Loading...
HomeMy WebLinkAboutAgenda 05/09/2019PORT ANGELES FORWARD COMMITTEE MEETING NOTICE May 9, 2019, 7:3 Oam City Hall Chambers Port Angeles, Washington AGENDA 1. Call to Order 2. Roll Call 3. Minutes -Review and approve minutes from December 6, 2018 4. Late Items 5. New Business a. Race Street Presentation/Ben Braudrick b. Appointment to Lodging Tax Advisory Committee c. William Shore Memorial Pool -PA Forward Support 6. Ongoing Business 7. Public Comment 8. Adjournment PA FORWARD—COMMITTEE MEMBERS PORT ANGELES CITY COUNCIL Cherie Kidd, Chair / Mike French, Vice Chair / Jim Moran, Alternate Clallam County Lower Elwha Klallam Tribe Port of Port Angeles Clallam County PUD Randy Johnson Linty Hopie Steve Burke Sean Worthington Clallam Transit Economic Dev. Corporation Chamber of Commerce PA Business Association Kevin Gallacci Julie Knott Marc Abshire Kaj Ahlburg Alt. Mike Oliver PA Downtown Association North Olympic History Center North Olympic Library System Beth Witters Kathy Estes Noah Glaude Citizen -At -Large Citizen -At -Large Citizen -At -Large Steve Bearman Judith Morris Peter Stolinsky Staff. Nathan West, City Manager / Allyson Brekke, CED Director / Ben Braudrick, Assistant Planner / Sherry Curran, Administrative Assistant Race Street Multimodal Complete Street Update PA Forward May 9, 2019 Presented by Benjamin G Braudrick, AICP -q� City of Port Angeles I Department of Community & Economic Development 4P -Oqp%ll or law Iqlmw Departrnerit of Corn rnu n ity & Lcofiovnic Development Thursday.. May 09, 2019 1 Slide 2 • WTIP — Initial Conceptual Design • Federal Lands Access Program Acceptance — Design • ALTA Planning + Design Consultant Selection • Concept Selection • 30% Design • Federal Lands Access Program Grant Acceptance — Construction • Federal Highway Improvement Program Acceptance — Design r • Federal Surface Transportation — Design and Construction L r: Department of Community & Economic Development Thursday, May 09, 2019 1 Slide 3 Existing Section (source. Cityprovided GIS and Google Streetwew) Location Diagram: M—) atE4M St ,.tsftq &II - -,)." t—qm (b,go— sou th of loft 1 7, 5. 1 15' 15' 1 20' 1 6' retaining sidewalk travel lane turnlane travel lane sidewalk wall & buffer F*k (varies) Aw 12'(varies) SO'curb-to-curb I 6' 1 "Aw CNOW 68'fight-of-way (varies) 1 I dr Iwo U - NOW Department of Comi-ni-inity & Economic Development ftwrsday, May 09, 2019 1 Slide 4 Concept 2: Shared Use Trail future Fie lo-:ebxi TBD reteu rry .. el-.nrpriy her<jit i nc. wall ::�uth of Bn'uxr A.� i nevergtar(k*d 6' 20' curb to paving edge 34' 60' right-of-way (varies) or law Llqqlw Department of Community & Economic Development Thursday, May 09, 2019 1 Slide 5 6' 10' 10' 1 9' I 12' 13' side shared travel lane planted directional ravine walk travel buffer/ shared use I l lane (conveyance trail 6' 20' curb to paving edge 34' 60' right-of-way (varies) or law Llqqlw Department of Community & Economic Development Thursday, May 09, 2019 1 Slide 5 I ONE Department of Community & Economic Development Thursday, May 09, 2019 Slide 6 EAST R/W WEST 80' EX. ROAD CENTERLINE 2' SHOULDER 2' SHOULDER E (3' MIN) VARIES 12' I E -u TRAVEL LANE TRAVEL LANE LANTIN SHARED USE PATH EX. GUARDRAIL WITH NEW PEDESTRIAN GUARDRAIL BEHIND 3- /�Q1 EX. CURB. 8 -- / LOCATION VARIES EX // EX SLOPE \- SEF DESIGN TO CREEK NOTE 2 WS Lanes at Ex. Guardrail (Park Ave to Lauridsen Blvd) 3 or 1► __ _ _� i t� ■Ir = Department of Community & Economic Development Thursday, May 09, 2019 1 Slide 7 EAST R/W I I E I E -D - IE EX. ROAD CENTERLINE 10' 10' 10' TRAVEL LANE TURN LANE TRAVEL LANE SEX 2 6 V2' DUSTING CURB AND GUTTER TO REMAIN _ W. 2', SEE DESIGN NOTE 3 2' SHOILAM 10' f RED USE PATH I if GUARDRAIL CGLUI*AARDRPEDESTRIANIL GUARDRAIL WITH BEMD 3 12x EX. CURB, LOCATION VARIES EX. SLOPE TO CRTEEk SEE DESIGN N01[ 3 v4sr R/W Channelized Section at South Leg of Lauridsen Blvd Intersecti n 1 = Department of Community & Economic Development Thursday, May 09, 201.9 1 Slide. 8 100h Save tree �5 _ �r KEY 4 I n� as y vlam Department of Community & Economic Development Thursday, May 09, 2019 1 Slide 9 Curb, gutter, planting U iw 2 - 12' lanes w w iN z U f � I �5 _ �r KEY 4 I n� as y vlam Department of Community & Economic Development Thursday, May 09, 2019 1 Slide 9 Current Budget Amount Required Match FLAP (PE) 2016 $ 472,300 $ 631761 Future Funding Amount Required Match HIP (PE) 2019 $ 1137348 $ 157301 STP (PE) 2019 $ 687000 $ 9,180 STP (CN) 2020 $ 5007000 $ 677500 FLAP (CN) 2020 $2,000,000 $270.000 Total $37153,648 $425,742 Department of Community & Economic Development Thursday May 09, 2019 1 Mice 10