building Systems (509)244-5611
2714 S.Garfield Road Fax:(509)244-2850
Airway Heights,WA 99001
Building
LGarcDo. Systems
ACCREDITED
AC472
DMISI'dr! df kob'Ntsoft-CL�Ico 1.1 C-orpamitibil Office:(800)941-2291
(509)244-5611
2714 S.Garfield Road Fax:(509)244-2850
Airway Heights,WA 99001-9595 http://www.garcobuildings.com
ANGELES,Washington
Building Code . . . . . . . . . . . . . . . . . . . . . 2009 International Building Code
Occupancy Category . . . . . . . . . . . . . . . . Normal (Category II)
Roof Dead Load
Superimposed . . . . . . . . . . . . . . . . . 3.05 psf (Bldg A)
2.85 psf (Bldg B)
Collateral . . . . . . . . . . . . . . . . . . . 3.00 psf
(0.00 psf Ceiling 3.00 psf other)
Roof Live Load . . . . . . . . . . . . . . . . . . . . 20.00 psf no reduction
Snow
Ground Snow Load (Pg) . . . . . . . . 25.00 psf
Snow Load Importance Factor (1) 1.00
Flat Roof Snow Load (Pf) . . . . . 18. 90 psf (per code) (Bldg A)
20.00 psf (per code) (Bldg B)
Minimum Roof Snow Load (Pf) 25.00 psf (used in design)
Snow Exposure Factor (Ce) . . . . 0.90
Thermal Factor (Ct) . . . . . . . . . . 1.20
Wind
Basic Wind Speed . . . . . . . . . . . . . 100.00 mph
Wind Importance Factor (I) . . . 1.00
Wind Exposure Category . . . . . . . C
Internal Pressure Coef (GCpi) 0.18/-0.18
Loads for components not provided by building manufacturer
Corner Areas (within 5.071 of corner) 32. 92 psf pressure -41.10 psf suction
Other Areas 32. 92 psf pressure -34 . 97 psf suction
These values are the maximum values required based on a 10 sq ft area.
Components with larger areas may have lower wind loads.
Seismic
Seismic Importance Factor (Ie) 1 .00
Seismic Design Category . . . . . . D
Soil Site Class . . . . . . . . . . . . . . D Stiff Soil
Ss . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 .119 g Sds . . . . . 0.785 g
Sl . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.468 g Sdl . . . . . 0.478 g
Analysis Procedure . . . . . . . . . . . Equivalent Lateral Force
Column Line (Bldg A) 1-3 SWA & SWC
Basic Force Resisting System C4 B4
Response Modification Coefficient (R) 3.50 3.25
Seismic Response Coefficient (Cs) 0.224 0.242
Design Base Shear in kips (V) 17 .66 14 . �
Column Line (Bldg B) SWA
Basic Force Resisting System B4
Response Modification Coefficient (R) 3.25
Seismic Response Coefficient (Cs) 0.242
Design Base Shear in kips (V) 1.37
Basic Structural System (from ASCE 7-05 Table 12 .2
B4 - Ordinary Steel Concentrically Braced Frame 4W1
C4 - Ordinary Steel Moment Frame
14-B-18415
Mailing Address: Office:(800)941-2291
Garcoo Building Systems (509)244-5611
2714 S.Garfield Road Fax:(509)244-2850
Airway Heights,WA 99001
DESIGN PACKAGE
BUILDER: J & J CONSTRUCTION OF PORT ANGELES I
CUSTOMER: BLUE MOUNTAIN LEASING
JOB NUMBER: 14-B-18415
TABLE OF CONTENTS
Page
Design Criteria I
Notes on Drawings 2-3
Deflection Criteria NA
Project Layout 4-5
Building A 6-24
Building B
Building C
Special Details 25-26
Original Design Completed thru Change Order# 0
Revision Histo
Update Date
Rev# Reactions Reason for Revision Pages Revised Revised Eng.
1 No Add tieback detail 25 8/5/13 TAB
2 No Change F.O. dimensions per CO # 01 4, 10 9/11/13 TAB
Add bay and adjust framed 3-17
3 Yes openings/bracing per CO # 02 10/8/13 TAB
4 Yes Revised F.O. and girt design per CO # 03 4, 7, 10-17 11/11/13 TAB
Project Engineer: Todd Barfuss (Spokane)
Checking Engineer: Dan A. Rauscher
Signing Engineer: Dan A. Rauscher, P.E.
Job Number . . . . . . . . . . . . . . . . . . . . . . . . 14-B-18415
Builder . . . . . . . . . . . . . . . . . . . . . . . . . . . J & J CONSTRUCTION OF PORT ANGELES I
Jobsite Location . . . . . . . . . . . . . . . . . . BLUE MOUNTAIN LEASING, PORT ANGELES,WashingtoLn
Building Code . . . . . . . . . . . . . . . . . . . . . 2009 International Building Code
Occupancy Category . . . . . . . . . . . . . . . . Normal (Category II)
Roof Dead Load
Superimposed . . . . . . . . . . . . . . . . . 3 . 05 psf (Bldg A)
2 . 85 psf (Bldg B)
Collateral . . . . . . . . . . . . . . . . . . . 3 . 00 psf
(0 . 00 psf Ceiling 3 . 00 psf Other)
Roof Live Load . . . . . . . . . . . . . . . . . . . . 20 . 00 psf no reduction
Snow
Ground Snow Load (Pg) . . . . . . . . 25 . 00 psf
Snow Load Importance Factor (1) 1 . 00
Flat Roof Snow Load (Pf) . . . . . 18 . 90 psf (per code) (Bldg A)
20 . 00 psf (per code) (Bldg B)
Minimum Roof Snow Load (Pf) 25 . 00 psf (used in design)
Snow Exposure Factor (Ce) . . . . 0 . 90
Thermal Factor (Ct) . . . . . . . . . . 1 . 20
Wind
Basic Wind Speed . . . . . . . . . . . . . 100 . 00 mph
Wind Importance Factor (I) . . . 1 . 00
Wind Exposure Category . . . . . . . C
Internal Pressure Coef (GCpi) 0 . 18/-0 . 18
Loads for components not provided by building manufacturer
Corner Areas (within 5 . 07 ' of corner) 32 . 92 psf pressure -41 . 10 psf suction
Other Areas 32 . 92 psf pressure -34 . 9� psf suction
These values are the maximum values required based on a 10 sq ft area .
Components with larger areas may have lower wind loads .
Seismic
Seismic Importance Factor (Ie) 1 . 00
Seismic Design Category . . . . . . D
Soil Site Class . . . . . . . . . . . . . . D Stiff Soil
Ss . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 . 119 g Sds . . . . . 0 . 785 g
Sl . . . . . . . . . . . . . . . . . . . . . . . . . . . 0 . 468 g Sdl . . . . . 0 . 478 g
Analysis Procedure . . . . . . . . . . . Equivalent Lateral Force
Seismic Response Coefficient (Cs) 0 .242
Page 1
10/08/2013
-D6sign ,criteria as noted is as given within order documents and
is applied in general accordance with the applicable provisions of
tihe model code and/or specification indicated. Neither the
manufacturer nor the certifying engineer declares or attests that
the loads as designated are proper for local provisions that may
apply or for site specific parameters . The design criteria is
supplied by the builder, project owner, or an Architect and/or
Engineer of Record for the overall construction project .
This project is designed using manufacture ' s standard
serviceability standards . Generally this means that all
deflections are within typical performance limits for normal
occupancy and standard metal building products .
The design collateral load has been uniformly applied to the
design of the building. Hanging loads are to be attached to the
purlin web. This may not be appropriate for heavily concentrated
loads . Any attached load in excess of 150 pounds shall be accounted
for by special design performed by a licensed engineer using
concentrated loads and may require seperate support members within
the roof system.
The use of fully exposed for the snow exposure results in the
rigid frames being designed for only 90 percent of the roof
snow load that is used for partially exposed. For a fully
exposed snow exposure to be used, all of the following
conditions must be true:
1 . The roof is exposed to wind on all sides with no
obstructions higher than the roof located closer to the
building than a distance equal to 10 times the height of the
obstruction above the roof.
2 . The roof is exposed to wind on all sides with no significant
obstructions on the roof such as parapet walls or large
roof top mechanical units .
3 . The roof is not exposed to accumulation of snow due to
drifting or sliding from adjacent structures .
Material properties of steel bar, plate, and sheet used in the fabrication
of built-up structural framing members conform to ASTM A529, ASTM A572,
ASTM A1011 SS, or ASTM A1011 HSLAS with a minimum yield point of 50 ksi .
Material properties of hot rolled structural shapes conform to ASTM A992,
ASTM A529, or ASTM A572 with a minimum specified yield point of 50 ksi .
Hot rolled angles, other than flange braces, conform to ASTM 36 minimum.
Hollow structural shapes conform to ASTM A500 grade B, minimum yield
point is 42 ksi for round HSS and 46 ksi for rectangular HSS .
Material properties of cold-formed light gage steel members conform to
the requirements of ASTM A1011 SS Grade 55, ASTM A1011 HSLAS Grade 55
Class 1, ASTM A653 SS Grade 55, or ASTM A653 HSLAS Grade 55 Class 1
with a minimum yield point of 55 ksi . For Canada, material properties
conform to CAN/CSA G40 . 20/G40 .21 or equivalent.
BOLT TIGHTENING - Bolted joints with A325-09 Type 1 bolts greater than
1/2" diamter are specified as pretensioned joints in accordance with
the Specification for Structural Joints Using ASTM A325 or A490 Bolts,
June 30, 2004 . Pre-Tensioning can be accomplished by using the
turn-of-nut method of tightening, calibrated wrench, twist off type
tension control bolts or direct tension indicator as acceptable to the
Inspecting Agency and Building Official . Installation Inspection Page2
10/08/2013
requirements for Pre-Tensioned joints (Specification for Structural
Joints Section 9 . 2) using turn-of-nut method is suggested.
The connections on this project are not slip critical .
X-Bracinq is to be installed to a taut condition with all slack
removed. Do not tighten beyond this state.
Framed openings, walk doors, and open areas shall be located in
the bay and elevation as shown in the erection drawings . The
cutting or removal of girts shown on the erection drawings
due to the addition of framed openings, walk doors, or open areas
not shown may void the design certifications supplied by the metal
building manufacturer.
Using standard eave gutter with 4 x 5 downspouts, the roof drainage
system has been designed using the method outlined in the MBMA
Metal Building Systems Manual . Downspout locations have not been
located on these drawings . The downspouts are to be placed on
the building sidewalls at a spacing not to exceed 71 . 6 feet with
the first downspout from both ends of the gutter run within
35 . 8 feet of the end. Downspout spacing that does not exceed the
maximum spacing will be in compliance with the building code .
The gutter and downspout system as provided by the manufacturer
is designed to accommodate 4 in/hr rainfall intensity.
The frame at framline 1 has been designed to receive a future 75 foot carry
beam supporting (2) 56 foot wide rafters at a spacing of 25 feet.
Frameline 1 has been designed to support lateral loads from one future
frame . Rafters being supported by the carry beam are not to impose any
thrust loads on the carry beam and the carry beam is not to impose any
weak-axis moment on the frame at frameline 1 .
Materials supplied by the metal building manufacturer have been designed
to support a future width expansion on Sidewall A. The future width
expansion shall be 25 ft wide, with a 2 : 12 roof slope and 18 ' -0" low side
eave height. The design loads for the future expansion shall be the
same as for this material . Bracing shall be provided in the roof
and low sidewail to provide longitudinal stability to the future
width expansion. The panel, girts, and bracing at side SWA
shall remain when the future width expansion is added.
A future width expansion different from the above description could void
warranties and certifications as they apply to the material supplied
by the metal building manufacturer.
Page 3
10/08/2013
C�
m
VMS -I-IVM3GIS
C9C86 VM S3-139NV id0d
9NISV3-1 NIViNnOW 3nis
8192 U 'se 0192 t o? C� Aaumo
40' 6 4 2 1 2 ,1 US -D, ru 9%0 0 ru cr%0 ru
36' 2 — i i i , I i , # 6 *
31' 10 --- -----
0181
27' 6 X0191- - -----
23' 2
18, 10 - C?
1810 - 0
14' 6 -
12' 0 tj
I 1' 2
7' 4
3' 6 ul-a!i oiuDal ainqnj,
�n
m ru I I I I ru
z OD 0�
8/ B/ Li
9c C� 0 z
> w
z
r- Ln o X0 0 XCL 0 -j
-
r
C; Ln - 0 <
�000 0 �c
m u Ln, m
v- rx) ru 8/
t=j co 00 z
Lj
0 c;2 0
0
Eh %D
————— ———— - —————
0
I fl,%,0 xj i---- - -----
0 -H-H-A
W0I,0CU00%DWV0 P2 P2
C102 t?l :IC :60 ZO I-DO UOW �D :-�, in 7�o ;;,- �-�, in
M -Www - - - 25' 8 25' 0 25' 0
SSnjJl0q0j-joJaA :uo!sAaA m -
10unJ Vglt?81 :ON qOr' 75' 8 (WM)ad!d=o
Dd JO N01i3ndiSN03 r I r SIDEWALL SWC IZ ajd!x�=xx
Aap I !nEl IZ alqnop=x qnA�S Aa>i
GARCO Building Systems, Airway Heights, WA
Design Summary Program User: tabarfuss Job Number: 18415A
Design Summary Report Version: 4 .4.7 run0l Date: 10/07/13
Start Time: 09:31:07
R:\ . .\14-B-18415\verOl-tabarfuss\Bldg-A\runol\18415A—bldg—A-0l.cds
-------------------------------------------------------------------------------
M A I N B U I L D I N G D E S I G N S U M M A R Y R E P 0 R T
All connections use ASTM A325N bolts, unless noted otherwise.
All anchor rods are checked according to ASTM F1554 Gr. 36 strengths.
ROOF PLANE ------- RPA
R:\Jobs\Active\ENG\14-B-18415\verOl-tabarfuss\Bldg-A\run0l\AroofRPA-0l.edf
Panel . . . . . . . . . . . . . . . . . . . . PBR26
Purlins . . . . . . . . . . . . . . . . . . 55.0 ksi Yield Strength
Eave Struts . . . . . . . . . . . . . . 55.0 ksi Yield Strength
Note to Drafting: provide G90 Galvanized Secondary.
PURLIN SPACING : 2@3 .3156 3@4 ' 6 2@3 '4 1.2022
Bay Length Member Size Brace L Lap R Lap
# (ft) Identification Locations Exten Exten
---------------------------------------------------------------------
1 2S .000 8X2 .5Z12 None S 0.000 3 .146 C
2 2S .000 8X2 .5Z14 None C 3 .146 3 .146 C
3 25 .667 8X2 .SZ12 None C 3 .146 0.000 S
Purlin Clip Use 2 A325 Bolts @ Level 2,3,4,5,6,7, 8 @ Supports:1,2,3,4
Purlin Stiffened Clips @ Level 2, 8 @ Supports:1,2,3,4
Purlin Backup Plate @ Level 2, 8 @ Supports:1,2,3,4
ROOF PLANE ------- RPC
R:\Jobs\Active\ENG\14-B-1841S\verOl-tabarfuss\Bldg-A\run0l\AroofRPC—Ol.edf
Panel . . . . . . . . . . . . . . . . . . . . PBR26
Purlins . . . . . . . . . . . . . . . . . . 55.0 ksi Yield Strength
Eave Struts . . . . . . . . . . . . . . 55.0 ksi Yield Strength
Note to Drafting: provide G90 Galvanized Secondary.
PURLIN SPACING : 2@3 .3156 3@4 ' 6 2@3 '4 1.2022
Bay Length Member Size Brace L Lap R Lap
# (ft) Identification Locations Exten Exten
---------------------------------------------------------------------
1 25 .667 8X2 .5Z12 None S 0.000 3 .146 C
2 25.000 8X2 .SZ14 None C 3 .146 3 .146 C
3 25.000 8X2 .5Z12 None C 3 .146 0 .000 S
Purlin Clip Use 2 A32S Bolt's @ Level 2,3,4,5, 6,7,8 @ Supports:4,3,2, 1
Purlin Stiffened Clips @ Level 2, 8 @ Supports:4, 3,2,1
Purlin Backup Plate @ Level 2, 8 @ Supports:4,3,2,1
Page 5
10/08/2013
GARCO Building Systems, Airway Heights, WA
Design Summary Program User: tabarfuss Job Number: 18415A
- Design Summary Report Version: 4.4 .7 run0l Date: 10/07/13
Start Time: 09:31:07
R:\. .\14-B-18415\verOl-tabarfuss\Bldg-A\run0l\18415A—bldg—A-01.cds
-------------------------------------------------------------------------------
RPC Purlin Strut @ 28.000 (ft) 8X2 .SZ12 Bays 3
RPC Purlin Strut @ 28.000 (ft) 8X2 .SZ12 Bays 2
RPC Purlin Strut @ 28.000 (ft) 8X2 .5Z12 Bays 1
SWC Pipe Strut @ 22 .167 (ft) P6X10.78 Bays 2
SWC Eave Strut @ 40.000 (ft) 8X3.5E14 Bays 3
SWC Eave Strut @ 40.000 (ft) 8X3 .5E12 Bays 2
SWC Eave Strut @ 40.000 (ft) 8X3.SE12 Bays 1
SWA Eave Strut @ 40.000 (ft) 8X3 .SE14 Bays 1
SWA Eave Strut @ 40.000 (ft) 8X3 .5E12 Bays 2
SWA Eave Strut @ 40 .000 (ft) 8X3 .5E12 Bays 3
SWA Pipe Strut @ 22 .167 (ft) P6X1O.78 Bays 3
Note: 1) All Purlin strut locations for all roof planes are measured from back
sidewall.
2) Pipe strut locations for all roof planes are measured from back
sidewall.
3) All pipe struts have a 3/8" thick plate and (4) 1/211 A325 bolts
connection.
Eave strut interior connection at SWA uses (4) -1/211 A325 bolts w/SC-18 plate.
Eave strut interior connection at SWC uses (4) -1/211 A325 bolts w/SC-18 plate.
Eave strut connection at end-frame uses (4) -1/211 A325 bolts.
BRACING ---- Roof: 2 bays Rod
Plane SWA 1 bays Rod
Plane SWC 1 bays Rod
Plane EWB :End Frame
Plane EWD :End Frame
Page 6
10/08/2013
GARCO Building Systems, Airway Heights, WA
Design Summary Program User: tabarfuss Job Number: 18415A
Design Summary Report Version: 4 .4 .7 run0l Date: 10/07/13
Start Time: 09:31:07
R:\. .\14-B-18415\verOl-tabarfuss\Bldg-A\run0l\18415A-bldg-A-01.cds
-------------------------------------------------------------------------------
SIDEWALL PLANE SWA -- ( 8.25011 Inset columns )
R:\Jobs\Active\ENG\14-B-1841S\verOl-tabarfuss\Bldg-A\run0l\AwallSWA-Ol.edf
Panel . . . . . . . . . . . . . . . . . . . . PBR26
Girts . . . . . . . . . . . . . . . . . . . . 55.0 ksi Yield Strength
Note to Drafting: provide G90 Galvanized Secondary.
GIRTS SPACINGS 3 ' 6 2@3 '10 3'4 3' 6 0'10 4@4 '4
Bay Elev. Length Member Size Brace L Lap R Lap
# (ft-in) (ft) Identification Locations Exten Exten
---------------------------------------------------------------------
1 316 2S .000 8X2 .5Z14 4 points S 0.000 3 .146 C
2 316 25 .000 8X2 .5Z14 3 points C 3 .146 0.000 S
3 316 25.667 8X2 .SZ16 None S 0.000 0.000 S
1 714 2S.000 8X2 .5Z14 4 points S 0.000 3 .146 C
2 714 25.000 8X2 .5Z14 3 points C 3 .146 0.000 S
3 714 25.667 8X2 .5Z16 None S 0.000 0.000 S
1 1112 25.000 8X2 .SZ14 4 points S 0.000 3 .146 C
2 1112 25.000 8X2 .5Z14 3 points C 3 .146 0.000 S
3 1112 25.667 8X2 .5Z16 None S 0.000 0.000 S
1 1416 25.000 8X2 .SZ14 4 points S 0.000 3 .146 C
2 1416 25.000 8X2 .SZ14 3 points C 3 .146 0.000 S
3 1416 25.667 8X2 .5ZI6 None S 0.000 0.000 S
3 1810 25 .667 C8X11.S None S 0.146 o.146 S
1 18110 25 .000 8X2 .5Z14 4 points S 0.000 2.479 C
2 18110 2S .000 8X2 .5ZI4 3 points C 2 .479 2 .479 C
3 18110 25.667 8X2 .SZ12 3 points C 2 .479 0.000 S
1 2312 2S.000 8X2 .5Z14 4 points S 0.000 2.479 C
2 2312 25.000 8X2 .SZ14 3 points C 2 .479 2.479 C
3 2312 25 .667 8X2 .5Z12 3 points C 2 .479 0.000 S
1 2716 2S .000 8X2 .5Z14 4 points S 0.000 2 .479 C
2 2716 25 .000 8X2 .5Z14 3 points C 2 .479 2 .479 C
3 2716 25.667 8X2 .SZ12 3 points C 2 .479 0.000 S
1 31110 25.000 8X2 .5Z14 4 points S 0.000 2 .479 C
2 31110 25.000 8X2 .5Z14 3 points C 2 .479 2 .479 C
3 31110 2S.667 8X2.SZ12 3 points C 2 .479 0.000 S
1 3612 25.000 8X2.SZ14 4 points S 0.000 2 .479 C
2 3612 25.000 8X2.SZ14 3 points C 2 .479 2 .479 C
3 3612 25.667 8X2 .5Z12 3 points C 2 .479 0.000 S
Note Maximum Distance To Extend Girt From Adjacent Bay is 36.00 inches.
FRAMED OPENINGS:
3 or 4
sided Qty Size Jamb Header/Sill Wall Bay Distance Sill ht
3 1 1610 x 1810 C8X11.5 C8X11.5* SWA 2 210 N/A
Use a C8X11.5 continuous header
Page 7
11/11/2013
GARCO Building Systems, Airway Heights, WA
Design Summary Program User: tabarfuss Job Number: 18415A
Design Summary Report Version: 4.4.7 run0l Date: 10/07/13
Start Time: 09:31:07
R:\ . .\14-B-1841S\verOl-tabarfuss\Bldg-A\run0l\1841SA-bldg A 01.cds
-------------------------------------------------------------------------------
SIDEWALL PLANE SWC -- ( 8.2SO" Inset columns )
R:\Jobs\Active\ENG\14-B-1841S\verOl-tabarfuss\Bldg-A\run0l\AwallSWC-Ol.edf
Panel . . . ... . . . . . . . . . . . . . . . PBR26
Girts . . . . . . . . . . . . . . . . . . . . SS.0 ksi Yield Strength
Note to Drafting: provide G90 Galvanized Secondary.
GIRTS SPACINGS 3 ' 6 2@3 ' 10 3 '4 3 ' 6 0' 10 4@4 '4
Bay Elev. Length Member Size Brace L Lap R Lap
# (ft-in) (ft) Identification Locations Exten Exten
---------------------------------------------------------------------
1 316 25.667 8X2 .SZ16 None S 0.000 0.000 S
2 316 25.000 8X2 .5Z14 3 points S 0.000 3 .146 C
3 316 25.000 8X2 .SZ14 4 points C 3 .146 0.000 S
1 714 25.667 8X2 .5Z16 None S 0.000 0.000 S
2 714 2S.000 8X2 .5Z14 3 points S 0.000 3 .146 C
3 714 25.000 8X2 .SZ14 4 points C 3 .146 0.000 S
1 1112 2S.667 8X2 .5Z16 None S 0.000 0.000 S
2 1112 25.000 8X2 .SZ14 3 points S 0.000 3 .146 C
3 1112 25.000 8X2 .SZ14 4 points C 3 .146 0.000 S
1 1416 25.667 8X2 .5Z16 None S 0.000 0.000 S
2 1416 25.000 8X2 .5Z14 3 points S 0.000 3 .146 C
3 1416 2S.000 8X2 .5Z14 4 points C 3 .146 0.000 S
1 1810 25.667 C8X11.5 None S 0.146 0.146 S
1 18 , 10 2S.667 8X2 .5Z12 3 points S 0.000 2 .479 C
2 18110 25.000 8X2 .5Z14 3 points C 2 .479 2 .479 C
3 18110 25.000 8X2 .5Z14 4 points C 2 .479 0.000 S
1 2312 2S.667 8X2 .5ZI2 3 points S 0.000 2 .479 C
2 2312 25.000 8X2 .5Z14 3 points C 2 .479 2 .479 C
3 2312 25 .000 8X2 .5Z14 4 points C 2 .479 0.000 S
1 2716 25.667 8X2 .5Z12 3 points S 0.000 2 .479 C
2 2716 25.000 8X2 .SZ14 3 points C 2 .479 2 .479 C
3 2716 25.000 8X2 .5Z14 4 points C 2 .479 0.000 S
1 31110 25.667 8X2 .SZ12 3 points S 0.000 2 .479 C
2 31110 25.000 8X2 .5Z14 3 points C 2 .479 2 .479 C
3 31110 25.000 8X2 .5Z14 4 points C 2 .479 0.000 S
1 3612 2S.667 8X2 .5Z12 3 points S 0.000 2 .479 C
2 3612 25.000 8X2 .5Z14 3 points C 2 .479 2 .479 C
3 3612 25.000 8X2 .5Z14 4 points C 2 .479 0.000 S
Note Maximum Distance To Extend Girt From Adjacent Bay is 36.00 inches.
FRAMED OPENINGS:
3 or 4
sided Qty Size Jamb Header/Sill Wall Bay Distance Sill ht
3 1 1610 x 1810 C8X11.5 C8X11.5* SWC 1 510 N/A
Use a C8X11.5 continuous header
Page 8
10/08/2013
GARCO Building Systems, Airway Heights, WA
Design Summary Program User: tabarfuss Job Number: 18415A
Design Summary Report Version: 4.4.7 run0l Date: 10/07/13
Start Time: 09:31:07
R:\ . .\14-B-18415\verOl-tabarfuss\Bldg-A\run0l\18415A-bldg A 01.cds
-------------------------------------------------------------------------------
Endwall Plane EWD Design . . . . . . . . Expandable Frame (CS
R:\Jobs\Active\ENG\14-B-18415\verOl-tabarfuss\Bldg-A\runol\AwallEWD-Ol.edf
Panel . . . . . . . . . . . . . . . . . . . . . . . PBR26
Girts . . . . . . . . . . . . . . . . . . . . . . . . 55.0 ksi Yield Strength
Note to Drafting: provide G90 Galvanized Secondary.
Girts Spacings 3 ' 6 2@3 '10 0 ' 10 2 ' 6 316 0 '10 S@4 '4
Bay Elev. Length Member Size Brace L Lap R Lap
# (ft-in) (ft) Identification Locations Exten Exten
---------------------------------------------------------------------
1 316 27.312 1OX2 .SZ14 None S 0.000 0 .000 C
2 316 27.312 10X2 .5Z14 None C 0.000 0.000 S
1 714 27.312 1OX2 .SZ14 None S 0.000 0.000 C
2 714 27.312 1OX2 .SZ14 None C 0.000 0.000 S
1 1112 27.312 10X2 .5Z14 None S 0.000 0.000 C
2 1112 27.312 1OX2 .SZ14 None C 0 .000 0.000 S
1 1416 27.312 10X2 .5Z14 None S 0.000 0.000 C
2 1416 27.312 C10X15.3 S points C 0.000 0.000 S
1 1810 27.312 C10X15.3 None S 0 .146 0.146 S
1 18 , 10 27.312 1OX2 .SZ12 5 points S 0.000 1.479 C
2 18110 27.312 10X2 .5Z12 5 points C 1.479 0.000 S
1 2312 27.312 1OX2 .SZ12 5 points S 0 .000 1.479 C
2 2312 27.312 10X2 .5Z12 5 points C 1.479 0.000 S
1 2716 27.312 10X2 .5Z12 5 points S 0 .000 1.479 C
2 2716 27.312 10X2 .5Z12 5 points C 1.479 0.000 S
1 31110 27.312 10X2 .5Z12 5 points S 0.000 1.479 C
2 31110 27.312 10X2 .5Z12 5 points C 1.479 0.000 S
1 3612 27.312 10X2 .5Z12 5 points S 0.000 1.479 C
2 3612 27.312 1OX2 .SZ12 5 points C 1.479 0 .000 S
1 4016 20.94S 1OX2 .SZ12 5 points S 0.000 1.479 C
2 4016 20.945 1OX2 .SZ12 5 points C 1.479 0.000 S
Note Maximum distance to extend girt from adjacent bay is 36.00 inches.
FRAMED OPENINGS:
3 or 4
sided Qty Size Jamb Header/Sill Wall Bay Distance Sill ht
3 1 1610 x 1810 C10X15.3 ClOX15 .3* EWD 1 1010 N/A
3 1 1210 x 1410 10X2 .5C12 10X2 .5C14 EWD 2 F.L. N/A
Use continuous header
Page 9
11/12/2013
Garco Building Systems FRAME ID #01 USER NAME:tabarfuss DATE:11/11/13 TIME:16:23:42 PAGE: 1-1
cs 56./40./25. 20./100./25. JOB NAME:18415A FILE:frame-l.fra
LOCATION: Gridlines I
DETAIL FILE: ctive\Eng\14-B-18415\verD.l.-tabarftiss\B.I-dg-A\Drft:g\xOIL (1) All sectional dimensions are in inches.
BOLTS:A325 FULLY TIGHT WEIGHT: 7755 lbs (2) All Flange lengths are measured along outer flange.
PURLINS(horz. from eave) :8"-Z 2@3'3 13/16",3@4'6",2@3'4"
GIRTS (vert. from floor) : 8—Z 3'6",2@3'10", ���'4�'13'6"10-10",4@4'4" (8.25�')
8�'O.25
3�5 0.25
().25 S./,0.25
WSB TT(' .315 1
4..655
2.00 10
12 9
7 8 M �M
40' E.H.
Cap plate-to-web we
x
5/16" fillet both sides
x I
11/4" flange-to-web weld
x
x
x
x
x
0.542' 0.542'
28'
0 2:
CONNECTION DETAILS
Location -D
— _U - 0
Web Dep. 16.0 22.7055 29.4109 36.1164 40.5 N/A 33.5 33.5 33.5 33.5
.:z CD Type BASE SPLICE SPLICE SPLICE HORZ STF CAP (EXT) 4E/4E SPLICE SPLICE 2E/2E
i�3
ID Plate(DN) 10.OXO.625 N/A N/A N/A 4.75XO.5 10.OXO.5 10.oxi.0 N/A N/A 8.OXO.375
Plate(UP) N/A N/A N/A N/A N/A N/A 10.0XI.0 N/A N/A 8.OXO.375
Bolts (4)-1 N/A N/A N/A N/A N/A (16)-1 N/A N/A (8)-3/4
Garco Building Systems FRAME ID #01 USER NAME:tabarfuss DATE:11/11/13 TIME:16:23:42 PAGE: 1-2
cs 56./40./25. 20./100./25. JOB NAME;18415A FILE:frame—l.fra
LOCATION: Gridlines 1
DETAIL FILE: ctive\Eng\14-3-18415\verOl-tabarfuss\Bldg-A\Drftg\xOlR (1) All sectional dimensions are in inches.
BOLTS:A325 FULLY TIGHT WEIGHT: 7755 lbs (2) All Flange lengths are measured along outer flange.
PURLINS(horz. from eave) :8"-Z 2@3'3 13/16",3@4'6",2@3'4"
GIRTS (vert. from floor) : 8"-Z 36",2@3'_10",3'4" 3'6"'0'10",4@4'4" (8.25")
Member Sizes and Connection Details Same as Left Side
8X0-25
0.25 8XQ-375 8XO-5 0.F,
8XQ-25 0.25 0 25 pVEB
10.0" 8X0-275
8X0-5 ,.F.
4 655,
10 2.00F----,
9 12
8
7
-4,0- E.H.
-A
x
d
Cap plate-to-web wel
x
5/16" fillet both sides
11/4" f lange-to-web weld
x
x
x x
x x
:E 0
.542' M -
W
28' 13
CONNECTION DETAILS
Location *-B
0 0 (�) -- (D .- (D �A)
Q-V) Web Dep. 16.0 22.7055 29.4109 36.1164 40.5 A A 33.5 33.5 33.5 33.5 NONE
CD Type BASE SPLICE SPLICE SPLICE HORZ STF nCAP (EXT) 4E/4E SPLICE SPLICE 2E/2E LT STIF
j,-3 —
C, — Plate(DN) 10.OXO.625 N/A N/A N/A 4.75XO.5 10.OXO.5 10.0X1.0 N/A N/A 8 OXO.375 N/A
Plate(UP) N/A N/A N/A N/A N/A N/A 10.0X1.0 N/A N/A 8.OXO.375 N/A
Bolts (4)-1 N/A N/A N/A N/A N/A (16)-1 N/A N/A (8)-3/4 N/A
Garco Building Systems FRAME ID #02 USER NAME:tabarfuss DATE:11/11/13 TIME:16:26:50 PAGE: 2-1
cs 56./40./25. 20./100./25. JOB NAME:18415A FILE:frame-2,fra
LOCATION: Gridlines 2
DETAIL FILE: ctive\Eng\14-B-18415\verOl-tabarfuss\Bldg-A\Drftg\xO2L (1) All sectional dimensions are in inches.
BOLTS:A325 FULLY TIGHT WEIGHT: 5648 lbs (2) All Flange lengths are measured along outer flange.
PURLINS(horz. from eave) :8"-Z 2@3'3 13/16",3@4'6",2@3'4"
GIRTS (vert. from floor) : 8"-Z 3'6",2@3'10", 3'4" 3'6" 0'l0",4@4'4" (8.25")
25
2 5 ().25
O.F. 25 0.25 25
WEB 'r 0 25
6�AD,312
4.665
2.00 10
12 9 C
8
7 C
40' E.H. C
x
x
x
x
x x
0 542' 0.542-*
2 8
0
CONNECTION DETAILS = 2
Location Q*-D
Web Dep. 14.0 21.4170 28.8341 36.2511 41.0 N/A 35.5 35.5 35.5 35.5
CD Type BASE SPLICE SPLICE SPLICE HORZ STF CAP (EXT) 2E/2E SPLICE SPLICE 2E/2E
j�s —
C:, N) Plate(DN) 8.OXO.625 N/A N/A N/A 3,'75XO.375 8.OXO.3125 8.0XI.0 N/A N/A 6.0X0.5
w Plate(UP) N/A N/A N/A N/A N/A N/A 8.OXI.a N/A N/A 6.OXO.5
Bolts (4)-1 N/A N/A N/A N/A N/A (8)-1 N/A N/A (8)-3/4
Garco Building Systems FRAME ID #02 USER NAME:tabarfuss DATE:11/11/13 TIME:16:26:50 PAGE: 2-2
cs 56./40./25. 20./100./25. JOB NAME:18415A FILE;frame-2.fra
LOCATION: Gridlines 2
DETAIL FILE: ctive\Eng\14-B-18415\verOl-tabarfuss\Bldg-A\Drftg\xO2R (1) All sectional dimensions are in inches.
BOLTS:A325 FULLY TIGHT WEIGHT: 5648 lbs (2) All Flange lengths are measured along outer flange,
PURLINS(horz. from eave) :8"-Z 2@3'3 13/16",3@4'6",2@3'4"
GIRTS (vert. from floor) : 8"-Z 3'6",2@3'10",314-1,3'6'1,0-10",4@4'4" (8.25")
Member Sizes and Connection Details Same as Left Side
GX0-25
0.25 6XO 25 6XO 312 0.
GXO-25 0.25 0.25 WED 7,
3.0,0" G>�G--15 GX0.3125
011
4.665,
10 2.00
12
7
AO- E.H.
x
x
x x
x
x x
—:E 0
0.542' M -
w
28 1-3
CONNECTION DETAILS 2
Location *-B
-U Web Dep. 14.0 21.4170 28.8341 36.2511 41.0 N/A 35.5 35.5 35.5 35.5 NONE
(D Type BASE SPLICE SPLICE SPLICE HORZ STF CAP (EXT) 2E/2E SPLICE SPLICE 2E/2E LT STIF
CD c Plate(DN) 8.OXO.625 N/A N/A N/A 3.75XO.375 8.OXO.3125 8.oxi.0 N/A N/A 6.OXO.5 N/A
Plate(UP) N/A N/A N/A N/A N/A N/A 8.oxi.0 N/A N/A 6.OXO.5 N/A
Bolts (4)-1 N/A N/A N/A N/A N/A (8)-1 N/A N/A (8)-3/4 N/A
Garco Building Systems FRAME ID #03 USER NAME:tabarfuss DATE:11/11/13 TIME:16:29:00 PAGE: 3--1
cs 56./40./25. 20./100./25. JOB NAME:18415A FILE:frame-3.fra
LOCATION: Gridlines 3
DETAIL FILE: ctive\Eng\14-B-18415\verOl-tabarfuss\Bldg-A\Drftg\xO3L (1) All sectional dimensions are in inches.
BOLTS:A323 FULLY TIGHT WEIGHT: 5648 lbs (2) All Flange lengths are measured along outer flange.
PURLINS(horz. from eave) A—Z 2@3'3 13/16",3@4'6",2@3'4"
GIRTS (vert. from floor) : 8"-Z 3'6"12@3'10",3'4",3'6",0'10�',4@4�4"(8.25")
6'AO.25
Gy'n.312 ().25
0.25 0,0.
0.25
Vi� G 0101,
-I.F. 4.665 101o"
2.00 10
12 9
7 8 C C
40' E.H. C
n
x
x
x
x
x x
0.542' 0.542
28
r, rn F,
0 3:
CONNECTION DETAILS = 3
Location Q*-D
Web Dep. 14.0 21.4170 28.8341 36.2511 41.0 N/A 35.5 35.5 35.5 35.5
CD Type BASE SPLICE SPLICE SPLICE HORZ STE CAP (EXT) 2E/2E SPLICE SPLICE 2E/2E
C) Plate(DN) 8.OXO.625 N/A N/A N/A 3.75XO.375 8.OXO.3125 8.oxi.0 N/A N/A 6.OXO.5
w Plate(UP) N/A N/A N/A N/A N/A N/A 8.0XI.0 N/A N/A 6.OXO.5
Bolts (4)-1 N/A N/A N/A N/A N/A (8)-1 N/A N/A (8)-3/4
Garco Building Systems FRAME ID #03 USER NAME:tabarfuss DATE:11/11/13 TIME:16:29:00 PAGE: 3-2
cs 56./40./25. 20./100./25. JOB NAME:18415A FILE:frame-3.fra
LOCATION: Gridlines 3
DETAIL FILE: ctive\Eng\14-B-18415\verOl-tabarfuss\Bldg-A\Drftg\xO3R (1) All sectional dimensions are in inches.
BOLTS:A325 FULLY TIGHT WEIGHT: 5648 lbs (2) All Flange lengths are measured along outer flange.
PURLINS(horz. from eave) :8—Z 2@3'3 13/16",3@4'6",2@3'4"
GIRTS (vert. from floor) : --8"--Z 3'6",2@3'10",3'4",3'6"10'10"14@4,4" 18.25") - -
Member Sizes and Connection Details Same as Left Side
6X0-25
0.25 6XG 25 GXO 312 0.F,
6X0-25 0.25 0.25 WED
10,()" 6XO 25 6X0.312
10,0" 1.p.
4.665
10 2.00
9 12
7
40' E.H.
x
x
I x x
X
x
x x
:2 0
.542'
28
CONNECTION DETAILS 3
Location *-B
Q
Web Dep. 14.0 21.4170 28.8341 36.2511 41.0 N/A 35.5 35.5 35.5 35.5 NONE
Type 2E/2E SPLICE SPLICE 2E/2E LT STIF
(D BASE SPLICE SPLICE SPLICE HORZ STF CAP (EXT)
8.OXO.3125
CD C Plate(DN) 8.OXO.625 N/A N/A N/A 3.75XO.375 8.oxi.0 N/A N/A 6.OX0.5 N/A
Plate(UP) N/A N/A N/A N/A N/A N/A 8.oxi.0 N/A N/A 6.OXO.5 N/A
Bolts (4)-1 N/A N/A N/A N/A N/A (8)-1 N/A N/A (8)-3/4 N/A
Garco Building Systems FRAME ID #04 USER NAME:tabarfuss DATE:11/11/13 TIME:16:32:32 PAGE: 4-1
cs 56./40./25. 20./100./25. JOB NAME:18415A FILE:frame-4-w-post.fra
LOCATION: Gridlines 4
DETAIL FILE: ct-ive\Eng\14-B-18415\ver0l.-tiabarfuss\Bldg-A\Drftg\xO4I. (1) All sectional dimensions are in inches.
BOLTS:A325 FULLY TIGHT WEIGHT: 7054 lbs (2) All Flange lengths are measured along outer flange.
PURLINS(horz. from cave) :8"-Z 2@3'3 13/16",3@4'6",2@3'4"
GIRTS (vert. from floor) : 8"-Z 3'6",2@3'10",3'4",3'6",0'10",4@4'4" (8.25")
25
'25
6�,O.3�
O.F. ().25 6y,0.25 25
B 6)�O.315 S.W.
I.E. 9.57�I
2.00 10
9
12 C
7 C
40' F.H. —
E
Single stiffener (NS/FS)
x
x aligned over column web
Z Rotate post to form
endwall column
x x
Brace interior column @
x K
11'1, 18'9, 23'1 , 275, 36'1 elevs.
x x
x x
11,512 0.542' 0.5
E, 28'
0 3:
CONNECTION DETAILS
Location Q*-D C
W Web Dep. 14.0 21.3171 28.6342 35.951.3 41.0 N/A 29.5 29.5 29.5 38.4375 20.0 20.0
Cc
(D Type BASE SPLICE SPLICE SPLICE HORZ STF CAP (EXT) 2E/2E SPLICE 2E/2E SPLICE BASE CAP/STF
i�s —
C) 0) Plate(DN) 8.OXO.625 N/A N/A N/A 3.75XO.375 8.OXO.375 8.0XI.0 N/A 6.0X0.5 N/A 8.OXO.625 8.OXO.375
zo, Plate(UP) N/A N/A N/A N/A N/A N/A 8.0XI.0 N/A 6.OXO.5 N/A N/A 2.75XO.375
Bolts (4)-1 N/A N/A N/A N/A N/A (8)-1 N/A (8)-3/4 N/A (4)-3/4 (4)-1/2
Garco Building Systems FRAME ID #04 USER NAME:tabarfuss DATE:11/11/13 TIME:16:32:32 PAGE: 4-2
cs 36./40./25. 20./100./25. JOB NAME:18415A FILE:frame_4_w_post.fra
LOCATION: Gridlines 4
DETAIL FILE: ctive\Eng\14-B-18415\verOl-tabarfuss\Bldg-A\Drftg\xO4R (1) All sectional dimensions are in inches.
BOLTS:A325 FULLY TIGHT WEIGHT: 7054 lbs (2) All Flange lengths are measured along outer flange.
PURLINS(horz. from eave) :8"-Z 2@3'3 13/16",3@4'6",2@3'V'
GIRTS (vert. from floor) : 8"-Z 3'6",2@3'lV 3'4",3'6",0'10",4@4'4" (8.25")
Member Sizes and Connection Details Same as Left Side
6X0.25
0.25 GXO-25 6XO
0 185 375 O.F
6X0-25 6X0-25 0.25
51 6XO WEB Tnrc
10, .375
9 577,
10 2.00
12
=4�O E.H.
x
x
Single stiffener (NS/FS)
aligned over column web
x x
Rotate post to form
Brace interior column @
endwall column
11'1 , 18'9, 23'1 , 27'5, 36'1 elevs. x x
C-2
x x
x x
:E 0
0.542' 0 542
28 1-3
CONNECTION DETAILS = 4
Location (D—B Q Q (D G) I nA
Web Dep. 14.0 21.3171 28.6342 35.9513 41.0 N/A 29.5 29.5 29.5 38.4375 20.0 20.0 NONE
Type BASE SPLICE SPLICE SPLICE HORZ STF CAP (EXT) 2E/2E SPLICE 2E/2E SPLICE BASE CAP/STF LT STIF
(D
N) Pl.te(DN) 8 OXO.625 N/A N/A N/A 3."75M.375 8.OXO.375 8.QX1.0 N/A 6.OX0.5 N/A 8.OXO.625 8.OXO�375 N/A
C)
Plate(UP) N/A N/A N/A N/A N/A N/A 8.0XI.0 N/A 6.OX0.5 N/A N/A 2.75XO.375 N/A
Bolts (4)-1 N/A N/A N/A N/A N/A (s)-i N/A (8)-3/4 N/A (4)-3/4 (4)-1/2 /A
BRACE AT TOP OF ENDWALL COLUMN JOB NO.
14-B- 18415
Extend (1) connection plate @ FL-2.
Attach to stiffener @ FL-3.
Use (2) 1" A325 Bolts. BEAM STRUT
10" x %" flanges
12" x 0. 185" web
0
0
1/4
3 16"
1" A325 Bolt
0
0
21, 3 x 3 x Y4 w/ spacers bolted at Y3rd points
1" A325 Bolt
1/2" Clip (typ) 2111
En ame rafter
C\I
2" Min. Edge Dist.
NN.
Page 18
10/08/2013
UHE CRANE BRACKET DETAILS JOB NO.
14-B- 184 15
L2 x 2 x Y8 Min. flange brace NS & FS
at purlin uphill and downhill from bra
3/8" Stiffeners
NS & FS
Rafter
0 0 4-Y4" x%" x 6"
Plate (typ)
,0
4� 0
V L3x3x3/16
Bracket angle brace
6" If spliced w/ 3/4" bolts
1/2 End-plate w/
3/4 bolts
Cq
C) Bracket
flanges and web
Runway beam by others
Beam height
Y2" Rod brace
between FL's 2 &3
T T�
Note: End stops by others
1) Provide bracket splice bracket angle brace only if Page 19
bracket length exceed 1'-2 at lowest point 10/08/2013
2) Use standard weldement per WS-3
ARM all
0,
Building syatuma
REACTIONS
BUILDER: J & J CONSTRUCTION OF PORT ANGELES I
CUSTOMER: BLUE MOUNTAIN LEASING
JOB NUMBER: 14-B-18415
Notes
1) The reactions provided are based on the Order Documents at the time of mailing. Any changes to building
loads or dimensions may change the reactions. The reactions will be superseded and voided by any future
mailing.
2) The reactions provided have been created with the following layout(unless noted otherwise).
a) A reaction table is provided with the reactions for each load group.
b) Rigid Frames
(1) Gabled Buildings
(a) Left and Right columns are determined as if viewing the left side of the building,as shown on
the anchor rod drawing,from the outside of the building.
(b) Interior columns are spaced from left side to right side.
(2) Single Slope Buildings
(a) Left column is the low sidecolumn.
(b) Right column is the high side column.
(c) Interior columns are spaced from low side to high side.
c) Endwalls
(1) Left and Right columns are determined as if viewing the wall from the outside.
(2) Interior columns are spaced from left to right.
d) Anchor rod size is determined by shear and tension at the bottom of the base plate. The length of the
anchor rod and method of load transfer to the foundation are to be determined by the foundation engineer.
e) Anchor rods are ASTM Fl 554 Gr. 36 material unless noted otherwise on the anchor rod layout drawing.
f) X-Bracing
(1) Rod Bracing reactions have been included in values shown in the reaction tables.
(2) For IBC and UBC based building codes,when x-bracing is present in the sidewall, individual
longitudinal seismic loads(RBUPEQ and RBDWEQ)do not include the amplification factor,00.
(3) For IBC and UBC based building codes,when x-bracing is present in the endwall, individual
transverse seismic loads(EQ)do not include the amplification factor,no.
3) Reactions are provided as un-factored for each load group applied to the column. The foundation engineer will
apply the appropriate load factors and combine the reactions in accordance with the building code and design
specifications to determine bearing pressures and concrete design. The factors applied to load groups for the
steel column design may be different than the factors used in the foundation design.
a) For projects using ultimate design wind speeds such as 2012 IBC or 2010 Florida building code,the wind
load reactions are at a streneth value with a load factor of 1.0.
The manufacturer does not provide "maximum"load combination reactions.However,the individual load
reactions provided may be used by the foundation engineer to determine the applicable load combinations for
his/her design procedures and allow for an economical foundation design.
Rev D 2/25/11
FRAME ID #01 USER NAME:tabarfuss DATE:10/ 8/13 PAGE: 1-3
cs 56./40./25. 20./100./25- JOB NAME:18415A FILE:frame-l.fra
SUPPORT REACTIONS FOR EACH LOAD GROUP
*LOCATION: Gridlines: 1
NOTE: All reactions are in kips and kip-ft. TIME:11:23:33
REACTION NOTATIONS
2� Z
HL �-, HR
� Vl, VR
L-D
LOAD GROUP REACTION TABLE 1
COLUMN *-D,
LOAD GROUP HL VL LNL HR VR LNR
DL 0.6 20.2 0.0 -0.6 5.9 0.0
COLL 0.4 4 .2 0.0 -0.4 2.5 0.0
SNOW 3.2 35.2 0.0 -3.1 21.21 0.0
ADW 0.0 1.4 0.0 0.0 0.01 0.0
AlDlL 0.3 3.9 0.0 -0.3 3.5 0.0
AlDlR 0.3 3.5 0.0 -0.3 3.9 0.0
LL 2.5 28.1 0.0 -2.5 17.0 0.0
AlVlL 0.5 8.8 0.0 -0.5 3.9 0.0
AlHlR -0.6 -0.8 0.0 -0.6 0.8 0.0
AlHlL 0.6 0.8 0.0 0.6 -0.8 0.0
AlVlR o-5F-3.9 0.0 -0.5 8.8 0.0
EQ -6.81 -9.6 0.0 -6.9 9.6 0.0
WL1 -11.41 -50.6 0.0 -16.6 -5.0 0.0
WL2 -19.2 -14 9 0.0 -7.4 12.7 0.0
LWL1 6.1 -44 1 0.0 -8.8 -21.9 0.0
LWL2 5.81 -41 1 0.0 -9.0 -22.5 0.0
LWL3 7.0 -31.� 0.0 -9.4 -15.4 0.0
LWL4 6.9 -30.5 0.0 -9.5 -15.7 0.0
LWL5 0.3 -8.5 0.0 -1.6 -4.1 0.0
LWL6 0.0 -5.5, 0.0, -1.8, -4.7, 0.0
LOAD GROUP DESCRIPTION
DL Roof Dead Load
CCLL Roof Collateral Load
SNOW Roo.- Snow Load
ADW Auxiliary Dead Weight
AlDlL Auxiliary Crane #1 Dead Loading #1 Max. at Left
AlDlR Auxiliary Crane #1 Dead Loading #1 Max. at Right
LL Roof Live Load
AlVlL Auxiliary Crane #1 Vert Loading #1 Max. at Left
AlHlR Auxiliary Crane #1 Horz Loading #1 to the Right
AlHlL Auxiliary Crane #1 Horz Loading #1 to the Left
AlVlR Auxiliary Crane #1 Vert Loading #1 Max. at Right
EQ Lateral Seismic Load [parallel to plane of frame]
WL1 Lateral Primary Wind Load
WL2 Lateral Primary Wind Load
LWLl Longitudinal Primary Wind Load
LWL2 Longitudinal Primary Wind Load
LWL3 Longitudinal Primary Wind Load
LWL4 Longitudinal Primary Wind Load
LWLS Longitudinal Primary Wind Load
LWL6 Longitudinal Primary Wind Load
FRAME ID #01 USER NAME:tabarfuss DATE:10/ 8/13 PAGE: 1-4
cs 56./40./25. 20./100./25. JOB NAME:18415A FILE:frame l.fra
SUPPORT REACTIONS FOR EACH LOAD GROUP
*LOCATION: Gridlines: I
NOTE: All reactions are in kips and kip-ft. TIME:11:23:33
REACTION NOTATIONS
HL HR
VL VR
F-'--B I
LOAD GROUP REACTION TABLE * = 1
COLUMN *-D *-B
LOAD GROUP HL VL LNL HR VR LNR
LWL7 1.3 3-9 0.0 -2.21 2.3 0.0
LWL8 1.2 5.1 0.0 -2.3 2.1 0.0
WL3 14 .6 -20.5 0.0 10.4 -35.0 0.0
WL4 6.8 15.2 0.0 19.6 -17.2 0.0
RS 2.0 15.1 0.0 -2.0 12.9 0.0
LS 2.0 26.0 0.0 -2.0 7.3 0.0
P2K1 0.3 2.0 0.0 -0.3 1.0 0.0
P2KRl 0.0 1.0 0.0 0.0 0.9 0.
SBAL 2.4 26.6 0.0 -2.3 16.0 0.0
DSNW 0.0 -0.1 0.0 0.0 2.5 0.0
SSNW 1 0.01 0.0, 0. 1 0.0, 1.9 0.01
LOAD GROUP DESCRIPTION
LWL7 Longitudinal Primary Wind Load
LWL8 Longitudinal Primary Wind Load
WL3 Lateral Primary Wind Load
WL4 Lateral Primary Wind Load
RS Unbalanced Right Roof Snow Load
LS Unbalanced Left Roof Snow Load
P2K1 2000# Point Load
P2KR1 2000# Point Load
SBAL Code Calculated Balanced Roof Snow Load
DSNW Drifting Snow
SSNW Sliding Snow
FRAME ID #02 USER NAME:tabarfuss DATE:11/11/13 PAGE: 2-3
cs 56./40./2S. 20./100./25. JOB NAME:18415A FILE:frame-2.fra
SUPPORT REACTIONS FOR EACH LOAD GROUP
*LOCATION: Gridlines: 2
NOTES: (1) All reactions are in kips and kip-ft. TIME:16:26:50
(2) The seismic overstrength factor (Omega) is not included in the "RBDWEQ" and "RBUPEQ" Load Group reactions.
Seismic "BASE-ONLY" combination reactions include an overstrength factor of: 2.000
REACTION NOTATIONS 11
HL Z H R
VL VR
F-i-D] F 157
LOAD GROUP REACTION TABLE 2
COLUMN *-D, *-B
LOAD GROUP HL VL LNL HR VR LNR
DL 0-6 4.5 0.0 -0.6 5.7 0.0
COLL 0.4 2.1 0.0 -0.3 3.1 0.0
SNOW 3.0 17.4 0.0 -2.8 2S.7 0.0
ADW 0.1 1.4 0.0 -0.1 1.4 0.0
AIDIL 0.2 2.5 0.0 -0.2 2.1 0.0
AlDlR 0.2 2.1 0.0 -0.21 2.5 0.0
LL 2.4 13.9 0.0 -2.3 20.6 0.0
AlVIL 0.4 7.4 0.0 -0.4 2-6 0.0
AIHIR -0.6 -0.8 0.0 -0.6 0.8 0.0
AIHIL 0.6 0.8 0.0 0.6 -0.8 0.0
AIVIR 0.4 2. 6 0.0 -0.4 7.4 0.0
EQ -3.2 -4.5 0.0 -3.6 4.4 0.0
RBUPEQ 0.1 -13.5 -8.6 -0.11 -16.6 -10.5
WL1 -7.S -26.1 0.0 -13.5 -12.4 0.0
WL2 -14.8 -7.5 0.0 -3.2 6.2 0.0
WL3 10.6 -9.4 0.0 5.4 -29.4 0.0
WL4 3.3 9.2 0.0 1S.8 -10.8 0.0
LWLI S.1 -23.3 0.0 -11.1 -24.6 0.0
RBUPLW 0.2 -17.6, -11.2 -0.2 -21.6 -13.7
LWL2 1 4.81 -22.31 0.01 -11.41 -24.5 0.0
LOAD GROUP DESCRIPTION
DL Roof Dead Load
COLL Roof Collateral Load
SNOW Roof Snow Load
ADW Auxiliary Dead Weight
AIDIL Auxiliary Crane #1 Dead Loading #1 Max. at Left
AlDlR Auxiliary Crane #1 Dead Loading #1 Max. at Right
LL Roof Live Load
AIVIL Auxiliary Crane #1 Vert Loading #1 Max. at Left
AIHIR Auxiliary Crane #1 Horz Loading #1 to the Right
AlHIL Auxiliary Crane #1 Horz Loading #1 to the Left
AIVIR Auxiliary Crane #1 Vert Loading #1 Max. at Right
EQ Lateral Seismic Load [parallel to plane of frame]
RBUPEQ Upward Acting Rod Brace Load from Longit. Seismic
WL1 Lateral Primary Wind Load
WL2 Lateral Primary Wind Load
WL3 Lateral Primary Wind Load
WL4 Lateral Primary Wind Load
LWLI Longitudinal Primary Wind Load
RBUPLW Upward Acting Rod Brace Load from Longitud. Wind
LWL2 Longitudinal Primary Wind Load
FRAME ID #03 USER NAME:tabarfuss DATE:11/11/13 PAGE: 3-4
cs 56./40./25. 20./100./25- JOB NAME:18415A FILE:frame 3.fra
SUPPORT REACTIONS FOR EACH LOAD GROUP
*LOCATION: Gridlines: 3
NOTES: (I) All reactions are in kips and kip-ft. TIME:16:29:00
(2) The seismic overstrenqth factor (Omeqa) is not included in the "RBDWEQ" and "RBUPEQ" Load Group reactions.
Seismic "BASE-ONLY" combination reactions include an overstrength factor of: 2.000
REACTION NOTATIONS
HL HR
VL IVR
L-1
[jD F B
LOAD GROUP REACTION TABLE 3
COLUMN *-D *-B
LOAD GROUP HL VL LNL HR VR LNR
LWL3 6.2 -17.41 0.0 -11.3 -16.8 0.0
LWL4 6.1 -16.51 0.0 -11.4 -16.0 0.0
LWL5 -2.2 -4.11 0.0 -0.7 -6.0 0.0
LWL6 -2.5 -3.7 0.0 -1.0 -5.9 0.0
LWL_7 -1.11 1.5 0.0 -1 .0 1 .9 0.0
LWL8 -1.21 1.9 0.0 -1.11 2.0 0.0
R S 1.91 7.5 0.0 -1 .91 13.0 0.0
LS 1 .91 13.0 0.0 -1.9 7.5 0.0
P2KI 0.31 1 .0 0.0 -0.3 1.0 0.0
P2KRI 0.0 0.0 0.0 0.0 1.0 0.0
SBAL 2.31 13.1 0.0 -2.1 19.4 0.0
DSNW -0.1 -0.1 0-0 0.1 4.6 0.0
SSNW 0.0 -0.1 0.0 0.1 3.6 0.0
RBDWLW 0.0 17 6 0.0 0.0 21.6 0.0
RBDWEQ 0.0 13.5, 0.0, 0.0, 16.6, 0.0
LOAD GROUP DESCRIPTION
LWL3 Longitudinal Primary Wind Load
LWL4 Longitudinal Primary Wind Load
LWL5 Longitudinal Primary Wind Load
LWL6 Longitudinal Primary Wind Load
LWL7 Longitudinal Primary Wind Load
LWL8 Longitudinal Primary Wind Load
RS Unbalanced Right Roof Snow Load
LS Unbalanced Left Roof Snow Load
P2KI 2000# Point Load
P2KRI 2000# Point Load
SBAL Code Calculated Balanced Roof Snow Load
DSNW Drifting Snow
SSNW Sliding Snow
RBDWLW Downward Acting Rod Brace Load from Longit. Wind
RBDWEQ Downward Acting Rod Brace Load from Long. Seismic
FRAME ID #04 USER NAME:tabarfuss DATE:11/11/13 PAGE: 4-3
cs 56./40./25. 20./100./25. JOB NAME:18415A FILE:frame-4.fra
SUPPORT REACTIONS FOR EACH LOAD GROUP
*LOCATION: Gridlines: 4
NOTE: All reactions are in kips and kip-ft. TIME:16:38:32_
REACTION NOTATIONS
HL HR
IVL VR
F�-7D F�-7B
LOAD GROUP REACTION TABLE 4
COLUMN *-D *-B
LOAD GROUP HL VL LNL HR VR LNR
DL 0.6 4.4 0.0 -0.6 5.6 0.0
COLL 0.4 2.1 0.0 -0.4 3.1 0.0
SNOW 3.3 17.4 0.0 -3.1 25.7 0.0
AlDIL 0.3 3.9 0.0 -0.3 3.5 0.0
AlDlR 0.3 3.5 0.0 -0.3 3.9 0.0
LL 2.6 13.9 0.0 -2.5 20.6 0.0
AIVIL 0.6 8.8 0.0 -0.6 3.9 0-0
AlHlR -0.6 -0-81 0.0 -0.61 0.8 0.01
AlHlL 0.6 0.8 0.0 0.6 -0.8 0.0
AlVlR 0.6 3.9 0.0 -0.6 8.8 0.0
EQ -3.2 -4.5 0.0 -3.5 4.4 0.0
WL1 -7.5 -26.0 0.0 -13.5 -12.3 0.0
WL2 -15.0 -7.5 0.0 -3.0 6.2 0.0
LWLl 5.31 -23.3 0.0 -11.3 -24.1 0.0,
LWL2 5.01 -22.2 0.0 -11.6 -24.5 0.0
LWL3 6.4 -17.1 0.0 -11.6 -16.6 0.0
LWL4 6.3 -16.6 0.0 -11.7 -16.6 0.0
LWL5 -2.2 -4 .7 0.0 -0.7 -6.0 0.0
LWL6 -2.5 -3.6 0.0 -1.0 -5.9 0.0
LWL7 -1.1 1.5 0.0, -1.0, 1.9, 0.0,
LOAQ_�P-DERLPTION
DL Roof Dead Load
COLL Roof Collateral Load
SNOW Roof Snow Load
AlDlL Auxiliary Crane #1 Dead Loading #1 Max. at Left
AlDlR Auxiliary Crane #1 Dead Loading #1 Max. at Right
LL Roof Live Load
AlVlL Auxiliary Crane #1 Vert Loading #1 Max. at Left
AlHlR Auxiliary Crane #1 Hor2 Loading #1 to the Right
AlHlL Auxiliary Crane #1 Horz Loading #1 to the Left
AlVlR Auxiliary Crane #1 Vert Loading #1 Max. at Right
EQ Lateral Seismic Load [parallel to plane of frame]
WL1 Lateral Primary Wind Load
WL2 Lateral Primary Wind Load
LWL1 Longitudinal Primary Wind Load
LWL2 Longitudinal Primary Wind Load
LWL3 Longitudinal Primary Wind Load
LWL4 Longitudinal Primary Wind Load
LWL5 Longitudinal Primary Wind Load
LWL6 Longitudinal Primary Wind Load
LWL7 Longitudinal Primary Wind Load
FRAME ID #04 USER NAME:tabarfuss DATE:11/11/13 PAGE: 4-4
cs 56./40./25. 20./100./25- JOB NAME:18415A FILE:frame-4.fra
SUPPORT REACTIONS FOR EACH LOAD GROUP
*LOCATION: Gridlines: 4
NOTE: All reactions are in kips and kip-ft. TIME:16:38:32
REACTION NOTATIONS
HL HR
IVL VR
Eki F I_B1
LOAD GROUP REACTION TABLE 4
COLUMN *-D *-B
LOAD GROUP HL VL LNL HR VR LNR
LWL8 -1.2 1.9 0.0 -1.1 1.9 0-0
WL3 10 6 -9.4 0.0 5.4 -29.4 0.0
WL4 3.1 9.2 0.0 16.0 -10.9 0.0
RS 2.1 7.5 0.0 -2.1 13.0 0.0
LS 2.1 13 0 0.0 -2.1 7.5 0.0
P2K1 0.3 1.0-- 0.0 -0.3 1.0 0-0
P2KRl 0.0 0.0 0.0 0.0 1.0 0.0
SBAL 2.5 13.1 0.0 -2.3 19.4 0.0
DSNW -0.11 -0.1 0.0 0.1 4.6 0.0
SSNW 1 0.01 -0.1, 0.0, 0.11 3.6, 0.0
LOAD GROUP DESCRIPTI
LWL8 Longitudinal Primary Wind Load
WL3 Lateral Primary Wind Load
WL4 Lateral Primary Wind Load
RS Unbalanced Right Roof Snow Load
LS Unbalanced Left Roof Snow Load
P2K1 2000# Point Load
P2KRl 2000# Point Load
SBAL Code Calculated Balanced Roof Snow Load
DSNW Drifting Snow
SSNW Sliding Snow
FRAME ID #04 USER NAME: tabarFuss DATE: 10/ 8/13 PAGE: 4-3
cs 56. /40. /25. 20. /100. /25. JOB NAME: 18415A FILE: frame-4-w-post. Fro.
UPPORT REACTIONS FOR EACH LOAD GROUP
LOCATION: Gridtines: 4
OTES: ( D ALL reactions are in kips and kip-ft. TIME: 15: 41:�4;
(2) The seismic overstrength Factor (Omega) is not included in the 'RBDWEQ' and 'RBUPEQ' Load Group reactions.
Seismic 'BASE-ONLY' combination reactions include an overstrength factor of: 2. 000
11EACTION N13TAT113NS
IVI
F-__`C-,
-13AD GROUP REACTION TABLE 4
COLUMN X-C
-OAD GROUP HI VI LNI
DL 0. 0 4. 4 0. 0
COLL 0. 0 2. 1 0. 0
SNOW 0. 0 17. 8 0. 0
AIDIL 0. 0 0. 9 0. 0.
AlDIR 0. 01 0. 9 0. 0
LL 0. 0 14. 2 0. 0
AlVIL 0. 0 1. 5 0. 0
AIHIR 0. 0 0. 0 0. 0
AIHIL 0. 0 0. 0 0. 0
AlVIR 0. 0 1. 5 0. 01
EQ 0. 01 0. 4 0. 0
RBUPEQ 0. 0 -0. 1 0. 0
WL1 0. 0 -8. 6 0. 0
WL2 0. 0 -7. 5 0. 0
WL3 0. 0 -8. 3 0. 0
WL4 0. 0 -7. 1 0. 01
LWL1 0. 01 -3. 4 14. 6
RBUPLW 0. 0 0. 1 0. 0
LWL2 0. 01 -3. 4 14. 6
2
LWL3 0. 01 1. 3 -16.
-DAD GROUP DESCRIPT113N
DL Roof Dead Load
COLL Roof Collateral Load
SNOW Roof Snow Load
AlDIL Auxi tiary Crane #1 Dead Loading #1 Max. at Left
AlDIR Auxi tiary Crane #1 Dead Loading #1 Max. at Right
LL Roof Live Load
A1VlL Auxi tiary Crane #1 Vert Loading #1 Max. at Left
AIHIR Auxi liary Crane #1 Horz Loading #1 to the Right
AlHIL Auxi tiary Crane #1 Horz Loading #1 to the Left
AIVIR Auxi tiary Crane #1 Vert Loading #1 Max. at Right
EQ Lateral Seismic Load (parallel to plane of Frame]
RBUPEQ Upward Acting Rod Brace Load from Longit. Seismic
WLI Lateral Primary Wind Load
WL2 Lateral Primary Wind Load
WL3 Lateral Primary Wind Load
WL4 Lateral Primary Wind Load
LWLI Longitudinal Primary Wind Load
RBUPLW Upward Acting Rod Brace Load from Longitud. Wind
LWL2 Longitudinal Primary Wind Load
LWL3 Longitudinal Primary Wind Load
FRAME ID #04 USER NAME: taloorfuss DATE: 10/ 8/13 PAGE; 4-4
cs 56. /40. /25. 20. /100. /25. JOB NAME: 18415A FILE: FrQme-4-w-post. fra
uPPbRT REACTIONS FOR EACH LOAD GROUP
LOCATION: Gridlines: 4
OTES: ( 1) Ali reactions are in kips and kip-ft. TIME: 15: 41: 4;
(2) The seismic overstrength Factor (Omega) is not included in the 'RBDWEQ' and 'RBUPEQ' Load Group reactions.
Seismic 'BASE-ONLY' combination reactions include an overstrength factor of: 2. 000
�EACTION NOTATIONS
IVI
F-1-T,
_OAD GROUP REACTION TABLE 4
COLUMN W-C
LOAD GROUP HI vi LNI
LWL4 0. 0 1. 3 -16. 2
LWL5 0. 0 -2. 2 14. 6
LWL6 0. 0 -2. 2 14. 6_
LWL7 0. 0. 2. 4 -16. 2
LWL8 0. 0 2. 4 -16. 2
RS 0. 0 11. 6 0. 0
LS 0. 0 11. 6 0. 0
P2KI 0. 0 1. 1 0. 0
P2K2 0. 0 1- 1 0. 01
P2KRI 0. 01 0. 0 0. 0
SBAL 0. 0 13. 4 o. b
DSNW 0. 0 0. 0 0. 0
SSNW 0. 0 0. 0 0. 0
RBDWLW 0. 0 -0. 4 0. 0
RBDWEQ 0. 0 -0. 31 0. 01
_0AD GROUP DESCRIPT113N
LWL4 Longitudinal Primary Wind Load
LWL5 Longitudinal Primary Wind Load
LWL6 Longitudinal Primary Wind Load
LWL7 Longitudinal Primary Wind Load
LWL8 Longitudinal Primary Wind Load
RS Unbalanced Right Roof Snow Load
LS Unbalanced Left Roof Snow Load
P2KI 2000# Point Load
P2K2 2000# Point Load
P2KRI 2000# Point Load
SBAL Code Calculated Balanced Roof Snow Load
DSNW Drifting Snow
SSNW Sliding Snow
RBDWLW Downward Acting Rod Brace Load from Longit. Wind .
RBDWEQ Downward Acting Rod Brace Load From Long. Seismic
FRAME ID #02 USER NAME:tabarfuss DATE:11/11/13 PAGE: 2-4
cs 56./40./25. 20./100./25. JOB NAME:18415A FILE:frame-2.fra
SUPPOR� REACTIONS FOR EACH LOAD GROUP
*LOCATION: Gridlines: 2
NOTES: (1) Ali reactions are in kips and kip-ft. TIME:16:26:50
(2) The seismic overstrenqth factor (Omega) is not included in the "RBDWEQ" and 'RBUPFQ" Load Group reactions.
Seismic "BAS7-ONLY" combination reactions include an overstrenqth factor of: 2.000
REACTION NOTATIONS
HL HR
VL VR
L__]
rT D
LOAD GROUP REACTION TABLE 2
COLUMN *-D *_B
LOAD GROUP HL VL LNL HR VR LNR
LWL3 6.2 -17.1 0.0 -11.3 -16.7 0.0
LWL4 6.1 -16.7 0.0 -11.4 -16.6 a.0
LWL5 -2.2 -4.7 0.0 -0.7 -6.0 0.0
LWL6 -2.5 -3.� 0.0 -1.0 -5.9 0.0
LWL� -1.1 1.51 0.0 -1.0 1.9 0.0-
LWL8 -1.2 1.9j 0.0 -1.1 2.0 0.0
RS 1.9 7.5 0.0 -1.9 13.0 0.0
LS 1.9 13.01 0.0 -1 .9 �.5 0.0
P2KI 0.3 1.01 0.0 -0.3 1.0 0.0
P2KRI 0.0 0.0 0.0 0.0 1.0 0.0
SBAL 2.3 13.1 0.0 -2.1 19.4 0.0
DSNW -0.1 -0.1 0.0 0.1 4.6 0.0
SSNW 0.01 -0.1 0.0 0.1 3.6 0.0
RBDWLW 0.01 17.6 0.0 0.0 21.6 0.0
RBDWEQ 1 0.01 13.5, 0.0, 0.0, 16.61 0.0,
LOAD GROUP DESCRIPTION
LWL3 Longitudinal Primary Wind Load
LWL4 Longitudinal Primary Wind Load
LWL5 Longitudinal Primary Wind Load
LWL6 Longitudinal Primary Wind Load
LWL7 Longitudinal Primary Wind Load
LWL8 Longitudinal Primary Wind Load
RS Unbaianced Right Roof Snow Load
LS Unbalanced Left Roof Snow Load
P2K1 2000# Point Load
P2KRI 2000# Point Load
SBAL Code Calculated Balanced Roof Snow Load
DSNW Drifting Snow
SSNW Sliding Snow
RBDWLW Downward Acting Rod Brace Load from Longit. Wind
RBDWEQ Downward Acting Rod Brace Load from Long. Seismic
FRAME ID #03 USER NAME:tabarfuss DATE:11/11/13 PAGE: 3-3
cs 56./40./25. 20./100./25. JOB NAME:18415A FILE:frame-3.fra
SUPPORT REACTIONS FOR EACH LOAD GROUP
*LOCATION: Gridlines: 3
NOTES: (l) All reactions are in kips and kip-ft. TIME:16:29:00'
(2) The seismic overstrength factor (Omega) is not included in the "RBDWEQ" and "RBUPEQ" Load Group reactions.
Seismic "BASE-ONLY" combination reactions include an overstrength factor of: 2.000
REACTION NOTATIONS
HL HR
IVL VR
LOAD GROUP REACTION TABLE 3
COLUMN *-D *-B
LOAD GROUP HL VL LNL HR VR LNR
DL 0.6 4.5 0.0 -0.6 5.7 0.0
COLL 0.4 2.1 0.0 -0.3 3.1 0.0
INC 3.0 17.4 0.0 -2.8 25.7 0.0
j;,:
ADW 0.1 1.4 0.0 -0.1 1.4 0.0
AlDlL 0.2 2.5 0.0 -0.2 2.1 0.0
AlDlR 0.2 2.1 0.0 -0.2 2.5 0.0
LL 2.4 13.9 0.0 -2.3 20.6 0.0
AlVlL 0.4� 7.4 0.0 -0.4 2.6 0.0
AlHlR -0.6 -0.8 0.0 -0.6 0.8 0.0
AlHlL 0.6 0.8 0.0 0.6 -0.8 0.0
AlVlP 0.4 2.6 0.0 -0.4 7.4 0.0
EQ -3 2 -4.5 0.0 -3.6 4.4 0-0
RBUPEQ 0.1 -13.5 -8.6 -0.1 -16. 6 -10.5
WL1 -7.5 -26.1 0.0 -13.5 -12.A 0.0
WL2 -14.8 -7.5 0.0 -3.2 6.2 0.0
WL3 10.6 -9.4- 0-0 5.4 -29.4 0.0
WL4 3.3 9.2 0.0 15.8 -10.8 0.0
LWLl 5.1 -24.1 0.0 -10.9 -24.9 0.0
RBUPLW 0.2 -17. 6 -11.2 -0.2 -21.6 -13.7
LWL2 1 5.0, -22.0, 0.01 -11.3, -23.1, 0.0
LOAD GROUP DESCRIPTION
DL Roof Dead Load
COLL Roof Collateral Load
SNOW Roof Snow Load
ADW Auxiliary Dead Weight
AlDlL Auxiliary Crane #1 Dead Loading #1 Max. at Left
AlDlR Auxiliary Crane #1 Dead Loading #1 Max. at Right
LL Roof Live Load
AlVlL Auxiliary Crane #1 Vert Loading #1 Max. at Left
AlHlR Auxiliary Crane #1 Horz Loading #1 to the Right
AlHlL Auxiliary Crane #1 Horz Loading #1 to the Left
AIVIR Auxiliary Crane #1 Vert Loading #1 Max. at Right
EQ Lateral Seismic Load [parallel to plane of frame]
REUPEQ Upward Acting Rod Brace Loadfrom Longit. Seismic
WL1 Lateral Primary Wind Load
WL2 Lateral Primary Wind Load
WL3 Lateral Primary Wind Load
WL4 Lateral Primary Wind Load
LWLl Longitudinal Primary Wind Load
RBUPLW Upward Acting Rod Brace Load from Longitud. Wind
LWL2 Longitudinal Primary Wind Load