HomeMy WebLinkAbout1515 W 10th St - Engineering
'~ORr A..v.
~~
~.
"it ~
~ --
'tiii~""
CITY OF PORT ANGELES
PUBLIC WORKS - UTILITIES DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Appl~cation Number
Application pin number
Property Address
ASSESSOR PARCEL NUMBER:
Application type description
Subdivision Name
Property Use
Property Zoning . . .
Application valuation
Owner
NORTH PENINSULA BUILDERS
P. O. BOX 748
PORT ANGELES
(360) 452-8160
Other struct info
Permit . . . . .
Additional desc .
Permit pin number
Permit Fee
Issue Date
Expiration Date
8/30/05
05-00000702 Date
710016
1515 W 10TH ST
06-30-00-0-3-0676-0000-
RES NEW SFR
RS7 RESDNTL SINGLE FAMILY
127730
Contractor
ASSOC
OWNER
WA 98362
TOTAL % LOT COVERAGE
NUMBER OF STORIES
LOT SIZE
TOTAL LOT COVERAGE
NUMBER OF UNITS
29.67
1.00
7000.00
2077.00
1.00
PUBLIC WORKS RES WATER SERV
57091
715.00
8/30/05
2/26/06
Plan Check Fee
Valuation
.00
127730
Qty Un~t Charge Per
1. 00 715.0000 EA PW W/M 1" SERV 5/8" METER
Permit . . . . .
Additional desc .
Permit pin number
permi t Fee
Issue Date
Expiration Date
Extension
715.00
RIGHT OF WAY
57083
50.00
8/30/05
2/26/06
Plan Check Fee
Valuation
.00
127730
Qty Unit Charge Per
1.00 50.0000 ECH RIGHT OF WAY PERMIT
Permit . . . . .
Additional desc .
Permit pin number
permi t Fee
Issue Date
Expiration Date
Extension
50.00
SANITARY SEWER HOOK UP
57075
110.00
8/30/05
2/26/06
plan Check Fee
Valuation
.00
127730
Qty Un~t Charge Per
1.00 110.0000 EA SAN SEWER HOOKUP
Extension
110.00
Special Notes and Comments
Bu~lding address sign shall not be less than 6" & not more
than 12" in height. Numbers colors must contrast with wall
color they are mounted on. (Ord. 14.36.050-E)
When roof gutters are installed, drains will located in dry
wells or piped to approved storm drain location. No
pressurized or pumping to curbs are allowed. An inspection
Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, pnvate and public improvements. ThiS permit becomes
null and void If work or construction authOrized IS not commenced Within 180 days, If construction or work is suspended or abandoned
for a period of 180 days after the work as commenced, or If required inspections have not been requested within 180 days from the last
inspection. I hereby certify that I have read and examined thiS application and know the same to be true and correct. All proVIsions of
laws and ordinances governing this type of work will be complied With whether specified herein or not The granting of a permit does not
presume to give authonty to Violate or cancel the provIsions of any state or local law regulating construction or the performance of
construction.
Signature of Contractor or AuthOrized Agent
Date
Signature of Owner (If owner IS builder)
Date
T \PohcJes\1102 15R [1/05J
CITY OF PORT ANGELES
PUBLIC WORKS - UTILITIES DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Application Number . . . . . 05-00000702
Application pin number 710016
Page
Date
2
8/30/05
Special Notes and Comments
by Building Department is required prior to backfill.
Address numbers shall be plainly visible from the street.
Address numbers shall be a minimum of six inches high and be
of contrasting color from the background.
08/11/2005 05:22 PM SROBERDS --- The proposal will
result ,in a s.f. res w/attached garage in the RS-7 zone for
total lot coverage of 30%. No land use issues are noted.
Electrical load calculations and elctrical permits are
required.
Connection fee $222.00
08/03/2005 08:50 AM GMCLAIN ----------------------------
Sidewalk to City standards required for school walking
route.
Sanitary sewer connection inspection is required by
Public Works pr10r to back fill of ditch.
Other Fees
SEWER SYSTEM DELV CHARGE
STATE SURCHARGE
PW WATER SYSTEM USE FEE
745.00
4.50
1025.00
Fee summary Charged Paid Credited Due
----------------- ---------- ---------- ---------- ----------
Permit Fee Total 875.00 875.00 .00 .00
Plan Check Total .00 .00 .00 .00
Other Fee Total 1774.50 1774.50 .00 .00
Grand Total 2649.50 2649.50 .00 .00
Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, pnvate and public Improvements This permit becomes
null and void If work or construction authonzed IS not commenced within 180 days, If construction or work is suspended or abandoned
for a penod of 180 days after the work as commenced, or If required inspections have not been requested within 180 days from the last
inspection I hereby certify that I have read and examined this application and know the same to be true and correct All provIsions of
laws and ordinances governing this type of work will be complied with whether specified herein or not The granting of a permit does not
presume to give authonty to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Signature of Contractor or Authonzed Agent
Date
Signature of Owner (If owner IS builder)
Date
T \Pol1cles\1102 15R [1/05J