HomeMy WebLinkAbout536 Marine Drive Address:
536 Marine Drive
PREPARED 8/22/16, 10:47:18 INSPECTION TICKET PAGE 5
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 8/22/16
------------------------------------------------------------------------------------------------
ADDRESS . : S36 MARINE DR SUBDIV:
CONTRACTOR : PHONE :
OWNER MALIK V ATWATER & VIVIAN WAI PHONE : (360) 477-1519
PARCEL 06-30-00-0-0-4930-0000-
APPL NUMBER: 16-00000889 COMM MECHANICAL PERMIT
------------------------------------------------------------------------------------------------
PERMIT: ME . 00 MECHANICAL PERMIT
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
---------- -----
-------------------------- ----M.CHA.ICALFINAL------------------------------------------------
ME99 01 8/22/16
August 22, 2016 10:51:37 AM jlierly.
Trent
------------ ------- --------- COMMENTS AND NOTES --------------------------------------
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Application Number . . . . . 1G-00000889 Date 6/21/16
Application pin number . . . 835950
Property Address . . . . 53G MARINE DR REPORT SALES TAX
ASSESSOR PARCEL NUMBER: 06-30-00-0-0-4930-0000-
Application type description COMM MECHANICAL PERMIT on your state excise tax form
Subdivision Name . . . . . .
Property Use . . . . . . . . to the City of Port Angeles
Property Zoning . . . . . . . INDUSTRIAL LIGHT (Location Code 0502)
Application valuation . . . . 6905
----------------------------------------------------------------------------
Application desc
install ductless heat pump
----------------------------------------------------------------------------
Owner Contractor
------------------------
------------ -----------
MALIK V ATWATER & VIVIAN WAI OWNER
6421 S. MT. ANGELES RD.
PORT ANGELES WA 98362
(360) 477-1519
-------------------------------- -------------------------------------------
Permit . . . . . . MECHANICAL PERMIT
Additional desc
Permit Fee 64.80 Plan Check Fee
Issue Date . . . . G/21/16 Valuation . . . . 6905
Expiration Date 12/18/16
Qty �'Unit"Charge -Per
E x t e n s i o n-
BASE FEE 50.00
1.00 14.8000 EA ME-FURN/HP/FAU < OR = 5 TON 14.80
---------------------------------------------------------------------------- --
Fee summary Charged Paid Credited Due
----------------- ---------- ---------- ---------- ----------
Permit Fee Total 64.80 64.80 .00 .00
Plan Check Total .00 .00 .00 .00
Grand Total 64.80 64.80 .00 .00
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 1 80,days 'from' iih-e�
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct: All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of.
construction.
Date Print Name Cont or or Authorized Agent Signature of Owner(if owner is builder)
TForms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Sternwall
Foundation Drainage I Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-in
Water Line(Meter to Bldg)
Gas Line
Back Flow/Water
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders I Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall(interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pump/Furnace FAU Ducts
Rough-In
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts
MANUFACTURED HOMES:
Footing/Slab
,Blocking&Hold Downs
ISkirting
PLANNING DEPT. Separate Permit#s SEPA:
Parking/Lighting ESA:
Landscaping ISHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction -R.W. PW I Engineering 417-4831
Fire 417-4653
Planning 417-4750
I Building 417-4815
06/17/2016 01:50 13604525177 ALL WEATHER HEATING PAGE 01/01
THE For city Use
Fo
er
C - 9!Y
F
ITY 0 P Permit#
'a
W A S H I Date Received-: (b V7– U
a. PP7
rov F? G
321 E 51h Street [Date Approved
Port Angeles,WA 9836
P-360-417-4817 F:360-417-4711
Emai 1:Rem=mdw-af� BUILDING PERMIT APPLICATION
Project Address:5365 Marine Drive
Pbone 360-477-2381
Primag Contact:Malik Atwater Email:
Name -- Phone
Malik Atwater 360-477-238.1 —
Property Mailing Addreqs 536 Marine Drive Fmail
Owner city Port Angeles State WA "P 98363
N3'"t'All Weather Heating & Cooling, Inc. P'.0ne360-452-9813 -
Contractor Address 302 Kemp Street billing@allweatherhc.com
Information F7-iP 98362
city Port Angeles I_State WA
Contractor License#ALLWEHC1 5OKU EXP,Date:9116
Legal Description-. zoning. Tax.Parcel# Project Value: (materials and labor)
1 $ 6905.00
Residential Commero,al Industrial El — Public
Demolition 13 Fire 0 Repair Reroof(tear off/lay over)
Permit
Classification. Eor the follomdng,fill out both nages a
(check New Construction 11 Exterior Remodel 1:1 Addition 0 Tenant Improvement
appropriate) MechanJi,cal N Plumbing 0 Other
Fire Sprinkler System Proposed Inigation System Proposedor ropoged Bathrooms I Proposed Bedrooms
or Existing? Yes E3 No E3 Existing? Yes 13 No 0
In addition tostandard hard copy submittals please send a PDF copy of all Stormwater plans and Engineering to
kiistall Ductless Heat pump system
Project DescriptJon
kmW Ductless Heat pump system
Is project iri.a Flood Zone: Yes 13 NoO Flood Zone Type.-
If in a Flood Zone,what is the value of the -structure before proposed improverneDt? $
1 have read and completed the application and know it to be true and correct.I am authodzed to apply for
this permit and understand that it is my responsibility to determine what permits are required and to
obtain permits prior to work. I understand that planreview fees arenot refundable after review has
occurred. I underst.md that I will forfeit review fees if I withdraw the application before the permit is
issued. I understand that if the e application
permit is not picked up/issued vd.thin x8o days of submittal,th
'll be considered abandoned and thefees will be forfeited.
wi
Date Print Name Karen McKeown Signature
536 Marine Drive �CUP 14-04
NGELES
P A�
ORT
of WASH INGTON, U. S. A.
DEPARTMENT OF COMMUNITY& ECONOMIC DEVELOPMENT
TO: Planning Commission
FROM: Scott K. Johns, AICP
DATE: May 28, 2014
RE: Conditional Use Permit- CUP 14-04
APPLICANT: Malik Atwater and Vivian Wai
ONVNER: SAME
LOCATION: 536 Marine Drive, Port Angeles, 98363
REQUEST: Allow the retail sales of recreational marijuana per Initiative 502, in the
Industrial Light(IL) zone.
RECOMMENDATION:
The Planning Division recommends that the Planning Commission approve CUP
14-04 with 3 conditions, citing 16 findings and 3 conclusions in support of that action as
listed in Attachment A to this staff report.
EXISTING CONDITIONS IN AREA:
The subject property is located at 536 Marine Drive. The site is located in the Industrial
Light zone immediately west of the intersection of Marine Drive and Cedar Streets. Lots in the
block and vicinity vary in size. Surrounding uses include boat manufacturing and repair
services, a hardware store,the longshoreman's union building, a caf6, log handling uses, and
other light industrial uses. Residential uses south of the site above the top of the marine bluff
some 230 feet from the site, and an apartment building is located approximately 750 feet to the
east on Cedar Street. Residential uses are nonconforming uses in the IL zone.
The subject parcel is developed with two structures addressed as 536 and 538 Marine
Drive. One structure (west) currently supports a restaurant use with the second structure(east)
being vacant. The vacant building is the subject of this proposal. The subject building is located
facing Marine Drive on the north with parking accessed from Cedar Street on the west. Marine
Drive is classified as a minor arterial at this location and Cedar Street is classified as a collector
arterial street. The application and site maps are attached as Attachment B to this staff report.
In,
Page 2
�-Ic�up, 14=,.ter/Wai
ssion May 28,2014
DEPARTMENT COMMENTS:
City Departments reviewed the proposal and provided the following comments:
The Fire Department had no comment.
The Public Works and Utilities Department had no comment.
The Buildina Division of DCD will require a building permit for anticipated remodel of
the structure.
PUBLIC COMMENT:
Notification of the proposed action was placed in the Peninsula Daily News on May 11,
2014, the site was posted on May 8, 2014,with notice mailed to property owners within 300 feet
of the subject property on May 8, 2014. No written public comments were received during the
written public comment period that ended on May 26, 2014.
STATE ENVIRONMENTAL POLICY ACT(SEPA)REVIEW:
A Determination of NonSignificance(DNS #1342)was issued for this proposed action by
the City's SEPA Responsible Official on May 28, 2014, per WAC 197-11-355. This satisfies the
City's responsibility under the State Environmental Policy Act(SEPA).
ENVIRONMENTAIL REVIEW:
The site is located outside of the 100-year flood zone per Flood Insurance Rate Map
#5300233 0003 C dated September 28, 1990. No environmentally sensitive areas are located on
the site. The marine bluff is located to the south of the site but is not located on the subject
property. The project will not create any adverse impacts to the bluff. This conditional use
permit review is the only environmental review required for the project.
DEPARTMENT OF COMMUNITY DEVELOPMENT ANALYSIS:
The entire Comprehensive Plan and Port Angeles Municipal Code were reviewed with
regard to the proposal with the references listed in Attachment C found to be the most relevant
to the proposal. In addition to the Comprehensive Plan goals and policies, development
regulations in the Industrial Light(IL) zone are also included in Attachment B to this staff report.
The City's Comprehensive Plan and Land Use Map identify the area as being located in
the Harbor Planning Area and the site as Industrial(1).
The site is zoned Industrial Light(IL). Some retail uses are allowed in the IL zone
PAMC 17.32.020(B)(6), however, the suggested sales items are somewhat specific and do not
include the proposed sales items. Other permitted uses in the zone include adult entertainment
businesses, cocktail lounges and taverns,restaurants and cafes, and business and professional
offices. The processing of food products and pharmaceuticals are permitted by conditional use
permit in the IL zone. The retail sale of marijuana has not previously been legal so there is no
specific mention of its sale in the City's Zoning Ordinance for comparison of compatibility with
the purpose of the zone. However, Section 17.32040(B)(10)of the Port Angeles Municipal Code
(PAMC), "Other uses compatible with the purpose of this Chapter" are also allowed by
conditional use permit. The purpose of the Industrial Light zone is "... intended to create and
preserve areasfor industrial uses that are largely devoid of exterior nuisances... such as noise,
glare, air and water pollution, andfire and safety hazards on adjacent non-industrial property,
and do not have an exceptional demand on publicfacilities. The purpose statement further states
that "While industrial and commercial uses that are largely devoid of any impacts detrimental to
CUP 14-04 Atwater/Wai Page 3
Planning Commission May 28,2014
the environment are allowed.....Buffering measures to reduce the impact of industrial uses on
nearby residential uses may be required."
The proposed use is a retail sales use. Some retail sales are allowed in the IL zone. The
sales of marijuana is not anticipated to create adverse impacts such as noise, glare, air or water
pollution, fire or safety hazards to adjacent or nearby properties. As required by the Washington
State Liquor Control Board, the site has been determined to be more that one thousand feet from
any school, day care center, public park/recreation center, or transit center. The proponents have
followed the State's application process and were selected in the State's lottery to be one of two
recreational marijuana retail outlets under the rules developed by the State.
No physical change to the site or exterior of the structure is proposed, so no change in
appearance or lot/site coverage is anticipated. Application materials include a preliminary
parking plan showing the availability for 20 parking spaces on-site. The site currently supports a
restaurant for which a portion of the parking spaces are dedicated. The proposed use will occupy
approximately 900 square feet of area in the unused portion of the structure. Per 14.40 PAMC,
retail stores are required to provide one parking space for every 300 square feet of retail space.
This will require that 3 parking spaces be provided for the retail use. Adequate off street parking
is available to meet the needs of both on-site uses in the 20 space off street parking area.
In consideration of a conditional use permit application, the Planning Commission may
impose whatever restrictions or conditions are considered to be essential to protect the public
health, safety, and welfare, and to prevent depreciation of neighboring property. Uses developed
by conditional use permit must remain in continual compliance with the conditions of approval
or the use may be revoked. Consideration is given to the impacts on traffic patterns, the physical
circumstances of the subject property, other uses in the neighborhood, schools, and needed
public improvements when reviewing,conditional use permit applications.
Per Section 17.96.070(D) PAMC, conditional use permits become void after one year if
the use to which the permit is approved has not commenced. Extensions of approved
conditional use permits shall be considered in accordance with the same procedures as for the
original permit and maybe granted for a period of one (1)to five (5)years provided that the
permit is in compliance with the conditions of approval and that there have been no adverse
changes in circumstances. If an extension is desired, the applicant is responsible for making a
written request prior to expiration of the permit.
The Planning Division recommends the Planning Commission approve Conditional Use
Permit CUP 14-04 subject to 2 conditions supported by the 14 findings and 3 conclusions listed
in Attachment A to this staff report:
Attachments: A-Conditions,Findings,and Conclusions
B-Application
C-Zoning Ordinance,Comprehensive Plan,and Other Municipal Code References
CUP 14-04 Atwater/Wai Page 4
Planning Commission May 28,2014
ATTACHMENT A
CONDITIONS, FINDINGS,AND CONCLUSIONS IN SUPPORT OF CUP 14-04
Conditions: %kly
I The conditional use,approvec�fbr Malik Atwater and Vivian Wai to operate a recreational
marijuana retail activity as lic&sed by the State of Washington for a period of one year at
536 Marine Drive as is described in CUP 14-04.
2. The applicant shall obtain all necessary permits and comply with all legal and regulatory
obligations. .
3. If the business expands into a larger portion of the structure than proposed in the
application materials,the applicant shall contact the City to determine additional parking
requirements and compliance with CUP 14-04.
Findings:
Based on the information provided in the Community Development Staff Report for CUP
14-04 dated May 28, 2014, including all information in the public record file, comments and
testimony presented during the public hearing, the Planning Commission discussion and
deliberation, and the above listed conditions of approval,the City of Port Angeles Planning
Commission hereby finds that:
I. Malik Atwater and Vivian Wai submitted Conditional Use Permit CUP 14-04
application to allow the sale of recreational marijuana per State Initiative 502 from a
building located in the City's Industrial Light(IL) zone at 536 Marine Drive.
4. The proposed site is described as Lots 9 and 10, Block 49,Townsite of Port Angeles and
contains 14,159 square feet of area. The subject site area includes warehousing,boat
manufacturing and repair, a hardware store, and log handling uses. Residential uses are
located within 250 feet of the site and 750 feet east of the site in the IL zone. Residential
uses are nonconforming in the IL zone and the residential uses south of the site are
physically separated from the proposed use by a steep marine bluff.
5. The site is zoned Industrial Light(IL). Surrounding zoning includes Public Buildings
and Parks PBP on the steep hillside south of the site, Industrial Heavy (111) directly north
across Marine Drive, Industrial Light(IL) directly west across Cedar Street and east of
the site to Valley, with Commercial Arterial (CA) located approximately 400 feet to the
east of the site.
6. The site is located in the City's Harbor Planning Area. The Comprehensive Plan
designates the site as Industrial. Adjacent designations are also Industrial with an
imprecise margin located approximately 265 feet east separating the Industrial
designation from the Commercial designation.
7. Some retail uses are listed as permitted in the IL zone. Sales of recreational marijuana
has not been considered in the Port Angeles Municipal Code due to its recent legalization
in Washington State. A conditional use in the IL zone is required to permit"Other uses
compatible with the purpose of this Chapter" per PAMC 17.32.040(B)(10).
CUP 14-04 Atwater/Wai Page 5
Planning Commission May 28,2014
8. Per Section 17.32.020 PAMC,the purpose of the Industrial Light zone is "... intended to
create andpreserve areasfor industrial uses that are largely devoid of exterior
nuisances... such as noise, glare, air and water pollution, andfire and safety hazards on
adjacent non-industrial property, and do not have an exceptional demand on public
facilities. The purpose statement ftu-ther states that "While industrial and commercial
uses that are largely devoid of any impacts detrimental to the environment are
allowed.....Buffering measures to reduce the impact of industrial uses on nearby
residential uses may be required"It is necessary for the Planning Commission to
determine that the proposed retail use is not in conflict with other uses permitted in the IL
zone.
9. Per 17.96.050 PAMC, the Planning Commission shall consider applications for
conditional use permits as specified in the applicable Chapter of the Zoning Regulations.
The Planning Commission may grant permits that are consistent and compatible with the
purpose of the zone in which the use is located, consistent with the Comprehensive Plan,
and not contrary to the public use and interest. In each application the Planning
Commission may impose whatever restrictions or conditions are considered essential to
protect the public health, safety, welfare, and to prevent depreciation of neighboring
property. The Planning Commission may refuse to issue a conditional use permit if the
characteristics of the intended use would defeat the purpose of the City's zoning
regulations.
10. The City's Comprehensive Plan was reviewed for consistency with the proposal. Land
Use Element Commercial; Goal D, Policy D.1, & Goal E; Transportation Element
Policies B.14 & 16; Economic Development Element Goal A. Policy 4; were found to be
most relevant to the proposal.
11. Chapter 14.40 PAMC Table A requires one (1)parking space for each 300 square feet of
retail space. The proposed use will occupy approximately 900 square feet of area in the
unused portion of the structure. Per 14.40 PAMC, retail stores are required to provide
one parking space for every 300 square feet of retail space. This will require that 3
parking spaces be provided for the retail use. Adequate off street parking is available to
meet the needs of both on-site uses in the site's 20 space off street parking area.
12. A development that is approved through the conditional use permit process must remain
in continual compliance with specific conditions of approval or may be revoked.
13. Reviewing City Departmental comments were considered in the review of this
application. Structural changes or remodel will require appropriate building permits.
14. Notification of the proposed action and conditional use permit application was placed in
the Peninsula Daily News on May 11, 2014,posted on the site on May 8, 2014, and
mailed to property owners within 300 feet of the subject property on May 8, 2014.
15. A Determination of Non-Significance was issued for this proposed action on May 26,
2014.
16. The Planning Commission conducted a public hearing on the proposal at the May 28,
2014, regular meeting.
17. Per Section 17.96.070(D) PAMC, conditional use permits become void after one (1)year
if the use to which the permit is approved has not commenced. Extensions of approved
conditional use permits shall be considered in accordance with the same procedures as for
CUP 14-04 Atwater/Wai Page 6
Planning Commission May 28,2014
the original permit and maybe granted for a period of one (1)to five (5) years provided
that the permit is in compliance with the conditions of approval and that there have been
no adverse changes in circumstances. If an extension is desired beyond the first year of
operation,the applicant is responsible for making a written request prior to expiration of
the permit.
Conclusions:
Based on the information provided in the Department of Community & Economic
Development Staff Report for CUP 14-04 May 28, 2014, including all of the information in the
public record file, comments, and testimony presented during the public hearing, the Planning
Commission's discussion and deliberation, and the above listed conditions of approval and listed
findings, the City of Port Angeles Planning Commission hereby concludes that:
1. The proposal was processed consistent with requirements for approval of a conditional
use permit as specified in Sectionl7.96.050 PAMC.
2. The proposal is consistent with Chapter 14.40 (Parking Ordinance) PAMC.
3. As conditioned, the use will not be detrimental to the public interest, safety, or welfare,
and is consistent with state law.
CUP 14-04 Atwater/Wai Page 7
Planning Commission May 28,2014
ATTACHMENT B
COMPREHENSIVE PLAN GOALS,POLICIES,AND OBJECTIVES THAT SUPPORT THE
USE AS A HOSTEL BY CONDITIONAL USE PERMIT IN THE CSD ZONE:
Comprehensive Plan
The City's Comprehensive Plan establishes the long range goals and policies of the City. Any
project proposed in the City must be consistent with the goals and policies of the Comprehensive Plan.
The site is located in the City's North Central Planning Area. The Comprehensive Plan was reviewed in
its entirety with regard to the proposed application and several goals and policies were found to be
relevant to the proposal. An analysis of compliance with those policies is as follows:
Land Use Element Commercial
GoalD: To create and maintain a healthy and diverse commercial sectorfor a balanced and
stable local economy.
Policy D.I- The City should encourage the recruitment ofnew and the retention of existing
commercial developments and businesses, which are consistent with the goals andpolicies of this
Comprehensive Plan.
Goal E.To provide shopping opportunities which meet the needs of all City residents and visitors
in safe, usable shopping areas that are compatible with the surrounding area and uses, the environment,
and the desired urban design of the City.
Transportation Element
Policy B.14 - "Off-street parking should be sufficient and accessible within business and
residential areas to ensure that the tra flow of the street is not impaired
Iffic
PolicyB.16. Parking requirements should make allowancesfor sharedparkingJacilities.
Economic Development Element
Goal A. To create and maintain a balanced and stable local economy withfull employment and
emphasis on strengthening the community's traditional natural resource related industries as well as
diversifying the overall economic base.
Policy A. 4 The City shouldpromote the diversification of the community's economic base by
encouraging the location, retention, and expansion of local businesses.
Zoning Ordinance
The Zoning Ordinance is the primary implementing ordinance for the Comprehensive Plan. The
Ordinance establishes what types of uses are permitted and where they may be located in the City. It also
establishes definitions and minimum design standards for such uses. Any project proposed in the City
must be consistent with specific regulations of the zone in which it is located.
The Zoning Map identifies the subject property and adjacent properties as Industrial Light(IL).
The purpose and intent of this zone is:"This is an industrial zone intended to create andpreserve areas
for industrial uses that are largely devoid of exterior nuisances in close proximity to airports and
highways. Permitted uses are largely devoid of exterior nuisancefactors, such as noise, glare, air and
waterpollution, andfire andsafety hazards on adjacent non-industrial property, and do not have an
exceptional demand on publicfacilities. These types of industrial uses typically involve the manufacture
offinishedproductsfrom pre-fabricated materials,product wholesaling, and material storage. Buffering
measures to reduce the impact of industrial uses on nearby residential uses may be required While
industrial and commercial uses that are largely devoid of any impacts detrimental to the environment are
CUP 14-04 Atwater/Wai Page 8
Planning Commission May 28,2014
allowed, vehicle service stations with petroleum products and entertainment businesses with adult-only
activities are also permitted uses, and a variety of maintenance and repair shops with hazardous
materials are also conditionally permitted uses. This zone provides the basic urban land use patternfor
light industrial uses with direct access on an arterial street, design standardsfor greater truck traffic,
and buffersfor nonindustrial uses. "
Conditional Use is defined as: "a use permitted in a zone but which requires a special degree of
control to make such use consistent and compatible with other existing or permissible uses in the same
zone
The purpose of a conditional use permit is defined as 'A Conditional Use Permit shall be to
assure that the maximum degree of compatibility between uses shall be attained. The purpose of these
regulations shall be maintained with respect to the particular use of the particular site and in
consideration of other existing andpotential uses within the general area in which such use is to be
located."
PAMC 17.96.050 specifies procedures for the review and processing of conditional use
applications, as follows:
17.96 050 Conditional Use Permit
,4. The Planning Commission shall consider applicationsfor Conditional Use Permits Of
uses as specified in the applicable Chapter of the Zoning Regulations. The Planning Commission may
grant saidpermits which are consistent and compatible with the purpose of the zone in which the use is
located, consistent with the Comprehensive Plan, and not contrary to the public use and interest. The
Planning Commission may refuse to issue a Conditional Use Permit if the characteristics of the intended
use as related to the specific proposed site are such as would defeat the purpose of these Zoning
Regulations by introducing incompatible, detrimental, or hazardous conditions.
A In each application, the Planning Commission may impose whatever restrictions or
conditions they consider essential to protect the public health, safety, and wetfare, and to prevent
depreciation ofneighboring property.
PARK1NG ORDINANCE
PAMC 14.40.060(D)requires 1 off-street parking spaces for each 300 square feet of retail space
with a total requirement of three(3)for the proposal. The development will be required to provide the
three parking spaces within the property boundaries.
File #
APPLICANT/OWNER INFORMATION: C /z//Y
Applicant: -MAU IK_ A—ak)A_Ff-�Q_ 4 VII V 14,N
Applicant Address: 642- 1 'S. kACI-N—,
Daytime phone #:r9w) LI-7 1- )c-,1'8 E-mail
Applicant's representative (if other than applicant):
Contact Address:
Daytime phone#: E-mail
Property owner (if other than applicant):
Address: Contact phone #:
PROPERTY INFORMATION:
Streetaddress: 53(o QAe_iWf� De_i v Zoning: _.Lj6H-r —J_NDIx5-1Q_Ito
Legal description: Lo-r,- 49
, 9 A I D 13 L 14 9 TPA Log- czvtjj,&w-r— Px�-CU-L-* 0 k 3 o 00 x t 30
Property dimensions: lq5'y 100' Property area'(total square feet): I L4 Is 9 -F+,
Physical characteristics (i.e., flat, sloped, vacant, developed, etc.):
C,omm(-.7(4C4A-L- RVID- �_*� LQ17�-I --3L_Df2CC> ACC_�-S 70 E��eXAN&j LQ-=
F 9-o rA C(E:_ocq_
PROPOSED USE:
Please describe the proposed conditional use: L
n-
Number of employees: Hours of operation:
Number of on-site parking spaces: '3 t
o
Total square foot of floor area for the proposal: Of QQ % Site coverage:
SIGNATURES:
Applicant: Date:
I certify that all of the above statements are true and com lete to the best of my knowledge and
p
acknowledge that wi�ful misrepresentation of information will terminate this permit application.
Applicant Signature Date: zo��j
(If the applicant is NOT the property owner, the property owner must sign this application or
provide a separate note that helshe islare aware of the application).
Owner's Signature(if other than applicant):
Signature Date
TAF0RMS\APPS\CUP.D0CX
_j MAY 0 2 2014 jD
#5 Conditional Use Permit Application Y OF PORT ANGELES
Interior Floor Plans-
Our anticipated retail sales area will be approximately 900 sq.ft. There will be at least 3 parking spaces
in the rear lot dedicated to the retail store.
PLkjL-�ikj(n EU&VAZrIONS
41 mAY 0 212014
LES�—
Rol'
Mr-
vvb
.............. ..
:11-7=
r3ot
Ile,
prelim
ov
.................
T NGELES
A
W SH INGTON, U. S. A.
[DEPARTMENT OF COMMUNITY& ECONOMIC DEVELOPMENT
TO: Nathan West, Director
Community and Economic Development Department
FROM: Scott K. Johns,AICP
DATE: July 6, 2015
RE: Extension of Conditional Use Permit- CUP 14-04
APPLICANT: Malik Atwater and Vivian Wai
OWNER: SAME
LOCATION: 536 Marine Drive, Port Angeles, 98363
REQUEST: Continue the activity of retail sales of recreational marijuana per Initiative
502, in the Industrial Light(IL) zone.
RECOMMENDATION:
The Planning Division recommends that the Director approve the extension of CUP
14-04 with conditions 1 through 3 to remain in place and Condition 4 being revised, citing
14 findings and 5 conclusions in support of that action as listed in Attachment A to this
staff report.
DEPARTMENT OF COMMUNITY DEVELOPMENT ANALYSIS:
The subject property is located at 536 Marine Drive. Since the original approval of CUP
14-04 for the sales of recreational marijuana per Washington State 1-502, the applicants have
established and operated their business at the approved location. In the last year, no
unanticipated adverse impacts have been identified. No complaints from surrounding businesses
or residents have been made to the Community and Economic Development Department.
The business has met and operated under the four conditions applied to the approval of
CUP 14-04. As part of the request for an extension, the applicants are asking for relief from
condition#4, (Hours of operation shall be allowedfrom 11:00 a.m. to 9:00 p.m., Monday
through Saturday, as stated in the application materials). Washington State law establishes
hours of operation and days of the week in which recreational marijuana may be sold. The
applicant is asking to be allowed to operate under the same framework as other competing
outlets for recreational marijuana sales. This is the only requested change to the original
conditions of approval.
CUP 14-04 Extension Atwater* Page 2
July 1,2015
DEPARTMENT COMMENTS:
City Departments reviewed the proposal and provided the following comments:
The Fire Dgpartment had no comment.
PUBLIC COMMENT:
Notification of the proposed action was placed in the Peninsula Daily News on June 16,
2015, the site was posted on June 16, 2015, with notice mailed to property owners within 300
feet of the subject property on June 16, 2015. No written public comments were received during
the written public comment period that ended on June 30, 2015.
STATE ENVIRONMENTAL POLICY ACT (SEPA) REVIEW:
A Determination of NonSignificance(DNS #1342)was issued for this proposed action by
the Citys SEPA Responsible Official on May 28, 2014,per WAC 197-11-355. This satisfies the
City's responsibility under the State Environmental Policy Act(SEPA) and no finiher
environmental review is required.
RECOMMENDATION
The Planning Division recommends the Director approve the extension of Conditional
Use Permit CUP 14-04 subject to the 3 conditions of original approval and modification of
condition#4 to allow the hours of operation to meet the standard established by the Liquor and
Cannabis Board as supported by the following findings and conclusions. No further review will
be required for this conditional use permit.
CUP 14-04 Extension Atwate!Pai Page 3
July 1,2015
CONDITIONS,FINDINGS,AND CONCLUSIONS IN SUPPORT OF
CUP 14-04 EXTENSION
Conditions:
1 The conditional use approved for Malik Atwater and Vivian Wai to operate a recreational
marijuana retail activity as licensed by the State of Washington for a period of one year at
536 Marine Drive as is described in CUP 14-04. This condition has been met No
further review is required.
2. The applicant shall obtain all necessary permits and comply with all legal and regulatory
obligations. This condition has been met
3. If the business expands into a larger portion of the structure than proposed in the
application materials, the applicant shall contact the City to determine additional parking
requirements and compliance with CUP 14-04. No expansion of the operation has
taken place. This condition shag remain in place.
4. Hours of operation shall be allowed from 11:00 a.m. to 9:00 p.m., Monday through
Saturday, as stated in the application materials.
This condition is modified to read:
Hours and days of operation shall be no more than those allowed by the State of
Washington under the rules established for 1-502.
Findings:
Based on the information provided in the Community Development Staff Report for CUP
14-04 dated May 28, 2014, including all information in the public record file, comments and
testimony presented during the public hearing, the Planning Commission discussion and
deliberation, review of the above listed conditions of approval, and review of the first year of
operation, the City of Port Angeles Planning Director hereby finds that:
1. Malik Atwater and Vivian Wai submitted a letter requesting an extension of
Conditional Use Permit(CUP 14-04) application to allow the continued sale of
recreational marijuana per State Initiative 502 from a building located in the City's
Industrial Light(IL) zone at 536 Marine Drive.
2. The site is zoned Industrial Light (IL). Surrounding zoning includes Public Buildings
and Parks PBP on the steep hillside south of the site, Industrial Heavy(111) directly
north across Marine Drive, Industrial Light(IL) directly west across Cedar Street and
east of the site to Valley Street, with Commercial Arterial (CA) located
approximately 400 feet to the east of the site.
3. The site is located in the City's Harbor Planning Area. The Comprehensive Plan
designates the site as Industrial. Adjacent designations are also Industrial with an
imprecise margin located approximately 265 feet east separating the Industrial
designation from the Commercial designation.
4. Some retail uses are listed as permitted in the IL zone. Sales of recreational
marijuana has not been considered in the Port Angeles Municipal Code due to its
recent legalization in Washington State. A conditional use in the IL zone is required
to permit "Other uses compatible with the purpose of this Chapter"per PAMC
17.32.040(B)(10).
CUP 14-04 Extension Atwates Page 4
July 1,2015
5. Per Section 17.32.020 PAMC, the purpose of the Industrial Light zone is "... intended
to create andpreserve areasfor industrial uses that are largely devoid of exterior
nuisances... such as noise, glare, air and water pollution, andfire and safety hazards
on adjacent non-industrial property, and do not have an exceptional demand on
publicfacilities. The purpose statement further states that "While industrial and
commercial uses that are largely devoid of any impacts detrimental to the
environment are allowed.....Buffering measures to reduce the impact of industrial
uses on nearby residential uses may be required."It is necessary for the Planning
Commission to deten-nine that the proposed retail use is not in conflict with other uses
permitted in the IL zone.
6. The City's Comprehensive Plan was reviewed for consistency with the proposal.
Land Use Element Commercial; Goal D, Policy D.1, & Goal E; Transportation
Element Policies B.14 & 16;Economic Development Element Goal A. Policy 4;
were found to be most relevant to the proposal.
7. Chapter 14.40 PAMC Table A requires one(1)parking space for each 300 square feet
of retail space. The proposed use will occupy approximately 900 square feet of area
in the unused portion of the structure. Per 14.40 PAMC, retail stores are required to
provide one parking space for every 300 square feet of retail space. This will require
that 3 parking spaces be provided for the retail use. Adequate off street parking is
available to meet the needs of both on-site uses in the site's 20 space off street
parking area.
8. A development that is approved through the conditional use permit process must
remain in continual compliance with specific conditions of approval or may be
revoked. To date, the development has operated within the conditions applied by the
Planning Commission and operated within the parameters established by Washington
State under Initiative 502.
9. Reviewing City Departmental had no additional comments.
10. Notification of the proposed conditional use permit extension application was placed
in the Peninsula Daily News on June 16,2015,posted on the site on June 12, 2015,
and mailed to property owners within 300 feet of the subject property on June 12,
2015.
11. A Determination of Non-Significance (#1342) was issued for this proposed action on
May 26, 2014. No additional environmental review is required.
12. The Planning Commission conducted a public hearing on the proposal at the May 28,
2014, regular meeting. The application was approve at that time.
13. Per Section 17.96.070(D) PAMC, conditional use permits become void after one(1)
year if the use to which the permit is approved has not commenced. The applicant
has met all conditions of approval established at the May 28, 2014, Planning
Commission meeting. No further review will be required.
14. The applicants have requested an amendment to Condition#4 to allow the business to
operate under the rules developed by the Washington State Liquor and Cannabis
Board for the sales of recreational marijuana. Those rules allow operation 7 days per
week.
CUP 14-04 Extension Atwateroll 40 Page 5
July 1,2015
Conclusions:
Based on the information provided in the Department of Community&Economic
Development Staff Report for CUP 14-04 May 28, 2014, including all of the information in the
public record file, comments, and testimony presented during the public hearing, the Planning
Commission's discussion and deliberation, and review of the past year's operation, the City of
Port Angeles Planning Director hereby concludes that:
I The proposal was processed consistent with requirements for approval of a conditional
use permit as specified in Sectionl 7.96.050 PAMC.
2. The proposal is consistent with Chapter 14.40 (Parking Ordinance) PAMC.
3. As conditioned, the use will not be detrimental to the public interest, safety, or welfare,
and is consistent with state law.
4. The project and operation were reviewed for consistency with required conditions. All
conditions of approval have been met.
5. No adverse impacts to the neighborhood or surrounding properties has occurred as a
result of the project.
Nathan West,Director Date
Community and Economic Development
CITY OF PORT ANGELES
AFFIDAVIT OF POSTING
RE
I JIM LIERLY, state that on the day of 20155
1 posted said notice, a true copy of which is hereto attache d made part hereof,
on the property proposed for a land use action pursuant Section 17.96. 40 of the
Port Angeles Municipal Code
ET
Subscribed to me this - day of 2015.
NOTARY PUBLIC for the State of
Washington, residing in Port Angeles
Tdorms/affidavitpostingj im
CITY OF PORT ANGELES
LAND USE ACTION
NOTICE IS HEPXBY GIVENthat on April 30, 2015, the CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT received a request for a required
one year review of a conditional use permit to allow the continuation of a RETAIL RECREATIONAL
MARIJUANA use in the City's Industrial Light zone. The original application was approved by the
Planning Commission on May 28, 2014. Interested parties are encouraged to comment on the proposal.
Written comment must be submitted no later than June 30, 2015, to be included in the staff report on this
matter. Comments should pertain to conditions required of the applicant as a result of the May 28, 2014,
decision for CUP 14-04. Review of requests for extensions of conditional uses are done administratively.
Information may be reviewed at the City Department of Community & Economic Development, City
Hall, P.O. Box 1150, 321 East Fifth Street, Port Angeles. City Hall is accessible to persons with
disabilities.
STATE ENVIRONMENTAL POLICY ACT: A Determination of Non Significance (DNS)
was issued per WAC 197-11-355 for the project following the public comment review period
on Mqy 28, 2014. No further environmental review is required.
APPLICANT: MALIK ATWATER & VIVIAN WAI
LOCATION: 536 Marine Drive
For further information contact: Scott Johns, (360) 417-4752
PUB: June 16,2015
POST: June 16,2015
MAIL: June 16,2015
T:\Cup\2014\Attwater Wai\Notice For 2nd Review.Doc
CITY OF TACOMA
1OR NGELES U.S.POSTAGE*PITNEY BOWES
VVJA 9.63
TAN
W A S H I NGTON, U. S. A.
ZIP 98362
P. 0. BOX 1 150
02 1VV
PORT ANGELES, WASHINGTON 98362-0217 0001368804JUN 16 2015
PETTIT OIL COMPANY
638 MARINE DR
PORT ANGELES,WA 98363-2263
X qlAA N7F 10,092 1 AT.Anprll 7 1/1 1; 1
't I-M-E- E i - Jib-
FORWARD P RTN TO sE
PETTIT Oil rnmpA*4,v
3 7 3 KI RKWbO5_'CTN '
MAPLE GROVE MN 55369-5205
RETURN TO SENDER
98362@0217
CITY OF PORT ANGELES
NOTICE OF
LAND USE ACTION
NOTICE IS HEREBY GIVENthat on April 30, 2015, the CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT received a request for a required
one year review of a conditional use permit to allow the continuation of a RETAIL RECREATIONAL
MARIJUANA use in the City's Industrial Light zone. The original application was approved by the
Planning Commission on May 28, 2014. Interested parties are encouraged to comment on the proposal.
Written comment must be submitted no later than June 30, 2015, to be included in the staff report on this
matter. Comments should pertain to conditions required of the applicant as a result of the May 28, 2014,
decision for CUP 14-04. Review of requests for extensions of conditional uses are done administratively.
Information may be reviewed at the City Department of Community & Economic Development, City
Hall, P.O. Box 1150, 321 East Fifth Street, Port Angeles. City Hall is accessible to persons with
disabilities.
STATE ENVIRONMENTAL POLICY ACT: A Determination of Non Significance (DNS)
was issued per WAC 197-11-355 for the project following the public comment review period
on Mgy 28, 2014. No further environmental review is required.
APPLICANT: MALIK ATWATER & VIVIAN WAI
LOCATION: 536 Marine Drive
For further information contact: Scott Johns, (360) 417-4752
PUB: June 16,2015
POST: June 16,2015
MAIL: June 16,2015
T:\Cup\2014\Attwater Wai\Notice For 2nd Review.Doc
Cannabis
IN, ' Buffers
11 A '44%�
..........-1
�/41�
7
0 z2t
I/z
6t6
Legend
ot
Atwater/ Wai site
CUP 14-04
Atwater / Wai
Area Zoning
Legend
Atwater/ Wai site
Zoning
CA
CBD
M CN
CO
CSD
M IH
I L
M PBP
RS7
M RHD
PRD
I*.N-INN,
RMD
RS11
/Z RS9
RTP
CUP 14-04
Atwater / Wai
AV P
Atwater Wai
on r%
Location map
I Ilk
-If
10
VA
Legend
Atwater/ Wai site
CUP 14-04
Atwater / Wai
07-
P LES Filing Fee: 1350.00
RRTIjGE Admin. $ 125.00
A
WASH INGTON, U. S. A.
r
L�J I R R Q 12 0 W I
CITY OF PORT ANG LE&I�MAY�02' 20N ]D
Y9
ENVIRONMENTAL C J
is
CITY OF PORT ANGELES
t4tA
Purpose of Checklist. COMMU'TTY&ECONOMIC DEVELOPMENT
Chapter 43.21 C RCW the State Environmental Policy Act (SEPA) requires all governmental
agencies to consider the environmental impacts of a proposal before making decisions. The purpose of
this review is to provide information to help you and the reviewing agency identify impacts that may result
from your proposal and to identify methods to reduce or avoid impacts from the proposal if they exist.
The review will help the agency decide whether further information is necessary or whether an
environmental impact statement(EIS) is necessary.
Instructions for Applicants:
This environmental checklist asks you to describe some basic information about your proposal.
Answer each question to the best of your knowledge with the most precise information known. Provide
the best descriptions you can. In most cases you should be able to answer the questions from your own
observations or project plans without the need to hire experts. If you do not know the answer, or if a
question does not apply to your proposal, write "do not know" or "does not apply (N/A). Complete
answers to the questions will avoid unnecessary delays later.
Some questions ask about governmental regulations, such as zoning, shoreline, and landmark
designations. Answer these questions if you can. If you have problems please ask the City Department
of Community& Economic Development employees to assist you.
The checklist questions apply to all parts of your proposal, even if you plan to phase them over a
period of time or on different parcels of land. If phasing is proposed, please provide that information in
Item 11, the description section. Attach any additional information that will help describe your proposal or
-its environmental effects and-include a site map.-
BACKGROUND
1. Name of project:
A. Address or general location of site:
2. Name, address, phone number, and e-mail address (if available)of applicant:
t- An-,)N-rEe_ 4- V;v V,[&.i (v W-1 5. V-Q.--o 8izrAw&6L,6,S,WA
3. Name, address, phone number, and e-mail address (if available) of contact person if other than
applicant:
4. Date checklist prepared:
5. Agency requesting checklist: CITY OF PORT ANGELES
6. Proposed timing or schedule (including phasing, if applicable):
A. What is the long term objective of this proposal?
kAA&A J U-111-IJA- 'SIO(L-b
B. How does this project relate to long-term plans?
Environmental Checklist EVALUATION FOR
Page 2 AGENCY USE
7. Do you have any plans for future additions, expansion, or
further activity related to or connected with this proposal? If yes,
explain.
N 0
8. List any environmental information you know about that has
been prepared, or will be prepared, directly related to this proposal:
i
NO 0 k2
9. Do you know whether applications are pending for
governmental approvals of other proposals directly affecting the
property covered by your proposal?
if yes, explain.
10. List any government approvals or permits that will be needed
for your proposal, if known. 0
11. Give brief, complete description of your proposal, including
the proposed uses and the size of the project and site. There are
several questions later in this checklist that ask you to describe certain
aspects of your proposal. You do not need to repeat those answers on
this page. (Lead agencies may modify this form to include additional
specific information on project description.)
W�_ Ae-L 0ferJ11,J(-n .6, P__C-7rA.%L I t1J
'Q0
12. Location of the proposal. Give sufficient information for a
person to understand the precise location of your proposed project,
including a street address, if any, and section, township, and range, if
known. If a proposal would occur over a range of area, provide the
range or boundaries of the site(s). Provide a legal description, site
plan, vicinity map, and topographic map, if reasonably available. While
you should submit any plans required by the agency, you are not
required to duplicate maps or detailed plans submitted with any permit
applications related to this checklist.
I'S AT- 52,(:
" KAA'9_t
-Poe-:r
PROJECT SPECIFIC ACTIONS:
Complete this section if your proposal involves a project specific
action such as a subdivision, new construction, a new or expanding
business, a site specific rezone (not area-wide), a conditional use
permit, a shoreline permit, or similar action:
Environmental Checklist EVALUATION FOR
Page 3 AGENCY USE
ENVIRONMENT
1 Earth
General description of the site (circle one):
�OFtiat,r` 'lling, hilly, steep slopes, mountainous,
ot r
B. What is the steepest slope on the site (approximate
percent slope)?
-e-,r .5 �_ov4C-
TO
C. What general types of soils are found on the site (for
example, clay, sand, gravel, peat, muck)? If you know the classification
of agricultural soils, specify them and note any prime farmland. --r 'EMOWV
D. Are there surface indications or history of unstable soils
in the immediate vicinity? If so, describe. T, r_ffiJo.'AD .
E. Describe the purpose, type, and approximate quantities
of any Filling or grading proposed. Indicate source of fill: tQot-.��6 F(2-afc��4�-t>
F. Could erosion occur as a result of clearing,
construction, or use? If so, generally describe. 010 4L._L'
G. About what percent of the site will be covered with
impervious surfaces after project construction (for example, asphalt or
buildings)? Noij�, p2 jD f) 6 n
H. Proposed measures to reduce or control erosion, or
other impacts to the earth, if any: NON
2. Air
A. What types of emissions to the air would result from the
proposal (i.e., dust, automobile, odors, industrial wood smoke) during
construction and when the project is completed? If any, generally
describe and give approximate quantities if known. No 1'4D�6
B. Are there any off-site sources of emissions or odor that
may affect your proposal? If so, generally describe.
C. Proposed measures to reduce or control emissions or
other impacts to air, if any: 6
3. Water
A. Surface:
L) Is there any surface water body on or in the
immediate vicinity of the site (including year-round and seasonal
streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and
provide names. If appropriate, state what stream or river it flows into.
No
Environmental Checklist EVALUATION FOR
Page 4 AGENCY USE
ii.) Will the project require any work over, in, or
adjacent to(within 200 feet) the described waters? If yes, please
describe and attach available plans. No
iii.) Estimate the amount of fill and dredge material
that would be placed in or removed from surface water or wetlands and
indicate the area of the site that would be affected. Indicate the source
of fill material: �J 0 0('
iv.) Will the proposal require surface water
withdrawals or diversions? Give general description, purpose, and
approximate quantities if known. W
v.) Does the proposal lie within a 100-year
floodplain? If so, note location on the site plan. MD
vi.) Does the proposal involve any discharges of
waste materials to surface waters? If so, describe the type of waste
and anticipated volume of discharge. No
B. Ground:
i.) Will ground water be withdrawn, or will water be
discharged to ground water? Give general description, purpose, and
approximate quantities if known. - NO
- - - - - - - -- ----- i i-.) - ---De's-dri b e-waste-m a- t-e-ri al that-w- -i 1-1-be-d-i s-ch-a--rg--ed------ - - ----
into the Ground from septic tanks or other sources, if any(for example:
Domestic sewage; industrial, containing chemicals; agricultural
wastes; etc.). Describe the general size of the system, the number of
such systems, the number of houses to be served (if applicable), or
the number of animals or humans the system(s)are expected to
serve.
C. Water Runoff(including storm water):
i.) Describe the source of runoff(including storm
water) and method of collection and disposal, if any(include quantities,
if known). Where will this water flow? Will the water flow into other
waters? If so, describe. A.:S ( V-5L ,
ii.) Could waste materials enter ground or surface
waters?
If so, generally describe how and what. No
Environmental Checklist EVALUATION FOR
Page 5 AGENCY USE
D. Proposed measures to reduce or control surface,
ground, and runoff water impacts, if any: wow,6,
4. Plants
A. Check or circle the type of vegetation found on the site:
deciduous tree: alder, maple, aspen, other
evergreen tree: fir, cedar, pine, other
shrubs
grass
pasture
crop or grain
wet soil plants: cattail, buttercup, bullrush, skunk
cabbage,
water plants: water lily, eelgrass, milfoil, other
V Other types of vegetation
B. What kind and amount of vegetation will be removed or
altered? No N
C. Proposed landscaping, use of native plants, or other
measures to preserve or enhance vegetation on the site, if
any.
W 0
5. Animals
A. Circle any birds and animals which have been
observed on or near the site or are known to be on or
near the site:
Birds: hawk, heron, eagle, songbird�,�oth�er)
Mammals: deer, bear, elk, beaver, other
Fish: bass, salmon, trout, herring, shellfish, other
---------- - -- - - --- -—
B. Threatened or endangered species known to be on or
near the site. NOWG
C. Is the site part of a migration route? If so, explain.
00
D. Proposed measures to preserve or enhance wildlife.
N()w G
6. Energy and Natural Resources
A. What kinds of energy(electric, natural gas, oil, wood
stove, solar)will be used to meet the completed project's energy
needs? Describe whether it will be used for heating, manufacturing,
etc. E-L-Gc7Ff;—' 4c-, IFOP-' P�-(,T"&.%L—
L,I G Wr I K)C-% -
B. Would your project affect the potential use of solar
energy by adjacent properties? If so, generally describe. W D
C. What kinds of energy conservation features are
included in the plans of this proposal? List other proposed measures
to reduce or control energy impacts, if any. tj 6 W
7. Environmental Health
Environmental Checklist EVALUATION FOR
Page 6 AGENCY USE
A. Are there any environmental health hazards, including
exposure to toxic chemicals, risk of fire and explosion, spill, or
hazardous waste, that could occur as a result of this proposal? If so,
describe. 11,13 0
i) Describe special emergency services that might
be required. N C) N3�>
ii) Proposed measures to reduce or control
environmental health hazards, if any. w 0 V,�
B. Noise
i) What types of noise exist in the area which may
affect your project(for example: traffic, equipment, operation, other)?
T e-AI=T- I U
ii) What types and levels of noise would be created
by or associated with the project on a short-term or a long-term basis
(for example: traffic, construction, operation, other)? Indicate what
hours noise would come from the site. No t,,)L
iii) Proposed measures to reduce or control noise
impacts, if any:
8. Land and Shoreline Use
A. What is the current use of the site and adjacent
,Z_(_< — _,T(_ � 01,j C_v_e_�NM SIT
properties? _;rA.U_p At4i L_OCoc�, _V,
't"D AQ_c H't,17--D
B. Has The site been used for agriculture? If so, describe.
C. - -D-e-sc-rib-e-a--ny-s-t-ruc-tu-r-es-o-n- -th-e -si-te-.-
D. Will any structures be demolished? Ifso, what? Nc>
E. What is the current zoning classification of the site?
F. What is the current Comprehensive Plan designation of
the site? I PC)N"V- �
G. What is the current Shoreline Master Program designation
of the site? 'I Do t�'-r r-"0�AD ,
H. Has any part of the site been classified as an
to environmentally sensitive" area? If so, specify. K C)
1. How many people would reside or work in the
completed project? 3 - q
J. Approximately how many people would the completed
project displace? No N-(--
Environmental Checklist EVALUATION FOR
Page 7 AGENCY USE
K. Proposed measures to avoid or reduce displacement
impacts, if any: No OL-
L Proposed measures to ensure the proposal is
compatible with existing and projected land uses and plans, if any:
N 0 t-)
9. Housing
A. Approximately how many units would be provided, if
any?
Indicate whether high, middle, or low-income housing. N101-
B. Approximately how many units, if any, would be
eliminated?
Indicate whether high, middle, or low-income housing. NIA_
C. Proposed measures to reduce or control housing
impacts, if any.
10. Aesthetics
A. What is the tallest height of any proposed structure(s),
not including antennas; what is the principal exterior building
material(s) proposed? L.:L- tjo-r' k3f, 4.L_rkP e_&D
F r4-vD Y�A_ F—K (S71 N&) 14 E_
G7-:4 -7s-T')t'� -e.;i r_-'I N tv) I'S' C/6 D A'O-- 'S H i f-j�'Lf's
B. What views in the immediate vicinity would be altered
or-obstructed?- . .� - - -- - - Not4�
C. Proposed measures to reduce or control aesthetic
impacts, if any. N-6
11. Light and Glare
A. What type of light or glare will the proposal produce?
What time of day would it mainly occur? No to L6
B. Could light or glare from the finished project be a safety
hazard or interfere with views? N 0
C. What existing off-site sources of light or glare may
affect your proposal? Kj6_N�,
D. Proposed measures to reduce or control light and glare
impacts, if any.
Environmental Checklist EVALUATION FOR
Page 8 AGENCY USE
12. Recreation
A. What designated and informal recreational
opportunities are in the immediate vicinity?
NO 0 6
B. Would the proposed project displace any existing
recreational uses? If so, describe. No
C. Proposed measures to reduce or control impacts on
recreation, including recreation opportunities to be provided by the
project or applicant, if any.
13. Historic and Cultural Preservation
A. Are there any places or objects listed on, or proposed
for, national, state, or local preservation registers known to be on or
next to the site? If so, generally describe: Ij 0
B. Generally describe any landmarks or evidence of
historic, archaeological, scientific, or cultural importance known to be
on or next to the site. No�'3 L,
C. Proposed measures to reduce or control impacts, if
any: "0 WC,
14. Transportation
A. Identify public streets and highways serving the site
and describe proposed access to the existing street system. Show on
site plans, if any. &cc,&--,:5 p��q I
LZTT- -s
F""
B. Is site currently served by public transit? If not, what is
the No
approximate distance to the nearest transit stop? I r>t)"'-r, L--�oLA.D
C. How many parking spaces would the completed project
have? How many would the project eliminate? A:-7> cv-e-e,6Ky-%
No--v-- P'a-Q-V--1N61 ,
D. Will the proposal require any new roads or streets, or
improvements to existing roads or streets, not including driveways? If
so, generally describe (indicate either public or private). r-11)0
E. Will the project use (or occur in the immediate vicinity
of)water, rail, or air transportation? If so, generally describe.
N-0
Environmental Checklist EVALUATION FOR
Page 9 AGENCY USE
F. How many vehicular trips per day would be generated
by the completed project? If known, indicate when peak volumes
would occur. i DotQ I T- Y-31JOLZ>
G. Proposed measures to reduce or control transportation
impacts, if any. N C)
15. Public Services
A. Would the project result in an increased need for public
services (for example?: fire protection, police protection, health care,
schools, other)? If so, generally describe. N D
B. Proposed measures to reduce or control direct impacts
on public services, if any. tj 0 W t-
16. Utilities
A.
enthLava.flab �elec�tricitv.
u Y,
natural ga wate refus servic elephon anitary seqq7b--septiC__r--
wa �e (j�L��o�
system, 1he .
B. Describe the utilities that are proposed for the project,
the utility providing the service, and the general construction activities
on the site or in the immediate vicinity which might be needed.
-VJIL-L- &U- C-XA-2-(2-4-f-M2n kA-5Q)
wt-ri,4 KIC) CAAW6-�6-'�,
17. Econ-omics
A. If the proposal will result in expansion of an existing
business, please describe the nature of the expansion: (e.g.,
additional land and/or buildings, new equipment, new employees).
P"PO-54�,i- L�jILL- ZA;;,5kA-L.::r iNj (=_KA�Uol .
B. If the proposal is the creation of a new business, please
describe (e.g., re-use of an existing building and site, construction of a
new building). OF:' e��IS--!IN6, 13U%AL-0iKJ&, AN%> S Fl-�>
C. Describe if the proposal is the first of its type in the
community, or what the similar uses are. F I e_--T oF I Ts f1Z1 IN -T-
kA Lk L-&.F— Lk5G5 4-2-
D. How many people will the proposa�provide L-tG?L"-0C-- 4
employment for at its completion and what types of jobs will be created
(e.g., sales clerks, factory workers, etc.)? (Jobs created by the
construction of the proposal should be reported separately.)
5 p.L�6i� (-L�6 t T�o t-i � Lxj% LA— B
E. Where will the materials, goods or services utilized by
the proposal come from? I Do t'�'r K-tJ0L'-'? y-46r
Environmental Checklist EVALUATION FOR
Page 10 AGENCY USE
F. Where will the goods or services produced by the
proposal be utilized? NO—i T",&B(;I(- PLACfZ--,C=,
G. Who will utilize the goods or services produced by the
proposal? (77 tr,"CPQ-XL- PLAZ�-) C, C>\/6e_-MG )NC-tG OT=
H. Will the proposal alter the tax assessments of the area?
N3 C)
Environmental Checklist EVALUATION FOR
Page I I AGENCY USE
Endangered Species Act (ESA)
Supplemental Checklist
Answer to the best of vour knowledge.
This checklist was developed to help project proponents and government agencies
identify when a project needs further analysis regarding potential adverse effects on
Endangered Species as required by the Endangered Species Act (ESA). For our
purposes, "ESA listed species" are any species listed as endangered, threatened, o
being considered for listing.
This supplemental checklist is for all development within ESA Potential Impact Areas,
which include the following locations:
• Federal Emergency Management Act(FEMA) designated floodplain and/or
floodway areas;
• Riparian Buffer Zones (RBZ) as described by the Dept of Natural Resources
2007 stream typing system and WDFW's 1997 stream buffer guidelines; and/or
• Channel Migration Zones (CMZ) plus 50' as identified according to Dept of
Ecology 2003).
If ESA listed species are present or ever were present within the ESA Potential Impact
Area where your project will be located, your project has the potential for affecting
them, and you must comply with the ESA. The questions in this section will help
determine if your proposed project could have an impact.
The Port Angeles regional watershed is an area where several endangered
species have historically been present. Please answer the following questions
to the best of your knowledge to assist the city in determining if your project
will have adverse impacts to ESA species or their habitats.
Po rt Ang e le s- 0 o- m m u n fly -a n- d Econ o-m- kc-Deve lo p-m-en t be pa-rtm e nt sta ff- -c a n-- -pro-vide
technical assistance in answering the following questions in this checklist. If necessary,
the Washington Department of Fish and Wildlife (WDFW) regional office can also
provide information to help you answer these questions.
PROJECT SPECIFICS: The questions in this section are specific to the
project and vicinity.
1. Do you know of any endangered species or WDFW priority species
on or in the vicinity of your project? K)Q
If yes, identify those species.
2. Name of waterbody nearest to your project:
3. What is the distance from your project to the nearest body of water?
(ODD T:T', 6F -TkxutoA:T'be-
rl()o F-r' CF- Pbe-�:r-- Aw6,,L�s i4Ae.6oa—
Often a buffer between the project and a stream can reduce the chance of a
negative impact to fish.
Environmental Checklist EVALUATION FOR
Page 12 AGENCY USE
4. What is the current land use adjacent to the potentially affected water
body(developed including commercial, parking lots, residential,
paved andlor graveled surfaces, agriculture, forestry,
etc)?
5. What is the predominant vegetative cover between the project and
the potentially affected water body (dense forest, woodland, scrub,
grasses,etc)?
6. Is the project above a barrier to fish passage:
natural permanent barrier(waterfall) Yes 0
natural temporary barrier(beaver pond) Yes No
human-made barrier(culvert, dam) Yes No__I/
other: Yes No
(explain):
If you answered yes to the questions above, describe the barrier and
source of
information:
7. If you answered yes to question 6 above, are there any resident
salmonid populations above the blockage? Yes No
Don't know
8. What percent of the project will be impervious surface (including
- pave-ment-&-roof-area)?
FISH MIGRATION: The questions in this section will help determine
if this project could interfere with the migration of adult and
juvenile fish. (Both increases and decreases in water flows can
affect fish migration.)
Does the project require the withdra al of:
i. Surface water? Yes No 7
Amount
Name of surface water body
ii. Ground Water? Yes No I/
Amount
From where
Depth of well
Environmental Checklist EVALUATION FOR
Page 13 AGENCY USE
(if you answered yes to any of the above questions, you will
need to contact the Washington Department of Fish and
Wildlife and the Washington Department of Ecology to obtain
appropriate approvals)
2. Will any water be rerouted? Yes No
If yes, will this require a channel 41-o—cation? Yes— No
Please
describe:
3. Will there be retention or detention ponds? Yes No V/
If you answer yes, will this be an infiltration pond or a surface
discharge to either a municipal storm water system or a surface
water body?
Yes No
If you answer"yes" to a surface water discharge, please give the
name of the waterbody that will receive the
discharge:
4. Will this project require the building of any temporary or permanent
roads? 1//1
Yes No (Increased road distance may affect the timing
of water reaching a stream and may impact fish habitat.)
5. Are any new or replacement culyerts or bridges proposed as part of
this project? Yes_ No /
6. Will topography changes,affect the duration/direction of runoff
flows? Yes No V/
— If yesi descFib–e—the
changes:
7. Will the project involve any placement of fill within the ESA Potential
Impact Area? Yes— No-I/
If you answered yes, describe expected impacts on flood storage
and/or flood conveyance and how these impacts will either be
avoided or
mitigated:
WATER QUALITY: The questions in this section will help determine
if this project could adversely impact water quality for either
surface or groundwater. Such impacts can cause problems for
listed species. (Water quality can be made worse by runoff from
impervious surfaces, altering water temperature, discharging
contaminants, etc.)
1. Do you know of any problems with water quality in any of tke/"
streams within ESA Potential Impact Areas? Yes— No
(Information on impaired water bodies can be obtained from
Washington Department of Ecology)
Environmental Checklist EVALUATION FOR
Page 14 AGENCY USE
If you answered yes,
describe:
2. Will your project either reduce or increase shade along or over a
waterbody?
Yes No V1 (Removal of shading vegetation or the building of
structures such as docks or floats often result in a change in shade).
If you answered yes, please
describe:
3. Will the project introduce any nutrients or other contaminants
(fertilizers, other waste discharges, or storm water runoff)to the
waterbody?
Yes No V/
4. Will turbidity be introduced to a water body by construction t e
project or during operation of the project? Yes- No '
(In-water or near water work will often increase turbidity.) If you
answered yes, consult with Washington Department of Ecology to
ensure compliance with water quality regulations.
5. Will your project require long term maintenance that could affect
water quality in the futur
,e, e.g., bridge cleaning, highway salting,
chemical sprays for tation management, clearing of parking
lots? Yes No
If yes, please
describe:
VEGETATION: The following questions are designed to determine
if the project will affect riparian vegetation, thereby, adversely
impacting salmon.
1. Will the project involve the removal of any vegetation from the
stream banks?
Yes No VIf you answered yes, please describe the existing
conditions, and the amount and type of vegetation to be removed:
If any vegetation is removed from a riparian area, a mitigation plan
will be required, please provide a copy of the plan if available.
Describe briefly what your proposed mitigation would consist
of:
Environmental Checklist EVALUATION FOR
Page 15 AGENCY USE
NOTE: Most applicants should have the information necessary to answer
most of the questions in this checklist. Additional information will need
to be obtained from local and state agencies if it appears that the project
is likely to affect ESA listed species.
RESOURCE AGENCIES:
Washington Department of Fish and Wildlife Website
http://wdfw.wa.gov/
This site has useful information on fish habitat.
Washington Department of Ecology Website
www.ecy.wa.go
National Marine Fisheries Services Website
Evolutionarily Significant Unit(ESU) maps can be found at
www.nwr.noaa.qo
Environmental Checklist EVALUATION FOR
Page 16 AGENCY USE
NON-PROJECT SPECIFIC ACTIONS:
Complete this section only if your proposal involves a non-
project specific action such as a Comprehensive Plan Amendment,
Zoning Code
Amendment, area-wide rezone (City-wide or large sub-area),or other
similar action:
When answering these questions be aware of to what extent
the proposal or the types of activities likely to result from the proposal
would affect the item at a greater intensity or at a faster rate than if the
proposal were not implemented. Respond briefly and in general terms.
1 How would the proposal be likely to increase discharge to
water;
emissions to air; production, storage, or release of toxic or hazardous
substances; or production of noise?
Proposed measures to avoid or reduce such increases:
2. How would the proposal be likely to affect plants, animals, fish,
or marine life?
Proposed measures to protect or conserve plants, animals, fish, or
marine life:
3. How would the proposal be likely to deplete energy or natural
resources?
Proposed measures to conserve energy and natural resources:
4. How would the proposal be likely to use or affect
environmentally
sensitive areas or areas designated (or eligible or under study)for
governmental protection; such as parks, wilderness, wild and scenic
rivers, threatened or endangered species habitat, historic or cultural
sites, wetlands, floodplains, or prime farmlands?
Proposed measures to protect such resources or to avoid or
reduce impacts:
Environmental Checklist EVALUATION FOR
Page 17 AGENCY USE
5. How would the proposal be likely to affect land and shoreline
use, including whether it would allow or encourage land or shoreline
uses incompatible with existing plans?
Proposed measures to avoid or reduce shoreland and land use
impacts:
6. How would the proposal be likely to increase demands on
transportation or public services and utilities?
Proposed measures to reduce or respond to such demand(s):
7. Identify, if possible, whether the proposal may conflict with
local, state, or federal laws or requirements for the protection of the
environment.
By affixing my signature hereto, I/we certify and declare under penalty of pe�ury that
the information furnished herein is true and correct to the best of my knowledge and
that I am the owner of the premises where the work is to be performed or am acting as
the owner's authorized agent. I further agree to hold harmless the City of Port Angeles
as to any claim (including costs, expenses and attorney's fees incurred in the
investigation of such claim) which may be made by any person, including the
undersigned, and filed against the City of Port Angeles, but only where such claim
arises out of the reliance of the City, including its officers and employees, upon the
accuracy of the information provided to the City as a part of this application.
I further agree that City of Port Angeles staff may enter upon the subject property at any
reasonable time to consider the merits of the application, to take photographs and to
post public notices.
SIGNED: 6—
DATE: &LD i PHONE: S66) LI-7-1-1 .5
CITY OF PORT ANGELES
AFFIDAVIT OF MAILING
RE: Conditional Use Permit 14-04 one year review
1, Scott K. Johns, state that on the 16th day of June 2015, 1 mailed said notice, a
true copy of which is hereto attached and made part hereof, to property owners
within 300 feet of the property proposed for a land use action pursuant to Section
17.96.140 of the Port Angeles Municipal Cod
4FIANT
Subscribed to me this day of —2015.
s01121191101",
P%%;SFj VE
NO�ARY PUBLIC for the State of
007%..5,%to Washington, residing in Port Angeles
-7 ivisue C'
0
T/forms/affidavitpostingj im
CITY OF PORT ANGELES
NOTICE OF
LAND USE ACTION
NOTICE IS HEPXBYGIVENthat on April 30, 2015, the CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT received a request for a required
one year review of a conditional use permit to allow the continuation of a RETAIL RECREATIONAL
MARIJUANA use in the City's Industrial Light zone. The original application was approved by the
Planning Commission on May 28, 2014. Interested parties are encouraged to comment on the proposal.
Written comment must be submitted no later than June 30, 2015, to be included in the staff report on this
matter. Comments should pertain to conditions required of the applicant as a result of the May 28, 2014,
decision for CUP 14-04. Review of requests for extensions of conditional uses are done administratively.
Information may be reviewed at the City Department of Community & Economic Development, City
Hall, P.O. Box 1150, 321 East Fifth Street, Port Angeles. City Hall is accessible to persons with
disabilities.
STATE ENVIRONMENTAL POLICY ACT: A Determination of Non Significance (DNS)
was issued per WAC 197-11-355 for the project following the public comment review period
on Mqy 28, 2014. No further environmental review is required.
APPLICANT: MALIK ATWATER & VIVIAN WAI
LOCATION: 536 Marine Drive
For further information contact: Scott Johns, (360) 417-4752
PUB: June 16,2015
POST: June 16,2015
MAIL: June 16,2015
T:\Cup\2014\Attwater Wai\Notice For 2nd Review.Doc
I P ORT NGELES
W A S H I N G T 0 N, U. S. A.
L448WA COMMUNITY & ECONomic DEVELOPMENT DEPARTMENT
Date: May 21, 2015
To: Malik Atwater and Vivian Wai
From: Nathan West, Director
Community& Economic Development
Subject: Minor Deviation—Condition#4 CUP 14-04
A minor deviation of a condition establishing operating days as Monday through
Saturday to include operating on Sundays as allowed by State Law is hereby approved.
This decision is supported by the following findings and conclusions:
Findings:
I. The Port Angeles Municipal Code provides that, per Section 17.96.070(F), upon
written request submitted to the Department of Community and Economic
Development a minor amendment may be made to an approved conditional use
permit under certain circumstances. Minor Deviations of the Port Angeles
Municipal Code require that findings be made such that:
a. The amendment does not increase the intensity of the use by more than ten
percent of the original approval;
b. The amendment will not be materially detrimental to the public welfare or
injurious to property or improvements in the vicinity and zone in which the
subject property is located; and
c. The site has been posted and adjacent property owners notified 15 days prior
to the decision.
Applications that are not granted a minor deviation must obtain an amendment
through the City's normal conditional use permit procedure..
2. Property owners Malik Atwater and Vivian Wai applied for a conditional use permit
to operate a recreational marijuana outlet at 536 Marine Drive in the IL Industrial,
Light zone. The Planning Commission approve the conditional use permit with 4
conditions on May 28, 2014. The fourth condition added at that meeting restricted
hours of operation to those stated in the application materials, limiting the store to
being open 6 days a week.
3. The property owners have requested that the condition be revised to allow operation 7
days a week as allowed under State Licensing criteria per Initiative 502.
Minor Deviation—Atwater/Wai
536 Marine Drive
Page 2
4. The original conditional use permit allowed operation between 11:00 a.m. and 9:00
p.m. six days a week, or 60 hours of operation. A 10% deviation would result in an
additional 6 hours per week.
Conclusion:
1. The minor deviation approval will allow for the operation of the business seven days
a week.
2. The minor deviation will maintain consistency with State laws controlling the sales of
recreational marijuana.
3. The minor deviation was processed and meets the criteria established by 17.96.080
PAMC for review and action on a minor deviation request.
Nathan A. West, Director
Department of Community Development
cc: Building Department files
CITY OF PORT ANGELES
AFFIDAVIT OF POSTING
RE: (��UE
I PAT BARTHOLICK, state that on the day of
2015, 1 posted said notice, a true copy of which is hereto attached/and made part
hereof, on the property proposed for a land use action pursuant to Section
17.96.140 of the Port Angeles Municipal Code.--
ell
A&1ANY-____
Subscribed to me this -day of 2015.
NOTARY PUBLIC for the State of
Washington, residing in Port Angeles
T/forms/affidavitpostingj im
V t,&.V,4 W,,, 1-1 Y— Ar va ocrr.
536 Marine Drive D --U IE
Port Angeles, WA 98363 APR 0 2015
April 30, 2015
Ic IMUNiTY&EC tS
Tj .-mv, Dt"VELOPMENT
Nathan
Director of Community and Economic Development
City of Port Angeles
321 E 5 th Street
Port Angeles,WA 98362
Dear Nathan:
Malik and I would like to request a maximum extension of 5 years for our conditional use permit approved by
the City of Port Angeles Planning Commission last May 28, 2014.
As per the original conditions of approval,we obtained all the necessary permits and are complying with all
legal and regulatory obligations to operate a recreational marijuana retail business at 536 Marine Drive.We
have no plans to expand into a larger portion of the structure as we find the current retail area more than
suff icient.
We would like to request that our allowable hours of operation correspond to the allowable hours of
operation as regulated by the Washington State Liquor Control Board for recreational marijuana retail
businesses. As a business,we need to be able to fairly compete with the other retail stores in the area that
are open earlier, longer hours, and also 7 days a week. In addition,as a business with a large tourist draw,we
must have the flexibility to be open weekends and longer hours in the summer to accommodate for weekend
travelers and summer vacationers.
Thank you and please let us know what further information you might need for the extension.
Sincerely,
Vivian Wai
(360)477-1518
waivivian@hotmaii.com
FiWVMOI�A30 NNON 03 AIINnjlvv�03
S3- -13-nNV-[.�J,2-0,
SIR T Avvq
LL
iA P
ky
CITY OF PORT ANGELES
*** CUSTOMER RECEIPT ***
OpeT: ACYGANOW Type: CT Drawer: I
Date: 5/01/15 01 Receipt no: 43062
Year Number Amount
2015 14
PZ PLANNING & ZONING
Trans number:
1774098
ATWATER/WAI
Tender detail
CA CASH $100.00
Total tendered $100.09
Total payment $100.00
Trans date: 5/01/15 Time: 15:56:46
THANK YOU FOR YOUR PAYMENT
FOR INOUIRIES 366-457-0411 PRESS I
UUW.CITYOFPA.US
0
0 0
CITY OF PORT ANGELES
321 East Fifth Street
Port Angeles, WA 98362
NOTICE OF DECISION
NOTICE IS HEREBY GIVEN the City of Port Angeles Planning Commission took the
following actions on May 28, 2014:
,-,-<Approval of a shoreline permit to facilitate the replacement and enlargement of the west
boat haven marina public boat launch ramp and gangways— 1305 Marine Drive.
0 Approval of a recreational retail marijuana activity in the Industrial Light zone.
Appeal of a decisions rendered by the Planning Commission must be made to the City Council
within 14 days of the decision.
For further information, please contact Sue Roberds, Planning Manager, Department of
Community& Economic Development, 321 East Fifth Street, Port Angeles, Washington, (360)
417-4750.
Pub: 6/6/14
Post: 6/6/14
OR NGELES
TA
WASH I NGTON, U. S. A.
Community & Economic Development Department
R NEI''
vg�
R4
June 2, 2014
,.......-----
-44,,��M Malik Atwater and Vivian Wai
"IP"'I"M!
6421 S. Mt.Angeles Road
Port Angeles, WA 98362
,"A "'R
RE 536 Marine Drive
Dear Mr. Atwater and Ms. Wai:
As you know, following a public hearing conducted by the City of Port Angeles Planning
ission unanimously voted to allow a
Commission on May 28, 2014, the Planning Comm
retail recreational marijuana use at property you own (536 Marine Drive)by conditional
use permit. Conditions of approval are as follow:
Conditions:
I. The conditional use approved is for Malik Atwater and Vivian Wai to operate a
recreational marijuana retail business as licensed by the State of Washington for a period of
one(1) year at 536 Marine Drive as is described in CUP 14-04.
2. The applicant shall obtain all necessary permits and comply with all legal and
regulatory obligations.
3. If the business expands into a larger portionof the structure than proposed in the
application materials,the applicant shall contact the City to determine additional parking
requirements and compliance with CUP 14-04.
4. Hours of operation shall be allowed from 11:00 a.m. to 9:00 m., Monday
p
through Saturday, as stated in the application materials.
As discussed with you earlier, decisions of the Planning Commission are final unless
appealed to the City Council within.14 days of the decision. Please don't hesitate to
contact this Department in the event you have further questions.
Sincerely,
Planning Manager
Phone: 360-417-4750 Fax:360-417-4711
Website: www.cityofpa.us Email: smartgrowth@cityofpa.us
11� A
321 East Fifth Street- P.O. Box 1150 Port Angeles, WA 98362-0217
Planning Commission Minutes
May 28,2014
Page 5
CONDITIONAL USE PERMIT—CUP 14-04—ATWATERIWAI:
536 Marine Drive: Retail Sales of Recreational Marijuana in the Industrial Light
zone.
Chair Headrick read the qualifying questions for quasi judicial proceedings to the
Commissioners. All Commissioners responded that they had no Appearance of Fairness issues
to report. The Chair then reviewed the quasi judicial public hearing procedures for audience
members. No concerns were noted.
Associate Planner Scott Johns reviewed the Department Report recommending approval of the
conditional use permit with conditions. Chair Headrick opened the public hearing.
Vivian Wai and Malik Atwater, 6421 S. Mt. Angeles Road, were present for questions. They
agreed that all of the information presented was correct to the best of their knowledge. They had
nothing further to add.
Commissioner Reimlinger asked if Mr. Atwater and Ms. Wai have a financial interest in the
abutting restaurant. Mr. Atwater responded that he and Ms. Wai own the restaurant. Mr.
Atwater said that he would like to provide access from the rear parking area if building
construction will allow. Original building construction and design presents some unique issues
given the long hallway to the parking area, which is troublesome. He would like to use the rear
parking area for the use.
Planning Manager Roberds noted a letter in the file dated received June 17, 2014, stating
objection to the use from Sunset Wire Rope. The letter was provided to the applicants prior to
the meeting.
There being no further testimony, Chair Headrick closed the public hearing.
Commissioner Miller noted that the main concern from Sunset Wire Rope was people walking
around the area that could be addressed by use of the rear parking area for access to the site. A
discussion regarding hours of operation began, during which Planner Johns noted that State law
allows hours of operation for this type of use to be between 8AM and 12 PM.
Commissioner Powers noted that the application indicates a desire to conduct business Monday
through Saturday 11 AM to 9 PM.
Planner Johns stated that there has been no precedent set with this type of new use and, as
conditional use permits are approved for an initial one year period, an amendment or adjustment
to the conditions of approval could be made following that first period of operation.
Discussion regarding off street parking for the use continued with the comment made that on
street parking is at a premium in this high traffic location. The general consensus was that the
operator and customers would prefer to park off street at the rear of the structure if possible.
Following discussion regarding location of the off street parking area at the rear of the site,that
is accessed by a sidewalk around the site, and operational hours and days of the week,
Planning Commission Minutes
May 28,2014
Page 6
Commissioner Reimlinger moved to approve the conditional use permit with 4 conditions,
15 findings, and 3 conclusions as follows:
Conditions:
I The conditional use approved for Malik Atwater and Vivian Wai to operate a recreational
marijuana retail activity as licensed by the State of Washington for a period of one year at
536 Marine Drive as is described in CUP 14-04.
2. The applicant shall obtain all necessary permits and comply with all legal and regulatory
obligations.
3. If the business expands into a larger portion of the structure than proposed in the
application materials,the applicant shall contact the City to determine additional parking
requirements and compliance with CUP 14-04.
4. Hours of operation shall be allowed from 11:00 a.m. to 9:00 p.m., Monday through
Saturday, as stated in the application materials.
Findings:
Based on the information provided in the Community Development Staff Report for CUP 14-04
dated May 28, 2014, including all information in the public record file, comments and testimony
presented during the public hearing,the Planning Commission discussion and deliberation, and
the above listed conditions of approval,the City of Port Angeles Planning Commission hereby
finds that:
I. Malik Atwater and Vivian Wai submitted Conditional Use Permit CUP 14-04
application to allow the sale of recreational marijuana per State Initiative 502 from a
building located in the City's Industrial Light(IL) zone at 536 Marine Drive.
2. The proposed site is described as Lots 9 and 10, Block 49, Townsite of Port Angeles and
contains 14,159 square feet of area. The subject site area includes warehousing, boat
manufacturing and repair, a hardware store, and log handling uses. Residential uses are
located within 250 feet of the site and 750 feet east of the site in the IL zone. Residential
uses are nonconforming in the IL zone and the residential uses south of the site are
physically separated from the proposed use by a steep marine bluff.
3. The site is zoned Industrial Light(IL). Surrounding zoning includes Public Buildings
and Parks PBP on the steep hillside south of the site, Industrial Heavy (11-1) directly north
across Marine Drive, Industrial Light(IL) directly west across Cedar Street and east of
the site to Valley, with Commercial Arterial (CA) located approximately 400 feet to the
east of the site.
4. The site is located in the City's Harbor Planning Area. The Comprehensive Plan
designates the site as Industrial. Adjacent designations are also Industrial with an
imprecise margin located approximately 265 feet east separating the Industrial
designation from the Commercial designation.
5. Some retail uses are listed as permitted in the IL zone. Sales of recreational marijuana
has not been considered in the Port Angeles Municipal Code due to its recent legalization
in Washington State. A conditional use in the IL zone is required to permit "Other uses
compatible with the purpose of this Chapter" per PAMC 17.32.040(B)(I 0).
Planning Commission Minutes
May 28,2014
Page 7
6. Per Section 17.32.020 PAMC, the purpose of the Industrial Light zone is "... intended to
create andpreserve areasfor industrial uses that are largely devoid of exterior
nuisances... such as noise, glare, air and water pollution, andfire and safety hazards on
adjacent non-industrial property, and do not have an exceptional demand on public
facilities. The purpose statement further states that "While industrial and commercial
uses that are largely devoid of any impacts detrimental to the environment are
allowed.....Buffering measures to reduce the impact of industrial uses on nearby
residential uses may be required"It is necessary for the Planning Commission to
determine that the proposed retail use is not in conflict with other uses permitted in the IL
zone.
7. Per 17.96.050 PAMC,the Planning Commission shall consider applications for
conditional use permits as specified in the applicable Chapter of the Zoning Regulations.
The Planning Commission may grant permits that are consistent and compatible with the
purpose of the zone in which the use is located, consistent with the Comprehensive Plan,
and not contrary to the public use and interest. In each application the Planning
Commission may impose whatever restrictions or conditions are considered essential to
protect the public health, safety, welfare, and to prevent depreciation of neighboring
property. The Planning Commission may refuse to issue a conditional use permit if the
characteristics of the intended use would defeat the purpose of the City's zoning
regulations.
8. The City's Comprehensive Plan was reviewed for consistency with the proposal. Land
Use Element Commercial; Goal D, Policy D.1, & Goal E; Transportation Element
Policies B.14 & 16; Economic Development Element Goal A. Policy 4; were found to be
most relevant to the proposal.
9. Chapter 14.40 PAMC Table A requires one (1)parking space for each 300 square feet of
retail space. The proposed use will occupy approximately 900 square feet of area in the
unused portion of the structure. Per 14.40 PAMC, retail stores are required to provide
one parking space for every 300 square feet of retail space. This will require that 3
parking spaces be provided for the retail use. Adequate off street parking is available to
meet the needs of both on-site uses in the site's 20 space off street parking area.
10. A development that is approved through the conditional use permit process must remain
in continual compliance with specific conditions of approval or may be revoked.
11. Reviewing City Departmental comments were considered in the review of this
application. Structural changes or remodel will require appropriate building permits.
12. Notification of the proposed action and conditional use permit application was placed in
the Peninsula Daily News on May 11, 2014,posted on the site on May 8, 2014, and
mailed to property owners within 300 feet of the subject property on May 8, 2014. A
letter from Sunset Wire Rope received on May 27, 2014, stating opposition to the
proposed use was read into the record.
13. A Determination of Non-Significance was issued for the proposed action on May 26,
2014.
14. The Planning Commission conducted a public hearing on the proposal at the May 28,
2014, regular meeting. A letter from Sunset Wire Rope dated May 27, 2014, was
0
Planning Commission Minutes
May 28,2014
Page 8
identified as being received after close of the written comment period. The letter was
provided to the applicant prior to the meeting and is part of the record.
15. Per Section 17.96.070(D) PAMC, conditional use permits become void after one (1) year
if the use to which the permit is approved has not commenced. Extensions of approved
conditional use permits shall be considered in accordance with the same procedures as for
the original permit and maybe granted for a period of one (1)to five (5) years provided
that the permit is in compliance with the conditions of approval and that there have been
no adverse changes in circumstances. If an extension is desired beyond the first year of
operation, the applicant is responsible for making a written request prior to expiration of
the permit.
Conclusions:
Based on the information provided in the Department of Community& Economic Development
Staff Report for CUP 14-04 May 28, 2014, including all of the information in the public record
file, comments, and testimony presented during the public hearing, the Planning Commission's
discussion and deliberation, and the above listed conditions of approval and listed findings, the
City of Port Angeles Planning Commission hereby concludes that:
1. The proposal was processed consistent with requirements for approval of a conditional
use permit as specified in Sectionl7.96.050 PAMC.
2. The proposal is consistent with Chapter 14.40 (Parking Ordinance) PAMC.
3. As conditioned, the use will not be detrimental to the public interest, safety, or welfare,
and is consistent with state law.
Commissioner Boyle seconded the motion that passed unanimously.
'ELES
1110-IRT NG
Al�
WASHINGTON, U. S. A.
EPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
TO: Planning Commission
FROM: Scott K. Johns, AICP
DATE: May 2 8, 2014
RE: Conditional Use Permit- CUP 14-04
APPLICANT: Malik Atwater and Vivian Wai
OWNER: SAME
LOCATION: 536 Marine Drive, Port Angeles, 98363
REQUEST: Allow the retail sales of recreational marijuana per Initiative 502, in the
Industrial Light (IL) zone.
RECOMMENDATION:
The Planning Division recommends that the Planning Commission approve CUP
14-04 with 3 conditions, citing 16 findings and 3 conclusions in support of that action as
listed in Attachment A to this staff report.
EXISTING CONDITIONS IN AREA:
The subject property is located at 536 Marine Drive. The site is located in the Industrial
Light zone immediately west of the intersection of Marine Drive and Cedar Streets. Lots in the
block and vicinity vary in size. Surrounding uses include boat manufacturing and repair
services, a hardware store, the longshoreman's union building, a caf6, log handling uses, and
other light industrial uses. Residential uses south of the site above the top of the marine bluff
some 230 feet from the site, and an apartment building is located approximately 750 feet to the
east on Cedar Street. Residential uses are nonconforming uses in the IL zone.
The subject parcel is developed with two structures addressed as 536 and 538 Marine
Drive. One structure (west) currently supports a restaurant use with the second structure (east)
being vacant. The vacant building is the subject of this proposal. The subject building is located
facing Marine Drive on the north with parking accessed from Cedar Street on the west. Marine
Drive is classified as a minor arterial at this location and Cedar Street is classified as a collector
arterial street. The application and site maps are attached as Attachment B to this staff report.
CUP 14-04 Atwater/Wai Page 2
Planning Commission May 28,2014
DEPARTMENT COMMENTS:
City Departments reviewed the proposal and provided the following comments:
The Fire Department had no comment.
The Public Works and Utilities Department had no comment.
The Building Division of DCD will require a building permit for anticipated remodel of
the structure.
PUBLIC COMMENT:
Notification of the proposed action was placed in the Peninsula Daily News on May 11,
2014, the site was posted on May 8, 2014, with notice mailed to property owners within 300 feet
of the subject property on May 8, 2014. No written public comments were received during the
written public comment period that ended on May 26, 2014.
STATE ENVIRONMENTAL POLICY ACT (SEPA)REVIEW:
A Determination of NonSignificance (DNS #1342)was issued for this proposed action by
the City's SEPA Responsible Official on May 28, 2014, per WAC 197-11-355. This satisfies the
City's responsibility under the State Environmental Policy Act(SEPA).
ENVIRONMENTAL REVIEW:
The site is located outside of the 100-year flood zone per Flood Insurance Rate Map
#5300233 0003 C dated September 28, 1990. No environmentally sensitive areas are located on
the site. The marine bluff is located to the south of the site but is not located on the subject
property. The project will not create any adverse impacts to the bluff. This conditional use
permit review is the only environmental review required for the project.
DEPARTMENT OF COMMUNITY DEVELOPMENT ANALYSIS:
The entire Comprehensive Plan and Port Angeles Municipal Code were reviewed with
regard to the proposal with the references listed in Attachment C found to be the most relevant
to the proposal. In addition to the Comprehensive Plan goals and policies, development
regulations in the Industrial Light(IL) zone are also included in Attachment B to this staff report.
The City's Comprehensive Plan and Land Use Map identify the area as being located in
the Harbor Planning Area and the site as Industrial (I).
The site is zoned Industrial Light(IL). Some retail uses are allowed in the IL zone
PAMC 17.32.020(B)(6), however,the suggested sales items are somewhat specific and do not
include the proposed sales items. Other permitted uses in the zone include adult entertainment
businesses, cocktail lounges and taverns, restaurants and cafes, and business and professional
offices. The processing of food products and pharmaceuticals are permitted by conditional use
permit in the IL zone. The retail sale of marijuana has not previously been legal so there is no
specific mention of its sale in the City's Zoning Ordinance for comparison of compatibility with
the purpose of the zone. However, Section 17.32040(B)(10) of the Port Angeles Municipal Code
(PAMC), "Other uses compatible with the purpose of this Chapter" are also allowed by
conditional use permit. The purpose of the Industrial Light zone is "... intended to create and
preserve areasfor industrial uses that are largely devoid of exterior nuisances... such as noise,
glare, air and water pollution, andfire and safety hazards on adjacent non-industrial property,
and do not have an exceptional demand on public facilities. The purpose statement further states
that "While industrial and commercial uses that are largely devoid of any impacts detrimental to
CUP 14-04 Atwater/Wai Page 3
Planning Commission May 28,2014
the environment are allowed.....Buffering measures to reduce the impact of industrial uses on
nearby residential uses may be required."
The proposed use is a retail sales use. Some retail sales are allowed in the IL zone. The
sales of marijuana is not anticipated to create adverse impacts such as noise, glare, air or water
pollution, fire or safety hazards to adjacent or nearby properties. As required by the Washington
State Liquor Control Board, the site has been determined to be more that one thousand feet from
any school, day care center,public park/recreation center, or transit center. The proponents have
followed the State's application process and were selected in the State's lottery to be one of two
recreational marijuana retail outlets under the rules developed by the State.
No physical change to the site or exterior of the structure is proposed, so no change in
appearance or lot/site coverage is anticipated. Application materials include a preliminary
parking plan showing the availability for 20 parking spaces on-site. The site currently supports a
restaurant for which a portion of the parking spaces are dedicated. The proposed use will occupy
approximately 900 square feet of area in the unused portion of the structure. Per 14.40 PAMC,
retail stores are required to provide one parking space for every 300 square feet of retail space.
This will require that 3 parking spaces be provided for the retail use. Adequate off street parking
is available to meet the needs of both on-site uses in the 20 space off street parking area.
In consideration of a conditional use permit application, the Planning Commission may
impose whatever restrictions or conditions are considered to be essential to protect the public
health, safety, and welfare, and to prevent depreciation of neighboring property. Uses developed
by conditional use permit must remain in continual compliance with the conditions of approval
or the use may be revoked. Consideration is given to the impacts on traffic patterns, the physical
circumstances of the subject property, other uses in the neighborhood, schools, and needed
public improvements when reviewing conditional use permit applications.
Per Section 17.96.070(D) PAMC, conditional use permits become void after one year if
the use to which the permit is approved has not commenced. Extensions of approved
conditional use permits shall be considered in accordance with the same procedures as for the
original permit and maybe granted for a period of one (1)to five (5) years provided that the
permit is in compliance with the conditions of approval and that there have been no adverse
changes in circumstances. If an extension is desired, the applicant is responsible for making a
written request prior to expiration of the permit.
The Planning Division recommends the Planning Commission approve Conditional Use
Permit CUP 14-04 subject to 2 conditions supported by the 14 findings and 3 conclusions listed
in Attachment A to this staff report:
Attachments: A-Conditions,Findings,and Conclusions
B-Application
C-Zoning Ordinance,Comprehensive Plan,and Other Municipal Code References
CUP 14-04 Atwater/Wai Page 4
Planning Commission May 28,2014
ATTACHMENT A
CONDITIONS, FINDINGS, AND CONCLUSIONS IN SUPPORT OF CUP 14-04
Conditions:
1. The conditional use approved for Malik Atwater and Vivian Wai to operate a recreational
marijuana retail activity as licensed by the State of Washington for a period of one year at
536 Marine Drive as is described in CUP 14-04.
2. The applicant shall obtain all necessary permits and comply with all legal and regulatory
obligations. .
3. If the business expands into a larger portion of the structure than proposed in the
application materials,the applicant shall contact the City to determine additional parking
requirements and compliance with CUP 14-04.
Findings:
Based on the information provided in the Community Development Staff Report for CUP
14-04 dated May 28, 2014, including all information in the public record file, comments and
testimony presented during the public hearing, the Planning Commission discussion and
deliberation, and the above listed conditions of approval,the City of Port Angeles Planning
Commission hereby finds that:
I. Malik Atwater and Vivian Wai submitted Conditional Use Permit CUP 14-04
application to allow the sale of recreational marijuana per State Initiative 502 from a
building located in the City's Industrial Light(IL) zone at 536 Marine Drive.
4. The proposed site is described as Lots 9 and 10, Block 49, Townsite of Port Angeles and
contains 14,159 square feet of area. The subject site area includes warehousing, boat
manufacturing and repair, a hardware store, and log handling uses. Residential uses are
located within 250 feet of the site and 750 feet east of the site in the IL zone. Residential
uses are nonconforming in the IL zone and the residential uses south of the site are
physically separated from the proposed use by a steep marine bluff.
5. The site is zoned Industrial Light(IL). Surrounding zoning includes Public Buildings
and Parks PBP on the steep hillside south of the site, Industrial Heavy (IH) directly north
across Marine Drive, Industrial Light(IL) directly west across Cedar Street and east of
the site to Valley, with Commercial Arterial (CA) located approximately 400 feet to the
east of the site.
6. The site is located in the City's Harbor Planning Area. The Comprehensive Plan
designates the site as Industrial. Adjacent designations are also Industrial with an
imprecise margin located approximately 265 feet east separating the Industrial
designation from the Commercial designation.
7. Some retail uses are listed as permitted in the IL zone. Sales of recreational marijuana
has not been considered in the Port Angeles Municipal Code due to its recent legalization
in Washington State. A conditional use in the IL zone is required to permit "Other uses
compatible with the purpose of this Chapter" per PAMC 17.32.040(B)(10).
CUP 14-04 Atwater/Wai 0 0 Page 5
Planning Commission May 2 8,2014
8. Per Section 17.32.020 PAMC,the purpose of the Industrial Light zone is "... intended to
create andpreserve areasfor industrial uses that are largely devoid of exterior
nuisances... such as noise, glare, air and water pollution, andfire and safety hazards on
adjacent non-industrial property, and do not have an exceptional demand on public
facilities. The purpose statement further states that "While industrial and commercial
uses that are largely devoid ofany impacts detrimental to the environment are
allowed.....Buffering measures to reduce the impact of industrial uses on nearby
residential uses may be required"It is necessary for the Planning Commission to
determine that the proposed retail use is not in conflict with other uses permitted in the IL
zone.
9. Per 17.96.050 PAMC,the Planning Commission shall consider applications for
conditional use permits as specified in the applicable Chapter of the Zoning Regulations.
The Planning Commission may grant permits that are consistent and compatible with the
purpose of the zone in which the use is located, consistent with the Comprehensive Plan,
and not contrary to the public use and interest. In each application the Planning
Commission may impose whatever restrictions or conditions are considered essential to
protect the public health, safety, welfare, and to prevent depreciation of neighboring
property. The Planning Commission may refuse to issue a conditional use permit if the
characteristics of the intended use would defeat the purpose of the City's zoning
regulations.
10. The City's Comprehensive Plan was reviewed for consistency with the proposal. Land
Use Element Commercial; Goal D, Policy D.1, & Goal E; Transportation Element
Policies B.14 & 16;Economic Development Element Goal A. Policy 4; were found to be
most relevant to the proposal.
11. Chapter 14.40 PAMC Table A requires one (1) parking space for each 300 square feet of
retail space. The proposed use will occupy approximately 900 square feet of area in the
unused portion of the structure. Per 14.40 PAMC, retail stores are required to provide
one parking space for every 300 square feet of retail space. This will require that 3
parking spaces be provided for the retail use. Adequate off street parking is available to
meet the needs of both on-site uses in the site's 20 space off street parking area.
12. A development that is approved through the conditional use permit process must remain
in continual compliance with specific conditions of approval or may be revoked.
13. Reviewing City Departmental comments were considered in the review of this
application. Structural changes or remodel will require appropriate building permits.
14. Notification of the proposed action and conditional use permit application was placed in
the Peninsula Daily News on May 11, 2014,posted on the site on May 8, 2014, and
mailed to property owners within 300 feet of the subject property on May 8, 2014.
15. A Determination of Non-Significance was issued for this proposed action on May 26,
2014.
16. The Planning Commission conducted a public hearing on the proposal at the May 28,
2014, regular meeting.
17. Per Section 17.96.070(D) PAMC, conditional use permits become void after one (1)year
if the use to which the permit is approved has not commenced. Extensions of approved
conditional use permits shall be considered in accordance with the same procedures as for
CUP 14-04 Atwater/Wai 0 Page 6
Planning Commission May 28,2014
the original permit and maybe granted for a period of one (1)to five (5) years provided
that the permit is in compliance with the conditions of approval and that there have been
no adverse changes in circumstances. If an extension is desired beyond the first year of
operation, the applicant is responsible for making a written request prior to expiration of
the permit.
Conclusions:
Based on the information provided in the Department of Community & Economic
Development Staff Report for CUP 14-04 May 28, 2014, including all of the information in the
public record file, comments, and testimony presented during the public hearing,the Planning
Commission's discussion and deliberation, and the above listed conditions of approval and listed
findings, the City of Port Angeles Planning Commission hereby concludes that:
1. The proposal was processed consistent with requirements for approval of a conditional
use permit as specified in Sectionl7.96.050 PAMC.
2. The proposal is consistent with Chapter 14.40 (Parking Ordinance) PANIC.
3. As conditioned, the use will not be detrimental to the public interest, safety, or welfare,
and is consistent with state law.
CUP 14-04 Atwater/Wai 0 Page 7
Planning Commission May 28,2014
ATTACHMENT B
COMPREHENSIVE PLAN GOALS,POLICIES,AND OBJECTIVES THAT SUPPORT THE
USE AS A HOSTEL BY CONDITIONAL USE PERMIT IN THE CSD ZONE:
Comprehensive Plan
The City's Comprehensive Plan establishes the long range goals and policies of the City. Any
project proposed in the City must be consistent with the goals and policies of the Comprehensive Plan.
The site is located in the City's North Central Planning Area. The Comprehensive Plan was reviewed in
its entirety with regard to the proposed application and several goals and policies were found to be
relevant to the proposal. An analysis of compliance with those policies is as follows:
Land Use Element Commercial
Goal D: To create and maintain a healthy and diverse commercial sectorfor a balanced and
stable local economy.
Policy D.I - The City should encourage the recruitment ofnew and the retention of existing
commercial developments and businesses, which are consistent with the goals andpolicies of this
Comprehensive Plan.
Goal E. To provide shopping opportunities which meet the needs of all City residents and visitors
in safe, usable shopping areas that are compatible with the surrounding area and uses, the environment,
and the desired urban design of the City.
Transportation Element
Policy B.14 - "Off-street parking should be sufficient and accessible within business and
residential areas to ensure that the trafficflow of the street is not impaired
PolicyB.16. Parking requirements should make allowancesfor sharedparkingJacilities.
Economic Development Element
Goal A. To create and maintain a balanced and stable local economy withfull employment and
emphasis on strengthening the community's traditional natural resource related industries as well as
diversifying the overall economic base.
Policy A. 4 The City shouldpromote the diversification of the community's economic base by
encouraging the location, retention, and expansion of local businesses.
Zoning Ordinance
The Zoning Ordinance is the primary implementing ordinance for the Comprehensive Plan. The
Ordinance establishes what types of uses are permitted and where they may be located in the City. It also
establishes definitions and minimum design standards for such uses. Any project proposed in the City
must be consistent with specific regulations of the zone in which it is located.
The Zoning Map identifies the subject property and adjacent properties as Industrial Light(IL).
The purpose and intent of this zone is:"This is an industrial zone intended to create andpreserve areas
for industrial uses that are largely devoid of exterior nuisances in close proximity to airports and
highways. Permitted uses are largely devoid of exterior nuisance factors, such as noise, glare, air and
waterpollution, andfire andsafety hazards on adjacent non-industrial property, and do not have an
exceptional demand on publicfacilities. These types of industrial uses typically involve the manufacture
offinishedproducts from pre-fabricated materials,product wholesaling, and material storage. Buffering
measures to reduce the impact of industrial uses on nearby residential uses may be required While
industrial and commercial uses that are largely devoid of any impacts detrimental to the environment are
CUP 14-04 Atwater/Wai 91 0 Page 8
Planning Commission May 28,2014
allowed, vehicle service stations with petroleum products and entertainment businesses with adult-only
activities are also permitted uses, and a variety of maintenance and repair shops with hazardous
materials are also conditionally permitted uses. This zone provides the basic urban land use pattern for
light industrial uses with direct access on an arterial street, design standardsfor greater truck traffic,
and buffersfor nonindustrial uses. "
Conditional Use is defined as: "a use permitted in a zone but which requires a special degree of
control to make such use consistent and compatible with other existing or permissible uses in the same
zone
The purpose of a conditional use permit is defined as "A Conditional Use Permit shall be to
assure that the maximum degree of compatibility between uses shall be attained. The purpose of these
regulations shall be maintained with respect to the particular use of the particular site and in
consideration of other existing andpotential uses within the general area in which such use is to be
located."
PAMC 17.96.050 specifies procedures for the review and processing of conditional use
applications,as follows:
17.96 050 Conditional Use Permit
A. The Planning Commission shall consider applicationsfor Conditional Use Permits qf
uses as specified in the applicable Chapter of the Zoning Regulations. The Planning Commission may
grant saidpermits which are consistent and compatible with the purpose of the zone in which the use is
located, consistent with the Comprehensive Plan, and not contrary to the public use and interest. The
Planning Commission may refuse to issue a Conditional Use Permit if the characteristics of the intended
use as related to the specific proposed site are such as would defeat the purpose of these Zoning
Regulations by introducing incompatible, detrimental, or hazardous conditions.
B. In each application, the Planning Commission may impose whatever restrictions or
conditions they consider essential to protect the public health, safety, and weffiare, and to prevent
depreciation ofneighboring property.
PARKING ORDINANCE
PAMC 14.40.060(D)requires I off-street parking spaces for each 300 square feet of retail space
with a total requirement of three(3)for the proposal. The development will be required to provide the
three parking spaces within the property boundaries.
File
APPLICANVOWNER INFORMATION:
Applicant: MALJLATk_k)AT-(_-(Z_ 4 VIVIAN WA-1
Applicant Address: 6411 S. kAcx,,N-,r At�i-_L_us
Daytime phone #:(�W)L4'1-1- I E-mail -IIJ CkJI V'I V I QA-r rr-�
Applicant's representative (if other than applicant):
Contact Address:
Daytime phone #: E-mail
Property owner (if other than applicant):
Address: Contact phone
PROPERTY INFORMATION:
Streetaddress: 53(v N-AAuWC- D c-A v t-- Zoning:
Legal description: Lo-r,.,- 9 A 10 13 L 149 TPA Urr- CD�(Wkw QL,30 00:;0 4930
Property dimensions: iq5'% 100' Property area*(total square feet): 114, 159 f+,-'-
Physical characteristics (i.e., flat, sloped, vacant, developed, etc.):
C,omm(:A4C4,&&_ pe-0- SLDR(-_D -TO f!�,e_X_IN61 La-r--
PROPOSED USE:
Please describe the proposed conditional use: IOAIZJ ��.A_PNA
cfco -R; f-ek&� �j
Number of employees: Hours of operation:
Number of on-site parking spaces: '3 t
7- Z007
Total square foot of floor area for the proposal: CI 00 % Site coverage:
SIGNATURES:
Applicant: Date:
5.1 j
I certify that all of the above statements are true and complete to the best of my knowledge and
acknowledge that wilful misrepresentation of information will terminate this permit application.
Date: Z7-/ZC)
Applicant Signature z4,U , 0 ,
(If the applicant is NOTthe property owner, the property owner must sign this application or
provide a separate note that helshe islare aware of the application).
Owner's Signature (if other than applicant):
Signature Date
TAF0RMS\APPS\CUP.D0CX
MAY 0 210% ]D
#5 Conditional Use Permit Application OF PdRT-ANGELES
LCO ct�t, If E"ON�;Mir,DEVELOPMENT
Interior Floor Plans-
Our anticipated retail sales area will be approximately 900 sq.ft. There will be at least 3 parking spaces
in the rear lot dedicated to the retail store.
MAY 2 20%
Es
rame ADIA;N-T
71
VVULk-
C E'L,,
prelim
Cj
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
PO Box 47775 -Olympia, Washington 98504-7775 (360)407-6300
711 for Washingtoo Relay Service -Persons with a speech disability can call 877-833-6341
May 21, 2014
Sue Roberds,Planning Manager Your address
City of Port Angeles is in the
Community&Economic Development
PO Box 1150
Port Angeles, WA 98362 watershed
Dear Ms. Roberds:
Thank you for the opportunity to comment on the optional determination of
nonsignificance/notice of application for the Atwater&Wai-Retail Recreational Marijuana
project located at 536 Marine Drive in Port Angeles as proposed by Malik Atwater&Vivian
Wai. The Department of Ecology(Ecology)reviewed the environmental checklist and has the
following comment(s):
WASTE 2 RESOURCES: Julie Robertson (360) 407-6471
Marijuana producers and processors have specific waste disposal practices that must be
followed according to WAC 314-55. Depending on the practices implemented,the applicant
must contact the Clallam County Health Department to determine what level of solid waste
regulatory oversight would be needed for this proposal.
Ecology's comments are based upon information provided by the lead agency. As such, they
may not constitute an exhaustive list of the various authorizations that must be obtained or legal
requirements that must be fulfilled in order to carry out the proposed action.
If you have any questions or would like to respond to these comments, please contact the
appropriate reviewing staff listed above.
Department of Ecology
Southwest Regional Office
(SM:14-2362)
cc: Julie Robertson, W2R
Malik Atwater&Vivian Wai (Applicants)
Sue Roberds
From: Eric Walrath
Sent: Tuesday, May 13, 2014 12:07 PM
To: Sue Roberds
Subject: RE: AtwaterMai CUP
No comments.
Eric C. Walrath
Engineering Projects Supervisor
City of Port Angeles
Tel. 360-417-4806
Fax. 360-417-4709
From: Sue Roberds
Sent: Thursday, May 08, 2014 4:42 PM
To: Eric Walrath; Roger Vess; Ken Dubuc; Terry Gallagher
Subject: Atwater/Wai CUP
Dear Reviewers,
Attached you will find an application from Malik Atwater and Vivian Wai for a conditional use permit to establish a recreational
marijuana use in the Industrial Light zone at 536 Marine Drive. Please review the application materials and note any appropriate
land use concerns or conditions you believe should be addressed in review of this application. Your comments no later than May 19
would be appreciated.
,5uc Kobcrds
Planning Manager
Ciiy,qt PortAngeles
C011111711nit'1)&-E'conoaiic Developatent
P.O. Box /150
Port"Ingeles, IVA 98362
sroberdsoa cityofoa.us
360-417-4750
0
CITY OF PORT ANGELES
AFFIDAVIT OF MAILING
I SUE ROBERDS, state that on the day of- 20149
I mailed said notice, a true copy of which is hereto attached and made part hereof,
to property owners within 300 feet of the property proposed for a land use action
pursuant to Section 17.96.140 of the Port Angeles Municipal Code.
AFFiAWT
Subscribed to me this day of Lz� 2014.
N016AY PUBLIC 'for the State of
Notary Public Washington, residing in Port Angeles
State of Washington
JANESSA M. HURD
M COMMISSION EXPIRES
y
T/forms/affidavitposfingjim
0
CITY OF PORT ANGELES
AFFIDAVIT OF POSTING
RE: 4�2� Z�'
I JIM LIERLY, state that on the -10--t"day of 2014�
I posted said notice, a true copy of which is hereto attached and mad art,hereo
on the property proposed for a land use action pursuant to Sectio 17.96.140 the
mad a�"'
tio 1 7.96..l 4�
Port Angeles Municipal Code
AFFf�iV
Subscribed to me this day of 2014.
S RO
'or
+0TA1fk P
NOTARY UBLIC for the State of
Washington, residing in Port Angeles
AIJBIP -Z
A
e4l, OP
V,.,i
T/fonns/affidavitpostingjim
0
CITY OF PORT ANGELES
NOTICE OF
DEVELOPMENT APPLICATION
AND
PUBLIC HEARING
NOTICEISHEPXBYGIVENthat on May 2, 2014, the CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT received an application for a
conditional use permit to allow a RETAIL RECREATIONAL MARIJUANA use in the City's Industrial
Light zone. The application was determined to be complete on May.7, 2014. Interested parties are
encouraged to comment on the proposal and to attend the public hearing that will be conducted at 6 PM,
City Hall, 321 East Fifth Street, Port Angeles, Washington. Written comment must be submitted no later
than Mgy 26, 2014, to be included in the staff report on this matter. Verbal testimony may be provided
during the public hearing. Information may be reviewed at the City Department of Community &
Economic Development, City Hall, P.O. Box 1150, 321 East Fifth Street, Port Angeles. City Hall is
accessible to persons with disabilities. Interested parties are invited to attend the meeting.
STATE ENVIRONMENTAL POLICY ACT: It is anticipated that a Determination of Non
Signficance (DNS) will be issued per WAC 197-11-355 for the project following the public
comment review period that will end on MM 26, 2014.
APPLICANT: MALIK ATWATER & VIVIAN WAI
LOCATION: 536 Marine Drive
For further information contact: Sue Roberds, (360) 417-4750
PUB: 5/11/14
POST: 5/8/14
MAIL: 5/8/14
T:XNOTICES\PCpubIichearing.wpd
JONES WASH STEVEDORING HARBOR REALTY CO JUDSON LINNABARY
COMPANY C/O STEVEDORING SERV 102 N CEDAR ST
PO BOX 3736 1131 SW KLICKITAT WAY PORT ANGELES,WA 98362
SEATTLE,WA 98124 SEATTLE,WA 98134
MALIK V ATWATER AND VIVIAN WAI SUNSET WIRE ROPE CO INC CITY OF PORT ANGELES
6421 S MT ANGELES RD PO BOX 1083 PO BOX 1150
PORT ANGELES,WA 98362 PORT ANGELES,WA 98362-0205 PORT ANGELES,WA 98362-0217
PORT OF PORT ANGELES DAVID J ANSTETT PENINSULA FUEL CO
PO BOX 1350 820 E FRONT ST C/O FLORENCE CHAMBERLAIN
PORT ANGELES,WA 98362-0251 PORT ANGELES,WA 98362-3613 1607 E BEACH RD
PORT ANGELES,WA 98363
PETTIT OIL COMPANY WASH CORP STATE OF WASHINGTON DEPT OF
638 MARINE DR TRANSPORATION
PORT ANGELES,WA 98363-2263 PO BOX 47440
OLYMPIA,WA 98504-7440
ND 0 WEED
i Fn m
MAY 0 7 2014
CITY OF PORT ANGELES
'Commut4lTy&grn4infillf,h1l"i nDAACArr
Sue Roberds
From: Terry Gallagher
Sent: Thursday, May 08, 2014 5:01 PM
To: Sue Roberds
Subject: RE: Atwater/Wai CUP
Police Department has no comment.
Terry K. Gallagher
Chief of Police
Port Angeles Police Department
321 East 5th Street
Port Angeles, WA 98362
(360)417-4901
tgallagher@citvofpa.us
This email is intendedfor the addressee shown. It contains information that is confidential and protectedfrom disclosure.
Any review, dissemination or use of this transmission or its contents by persons or unauthorized employees of the
intended organizations is strictly prohibited. All messages, sent or received, are subject to Public Disclosure Low and
record retention requirements.
From: Sue Roberds
Sent: Thursday, May 08, 2014 4:42 PM
To: Eric Walrath; Roger Vess; Ken Dubuc; Terry Gallagher
Subject: Atwater/Wai CUP
Dear Reviewers,
Attached you will find an application from Malik Atwater and Vivian Wai for a conditional use permit to establish a recreational
marijuana use in the Industrial Light zone at 536 Marine Drive. Please review the application materials and note any appropriate
land use concerns or conditions you believe should be addressed in review of this application. Your comments no later than May 19
would be appreciated.
15ucL;),-Lcrd5
IXOD
P1(1171-lil�g�1161170gel-
Ot"I,qtTortAngeles
Connnitnitv& Econoinic Devetopnimt
/'.0. Box �150
1'ort,lngeles, IJA 98362
sroberds oacityofpams
360-417-4750
Sue Roberds
From: Ken Dubuc
Sent: Thursday, May 08, 2014 4:52 PM
To: Sue Roberds
Cc: Ken Dubuc
Subject: RE: Atwater/Wai CUP
Good afternoon Sue—
The Fire Department has no comments.
My assumption, based upon what they say, is that this is simply a retail outlet where a product is sold and then taken
away to be used at home. The only requirement would be a fire extinguisher, which should already be in place for the
resta u ra nt.
I'm not sure if it matters particularly, but will the restaurant still be in business?
Thanks,
Ken
From: Sue Roberds
Sent: Thursday, May 08, 2014 4:42 PM
To: Eric Walrath; Roger Vess; Ken Dubuc; Terry Gallagher
Subject: Atwater/Wai CUP
Dear Reviewers,
Attached you will find an application from Malik Atwater and Vivian Wai for a conditional use permit to establish a recreational
marijuana use in the Industrial Light zone at 536 Marine Drive. Please review the application materials and note any appropriate
land use concerns or conditions you believe should be addressed in review of this application. Your comments no later than May 19
would be appreciated.
15uc Koberds
Plam iing A lant�ger
Cit.Y q/Port Angeles
C ommuni1v& h,conomic Developtnew
11.0. BO.-v 1150
1'ortAngeles, HA 98362
sroberdsCa_kityoTfa.us
360-417-4750
N I-FV t\-AA-6
-24
C%j
uz
is- UZ
AMW
CA
C4
M
co
4t
4Z-
0
C> CN
C14
C%4
U�
C-1
Cl)
Lo
to
Cl)
00 Cb
n m
LO
Cl)
00
m
oq
44
NGELES
Cow
CF-X CIS I
N U 0
4v
lie
lk
,Al�
N,
Address:
536 Marine Drive
5- 3 � �A af' 'Ae- �) C ,
PREPARED 3/02/15, 13:36:30 INSPECTION TICKET PAGE 3
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 3/0
---------------------------------------------------------------------------------------
ADDRESS . : 536 MARINE DR SUBDIV:
CONTRACTOR : PHONE :
OWNER MALIK V ATWATER & VIVIAN WAI PHONE : (360) 477-1519
PARCEL 06-30-00-0-0-4930-0000-
APPL NUMBER: 14-00001185 COMM REMODEL
------------------------------------------------------------------------------------------------
PERMIT: BPC 00 BUILDING PERMIT - COMMERCIAL
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
BAIR 01 11/12/14 JLL BLDG AIR SEAL
11/12/14 AP November 12, 2014 3:56:28 PM jlierly.
November 12, 2014 3:56:44 PM jlierly.
BL3 01 11/12/14 JLL BLDG FRAMING
11/12/14 AP November 12, 2014 10:40:32 AM pbarthol.
Vivian
November 12, 2014 3:55:23 PM jlierly.
BLI 01 11/17/14 JLL BLDG INSULATION
11/17/14 AP November 17, 2014 9:07:21 AM pbarthol.
Vivian 477-1518
November 17, 2014 4:10:29 PM jlierly.
BL99 01 3/02/15 JLL BLDG FINAL
A_�� March 2, 201S 11:36:37 AM pbarthol.
p Malik 477-2381
---------------------- -----------------------------------------------------------------------
PERMIT: ME 00 MECHANICAL PERMIT
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
ME99 01 3/Cfi/15 MECHANICAL FINAL
--:;�. 17- March 2, 2015 11:37:13 AM pbarthol.
---- ---- f P117-___-1-73---------------------------------------------------------------------------
PERMIT: PL / 00 PLUMBING PERMIT
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
PL2 01 11/12/14 JLL PLUMBING ROUGH-IN
11/12/14 AP November 12, 2014 3:56:09 PM jlierly.
November 12, 2014 3:56:52 PM jlierly.
PL99 01 J�� PLUMBING FINAL
_. _a March 2, 2015 11:37:24 AM pbarthol.
--------- ---;w------------ COMMENTS AND NOTES --------------------------------------
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY&ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES,WA 98362
Application Number . . . . . 14-00001185 Date 10/13/14
Application pin number . . . 434255
Property Address . . . . . . .536 MARINE DR
ASSESSOR PARCEL NUMBER: 06-30-00-0-0-4930-0000- REPORT SALES TAX
Application type description COMM REMODEL
Subdivision Name . . . . . . on your state excise tax fban
Property Use . . . . . . . . to the City of Port Angeles
Property Zoning . . . . . . . INDUSTRIAL LIGHT
Application valuation . . . . 10000 (Location Code 0502)
----------------------------------------------------------------------------
Application desc &
INTERIOR REMODEL / ADD ADA WASHROOM k3i
----------------------------------------------------------------------------
Owner Contractor
------------------------ ------------------------
MALIK V ATWATER & VIVIAN WAI OWNER
6421 S. MT. ANGELES RD.
PORT ANGELES WA 98362
(360) 477-1519
---------------------------------j 7------------------------------------------
Permit . . . . . . BUILDING PERMIT - COMMERCIAL
Additional desc . . REMODEL
Permit Fee . . . . 207.75 Plan Check Fee 135.04
Issue Date . . . . 10/13/14 Valuation . . . . 10000
Expiration Date . . 4/11/15
Qty Unit Charge Per Extension
BASE FEE 95.75
8.00 14.0000 THOU BL-2001-25K (14 PER K) 112.00
----------------------------------------------------------------------------
Permit . . . . . . MECHANICAL PERMIT
Additional desc EXHAUST FAN
Permit Fee . . . . 57.25 Plan Check Fee .00
Issue Date . . I . 10/13/14 Valuation . . . . 0
Expiration Date . . 4/11/15
Qty Unit Charge Per , Extension
BASE FEE 50.00
1.00 7.2500 EA ME-VENT FAN (SINGLE DUCT) 7.25
----------------------------------------------------------------------------
Permit . . . . . . PLUMBING PERMIT
Additional desc . . ADA BATHROOM
Permit Fee . . . . 85.00 Plan Check Fee .00
Issue Date . . . . 10/13/14 Valuation . . . . 0
Expiration Date . . 4/11/15
Qty Unit Charge Per Extension
BASE FEE 50.00
2.00 7.0000 EA PL-PLUMBING TRAP 14.00
1.00 7.0000 EA PL-WATER LINE 7.00
.1.00 7.0000 EA PL-DRAIN VENT PIPING 7.00
1.00 7.0000 EA PL-WATER HEATER 7.00
----------------------------------------------------------------------------
Special Notes and Comments
October 10, 2014 12:36:05 PM sroberds.
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
*-3/1 Lf
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
— PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backfiow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Sternwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-In
Water Line(Meter to Bldg)
Gas Line
Back Flow/Water FINAL Date Accepted by
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders/Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall(Interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pump/Furnace/FAU/Ducts
Rough-In
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts FINAL Date Accepted by
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parking/Lighting ESA:
Landscaping ISHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction-R.W. PW I Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
T:Forms/Building Division/Building Permit
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY& ECONOMIC DEVELOPMENT-BUILDING DIVISION.
321 EAST 5TH STREET, PORT ANGELES,WA 98362
Page 2
Application Number . . . . . 14-00001185 Date 10/13/14
Application pin number . . . .434255
---------------------------------------------------------------------------- REPORT SALES TAX
Special Notes and Comments
The permit will result in new' retail/office space per CUP on your state excise tax form
14-04 in the IL zone. Applicant stated that licensing and to the City of Port Angeles
business plan does not lend to rear entry/exit way. Parking
is provided at the rear of the building. No land use issues (Location Code 0502)
anticipated.
----------------------------------------------------------------------------
Other Fees . . . . . . . . . STATE SURCHARGE 4.50
----------------------------------------------------------------------------
Fee summary Charged Paid Credited Due
----------------- ---------- ---------- ---------- ----------
Permit Fee Total 350.00 350.00 .00 .00
Plan Check Total 135.04 135.04 .00 .00
Other Fee Total 4.50 4.50 .00 .00
Grand Total 489.54 489.54 .00 .00
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced,or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
— PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Stemwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-In
Water Line(Meter to Bldg)
Gas Line
Back Flow I Water FINAL Date Accepted by
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders/Under Floor
Shear Wall I Hold Downs
Walls/Roof/Ceiling
Drywall(Interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL.
Heat Pump/Furnace/FAU/Ducts
Rough-In
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts FINAL Date Accepted by
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parking/Lighting ESA:
Landscaping ISHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction-R.W. PW I Engineering 417-4831
Fire 417-4653
Planning 417-4750
L Building 417-4815
T:Forms/Building Division/Building Permit
THE
CITY OF For City Use
0
N
A Permit#
W A S H I N G T 0 N. U. S. Date Received: li�)
321 E 51h Street
Date Approved
---4, 4ra
Port Angeles,WA 983 6
P:360-417-4817 F:360-417-4711
Email:permits0cii;yofpa.us BUILDING PERMI A�LICATION
Project Address: 63(o "Ap-it4e, Nve R
, oea- wA
PrimaFyContact. Phone: (�3b C��) Q-7 7-7-';-S
Email: r��',
Name '--Fh—one
Property Mailing Address Email
(og 7-1
Owner
city State zip
Name Phone
SAAA:;�
Contractor A ddress Email
Information city State Zip
! Contractor License# Exp.Date:
Legal Description: Zoning: Tax Parcel# Project Value: (materials and labor)
L$10 Doo
Residential 11 Commercial IT Industrial 11 Public 11
Permit Demolition 11 Fire 0 Repair 0 Reroof(tear off/lay over) 11
Classification For the following.fill out both pages of permit application:
(check New Construction 0 Exterior Remodel 0 _,Addition 13 Tenant Improvement 11
appropriate) Mechanical ePlumbing 0 Other Er
Will a fire sprinkler system be installed Irrigation Systeo? Proposed Bathrooms I Proposed Bedrooms
or modified? Yes 13 No W Yes 13 No
Project Description JZe1,AQ0tL oF- 14 EAs-r
,::,1,Dt OV p
L_r�,I rj W At->-C>
or- QWL- AVA-, F>A--TIAZOOM FoV- 100r-T2 QH
S�,Ace Aw> 2,76 Fr2- or- oFF,u-- STQ0,,-,G&/ F:---L60LO�J 64 <FA.0
Is project in a Flood Zone: Yes NoO/Flood Zone Type:
If in a Flood Zone, what is the value of the structure before proposed improvement? $
I have read and completed the application and know it to be true and correct. I am authorized to apply for
this permit and understand that it is my responsibility to determine what permits are required and to
obtain permits prior to work. I understand that plan review fees are not refundable after review has
occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is
issued. I understand that if the permit is not picked up/issued within i8o days of submittal,the application
will be considered abandoned and the fees will be forfeited.
101 1 1 1 � MAOK ATWA-Tt�
Da Print Name
Residential Structures
For Office Use
Area Description(SQ FT) Existing Proposed ss value
Basement
First Floor
Second Floor
Covered Deck/Porch/Entry
Deck(over 30"or nl floor)
Garage
Carport
Other(describe)
Area Totals
Commercial Structures
Proposed For Office Use
Area Descriptions(SQ IT) Existing Proposed ss Value
Existing Structure (s) 9-15 F'ra 41-7 S r--r'7-
Proposed Addition t4 It- N�A.
Tenant Improvement? No
Other work(describe)
Site Area Totals
Lot/Site Coverage Calculations
Lot Size (sq ft) Lot Coverage (sq ft) %Lot Coverage(Total lot coverage lot size)
Site Coverage (Sq Ft of all impervious) %of Site Coverage(total site coverage-- lot size)
Mechanical Fixtures
Indicate how many of each type of fixture to be installed or relocated as part of this project.
Air Handler I Size: # Haz/Non-Haz Piping Outlets:
Appliance Exhaust Fan # Heater(Suspended, Floor,Recessed wall) #
Boiler/Compressor Size: # Heating/Cooling appliance #
j repair/alteration
Evaporative Cooler(attached,not # Pellet Stove/Wood-burning/Gas #
portabl ) Fireplace/ as Stove/Gas Cook Stove/Misc.
Fuel Gas Piping #of Outlets: Ventilation Fan,single duct #
# Ventilation System #
Forced Air Unit I I I
Furnace/Heat Pump 7 Siz -
Plumbing Fixtures
Indicate how many of each type of flxtu e to be installed or relocated
Plumbing Traps # Fuel gas piping #of Outlets:
Water Heater # Medical gas piping #of Outlets:
Water Line # Plumbing Vent piping #
Sewer Line # Industrial waste pretreatment
interceptor(Grease Trap) Size
Other(describe):
T:\BUILDING\APPLICATION FORMS\Current BP Applicatlon\Building Permit 4-17-13.docx
Nz9H71-1
3 ,
T
61VqJqEAJ7- 3' VWOM&N�
O&Tkj D-,rqAd4 t� -ro
T' INMott
VVE5-r
APA—Wr Alor
E-A-S 7-
7 T'/
01
b
'T�
ADA TdJL tT
t -,TV OF 11ORTANGRES—COnstruction Plang
The is!UancE of this PMW'"' "M these Plans,specirl.
r,2ticns and other daim�lt:rqnot Pr('!.'W the building official
fTOM Mereal er r&jtj�jg the corre&,q Of errors in said
A A. SJIVkl rq O!"s, 31necif c86PS and fter data, or *W preventing
b"1;ldiq'op*i0m Uing carried on
thereunder when in
"."'fun of all COM Ud ordl�naqces Of this jurisdiction.
WOW Date 9 1
I r, PZ7 ,� -1 �%c
r"4*�
. X1 IV f �
I11X-rbq1,0R WALLS To Rr 44-9&.471FO WIM R1.3 PVS111-A7'1,0,4)
eklL.1,06 7-,q gr M511LA-aD 110771 A31 R6a 1AIJ4144--rld")
F-LE61-121r, -SkWC-L-C, -M HIRE fIV-11RE SPACE711,"'I"17�)A CcWNbCl'-
L��) &jr-rj /10 SEU)CES -
PWISV) MMMIT-) To AN
kSTIM47V�0 COSr
OF MAJC-r-7- - /AIU OPIA4,
CAJO7
21C
10411 M.C&A OAMU
All,
�lk
"'14,p0'
�Kl
Mal "K.
via C&A
00
VIA W-
00*7
tt (9 M-
:201
Sam — 41
LO
min.
max .1370 .
op
.42.
065
A k
%bar