HomeMy WebLinkAbout824 E. 8th Street Address:
824 E 811 Street
PREPARED- 7/27/16, 8:59:02 INSPECTION TICKET PAGE 4
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE' 7/27/16
------—------—-------—----------——----------------------------—---------------------------
ADDRESS 824 E 8TH ST - SUBDIV:
CONTRACTOR ALPHA BUILDER CORPORATION PHONE (360) 452-3154
OWNER WILLARD H HENKES RETIRE TRUST PHONE - -
PARCEL 06-30-01-6-7-0000-3010-
APPL NUMBER: 16-00000037 RE-ROOF
---------------------
PERMIT: BNOP 00 BUILDING PERMIT .- NO PR FEE -
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
------------------------------------------------------------------------------------------------
BL99 01 7/27/16 BLDG FINAL
July 27, 2016 9:03:11 AM jlierly.
Connie 452-3154
------------------------ ------------ COMMENTS AND NOTES --------------------------------------
%�. CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Application Number . . . . . 16-00000037 Date 1/11/16
Application pin number . . . 445033
Property Address . . . . . . 824 E 8TH ST
ASSESSOR PARCEL NUMBER: 06-30-01-6-7-0000-3010- REPORT SALES TAX
Application type description RE-ROOF
Subdivision Name . . . . . . on your state excise tax form
Property Use . . . . . . . . to the City of Port Angeles
Property Zoning . . . . . . .
Application valuation . . . . 15560 (Location Code 0502)
Application desc
( ^�' - TEAR OFF SHAKE INSTALL SNAP LOCK METAL OM MANSARD
V ). - ----------------------------------------------------------------------------
Owner Contractor
'WILLARD H HENKES RETIRE TRUST ALPHA BUILDE$ CORPORATION
824 E 8TH ST 105 1/2 E. 1ST ST.
PORT ANGELES WA 983626451 PORT ANGELES WA 98362
(360) 452-3154
--------------------------------=-------------------------------------------
Permit . . . . . . BUILDING PERMIT - NO PR FEE
Additional desc . . REROOF
W_ Permit Fee . . . 291.75 Plan Check Fee .00
Issue Date . . . 1/11/16 Valuation . . . . 15560
Expiration Date 7/09/16
�— Qty Unit Charge Per Extension
_..
BASE FEE 95.75
14.00-------14.0000 THOU BL-2001-25K (14 PER K)-------- -----196.00
------- -
-----------------------------
Other Fees STATE SURCHARGE 4.50
----------------------------------------------------------------------------
Fee summary Charged Paid . . Credited Due
.` ----------------- ---------- ---------- ---------- ----------
Permit Fee Total 291.7.5 291.75 .00 .00
Plan Check Total .00 .00 .00 .00
Other Fee Total 4.50 4.50 .00 .00
Grand Total 296.25 296.25 .00 .00
4 '
Separate Permits are required forelectrical work,SEPA,Shoreline,ESA,utilities,private and public improvements. This permit becomes
null and void if work or construction authorized isnot commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced, or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or,not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or loc law regulating construction or the performance of
construction.
I IVI
Date Print Name Signature of Contractor or Authorized Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
BUILDING PERMIT INSPECTION RECORD
PLEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections 417-4815 Electrical Inspections 4174735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Stemwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-In
Water Line Meter to Bldg)
Gas Line
Back Flow/Water
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders I Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall Interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pump/Furnace/FAU/Ducts
Rough-In
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parkin /Lighting ESA:
Landscaping SHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE
Inspection Type _ Date Accepted By
Electrical 417-4735
Construction -R.W. PW I Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
THE
For City Use
CITY OF
tea- Permit#
W A S H 1 N GT O N, U. S. Date Received: L— 6�—1
321 E 51h Street Date Approved �' Lt —i(a
Port Angeles,WA 9836
P:360-417-4817 F:360-417-4711
Email:permits@cityofga.us BUILDING PERMIT APPLICATION
Project Address:824 E 8th
Phone:452-3154
Primary Contact:Ken Tobias Email: Alpha @olypen.corn
Na11eParkridge Center Condominium phone 452-7923 (Jerry Austin)
Property Mailing Address Email
Owner
city Port Angeles State WA zip 98362
Name Alpha Builder Corp Phone 360-452-3154
Contractor Address 402 South Lincoln Emailalpha@olypen.com
Information City port Angeles state WA zip 98362
Contractor License#ALPHAABC943LW Exp.Date:6-16-16
Legal Description: Zoning: Tax Parcel# Pro ect Value: (materials and labor)
$ 1 ,560.00
Residential ❑ Commercial 8 Industrial ❑ Public ❑
Permit Demolition ❑ Fire ❑ Repair ❑ Reroof(tear off/lay over) 8
Classification For the following,fill out both pages of permit application:
(check New Construction ❑ Exterior Remodel ® Addition ❑ Tenant Improvement ❑
appropriate) Mechanical ❑ Plumbing ❑ Other ❑
Fire Sprinkler System Proposed Irrigation System Proposed or Proposed Bathrooms Proposed Bedrooms
or Existing? Yes 0 No D Existing? Yes 0 No 0 10 0
In addition to standard hard copy submittals please send a PDF copy of all Stormwater plans and Engineering to
www.stormwater0cityo a.us
Project Description SHAKE FACADES WITH SNAP-LOCK METAL ROMING
RIBROOF SAKE FACADES WITH SNAP-LOCK LIETAL IMMMS
Is project in a Flood Zone: Yes ❑ No8 Flood Zone Type:
If in a Flood Zone,what is the value of the structure before proposed improvement? $
I have read and completed the application and know it to be true and correct.I am authorized to apply for
this permit and understand that it is my responsibility to determine what permits are required and to
obtain permits prior to work. I understand that plan review fees are not refundable after review has
occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is
issued. I understand that if the permit is not picked up/issued within i8o days of submittal,the application
will be considered abandoned and the fees will be forfeited.
7L - 7
Date Print Name Signature