HomeMy WebLinkAbout830 Boathaven Drive Address:
830 Boathaven Drive
PREPARED 5/31/16, 10:08:22 INSPECTION TICKET PAGE 6
CITY OF PORT ANGELES INSPECTOR: JAMES LIERLY DATE 5/31/16
------------------------------------------------------------------------------------------------
ADDRESS . : 830 BOATHAVEN DR SUBDIV:
CONTRACTOR : PHONE
OWNER PORT ANGELES MARINE DOCK PHONE
PARCEL 06-30-00-0-7-9825-5002-
APPL NUMBER: 16-00000471 COMM REMODEL
------------------------------------------------------------------------------------------------
PERMIT: BPC 00 BUILDING PERMIT - COMMERCLAL
REQUESTED INSP DESCRIPTION
TYP/SQ COMPLETED RESULT RESULTS/COMMENTS
---- --- ------
BL3 01 5/04/16 PB BLDG FRAMING
5/06/16 AP May 4, 2016 9:57:54 AM pbarthol.
Rick 460-0139
May 6, 2016 12:48:13 PM pbarthol.
BL99 01 5/31/16L BLDG FINAL
May 27, 2016 2:09:34 PM jlierly.
460-0139 call first
-------------------------------------- COMMENTS AND NOTES --------------------------------------
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT- BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
•
Application Number . . . . . 16-00000471 Date 4/25/16
Application pin number . . . 059427
Property Address . . . . . . 830 BOATHAVEN DR REPORT SALES TAX
ASSESSOR PARCEL NUMBER: 06-30-00-0-7-9825-5002-
Application type description COMM REMODEL on your state excise tax form
Property
Name . . . . . . to the City of Port Angeles
Pro ert Use
Property Zoning . . . . . . . INDUSTRIAL HEAVY (Location Code 0502)
Application valuation 18000
Application desc
REMODEL EXISTING SHOP FOR OFFICE
----------------------------------------------------------------------------
Owner Contractor
------------------------ ------------------------
PORT ANGELES MARINE DOCK OWNER
832 BOATHAVEN DR
PORT ANGELES WA 983622101
----------------------------------------------------------------------------
Permit . . . . . . BUILDING PERMIT - COMMERCIAL
`1 Additional desc .
Permit Fee . . . . 319.75 Plan Check Fee 207.84
Issue Date . . . . 4/25/16 Valuation . . . . 18000
• Expiration Date 10/22/16
N
1�, Qty Unit Charge Per Extension
BASE FEE 95.75 -
16.00 14.0000 THOU BL-2001-25K (14 PER K) 224.00
- - ---------------------------------------------------------
d Special Notes and Comments
0 April 25, 2016 1:12:47 PM pbarthol.
no planning land use problems anticipated-
----------------------------------------------------------------
Other Fees . . . . . . . . . STATE SURCHARGE 4.50
----------------------------------------------------------------------------
Fee summary Charged Paid Credited Due
------------ ----------
(�/� Permit Fee Total 319.75 319.75 .00 .00
Plan Check Total 207.84 207.84. .00 .00
Other Fee Total 4.50 4.50 ,. .00 .00
Grand Total 532.09 532.09 .00 .00
Separate Permits are required for electrical work,SEPA,Shoreline,ESA,utilities,private and public improvements.This permit becomes
. null and void if work or construction authorized isnot commenced within 180 days,if construction or work is suspended or abandoned
for a period of 180 days after the work has commenced,or if required inspections have not been requested within 180 days from the
last inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions
of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does
not presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
2�"�
Date Print Name Signature of Contractor or thorize Agent Signature of Owner(if owner is builder)
T:Forms/Building Division/Building Permit
�.BUILDING PERMIT INSPECTION RECORD
- 'LEASE PROVIDE A MINIMUM 24-HOUR NOTICE FOR INSPECTIONS—
Building Inspections 417-4815 Electrical Inspections 417-4735
Public Works Utilities 417-4831 Backflow Prevention Inspections 417-4886
IT IS UNLAWFUL TO COVER,INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED.
POST PERMIT INCONSPICUOUS LOCATION. KEEP PERMIT AND APPROVED PLANS AT JOB SITE.
Inspection Type Date Accepted By Comments
FOUNDATION:
Footings
Stemwall
Foundation Drainage/Downspouts
Piers
Post Holes(Pole Bldgs.)
PLUMBING:
Under Floor/Slab
Rough-in
Water Line Meter to Bldg)
Gas Line
Back Flow/Water
AIR SEAL:
Walls
Ceiling
FRAMING:
Joists/Girders/Under Floor
Shear Wall/Hold Downs
Walls/Roof/Ceiling
Drywall Interior Braced Panel Only)
T-Bar
INSULATION:
Slab
Wall/Floor/Ceiling
MECHANICAL:
Heat Pump/Furnace/FAU/Ducts
Rough-In
Gas Line
Wood Stove/Pellet/Chimney
Commercial Hood/Ducts
MANUFACTURED HOMES:
Footing/Slab
Blocking&Hold Downs
Skirting
PLANNING DEPT. Separate Permit#s SEPA:
Parkin /Lighting ESA:
Landscaping SHORELINE:
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCY/USE
Inspection Type _ Date Accepted By
Electrical 417-4735
Construction -R.W. PW I Engineering 417-4831
Fire 417-4653
Planning 417-4750
Building 417-4815
THE
CITY � 0� �€ l� N �';� S For City Use
Y OF
Permit#
W( A S H l N G T o N , U . S. Date Received: L( b
321 E Slh Street Date Approved
Port Angeles,WA 9836
P:360-417-4817 F:360-417-4711
Email:germits@cityofpa.us 4
BUILDING PERMIT APPLICATION
Project Address: gidAT \1 - �a)z�-- A/✓ S
/j ,,65 5m1V74, ij17&,ZT Phone:
Primary Contact: (-I 5n17P an Email: a dSAr-C • c.a wt
Name G IJ�G 1Z }_. A 1 Phone-2 4-01 -
6(455
Property Mailing Address
�®. N /1�A5T�e7 V-D Email �Y
Owner
City FbP,_ �( „CjOL� State w Zip y
Name 'AAV MOW�i1 Phone
V,�`IY
Contractor Address Email
Information City State Zip
Contractor License# Exp.Date:
_Legal Description: Zoning: Tax Parcel# Pro)qct Value- (m terials and labor)
�— $
Residential ❑ Commercial Er Industrial ❑ Public ❑
Permit Demolition ❑ Fire ❑ Repair ❑ Reroof(tear off/lay over) ❑
Classification For the following. fill out both pages of permit application:
(check New Construction ❑ Exterior Remodel ❑ Addition ❑ Tenant Improvement
appropriate) Mechanical ❑ Plumbing ❑ Other ❑
Fire Sprinkler System Proposed Irrigation System Proposed or Proposed Bathrooms Prosed Bedrooms
or Existing? Yes ❑ No Existing? Yes ❑ No
In addition to standard hard copy submittals please send a PDF copy of all Stormwater plans and Engineering to
storm wt cit o s
Project Description Pehdy�IL 4W/1511A/61 SHQF
�615 , N / pus i V-P)1,L VJ4LLs 47-
N (faAIIV6,ea, V-7-J tM
t9!;?[V1 r)W- Now s1 NJL
Is project in a Flood Zone: Yes ❑ No❑ Flood Zone Type:
If in a Flood Zone, what is the value of the structure before proposed improvement? $ -
I have read and completed the application and know it to be true and correct. I am authorized to apply for
this permit and understand that it is my responsibility to determine what permits are required and to
obtain permits prior to work. I understand that plan review fees are not refundable after review has
occurred. I understand that I will forfeit review fees if I withdraw the application before the permit is
issued. I understand that if the permit is not picked up/issued within 18o days of submittal,the application
will be considered abandoned and the fees will be forfeited.
A 1A1\V I.l sur. , 42 pia_
Date Print Name Si nature
Residential Structures
Existing Proposed Construction For Office Use
Area Descriptions (SQ FT) Floor area Floor area $Value new area
Basement
First Floor
Second Floor
Covered Deck/Porch/Entry
Deck(over 30"or i" floor)
Garage
Carport
Other(describe)
Area Totals
Commercial Structures
Area Descriptions (SQ FT) Existing Proposed Construction For Office Use
Floor area Floor area $Value new area
Existing Structure(s)
Proposed Addition
.Tenant Improvement?
Other work(describe)
Site Area Totals
Lot/Site Coverage Calculations
Lot Size (sq ft) Lot Coverage(sq ft)foot print of %Lot Coverage(Total lot cov_lot size) Max Bldg Height
all structures sq ft
Site Coverage (Sq Ft of all impervious) %of Site Coverage (total site cov_lot size)
Mechanical Fixtures
Indicate how many of each type of fixture to be installed or relocated as part of this project.
Air Handler Size: # Haz/Non-Haz Piping Outlets:
Appliance Exhaust Fan # Heater(Suspended,Floor, Recessed wall) #
Boiler/Compressor Size: # Heating/Cooling appliance #
re air/alteration
Evaporative Cooler(attached,not # Pellet Stove/Wood-burning/Gas #
portable) Fireplace/Gas Stove/Gas Cook Stove/Misc.
Fuel Gas Piping #of Outlets: Ventilation Fan,single duct #
Furnace/Heat Pump/ Size: # Ventilation System #
Forced Air Unit
Plumbing Fixtures
Indicate how many of each type of fixture to be installed or relocated
Plumbing Traps # Water Heater #
Plumbing Vent piping # Medical gas piping #of Outlets:
Water Line # Fuel gas piping #of Outlets:
Sewer Line # Industrial waste pretreatment
interceptor Grease Trap) Size
Other(describe):
T:\BUILDING\APPLICATION FORMS\Current BP Application\Building Permit 4-17-13.docx
t
.4•• ,�4
J )
O
':k W
Y
. Y
00
CD
IX
6
00
OD
N f
rn
Porf Angeles Marine.. Inc.
832 Boat Haven Drive Port Angeles, WA 98363 (360) 457-4505 Fax (360) 457-4921
<:� -jk
*T lk7tk4
Gam-
.
APR`
05 2016
CI OF P , T�6"N LES ;
COMMUNITY&ECONOl Ilc DEVELOPMENT
1J BER.A,
C H T
A R
319 s.peabody,suite b;port angeles,wa 98362
360.452.6116/fax 360.452.7064
Project: 930 tC9S lAAVVV Project No.
Subject'-jml }"OIZ y1' CM. By: c77
Date: IMiN �J,ljj]� Sheet . / of
lik p
7Sm�L D 2
i
I
i
\
I
I
I
I I
I
Project: page
Charles D Smith
Location: Uniformly Loaded Floor Beam 1
Uniformly Loaded,Floor Beam of
[2012 International Building Code(2012 NDS)]
1.5 IN x 5.5 IN x 3.5 FT
#2-Douglas-Fir-Larch(North)-Dry Use StruCalc Version 9.0.1.4 3/28/2016 12:22:41 PM
Section Adequate By:7.1%
Controlling Factor: Moment
DEFLECTIONS Center LOADING DIAGRAM
Live Load 0.04 IN U1104
Dead Load 0.00 in
Total Load 0.04 IN U982
Live Load Deflection Criteria: L/360 Total Load Deflection Criteria: L/240
REACTIONS A_ B
Live Load 656 Ib 656 Ib
Dead Load 82 Ib 82 Ib
Total Load 738 Ib 738 Ib
Bearing Length 0.79 in 0.79 in
BEAM DATA Center
Span Length 3.5 ft
Unbraced Length-Top 1.33 ftA- 3.5ft B
Floor Duration Factor 1.00
Notch Depth 0.00
MATERIAL PROPERTIES
#2-Douglas-Fir-Larch(North) FLOOR LOADING
Base Values Adjusted Side 1 Side 2
Bending Stress: Fb= 850 psi F. Floor Live Load FLL= 125 psf 40 psf
= 1097 psi Floor Dead Load FDL= 15 psf 15 psf
Shear Stress: Fv= 180 psi Fv' 180 psi
Cd=1.00 C1=0.99 CF= Floor Tributary Width FTW= 3 ft 0 ft
=
Cd=1.00 Wall Load WALL= 0 plf
Modulus of Elasticity: E= 1600 ksi E'= 1600 ksi
Comp.-L to Grain: Fc-1= 625 psi Fc- t'= 625 psi BEAM LOADING
Beam Total Live Load: wL= 375 plf
Controlling Moment: 646 ft-Ib Beam Total Dead Load: wD= 45 plf
`1.75 ft from left support Beam Self Weight: BSW= 2 plf
Created by combining all dead and live loads. Total Maximum Load: wT= 422 plf
Controlling Shear: -738 Ib
At support.
Created by combining all dead and live loads.
Comparisons with required sections: Reo'd Provided
Section Modulus: 7.06 in3 7.56 in3
Area(Shear): 6.15 in2 8.25 in2
Moment of Inertia(deflection): 6.78 in4 20.8 in4
Moment: 646 ft-Ib 691 ft-Ib
Shear: -738 lb 990 lb
I�
Project:
page
,. Charles D Smith
Location: Uniformly Loaded Floor Beam 1 /
Ur4ormly Loaded Floor Beamx
of
[2012 International Building Code(2012 NDS)] „V
1.5 INx5.5INx3.OFT
#2-Douglas-Fir-Larch(North)-Dry Use StruCalc Version 9.0.1.4 3/28/2016 12:23:23 PM
Section Adequate By:45.7%
Controlling Factor:Moment
DEFLECTIONS Center LOADING DIAGRAM
Live Load 0.02 IN U1753
Dead Load 0.00 in
Total Load 0.02 IN U1559
Live Load Deflection Criteria: L/360 Total Load Deflection Criteria: U240
REACTIONS A_ B
Live Load 563 Ib 563 Ib
Dead Load 70 Ib 70 Ib
Total Load 633 Ib 633 Ib
Bearing Length 0.67 in 0.67 in
BEAM DATA Center
Span Length 3 ft
Unbraced Length-Top 1.33 ft -A— --__ 3 n —B
Floor Duration Factor 1.00
Notch Depth 0.00
MATERIAL PROPERTIES FLOOR LOADING
#2-Douglas-Fir-Larch(North)
Base Values Adjusted Side 1 Side 2
Bending Stress: C = 850 psi F. Floor Live Load FILL= 125 psf 40 psf
= 1097 psi Floor Dead Load FDL= 15 psf 15 psf
Shear Stress: Fv= 180 psi Fv' 180 psi W d=1.00 C1=0.99 CF= Floor Tributary Width FT = 3 ft 0 ft
=
Cd=1.00 Wall Load WALL= 0 plf
Modulus of Elasticity: E= 1600 ksi E'= 1600 ksi
Comp.-L to Grain: Fc-1= 625 psi Fc-1'= 625 psi BEAM LOADING
Beam Total Live Load: wL= 375 plf
Controlling Moment: 474 ft-Ib Beam Total Dead Load: wD= 45 plf
'1.5 ft from left support Beam Self Weight: BSW= 2 plf
Created by combining all dead and live loads. Total Maximum Load: wT= 422 plf
Controlling Shear: -633 Ib
At support.
Created by combining all dead and live loads.
Comparisons with required sections: Read Provided
Section Modulus: 5.19 in3 7.56 in3
Area(Shear): 5.27 int 8.25 in2
Moment of Inertia(deflection): 4.27 in4 20.8 in4
Moment: 474 ft-Ib 691 ft-Ib
Shear: -633 lb 990 lb
Project: Page
Charles D Smith
Location: Uniformly Loaded Floor Beam 3
Untormly Loaded Floor Beam M, or
[2012 International Building Code(2012 NDS)]
(2)1.5 INx5.5INx5.OFT
#2-Douglas-Fir-Larch(North)-Dry Use StruCalc Version 9.0.1.4 3/28/2016 12:30:06 PM
Section Adequate By:39.7%
Controlling Factor: Moment
DEFLECTIONS Center LOADING DIAGRAM
Live Load 0.06 IN U1010
Dead Load 0.01 in
Total Load 0.07 IN U892
Live Load Deflection Criteria: U360 Total Load Deflection Criteria: U240
REACTIONS A_ B
Live Load 703 Ib 703 Ib
Dead Load 93 Ib 93 Ib
Total Load 796 Ib 796 Ib
Bearing Length 0.42 in 0.42 in
BEAM DATA Center
Span Length 5 ft47
Unbraced Length-Top 1.33 ft A sn —
Floor Duration Factor 1.00
Notch Depth 0.00
MATERIAL PROPERTIES FLOOR LOADING
#2-Douglas-Fir-Larch(North)
Base Values Adjusted Side 1 Side 2
Bending Stress: Fb= 850 psi Fb'= 1103 psi Floor Live Load FLL= 125 psf 40 psf
Floor Dead Load FDL= 15 psf 15 psf
Cd=1.00 C/=1.00 CF=1.30 Floor Tributary Width FTW= 2.3 ft 0 ft
Shear Stress: Fv= 180 psi Fv'= 180 psi
Cd=1.00 Wall Load WALL= 0 plf
Modulus of Elasticity: E= 1600 ksi E'= 1600 ksi
Comp.1 to Grain: Fc-1= 625 psi Fc-1'= 625 psi BEAM LOADING
Beam Total Live Load: wL 281 plf
Controlling Moment: 995 ft-Ib Beam Total Dead Load: wD 34 plf
2.5 ft from left support Beam Self Weight: BSW= 4 plf
Created by combining all dead and live loads. Total Maximum Load: wT= 319 plf
Controlling Shear: 796 Ib
At support.
Created by combining all dead and live loads.
Comparisons with required sections: Rep'd Provided
Section Modulus: 10.83 in3 15.13 in3
Area(Shear): 6.64 in2 16.5 in2
Moment of Inertia(deflection): 14.83 in4 41.59 in4
Moment: 995 ft-Ib 1390 ft-Ib
Shear: 796 lb 1980 Ib
page
Project: Charles D Smith
Location: Uniformly Loaded Floor Beam 4
Uniformly Loaded Floor Beam
[2012 International Building Code(2012 NDS)] or
3.5 INx5.5INx6.OFT
#2-Douglas-Fir-Larch(North)-Dry Use StruCalc Version 9.0.1.4 3/28/2016 12:30:50 PM
Section Adequate By: 13.0%
Controlling Factor: Moment
DEFLECTIONS Center LOADING DIAGRAM
Live Load 0.11 IN U682
Dead Load 0.01 in
Total Load 0.12 IN U601
Live Load Deflection Criteria: L/360 Total Load Deflection Criteria: U240
REACTIONS A B
Live Load 844 Ib 844 Ib
Dead Load 114 Ib 114 Ib
Total Load 957 Ib 957 Ib
Bearing Length 0.44 in 0.44 in
BEAM DATA Center
Span Length 6 ft
Unbraced Length-Top 1.33 ft -A sn —
Floor Duration Factor 1.00
Notch Depth 0.00
MATERIAL PROPERTIES FLOOR LOADING
#2-Douglas-Fir-Larch(North) Side 1 Side 2
Base Values Adjusted Floor Live Load FLL= 125 psf 40 psf
Cd=1.00 C1
Bending Stress: = 850 psi F. = 1104 psi Floor Dead Load FDL= 15 psf 15 psf
Shear Stress: Fv= 180 8CF= Floor Tributary Width FTW= 2.3 ft 0 ft
0 psi Fv' 180 psi=
Cd=1.00 Wall Load WALL= 0 plf
Modulus of Elasticity: E= 1600 ksi E'= 1600 ksi
Comp.-L to Grain: Fc- = 625 psi Fc-1'= 625 psi BEAM LOADING
Beam Total Live Load: wL= 281 plf
Controlling Moment: 1436 ft-Ib Beam Total Dead Load: wD= 34 plf
3.0 ft from left support Beam Self Weight: BSW= 4 plf
Created by combining all dead and live loads. Total Maximum Load: wT= 319 plf
Controlling Shear: -957 Ib
At support.
Created by combining all dead and live loads.
Comparisons with required sections: Recd Provided
Section Modulus: 15.61 in3 17.65 in3
Area(Shear): 7.98 int 19.25 int
Moment of Inertia(deflection): 25.62 in4 48.53 in4
Moment: 1436 ft-Ib 1623 ft-Ib
Shear: -957 lb 2310 lb