HomeMy WebLinkAbout521 E 11th Street Address:
l' Street
4�- a \ C- I ( 1A 5 �-
PREPARED 3/02/15, 13:36:30 INSPECTION TICKET PAGE 1
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 3/02/15
------------------------------------------------------------------------------------------------
ADDRESS . : 521 E 11TH ST SUBDIV:
CONTRACTOR : PHONE
OWNER RUSSELL B CHASE / SUSAN J REED PHONE
PARCEL 06-30-00-0-3-3275-0000-
APPL NUMBER: 14-00000607 RES ACCESSORY BUILDING
------------------------------------------------------------------------------------------------
PERMIT. BPR 00 BUILDING PERMIT - RESIDENTIAL
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
BL1 01 6/26/14 PB BLDG FOUNDATION FOOTING
6/27/14 DA June 27, 2014 8:27:51 AM pbarthol.
verify rear property line. install UFR ground.
BL1 02 6/27/14 JLL BLDG FOUNDATION FOOTING
6/27/14 AP June 27, 2014 8:28:55 AM pbarthol.
Russell 460-6580
verify rear property line/setback (strung behind power
poles) . verify UFR ground.
June 27, 2014 4:18:56 PM jlierly.
BL2 01 7/08/14 JLL BLDG FOUNDATION STEM WALL
7/08/14 AP July 8, 2014 8:24:22 AM pbarthol.
Russell 460-6580
July 8, 2014 4:12:16 PM jlierly.
BL9 01 8/15/14 PB BLDG SHEARWALL
8/15/14 AP August 15, 2014 9:16:12 AM pbartho
RUSSELL 460-6580
August 15, 2014 4:45:27 PM pbarthol.
BL99 01 12/22/14 PB BLDG FINAL
12/23/14 DA December 22, 2014 12:41:50 PM pbarthol.
Russell 460-6580
December 23, 2014 11:47:36 AM pbarthol.
all exterior wood must be proteded (paint or decay
resistant)
downspouts need to go somewhere other than the surface.
BL99 02 JLI� BLDG FINAL
March 2, 2015 11:34:49 AM pbarthol.
Russell 460-6580
------------------- COMMENTS AND NOTES --------------------------------------
-------------
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY& ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES,WA 98362
Application Number . . . . . 14-00000607 Date 6/09/14
Application pin number . . . 997029
Property Address . . . . . . 521 E 11TH ST
ASSESSOR PARCEL NUMBER: 06-30-00-0-3-3275-0000- REPORT SALES TAX
Application type description RES ACCESSORY BUILDING
Subdivision Name . . . . . . on your state excise tax form
Property Use . . . . . . . . to the City of Pott Angeles
Property Zoning . . . . . . . RS7 RESDNTL SINGLE FAMILY
Application valuation . . . . 17280 (Location Code 0502)
----------------------------------------------------------------------------
Application desc
new 24x24 garage
----------------------------------------------------------------------------
Owner Contractor
------------------------ ------------------------ Q\
RUSSELL B CHASE / SUSAN J REED OWNER
521 E 11TH ST
PORT ANGELES WA 98362
Other struct info . . . . . �HARD SURFACE AREA
----------------------------------------------------------------------------
Permit . . . . . . BUILDING PERMIT -RESIDENTIAL
Additional desc NEW 576 SF GARAGE
Permit Fee 319.75. Plan Check Fee 207.84
Issue Date . . . . 6/09/14 Valuation . . . . 17280
Expiration Date . . 12/06/14
Qty Unit Charge Per Extension
BASE FEE 95.75
16.00 14.0000 THOU BL-2001-25K (14 PER K) 224.00
----------------------------------------------------------------------------
Special Notes and Comments
May 29, 2014 9:24:14 AM tamiot.
electrical permit is required for all electrical work.
The Fire Department has reviewed the project application and
has no comments
June 9, 2014 4:11:04 PM permits.
Proposal will result in, new detached accessory.structure for
total lot and site cov of 28t. Existing accessory structure
MUST BE DEMOLISHED prior to final of this permit.
1. Establishing Construction Access.
2. Install sediment controls BMPs.
3. Stabilize exposed soils.
4. Protect slopes from erosion.
5. Protect drain inlets.
6. Control pollutants including but not limited to spills,
concrete wash. out, exposed aggregate processes, concrete
grinding and saw cut waste water.
7. Maintain temporary and permanent erosion control BMPS
during project.
Consider applying for the City Green Infrastructure Rebate
of up to $750.00 towards the materials to install rain
garden to control roof and driveway runoff. Also rebates
available for downspout disconnections.Contact Jonathan
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
constructio
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
TForms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER, INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By C comments
FOUNDATION:
Footings
Sternwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole BIdgs.)
PLUMBING:
Under Floor/Slab
Rough-in
Water Line(Meter to Bldg)
Gas Line
Back Flow/Water FINAL Date Accepted bV
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders/Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall(Interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pump/Furnace/FAU/Ducts
Rough-In
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts FINAL Date Accepted bV
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
,Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parking/Lighting ESA:
Landscaping ISHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction-R.W. PW I Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
T:Forms/Building Division/Building Permit
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY&ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES,WA 98362
Page 2
Application Number . . . . . 14-00000607 Date 6/09/14
Application pin number . . . 997029
---------------------------------------------------------------------------- REPORT SALES TAX
Special Notes and Comments
Boehme at 360 417-4811 on your state excise tax form
No attachment to sanitary sewer of stormwater roof leaders, to the City of Port Angeles
foundation drains, yard drains, or any other CSO
contribution is allowed. (Location Code 0502)
----------------------------------------------------------------------------
Other Fees . . . . . . . . . STATE SURCHARGE 4.50
----------------------------------------------------------------------------
Fee summary Charged Paid Credited Due
----------------- ---------- ---------- ---------- ----------
Permit Fee Total 319.75 319.75 .00 .00
Plan Check Total 207.84 207.84 .00 .00
Other Fee Total 4.50 4.50 .00 .00
Grand Total 532.09 532.09 .00 .00
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
— PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backfiow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMfTIN CONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Stemwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-In
Water Line(Meter to Bldg)
Gas Line
Back Flow/Water FINAL Date Accepted by
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders I Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall(interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pump/Furnace/FAU/Ducts
Rough-in
Gas Line
Wood Stove/Pellet I Chimney
Commercial Hood/Ducts FINAL Date Accepted by
MANUFACTURED HOMES:
Footing I Slab
Blocking&Hold Downs
Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parking/Lighting ESA:
Landscaping ISHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction-R.W. PW I Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
T:Forms/Building Division/Building Permit
TH F- For City Use
CITY OF
Permit# Iq &0,-)
W A S .H I N G T 0 N, U. S.
Date Received: 4�;-1 2-) lit
321 E 51h Street Date Approved
Port Angeles,WA 9836
P:360-417-4817 F:360-417-4711
Email:Vermits0dtyofpa.us BUILDING PERMIT APPLICATION
ProjectAddress: Cj,
Phone:
ca 6),
Pri-miOntact: Email: -;t,. v-�4r,mcn V1
-Va-ft
v<
Property Vatting Address
Owner
City State
� , UP
Name Phone
Contractor Address Email
Information city State
Contractor License# Exp.Date:
Legal Description Zoning: #
Tax Parce Project Vgue: (materials and labor)
0 Log 0 C)(3
LJ� I Z5 '13 t 2-3-1 AID 3:a a-46 $
Public 0
kesidential' O Commercial 11 Induqr--"' r4l
Permit Demolition 0 Fire 0 Repair 13 Reroof(tear off/lay over) 0
Classification For the following.fill out both pages of permit application:
(check New ConstructionB Exterior Remodel 0 Addition 0 Tenant Improvement 0
appropriate) 1 Mechanical 0 Plumbing 11 Other 13
-T
Will a fire sprinkler system be installed Irrigation Syste ProposedBathr roposed Bedrooms
or modified? Yes E3 No GL Yes 13 No !f�
Project Description Z>Wx'�;W !�ex#—e-e
"Zi V
Is project in a Flood Zone: Yes 13 NoIS Flood Zone Type:
If in a Flood Zone,what is the value of the structure before proposed improvement? $
1 have read and completed the application and know it to be true and correct.I am authorized to apply for
this permit and understand that it is my responsibility to determine what permits are required and to
obtain permits prior to work. I understand that plan review fees are not refundable after review has
occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is
issued. I understand that if the permit is not picked up/issued within iL8o days of submittal,the application
will be considered abandoned and the fees will be forfeited.
Date 1 Print Name 1 Signaturg
Residential Structures
For Office Use
Area Description(SQ FT) Existing Proposed ss value
Basement
First Floor A0-7 o-1
Second Floor
Covered Deck/Porch/Entry P..Jt-,-a
Deck(over 30"or 2'd floor)
Garage va
Carport
Other(describe)
Area Totals
Commercial Structures
Proposed For Office Use
Area Descriptions(SQ FT) Existing Proposed ss Value
Existing Structure(s)
Proposed Addition
Tenant Improvement?
Other work(describe)
Site Area Totals
Lot/Site Coverage Calculations
Lot Size(sq ft) Lot Coverage ft) %Lot Coverage_(Total lot coverage+lot size) Z�D
7000 lb a_0-:`2- '
%of Sifte Cover (total site coverage+lot size)
Site Coverage(Sq Ft of all imperviousl
Mechanical rixtures
Indicate how many of each type of fixture to be installed or relocated as part of this project.
Air Handler Size: # Haz/Non-Haz Piping Outlets:
Appliance Exhaust Fan # Heater(Suspended,Floor,Recessed wall) #
Boiler/Compressor Size: # Heating/Cooling appliance #
I repair/alteration
Evaporative Cooler(attached,not # Pellet Stove/Wood-burning/Gas #
portabl ) -Fireplace/Gas Stove/Gas Cook Stove/Misc.
Fuel Gas Piping #of Outlets: Ventilation Fan,single duct #
Furnace/Heat Pump/ Size: # Ventilation System #
Forced Air Unit I I I I
Plumbing Fixtures
Indicate how many of each type of fixture to be installed or relocated
Plumbing Traps # Fuel gas piping #of Outlets:
Water Heater # Medical gas piping #of Outlets:
Water Line # Plumbing Vent piping #
Sewer Line # Industrial waste pretreatment
interceptor(Grease Trap) Size
Other(describe):
T:\BUILDING\APPLICATION FORMS\Current BP Application\Building Permit 4-17-13.docx
MAY 2 9 20%
Olt=nj-";
1426� <'�A
,,,74,47 f
rol 4"c
_s—
wj
7L Aozz"alej
L4_7
2 woe
!�Z' x z�b L 9 W
Z04
'�K
f ILE
CITy OF PORT ANGELES—Construction Plans
The issuance of this npon these plans,Spec fl-
cations and other da".sl,!!not P,!-.,!-:it the building official
rors in said
from therealtet 'Ig the correc,q of er
plans, specifications and other data, or from preventing
building operations b,,_-;ng carried on t4ereunder when in
violation of all codes ore�nances of this jurisdiction.
12C)I'd_ffJ
By JLL--1-10C
z4�
Approval Date
%V,
rz;�14,
BU
rA A�
�Ak
,�Ll
x ys"
lb
axq
10
04- 1p, &�rv"4
77 4..j
"im at,- wo, Not
J��CL�v -L-r-d 4"C�A4�r S \q/x
40 t,4&,LU- b"
DNA-
zj�
--7 -7
C 0 V,e- e- SI-L
IL
F
Je,
41e
J--,t.
-7
1-3'
a,4
ZVI
��Olr c r, �"--)
Ce
qt'o �*
T�
ll A Tk 11 11 11
L 1! 1 11 Y111 K\- - I
t4l�C- �1,0 f 9
411
ou,
4D f- Aj
-7/
I
.>
I I/ Af-
.L
y
411S �Owj+ -�po-4-
-C�-o Jr
520
526
'V�
530
e If
536
517
521
A,
JK
AF�
525
529
Ali
`7
533