HomeMy WebLinkAbout538 W. 4th Street Address:
538W4 Ih Street
3
PREPARED 10/24/13, 9:16:35 INSPECTION TICKET PAGE
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 10/24/13
----------------------------------------------------------------------------------------------------
ADDRESS . : 538 W 4TH ST SUBDIV:
CONTRACTOR : PHONE
OWNER BAKER, DEBORAH ANN PHONE
PARCEL 06-30-00-0-0-8440-0000-
APPL NUMBER: 12-00001152 RES REPAIR
------------------------------------------------------------------L------------
PERMIT: BPR 00 BUILDING PERMIT - RESIDENTIAL
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
BL99 01 10/24/13 JLL BLDG FINAL
Ort.b.� 24, 2013 8:49:07 AM pbarthol.
Roo Final
Jasofn 457-8147
-------------------- --------- COMMENTS AND NOTES --------------------------------------
BUILDING PERMIT INSPECTION RECORD
PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS–
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings z-
Sternwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-In
Water Line(Meter to Bldg)
Gas Line
Back Flow/Water FINAL Date Accepted by
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders/Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall(interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pump/Furnace/FAU/Ducts
Rough-In
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts FINAL Date Accepted by
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold D wns
Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parking/Lighting ESA:
Landscaping ISHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY1 USE
Inspection Type Date Accepted By
Electrical 417-4735
Construction- R.W. PW /Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
ID—if
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY&ECONOMIC DEVELOPMENT-BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Application Number . . . . . 12-00001152 Date 9/12/12
Application pin number . . . 856000
Property Address . . . . . . 538 W 4TH ST
ASSESSOR PARCEL NUMBER: 06-30-00-0-0-8440-0000- REPORT SALES TAX
Application type description RES REPAIR on your state excise tax form
Subdivision Name . . . . . . .
Property Use . . . . . . . .
to the City of Port Angeles
Property Zoning . . . . . . . RS7 RESDNTL SINGLE FAMILY
Application valuation . . . . 14484 (Location Code 0502)
----------------------------------------------------------------------------
Application desc
EXTEND ROOF OVER 2ND STORY DECK & REROOF
-----------------------------------------------------------------------------
Owner Contractor
------------------------ ------------------------
BAKER, DEBORAH ANN OWNER
538 W 4TH ST
PORT ANGELES WA 98362
----------------------------------------------------------------------------
Permit . . . . . . BUILDING PERMIT -RESIDENTIAL
Additional desc . . EXTEND ROOFOVER DECK/REROOF
Permit Fee , . . . 277.75 Plan Check Fee 180.54
Issue Date . . . . 9/12/12 Valuation . . . . 14484
Expiration Date 3/11/13
Qty Unit Charge Per Extension
BASE FEE 95.75
13.00 14.0000 THOU BL-2001-25K (14 PER K) 182.00
----------------------------------------------------------------------------
Special Notes and Comments
The Fire Department has reviewed the project application and
has no comments
September 6, 2012 10:55:00 AM sroberds.
The proposal will result.in a re roof that will include a
new roof over a 2nd floor deck. No additional lot coverage.
September 6, 2012 10:20:05 AM banders.
Electrical service mast must be extended prior to roof
addition being built. Contact Trent (417-4735) or Brian
(417-4708) for more details.
Electrical load calculations and electrical permits are
required.
Public Works Utility Engineering has no requirements for
this plan review.
I-------------------------------------------------------------------
Other Fees . . . . . . . . . STATE SURCHARGE 4.50
----------------------------------------------------------------------------
Fee summary Charged Paid Credited Due
----------------- ---------- ---------- ---------- ----------
Permit Fee Total 277.75 277.75 .00 .00
Plan Check Total 180.54 180.54 .00 .00
Other Fee Total 4.50 4.50 .00 .00
Grand Total 462.79 462.79 .00 .00
Separate Permits are required for electrical work,S EPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Oate Print Name Sig�are of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
THE
CITY OF RT NGELES For City Use 0 M
C., M
P A '�"' So
Permit # M 0
W A S H I N G T 0 N , U . S . -a
- Z 0 1
Date Received: M
321 East 511 Street
Z� rc��
Port Angeles, WA 98362 DateApproved:9 1) �2 C' —
�Z r- M
0 M
I/ m
P: 360-417-4817 F: 360-417-4711
hcatuzo@cityofpa.us
Building Permit Application
Project Address: 4i,\
32 H 7
Main Contact: Phone # Lk
Property Name Phone 3�oD- -7-
Owner MailingAddress Email
�5 3 9 W,
city State Zip
'-F�,V J4 \1J
Contractor Name Phone
Mailing Address Email
City state Zip
Contractor License # Expiration:
Project Value: Zoning: ax Parcel # ot#
$ 44,0��� "'T U60 00 W8440
Type of Residential)o commercial . industrial 1:1 Public 0
Permit Demolition 0 Fire 1:1 Repair A Reroof(tear off/lay over)
For the following,fill out both pages of permit application:
New Construction 11 Remodel 11 Addition 13 Tenant Improvement El
L Mechanical 0 Plumbing 0 Other A
Existing Fire Sprinkler System? Maximum height of structure Proposed Bedrooms Proposed Bathrooms
Yes 11 No A14 AIA
Project
Description
(7
S26^4j icaak. & OP 5:�-00'45 ep4q-o
A
I have read and completed the application and know it to be true and correct.I am authorized to apply for this
permit and understand that it is my responsibility to determine what permits are required,and to obtain
permits prior to working on projects.I understand the plan review fee is not refundable after review has
occurred.I understand that I will forfeit 20%of the review fee if I cancel or withdraw the application before
plan review has occurred.I understand that if the permit is not issued within 180 days of receipt,the
application will be considered abandoned,and the fees forfeit.
Date rint Name S" tu
il
r
Residential Structures
.Area Description(SQ FT) Existing Proposed Minimum$ For Office Use
value
Basement
First Floor
Second Floor
Covered Deck/Porch/Entry
Deck
Garage
Carport
Other(describe)
Area Totals
Commercial Structures
Area Description(SQ FT) Existing Proposed Minimum$ For Office Use
value
Structure(s)
Addition
Tenant Improvement
Other(describe)
Area Totals
Lot/Site Coverage Calculations
Footprint(SQ FT) of all Structures: Lot Size: %Lot Coverage
"a nem e-o\L
SQ FT Site coverage (all impervious+ (-j %Site Coverage
structures)
Mechanical Fixtures
Indicate how many of each type of fixture to be installed or relocated as part of this project.
Air Handler Size: # Haz/Non-Haz Piping #of Outlets:
Appliance Vent # Heater(Suspended,Floor,Recessed wall) #
Boiler/Compressor Size: # Heating/Cooling appliance #
repair/alteration
Evaporative Cooler(attached,not # Pellet Stove/Wood-burning/Gas #
portable) Firqplace/Gas Stove/Gas Cook Stove/Misc.
Fuel.G!a�s'Riplfig '9,-crf Outlets',," #
Furnac67-Heat,PunI07, S fte #-'!z j VeIitil;itibn�S In #
Forced Air Unit
Plumbing Fiitures
Indicate how many of each type of fixture to be installed or relocated
Plumbing Traps # Fuel gas piping #of Outlets:
Water Heater # Medical gas piping #of Outlets:
Water Line # Vent piping #
Sewer Line # Industrial waste pretreatment #
Other(describe): interceptor
I O'�
537
it
i 4
5 531
31
538
36
538 532
61
421
423 423 421 531 524
Clallarn County Assessor& Treasurer - Property Details - 56238 DEBORAH ANN BAK... Page I of I
Clallarn County Assessor & Treasurer
Property Search Results > 56238 DEBORAH ANN BAKER for Year 2011 -2012
Account
Property ID: 56238 Legal Description: LT 10 EXC S 50'BL
84
Geographic ID: 0630000084400000 Agent Code:
Type: Real
Tax Area: 0010-PA 121 PORT ST CNTY H2 L WMP Land Use Code 11
Open Space: N DFL N
Historic Property: N Remodel Property: N
Multi-Family Redevelopment: N
Township: Section:
Range:
Location
Address: 538 W FOURTH ST Mapsco:
PORT ANGELES,WA 98362
Neighborhood: PA West Res MapID: 2
Neighborhood CD: 5151000
Owner
Name: DEBORAH ANN BAKER Owner ID: 211528
Mailing Address: 538 W FOURTH ST %Ownership: 100.0000000000%
PORT ANGELES,WA
Exemptions:
Taxes and Assessment Details
Values
Taxing Jurisdiction
nt/Building
Sketch
Property image
Land
oil Value History
Deed and Sales History
Payout Agreement
Website version:9.0.32.2200 Database last updated on:9/4/2012 3:50 2012 True Automation, Inc.All Rights
AM Reserved. Privacy Notice
http://websrv8.clallam.net/propertyaccess/Property.aspx?cid=O&year--201 I&prop—id=56238 9/4/2012
HARTNAGEL BUILDING SUPPLY INC. PAGE NO 1
3111 HIGHWAY 101 EAST
PORT ANGELES, WA 98362
TOLL FREE 1-888-452-6252
PHONE: (360) 452-8933
AN EMPLOYEE OWNED AND OPERATED
LUMBERTRADERSSTORE
CE
'ObRcHA�E OR 6ikii� REP' REM
�CUST�Np; ...... cl�
ASHI.cHEC 'Z
203'8
TERMINAL:559
EXP.DATE:9/7/12
PA AS
y
SALESPERSON: 81 KEVIN WIEGEL
WA `918.548�:�.,'. :_ -CASH RETAI
TAX:H4 HARTNAGELS
ES TIMA TE: 532300
�'�s 0 P, 4', C T UQG
QERE OR QE/. RFR EXT
H I PP;�:E-D`,��'
08122/12
2 10 RL FELT30 2 SQ 30#FELT (29) 10 23.27 /RL 232.70
3 19.25 EA S0412 26 SKYLINE, 16"CANYON RED 19.25 138.99 /EA 2,675.56
4 8/19'-0" 27/2'-4" 13/4'-10"
5 28/14'-0" 31/24'-0"
6 4 EA S0412 R1 6 SL VENTED RIDGE. 4 16.45 /EA 65.80
7 8 EA S0412 SW16 SL SIDEWALL. 8 13.56 /EA 108.48
8 18 EA S0412 G17 SL GABLE. 18 15.64 /EA 281.52
9 10 EA S0412 E17 EAVE TRIM. 10 12.59 /EA 125.90
10 3 EA S0412 EW16 ENDWALL. 3 14.21 /EA 42.63
11 3 EA S0412 Z17 SOLID ZEE CLOSURE. 3 5.91 /EA 17.73
12 8 EA S0412 CUSTOM L: V'0"no hem. 8 9.94 /EA 79.52
13 7 EA S0412 32"top closure for 16"panels, 7 5.94 /EA 41.58
14 PACKAGEA
19 0.75 EA S0412 1"PAINTED TRIM SCREWS. .75 52.50 /EA 39.38
20 2 EA S0412 1"FIELD SCREWS. 2 28.13 /EA 56.26
21 1 EA BOOM BOOM TRUCK DELIVERY CHARGE 1 50.00 /EA 50.00
22 BOOM TRUCK CHARGE$50.00 MINIMUM
23 AND$85.00 PER HOUR AFTER 30 MIN
24 SPECIAL JOBS AND CONDITIONS WILL
25 BE QUOTED ON AN INDIVIDUAL BASIS
26
27 8 PC PT468 4 X 6 PRIES TREATED 8' 8 15.121 /PC 120.97
28 2 EA TIM41012 4 X 10 FIR TIMBERS 12' 2 29.082 /EA 58.16
- 29 2 EA TIM41020 4 X 10 FIR TIMBERS 20' 2 48.47 /EA 96.94
30 8 EA ABU46Z ZMAX-ABU46 4x6 ADJ. POST BASE 8 28.97 /EA 231.76
31 16 EA LCE4Z ZMAX-LCE4Z LIGHT POST CAP 16 5.69 /EA 91.04
32 15 EA DF2412 2 X 4 DOUGLAS FIR 12' 15 4.401 /EA 66.02
33 42 EA DF21012 2 X 10 DOUGLAS FIR 12' 42 11.135 /EA 467.67
34 21 EA DF21014 2 X 10 DOUGLAS FIR 14' 21 12.99 /EA 272.81
35 6 EA DF21020 2 X 10 DOUGLAS FIR 20' 6 18.558 /EA 111.35
36 5 PC CDX34 3/4"-4 X 8 CDX PLY 5 31.439 /PC 157.20
37 78 PC OSB716 7/16"4 X 8 OSB 78 13.60 /PC 1,060.80
Continued...
HARTNAGEL BUILDING SUPPLY INC. PAGE NO 2
3111 HIGHWAY 101 EAST
PORT ANGELES, WA 98362
TOLL FREE 1-888-452-6252
PHONE: (360) 452-8933
AN EMPLOYEE OWNED AND OPERATED
LUMBER TRADERS STORE ....... ......
DATE,rTImt;
JOB�NO-' U
9HtcHEGKjB
.2.�! .3;2::li,;'
TERMINAL:559
,�'SOLD� O-�" EXP.DATE:9/7/12
-s-
HAN D Y M A N�','RE-P Ad R
"CLYD.E--'P`7A'
y
KEVIN WIEGEL
...... SALESPERSON: 81
PbR
TAX:H4 HARTNAGELS-CASH RETAI
ESTIMA TE: 532300
HiPP
fQ ',;8,K, DE'S'C "T �8UGG UNIT' S ' PRICE/ PERTXTE_NS`fON L-"�"
'RIP
_RQE�
"ION.
0.10 /EA 20.00
318 200 EA 716PSCL SIMPSON 7/16PLYWOOD SHEATHNG CLP 200
3, 5/4x6 16'SPF KD PRIME FACIA 100 1704.29 /MF 170.43
39 10 PC PF540616
r4O 1 EA 999 MISC ALLOWANCE. 1 500.00 /EA 500.00
TAXABLE (7124;2.Zo>
.0
NON-TAXABLE 0-00
SUBTOTAL 7242.21
TAX AMOUNT 608.35
TOTAL 7850.56,
TOT WT: 8791.50 x
Received By
44140 sr
S 3 13 0. J-/;tl., Oo-oe,- Dc�b; &ke--
P,o Av� e-I e- --4 Z;ras Pv e?A,"b/v C/
'y At
TJO
X
IS
aid
Al
Dae-X
Ile
Si4e OaLIK
Ceder
Ar x H-2-St-5+. : RECEIVED!
Up SEP — 4 2012
Les
E—ARME
BUILDING DMSION
PM PC r-l� L;)ae
-2q P4
4::�
?6.peety
I.;"e-
F
CITY OF PORT All.GELES—Construction Mans
The Issuance of this permit besed upon these plans,spe.ifl-
cations and other data shall not prevent the building official
from thereafter requiring the correction of errors in said
plans, specifications and other data, or froin preventing
I k ag carried on thereunder when in
building operations bei,
violation of all codes and orcorances of this jurisdiction.
N&I
Approval Date
-J I __J
/stlit
):
Side, W&IK
El
-13 — A
j -�A
exia" i0o, elbo.
AX)o4
j- NyVo- I Axy
pe-a
9
qx1,
P 7 OPc.-j
)07-
A x Pr Axil Pr
ge ------i
jig
L
Jx
GT) 37
be