Loading...
HomeMy WebLinkAbout525 W. 11th Street Address: I lth Street PREPARED 11/10/14, 10:12:21 INSPECTION TICKET PAGE 4 CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 11/10/14 ------------------------------------------------------------------------------------------------ ADDRESS . : 525 W 11TH ST SUBDIV: CONTRACTOR POWER TRIP ENERGY CORP PHONE (360) 643-3080 OWNER WARREN ANNETTE R PHONE PARCEL 06-30-00-0-3-236S-0000- APPL NUMBER: 14-00001307 RES SOLAR PROJECT ------------------------------------------------------------------------------------------------ PEaZMIT: BSOL 00 BUILDING PEIZMIT - SOLAR REQUESTED INSP DESCRIPTION TYP/SQ COMPLETED RESULT RESULTS/COMMENTS ------------------------------------------------------------------------------------------------ BL99 01 11/10/14 BLDG FINAL November 10, 2014 10:15:07 AM jlierly. 643-3080 --------------------- --------- COMMENTS AND NOTES -------------------------------------- CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY&ECONOMIC DEVELOPMENT-BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES,WA 98362 Application Number . . . . . 14-00001307 Date 10/29/14 Application pin number . . . 277982 Property Address . . . . . . 525 W 11TH ST ASSESSOR PARCEL NUMBER: 66-30-00-0-3-2365-0000- REPORT SALES TAX Application type description RES SOLAR PROJECT Subdivision Name . . . . . . on your state excise tax form Property Use . . . . . . . . to the City of Port Angeles Property Zoning . . . . . . . RS7 RESDNTL SINGLE FAMILY Application valuation . . . . 14535 (Location Code 0502) ---------------------------------------------------------------------------- Application desc ROOF MOUNTED GRID-TIED PV SOLAR PANELS ---------------------------------------------------------------------------- Owner Contractor ------------------------ ------------------------ WARREN ANNETTE R POWER TRIP ENERGY CORP 525 W 11TH ST 83 DENNY AVE PORT ANGELES WA 983627307 PORT TOWNSEND WA 98368 (360) 643-3080 ----- -------- Permit . . . . . . BUILDING PERMIT - SOLAR Additional desc . , ROOF MOUNTED SOLAR Permit Fee . . . . 130.00 Plan Check Fee .00 Issue Date . . . . 10/29/14 Valuation . . . . 14535 Expiration Date . . 4/27/15 Qty Unit Charge Per Extension BASE FEE 130.00 ---------------------------------------------------------------------------- Other Fees . . . . . . . . . STATE SURCHARGE 4.50 ---------------------------------------------------------------------------- Fee summary Charged Paid Credited Due -------- ---------- ---------- ---------- ---------- Permit Fee Total 130.00 130.00 .00 .00 Plan Check Total .00 .00 .00 .00 Other Fee Total 4.50 4.50 .00 .00 Grand Total 134.50 134.50 .00 .00 Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder) T:Forms/Building Division/Building Permit BUILDING PERMIT INSPECTION RECORD — PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS— Building Inspections 417-4815 Electrical Inspections 417-4735 Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886 IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE. Inspection Type Date Accepted By Comments FOUNDATION: Footings Sternwall Foundation Drainage/Downspouts Piers Post Holes(Pole Bidgs.) PLUMBING: Under Floor/Slab Rough-In Water Line(Meter to Bldg) Gas Line Back Flow/Water FINAL Date Accepted by AIR SEAL: Walls Ceiling FRAMING: Joists/Girders/Under Floor Shear Wall/Hold Downs Walls/Roof/Ceiling Drywall(interior Braced Panel Only) T-Bar INSULATION: Slab Wall I Floor/Ceiling MECHANICAL: Heat Pump/Furnace/FAU/Ducts Rough-In Gas Line Wood Stove/Pellet/Chimney Commercial Hood/Ducts FINAL Date Accepted by MANUFACTURED HOMES: Footing/Slab Blocking&Hold Downs Skirting PLANNING DEPT. Separate Permit#s SEPA: Parking/Lighting ESA: Landscaping ISHORELINE: FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE Inspection Type Date Accepted By Electrical 417-4735 Construction- R.W. PW /Engineering 417-4831 Fire 417-4653 Planning 417-4750 L Building 417-4815 T:Forms/Building Division/Building Permit ------------------- CITY OF PORT ANGELES DEPARTMENT OF COMMUNITY&ECONOMIC DEVELOPMENT-BUILDING DIVISION 321 EAST 5TH STREET, PORT ANGELES,WA 98362 Application Number 14-00001307 Date 10/29/14 Application pin number . . . 277982 Property Address . . . . . . 525 W 11TH ST ASSESSOR PARCEL NUMBER: 06-30-00-0-3-2365-0000- REPORT SALES TAX Application type description RES SOLAR PROJECT Subdivision Name . . . . . . on your state excise tax form Property Use . . . . . . . . Property Zoning . . . . . . . RS7 RESDNTL SINGLE FAMILY to the City of Port Angeles Application valuation . . . . 14535 (Location Code 0502) ---------------------------------------------------------------------------- Application desc ROOF MOUNTED GRID-TIED PV SOLAR PANELS ---------------------------------------------------------------------------- Owner Contractor ------------------------ ------------------------ WARREN ANNETTE R POWER TRIP ENERGY CORP 525 W 11TH ST 83 DENNY AVE PORT ANGELES WA 983627307 PORT TOWNSEND WA 98368 (360) 643-3080 ---------------------------------m------------------------------------------ Permit . . . . . . BUILDING PERMIT - SOLAR Additional desc . . ROOF MOUNTED SOLAR Permit Fee . . . . 130.00 Plan Check Fee .00 Issue Date . . . . 10/29/14 Valuation . . . . 14535 Expiration Date 4/27/15 Qty Unit Charge Per Extension BASE FEE 130.00 ---------------------------------------------------------------------------- Other Fees . . . . . . . . . STATE SURCHARGE 4.50 ---------------------------------------:------------------------------------- Fee summary Charged Paid Credited Due ----------------- ---------- ---------- ---------- ---------- Permit Fee Total 130.00 130.00 .00 .00 Plan Check Total .00 .00 .00 .00 Other Fee Total 4.50 4.50 .100 'o '0 Grand Total 134.50 134.50 .00 C, Separate Permits are required forelectrical work,SEPA,Shoreline,ESA,utilities,private and public improvements.This permit becomes null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned for a period of 180 days after the work has commenced,or if required inspections have not been requested within 180 days from the Jast inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of construction. Date Print Name Signature of Contractor or Authorized 4)nt Signature of Owner(if owner is builder) T:Forms/Building Division/Building Peffnft THE For City Use CITY OF GELES -4. At Permit# W A S H I H G T 0 N. U. S. Date Received: ,>-;I 321 E Sth Street Date Approved Port Angeles,WA 9836 P:360-4174817 F:360-4174711 Email:11ermits0cftQfpa.us BUILDING PERMIT APPLICATION — - — W E��-C I t M 5T. Vo-KT F LJF5, WA, 9 9�3 6 3 ProjectAddress: t""'7 Tbwe�--T?--tp El-eA49 C-e,- Phone: 3&0-6 Lf 3--3 9 0 Fl�c '56.,o ii5 LZ'Ftz�4' PrimaFyContact: -10KI-1 FL-EptjACT Email: �XCKI'4 0— FCW FXT�ki�tF-W t,--94-�,C-UM Name Phone Property Mailin Address TK Email Owner 15-4'5 W, o t�E-T e `y1r6Fzr 46LeL'e5 State Z lip Name Phone( ��O) &,_f-�_3 0 flow EIL Tfup Eoep-crlf (�O� Contractor Address De�i4" ANE Email -1-6ftm Information ciq 70A:1— T-Cwl'iseWb State Vv/t zip 'i asf�s I Contractors license# !FC%AE-P-TE 934aff Exp.Date: Legal Description: Zoning: Tax Parcel Project Value:(materials and labor) wr It �Wcr- 3T*3 600 at-5234�'s'Vo o I $ 114,5 -7,4'9 1 Residential IN Commercial 0 Industrial 11 Public 0 Permit Demolition 11 Fire 0 Repair 1:1 Reroof(tear off/lay over) (160 50 Classification For the following.fill out bo1hDages of jaernlit aDDlication: ------------------ (check New Construction 11 Exterior Remodel 11 Addition El Tenant Improvement appropriate) Mechanical 11 Plumbing 0 Other 0 Fire Sprinkler System? irrigation System? Proposed Bathrooms A_ Proposed Bedrooms Yes 13 No M Yes C3 No M I — P/& Project Description RCOF' mauf-IlEb, (!�Pub,-r�'C. b P\/ Lpk Is project in a Flood Zone: Yes 13 NoW Flood Zone Type: If in a Flood Zone,what is the value of the structure before proposed improvement? $ 1 have read and completed the application and know it to be true and correct.I am authorized to apply for this permit and understand that it is my responsibility to determine what permits are required and to obtain permits prior to work. I understand that plan review fees are not reiftmdable after review has occurred. I understand that I will forfeit review fees if 1,%vithdraw the application before the permit is issued. I understand that if the permit is not picked up/issued within iLgo days of submittal,the application will be considered abandoned and the fees will be forfeited. Date Print Name 1174 Redd HTE ApprVd $130 Fee Application and Checkftt for Roof Mounted Residential Solar Panels Project Information- Property Owner A_NtAaTM Name: Project Address: 6Z5 VIJ Fe;, J1 _It Sr PT- L--Lt�Phone: Contractor Name 170LUej�71Lip EPCA,4_� a, Registration# Contractor Phone: .;Go-64�-3010 PV system PW KmRtEb Q-PUID-Tiff t� 14-56�_w Mfg/model q of m4aor equip: 5ui,3 Pcv�L-4_ description I Af _� CKUijeus P V A,;)D kZ(Z's Y-w s 7-T WW t It"tc W-es' ro icw Aaa Per WAC 51-51-2300,if the answer to the following questions is"yes"a building permit will be issued for simple(10-IL5kw output)PV systems without further engineering. Section M2302.2.1-Where solar panels are installed on roofs,the roof structure shall be deemed adequate to support the load of the rooftop if all of the following are met: Yes No 1. PV system is designed and proposed for a single family or detached accessory structure 13 2. The photovoltaic panels and modules and supporting structure shall be constructed of 0 noncombustible materials or fire-retardant treated wood equivalent to that required for the roof construction. The installation shall meet the requirements of the international Fire Code as amended by WA State. PV modules are listed and labeled with a fire classification in accordance with UL 1703 3. The PV system is designed for the wind speed of the local area and will be installed per the manufacturer's specifications. 4. The ground snow load does not exceed 70 pounds per square foot.The PV system is designed CK 0 for the wind speed of the local area,and will be Installed per the manufacturer's specifications. S. Total dead load of modules,supports,mountings,raceways and all other appurtenances weigh L9 0 no more than four pounds per square foot.Enter total dead load of system(Ibs/ft').07, �5r 6. Supports for solar modules are installed to spread the dead load across as many roof-framing D members as needed to ensure that no point load exceeds fifty(50)pounds. Modules are mounted no higher than 18"above the surface of the roofing to which they are affixed and do not exceed the highest point of the roof unless approved by the local jurisdiction. MOTE: Of site inspection indicates a concern that the roof structure is not adequate to support the PV module(s),engineering may be required prior to final of the permit. As the property owner or authorized representative of the above listed property, I attest that all information in this checklist is accurate to the best of my knowledge. Applicant Signature: TDate: 1012,qlz ±f�__T� Applicant Name(Please Print): -q-bt1t4Y5�FLet41lJ(,', Nvie-YtTAPENC*Cf Cc, Relationship to Property Owner: T.\BUILDING\APPLICATION FORMS\SOLAR PERM CHECKLIST.D00( CIVIL ENGINEERING LAND SURVEYING tE N 0 301 bst 6thStreet,Sulte I & AS SO C I AT ES Port AngelesAhshington 98362 I N CORPORATED (360)417-0501 Fax(360)417-0514 F.-Inail:n1lovidpolympus.110E October 17, 2014 Mr. Jim Lierly City of Port Angeles Department of Community Development 321 East Fifth Street Port Angeles, WA 98362 SUBJECT: Solar Panel Project for Warren—525 W. 1 11h Street, Port Angeles, Washington Dear Mr. Lierly: This office has reviewed the plans and information provided by Power Trip Energy Company for the solar panel project noted above. This office has also performed a visual inspection at the residence to verify the existing roof structure. The residence is of typical wood framed construction with engineered trusses. Based on my review and attached calculations the existing roof structure has adequate capacity to support the additional weight of the proposed solar panels without compromising the structure and thus it is acceptable to this office. The system will be installed on the existing metal roofing using the SnapNrack Series 100 PV mounting system, Please call me if you have any further questions on this matter. Sincerely, Tracy Gudgel, P.E. WAS, Cc: Warren ;A 32777.' NA1, lo /)44,3 2 /.3 )'Al! vl 3 Zlo c—g— --r'Lys AI- -------------- Power Trip Energy Corp 83 Denny Ave Poit Townsend, WA 98368 (360) 643-3080 wvm.powertripenergy.com Lic # POW(UME964JN October 8,2014 Pat Bartholick Code Compliance Officer 321 E 5th Street P.O.Box 1150 Port Angeles,WA 98362 codecompliance@cityofpa.us Dear Mr.Bartholick, Enclosed please find a building permit and electrical permit for work to be done at 525 West 1 lth St,Port Angeles for Annette Warren. Our company(Power Trip Energy) will be installing a 4.58 kW solar array on the north end of the southeast roof of her house. I am using the new Over-The-Counter Building Permit Checklist,modified for additional information the standard City of Port Angeles building permit requests(zoning,email,project value,licenses expiration dates,primary contact). I know Jim Lierly is aware of this process from the recently finaled Duchow solar permit at 311 West 3rd St,PA. Power Trip Energy will be happy to pay for the plan check fee by credit card as soon as you can determine what amount this will be. The electrical permit fee will also be paid by Power Trip Energy and the credit card information is provided on its application form. The final building permit fee will be paid by this credit card when the permit is ready to be issued. If you have any additional questions please do not hesitate to call the office at 360-643-3080 or my cell phone at 360-452- 8500. Sincerely, John Fleming,PE Solar Engineer Power Trip Energy Attachments: I —Over-The-Counter Building Permit Checklist Application& site plan 2—Electrical Permit Application&Electrical Line Drawing 11. Supports for solar modules are installed to spreacilthe dead load across as many roof- X [I framing members as needed to ensure that no,point load exceeds fifty(50) pounds. [IRC M2302.2.1(5)] 12. The photovoltaic modules and supportingstructule shall be constructed of X noncombustible materials or fire-retardant treated, wood equivalent to that required for the roof construction. [IRC M2302.2.1] 13. Roof and wall penetrations shall be flashed and s�i aled to prevent entry of water, X 0 rodents,and insects. [IRC M2302.2.2] 14. PV modules are listed and labeled with a fire classification in accordance with UL 1703. X 0 [I RC M2302.2.3] Comments: Item#3:Single layer of comp(3 psf),with�ingle layer of standing seam metal roofing(1.5 psf),plus Item#9,3 psf of PV equipment on roof. Engineering provided by Tracy Gudgel,PE,Zenovic& Associates. If you answered yes to all of the above ques�tlions,the project qualifies for the over-the- counter permitting process. 3) Submit this Checklist, Site Plan, and other, required permit application forms to: i The City of P�rt Angeles 321 ES th Street Port Angeles,� WA 98362 P.-360-417-4817f.-360-417-4711 Email:perm1tS'@cityqfpa.us As the property owner or authorized repres I entative of the above listed property, I attest that all information in this checklist is accurate to the best of my knowledge. => Date:10/7/2014 Applicant Signature: Applicant Name(Please Print): Power Trip Energy Co,1 ohn Fleming J --------TO BE COMPLET D BY CITY STAFF----- Qualifies for OTC Building Permit? OYes ONo Permit Application#: Staff Initials Date: 2 OVER-THE-COUNTER BUILDING PERMIT CHE i CKLIST FOR RESIDENTIAL SOLAR PHOTOVOLTAIC SYSTEMS: ROOFTOP MOUNTED Contractors can opplyfor an Over-The-Counter(OTC)permit where the PV system meets the requirements listed in this Checklist.All project plans and supporting docume�tation must be provided on site for the inspector. --------TO BE COMPLETED BY APPLICANT------- 1) Project Information Property Owner Name: Annette Warren Project Address: 525 W. 11th St Street i Parcel# 0630000323650000 City: Port Angeles 1 1 State:WA ZIP:98362 Day Phone&email: 360-808-2726; net@olypen.com Contractor Name Power Trip Energy Co Contractor License#: General:POWERTE934QE exp. 11/5/15, Electrical:POWERTE964JN exp.4/15/16 Contractor Phone& 360-643-3080;john@powertripenergy.com email: PV system description Roof mounted,Grid-tied PV s�stem-4.58 kW nominal total module system size,14 (include manufacturer @ 327 watt SunPower PV mo i dules SPR-E20-327,61W Power One inverter PVI-6.0- and model#of major OUTD-S-LIS-A. 1 equipment): 2) Determine if your project qualifies for expedited permitting: Yes No 1. PV system is designed and proposed for a cletach'�d one or two family dwelling or X 0 townhouse not more than three stories above grade or detached accessory structure that I is code compliant to setbacks and height,or code allows expansion of nonconformity for solar modules. [IRC 101.2] 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by X El the local jurisdiction. 3. Rooftop is made from lightweight material such as a single layer of composition shingles, 0 X metal roofing,lightweight masonry,or cedar shin,gles. 4. The installation shall comply with the manufact.ur�er's instructions. [IRC M2302.2] X 0 5. The installation shall meet the requirements of NFPA 70 National Electrical Code,and all X El required electrical permit(s) must be obtained from the Authority Having Jurisdiction to administer the electrical code. [IRC M2302.2] 6. The installation shall meet the requirements of the international Fire Code as amended X 0 by WA State. [IRC M2302.2] 7. The PV system is designed for the wind speed of!,the local area,and will be installed per X 0 the manufacturer's specifications. [IRC M2302.11:1(l)] 8. The ground snow load does not exceed 70 po unds per square foot. [IRC M2302.2.1(2)] X 0 9. Total dead load of modules,supports,mountings,raceways and all other appurtenances X 0 weigh no more than four pounds per square foot. [IRC M2302.2.1(3)] Enter total dead load of system(lbs/ft):3 10. To address uplift,modules.are mounted no higher than 18"above the surface of the X 0 roofing to which they are affixed. [IRC M2302.2.1(4)] Proposed Solar Array: 14 PV modules on Southeast facing roof 4,1 3 I 15A 9.8 Y _e. J 18+ roof pitch, 120* azimuth L---24' 811— 3 R A Phn COD Co A wve,�-Ivo uvvym ti-l-miogg �h I_DN�,a Am g)@, %!Z9 W rjtA" Site Plan for A� Approximate property Annette Warren 525 W. 11 th St. Port Angeles, WA 98362 I Ah Proposed 14 solar PV modules on house's southeast facing roof NORTH — ResIdence of Annette Warren 525 West 11th St 11th Street J Port Angeles, WA 98362 360-808-2726 Base map from Google Maps Proposed "')olar Array., 1.4 PV niodule�s on Southeast facing roof 2,41 211 11 lit P 15, 9" If-+++ -N .1 J 66' 2" IS roof pitch, 120" azimuth 3 -:3) 66) y WN M- Rr CO-)M G' -g-E) VAWL3 6�, P,"MO , n IZ2 Friday,January 31,2014 Snap rack SnapNrack Norman 775 Fiero Lane,Suite 200 San Luis Obispo,CA 93401 "Series 100 Roof Mount"Cover Lette h e e I To Whom It May Concern, (CN We have performed calculations for the I UU senes roof mount PV system based on �)tructural the information provided by SnapNraci. Included with this letter are the report and calculations. We did the calculations ill accordance with the 2012 IBC,ASCE 7-10, 2012 NDS, and guidelines stated im the Solar America Board for Codes and Standards. Engineer Some of the components in the SnapNrack test data were used to determine the capacity and section properties of maierials. We collected the test data using the 5022 Sunrise Blvd. procedures outlined in the 2012 IBC Chapter 17. Fair Oaks,CA 95628 (916)536-9585 (916)536-0260(fax) We included the following types of loa�combinations and building parameters into our calculations: 1989-2013 24 years of excellence 0 ASCE 7-10 wind speeds frorit I 10 mph to 190 for B and C exposure categories 0 ASCE 7-10 Seismic Design Category E a ASCE 7-10 Snow Loads up to :i20 psf ground snow 0 Buildings with mean roof heights up to 60 foot tilt angles roof pitches from 0 degrees to 60 degrees. Norman Scheel,S.E. LEED AP BD+C LEED AP Homes The calculations have also been completed in accordance with the 2006 IBC,2009 Fellow—SEAOC IBC,and ASCE 7-05. To use the data i contained in this packet for projects that are Fellow-ASCE 1 E-mail:norm6'�,n%se.co being evaluated to the older ASCE 7-05 wind speeds,refer to Appendix A for a Rob Coon wind speed conversion chart. Find the ASCE 7-05 (IBC 2006/2009)wind speed in the Chart in Appendix A,identify the corresponding ASCE 7-10(IBC 2012)wind General Manager t E-mail:robcoonna nsse.com speed value,and proceed with using th�charts contained in this packet with the adjusted wind speed value. Steve Smith P.E. i Project Manager i E-mail:stevesmith(a�nssexom In our opinion, the mounting syster,h, outlined by SnapNrack Series 100 PV Mounting System Code Compliance 1 1 installation Manual, is acceptable and meets Steven Cooksey the loading requirements as stated above. See the report and calculations included CAD Sumvisor E-mail:steveAlmsse.co with this letter for more information. If there are any fiarther questions,pleas e contact Norm Scheel. J. SO Jacide Winslow Office Manager E-mail:iackie(i�,nssexom Norman Scheel PE, SE LEED-AP BD+C,LEED-AP Homes NO, ;EMBER 26. LOV51 Snap rac Sn.apMrack Series 100 Projectinfo: Dealerd Project Name: Annette Warren Create Date: 2014-10-07T13:11:46-0700 BOM#: 17809 PV Module Data: Module Brandl SunPower I I Length '�_1.35 inches Modell SPR-327NE-WHT-D Width �4_1.18 inches Depth 1.81 inches Environmental Requirements: Weight ".41-.00 pounds Topographic Condition Standard Rated power @ STC W Standard IBC 2012 Rail Color Mack Snow Load 21-30 psf lterJ8 checklist Racking Color Clear Wind Speed 130 mph Iteml 7 checklist Rafter Spacing 24 inches Roof Attachment Flashed L-Fo6t System Style: Rail Finish Black Anodized End Clamp Type Universal Grounding Method UL 2703 Listed Micro Attachment Kits No Edge Screen Trim? No if"Yes",V'or 87 screen? Screen Height inches Tilt Up? Sub-Arrays: 7Premium Allo�y Rail No suik.CUstornOr No No N; Sub-Array Rail Mid End Edge Roof Sub-Array Modules 122"Rail 162"Rail S i plices Clamps Clamps Screen Attachments 1 - 14 10 0 8 24 8 0 28 2 3 4 5 6 7 8 9 10 TOTALS 14 1 0 8 24 0 28 SnapNrack Serle� 100 Calculator Proposed:Bill Matienals Part Number Descriobon Qty 015-09822 SNAPNRACK,STANDARD RAIL SET,122N,BLACK,6 PC 1 015-09816 SNAPNRACK,STANDARD RAIL SET,122IN,BLACK,2 PC 2 242-04015 SNAPNRACK,BONDING STANDARD RAIL*SPOCE ASSEMBLY,BLACK 8 242-02055 SNAPNRACK,BONDING MID CLAMP ASSEWLY,1.50-2.00IN,BLACK 24 242-02063 SNAPNRACK,BONDING UNIVERSAL ENFC ,MP ASSEMBLY 8 232-01023 SNAPNRACK RAIL END CAP,STANDARD,BOCK 8 242-02700 SNAPNRACK,BONDING L-FOOT KIT W/BASE AND FLASHING,CLEAR L-FOOT 28 242-02101 SNAPN CK,GROUNDING LUG ASSEMBLY 2 I Total Weight: lall.66 lbsj 'atal Wilghti 7130.00.lbs Array Area 14 modules X(41.2"x 61.4" 144 sq.inch peri,sf) 250 sf Pounds per Square Foot of Array 730 lbs/250 sf=2.92 Osf Item 9 checklist Pounds per Attachment 730 lbs 28 26 lbs per Attachr I hent Item 11 checklist Modules Per 7 Array Pitch(degrees) 18 Sub-Array Modules 14 Row Modul 2 Building Height(ft) 14 Edge Screen(It) 0 Rowse I Orientation Portrait Attachment Spacing 72 Attachment Spacing 48 Array Power(kW) 4.578 1 L_(inches) , override(inches) I The maximum recommended rail span for this sub-array is 72 Inches.The rail span for modules located in edge zonei is reducLd by 24 inches to 48 inches Group I Rail Group 2 Rail Group 3 Rail Group 4 Rail Group 5 Rail 122"Rail 162"Rail Row Mid Row End Row Attach- Module Rail Length Length Length Length Length Qty QtY clamps Clamps Splices ments Bonding Bonding 291.26 S 0 12 4 4 14 0 1 291.26 0 12 4 4 14 0 1 Sub-Array 10 0 24 8 8 28 0 2 Totals SUNPOWER FE-SERIES '�­)CAAR PANELS SUNPOWER OFFERS THE BEST COMBINED POWER AND PRODUCT WARRAN TY POWER WARRANTY PRODUCT WARRANTY 90% 85% .W� l 75% 1 0 1 z to ?3 YMM More guaranteed power:95%for first 5 years, Combined Power and Product defect 25 year coverage -0.4%/yr.to year 25.8 that includes panel replacement costs.9 ELECTRICAL DATA OPERATING CONDITION AND MECHANICAL DATA E2D-327 E19-M Temperature -40'F to+I 85*F(-40'C to+85'C) IlTiE Nominal Power"(Pnom) 327 W 320 W Wind:50 psf,2400 Pa,2A5 kg/M2 front&back Power Tolerance +51-0% +51-011. Snow: 112 psf,5400 Pa,550 kg/M2 front LTIE#% Avg. Panel Efficiency" 20.4% 19.8% Impact resistance 1 inch(25mm)diameter hail at 52 mph(23 m/s). Rated Voltage(Vmpp) 54.7 V 54.7 V Appearance Closs-A Rated Current(Impp) 5.98 A 5.86 A Solar Cells 96 Monocrystalline Maxeon Gen 11 Open-Circuit Voltage(Voc) 64.9 V 64.8 V Tempered Glass High transmission tempered Anti-Refleclive Short�Circuit Current(Isc) 6.46 A 624 A Junction Box IP-65 Rated Connectors MC4 Compatible Connectors Max.System Voltage 600 V UL&1000 V IEC Frame Class I black anodized(highest AAMA rating) Maximum Series Fuse 20 A Weight 41 lbs(18.6 kg) Power Temp Coef. -0.38%/*C Voltage Temp Coef. -176.6 mv/OC TESTS AND CERTIFICATIONS Current Temp Coef. 3.5 mA/*C Standard tests CEDEC 61215,IEC 61730- I-TZA REFERENCES: Quality tests ISO 9001:2008,ISO 14001:2004 1 All comparisons are SPR-E20-327 vs.a repriesentative conventional panel: EHS Compliance RoHS,OHSAS 18001:2007,load five 240W,approx. 1.6 M2, 15%efficiency. Ammonia test IEC 62716 2 PVEvalution Labs"SunPower Shading Study,"Feb 2013. Solt Spray test IEC 61701 1possed maximum severity) 3 Typically 7-9%more energy per watt,BEW/DNV Engineering"SunPower Yield Report,"Jon 2013. PID test Potentiol-Incluced Degradation free: I 000V` 4 SunPower 0.25%/yr degradation vs. 1.0%/yr conv.panel.Campeau,Z,et Available listings UL,CEC,CSA,TUV,JET,KEMCO,MCS,FSEC aL"SunPower Module Degradation Rate,"SunPower wh4e paper,Feb 2013;Jordan,Dirk"SunPower Test Report,"NREL,Oct 2012. 5"SunPower Module 40-Year Useful Urfe"SunPower wWe paper,Feb 2013. Useful life is 99 out of 100 panels operating at more than 70%of rated power. 6 Out of all 2600 panels listed in Photon Intemational,Feb 2012. 6 nnnn 7 8%more energy than the average of the top 10 panel companies tested in [41.2 in) 2012(151 panels, 102 companies),Photon International,March 2013. 8 Compared with the top 15 manufacturers.SunPower Warranty Review, Feb 2013. 9 Some exclusions apply.See warranty for details. 7 10 5 of top 8 panel manufacturers were tested by Frounhofer ISE,"PV 46 mrn 1559 MM Module Durability Initiative Public Report,"Feb 2013. (1.8 in) 11 Compared with the non-stress-tested control panel.Atlas 25+Durability [61.4ini test report,Feb 2013. 12 Standard Test Conditions(1000 W/m2 irradiance,AM 1.5,25*C). 13 Based on average of measured power values during production See http://�.sunpo�rrorp.com/fcct for more reference information. For more details,see wdended datasheet-�.sunpowercorpxom/dcfasheets.Read safety and installation instructions before using this product. ,PMcy 2013 S�.P­Corpwafio..AlligFft me�*d.SUNPOWER,the SUNPOWER logo,MAXEON,MORE ENERGY.FOR UPE.,and SIGNATURE we tradernwla�or registered www.sunpowercorp.com tmd—ks of SunPc­er Corponafion.Specifications;nJuded in thiz dotmheet are�biect to change without notice. D--�#504W%�9/LTR-US SUNPOWER E--SERIES SOLAR PANEIS HIGH PERFORMANCE & EXCELLENT DURABILITY 20.4%efficiency Ideal for roofs where space is at a premium or where future expansion might be E 2-0-3,"7 P,:�f, needed. * High performance HIGH EFFICIENCy6 Delivers excellent performance in real world Generate more energy per square foot conditions, such as high temperatures, clouds and low light.'.2,3 E-Series residential panels convert more sunlight to electricity producing - Proven value 36% more power per panel,1 and 60% more energy per square foot Designed for residential rooftops, E-Series over 25 years.3-' panels deliver the features, value and HIGH ENERGY PRODUCTION 7 performance for any home. Produce more energy per rated wott High year one performance delivers 7-9% more energy per ratedwo tt.3 This advantage increases over time, producing 20%more energy over the first 25 years to meet your needs.' 120% More Energy 110% Maxeon'Solar Cells:Fundamentally better. c Per Rated Waft 0 4%mora,ycc, Enginee,e6 for Wormance,designed for durability *= 1001, u 90�; Engineered for peace of mind c�- 35'. >1 80% year 2f Designed to deliver consistent, tTouble-free 2) Q r- 7 0 energy over a very long lifetiMe. .5 LLj Designed for clurabili�/ In 50% The SunPower Maxeon Solar Cell is the 04 0 5 15 2'0- 25 only cell built on a solid copper foundation. Years Virtually impervious to the corrosion and 101'. cracking that degrade Conventional 1 Maintains High Panels.',' Q) 8*16 Power at High Temps No Light-Induced c: #I Ranked in Fraunhofer durability test.10 0 6% PHOTON > Degradation 21 4% Befter La%�Light and 100% power maintained in Atlas 25' High Average Wals comprehensive PVDI Durability test. Spectral Response Lu 2 1� High-Performonce Awi-Reflective Gl= 0% www.sunpowercorp.com