HomeMy WebLinkAboutAgenda Packet 06/18/2019�a
JUNE 189 2019
City of Port Angeles Council Meeting Agenda
City Council Chambers, 321 East 5th Street
The Mayor may determine the order of business for a particular City Council meeting. The agenda should be arranged to best serve
the needs and/or convenience of the Council and the public. The Mayor will determine time of break. Hearing devices are available
for those needing assistance. The items of business for regular Council meetings may include the following:
A. Call to Order — Special Meeting
4:30-5:00 — Closed Session to be held under authority of RCW 42.30.140(4) (b), to adopt or plan the strategy or position to
be taken by the City during the course of any collective bargaining, professional negotiations, or reviewing the proposals
made in the negotiations.
5:00 p.m. — Budget Goals Work Session 5-6: 00 p. m. — Open to the public
Call to Order — Regular Meeting at 6:00 p.m.
B. Roll Call, Pledge of Allegiance
Ceremonial Matters, Proclamations & Employee Recognitions
C. Public Comment
The City Council desires to allow the opportunity for Public Comment. However, the business of the City must proceed in an
orderly, timely manner. At its most restrictive, Public Comment shall be limited to a total of 15 minutes for the first Public
Comment period and shall be concluded not later than 9:45 p.m. for the second Public Comment period. Individuals may speak
for three minutes or less, depending on the number of people wishing to speak. If more than 20 people are signed up to speak,
each speaker may be allocated two minutes (Council Rules of Procedure Section 12).
D. Late Items
To be placed on this or future agendas, including any executive session needed during or at the end of the meeting.
E. Consent Agenda I Approve
1. City Council Minutes of June 4, 2019 /Approve Agenda............................................................................................... E-1
2. Expenditure Report: From May 25, 2019 through June 7, 2019 in the amount of $808,626.95 /Approve Report......... E-5
F. Public Hearings 16:30 p.m. or Soon Thereafter
1. 2020-2025 Capital Facilities Plan and Transportation Improvement Plan/ Conduct Second Reading /Pass Resolution
......................................................................................................................................................................................... F-1
2. 2019 Amendment to the Comprehensive Plan/ Conduct Second Reading /Adopt Ordinance ....................................... F-8
G. Ordinances Not Requiring Council Public Hearings
1. Amendments to the Electric Utility Port Angeles Municipal Code (changes do not affect rates) / Conduct First Reading of
Ordinance / Continue to July 2 Meeting.......................................................................................................................... G-1
2. Amendments to the Wastewater Utility Port Angeles Municipal Code (changes do not affect rates) / Conduct First Reading of
Ordinance / Continue to July 2 Meeting.......................................................................................................................... G-12
June 18, 2019 Port Angeles City Council Meeting Page 1
H. Resolutions Not Requiring Council Public Hearings.......................................................................................None
L Other Considerations
1. Think Tank
a. Compassion Charter Ideas
b. Advisory Board Discussion
c. Think Tank Agenda Items for Future Meetings
J. Contracts & Purchasing...............................................................................................................................................None
K Council Reports
L. Information
City Manager Reports:
1. Bi -Monthly Construction Status Report ..........................................................................................................................L-1
2. Bi -Monthly Grants and Loans Status Report ...................................................................................................................L-2
3. Drought Condition — Voluntary Water Curtailment / Information Only......................................................................... L-5
4. Parks, Recreation & Beautification Commission Minutes.............................................................................................. L-6
5. Surplus 2009 Tar Heater Trailer, Equipment #940.......................................................................................................... L-8
6. 2019 January -May Building Report ................................................................................................................................ L-9
M. Second Public Comment
The City Council desires to allow the opportunity for Public Comment. However, the business of the City must proceed in an
orderly, timely manner. At its most restrictive, Public Comment shall be limited to a total of 15 minutes for the first Public
Comment period and shall be concluded not later than 9:45 p.m. for the second Public Comment period. Individuals may speak
for three minutes or less, depending on the number of people wishing to speak. If more than 20 people are signed up to speak,
each speaker may be allocated two minutes (Council Rules of Procedure Section 12).
Adjournment
PUBLIC HEARINGS
Public hearings are set by the City Council in order to meet legal requirements. City Council may set a public hearing in order to
receive public input prior to making decisions which impact citizens. Certain matters may be controversial and City Council may
choose to seek public opinion through the public hearing process.
June 18, 2019 Port Angeles City Council Meeting Page 2
THE ,,, I
BUDGET OVERVIEW - REVENUES
im
F:1iropeirty rax Sales rax utility"'razes relephone rax Building
(including F:lerrn itsflF:11 an
Criminal Check F::ees
Q
ON
Co
Ln
00A
wl
M",/,/,/,Ell,
64
Lodging rax
IFF "'r i & REE
r riminspoirtation
11
Benefit District
rax
justice)
�2W 7 Kim 20 1I 8 20 1I 9 Y FllChange firoirn 201I8
8.V/o
. . . . . . . . . . . . . . . . ..
. . . . . . . . . . .
. . . . .. . . . . ..
15.0%
ff MIN 6"w �Mmw
35.0% ........... ... .....
.. . . . . . .............................
BUDGET OVERVIEW — EXPENDITURES
' 4
i�� Year-to-clate all expenditures Citywide are on track. ",qlq U
tip
Expenditures have consistently gone down over the
last 3 years in all areas except salaries and wages.
Additional $787,000 placed into reserves in 2018.
11111111111 Staffing vacancies
BUDGET OVERVIEW
m
DEBT
,' q.M W Ir. 00 (n 0 .1 eq M q.M W lr%. 00 X34 0 r q eq M q.M W lr%. 00 (n 0 .1 eq M ko lr%.
BUDGET OVERVIEW - RESERVES
7,000,000
6,000,000
5,000,000
4,000,000
3,000,000
2,000,000
IFuind/Casllh I13allaince irequired % of 20 9 Expenditures — — Fund I13allaince I arget
L
W
BUDGET OVERVIEW — RESERVES
Hold $157,000 in reserves for anticipated revenues
from McKinley mill startup
Estimated additional $350,000 needed for the $1.0
million balloon payment for the Niichel property.
Capital projects.
7
11
7
FINANCIAL POLICIES
Council to consider the communities "ability to pay"
prior to any tax, utility rate or fee increases. (Section
2.2)
(Section 2.3.1)
TAX & REET funding sources should not be used to
pay debt or long-term commitments. (Section 2.9.1)
recurring expenses. (Section 2.12.1)
FINANCIAL POLICIES
i�� A conservative revenue approach will be taken when
developing the budget. 1-
LL
i�� Additional operating expenditures will only be proposed U
if there are on-going supported revenues. (Section 3.3.1) C
Qi
i�� The General Fund will maintain a 25% fund balance. i,
io
UPCOMING ITEMS
JUNE City Council Budget Goals Worksession
18
JUNE - Departmental Budget Entry
JULY
AUG - City Manager meetings with Departments
SEPT Budget Balancing
OCT 2020 Preliminary Budget Document
distributed AA
12
C
U
ru
W�m �96*4���� C�7
City Council Meeting
PUBLIC COMMENT SIGN-UP SHEET
June 18, 2019
Print Name Clearly
Are you a City of
Port Angeles
.
.resident or business owner?
Yes or No
•
TO1C
or No
Yes or No
Yes or No
Yes or No
Yes or No
Yes or No
Yes or No
Yes or No
Yes or No
Page 1
CITY COUNCIL MEETING
Port Angeles, Washington
June 4, 2019
CALL TO ORDER -REGULAR MEETING
Mayor Bruch called the regular meeting of the Port Angeles City Council to order at 6:00 p.m.
ROLL CALL
Members Present: Mayor Bruch; Deputy Mayor Dexter; Councilmembers French, Kidd, Merideth, Moran, and
Schromen-Wawrin.
Members Absent: None
Staff Present: City Manager West, Attorney Bloor, Clerk Martinez -Bailey, C. Delikat, K. Dubuc, B. Smith,
D. Wechner, S. Carrizosa, S. Shere, and B. Braudrick.
PLEDGE OF ALLEGIANCE:
Mayor Bruch led the Pledge of Allegiance to the Flag.
CEREMONIAL MATTERS, PROCLAMATIONS & EMPLOYEE RECOGNITIONS
1. Maritime Festival Proclamation
Mayor Bruch presented Port Angeles Regional Chamber of Commerce Executive Director Mark Abshire with a
proclamation celebrating the Port Angeles Maritime Festival, organized by the Port of Port Angeles, Port Angeles
Yacht Club, Chamber of Commerce, the North Olympic History Center, as well as numerous businesses, and local
individuals.
2. "Pink Up" Port Angeles Proclamation
Mayor Bruch presented Councilmember Kidd and several members of the Soroptimist International of Port Angeles
Noon Club with the "Pink Up Port Angeles" Proclamation, inviting the entire community to join together and dedicate
the week of June 15-22, 2019, to fighting cancer.
3. Recognition of Port Angeles High School Emmy Award Nominees
Port Angeles High School Communication Technology Instructor Patric McInnis, spoke about the significance of the
student Emmy nominations through the National Academy of Arts and Sciences. Mayor Bruch presented Ethan
Musalek (not present), Malleck Braun, Carter Holm, Nathaniel Perry, and Colby Backman with certificates
recognizing their achievements.
PUBLIC COMMENT
Marolee Smith, city resident, spoke about the need for sidewalks near her home in the Mount Angeles area.
Jeff Bohman, city resident, spoke about the student nominees that were recognized and provided background on the
significance of the nomination.
LATE ITEMS TO BE PLACED ON THIS OR FUTURE AGENDAS as determined by City Manager
or Councilmember —
Acting Attorney Bloor brought the late item - Consideration of the Use of the City Logo by the League of Women
Voters. Bloor reminded Council they would need to have consensus in order to add the item to the agenda.
By a motion from Councilmember French with no second, by consensus of the Council, the late item was added to
the agenda.
June 18, 2019 E-1
PORT ANGELES CITY COUNCIL MEETING — June 4, 2019
CONSENT AGENDA
It was moved by Dexter and seconded by French to approve the Consent Agenda to include:
1. City Council Minutes of May 21, 2019 /Approve Minutes
2. Expenditure Report: From May 11, 2019 to May 24, 2019 in the amount of $2,389,665.97 /Approve
Expenditure Report
3. Replacement of Light Operations Vehicle #6902 / Approve and authorize the City Manager to sign a
contract for the purchase and outfitting of a new Light Operations pick-up truck in an amount not to exceed
$36,400, 2. Approve and authorize the City Manager to make minor modifications to the contract if
necessary, 3. Approve and authorize the City Manager to surplus vehicle #6902, when the new vehicle is
placed into service.
4. Replacement of Parks Department Vehicle #4400 /Approve and authorize the City Manager to sign a
contract for the purchase and outfitting of a new Parks Department van in an amount not to exceed
$41,600. 2. Approve and authorize the City Manager to make minor modifications to the contract if
necessary. 3. Approve and authorize the City Manager to surplus vehicle #4400, once the new vehicle is
placed into service.
5. Lodging Tax Appointments / Confirm the recommendations of the ad hoc committee and appoint Jane
Vanderhoof to a citizen -at -large position, and to appoint Peter Stolinsky to represent the Port Angeles
Forward Committee on the LTAC.
6. David Wechner Professional Services Agreement /Approve Professional Services Agreement with David
Wechner and authorize the City Manager to sign the agreement.
Motion carried 7-0.
OTHER CONSIDERATIONS
2. Consideration of Use of the City Log by the League of Women Voters
Council discussion followed.
It was moved by French and seconded by Dexter to:
Agree to the request by the League of Women Voters of Clallam County for the City's partnership on the Sequim-
Dungeness-area water education project in 2019 and 2020, for support in the areas of venues, making contacts, and
promotion.
Motion carried 7-0.
PUBLIC HEARINGS
1. 2020-2025 Capital Facilities Plan and Transportation Improvement Plan
Acting Manager Bloor introduced the agenda item and said questions asked during the Council meeting would be
noted and answered at the next Council meeting. Finance Director Sarina Carrizosa introduced the proposed Capital
Facilities Plan.
The Mayor opened the public hearing at 6:38 p.m.
The Mayor conducted the first reading of the resolution, titled, entitled,
RESOLUTION NO.
A RESOLUTION of the City Council of the City of Port Angeles, Washington, adopting the City's Capital Facilities
Plan for 2020 — 2025, which includes the City's Transportation Improvement Program for the years 2020 -2025.
Joseph Nevis, city resident, spoke about land use and eminent domain, including White Creek.
Jim Haguewood, president of Chamber of Commerce, shared a history of the Chamber and their goals to make the
community better.
Christopher Thompson, Vice President of the Chamber of Commerce, spoke about the Chamber's work and provided
their recommendations to designate Phase III Water Front Redevelopment as active, designate Railroad Avenue as an
arterial road, and explore partnerships for City Pier maintenance and management.
Page 2 of 4
June 18, 2019 E - 2
PORT ANGELES CITY COUNCIL MEETING — June 4, 2019
Mace Gratz, city resident, discussed the need for sidewalks along Mount Angeles, in particular, at the intersections of
Craig, Olympus and Grant Avenues.
Marolee Smith, city resident, spoke about commercial internet.
Beth Whitters, Vice -President of the Downtown Association, said the Association would like to be involved in the
scope of the projects that take place in regards to a redevelopment.
Council discussion followed.
Schromen-Wawrin and French seconded to:
Request staff to share a presentation at the next City Council meeting, a detailed presentation, specifically covering
the Waterfront Redevelopment Project (TRO 113), the Railroad Avenue Arterial (TR0818), Downtown Improvement
Plan (GG0219) and any City Pier projects deemed relevant, to provide the Council and the public a better
understanding of these projects and their interactions.
Motion carried 7-0.
The Mayor continued the public hearing to June 18.
2. 2019 Amendment to the Comprehensive Plan
Interim Community and Economic Development Director Dave Wechner, introduced Associate Planner Ben
Braudrick who shared background on the amendment process and provided a PowerPoint slide that listed the motions
Council made on September 18, 2019, related to the amendment process. He noted the Planning Commission decided
on February, 22"d, 2019 to have additional public comment in order to add a land use map. Planner Braudrick
recommended Council open the public hearing and continue it to the June 18 meeting.
Mayor Bruch opened the public hearing at 7:26 p.m.
Mayor Bruch read the proposed ordinance titled, and entitled,
ORDINANCE NO.
AN ORDINANCE of the City of Port Angeles, Washington adopting a new Amended Comprehensive Plan
Marolee Smith, city resident, spoke about the airport.
Council discussion followed.
The Mayor continued the public hearing to June 18.
CONTINUED OTHER CONSIDERATIONS
1. Consideration of the Schedule of Future Think Tanks
Mayor Bruch opened the discussion and said she and the City Manager will determine when the Think Tanks will be
scheduled, adding the meetings will be scheduled once a month, as the agenda allows. She also noted that she and the
City Manager will determine agenda items for Think Tank meetings.
CONTRACTS & PURCHASING
1. Complete Streets Grant Acceptance Francis Street ADA Ramp Project
Shailesh Shere introduced the agenda item and provided background on the project. Council discussion followed.
It was moved by Kidd and seconded by French to:
Accept the Washington State Transportation Improvement Board Complete Streets grant in the amount of $300,000
and authorize the City Manager to execute an agreement for the grant.
Motion carried 7-0.
Page 3 of 4
June 18, 2019 E - 3
PORT ANGELES CITY COUNCIL MEETING — June 4, 2019
CITY COUNCIL REPORTS
Councilmember Moran spoke about Council reports and suggested the Council have a discussion on Council reports
to determine whether they are necessary or not.
Councilmember French shared he attended meetings for the Homelessness Task Force, Downtown Association, and
VIMO Board. He spoke about the Rediscovery Program and discussed future funding. He shared he attended the
Boy's and Girl's Club ground breaking ceremony.
Councilmember Schromen-Wawrin shared his experience at the Port of Port Angeles master plan meeting he attended
along with Councilmember Moran and Parks and Recreation Director Delikat. He spoke about his attendance at the
Association of Washington Cities event.
Deputy Mayor Dexter shared her experience at the Mayor's and Entrepreneurial conference, said it was paid for 100%
by the Kaufman Foundation. She invited the Council to join her on the 5-2-1-0 Challenge. She also spoke about an
event at Feiro Marine Life Center.
Councilmember Merideth spoke about his attendance at the William Shore Memorial Pool District Board meeting.
Councilmember Kidd shared her interest in a discussion on guidelines and parameters for council reports.
Mayor Bruch spoke about the recent Lauridsen Trust meeting she attended. She spoke about issues that were brought
up to her by members of the public during her attendance at the Farmer's Market. She spoke about the upcoming
Clallam County Lodging Tax Advisory Committee meeting and shared there were new tables and chairs are at the
transit station downtown.
No other reports were given.
INFORMATION
Acting Manager and City Attorney Bloor spoke regarding the reports included in the packet for their review and
reminded Council about the upcoming Budget Goals Work Session at the June 18 meeting.
SECOND PUBLIC COMMENT
Marolee Smith, city resident, shared she enjoyed council reports and added she hoped to see more town hall meetings.
Amy Miller, invited the Council to an upcoming picnic.
Tera Dummitt, city resident, suggested Council keep their reports but limit the time of each reports.
Joseph Nevis, city resident, spoke about the Comprehensive Plan.
Gail Brauner, city resident, spoke about the recent experiences residents have had where they have felt intimidated by
the actions of individuals' downtown.
ADJOURNMENT
Mayor Bruch adjourned the meeting at 8:11 p.m.
Sissi Bruch Mayor
Page 4 of 4
Kari Martinez -Bailey, City Clerk
June 18, 2019 E - 4
Finance
Department
Sarina Carrizosa
Finance Director
Trina McKee
Senior Accountant
MarySue French
Senior Accountant
Linda Kheriaty
Financial Systems Analyst
Melody Schneider
Accountant
Jane Perkins
Payroll Specialist
Julie Powell
Accounting Technician
Jason Jones
Accounting Technician
Nicole Blank
Administrative Analyst
Kathyellen Haney
Customer Services Manager
Tracy Rooks
Utility Billing Specialist
11 P T'', NGELES
A
W A S H I N G T 0 N, U. S. A.
June 18, 2019
We, the undersigned City Officials of the City of Port Angeles, do hereby
certify that the merchandise and/or services herein specified have been
received and that these claims are approved for payment in the amount of
$808,626.95 this 18th day of June, 2019.
T <b
Mayor
City Manager
City of Port Angeles
i City Council Expenditure Report
,C,,,ff, Between May 25, 2019 and Jun 7, 2019
Vendor
A/R MISCELLANEOUS REFUNDS
AIRPRO EQUIPMENT, INC
Description
FEMA 009-55365-00 REFUND
DUPLICATE PMT INV #62838
OVERPMT RECORDS REQ FEES
Personal items -Reimbursed
Personal items -Reimbursed
MISC BUILDING PERMIT REFUNDS
MISC DEPOSIT & PERMIT REFUNDS CAMPFIRE CLUBHOUSE DEPOSI
VERN BURTON DEPOSIT REFUN
VERN BURTON DEPOSIT REFUN
VERN BURTON DEPOSIT REFUN
VERN BURTON DEPOSIT REFUN
VERN BURTON DEPOSIT REFUN
Division Total:
Department Total:
SOUND PUBLISHING INC
City Clerk Division Total:
City Manager Department Total:
PACIFIC OFFICE EQUIPMENT INC
Accounting Division Total:
ELAVON, INC -WIRE
EQUIFAX
FEDERAL EXPRESS CORP
SWAIN'S GENERAL STORE INC
WASHINGTON (DRS), STATE OF
Customer Service Division Total:
PACIFIC OFFICE EQUIPMENT INC
Reprographics Division Total:
Finance Department Total:
BECKWITH, THOMAS E JR
OLYMPIC STATIONERS INC
SOUND PUBLISHING INC
Page 1 of 18
June 18, 2019
COMMUNICATIONS/MEDIA SERV
OFFICE SUPPLIES, GENERAL
3rd Party Cr Card Fees
FINANCIAL SERVICES
COMMUNICATIONS/MEDIA SERV
FIRST AID & SAFETY EQUIP.
FIRST AID & SAFETY EQUIP.
INSURANCE, ALL TYPES
PAPER (OFFICE,PRINT SHOP)
CONSULTING SERVICES
ENVELOPES, PLAIN, PRINTED
PUBLICATION/AUDIOVISUAL
PUBLICATION/AUDIOVISUAL
PUBLICATION/AUDIOVISUAL
PUBLICATION/AUDIOVISUAL
Account Number
Amount
001-0000-213.10-90
39,140.70
001-0000-213.10-90
70.00
001-0000-213.10-90
5.85
001-0000-213.10-00
9.17
001-0000-213.10-00
(9.17)
001-0000-239.20-00
2,832.49
001-0000-239.10-00
50.00
001-0000-239.10-00
50.00
001-0000-239.10-00
200.00
001-0000-239.10-00
200.00
001-0000-239.10-00
250.00
001-0000-239.10-00
250.00
$43,049.04
$43,049.04
001-1230-514.44-10
39.92
$39.92
$39.92
001-2023-514.31-01
431.65
$431.65
001-2025-514.41-50
10,539.62
001-2025-514.41-50
166.68
001-2025-514.41-50
56.66
001-2025-514.31-11
108.42
001-2025-514.31-11
180.16
001-2025-514.20-30
14,531.28
$25,582.82
001-2070-518.31-01
61.08
$61.08
$26,075.55
001-4060-558.41-50
2,600.00
001-4060-558.31-01
36.61
001-4060-558.41-15
93.22
001-4060-558.41-15
56.88
001-4060-558.41-15
56.88
001-4060-558.41-15
45.82
Jun
12, 2019 9:33:10 AM
E-5
City of Port Angeles
City Council Expenditure Report
r, Between May 25, 2019 and Jun 7, 2019
;+IAnk�t
Vendor Description
SOUND PUBLISHING INC PUBLICATION/AUDIOVISUAL
Planning Division Total:
Community Development Department Total:
MISC TRAVEL B SMITH -WA ASSOC OF SHERI
DOMBROWSKI-MTG FOR STONEG
Police Administration Division Total:
MISC TRAVEL
Investigation Division Total:
DROPP-GSK/SHEN PRESENTATI
E SMITH-GSK/SHEN PRESENTA
MARTIN-GSK/SHEN PRESENTAT
PENINGER-WHIA CONF
ARAND-GSK/SHEN PRESENTATI
FREDS AUTO WRECKING,
EXTERNAL LABOR SERVICES
TOWING/REPAIR
(50.00)
HOME DEPOT PRO-SUPPLYWORKS
FIRST AID & SAFETY EQUIP.
INTOXIMETERS INC
POLICE EQUIPMENT & SUPPLY
JIM'S PHARMACY INC
HOSP SURG ACCES & SUNDRIS
LINCOLN STREET STATION
EXTERNAL LABOR
MISC TRAVEL
BALDERSON-DT OC INSTRUCTO
K COOPER -PRE -SUPERVISOR C
PORT ANGELES POLICE
Bridge Toll
DEPARTMENT
SOUND UNIFORM
SOLUTIONS/BRATWEAR
WA STATE CRIMINAL JUSTICE
Patrol Division Total:
CROSS MATCH TECHNOLOGIES
INC
LEIRA
MISC TRAVEL
QUILL CORPORATION
Records Division Total:
Page 2 of 18
June 18, 2019
CLOTHING & APPAREL
CLOTHING & APPAREL
HUMAN SERVICES
HUMAN SERVICES
HUMAN SERVICES
HUMAN SERVICES
DATA PROC SERV &SOFTWARE
HUMAN SERVICES
HUMAN SERVICES
LEMON -PUBLIC RECORDS TRAI
COMPUTERS,DP & WORD PROC
Account Number
001-4060-558.41-15
001-5010-521.43-10
001-5010-521.43-10
001-5021-521.43-10
001-5021-521.43-10
001-5021-521.43-10
001-5021-521.43-10
001-5021-521.43-10
001-5022-521.49-90
001-5022-521.31-01
001-5022-521.35-01
001-5022-521.31-01
001-5022-521.42-10
001-5022-521.43-10
001-5022-521.43-10
001-5022-521.43-10
001-5022-521.31-11
001-5022-521.31-11
001-5022-521.43-10
001-5022-521.43-10
001-5022-521.43-10
001-5022-521.43-10
001-5029-594.64-10
Amount
63.20
$2,952.61
$2,952.61
76.25
27.50
$103.75
288.00
288.00
288.00
82.50
451.29
$1,397.79
488.25
101.48
143.48
39.64
10.94
537.88
1.78
6.00
450.54
456.54
375.00
400.00
150.00
200.00
$3,361.53
3,518.76
001-5029-521.43-10
50.00
001-5029-521.43-10
(50.00)
001-5029-521.43-10
264.31
001-5029-521.31-01
305.22
$4,088.29
Jun 12,
2019 9:33:10 AM
E-6
IZ3
City of Port Angeles
City Council Expenditure Report
Between May 25, 2019 and Jun 7, 2019
Vendor
Description
Account Number
Amount
Police Department Total:
$8,951.36
ACTIVE 911, INC
MEMBERSHIPS
001-6010-522.42-13
762.50
PACIFIC OFFICE EQUIPMENT INC
PAPER (OFFICE,PRINT SHOP)
001-6010-522.31-01
128.92
Fire Administration Division Total:
$891.42
BAXTER AUTO PARTS #15
JANITORIAL SUPPLIES
001-6020-522.31-02
63.30
CURTIS & SONS INC, L N
CLOTHING & APPAREL
001-6020-522.31-11
193.98
PACIFIC OFFICE EQUIPMENT INC
OFFICE SUPPLY, INKS,LEADS
001-6020-522.31-01
125.05
PORT ANGELES POWER
EQUIP MAINT & REPAIR SERV
001-6020-522.31-01
291.81
EQUIPMENT
SEAWESTERN INC
CLOTHING & APPAREL
001-6020-522.31-11
238.32
CLOTHING & APPAREL
001-6020-522.20-80
317.51
SWAIN'S GENERAL STORE INC
ACOUST TILE, INSULAT MAT
001-6020-522.31-02
130.24
WA STATE PATROL
HUMAN SERVICES
001-6020-522.43-10
7,185.60
Fire Suppression Division Total:
$8,545.81
PORT ANGELES FIRE
Support Officer's Lunch
001-6021-522.31-01
76.00
DEPARTMENT
Fire Volunteers Division Total:
$76.00
MISC TRAVEL
INGRAHAM-SUPERIOR TRAININ
001-6045-522.43-10
32.30
Fire Training Division Total:
$32.30
Fire Department Total:
$9,545.53
COMPUNET, INC
COMPUTER SOFTWARE FOR MIC
001-7010-532.31-80
23.90
DRAKE'S PIZZA & SUBS
SUPPLIES
001-7010-532.31-01
108.75
MISC BUILDING PERMIT REFUNDS
001-7010-343.20-00
133.62
MISC EMPLOYEE EXPENSE
REIMBURSEMENT FOR INTERVI
001-7010-532.43-10
1,456.99
REIMBURSEMENT
Public Works Admin. Division Total:
$1,723.26
Public Works & Utilities Department
Total:
$1,723.26
OLYMPIC PRINTERS INC
SUPPLIES
001-8012-555.31-01
461.98
SHI INTERNATIONAL CORP
COMPUTER HARDWARE&PERIPHE
001-8012-555.31-01
144.57
Senior Center Division Total:
$606.55
ANGELES MILLWORK & LUMBER
SUPPLIES
001-8050-536.31-20
34.37
SUPPLIES
001-8050-536.31-20
43.86
SUPPLIES
001-8050-536.31-20
14.80
SUPPLIES
001-8050-536.31-20
60.26
ASCO PACIFIC SUPPLY CO INC
SUPPLIES
001-8050-536.31-20
1,768.10
QUIRING MONUMENTS INC
SUPPLIES
001-8050-536.34-01
384.00
Page 3 of 18 Jun 12, 2019 9:33:10 AM
June 18, 2019 E - 7
$w'-Iff,
City of Port Angeles
City Council Expenditure Report
Between May 25, 2019 and Jun 7, 2019
Vendor
Description Account Number
Amount
QUIRING MONUMENTS INC
SUPPLIES
001-8050-536.34-01
384.00
SUPPLIES
001-8050-536.34-01
931.00
SUPPLIES
001-8050-536.34-01
190.00
SUPPLIES
001-8050-536.34-01
250.00
SUPPLIES
001-8050-536.34-01
250.00
SUPPLIES
001-8050-536.34-01
250.00
THURMAN SUPPLY
SUPPLIES
001-8050-536.31-20
237.66
Ocean View Cemetery Division Total:
$4,798.05
ANGELES MILLWORK & LUMBER
SUPPLIES
001-8080-576.48-10
38.53
BILL'S PLUMBING & HEATING INC
SUPPLIES
001-8080-576.48-10
190.00
BLAKE SAND & GRAVEL, INC
SUPPLIES
001-8080-576.31-40
1,620.06
CASTLE BRANCH, INC
SUPPLIES
001-8080-576.49-90
928.00
FASTENAL INDUSTRIAL
SUPPLIES
001-8080-576.31-20
29.00
HOME DEPOT PRO-SUPPLYWORKS
SUPPLIES
001-8080-576.31-20
11.22
JENNINGS EQUIPMENT INC
SUPPLIES
001-8080-576.31-01
586.49
SKAGIT GARDENS INC
SUPPLIES
001-8080-576.31-40
3,847.24
SWAIN'S GENERAL STORE INC
SUPPLIES
001-8080-576.31-20
21.10
SUPPLIES
001-8080-576.31-40
184.81
SUPPLIES
001-8080-576.31-40
395.19
THURMAN SUPPLY
SUPPLIES
001-8080-576.31-20
44.27
SUPPLIES
001-8080-576.31-20
17.07
SUPPLIES
001-8080-576.31-20
128.27
Parks Facilities Division Total:
$8,041.25
Parks & Recreation Department Total:
$13,445.85
DAVE'S HEATING & COOLING SVC
SUPPLIES
001-8112-555.48-10
288.06
DEPT OF LABOR & INDUSTRIES
SUPPLIES
001-8112-555.48-10
24.23
Senior Center Facilities Division Total:
$312.29
ANGELES MILLWORK & LUMBER
SUPPLIES
001-8131-518.35-01
14.17
CED/CONSOLIDATED ELEC DIST
SUPPLIES
001-8131-518.31-20
12.72
SUPPLIES
001-8131-518.31-20
11.30
SUPPLIES
001-8131-518.31-20
271.75
SUPPLIES
001-8131-518.31-20
19.22
CONTRACT HARDWARE INC
SUPPLIES
001-8131-518.31-20
(43.48)
FERGUSON ENTERPRISES INC
SUPPLIES
001-8131-518.31-20
217.57
HARTNAGEL BUILDING SUPPLY INC
SUPPLIES
001-8131-518.31-20
40.92
Page 4 of 18
Jun 12,
2019 9:33:10 AM
June 18, 2019
E - 8
$w'-Iff,
City of Port Angeles
City Council Expenditure Report
Between May 25, 2019 and Jun 7, 2019
Vendor
Description
Account Number
Amount
SEARS COMMERCIAL ONE
SUPPLIES
001-8131-518.31-20
42.37
SUPPLIES
001-8131-518.31-80
86.95
SWAIN'S GENERAL STORE INC
SUPPLIES
001-8131-518.31-20
88.72
THURMAN SUPPLY
SUPPLIES
001-8131-518.31-20
78.20
SUPPLIES
001-8131-518.31-20
28.98
SUPPLIES
001-8131-518.31-20
2.91
SUPPLIES
001-8131-518.31-20
219.85
SUPPLIES
001-8131-518.31-20
23.45
SUPPLIES
001-8131-518.31-20
118.72
Central Svcs Facilities Division Total:
$1,234.32
Facilities Maintenance Department Total:
$1,546.61
COMA, ROBERT A
REFEREE PAY FOR WOMEN'S B
001-8221-574.41-50
25.00
EDGAR, KELSEY
REFEREE PAY FOR WOMEN'S B
001-8221-574.41-50
200.00
PIMENTEL, HENRY
REFEREE PAY FOR WOMEN'S B
001-8221-574.41-50
350.00
RAMSEY, SCOTT
REFEREE PAY FOR WOMEN'S B
001-8221-574.41-50
25.00
ROBINSON, JASON
SCOREKEEPER PAY FOR WOMEN
001-8221-574.41-50
270.00
ROGERS, LAMBROS JR.
REFEREE PAY FOR WOMEN'S B
001-8221-574.41-50
25.00
ROONEY, RANDY L
REFEREE PAY FOR WOMEN'S B
001-8221-574.41-50
225.00
WA AMATEUR SOFTBALL ASSN
FEE TO SANCTION SOFTBALL
001-8221-574.41-50
25.00
Sports Programs Division Total:
$1,145.00
Recreation Activities Department Total:
$1,145.00
General Fund Fund Total:
$108,474.73
HURRICANE RIDGE WINTER
MISCELLANEOUS SERVICES
101-1430-557.41-50
17,000.00
SPORTS CLUB
PENINSULA ADVENTURE SPORTS
MISCELLANEOUS SERVICES
101-1430-557.41-50
2,000.00
Lodging Excise Tax Division Total:
$19,000.00
Lodging Excise Tax Department Total:
$19,000.00
Lodging Excise Tax Fund Total:
$19,000.00
ALPINE PRODUCTS, INC
PW CONSTRUCTION & RELATED
102-7230-542.31-25
2,397.62
ANGELES MILLWORK & LUMBER
SUPPLIES
102-7230-542.35-01
22.12
LAKESIDE INDUSTRIES INC
ROAD/HWY MATERIALS ASPHLT
102-7230-542.31-20
281.23
PUD #1 OF CLALLAM COUNTY
MISC PROFESSIONAL SERVICE
102-7230-542.47-10
18.89
SOUND PUBLISHING INC
COMMUNICATIONS/MEDIA SERV
102-7230-542.41-15
184.61
TRAFFIC SAFETY SUPPLY CO
MARKERS, PLAQUES,SIGNS
102-7230-542.31-25
1,562.56
MARKERS, PLAQUES,SIGNS
102-7230-542.31-25
2,054.43
Page 5 of 18 Jun 12, 2019 9:33:10 AM
June 18, 2019 E-9
, 4
,c,,,ff"".
City of Port Angeles
City Council Expenditure Report
Between May 25, 2019 and Jun 7, 2019
Vendor
Description
Account Number
Amount
Street Division Total:
$6,521.46
Public Works -Street Department Total:
$6,521.46
Street Fund Total:
$6,521.46
A WORKSAFE SERVICE, INC
HEALTH RELATED SERVICES
107-5160-528.41-50
55.00
CLINICARE OF PORT ANGELES INC
HEALTH RELATED SERVICES
107-5160-528.41-50
97.00
MISC TRAVEL
D'AGOSTINO-KING CY EMD -
107-5160-528.43-11
2.53
HOMAN-WA APCO/NENA SUMMER
107-5160-528.43-11
823.25
ROMBERG-WA APCO/NENA SUMM
107-5160-528.43-11
1,319.32
JOHNSTON-KITAZAWA-KING CY
107-5160-528.43-11
2.53
ROMBERG-STATE E911 AUTH S
107-5160-528.43-11
311.96
PUBLIC SAFETY TESTING INC
MISCELLANEOUS SERVICES
107-5160-528.41-50
50.00
QUILL CORPORATION
SUPPLIES
107-5160-528.31-01
44.83
Pencom Division Total:
$2,706.42
Pencom Department Total:
$2,706.42
Pencom Fund Total:
$2,706.42
MISC DEPOSIT & PERMIT REFUNDS
CANCELLED LOOMIS RENTAL
316-8982-362.40-12
120.00
Park Improvmt Division Total:
$120.00
Capital Proj-Parks & Rec Department Total:
$120.00
Park Improvement Fund Fund
Total:
$120.00
ANIXTER, INC
ELECTRICAL EQUIP & SUPPLY
401-0000-141.42-00
2,486.19
ELECTRICAL CABLES & WIRES
401-0000-141.42-00
2,470.75
CED/CONSOLIDATED ELEC DIST
ELECTRICAL EQUIP & SUPPLY
401-0000-141.42-00
175.46
ELECTRICAL EQUIP & SUPPLY
401-0000-141.42-00
31.63
ELECTRICAL EQUIP & SUPPLY
401-0000-141.42-00
112.83
GENERAL PACIFIC INC
ELECTRICAL EQUIP & SUPPLY
401-0000-141.42-00
3,363.83
ELECTRICAL EQUIP & SUPPLY
401-0000-141.41-00
303.82
MISC UTILITY DEPOSIT REFUNDS
FINAL BILL REFUND
401-0000-122.10-99
10.02
FINAL BILL REFUND
401-0000-122.10-99
12.21
FINAL BILL REFUND
401-0000-122.10-99
46.43
FINAL BILL REFUND
401-0000-122.10-99
50.41
FINAL BILL REFUND
401-0000-122.10-99
70.19
FINAL BILL REFUND
401-0000-122.10-99
114.36
FINAL BILL REFUND
401-0000-122.10-99
157.96
FINAL BILL REFUND
401-0000-122.10-99
210.96
FINAL BILL REFUND
401-0000-122.10-99
250.00
Page 6 of 18
Jun 12,
2019 9:33:10 AM
June 18, 2019
E-10
$w'-Iff,
City of Port Angeles
City Council Expenditure Report
Between May 25, 2019 and Jun 7, 2019
Vendor
Description
Account Number
Amount
MISC UTILITY DEPOSIT REFUNDS
FINAL BILL REFUND
401-0000-122.10-99
383.26
FINAL BILL REFUND
401-0000-122.10-99
751.32
FINAL BILL REFUND
401-0000-122.10-99
17.09
FINAL BILL REFUND
401-0000-122.10-99
100.82
FINAL BILL REFUND
401-0000-122.10-99
213.55
FINAL BILL REFUND
401-0000-122.10-99
410.22
OVERPAYMENT -1030 HOMESTEA
401-0000-122.10-99
2.75
OVERPAYMENT -1120 E 6TH ST
401-0000-122.10-99
33.83
OVERPAYMENT -1231 CAMPBELL
401-0000-122.10-99
90.01
OVERPAYMENT -1326 CAMPBELL
401-0000-122.10-99
90.69
OVERPAYMENT -921 W 15TH ST
401-0000-122.10-99
713.35
FINAL BILL REFUND
401-0000-122.10-99
22.17
FINAL BILL REFUND
401-0000-122.10-99
67.96
FINAL BILL REFUND
401-0000-122.10-99
125.38
FINAL BILL REFUND
401-0000-122.10-99
155.74
FINAL BILL REFUND
401-0000-122.10-99
252.93
FINAL BILL REFUND
401-0000-122.10-99
335.79
FINAL BILL REFUND
401-0000-122.10-99
375.04
FINAL BILL REFUND
401-0000-122.10-99
379.68
FINAL CREDIT -817 E 6TH ST
401-0000-122.10-99
41.33
Division Total:
$14,429.96
Department Total:
$14,429.96
EES CONSULTING INC
MISC PROFESSIONAL SERVICE
401-7120-533.49-01
529.23
MARSH MUNDORF PRATT
CONSULTING SERVICES
401-7120-533.49-01
528.67
SULLIVAN
Power Systems Division Total:
$1,057.90
AIRPORT GARDEN CENTER
FEED, BEDDING,VIT-ANIMALS
401-7180-533.34-02
23.86
CED/CONSOLIDATED ELEC DIST
ELECTRICAL EQUIP & SUPPLY
401-7180-533.34-02
128.27
FASTENAL INDUSTRIAL
FASTENERS, FASTENING DEVS
401-7180-533.34-02
31.10
GLOBAL RENTAL COMPANY, INC
RENTAL/LEASE EQUIPMENT
401-7180-533.45-30
3,815.00
RENTAL/LEASE EQUIPMENT
401-7180-533.45-30
(1,362.50)
RENTAL/LEASE EQUIPMENT
401-7180-533.45-30
625.03
INSIGHT PUBLIC SECTOR
COMPUTERS,DP & WORD PROC.
401-7180-533.34-02
1,071.08
KENNEDY, STEPHEN H.
REAL PROPERTY, RENT/LEASE
401-7180-533.45-30
7,000.00
MATT'S TOOLS USA, LLC
HAND TOOLS ,POW&NON POWER
401-7180-533.35-01
153.79
Page 7 of 18 Jun 12, 2019 9:33:10 AM
June 18, 2019 E-11
City of Port Angeles
i City Council Expenditure Report
,C,,,ff, Between May 25, 2019 and Jun 7, 2019
Vendor
MATT'S TOOLS USA, LLC
OLYMPIC SYNTHETIC PRODUCTS
PORT ANGELES POWER
EQUIPMENT
POWER MONITORS INC
ROHLINGER ENTERPRISES INC
SHI INTERNATIONAL CORP
SHOTWELL CORP, JONATHAN
SWAIN'S GENERAL STORE INC
THURMAN SUPPLY
TYNDALE COMPANY
UTILITIES UNDERGROUND LOC
Description
HAND TOOLS ,POW&NON POWER
HARDWARE,AND ALLIED ITEMS
HARDWARE,AND ALLIED ITEMS
EQUIP MAINT & REPAIR SERV
ELECTRICAL EQUIP & SUPPLY
EXTERNAL LABOR
ELECTRICAL EQUIP & SUPPLY
TESTING&CALIBRATION SERVI
TESTING&CALIBRATION SERVI
TESTING&CALIBRATION SERVI
TESTING&CALIBRATION SERVI
COMPUTER HARDWARE&PERIPHE
SEED,SOD,SOIL&INOCULANT
EQUIP. MAINT. AUTO,TRUCK
ELECTRICAL CABLES & WIRES
FIRE PROTECTION EQUIP/SUP
FIRE PROTECTION EQUIP/SUP
FIRE PROTECTION EQUIP/SUP
FIRE PROTECTION EQUIP/SUP
FIRE PROTECTION EQUIP/SUP
FIRE PROTECTION EQUIP/SUP
FIRE PROTECTION EQUIP/SUP
MISCELLANEOUS SERVICES
CTR
Electric Operations Division Total:
Public Works -Electric Department Total:
Electric Utility Fund Total:
BACKFLOW PARTS USA PLUMBING EQUIP FIXT,SUPP
Division Total:
Department Total:
AIRPORT GARDEN CENTER NURSERY STOCK & SUPPLIES
AMAZON CAPITAL SERVICES SHIPPING AND HANDLING
SUPPLIES
BACKFLOW PARTS USA PLUMBING EQUIP FIXT,SUPP
Account Number
401-7180-533.35-01
401-7180-533.35-01
401-7180-533.35-01
401-7180-533.48-10
401-7180-533.35-01
401-7180-533.31-01
401-7180-533.35-01
401-7180-533.48-10
401-7180-533.48-10
401-7180-533.48-10
401-7180-533.48-10
401-7180-533.31-01
401-7180-533.31-01
401-7180-533.31-01
401-7180-533.34-02
401-7180-533.31-01
401-7180-533.31-01
401-7180-533.31-01
401-7180-533.34-02
401-7180-533.31-01
401-7180-533.31-01
401-7180-533.31-01
401-7180-533.49-90
402-0000-237.00-00
402-7380-534.31-20
402-7380-534.31-01
402-7380-534.31-01
402-7380-534.31-20
Amount
219.32
369.99
299.81
91.99
82.94
20.03
3,886.03
62.77
266.62
706.01
209.80
186.96
500.00
5.95
37.93
242.29
240.83
934.62
311.54
216.73
757.53
50.77
33.49
$21,219.58
$22,277.48
$36,707.44
(47.94)
($47.94)
($47.94)
95.81
6.51
21.73
598.92
Page 8 of 18 Jun 12, 2019 9:33:10 AM
June 18, 2019 E-12
$w'-Iff,
City of Port Angeles
City Council Expenditure Report
Between May 25, 2019 and Jun 7, 2019
Vendor
CASCADE COLUMBIA
DISTRIBUTION, INC
CLALLAM CNTY DEPT OF HEALTH
DRY CREEK WATER ASSN, INC
EDGE ANALYTICAL
FASTENAL INDUSTRIAL
FEDERAL EXPRESS CORP
HEARTLINE
MISC EMPLOYEE EXPENSE
REIMBURSEMENT
MISC TRAVEL
PORT ANGELES POWER
EQUIPMENT
SHOTWELL CORP, JONATHAN
SOUND PUBLISHING INC
SPECTRA LABORATORIES-KITSAP
SWAIN'S GENERAL STORE INC
THURMAN SUPPLY
USA BLUEBOOK
UTILITIES UNDERGROUND LOC
Description Account Number
SALT (SODIUM CHLORIDE) 402-7380-534.31-05
TESTING&CALIBRATION SERVI
MISC PROFESSIONAL SERVICE
MISC PROFESSIONAL SERVICE
TESTING&CALIBRATION SERVI
SUPPLIES
MATERIAL HNDLING&STOR EQP
PAINTS, COATI NGS,WALLPAPER
OPTICAL EQUIP ACESS& SUPP
PROSTHETIC,HEARING AID ET
Shipping Charges
SEED,SOD,SOIL&INOCULANT
MEAL REIMBURSMENT
HART -MGT -342 DISASTER MGM
MACHINERY & HEAVY HRDWARE
BUILDING MAINT&REPAIR SER
BUILDING MAINT&REPAIR SER
BUILDING MAINT&REPAIR SER
COMMUNICATIONS/MEDIA SERV
TESTING&CALIBRATION SERVI
FIRST AID & SAFETY EQUIP.
NURSERY STOCK & SUPPLIES
PIPE FITTINGS
ELECTRONIC COMPONENTS
PIPE FITTINGS
MISCELLANEOUS SERVICES
CTR
Water Division Total:
Public Works -Water Department Total:
Water Utility Fund Total:
ENVIRONMENTAL RESOURCE
ASSN
NCL NORTH CENTRAL
LABORATORIES
ENVIRONMENTAL&ECOLOGICAL
CHEMICAL LAB EQUIP & SUPP
402-7380-534.41-50
402-7380-534.33-10
402-7380-534.33-10
402-7380-534.41-50
402-7380-534.31-20
402-7380-534.31-01
402-7380-534.31-20
402-7380-534.31-01
402-7380-534.31-01
402-7380-534.42-10
402-7380-534.31-20
402-7380-534.31-01
402-7380-534.43-10
402-7380-534.31-01
402-7380-534.48-10
402-7380-534.48-10
402-7380-534.48-10
402-7380-534.41-15
402-7380-534.41-50
402-7380-534.31-01
402-7380-534.31-20
402-7380-534.31-20
402-7380-534.31-01
402-7380-534.31-20
402-7380-534.49-90
403-0000-237.00-00
403-0000-237.00-00
Amount
6,118.88
235.00
488.48
900.74
52.00
83.34
602.55
213.11
36.91
185.09
195.63
133.70
95.00
143.25
36.87
50.00
150.00
150.00
186.61
239.00
94.15
29.73
56.28
19.85
76.30
33.50
$11,328.94
$11,328.94
$11,281.00
(8.23)
(77.48)
Page 9 of 18 Jun 12, 2019 9:33:10 AM
June 18, 2019 E-13
,, r4 City of Port Angeles
5 IF
i City Council Expenditure Report
,c,,,�,• Between May 25, 2019 and Jun 7, 2019
Vendor
Division Total:
Department Total:
CONTRACT HARDWARE INC
DEPT OF LABOR & INDUSTRIES
ENVIRONMENTAL RESOURCE
ASSN
FEDERAL EXPRESS CORP
FERGUSON ENTERPRISES INC
GRANICH ENGINEERED
PRODUCTS INC
KUBWATER RESOURCES, INC
MISC TRAVEL
NAPA AUTO PARTS
NCL NORTH CENTRAL
LABORATORIES
O'REILLY AUTO PARTS
PUD #1 OF CLALLAM COUNTY
SWAIN'S GENERAL STORE INC
THURMAN SUPPLY
USA BLUEBOOK
UTILITIES UNDERGROUND LOC
Description
HARDWARE,AND ALLIED ITEMS
CONSULTING SERVICES
ENVIRONMENTAL&ECOLOGICAL
Account Number
403-7480-535.31-01
403-7480-535.49-90
403-7480-535.41-50
Shipping Charges
403-7480-535.42-10
PIPE FITTINGS
403-7480-535.31-20
PIPE AND TUBING
403-7480-535.31-20
BEARINGS (EXCEPT WHEEL)
403-7480-535.31-20
WATER&SEWER TREATING CHEM
BOWEN-LSC DRY CLEANERS WK
BOWEN-MUNICON 2019 CONF
PLUMBING EQUIP FIXT,SUPP
CHEMICAL LAB EQUIP & SUPP
PLUMBING EQUIP FIXT,SUPP
MISC PROFESSIONAL SERVICE
PIPE FITTINGS
SUPPLIES
SUPPLIES
PIPE AND TUBING
PIPE FITTINGS
CHEMICAL LAB EQUIP & SUPP
PIPE FITTINGS
MISCELLANEOUS SERVICES
CTR
Wastewater Division Total:
Public Works-WW/Stormwtr Department Total:
Wastewater Utility Fund Total:
A/R MISCELLANEOUS REFUNDS OVERPMT OF TRFR STN FEES
OVERPMT OF TRFR STN FEES
OVERPMT TRANSFER STN FEES
Division Total:
Department Total:
403-7480-535.31-05
403-7480-535.43-10
403-7480-535.43-10
403-7480-535.31-20
403-7480-535.31-01
403-7480-535.35-01
403-7480-535.47-10
403-7480-535.31-20
403-7480-535.31-01
403-7480-535.31-01
403-7480-535.31-20
403-7480-535.31-20
403-7480-535.35-01
403-7480-535.35-01
403-7480-535.49-90
404-0000-213.10-90
404-0000-213.10-90
404-0000-213.10-90
Amount
($85.71)
($85.71)
748.73
281.93
102.75
284.72
15.14
124.05
1,875.08
3,987.64
42.00
125.00
3.25
968.05
1.45
236.12
2.76
398.81
173.63
9.12
2.80
914.96
148.58
33.49
$10,480.06
$10,480.06
$10,394.35
0.24
194.74
117.42
$312.40
$312.40
Page 10 of 18 Jun 12, 2019 9:33:10 AM
June 18, 2019 E-14
i
,C,,,ff,
City of Port Angeles
City Council Expenditure Report
Between May 25, 2019 and Jun 7, 2019
Vendor
Description
Account Number
Amount
ALL WEATHER HEATING &
ENVIRONMENTAL&ECOLOGICAL
404-7538-537.48-10
1,878.34
COOLING
MISC EMPLOYEE EXPENSE
MEAL REIMBURSEMENT
404-7538-537.31-01
76.00
REIMBURSEMENT
MEAL REIMBURSEMENT
404-7538-537.31-01
57.00
DRIVING ABSTRACT REIMB -
404-7538-537.49-90
13.00
SWAIN'S GENERAL STORE INC
JANITORIAL SUPPLIES
404-7538-537.31-01
59.79
SUPPLIES
404-7538-537.31-01
45.16
SW - Transfer Station Division Total:
$2,129.29
MISC EMPLOYEE EXPENSE
MEAL REIMBURSEMENT
404-7580-537.31-01
38.00
REIMBURSEMENT
MEAL REIMBURSMENT
404-7580-537.31-01
38.00
MEAL REIMBURSMENT
404-7580-537.31-01
19.00
MEAL REIMBURSMENT
404-7580-537.31-01
19.00
MEAL REIMBURSMENT
404-7580-537.31-01
19.00
MEAL REIMBURSMENT
404-7580-537.31-01
38.00
SWAIN'S GENERAL STORE INC
SHOES AND BOOTS
404-7580-537.31-01
156.42
SHOES AND BOOTS
404-7580-537.31-01
230.34
Solid Waste -Collections Division Total:
$557.76
THURMAN SUPPLY
PIPE AND TUBING
404-7585-537.48-10
570.76
Solid Waste -Landfill Division Total:
$570.76
Public Works -Solid Waste Department Total:
$3,257.81
Solid Waste Utility Fund Total:
$3,570.21
AIRPORT GARDEN CENTER
NURSERY STOCK & SUPPLIES
406-7412-538.31-20
133.81
ANGELES MILLWORK & LUMBER
PAINTS, COATI NGS,WALLPAPER
406-7412-538.35-01
10.38
BAXTER AUTO PARTS #15
AUTO SHOP EQUIPMENT & SUP
406-7412-538.31-01
43.87
CLALLAM CNTY DEPT OF HEALTH
LAB EQUIP,BIO,CHEM,ENVIR
406-7412-538.41-50
2,560.00
LAB EQUIP,BIO,CHEM,ENVIR
406-7412-538.41-50
540.00
LAB EQUIP,BIO,CHEM,ENVIR
406-7412-538.41-50
660.00
LAB EQUIP,BIO,CHEM,ENVIR
406-7412-538.41-50
540.00
HEARTLINE
NURSERY STOCK & SUPPLIES
406-7412-538.31-20
56.52
SWAIN'S GENERAL STORE INC
LAWN MAINTENANCE EQUIP
406-7412-538.35-01
100.86
THURMAN SUPPLY
PIPE FITTINGS
406-7412-538.31-20
16.14
UTILITIES UNDERGROUND LOC
MISCELLANEOUS SERVICES
406-7412-538.49-90
33.50
CTR
Stormwater Division Total:
$4,695.08
Public Works-WW/Stormwtr Department Total:
$4,695.08
Page 11 of 18 Jun 12, 2019 9:33:10 AM
June 18, 2019 E-15
i
,C,,,ff,
City of Port Angeles
City Council Expenditure Report
Between May 25, 2019 and Jun 7, 2019
Vendor
Description
Account Number
Amount
Stormwater Utility Fund Total:
$4,695.08
LIFE ASSIST
SALE SURPLUS/OBSOLETE
409-6025-526.31-02
669.81
REIFENSTAHL, PATRICIA
FIRST AID & SAFETY EQUIP.
409-6025-526.31-08
400.00
SWAIN'S GENERAL STORE INC
SUPPLIES
409-6025-526.20-80
48.92
CLOTHING & APPAREL
409-6025-526.20-80
86.85
CLOTHING & APPAREL
409-6025-526.20-80
147.58
WA STATE HEALTH CARE
CY 2017 GEMT IGT
409-6025-526.41-50
69,125.10
AUTHORITY
Medic I Division Total:
$70,478.26
Fire Department Total:
$70,478.26
Medic I Utility Fund Total:
$70,478.26
FOSTER PEPPER PLLC
MISC PROFESSIONAL SERVICE
413-7481-535.41-50
19,799.79
INTEGRAL CONSULTING, INC
CONSULTING SERVICES
413-7481-535.41-50
15,041.19
Wastewater Remediation Division Total:
$34,840.98
Public Works-WW/Stormwtr Department Total:
$34,840.98
Harbor Clean Up Fund Total:
$34,840.98
ALL WEATHER HEATING &
CITY REBATE
421-7121-533.49-86
500.00
COOLING
CITY REBATE
421-7121-533.49-86
500.00
MATHEWS GLASS CO INC
CITY REBATE
421-7121-533.49-86
52.50
CITY REBATE
421-7121-533.49-86
26.58
CITY REBATE
421-7121-533.49-86
90.00
CITY REBATE
421-7121-533.49-86
157.50
MISC CITY CONSERVATION
CITY REBATE
421-7121-533.49-86
94.44
REBATES
CITY REBATE
421-7121-533.49-86
500.00
CITY REBATE
421-7121-533.49-86
500.00
PENINSULA HEAT INC
CITY REBATE
421-7121-533.49-86
500.00
Conservation Division Total:
$2,921.02
Public Works -Electric Department
Total:
$2,921.02
Conservation Fund Total:
$2,921.02
AMAZON CAPITAL SERVICES
AUTO & TRUCK MAINT. ITEMS
501-0000-141.40-00
74.81
ASSOCIATED PETROLEUM
FUEL,OIL,GREASE, & LUBES
501-0000-141.20-00
5,227.67
PRODUCTS, INC
FUEL,OIL,GREASE, & LUBES
501-0000-141.20-00
6,027.62
BAXTER AUTO PARTS #15
BELTS AND BELTING
501-0000-141.40-00
48.70
MASCO PETROLEUM, INC
FUEL,OIL,GREASE, & LUBES
501-0000-141.20-00
462.83
MCMASTER-CARR SUPPLY CO
AUTO & TRUCK ACCESSORIES
501-0000-141.40-00
116.92
Page 12 of 18 Jun 12, 2019 9:33:10 AM
June 18, 2019 E-16
$w'-Iff,
City of Port Angeles
City Council Expenditure Report
Between May 25, 2019 and Jun 7, 2019
Vendor
Description
Account Number
Amount
NAPA AUTO PARTS
AUTO & TRUCK ACCESSORIES
501-0000-141.40-00
16.70
AUTO & TRUCK MAINT. ITEMS
501-0000-141.40-00
513.98
PAPE-KENWORTH NORTHWEST,
AUTO & TRUCK MAINT. ITEMS
501-0000-141.40-00
80.17
INC
PORT ANGELES TIRE FACTORY
AUTO & TRUCK MAINT. ITEMS
501-0000-141.40-00
240.25
PRICE FORD LINCOLN
AUTO & TRUCK MAINT. ITEMS
501-0000-141.40-00
75.58
QUALITY 4X4 TRUCK SUPPLY
AUTO & TRUCK MAINT. ITEMS
501-0000-141.40-00
2.17
Division Total:
$12,887.40
Department Total:
$12,887.40
ARAMARK
LAUNDRY/DRY CLEANING SERV
501-7630-548.49-90
125.99
ASSOCIATED PETROLEUM
FUEL,OIL,GREASE, & LUBES
501-7630-548.32-13
236.12
PRODUCTS, INC
FUEL,OIL,GREASE, & LUBES
501-7630-548.32-13
60.00
BAXTER AUTO PARTS #15
AUTO & TRUCK MAINT. ITEMS
501-7630-548.34-02
53.70
AUTO & TRUCK MAINT. ITEMS
501-7630-548.34-02
61.74
AUTO & TRUCK MAINT. ITEMS
501-7630-548.34-02
64.95
FAR -WEST MACHINE &
AUTO & TRUCK MAINT. ITEMS
501-7630-548.34-02
35.61
HYDRAULICS
FREIGHTLINER NORTHWEST
AUTO & TRUCK MAINT. ITEMS
501-7630-548.34-02
51.00
GRAINGER
AUTO & TRUCK MAINT. ITEMS
501-7630-548.34-02
925.97
AUTO & TRUCK MAINT. ITEMS
501-7630-548.31-20
808.75
HEARTLINE
AUTO & TRUCK MAINT. ITEMS
501-7630-548.34-02
1,402.23
LES SCHWAB TIRE CENTER
AUTO & TRUCK MAINT. ITEMS
501-7630-548.34-02
114.52
AUTO & TRUCK MAINT. ITEMS
501-7630-548.34-02
882.78
EXTERNAL LABOR SERVICES
501-7630-548.34-02
178.13
LINCOLN INDUSTRIAL CORP
AUTO & TRUCK MAINT. ITEMS
501-7630-548.34-02
17.16
AUTO & TRUCK MAINT. ITEMS
501-7630-548.31-01
21.66
METALS, BARS, PLATES, RODS
501-7630-548.34-02
82.82
EXTERNAL LABOR SERVICES
501-7630-548.34-02
33.70
METALS, BARS, PLATES, RODS
501-7630-548.34-02
96.10
MATT'S TOOLS USA, LLC
AUTO & TRUCK MAINT. ITEMS
501-7630-548.35-01
23.15
AUTO & TRUCK MAINT. ITEMS
501-7630-548.35-01
10.53
MCMASTER-CARR SUPPLY CO
AUTO & TRUCK MAINT. ITEMS
501-7630-548.31-01
130.44
N C MACHINERY CO
AUTO & TRUCK MAINT. ITEMS
501-7630-548.34-02
829.95
AUTO & TRUCK MAINT. ITEMS
501-7630-548.34-02
124.08
NAPA AUTO PARTS
AUTO & TRUCK MAINT. ITEMS
501-7630-548.34-02
18.47
Page 13 of 18 Jun 12, 2019 9:33:10 AM
June 18, 2019 E-17
$w'-Iff,
City of Port Angeles
City Council Expenditure Report
Between May 25, 2019 and Jun 7, 2019
Vendor
Description
Account Number
Amount
NAPA AUTO PARTS
AUTO & TRUCK MAINT. ITEMS
501-7630-548.34-02
56.02
AUTO & TRUCK MAINT. ITEMS
501-7630-548.49-90
(63.58)
O'REILLY AUTO PARTS
AUTO & TRUCK MAINT. ITEMS
501-7630-548.34-02
73.87
AUTO & TRUCK MAINT. ITEMS
501-7630-548.34-02
272.51
AUTO & TRUCK MAINT. ITEMS
501-7630-548.34-02
(102.18)
OFFICE DEPOT
OFFICE SUPPLIES, GENERAL
501-7630-548.31-01
243.48
PACIFIC GOLF & TURF
AUTO & TRUCK MAINT. ITEMS
501-7630-548.34-02
455.75
PORT ANGELES AUTO GLASS
AUTO & TRUCK MAINT. ITEMS
501-7630-548.34-02
340.87
PORT ANGELES TIRE FACTORY
EXTERNAL LABOR SERVICES
501-7630-548.34-02
18.42
EXTERNAL LABOR SERVICES
501-7630-548.34-02
18.42
EXTERNAL LABOR SERVICES
501-7630-548.34-02
73.70
EXTERNAL LABOR SERVICES
501-7630-548.34-02
18.42
EXTERNAL LABOR SERVICES
501-7630-548.34-02
73.70
AUTO & TRUCK MAINT. ITEMS
501-7630-548.49-90
101.09
AUTO & TRUCK MAINT. ITEMS
501-7630-548.34-02
179.16
EXTERNAL LABOR SERVICES
501-7630-548.34-02
73.70
RICHMOND 2 -WAY RADIO
AUTO & TRUCK MAINT. ITEMS
501-7630-548.34-02
26.09
AUTO & TRUCK MAINT. ITEMS
501-7630-548.34-02
47.83
EXTERNAL LABOR SERVICES
501-7630-548.34-02
156.53
EXTERNAL LABOR SERVICES
501-7630-548.34-02
208.70
RUDDELL AUTO MALL
AUTO & TRUCK MAINT. ITEMS
501-7630-548.34-02
10.01
RUDY'S AUTOMOTIVE
AUTO & TRUCK MAINT. ITEMS
501-7630-548.34-02
442.68
EXTERNAL LABOR SERVICES
501-7630-548.34-02
522.97
WEST COAST WIRE, ROPE &
AUTO & TRUCK MAINT. ITEMS
501-7630-548.34-02
441.10
RIGGING
Equipment Services Division Total:
$10,078.81
Public Works Department Total:
$10,078.81
Equipment Services Fund Total:
$22,966.21
CANON USA, INC
OFFICE MACHINES & ACCESS
502-2081-518.45-31
3,928.28
CENTURYLINK-QWEST
05-10 A/C 360Z1 00240955B
502-2081-518.42-10
193.07
05-14 A/C 3604570411199B
502-2081-518.42-10
786.74
05-14 A/C 3604570831558B
502-2081-518.42-10
51.73
05-14 A/C 3604570968343B
502-2081-518.42-10
107.43
05-14 A/C 3604571270975B
502-2081-518.42-10
252.13
05-14 A/C 3604571535571 B
502-2081-518.42-10
105.42
Page 14 of 18 Jun 12, 2019 9:33:10 AM
June 18, 2019 E-18
o,;.,
i
w.Iff,
City of Port Angeles
City Council Expenditure Report
Between May 25, 2019 and Jun 7, 2019
Vendor
Description
Account Number
Amount
CENTURYLINK-QWEST
05-14 A/C 3604574859247B
502-2081-518.42-10
107.06
05-14 A/C 3604575170121 B
502-2081-518.42-10
122.27
05-14 A/C 3604576315689B
502-2081-518.42-10
107.23
05-14 A/C 3604576684085B
502-2081-518.42-10
641.66
05-16 A/C 206T325585090B
502-2081-518.42-10
54.51
05-16 A/C 206T329544912B
502-2081-518.42-10
54.51
05-16 A/C 206T355724768B
502-2081-518.42-10
57.62
05-16 A/C 206T359336570B
502-2081-518.42-10
489.69
05-20 A/C 206T217227465B
502-2081-518.42-10
57.62
CONSOLIDATED TECH SERVICES
COMMUNICATIONS/MEDIA SERV
502-2081-518.42-10
494.12
NEW HORIZONS COMPUTER LRNG
DATA PROC SERV &SOFTWARE
502-2081-518.43-10
2,380.00
CTRS
VERIZON WIRELESS
05-05 A/C 542276284-00001
502-2081-518.42-10
68.70
05-15 A/C 842160242-00003
502-2081-518.42-10
1,615.58
05-15 A/C 842160242-00004
502-2081-518.42-10
4,863.89
WAVE BROADBAND
DATA PROC SERV &SOFTWARE
502-2081-518.42-12
14,015.60
Information Technologies Division Total:
$30,554.86
PUD #1 OF CLALLAM COUNTY
RADIO & TELECOMMUNICATION
502-2083-518.47-10
47.89
Wireless Mesh Division Total:
$47.89
Finance Department Total:
$30,602.75
Information Technology Fund
Total:
$30,602.75
HSA BANK
HSA Service Fee
503-1631-517.41-50
272.50
NW ADMIN TRANSFER ACCT
INSURANCE, ALL TYPES
503-1631-517.46-33
85,738.75
INSURANCE, ALL TYPES
503-1631-517.46-34
5,763.60
REDACTED
Disability Board -May
503-1631-517.46-35
5.02
Disability Board -May
503-1631-517.46-35
5.69
Disability Board -May
503-1631-517.46-35
31.00
Disability Board -May
503-1631-517.46-35
67.83
Disability Board -May
503-1631-517.46-35
95.70
Disability Board -May
503-1631-517.46-35
261.41
Disability Board -May
503-1631-517.46-35
436.42
REIMBURSE MEDICARE -MAY
503-1631-517.46-35
(572.50)
REIMBURSE MEDICARE -MAY
503-1631-517.46-35
(375.50)
REIMBURSE MEDICARE -MAY
503-1631-517.46-35
(302.80)
REIMBURSE MEDICARE -MAY
503-1631-517.46-35
(135.50)
Page 15 of 18 Jun 12, 2019 9:33:10 AM
June 18, 2019 E-19
,, r4
i
5 IF,c,,,�,•
City of Port Angeles
City Council Expenditure Report
Between May 25, 2019 and Jun 7, 2019
Vendor
Description
Account Number
Amount
REDACTED
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
(134.00)
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
(134.00)
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
(134.00)
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
(134.00)
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
(127.50)
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
(123.00)
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
(120.00)
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
(118.50)
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
(113.00)
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
(109.00)
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
(108.00)
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
(108.00)
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
(108.00)
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
(108.00)
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
108.00
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
108.00
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
108.00
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
108.00
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
109.00
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
113.00
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
118.50
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
120.00
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
123.00
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
127.50
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
134.00
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
134.00
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
134.00
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
134.00
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
135.50
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
270.90
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
302.80
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
375.50
REIMBURSE MEDICARE-MAY
503-1631-517.46-35
572.50
Other Insurance Programs Division Total:
$92,948.82
Page 16 of 18 Jun 12, 2019 9:33:10 AM
June 18, 2019 E - 20
Page 17 of 18 Jun 12, 2019 9:33:10 AM
June 18, 2019 E - 21
City of Port Angeles
City Council Expenditure Report
Between May 25, 2019 and Jun 7, 2019
Vendor
Description
Account Number
Amount
DEPT OF LABOR & INDUSTRIES
2019 1ST QTR SELF INSURAN
503-1661-517.49-50
41.43
Worker's Compensation Division Total:
$41.43
Self Insurance Department Total:
$92,990.25
Self -Insurance Fund Total:
$92,990.25
REDACTED
Disability Board -May
602-6221-517.46-35
859.75
Disability Board -May
602-6221-517.46-35
15,959.14
REIMBURSE MEDICARE -MAY
602-6221-517.46-35
(127.00)
REIMBURSE MEDICARE -MAY
602-6221-517.46-35
(122.50)
REIMBURSE MEDICARE -MAY
602-6221-517.46-35
122.50
REIMBURSE MEDICARE -MAY
602-6221-517.46-35
127.00
Fireman's Pension Division Total:
$16,818.89
Fireman's Pension Department Total:
$16,818.89
Firemen's Pension Fund Total:
$16,818.89
AFLAC
SUPPLEMENTAL INSURANCE
920-0000-231.53-10
1,686.50
PAYROLL SUMMARY
920-0000-231.53-11
192.31
PAYROLL SUMMARY
920-0000-231.53-12
836.16
CHAPTER 13 TRUSTEE
Case #14-14948
920-0000-231.56-90
904.16
EMPLOYEES ASSOCIATION
PAYROLL SUMMARY
920-0000-231.55-30
560.00
EMPOWER-P/R WIRE
PAYROLL SUMMARY
920-0000-231.52-20
18,328.72
FEDERAL PAYROLL TAX
PAYROLL SUMMARY
920-0000-231.50-10
72,526.47
FICA/MEDICARE PAYROLL TAX
PAYROLL SUMMARY
920-0000-231.50-20
81,026.74
HSA BANK
Employee Contr to HSA
920-0000-231.52-40
4,056.46
Employee Contr to HSA
920-0000-231.52-40
4,131.46
ICMA-P/R WIRES
PAYROLL SUMMARY
920-0000-231.52-10
18,522.39
JOHN HANCOCK LIFE INSURANCE
PAYROLL SUMMARY
920-0000-231.52-25
3,318.95
CO
LEOFF
PAYROLL SUMMARY
920-0000-231.51-21
28,136.30
OFFICE OF SUPPORT
PAYROLL SUMMARY
920-0000-231.56-20
138.46
ENFORCEMENT
PERS
PAYROLL SUMMARY
920-0000-231.51-10
1,249.16
PAYROLL SUMMARY
920-0000-231.51-11
13,363.32
PAYROLL SUMMARY
920-0000-231.51-12
78,537.32
TEAMSTERS LOCAL 589
PAYROLL SUMMARY
920-0000-231.54-10
1,877.00
PAYROLL SUMMARY
920-0000-231.54-10
1,924.00
UNITED WAY (PAYROLL)
PAYROLL SUMMARY
920-0000-231.56-10
262.54
Page 17 of 18 Jun 12, 2019 9:33:10 AM
June 18, 2019 E - 21
City of Port Angeles
i City Council Expenditure Report
,C,,,K, Between May 25, 2019 and Jun 7, 2019
Vendor Description Account Number Amount
VOLUNTEER FIRE ASSOCIATION PAYROLL SUMMARY 920-0000-231.55-20 2.00
WSCCCE AFSCME AFL-CIO PAYROLL SUMMARY 920-0000-231.54-40 232.48
WSCFF/EMPLOYEE BENEFIT PAYROLL SUMMARY 920-0000-231.53-20 1,725.00
TRUST
Division Total: $333,537.90
Department Total: $333,537.90
Payroll Clearing Fund Total: $333,537.90
Total for Checks Dated Between May 25, 2019 and Jun 7, 2019 $808,626.95
Page 18 of 18 Jun 12, 2019 9:33:10 AM
June 18, 2019 E - 22
P-Q-R-TANGELES
CITY COUNCIL
WASH I N G T O N, U.S. MEMO
Date: June 18, 2019
To: City Council
From: Nathan West, City Manager
Sarina Carrizosa, Finance Director
Subject: The 2020-2025 Capital Facility Plan and Transportation Plan
Summary: The Capital Facilities Plan and Transportation Improvement Plan (CFP/TIP) are required
components of the City's Comprehensive Plan. The plans allows the City to plan for asset management
proactively and maximize our limited resources. Additionally, including projects in the CFP/TIP allows
the City to leverage outside funding sources.
Funding: No funding is required at this time.
Recommendation: Staff requests that Council:
1) Continue the second public hearing on the 2020-2025 Capital Facilities Plan and Transportation
Improvement Plan.
2) Close the public hearing.
3) Conduct the second reading of the 2020 -2025 Capital Facilities Plan and Transportation
Improvement Plan resolution and adopt the Resolution.
Background / Analysis:
The Washington State Growth Management Act requires that the City review and update the Capital
Facilities Plan and Transportation Improvement Plan annually. The CFP is a six year planning document
that is based on needs and policies identified in the City of Port Angeles Comprehensive Plan. It
represents Port Angeles' current list of needed projects and programs for the next six years. The
document also identifies secured or reasonably expected revenues and expenditures for each of the
projects included in the CFP. Projects without identified funding are also listed in the CFP/TIP to allow
for additional funding options to be explored. These projects are grouped into the following project types:
• General Government
o Public Safety
o Parks and Recreation
• Utilities:
o Electric
o Water
o Wastewater
o Solid Waste
o Stormwater
o Combined Sewer Overflow (CSO)
• Information Technologies
• Equipment Services
• Transportation
o Transportation Benefit District
June 18, 2019 F-1
The CFP/TIP is required to be filed with the State of Washington by June 30r' of each year in order to be
eligible for certain grant opportunities for transportation projects.
The 2020-2025 Capital Facilities Plan and Transportation Improvement Plan (CFP) allows citizens,
advisory boards and City Council to critically review and identify priority projects as well as items that
require long-term planning. This comprehensive approach allows consideration and approval of capital
improvements/replacements for a longer range than an annual review and coordinates the decision
making process to include all available information and resources.
Projects in the CFP have been vetted by City staff and management, and the Utility Advisory Committee
has forwarded a favorable recommendation on the utility projects. In addition, on May 28' Council held a
work session to discuss the CFP/TIP. In all instances Council's directives have been considered and
implemented:
1) Replacement of critical infrastructure based on priorities with a focus on preventable
maintenance to increase asset life.
2) Leverages projects by building multiple projects in one area at the same time to save on
construction costs.
3) Best use of funds available to limit the impact on customer rates from capital investment.
4) No new debt is required to complete projects or is planned for future projects.
5) Building capital reserves to a cash to depreciation ratio of 1:1.
■ General Government and Transportation currently are below this threshold but have
improved since last year.
A list of all active and prioritized projects is attached to this memo. Unfunded projects are described in
the CFP/TIP document, but they are not included in the exhibit. The complete document can be reviewed
in detail in the Preliminary CFP/TIP document posted on the City's website.
At the work session on May 28' City Council recommended including all AIA projects that are in the
City's Comprehensive Plan. As a result two projects, GG0319 — Peabody Creek Daylight and TR0719 —
First/Front Decoupling, have been added to CFP/TIP in the unfunded section. Additionally, at the June 4'
Council meeting, after the first public hearing on the CFP/TIP, Council requested staff to present details
regarding project TR0113 — Waterfront Redevelopment Project, TRO818 — Railroad Avenue Arterial,
GG0219 — Downtown Improvement Plan as well as any relevant City Pier projects. Staff will present
these details at tonight's meeting.
As a reminder please note that projects that move to an "Active" status are those that are currently funded
and under construction, "Prioritized" projects will be funded within the CFP's 6 year period and
"Unfunded" projects do not have any funding source. In order for a project to change in status both staff
time and funding must be identified. These can be accomplished by Council reprioritizing and
reallocating funding to a project deemed a higher priority than another, or Council can reprioritize staff
time to identify funding for a certain unfunded project before other unfunded projects are explored.
In conclusion, the CFP/TIP is a living document and is subject to change due to shifting priorities,
emergencies and other factors. As amendments are presented to Council by staff an analysis will be
performed to ensure rates are not impacted negatively and both funding and staff time is available.
Funding Overview:
No funding is required at this time.
June 18, 2019 F - 2
2020 - 2025 Capital Facilities Plan Transportation Improvement Plan
Exhibit
CAPITAL FACILITIES PIAN
Number �,................ WATER r Y
CAPITAL FACILITIES PLAN
,..,,..,„. CTRICPROJECTS
PRIORITY
TOTAL PROJECT
BUDGET
2020
2021
2022
2023
2024
2025
Number TiIf
2019
WT0118
Ranney Well Roof
GENERAL GOVERNMENT/FACILITIES
90,333
90,000
-
-
-
-
-
-
CLO218 Leasehold Improvements A
GGO3O3 NICE Program
R
732,100
100,000
100,000
100,000
100,000
100,000
100,000
100,000
GG1113 Facility Security Projects
2
184,268
60,000
31,000
75,000
-
-
-
-
GG0416 City Hall Fire Detection System
3
75,000
75,000
-
-
-
-
-
-
GG0516 Senior Center Fire Detection System
4
50,000
-
50,000
-
-
-
-
-
PUBLIC SAFETY
-
-
-
CL0119 Overhead Reconductoring-2020 2
200,000
-
200,000
-
-
CAPPC Pencom Capital
R
555,475
53,300
50,000
50,000
50,000
50,000
50,000
50,000
PDO116 Mobile Data Terminal Replacements
A
140,467
21,000
25,000
28,000
-
-
-
-
PD0119 Computer Aided Dispatch, Law Enforcement records ma
1
300,000
50,000
250,000
-
-
-
-
-
FD0415 Fire Dept Turn -Out Gear
R
160,316
-
-
-
-
-
-
-
FD0615 Fire Hoses
R
40,643
5,000
5,000
5,000
5,000
5,000
5,000
5,000
FDO118 Defibrillator Revolving Account
R
216,883
35,000
35,000
36,000
37,000
-
-
40,000
FDO218 Self Contained Breathing App.
R
-
-
-
-
-
-
-
-
FD0318 Emergency Management Pods
5
150,000
-
50,000
50,000
-
50,000
-
-
FD0315 Fire Station Garage Door
6
50,000
-
50,000
-
-
-
-
-
PARKS AND RECREATION
-
-
CL0202 Feeder Tie Hwy 1O1, Porter to Golf Course Road 13
260,000
-
-
-
260,000
-
PKO216 Facility Improvement Revolving Fund
R
105,000
15,000
15,000
15,000
15,000
15,000
15,000
15,000
PKO2O5 Restroom Replacement Program
R
600,000
75,000
75,000
75,000
75,000
75,000
75,000
75,000
PKO418 Civic Field Upgrades
A
98,676
75,000
-
-
-
-
-
-
PK0219 Generation II Dream Playground
7
425,000
200,000
225,000
-
-
-
-
-
PK0619 Downtown Tree Replacement -Phase III
8
100,000
-
-
100,000
-
-
-
-
PK0719 Parks Maintenance Building
9
500,000
50,000
450,000
TOTALS
4,483,828
764,300
1,011,000
984,000
282,000
295,000
245,000
285,000
CAPITAL FACILITIES PIAN
Number �,................ WATER r Y
CAPITAL FACILITIES PLAN
,..,,..,„. CTRICPROJECTS
PRIORITY
TOTAL PROJECT
BUDGET
2020
21
2022
2023
2024
2025
Number TiIf
2019
WT0118
Ranney Well Roof
ELECTRIC
90,333
90,000
-
-
-
-
-
-
CLO218 Leasehold Improvements A
143,396
65,800
-
-
-
-
-
-
CL0414 Construct New Light Ops Building A
6,400,000
400,000
6,000,000
-
-
-
-
-
CL0916 Replace Laurel St Substation Switchgear A
500,000
500,000
-
-
-
-
-
-
CL0219 Underground Cable Replacement -2019 A
200,000
200,000
-
-
-
-
-
-
CL0716 "F" Street Substation Transformer and Switchgear 1
1,500,000
-
1,500,000
-
-
-
-
-
CL0119 Overhead Reconductoring-2020 2
200,000
-
200,000
-
-
-
-
-
CL0319 Underground Cable Replacement -2020 3
200,000
-
200,000
-
-
-
-
-
CL0217 I Street Substation Switchgear 4
500,000
-
-
500,000
-
-
-
-
CL0919 Replace "A" Street Substation Breaker 5
500,000
-
-
500,000
-
-
-
-
CL0419 Underground Cable Replacement -2021 6
200,000
-
-
200,000
-
-
-
-
CLO 519 Underground Cable Replacement -2022 7
200,000
-
-
-
200,000
-
-
-
CL0117 Washington Street Substation SwitchGear 8
500,000
-
-
-
-
500,000
-
-
CL0819 Overhead Reconductoring-2023 9
200,000
-
-
-
-
200,000
-
-
CL0619Underground Cable Replacement -2023 10
200,000
-
-
-
-
200,000
-
-
CL0719 Underground Cable Replacement -2024 11
200,000
-
-
-
-
-
200,000
-
CL0216 City / PUD Service Area Capital Needs 12
400,000
-
200,000
200,000
-
-
-
-
CL0202 Feeder Tie Hwy 1O1, Porter to Golf Course Road 13
260,000
-
-
-
260,000
-
-
-
CL0313 Pole Replacement Program 14
1,300,000
-
650,000
-
-
650,000
-
-
CL1019 Underground Cable Replacement - 2 02 5 15
200,000
-
CAPWT
General WaterE ui ment
10
469,239
59,500
200,000
TOTALS 14
13,803,396
1,165,800
8,750,000
1,400,000
460,000
1,550,000
200,000
200,000
CAPITAL FACILITIES PIAN
Number �,................ WATER r Y
TOTAL PROJECT
BUDGET
2019
2020
2021
2022
2023
2024
2025
WATER
WT0118
Ranney Well Roof
A
90,333
90,000
-
-
-
-
-
-
WT0215
Marine Or Channel Water Main Crossing Replacement
A
83,075
27,450
-
-
-
-
-
-
WT0218
Reservoir Repairs
A
175,000
175,000
-
-
-
-
-
-
WT0419
Decant Facility at Transfer Station- Water Soils Decant B
A
150,000
25,000
125,000
-
-
-
-
-
WT0512East
4th Street Water Main
A
405,000
50,000
355,000
-
-
-
-
-
WT0518
10th Street Water Main "I to N"
A
319,966
40,000
-
-
-
-
-
-
WT0612
3rd Street and Vine Street Main
A
361,000
50,000
311,000
-
-
-
-
-
WT0319
Ground Water Test Wells
1
600,000
-
150,000
250,000
200,000
-
-
-
WT0212
East 6th Street Water Main
2
368,200
-
57,200
311,000
-
-
-
-
WT0519
Water Treatment Plant Repairs
3
170,000
-
170,000
-
-
-
-
-
WT0412
West 4th Street Water Main
4
1,239,400
-
-
-
-
202,400
1,037,000
-
WT0111
Liberty Street Water Main
5
455,609
5,000
-
-
48,000
390,000
-
-
WT0717
Rare/Caroline Street Fire Flow
6
760,000
-
-
-
-
-
120,000
-
WT0219
Peabody Heights Floating Cover Replacement
7
400,000
-
-
-
-
-
200,000
200,000
WTO112
10th Street Water Main
8
1,081,000
-
-
-
-
-
-
176,000
WTO619
Peabody Reservoirinlet Pipe Replacement
9
230,000
-
230,000
-
-
-
-
-
CAPWT
General WaterE ui ment
10
469,239
59,500
1 50,000
1 50,000
1 50,000
1 50,000
1 50,000
50,000
I I TOTALS 'fly°' I 1 7,357,822 1 521,950 1 1,448,200 1 611,000 1 298,000 1 642,400 1 1,407,000 1 426,000 1
June 18, 2019 F - 3
2020 - 2025 Capital Facilities Plan Transportation Improvement Plan
Exhibit
PLAN
PRIORITY
TOTAL PROJECT
BUDGET
2019
2020
2021
2022
2023
2024
2025
WASTEWATER
2024
2025
Number Tide
PRIORITY
TOTAL PROJECT
2019
2020
2021
2022
WWO205 Biosolids Dewatering and Reuse
A
1,462,926
50,000
-
-
-
-
-
-
W W0308 Pump Station #3 Replacement
A
1,042,358
810,000
200,000
-
-
-
-
-
W W0315 Marine Channel Bridge Sewer Crossing
A
89,900
89,900
-
-
-
-
-
-
WW0618 2019 Neighborhood Sewer Rehab
A
300,000
300,000
-
-
-
-
-
-
WW0815 Laurel Street Sewer Separation
A
275,000
25,000
250,000
-
-
-
-
-
WW0715 Oak Street Sewer Separation
A
275,000
25,000
250,000
-
-
-
-
-
W W1218 10th Street Sewer Main
A
23,000
3,165
-
-
-
-
-
-
WW0519 Decant Facility at Transfer Station- Wastewater Soils De
A
150,000
25,000
125,000
-
-
-
-
-
WWO419 WWTP HVAC Replacement
1
200,000
50,000
150,000
-
-
-
-
-
WW0219 WWTP Digester Cleaning and Repair
2
100,000
-
100,000
-
-
-
-
-
WW0508 Digester Mixing Improvement WWTP
3
600,000
-
50,000
150,000
400,000
-
-
-
WW0319 Wastewater Comprehensive Plan
4
300,000
-
200,000
100,000
-
-
-
-
WW0718 2020 Neighborhood Sewer Rehab
5
300,000
-
300,000
-
-
-
-
-
WW0818 2021 Neighborhood Sewer Rehab
6
300,000
-
-
300,000
-
-
-
WW0918 2022 Neighborhood Sewer Rehab
7
300,000
-
-
-
300,000
-
-
WW0516 WWTP Boiler Replacement
8
115,000
-
-
-
45,000
70,000
-
-
WW1018 2023 Neighborhood Sewer Rehab
9
300,000
-
300,000
-
-
WW1118 2024 Neighborhood Sewer Rehab
10
300,000
-
300,000
-
CAPWW General Wastewater Equipment
11
1 586,835
84,000
.1 000
50,000
50,000
50,000
50,000
50,000
TOTALS
$ 7 020 019
$1462 065
$1675 000
$ 600 000
$ 795 000
$ 420 000
$ 350 000
$ 50 000
June 18, 2019 F-4
CAPITAL FACILITIES PLAN
CSO PROJECTS
BUDGET
BUDGET
2020
2021
2022
2023
2024
2025
Number Tide
PRIORITY
TOTAL PROJECT
2019
2020
2021
2022
2023
2024
2025
COMBINED SEWER OVERFLOW
Finance
-
-
-
33,122
-
WW0316 CSO6 and 7 Reconstruction
SW 112
208,449
-
-
-
15,000
150,000
-
-
WW0117 Francis Street Pi 'n B ass
-
190,000
Landfill Operating Software
190,000
80,000
80,000
-
-
-
TOTALS
-
398,441
SW(0)217
190'(
A
15,(
150,(
-
-
June 18, 2019 F-4
CAPITAL FACILITIES PLAN
SOLID WASTE PROJECTS
BUDGET
BUDGET
2019
Number Title
PRIORITY
TOTAL PROJECT
2019
2020
2021
2022
2023
2024
2025
SOLID WASTE
Finance
-
-
-
33,122
-
DR0213 "H" Street Stormwater Outfall
SW 112
Decant Facility at Transfer Station
A
637,354
155,000
457,300
-
-
-
-
-
SW0117
Landfill Operating Software
A
80,000
80,000
-
-
-
-
-
370,000
SW(0)217
Landfill Flare Re lacement
A
204,789
156,000
-
-
DR0404 Canyon Edge &Ahlvers Stormwater
1
1,045,000
-
120,000
TOTALS
-
922,143
391,000
457,300
DR0117 Peabody Creek Water Quality Project
2
620,000
-
-
June 18, 2019 F-4
CAPITAL FACILITIES PLAN
STORMWATER PROJECTS
BUDGET
BUDGET
2019
Number Title
PRIORITY
TOTAL PROJECT
20192020
2024
2021
2022
2023
2024
202�;i.
STORMWATER
Finance
-
-
-
33,122
-
DR0213 "H" Street Stormwater Outfall
A
514,463
10,000
500,000
-
-
-
-
-
DR0215 Francis Street Outfall Repair
A
35,000
35,000
-
-
-
-
-
-
DR0118 10th Street Catchbasins
A
370,000
42,565
-
-
-
-
-
-
DR0404 Canyon Edge &Ahlvers Stormwater
1
1,045,000
-
120,000
925,000
-
-
-
-
DR0117 Peabody Creek Water Quality Project
2
620,000
-
-
20,000
600,000
-
-
-
DR0115 Liberty Street Stormwater Improvement
3
1,135,000
-
-
-
135,000
1,000,000
-
-
DR0119 N Street Outfall Improvement
4
250,000
-
-
-
-
70,000
180,000
-
DR0304 LaurelStreet and US 101 Stormwater
5
575,000
-
-
-
-
-
75,000
500,000
DR0219 Outfall to Creek Improvement Program
6
140,000
-
-
-
-
-
40,000
100,000
DR0804 Lincoln Park/Big Boy Pond S[ud
7
100,000
68,200
276,000
-
75,700
100,
InformationServices
-
TOTALS
-
-
87 565
6200
0 0
945 0 00
73 5 000
1 170 000
295 000
600000
000
June 18, 2019 F-4
CAPITAL FACILITIES PLAN
DEPARTMENT
BUDGET
2019
2020
2021
2022
2023
2024
2025
EQUIPMENT SERVICES
Finance
-
-
-
33,122
-
34,461
Community Development
-
-
-
-
-
-
-
Police
151,200
154,500
157,500
160,500
163,800
167,100
227,200
Fire & Medic 1
239,215
47,200
-
54,600
694,500
273,700
-
Parks & Recreation
91,000
-
80,100
30,800
92,900
42,500
90,800
Engineering
-
-
-
-
-
59,800
46,900
Light Ops
328,427
-
43,300
63,500
76,000
57,400
122,700
Water
42,600
212,200
39,000
-
140,800
41,400
-
Wastewater
62,400
-
-
-
31,500
-
36,900
Solid Waste
45,800
407,500
-
427,300
-
398,600
24,500
Stormwater
-
23,200
-
-
-
-
-
Conservation
-
-
-
-
-
-
-
Equipment Services
24,073
-
68,200
276,000
-
75,700
281,700
InformationServices
-
-
-
-
-
-
-
Streets
156,100
419,200
254,400
27,600
195,500
401,300
1 140 815
1 263 800
642 500
1 073 422
1 199 500
1 346 161
1 232109
June 18, 2019 F-4
2020 - 2025 Capital Facilities Plan Transportation Improvement Plan
Exhibit
PROJECT EXPENDITURE LISTING BY YEAR
INFORMATION SERVICES
RANK
PROJECT
Budge,
2021
CAPITAL FACILITIES
2022
CAPITAL FACILITIES PLAN
2024
2025
NaQ20
021
2023
2024
2025
INFORMATION SERVICES
IT0317 Phone System 911 Interface
A
42,820
5,000
-
-
- -
-
-
IT0918 Internal Network Segmentation & VLAN Configuration
A
220,977
130,000
-
-
- -
-
-
IT0218 Click2Gov3 / Fusion
A
14,885
5,000
-
-
- -
-
-
IT0217 SCADA Server Replacements
A
75,000
75,000
-
-
- -
-
-
IT0816 Facility and Class Management Scheduling
A
10,000
10,000
-
-
- -
-
-
IT0214 Records Management System
A
247,035
-
-
30,000
- 30,000
-
30,000
IT0618 Virtual Server Replacements -EXSI
1
450,000
-
-
150,000
- 150,000
-
150,000
IT0714 Data Backup Systems Replacement
2
210,000
-
210,000
-
- -
-
-
IT0716 ERP Road Map
3
50,000
-
50,000
-
- -
-
-
IT0514 Data Storage Array Systems
4
150,000
-
-
150,000
- -
-
-
IT0119 Wireless Bridge
5
60,000
-
60,000
-
- -
-
-
IT0319 NETWORK Refresh
6
280,000
-
-
-
- -
280,000
-
IT0219 City Hall Wireless Network
7
21,000
-
21,000
-
- -
-
-
IT1018 UPS Replacement- Disaster Recovery DataCenter
8
60,000
-
60,000
-
- -
-
-
IT0416 Cemetery Software
9
30,000
-
30,000
-
- -
-
-
IT1118 IT Security Audit
11
20,000
-
20,000
-
-
-
-
TOTAL EXPENDI111111111�°
-
-
300,000
-
-
180,0001
280,0001
180,000
TRANSPORTATION PROJECTS
Numbe. Title RANK
PROJECT
TOTAL
Budget
2019
2020
2021
CAPITAL FACILITIES
2022
PLAN
2023
2024
2025
TRANSPORTATION BENEFIT DISTRICT PROJECTS
TR1118 Revolving Street improvements
R
180,000
30,000
30,000
30,000
30,000
30,000
30,000
-
TR0405 Alley Paving Revolving Funding
R
875,000
125,000
125,000
125,000
125,000
125,000
125,000
125,000
TR1100 10th Street Reconstruction
A
2,000,000
444,016
-
-
-
-
-
-
TRO515 Lauridsen Blvd Overlay
A
1,030,800
1,030,800
-
-
-
-
-
-
TR0414 Peabody Creek/Lincoln St Culvert Repair
1
3,446,300
446,300
-
-
3,000,000
-
-
-
TR1299 Park Avenue Chip Seal
2
130,000
130,000
-
-
-
-
-
-
TR1516 Peabody Street Chip Seal Phi
4
125,000
-
125,000
-
-
-
-
-
TR0215 Peabody Street Chip Seal Ph3
5
125,000
-
125,000
-
-
-
-
-
TR0315 Peabody Street Chip Seal Ph2
6
200,000
-
200,000
-
-
-
-
-
TR0615 Golf Course Road Chip Seal
7
200,000
-
-
200,000
-
-
-
-
TR0218 Lincoln Street Safety
8
1,485,000
135,000
100,000
1,250,000
-
-
-
-
TR1416 Hamilton School Walking Routes
9
215,000
15,000
-
-
200,000
-
-
-
TR0616 ADA -Francis Street
10
300,000
-
-
-
300,000
-
-
-
TR0618 Stevens Middle School Walking Routes
17
650,000
-
-
-
-
50,000
600,000
-
TRO115 N Street (5th to 15th) - Chip Seal
18
300,000
-
-
-
300,000
-
-
-
TRO518 I Street (5th to 16th) Chipseal
19
300,000
-
-
-
-
300,000
-
-
TR0316 8th Street (A to I) Chip Seal
20
300,000
-
-
-
300,000
-
-
-
TR0219 5th Street Chip Seal - A to M Street
21
300,000
-
-
-
-
300,000
-
-
TR0417 Ennis Street Pavement Repair
23
70,000
-
-
-
70,000
-
-
-
TRO117 Liberty Street Reconstruction
24
460,000
-
-
-
10,000
450,000
-
-
TR0915 Park Avenue Paving Overlay
25
390,000
-
-
-
-
-
15,000
375,000
TR1116 School Area Speed Signs (Near Franklin)
26
50,000
-
-
-
-
50,000
-
-
TR0716 ADA -Peabody Street
28
310,000
-
-
-
-
10,000
300,000
-
TRO119 8th Street Paving - Lincoln to A
29
900,000
-
-
-
-
-
-
900,000
TRANSPORTATION PROJECTS
TRO111 Marine Drive Channel Bridge
A
644,727
319,840
-
-
-
-
-
-
TRO114 Hill Street -Olympic Discovery Trail
A
1,648,165
46,000
-
1,421,700
-
-
-
-
TR0209 Race Complete Street
A
3,564,954
189,800
115,000
3,000,000
-
-
-
-
TR0909 Wayfinding & DDT Signage
A
212,013
211,500
-
-
-
-
-
-
TR1216 5th and Liberty Solar Speed Display
A
50,000
50,000
-
-
-
-
-
-
TRO519 Peabody St Sidewalk Repair
3
95,000
95,000
-
-
-
-
-
-
TR0715 16th Street LID If Street to L Street)
11
1,060,000
160,000
-
900,000
-
-
-
-
TR0416 1St/2nd/Valley/Oak Green Alley
12
472,216
-
-
450,000
-
-
-
-
TR1215 City Hall East Parking Lot LID
13
602,000
102,000
-
-
500,000
-
-
-
TRO517 6th/7th Alley (Francis to Washington)
14
200,000
-
200,000
-
-
-
-
-
TRO101 Laurel Street Stairs Replacement
15
410,000
-
35,000
375,000
-
-
-
-
TR0418 Front St Alleys
16
250,000
-
-
250,000
-
-
-
-
TR0318 8th/10th Street Bike Lanes
22
400,000
-
-
20,000
380,000
-
-
-
TR0319 Albert Street AlleV 4th5th
27
135,000
10,000
125,000
24,086,174
3,530,256
1,055,000
8,021,700
5,215,000
1,325,000
1,195,000
1,400,000
Ke
R Revolving fund
A Active
tt Priority assigned number
OF Unfunded
June 18, 2019 F-5
RESOLUTION NO.
A RESOLUTION of the City Council of the City of Port Angeles, Washington,
adopting the City's Capital Facilities Plan for 2020 — 2025, which
includes the City's Transportation Improvement Program for the years
2020-2025.
WHEREAS, the City of Port Angeles is required to annually update its Capital Facilities
Plan (CFP) and its Transportation Improvement Program (TIP); and
WHEREAS, the City Council of the City of Port Angeles, Washington being the
legislative body of said City, on the 4th day of June 2019 and the 18th day of June 2019, did hold
public hearings on the update of its CFP and TIP; and
WHEREAS, the proposed CFP and TIP for 2020-2025 are consistent with the City's
Comprehensive Plan; and
WHEREAS, the City Council finds and declares that the CFP, including the TIP, is
appropriate to address the capital and transportation planning needs of the City for 2020-2025.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Port
Angeles, Washington, that the City's 2020 — 2025 CFP, which includes the City's TIP, as
published May 8, 2019 in a document filed with the City Clerk as the "2020-2025 Preliminary
Capital Facilities Plan and Transportation Improvement Plan for the City", as amended, with the
addition of two projects -- GG0319, Peabody Creek Daylight and TR0719, First/Front Decoupling-
- is hereby adopted.
PASSED by the City Council of the City of Port Angeles at a regular meeting of said
Council held on the 18th day of June 2019.
Sissi Bruch, Mayor
ATTEST:
June 18, 2019
F-6
Kari Martinez -Bailey, City Clerk
APPROVED AS TO FORM:
William E. Bloor, City Attorney
June 18, 2019 F - 7
BACKGROUND
June 4th Council requested a presentation on CFP Items:
Waterfront Redevelopment TRO I-13
Railroad Avenue Paving TR08-18
Downtown Plan TR 02-19
City Pier Project PK 0319
All currently inactive projects are unfunded.
No Funding has been committed
No resources have been committed
WATERFRONT REDEVELOPMENT -TRO 113
# I issue is capacity we have made active those WTI P
projects for which funding has been made available
Customs and Immigration pre -Clearance
Cost of roadway improvements
Pending Construction/Timing of Projects Unknown
11111111111 LEKT Hotel
Landing Mail Renovations
Red Lion Renovations
Blackball Terminal
Other Railroad Avenue Businesses
1111111111111 NOAA/Feiro New Home
3
Z911wagdo
WATERFRONT REDEVELOPMENT -TRO 113
4
Z.I�Ilwm
WATERFRONT REDEVELOPMENT -TRO 1 13
WEST Bf,�, FARK, EAST
WEST ENPMK AEST
H7) 11
711 UIR To I I Tka- w 00 m2l,
LANDN'.' �0 UTf NER
BOAR'DINALK
AvEwE RALRO A RALl','ON.) NVENUE
RALROAD AvENUE FAR, WEST WEST, FM E16T
HIlLY6000 'KACH
EXPANSPN
s hit
H'DLLYW00[/"
F[AJA/
PAR -INC
N
mktqb-qlo Wdj
WATERFRONT REDEVELOPMENT -TRO 1 13
A. Light Touch
This scenario addresses the least -cost approach to
upgrading the appearance and function of City Pier. It
proposes to fix the metal railing, improve landscaping in the
parking area and on the pier, renovating the existing Feiro
building, and include cultural heritage elements in
Hollywood Beach. It assumes that funds will be scarce and
minimal, suggesting that improvements will be made only as
opportunity presents. Updated activities would include:
Play facility remodel
WATERFRONT REDEVELOPMENT -TRO 113
2015- BIG TER 11 Grant- $280,000 (75%/25%)
Lowest Bid- $194,365
Purchase Additional Float
City Pier Assessment- Sargent Engineering
WATERFRONT REDEVELOPMENT -TRO 113 iiiiiiiiiiiiiiiiiiiiiillillillillillillilliillillillillillillilliilillillilillillillilillilI
IIIII Load Rating & Overall Assessment
Piling Repairs- $600-700K
City Pier Railing- $165K (Materials)
&NNINW�.44
RAILROAD AVENUE OVERLAY -T!10818
$200,000 Paving Overlay
Recognizes that Waterfront Redevelopment may be
years away
Ultimately paving will need to be removed
Competes with other roadway projects
5 year temporary fix
Requires reconstruction of ADA access points
ARTERIAL STREET STANDARD
Requirements must be met to make a roadway an
arterial.
There are three levels of arterial street
PAMC Minor Arterial - Minimum average daily
traffic count of 2,500
IN1111,1111WA
DOWNTOWN IMPROVEMENT PLAN -000219 ' 1
Previously CL0318 item and specific to a construction
project involving downtown lighting
Initial project emerged after hearing concerns over the
darkness of downtown (for pedestrian safety, etc).
Never funded
Last year reworked to include a subarea/neighborhood
DOWNTOWN IMPROVEMENT PLAN-GG0219
Washington Growth Management Act (GMA) lays out
mandatory and optional elements of a comprehensive plan
Optional element includes subarea plans (neighborhoods, rural
villages, U GAs, tribal areas, etc)
The Downtown Improvement Plan would be a specific subarea
plan of the downtown neighborhood
Goals of the planning effort would be community driven
(property and business owners, residents)
Plan would typically lay out short and long term tasks for
implementation
bNb.l�low.Ai
ALTERNATIVES FOR COUNCIL
CONSIDERATION
wllrllllr VIII ' .. ..VIII , ' 4
' VIII IIIb
Consider delaying Race Street Project
Consider delaying ODT Hill Street Priority
Reprioritize Waterfront Redevelopment
Make Active PK03-19 —2019/2020 (railing install)
Council could choose to move forward with overlay —
staff would analyze CFP to postpone or make inactive
other projects
ON I I W, A A
OTHER PROJECTS BROUGHT FORWARD 14
DURING THE FIRST PUBLIC HEARING A
As a result of the items brought forward by citizens
during the public comment period on June 41" the
following projects will be added or included in the
CFP. These projects are currently unfunded.
TR0819 - Mount Angeles and Porter Road
IN6.1�llwA
RECOMMENDATION
The Chamber of Commerce has offered to assist moving these
projects forward:
With the Chamber's assistance the City could be better
informed on timeframe and status of private sector
projects
Available resources and timing information on area
projects could enable reprioritization of either TRO 1-13 or
TR08-18
RECOMMENDATION
The Chamber of Commerce should work with the Port Angeles
Downtown Association to approach businesses to determine:
How businesses feel about making Railroad Avenue an
arterial road.
Estimated timeframes for construction and development.
What the utility needs of these businesses are to avoid
utility cuts or impact to roadway from abutting projects
16
&Z"1101 W�n
QUESTIONS & DISCUSSION
-%; 2 � P ORTANGELES CITY COUNCIL
WASH I N G T o N, u. s. MEMO
Date: June 18, 2019
To: City Council
From: David Wechner, Interim Planning Manager, Community and Economic Development
Subject: 2019 Amendment to the Comprehensive Plan
Summary: In response to City Council direction to remove internal inconsistences, eliminate
redundancies, and evaluate the definition of policy, CED staff and the Planning Commission reviewed
the Comprehensive Plan and drafted amendments as a part of the City's 2019 annual amendment cycle,
including those proposed in 2018. Public Hearings for these amendments are scheduled before City
Council on June 4' and June 18' in order to provide a time to adopt the Plan document prior to the
Washington State Department of Commerce deadline of June 30, 2019. Findings of the Council and
clean copy of the finished Plan document and Appendices are provided as an exhibit to the proposed
ordinance.
Funding: N/A
Recommendation: Adopt the ordinance approving the 2019 Comprehensive Plan Amendment as
recommended by the Planning Commission.
Background / Analysis:
During the June 5, 2018 public hearing for the 2018 Comprehensive Plan Amendment, City Council passed
a motion to ask the Planning Commission to take up the Comprehensive Plan Amendment with sufficient
time for substantive review and discussion, and to request a timeline from City staff for the Planning
Commission and Council review that meets the June 2019 deadline. A second motion resolved to declare
that the current Comprehensive Plan satisfies State Growth Management Act requirements. The 2018
Amendment involved the integration of the 2009 American Institute of Architects (AIA) Sustainable Design
Assessment Team (SDAT) Study into the Plan's vision, improved accuracy, fixed errors, and reviewed the
plan's policies to ensure the City's vision is clear, prioritized, and can be implemented.
A joint meeting between the City Council and Planning Commission took place on September 12, 2018
where discussion focused on the Comprehensive Plan amendment and update process, the roles of City
Council and the Planning Commission, and details concerning the upcoming 2019 Comprehensive Plan
Amendment. Discussion included history of the 2018 Amendment, intent and goals of the final product,
timing of the process, and action and direction related to the amendment.
At the regular September 18, 2018 City Council Meeting, five motions were passed directing the Planning
Commission in the 2019 Comprehensive Plan Amendment process:
Motion 1: Request the Planning Commission to assess the Comprehensive Plan and amendment to
address internal inconsistencies;
June 18, 2019 F - 8
Motion 2: Recommend the Planning Commission evaluate the land use map for the maps
compatibility with the vision, goals, policies and objectives stated in the plan;
Motion 3: Move to request the Planning Commission recommend amendments to the
Comprehensive Plan based on elimination of redundancies, vagueness, and ambiguity;
Motion 4: Ask the Planning Commission to evaluate the definition of policy, and make a
recommendation regarding that definition in the Comprehensive Plan and the amendment; and
Motion 5: Recommend the Planning Commission begin work on the amendment drafting process
immediately.
On May 8, 2019, the Planning Commission recommended the City Council adopt four distinct amendments
to the Comprehensive Plan it had been working on as early as spring of 2018. Work on addressing and
fulfilling the five motions made by the Council began on October 24, 2018.
On April 15, 2019 the Planning Division submitted its 60 day notice of intent to amend the City's
Comprehensive Plan to the Washington State Department of Commerce (WSDOC). In accordance Port
Angeles Municipal Code Chapter 18.04.040 the Planning Commission conducted a public hearing on the
Amendment on April 24' and continued the hearing to May 8t''. One written comment and one verbal
comment were received as a part of the public hearing process. Notice of the application was provided on
the following dates and in the following manner:
1. 4/15/19: Notice to WSDOC of Intent to Amend the Comprehensive Plan
2. 4/16/19: City of Port Angeles Website
3. 4/12/19: City Hall, Notice Board
4. 4/10/19: Peninsula Daily News, Circulation
5. 4/24/19: Planning Commission Public Hearing and end to the comment period for the SEPA
process.
6. 5/8/19: Continued Public Hearing and Planning Commission recommendation of approval of the
2019 Annual Comprehensive Plan Amendment (Application No. 19-32) to City Council.
7. 5/21/19: CED staff presented the recommendations of the Planning Commission to City Council
in a public meeting to inform them of proposed changes and process of the amendment.
8. 5/30/19: Council First Reading of Ordinance of adoption posted on the City's website, including
Plan document and Appendices
9. 6/4/19: Public Hearing: First reading of Ordinance and 2019 Plan Amendment.
10. 6/13/19: Council Second Reading of Ordinance of adoption posted on the City's website,
including Plan document and Appendices
A link to the proposed Comprehensive Plan and Appendices are listed below:
https://www. citofpa.us/DocumentCenter/View/6689/2019-Comprehensive-Plan
Funding Overview:
N/A
June 18, 2019 F - 9
ORDINANCE NO.
AN ORDINANCE of the City of Port Angeles, Washington adopting a
new Amended Comprehensive Plan.
WHEREAS, the City of Port Angeles first adopted a Comprehensive Plan on June 28, 1994
and last updated the Comprehensive Plan in June 2016; and
WHEREAS, each year the City conducts an annual amendment cycle for the
Comprehensive Plan to ensure a consistent review and evaluation of the Plan and City
development regulations occurs and, if needed, propose revisions to ensure the plan and
regulations comply with the State of Washington's Growth Management Act; and
WHEREAS, at the regular September 18, 2018 City Council Meeting five motions were
passed directing the Planning Commission in the 2019 Comprehensive Plan Amendment process
to: assess the Comprehensive Plan to address internal inconsistencies; evaluate the land use map
for the map's compatibility with the vision, goals, policies and objectives stated in the plan;
eliminate redundancies, vagueness, and ambiguity; evaluate the definition of policy, and make
recommendation regarding that definition in the amendment; and
WHEREAS, the Planning Commission held several work sessions from October 2018 to
April 2019 to review and address all elements of the Plan; and,
WHEREAS, all elements of the Comprehensive Plan were reviewed in response to
Council's direction, and to comply with the City's its legal obligations to the State of Washington's
Growth Management Act; and
WHEREAS, the Planning Commission held a public hearing concerning a proposed
Amended Comprehensive Plan on May 8 and May 22, 2019; and
WHEREAS, after considering all the data, facts, presentations, testimony, comments, and
other materials relating to the proposed Amended Comprehensive Plan, the Planning Commission
adopted the Findings and Conclusions, which are attached hereto as Exhibit "A; and
WHEREAS, after adopting the Findings and Conclusions, the Planning Commission
approved and recommended to the City Council the Amended Comprehensive Plan for the City of
Port Angeles, which is attached hereto as Exhibit "B";
WHEREAS, the City Council held a public hearing concerning the proposed Amended
Comprehensive Plan on June 4 and 18, 2019; and
1
June 18, 2019 F-10
WHEREAS, the Planning Commission has transmitted a copy of its recommendation to
the City Council and the City Council has considered the Commission's recommendation; and
NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF PORT ANGELES DO
HEREBY ORDAIN as follows:
Section 1. The Findings and Conclusions of the City of Port Angeles Planning
Commission, attached hereto as Exhibit "A" and incorporated herein by this reference, are hereby
adopted.
Section 2. The Amended Comprehensive Plan for the City of Port Angeles, attached
hereto as Exhibit "B" and incorporated herein by this reference, is hereby adopted as the
Comprehensive Plan of the City. The Amended Comprehensive Plan, Exhibit B, supersedes and
entirely replaces the Comprehensive Plan adopted on June 28, 1994 and last updated in June 2016.
Section 3. A copy of the Amended Comprehensive Plan shall be kept on file with the
City Clerk and shall be available for public inspection.
Section 4. This ordinance, being an exercise of a power specifically delegated to the
City legislative body, is not subject to referendum. This ordinance shall take effect five days after
its publication by summary.
PASSED by the City Council of the City of Port Angeles at a regular meeting of said
Council held on the day of June, 2019.
ATTEST:
Kari Martinez -Bailey, City Clerk
PUBLISHED: June 2019
By Summary
2
Sissi Bruch, Mayor
APPROVED AS TO FORM:
William E. Bloor, City Attorney
June 18, 2019 F-11
EXHIBIT A
Findings and Conclusions in Support of Comprehensive Plan Amendment
Application No. 19-32, 2019 Annual Comprehensive Plan Amendment:
Findings:
Based on the information provided in the Community and Economic Development Staff
Memorandum for the 2019 annual Comprehensive Plan Amendment (Application No. 19-32) dated May
21, 2019 and staff report to the Planning Commission dated April 24, 2019, including all information in
the public record file, comments and testimony presented during the public hearing, the City Council
discussion and deliberation, the City of Port Angeles City Council hereby finds that:
The City submitted notice of intent to adopt the Comprehensive Plan amendments to the
Department of Commerce on April 15, 2019. Notice was received from Department of
Commerce that the materials were received for review on April 15, 2019. The City may
not take final action on the Comprehensive Plan Amendment proposal until after a 60 -
day review period, beginning on the date Commerce received the amendment.
2. Review of the City's Comprehensive Plan may be done on an annual basis. Amendment
opportunity is provided and outlined in Chapter 18.04 of the Port Angeles Municipal Code
(PAMC). Per Section 18.04.040 PAMC, proposed amendments to the Comprehensive Plan shall
be considered on an annual basis, and shall be adopted no more than once a year except when an
emergency exists.
3. The proposed amendments to the Comprehensive Plan language are area -wide.
4. Notification of the Comprehensive Plan amendment permit application was placed in the
Peninsula Daily News on April 10, 2019 and on the City's website April 16, 2019 with a public
comment extending to April 24, 2019.
5. The public notice included a statement the City expects to issue a Determination of Non-
significance following the public comment period, which closed on April 24, 2019; this notice
was sent to the Department of Ecology on April 5, 2019.
6. The City of Port Angeles adopted its present Comprehensive Plan on June 28, 1994, by
Ordinance 2818; it has been regularly amended since its adoption.
7. The City of Port Angeles Planning Commission recommended approval, in a 7-0 vote, of the
2019 Annual Comprehensive Plan Amendment (Application No. 19-32) citing recommended
changes listed in Appendices A and D, Appendix E recommendations, and three conclusions in
support of that action as listed in the Staff Report
Conclusions:
Based on the information provided in the Department of Community and Economic Development
Staff Memorandum for 2019 annual Comprehensive Plan Amendment (Application No. 19-32) dated
May 21, 2019 and staff report to the Planning Commission April 24, 2019, including all of the
information in the public record file, comments, and testimony presented during the public hearing, the
City Council discussion and deliberation, and listed findings, the City of Port Angeles City Council
hereby concludes that:
The proposed amendments to the Comprehensive Plan are in compliance with the State's
requirements for updating the Comprehensive Plan under the Growth Management Act and with
Section 18.04.040 of the Port Angeles Municipal Code.
June 18, 2019 F-12
EXHIBIT A
2. The Comprehensive Plan amendments are not in conflict with the City's development regulations
or Capital Facilities Plan and will not reduce the level of service required by the Comprehensive
Plan for those urban services necessary to serve development projects.
3. The Comprehensive Plan was last thoroughly reviewed and updated in 2017. This annual update
is a part of the City's recognized annual amendment cycle.
June 18, 2019 F-13
2019 Co prehensive Plar.
1
end ent
GIty coundd�
iiia 'iii n biian of III: ) 111 111Iii Ilh.....l iiitcing
June
III iresented by III III . s iiia III; III; iii IIIA IIIA III III
III iii III III III n iiia iii III III IIIA iiia .
i III III iii iii iii iii iiia iii
June 5 — Council resolves to declare Plan meets GMA
September 18 — Five Motions made for 2019 Amendment
October 11 — 2019 Amendment Kick -Off
April 15 — .1 day N• - to of - to Adopt
April 24 — Planning Commission Public Hearing
May 8 — PC Recommendation to Adopt
................
. .....................
'e a iiI nn e int of t � iiinin n lily & eve o f limn e int
Wednesday, June 19, 201 I &
Motion 1: Request the Planning Commission to asses
the Comprehensive Plan and amendment to address
internal inconsistencies; I
Motion 2: Recommend the Planning Commission
evaluate the land use map for the maps compatibility with
the vision, goals, policies and objectives stated in the
plan;
..................................................................................................................................................................................................................................................................................................................................................................................................................................................
...............
. ..................
'e pa iiI nn e int of t � iiinimn n lily & eve Ill o f limn e int
Wednesday, June 19, 201 I S
Motion 3: Move to request the Planning Commission
recommend amendments to the Comprehensive Plan
based on elimination of redundancies, vagueness, an,V.
ambiguity;
Motion 4: Ask the Planning Commission to evaluate the
definition of policy, and make a recommendation
regarding that definition in the Comprehensive Plan and
the amendment; and
................
. .....................
'e a iiI nn e int of t � iiinin n lily & eve o f limn e int
Wednesday, June 19, 201 I Slde 4.
Motion 5: Recommend the Planning Commission begin
work on the amendment drafting process immediately.
11
of Cuunnunlly & eve Ill o f limn e int
Wednesday, June 19, 201 I S
The Planning Commission recommends approval of the
2019 Annual Comprehensive Plan Amendment
(Application
recommended changes listed in Appendices A and D,
Appendix E recommendations, and the 3 conclusions in
support of that action listed in the Staff Report.
................
. .....................
'e a iiI nn e int of t � iiinin n lily & eve o f limn e int
Wednesday, June 19, 201 I &
#1 Inclusion of the AIA SDAT study into the
Comprehensive Plan's vision. (2017-18)
#2 Edits to the TOC, Ch. 17 &Appendices. (2017-18)
#3 Inclusion of Performance Measure Metrics for each
City Department. (2017-18)
#4 Edits to the Plan's Policies and Actions Ch. 2-11.
(2018-19)
................
. .....................
'e a iiI nn e int of t � iiinin n lily & eve o f limn e int
Wednesday, June 19, 201 I Side 7
Figure 3.01— Future Land Use Map
'.:.
f Ciiinin mill ; naimnli III eve o f limn e int
A
N
4.250
0
Feet
Legend
Land use
6 ���Lnw Dnn.itY Residential
VV
M-tl"um GansNy R.itlnrkial
+' H;�h Dcnx(tY R •.Irlent(al
Street centerline COPA
Street centerline Cnty
Wednesday, June 19, 201
f,
City g of Port Angeles
Com� prehensive"',
PlanM
'C a .Ilft�
W'tulF �
a
W
:1.
R
2019 Amendment
N W " r
This page is left intentionally blank
Acknowledgements
2019 Amendment
The following citizen volunteers, past and present elected officials and staff are acknowledged for their
various contributions to the 2019 amendment of this Comprehensive Plan, last updated in 2016. These
individuals contributed hundreds of hours to a citizen participation process, striving to reflect the
wishes of the community in this long-range plan. Everyone's efforts have made this planning effort a
success and are greatly appreciated.
2019 City Council Members
Sissi Bruch, Mayor
Kate Dexter, Deputy Mayor
Mike French
Cheri Kidd
2019 Planning Commission Members
Andrew Schwab
Benjamin Stanley
Steve Hopkins
Duane Morris
2019 Staff
Nathan West, City Manager
Allyson Brekke, DCED Director
2016 City Council Member
Patrick Downie, Mayor
Cherie Kidd, Deputy Mayor
Brad Collins
Dan Gase
2016 Planning Commission Members
Andrew Schwab
Brian Hunter
Chad Aubin
Duane Morris
2016 Staff
Dan McKeen, City Manager
Nathan West, DCED Director
Ben Braudrick, Assistant Planner
Michael Merideth
Jim Moran
Lindsey Schromen-Wawrin
Amy Powell
Mel Messineo
Pamela Hastings
Tara Lopez
Ben Braudrick, Assistant Planner
Kevin Bagwell, Planning Technician
Michael Merideth
Lee Whetham
Sissi Bruch
Elwyn Gee
John Mathews
Matt Bailey
Craig Fulton, Public Works Director
Byron Olson, Finance Director
Scott Johns, Associate Planner
Consultants: Studio Cascade Inc., Spokane WA
Minor amendments are made to the Comprehensive Plan on an annual basis.
City Clerk Certification
The Plannning Commission recommended adoption of this Comprehensive Plan
Amendment on May 22, 2019 to be adopted by the City Council Ordinance #
Table of Contents
Chapter 1- Introduction
Foundationof City Policy.........................................................................................................
1.1
GMACompliance.....................................................................................................................
1.1
Purpose of the Comprehensive Plan........................................................................................
1.2
Compliance with the Comprehensive Plan..............................................................................
1.3
Plan Development & Public Participation................................................................................
1.4
Organization & Requirements of the Comprehensive Plan ......................................................
1.4
Use of the Comprehensive Plan...............................................................................................
1.8
CommunityVision...................................................................................................................
1.9
City Actions Since the 2004 Update.........................................................................................
1.13
Chapter 2 Growth Management
GeneralComments.................................................................................................................. 2.2
GMAGoals & Policies.............................................................................................................. 2.3
Chapter 3 Land Use
GeneralComments..................................................................................................................
3.1
LandUse Categories................................................................................................................
3.2
Future Land Use Map (Figure 3.01)...................................................................................................3.5
Land Use Map Goals & Policies................................................................................................
3.7
Residential Goals & Policies.....................................................................................................
3.7
Commercial Goals & Policies...................................................................................................
3.8
Industrial Goals & Policies........................................................................................................
3.10
Open Space Goals & Policies....................................................................................................
3.11
Chapter a Transportation
GeneralComments..................................................................................................................4.1
Transportation Goals & Policies...............................................................................................4.2
Chapter 5 - Utilities & Public Services
GeneralComments.................................................................................................................. 5.1
Utilities Goals & Policies.......................................................................................................... 5.2
Chapter 6 - Housing
GeneralComments.................................................................................................................. 6.1
HousingGoals & Policies.......................................................................................................... 6.2
i City of Port Angeles Comprehensive Plan ��
Chapter 7 - Conservation
GeneralComments.................................................................................................................. 7.1
Conservation Goals & Policies................................................................................................. 7.2
Chapter 8 - Capital Facilities
GeneralComments.................................................................................................................. 8.1
Capital Facilities Goals & Policies............................................................................................. 8.3
Chapter 9 Economic Development
GeneralComments..................................................................................................................9.1
Economic Development Goals & Policies................................................................................ 9.2
Chapter 10 - Parks & Recreation
GeneralComments................................................................................................................ 10.1
Parks & Recreation Goals & Policies...................................................................................... 10.2
Chapter 11- Implementation
GeneralComments................................................................................................................ 11.1
Objectives Table (Table 11.01)........................................................................................................11.3
Appendix A - Community Profile
(See Appendix Table of Contents for listing)
Appendix B - Definitions
(See Appendix Table of Contents for listing)
Appendix C - GMA Requirements
(See Appendix Table of Contents for listing)
Appendix D - Transportation Analysis
(See Appendix Table of Contents for listing)
1OM Table of Contents
Introduction
Foundation of City Policy
The comprehensive plan is the policy foundation
for the City; it sets fundamental goals, policies,
and objectives that are the basis for all action. The
City's budget, Capital Facilities Plan, work plan,
transportation plan, and departmental performance
standards are all based on and are consistent with
comprehensive plan policy. The City's strategic
plan also ties back to the comprehensive plan,
specifically addressing how the City will implement
comprehensive plan objectives over the next two
years, establishing priorities for action.
GMA Compliance
In 1990, the Washington State Legislature enacted
the State Growth Management Act (GMA), which
requires all cities and counties subject to the
Act to develop and adopt comprehensive plans
and implementing ordinances that will regulate
and guide future growth and development. In
accordance with the Act, each county must also
establish independent Urban Growth Areas
capableof containing future growth for the next
20 years. To ensure compatibility between various
comprehensive plans, the cities, county, and other
affected agencies cooperatively developed a set of county -wide
planning policies to guide this process.
To ensure orderly development, the City of Port Angeles agreed to
work with Clallam County in the development of comprehensive plan
goals and policies for the Port Angeles Urban Growth Area (UGA).
The Port Angeles Comprehensive Plan has been developed and
periodically updated to meet the requirements of the GMA and is
consistent with the Clallam County -Wide Planning Policy.
This 2016 update was undertaken to meet the State's GMA
requirements and included a process intended to capture comments
and suggestions from the broadest range of the public.
Purpose of the Comprehensive Plan
A City's Comprehensive Plan acts as the guiding document for
land use controls. All other city plans, ordinances, and regulations
must be consistent with the goals, policies, and intent of the City's
Comprehensive Plan.
If subordinate planning or regulations, such as the City's Zoning
Ordinance or Capital Facility Plan, are not consistent with the goals
and policies of the Comprehensive Plan, then those documents may
be determined to be illegal and rendered invalid.
Prior to the passage of the State GMA, such compliance was
considered desirable but actual consistency was not required. The
GMA now makes such compliance a requirement.
The Comprehensive Plan is the basis upon which local governmental
decisions are to be made. It sets forth the City's goals and policies
and visualizes directions the City will take over the next two
decades. The Comprehensive Plan Land Use Map illustrates the
desired development pattern for the city.
It is, therefore, important that the Comprehensive Plan truly reflect
the goals and desires of the community. In order for that to take
place, it is vital that citizens take an active role in determining the
quality, context, and vision incorporated within this Comprehensive
Plan.
Chapter 1 - Introduction 1.2
�i
Figure 1.01— The 2016 update process reviewed and updated this plan's vision, as well as many of its
implementing policies and objectives. (Image: Studio Cascade, Inc.)
Compliance with the Comprehensive Plan
The Comprehensive Plan is the foundation upon which the City's
development regulations (zoning, environmentally sensitive areas
protection, parking and sign codes, and subdivision ordinances) and
Urban Services Standards and Guidelines Manual, Capital Facilities
Plan and Urban Services and Utilities Plans are based, and from
which the City's future land use pattern will come.
A community is a diverse and heterogeneous grouping of people.
Individually, each of us has a set of treasured values. Together, we
give the community a set of shared values.
In a community, individual values often clash and indeed must
confront each other if the shared values of the community are to
develop. Good planning uncovers the values we share as a
community and uses the shared values to guide development of the
Comprehensive Plan.
No plan can be expected to last for all time. Times change,
conditions change, and what we value in our community changes.
Even though this Comprehensive Plan is intended to cover a 20- year
period, the State requires it to be reviewed at least every seven
years and can be amended on an annual basis as necessary. This
allows the City to adjust the Comprehensive Plan as conditions,
Chapter 1 - Introduction 1.3
�i
needs, and desires of the community change. Through the ongoing
development of this Comprehensive Plan, the City of Port Angeles
reaffirms that it is the rightful goal of the people of our community
to take an active role, sharing the work and responsibility involved in
determining the character, quality, and destiny of this community.
Plan Development & Public Participation
The Port Angeles Comprehensive Plan was initially updated from its
1976 version under the GMA in June of 1994. The City's last major
update to the Comprehensive Plan was in 2016. Several minor
amendments have been approved since that time. The 2016 updates
reflected a citywide approach with an ambitious public participation
program.
The 2016 update of the Comprehensive Plan was updated to meet
the requirements of the GMA. Areas of the plan that were expanded
to include handling of archaeological discoveries and sites, the
inclusion of low -impact stormwater management methods that
more closely mimic natural processes, increased emphasis on urban
forestry and landscaping and consideration of issues surrounding
climatic change.
The City of Port Angeles allows amendments to the Comprehensive
Plan to occur on an annual basis, within limited time periods.
The intent of this allowance is to address the community's
destre to adjest zoning, which might also require a change in
land use designation. Individual citizens or groups may propose
Comprehensive Plan amendments during the three month
period between January 1 and March 31 of each year. Proposed
amendments require environmental review, consideration by the
Planning Commission and opportunity for the public to participate,
and a public hearing prior adoption by the City Council.
Organization & Requirements of the
Comprehensive Plan
The Port Angeles Comprehensive Plan is organized with an (1)
Introduction, (2) a series of required and included elements., and
(3) various appendixes including community profile, definition
section, the Capital Facilities Plan, Housing Needs Assessment,
Chapter 1 - Introduction 1.4
�i
and Environmental Impact Statement. Each element addresses
a particular topic and contains a general comment section and
multiple goals with various related policies and objectives. Some of
the elements have an associated map or plan.
The Port Angeles Comprehensive Plan goals are expressed as
broad statements of intent that will fulfill the vision of what the
city intends to become or how the city should look or feel in
the future. The goals in the Comprehensive Plan are supported
by policy statements that usually include the word should. The
policy statements are directive, and provide a basis for decision-
making and establish a principal of wise management leading to
achievement of a goal. Objectives are statements of specific actions
that when taken will result in the realization of a goal.
The GMA requires that a comprehensive plan consist of a map
or maps and descriptive text covering objectives, principles, and
standards used to develop the comprehensive plan. The plan must
also be an internally consistent document, with all elements made
consistent with the Comprehensive Plan Land Use Map.
The Land Use Map is provided to show general uses to be located
in generalized areas of the City. The plan shows six general land
use categories: Low, Medium and High -Density Residential; and
Commercial, Industrial, and Open Space. These general land use
areas are not specifically bounded by streets, parcel lines, or other
political boundaries. For purposes of this plan, they are separated by
what is referred to as "imprecise margins." These, together with the
land use categories, provide a framework and direction for desired
development patterns, while at the same time, allow for flexibility in
applying zoning designations.
The GMA requires that comprehensive plans include a plan, scheme,
or design for each of the following:
• Land Use Element
• Transportation Element
• Utilities Element
• Housing Element
• Capital Facilities Plan Element.
Additionally, comprehensive plans must contain a process for
identifying and siting Essential Public Facilities.
tI
►®—
Chapter 1 - Introduction 1.5
This plan contains each of the required elements as well as four
additional optional elements: A Conservation Element, an Economic
Development Element, a Growth Management Element and a Parks
& Recreation Element. Each of the elements have been developed
to be consistent with the GMA and to reflect the needs and desires
of the City of Port Angeles and its citizens. Detailed minimum
requirements for GMA-required elements are provided in Appendix
C.
tI
►®—
Chapter 1 - Introduction 1.6
Ideals
Implementing
Plans`
Pla ns
D� artrraentai
j
Subarea
Pla ns
Topical
Research
Nq
Strategic »y
Plans
Values Behave -ors
2 0bjecdves ;rndude programs, cupltai Investments, regWatiDm ete,.
-1 fx°omples anIV. rmoeman&g plans may Include a wide warkly ojp(arr types
Figure 1.02 — Comprehensive plans are organized as tiered systems, expressing community desires from
broad -brush ideals (vision) through specific action items the City can lead (objectives). Other types of
plans are sometimes prepared to identify or help implement objectives, taking vision, goal and policy
cues from the comprehensive plan. (Image: Studio Cascade, Inc.)
I►®�
` Chapter 1 - Introduction 1.7
Use of the Comprehensive Plan
The Comprehensive Plan is designed to be used by the public
as a way for citizens to learn the long-range goals and policies
of the City. It is also used as a foundation upon which City
officials make land use and other decisions, and as a tool
which City staff uses to ensure desirable development of
the City. This document provides a sense of predictability
to citizens of the city or potential residents considering
relocating to Port Angeles.
The Plan's Environmental Impact Statement (EIS, Appendix
A) is designed as a programmatic EIS and may be used as a
phased reviewed environmental document for any plans,
ordinances, programs, or development projects that are
consistent with the goals and policies of the Comprehensive
Plan. The EIS has been updated through addenda and regular
State Environmental Policy Act (SEPA) review as amendments
to the Comprehensive Plan have been periodically approved.
Any project proposed in the City will have to show that it is
consistent with the Comprehensive Plan. If it is not, it cannot
be approved unless the Comprehensive Plan is amended and
additional environmental review is completed
Chapter 1 - Introduction 1.8
�i
Community Vision
The Comprehensive Plan public process with the 2016 mandated update resulted in the
following vision statements for a variety of specific areas of interest to citizens, Vision
statements are based on the anticipated conditions of Port Angeles in 2036.
The City of Port Angeles is vibrant and prospering, nurturing a balance of innovation
and tradition to create an environmentally, economically, and fiscally sustainable
community, accepting and cherishing its social diversity, small-town character and
natural setting.
In achieving this vision, Port Angeles recognizes the important roles each of the following
plays:
Environment
Port Angeles' natural setting – with the Strait to the north and
the Olympics to the south – is unique, with creeks, wetlands,
steep slopes and a weather pattern that can be demanding. The
town balances the community's need for economic stability, its
potential for growth and the preservation of the areas' natural
systems.
Economic Development
am Keeping the community em
well -served are key econo
of Port Angeles facilitates
ployed, prosperous, educated, and
m
is development objectives. The City
sustained economic growth, directing
investment to revitalize activity downtown, support local
employment, and keep public services affordable and of high
quality.
Neighborhoods
Slightly more than 25,000 people call Port Angeles home in
2036, residing in neighborhoods that are safe, attractive and rich
in character.
Airport
Fairchild International Airport is an important aviation resource
for local residents and businesses, operating as an important
economic development and community safety priority and with
regular commercial service to SeaTac International Airport.
tI
►®—
Chapter 1 - Introduction
1.9
Downtown
M, _. Port Angeles' central business district is vital and prominent.
The central commercial district is one of Port Angeles' major
assets, intimately connected to the waterfront and featuring
a variety of retail, civic, residential and professional office
uses.
Small Commercial Centers
Small-scale commercial centers are located in areas convenient for
nearby residents and workers, offering a modest array of goods
and services within an easy, enjoyable walk from nearby homes and
employment centers.
Waterfront
w
The central waterfront is an active and successful civic and social
space, equally welcoming to residents and visitors.
'm!% -:Transportation
Mit
' a.` aimPort Angeles' transportation network moves people and goods to,
through and within the community, harmoniously accommodating
cars, bikes, trucks, public transportation, planes, boats, ferries, and
travel by foot.
A-N%Abk I Community Services
k
The community's systems of housing, transportation, economic
1_ development and parks and recreation coordinate to serve all of Port
Angeles' residents, ensuring public safety, economic opportunity,
public health and overall community wellness.
Trails
Port Angeles' trail system builds on the Olympic Discovery Trail
and miles of local trails, contributing to the local quality of life by
inviting community residents and visitors of all ages to wander
and explore.
Chapter 1 - Introduction 1.10
�i
Parks and Recreation
Leisure is an important contributor to quality of life, and Port
Angeles is committed to provide a robust parks and recreation
system in response. Open spaces, both constructed and natural,
function to enliven the human spirit. Whether it's a small pocket
park near downtown, a waterfront esplanade, a sculpture garden
on the hill, or a vast sports complex, the system serves multiple
community needs.
The American Institute of Architects Sustainable
Design Assessment Team Report Vision
In 2009, the City of Port Angeles was inspired by the concept
of bringing in individuals with an outside eye to review
development trends and community issues. The City prepared a
grant application to the American Institute of Architect's Center
for Communities by Design focused on tourism and community
development. The application sought a Sustainable Design
Assessment Team (SDAT) to travel to Port Angeles. In March
of that year five (5) team members engaged the community
to learn more about local challenges and to present a series
of resolutions to those issues. An intense three day planning
exercise ended with thirty new recommendations for the
community to pursue. Allured by the quality and respect given
to the American Institute of Architects organization participation
was widespread resulting in a high level of interest far beyond
that of a typical planning process.
Community members filled Council chambers and anxiously
sought follow up to the recommendations. The City made
a commitment to move forward with recommendations.
Specifically the City Council sub -committee known as the
Port Angeles Forward Committee assisted in getting the low
hanging fruit of the plan implemented. Instead of waiting for
the final report, the Committee dissected the power point
presentation from the final evening meeting of the SDAT process
and developed a detailed list of each specified project. Within
two weeks, 10 items were moved forward to City Council for
implementation. Next the City promoted an additional public
meeting for members of the public to publicly rank each of the
SDAT team recommendations.
Chapter 1 - Introduction 1.11
�i
Immediate items included comprehensive plan changes and
policy oriented issues which shifted focus towards specific
capital projects and code changes. The first ten implementation
items included the introduction of 5 new items in the City
Capital Facilities Plan and 5 new policy items for insertion in the
City's Comprehensive Plan.
Since this initial year new items from the plan have been
implemented annually. The American Institute of Architects
(AIA) report has become the Council endorsed vision for the City
of Port Angeles. This vision complemented by the continued
public input received at public meetings and engagement
sessions over the last nine (9) years.
The vision focuses on improving: the gateways to our
community, our downtown, our primary transportation
corridors and sustaining and enhancing the quality of our local
environment and economy. The visions approach is:
• integrative, holistic, and visual;
• central to achieving a sustainable relationship between
humans, the natural environment, and the place;
• it gives three-dimensional form to a culture and a place; and
• it achieves balance between culture, environment, and
economic systems.
Today the comprehensive plan acts as one of the primary
implementing instruments of the AIA report.
Chapter 1 - Introduction 1.12
�i
LL
Figure 1.03 – Phase II of efforts identified in the 2013 Waterfront
& Transportation Improvement Plan (a subarea plan) designed,
permitted and re-established a beach just west of Oak Street. The
site had formerly been graded and utilized for mill operations.
(Images: City of Port Angeles, Studio Cascade, Inc.)
City Actions Since the 2004 Update
Since the last major update of the Comprehensive Plan,
several objectives have been accomplished. Those
accomplishments include the replacement of both century -
old trestle bridges spanning Valley Creek and Tumwater
Creek on 8th Street. The bridge spanning Peabody Creek at
Lauridsen Boulevard was replaced with a structure that will
allow truck traffic to make the turn and follow Lauridsen as intended
for a cross-town alternative to Highway 101.
The City's landfill has been closed and converted into a regional
transfer station, and work to remove waste materials that remain
in the marine bluff and stabilize the bluff to prevent further adverse
impacts to the shoreline is now complete. A major project to resolve
long-standing issues with combined sewer/stormwater systems
overflowing into the Strait of Juan de Fuca has been completed and
the second project phase is underway and nearing completion.
The City has followed through with the creation of new zone
designations in anticipation of future annexations, especially the
tI
►®—
Chapter 1 - Introduction 1.13
Figure 1.04 — Phase I of efforts identified in the 2013 Waterfront & Transportation Improvement Plan
designed and created a new esplanade along Railroad Avenue between Laurel and Oak streets. (Image:
LMN Architects)
eastern UGA. The Commercial Regional zone was created to be applied
to areas along Highway 101 where existing large commercial uses such
as car dealerships and large -volume stores currently exist or where
land is available for such uses. A major infrastructure goal was achieved
with the extension of a sewer main line to the eastern UGA.
A second new zone was created for large suburban -scale residential
lots. The Residential Single Family zone (RS -11), restricting residential
lots to a minimum of 11,000 square feet or larger has been applied to
areas within existing city limits.
An Industrial Marine (IM) zone was also created to be applied to
shoreline areas focusing primarily on marine trades that may need the
support of commercial uses to provide a framework for mixed uses in a
campus -like environment.
In 2009 the City received a grant from the American Institute of
Architects (AIA). The grant resulted community planning effort known
as the Sustainable Design Assessment. The AIA Sustainable Design
Assessment Team Report has been adopted and incorporated as
an extension of the Comprehensive Plan. Implementation of the
document can be found throughout the implementation chapter of this
document as well as in the City's Strategic Plan.
Chapter 1 - Introduction 1.14
�i
Industrial zoning was modified to include the potential for
work/live situations, where working artists requiring large
work studios with industrial types of activities, are permitted
to live at their studios by conditional use permit.
A major planning effort was completed in 2014. The Shoreline
Master Program (SMP) was approved and accepted by the
Department of Ecology, completing a five-year effort that
included the writing of a new Harbor Resource Management
Plan, Shoreline Inventory/Characterization/Analysis
Document, a Cumulative Impacts Analysis and a Shoreline
Restoration Plan. The shoreline planning effort took place
concurrently with several restoration projects occurring on
the south shoreline of Ediz Hook. The last phase of shoreline
restoration was completed during the summer months of
2016, and will result in a continuous restored shoreline from
Harbor View Park on the east to Sail and Paddle Park on the
west.
A 358 -acre area was annexed into the City in 2005. The
area is located along the south side of Highway 101, west
of the city limits at that time. The area primarily consists
of the Eclipse Industrial Park, accommodating several large
operations, and much of the area is zoned Industrial Heavy.
Portions of the annexed area along Highway 101 also include
commercial and residential uses.
Another major accomplishment is the construction of a
Waterfront Promenade located between Oak Street and
Laurel Street in the city's downtown. The promenade was
the first phase of a multi- phase project planned for the
downtown waterfront. The second phase, also completed,
included creation of two small beach areas where hard -
armored shoreline once existed west of Oak Street to the
Valley Creek Estuary Park. Enhancements to the Waterfront
Trail are also an integral portion of the project. Subsequent
phases will improve the portion of Railroad Avenue east of
Laurel Street to City Pier Park.
An associated downtown project that had been anticipated
for several years was also completed. This "Gateway Project"
resulted in a downtown transit center and covered pavilion
area for public activities. The pavilion is now used regularly
for the local Farmers Market, and as a venue for various
festivals.
Chapter 1 - Introduction 1.15
�i
A portion of downtown's sidewalks and water lines were
replaced beginning in 2006. As part of that project, the west
side of Laurel Street between First and Front was developed
to preserve the last remaining portion of the "Port Angeles
Underground."
Regionally, a major effort involved the removal of the two
dams placed on the Elwha River a century ago. This project
included reconstruction of the City's water collection system
and the intake for the industrial water supply. In addition,
a new bridge was built spanning the river. The new bridge
includes a suspended pedestrian/ bicycle segment of the
Olympic Discovery Trail.
The Olympic Discovery Trail between the western city limits
and 18th Street was improved as the trail right-of-way and
was also used for a sewer line extension to the Lower Elwha
Klallam Tribe's reservation lands. The sewer extension
outside of the city was made necessary by the removal of
the dams upstream from the reservation. The removal of the
dams resulted in a higher ground water table, making on-site
sewer drainfields unusable. The reservation is now served by
City sewer facilities.
In 2007, the City added a Parks & Recreation Element to the
Comprehensive Plan.
In 2009, the City implemented a Fagade and Sign
Improvement Grant program to help small businesses
enhance the appearance of buildings in the city.
Another effort at citywide beautification was accomplished
in 2014 with the passage of a Street Tree Ordinance. The
passage of the ordinance resulted in the City being awarded
the "Tree City USA" designation from the National Arbor Day
Foundation.
All of the above-mentioned projects were included in the
earlier version of the Comprehensive Plan as goals, policies,
or objectives.
Chapter 1 - Introduction 1.16
�i
2.1
page is intentionally left blank)
City of Port Angeles Comprehensive Plan
Growth
Management
This Comprehensive Plan has been developed in
accordance with the requirements of the State
Growth Management Act (GMA). The City met all
of the Act's required deadlines for compliance and
participated with Clallam County (The County), the
City of Forks, the City of Sequim, area Tribes and Nei
other agencies in the development of a County -
Wide Planning Policy.
Early in the planning process, the City agreed with
the County to address only areas within the current
City Limits in the Comprehensive Plan and to work
with the County on a joint Comprehensive Plan for
the Urban Growth Area (UGA). On April 13, 1993,
the Board of Clallam County Commissioners adopted
an Interim Port Angeles UGA. In 2005, the City
and County entered into an interlocal agreement
on a phased annexation plan for the Eastern UGA.
A similar agreement was reached regarding the
western UGA. At that time, the City established
the intended zones that would be applied to areas
annexed to the City from the Eastern UGA.
The following goals and policies are included to
insure continued compliance with the GMA, and
compatibility with the County's Comprehensive Plan
outside of the Port Angeles UGA (PAUGA). Actions
related to GMA goals and policies are included in
Chapter 11, Implementation.
■ GMA Goals & Policies
Goal
G -2A To manage growth in a responsible manner
that is beneficial to the community as a
whole, is sensitive to the rights and needs of
individuals, and is consistent with the State
of Washington's Growth Management Act.
Policies
P -2A.01 In all its actions and to the extent consistent with
the provisions of this comprehensive plan, the City
will strive to implement the following goals of the
State Growth Management Act:
a) Urban growth. Encourage development in urban
areas where adequate public facilities and
services exist or can be provided in an efficient
manner.
b) Reduce sprawl. Reduce the inappropriate
conversion of undeveloped land into sprawling,
low-density development.
c) Transportation. Encourage efficient multi-
modal transportation systems that are based on
regional priorities and coordinated with county
and city comprehensive plans.
d) Housing. Encourage the availability of
affordable housing to all economic segments of
the population. Promote a variety of residential
densities and housing types and sizes, and
encourage preservation and expansion of
existing housing stock.
e) Economic development. Encourage economic
development throughout the region that is
consistent with adopted comprehensive plans,
promote economic opportunity, especially for
unemployed and for disadvantaged persons,
and encourage growth in areas experiencing
insufficient economic growth, all within the
capacities of the region's natural resources,
public services and public facilities.
f) Property rights. Private property should not be
taken for public use without just compensation
having been made. The property rights of
landowners should be protected from arbitrary
and discriminatory actions.
2.3 City of Port Angeles Comprehensive Plan ti
gJ Permits. Applications for both state and local government permits should
be processed in a timely and fair manner to ensure predictability.
hJ Natural resource industries. Maintain and enhance regional natural
resource-based industries, including productive timber management,
agricultural, and fisheries industries.
iJ Open space and recreation. Encourage the retention of open space and
development of recreational opportunities, conserve fish and wildlife
jJ Habitat areas. Increase access to natural resource lands and water, and
develop parks.
kJ Environment. Protect the environment and enhance the state's high
quality of life, including air and water quality, and the availability of
water.
IJ Citizen participation and coordination. Encourage the involvement
of citizens in the planning process and ensure coordination between
communities and jurisdictions to reconcile conflicts.
mJ Public facilities and services. Ensure that those public facilities and
services necessary to support development should be adequate to serve
the development at the time the development is available for occupancy
and use without decreasing current service levels below locally
established minimum standards.
n) Historic preservation. Identify and encourage the preservation of lands,
sites and structures that have historical or archaeological significance.
P -2A.02 The Port Angeles Urban Growth Area (PAUGA) should be established based
at a minimum upon land use demand as determined by the Clallam County
20 -year population forecast for Clallam County and specified sub -areas, so
long as the county -wide forecast is not less than the most recent forecasts
available from the State Office of Financial Management.
P -2A.03 Provide urban services/facilities consistent with the Capital Facilities
Element.
P -2A.04 Work with the County and other service providers to determine the
appropriate levels of service for such facilities and services and to ensure
consistency between service provision within the City, the PAUGA, and the
County.
P -2A.05 Include areas in the PAUGA that are characterized by urban growth
adjacent to the existing City boundaries and take into account the area's
physical features.
P -2A.06 Locate land designated for commercial or industrial uses that encourage
adjacent urban development within the PAUGA.
P -2A.07 Base the amount of acreage designated for commercial, industrial, or
other non-residential uses within the PAUGA upon the Land Use Element
and Economic Development Element in the City's Comprehensive Plan.
tI
►®—
Chapter 2 - Growth Management Element 2.4
P -2A.08 Avoid and exclude critical areas and resource lands in the inclusion of the
PUAGA unless addressed as part of the City's Comprehensive Plan.
P -2A.09 Include, at a minimum, planning and the provision of sanitary sewer
systems, solid waste collection/disposal systems, water systems, urban
roads and pedestrian facilities, street cleaning services, transit systems,
stormwater systems, police, fire and emergency services systems,
electrical and communication systems, school and health care facilities,
and neighborhood and/or community parks within the PAUGA.
P -2A.10 Be the ultimate provider of urban services within the City limits and the
PAUGA for those services the City provides except to the extent otherwise
provided in a UGA Urban Services and Development Agreement that is
reached pursuant to the County -Wide Planning Policy.
P -2A.11 Provide constructed urban services/facilities for which the City is the
ultimate provider to meet the design and construction standards of the
City.
P -2A.12 Demonstrate the financial capability for continued operation of a new
facility prior to construction.
P -2A.13 Ensure the protection of critical areas occurring within the PAUGA.
P -2A.14 Promulgate all development regulations with due regard for private
property rights in order to avoid regulatory takings or violation of due
process and to protect property rights of landowners from arbitrary and
discriminatory actions.
P -2A.15 Work with the County to designate and set aside additional lands on the
west side of the City for industrial and commercial purposes, both inside
the City limits and in the UGA.
P -2A.16 Establish performance measures to review progress toward
accommodating growth and to ensure appropriate actions are taken to
achieve the goals within the Comprehensive Plan.
Goal
G-2113 To ensure the orderly transition of land within the PAUGA into the
City of Port Angeles.
Policies
P-26.01 Annexation of land outside the established boundaries of the PAUGA shall
not be allowed.
P-26.02 Annexation of land from within the established boundaries of the PAUGA
shall be in accordance with the adopted annexation laws.
P-26.03 Annexation of land not adjacent to and/or contiguous with the established
City Limits boundary -line, should not be allowed.
2.5 City of Port Angeles Comprehensive Plan t
��
P-26.04 Appropriately classify and zone such land at the time of annexation based
upon the City Comprehensive Land Use Map and the City Comprehensive
Plan. The provisions, restrictions, and requirements of The Port Angeles
Zoning Code shall apply to development of the annexed area.
P-26.05 Remain consistent with the orderly extension of urban services/facilities
and be in accordance with the City's Comprehensive Plan and capital
facility planning in the annexation and development of land.
P-26.06 Restrict annexation of developed land that cannot meet established
concurrency requirements of the City within six years from the time of
annexation.
P-26.07 Restrict annexation of land that results in decreased minimum standards
for City streets, water service, sewer service, and/or electrical service
provided to existing residents of the City.
P-26.08 Restrict annexation of land that results in decreased minimum standards
for City solid waste collection, stormwater management programs,
emergency services and/or telecommunication services provided to
existing residents of the City.
P-26.09 Draw annexation boundaries to eliminate boundary, interjurisdictional,
and service problems.
P-26.10 Obtain necessary rights-of-way and easements prior to or at the time of
annexation.
P-26.11 Facilitate annexation in a manner that will minimize financial impact to all
residents and businesses.
P-26.12 Annex urban growth areas (UGAs) in accordance with State statutes as
facilities are extended into those areas and as new urban development
takes place.
0
Chapter 2 - Growth Management Element 2.6
�i
2.7
page is intentionally left blank)
City of Port Angeles Comprehensive Plan
Land Use
The Land Use Element establishes City policy
regarding how land may be developed. This
element and its Future Land Use Map (Figure 3.01)
establishes the following six comprehensive plan
land use categories:
• Low Density Residential
• Medium Density Residential
• High Density Residential
• Commercial
• Industrial
• Open Space.
These categories and their associated areas are
configured in coordination with a wide range
of planning considerations including population
projections and a developable lands inventory, per
GMA requirements. Details on these factors may be
found in Appendices A and C.
Together, the goal and policy framework presented
in this element provides direction in realizing
Port Angeles' long-range vision regarding land
use - including optimizing the city's relationship
with its setting; supporting safe, attractive and
character- rich neighborhoods; creating a more
dynamic, successful downtown; and supporting a wide range of
recreational opportunities available to the entire community. Actions
related to Land Use goals and policies are included in Chapter 11,
Implementation.
Land Use Categories
These land use categories are described below and located on the
Future Land Use Map.
Low Density Residential (Up to 6 units per acre)
The Land Use Map identifies three separate categories of residential
land use. The first category is Low Density Residential, which allows
an overall residential density to 6 units per acre. The high majority of
residentially designated property in the City will be of this designation.
It is intended primarily to accommodate single family homes. It also
allows for the development of accessory residential units and duplexes
in accordance with zoning regulations.
Medium Density Residential (Up to 14 units per acre)
This category encourages property development involving multiple
residential units including but not limited to duplexes, townhouses,
condominiums, and apartments at a density no less than 4 units per
acre and up to 14 units per acre.
High Density Residential (Up to 40 units per acre)
This category encourages development at a density no less than 10
units per acre and up to 40 units per acre. Itis intended for areas where
a higher concentration of residents is compatible with the surrounding
area and uses. Condominiums and apartments, are the most common
types of building designs appropriate for this category. An exception is
made for existing motel or hotel units converted to residential units at
a density greater than 40 Units per acre).
Commercial
The Land Use Map contains one commercial category, thus providing
maximum flexibility in the types of commercial uses allowed in
permitted locations under the City's Zoning Ordinance.
Industrial
The Land Use Map also designates only one industrial category, thus
again providing maximum in the types of industrial uses allowed in
permitted locations under the City's Zoning Ordinance.
3.2 City of Port Angeles Comprehensive Plan ti
Open Space
The Open Space category specifies areas of the City with unique or
significant physical open spaces, such as marine shorelines, bluffs,
ravines, major streams, wetlands, critical wildlife habitat, and other
natural areas deemed important to the community.
This category also includes developed parks and recreational spaces.
The development of natural open space areas should minimize
degradation the remaining natural open space. Goal G -3A
t
►��
Chapter 3 - Land Use Element 3.3
�i
(This page intentionally left blank)
iloal'ajoi
L-0
ti
■ Land Use Map Goals & Policies
Goal
G -3A To guide land development in a manner that balances providing
certainty about future land use and allowing flexibility necessary
to adapt to future challenges and opportunities.
Policies
P -3A.01 Use the Comprehensive Plan Land Use Map as a conceptual guide when
making all zoning and other land use decisions, including all land use
decisions and approvals made by City Council and/or any of its appointed
Commissions, Boards, or Committees.
P -3A.02 Use low impact development techniques, where feasible in new land
development.
■ Residential Goals & Policies
Goal
G-3113 To ensure residential land use and development is compatible with
the environment with existing uses and residents, and with desired
urban design.
Policies
P-36.01 Provide urban services to all residential areas as required by the Capital
Facilities Element concurrency policy.
P-36.02 Ensure that single family lots are of reasonable shape and have access
provided by a collector arterial, local access street or alley.
P-36.03 Require the subdivision of large lots which leaves remaining lots larger
than the minimum density for the zone to allow future subdivisions at the
densities permitted for the zone in which they are located.
P-36.04 Design streets and circulation patterns in all new residential developments
to enable fire protection and service vehicle access as key factors in street
design and circulation pattern.
P-36.05 Encourage street improvements and acquisition of rights-of-way to further
the grid street pattern in the central "townsite" area of the City. Permit
cul-de-sacs and curvilinear streets in outlying areas subject to low impact
development standards when designed in conjunction with the main
street grid.
Chapter 3 - Land Use Element
�i
3.7
0
P-36.06 Encourage residential development to preserve and capitalize on existing
unique natural, historic, archaeological, and/or cultural features including
promotion of native and drought tolerant vegetation and scenic views.
Encourage design of new residential development that maximizes
southern exposures and solar efficiency, protects from prevailing winds,
and is designed to minimize energy use.
P-38.07 Emphasize the overall density of the development rather than minimum
lot sizes when planning new residential development.
Goal
G -3C To create and maintain a fulfilling and enjoyable community of
viable districts and neighborhoods with a variety of residential
types attractive to people of all ages, characteristics and interests.
Policies
P -3C.01 Employ the district and neighborhood concept when developing
residential land. Although such districts may be composed primarily of
residential uses of a uniform density, the most healthy, viable districts are
composed of residential uses of varying densities, and may be augmented,
by other compatible uses. Single family and multi -family homes, parks and
open -spaces, schools, churches, day care and residential services, home
occupations, and district shopping areas are all legitimate components of
residential districts
P -3C.02 Ensure medium and high density housing is served by arterial streets
of sufficient size in order to satisfy traffic demand and to lessen
neighborhood traffic congestion.
P -3C.03 Apply medium and high density housing policies to mobile home parks.
P -3C.04 Treat manufactured homes that meet current state regulations as site
constructed housing for zoning purposes.
P -3C.05 Expand housing opportunities in the Central Business District for all
income levels, with an emphasis moderately priced owner -occupied units.
Commercial Goals & Policies
Goal
G-311) To create and maintain a healthy and diverse commercial sector
for a balanced and stable local economy.
Policies
P -3D.01 Encourage the recruitment of new and the retention of existing
commercial developments and businesses
3.8 City of Port Angeles Comprehensive Plan ti
P -3D.02 Allow public uses such as government offices, public service buildings,
and other public and quasi -public facilities and services in commercially
designated areas.
Goal
G -3E To provide shopping areas meeting the needs of all City residents
and visitors that are safe, compatible with surrounding land uses,
and congruent with environmental goals.
Policies
P -3E.01 Mitigate the impacts of commercial development on adjacent residential
properties, including the use of site design elements that soften the
impacts.
P -3E.02 Separate vehicles and bicycles from pedestrian areas whenever possible to
accommodate vehicular traffic and pedestrian safety.
P -3E.03 Locate shopping areas at the intersections of arterial streets of sufficient
size to satisfy traffic demand and at the boundaries of neighborhoods so
that more than one neighborhood may be served.
Goal
G -3F To provide a pleasant, safe, and attractive shopping environment in
the traditional downtown waterfront area including a wide variety
of shopping, dining, entertainment, arts, culture, and housing
opportunities for visitors and residents alike.
Policies
P -3F.01 Guide commercial development in the traditional downtown to emphasize
its waterfront location and historic heritage
P -3F.02 Orient the design of commercial development in downtown around
pedestrian travel, tourist enjoyment, and protection from adverse weather
conditions.
P -3F.03 Actively promote improvements to the traditional downtown area through
beautification projects and in cooperation with downtown business
merchants.
P -3F.04 Encourage residential units in the downtown area as part of a mixed-
use development concept, including live/work spaces. Ensure that the
downtown physical environment is amenable to residential development
by minimizing traffic impacts, maintaining security, and providing and
maintaining amenities.
t
►��
Chapter 3 - Land Use Element 3.9
�i
0
Industrial Goals & Policies
Goal
G -3G To create and maintain a healthy and diverse industrial sector for a
balanced and stable local economy.
Policies
P -3G.01 Develop and promote a cooperative intergovernmental plan for
comprehensive development of industrial infrastructure and amenities to
attract and support light and heavy industry.
P -3G.02 Allow office, commercial, and limited live/work uses in specifically
designated industrial areas. Encourage live/work environments for art or
media based cultural activities that are consistent with and avoid impact
on neighboring industrial uses.
P -3G.03 Consider the William R. Fairchild International Airport an essential public
facility, as referenced in Appendix B (Clallam County -Wide Planning
Process).
Goal
G -3H To provide opportunities for industrial development in a manner,
which efficiently uses the community's natural resources and
physical environment, has minimal impact on the natural
environment, contributes to quality of life, and is compatible with
the desired development patterns
Policies
P-311-11.01 Ensure provision of urban services to all industrial areas, as required by
the Capital Facilities Element concurrency policy.
P-311-11.02 Develop infrastructure, which makes sites attractive and ready to develop,
including transportation facilities and utilities at industrial parks. Industrial
development should be encouraged to follow industrial park design
concepts.
P-311-11.03 Ensure that industrial areas mitigate nuisances and hazardous
characteristics such as noise, air, water, odor, pollution, or objectionable
visual material.
P-311-11.04 Do not permit petroleum refineries, liquefied natural gas and liquefied
petroleum gas facilities, non -clean energy facilities, energy plants and
their associated facilities and associated transmission facilities (as defined
in Chapter 80.50 RCW) outside the heavy industrial use area and without
conditional use review. These facilities are hazardous to the community
and detrimental to the general environment of the area.
3.10 City of Port Angeles Comprehensive Plan ti
P-311-11.05 Discourage the siting of land uses incompatible with airport related uses
and other neighboring land uses adjacent to the William R. Fairchild
International Airport
P-311-11.06 Allow the conditional siting of clean -energy facilities (e.g., solar, wind,
geothermal, wave, tidal) outside of industrial areas.
P-311-11.07 Consider the climate change impacts of any proposed new industrial
activity or expansion before approval.
Goal
G-31 To facilitate reuse of large vacant or isolated industrial areas no
longer in operation to improve the local economy and employment
stability.
Policies
P-31.01 Allow a wide range of land uses in the redevelopment of large vacant
or isolated industrial areas no longer in operation, including mixed-use
development, commercial development, or residential development as
well as industrial uses, provided that these uses will not encourage the
conversion of other industrial areas to non -industrial use.
■ Open Space Goals & Policies
Goal
G -3J To create open space within the urban landscape, retain natural
landscapes, preserve fish and wildlife habitat, and to provide
natural corridors connecting wildlife habitats.
Policies
P-31.01 Preserve unique or major physical features such as marine shorelines,
bluffs, ravines, streams, wetlands, wildlife habitat and other
environmentally sensitive areas deemed of significant importance to the
community as designated open space.
P-31.02 Promote the preservation of wildlife habitat and open space corridors
between the waterfront and Olympic National Park.
P-31.03 Regulate access to natural areas open spaces so as to avoid degrading
areas and to protect the rights of property owners. Discourage intensive
recreational uses and construction of impervious surfaces in sensitive
open spaces.
P-31.04 Preserve wooded areas, vegetation, and individual trees in the urban
landscape, as they serve a functional purpose in climate, noise, light,
habitat, and pollution control.
t
►��
Chapter 3 - Land Use Element 3.11
�i
Goal
G -31K To encourage the development of parks and recreational
opportunities for all residents of the City and to increase access
to natural areas in a manner that minimizes adverse impacts, and
achieves the desired urban design of the City.
Policies
P -311K.01 Ensure that development and planning of parks and recreational facilities
is consistent with the Capital Facilities Element.
P -311K.02 Distribute public parks and recreational facilities equitably throughout the
City to afford access to all residents.
P -311K.03 Utilize land donated for public use to provide common open space, public
buildings, parks, and recreational opportunities, while incorporating LID
techniques and BMPs in all projects where feasible.
P -311K.04 Preserve and maintain unique or major physical features contained
within the boundaries of City parks and recreational areas for access and
enjoyment by residents of the community.
P -311K.05 Cooperate with the County and other jurisdictions in planning, funding,
constructing, and managing multi-purpose recreation and transportation
trails which link together various areas of the City, the Port Angeles Urban
Growth Area (PAUGA), and other areas of the County and region.
0
3.12 City of Port Angeles Comprehensive Plan ti
Transportation
The intent of the Transportation Element is to
define in a comprehensive manner how vehicular
traffic and non -motorized modes of travel are to
be routed from one portion of the community
to another in the most efficient, economical,
and compatible manner. The City's Circulation
Plan in accordance with the Statewide National
Functional Classification System identifies the City's
principal arterial streets, minor arterial streets,
and collectors with the remaining streets classified
as local streets (See Figure A914). The City's
Circulation Plan acknowledges that such a regional
system serves many functions. It is a means of
intercity commuting, a way to promote economic
development, a means to promote a healthy
lifestyle, and a way to provide future utility right-of-
way.
Together, the goal and policy framework presented
in this element (and the analysis in Appendix D)
provides direction in realizing the City's long-range
vision regarding transportation - including support
for a strong economy; creating walkable, people -
friendly environments; and improving the health
and quality of life for all residents of Port Angeles.
Actions related to Transportation are included in
Chapter 11, Implementation.
TO
0
Transportation Goals & Policies
Goal
G -4A To develop a coordinated, multimodal transportation system,
which serves all areas of the city and all types of users in a safe,
economical, and efficient manner.
Policies
P -4A.01 The safety of non -motorized modes of transportation shall be a primary
consideration in the circulation system.
P -4A.02 Planning for transportation services and facilities (including public streets,
bikeways, pedestrian walkways, public and private air, marine and land
transit services and facilities) shall be performed consistent with the goals
and policies of the Capital Facilities Element.
P -4A.03 Road improvements should provide for alternate modes of transportation,
and new roads should be evaluated for the ability to accommodate
alternate modes of transportation.
P -4A.04 Encourage development of low -carbon -impact transportation
infrastructure.
P -4A.05 Consider converting alleyways into attractive pedestrian zones for access
to local businesses. Encourage alleyways for use as pedestrian zones.
P -4A.06 Improve trails, sidewalks, streets, and public facilities to encourage
walkability and non -motorized transportation.
Goal
G-4113 To improve circulation patterns across and within the community,
and to achieve the desired urban design of the City.
Policies
P-46.01 Consider traffic flow modifications such as signalization, signing, parking
restrictions, channelization, and one-way couplets before physical
alterations are made to existing streets.
P-46.02 Divert cross-town truck traffic around the downtown area.
P-46.03 Facilitate the planning processes necessary for the development of an
alternate local cross-town route with improvements that provide full
access at US 101 and SR 117 (the Tumwater Truck Route).
P-46.04 Strengthen the city's development regulations as necessary to preserve
the right-of-way within an identified US 101 corridor
P-46.05 Advocate a second crossing over White's Creek.
4.2 City of Port Angeles Comprehensive Plan t
��
P-46.06 Design and construct new arterial streets, local access streets, and
alleys to conform to the most current editions of the Statewide National
Functional Classification System for Federal Aid Systems, WSDOT, and
Transportation Improvement Board minimum design standards and
standards as adopted by the City. Permeable pavement is preferred for
local access streets and alleys where feasible.
P-46.07 Publicly dedicate street rights-of-way associated with the subdivision
processing advance of the time of individual lot development in
accordance with the Comprehensive Plan's Circulation Plan Map.
P-46.08 Locate principal, minor, and collector arterial streets on the edge of
district boundaries wherever possible.
P-46.09 Ensure off-street parking should be sufficient and accessible within
business and residential areas so the traffic flow of the street is not
impaired.
P-46.10 Police and fire protection should be a key factor in residential subdivision
street designs and circulation patterns.
P-46.11 Coordinate the development of the City's comprehensive service and
facilities plan for streets, bikeways, pedestrian walkways, and the overall
transportation system and regional transportation plans.
P-46.12 Work with other jurisdictions to identify and protect a right-of-way for a
second developed right of way
P-46.13 Work with public and private transportation providers to provide greater
access and opportunities to residents, including Sunday and holiday
service.
P-46.14 Consider potential environmental consequences, such as greenhouse -
gas emissions and carbon footprints, when encouraging new commercial
developments and businesses.
Chapter 4 -Transportation Element 4.3
(This page intentionally left blank)
Utilities & Public
Services
The Utilities and Public Services Element identifies
and addresses the various services that make a
community a safe and desirable place to live. It also
establishes policies that define which services are
the responsibility of the City to provide and which
should be provided by the community as a whole.
Taken together, the policy framework presented
in this element will help Port Angeles realize many
of its long-range goals - including sustaining the
natural environment; supporting economic growth
and opportunity; and helping keep services efficient
and cost-effective. Actions related to Utilities
and Public Services are included in Chapter 11,
Implementation.
M
■ Utilities Goals & Policies
Goal
G -5A To provide or allow the opportunity for services and facilities
which enhance the quality of life for Port Angeles citizens of all
ages, characteristics, needs, and interests and to achieve the
desired urban design of the City.
Policies
P -5A.01 Include provisions in public facilities for citizens with disabilities and
construct them according to accepted standards.
P -5A.02 Locate social services providing home care in residential neighborhoods in
a manner that maintains the character of the immediate neighborhood.
P -5A.03 Comprehensive service and facility plans should be consistent with the
City's Comprehensive Plan and should be implemented through applicable
land use approvals and construction permits.
P -5A.04 Encourage age-appropriate services for all -age groups.
P -5A.05 Incorporate tribal issues and interests into city projects.
Goal
G-5113 To support services and facilities through different levels of
participation in cooperation with other public or private agencies.
Policies
P-56.01 The City should be the "primary responsible agency" and should take the
lead in cooperation with other governmental entities to provide:
■ Utility and emergency services (water, sewer, electrical, stormwater,
police, fire and emergency medical response services)
■ Transportation infrastructure, including trails and sidewalks and
■ Parks and recreation
P-56.02 The City should participate as a "financial partner" to support essential
programs and services including:
■ Youth recreation programs and facilities
■ Library facilities
■ Senior programs
■ Low and moderate income housing programs
■ Facilities for senior programs
■ Utility assistance for low income households, and
5.3 City of Port Angeles Comprehensive Plan ti
■ Social and public health services.
P-56.03 As a "supporter," the City should promote and cooperate in providing
programs and services including:
■ Library programs such as information and assistance
■ Affordable housing information and referral
■ Economic and business development services
■ Tourism information and services
■ Schools and community learning
■ Fine arts
■ Community recreation
■ Public and private youth, family and senior services
■ Telecommunications and
■ Crime prevention programs
■ Health Care programs.
P-56.04 Develop and use public facilities cooperatively, in the promotion of social
and community services.
Goal
G -5C To provide safe, clean, usable, and attractive public facilities which
enhance the cultural, educational, economic, recreational, and
environmental attributes of the City.
Policies
P -5C.01 Support industrial diversification by the development of urban services.
P -5C.02 Major parks and large open spaces should provide for a variety of
outdoor activities and be located to take advantage of natural processes
(such as wetlands and tidal actions) and unusual landscape features
(such as cliffs and bluffs), and to integrate stormwater facilities into the
natural landscape where feasible (such as LID techniques and BMPs and
stormwater treatment wetlands).
P -5C.03 Provide a variety of settings and activities suitable to people of all ages,
characteristics, and interests.
P -5C.04 Encourage more active involvement and communication between
education (professional and student), business, community, art and
cultural communities to help integrate key people into the startup
community.
P -5C.05 Work in partnership with the community as stewards of the area's unique
environment and quality of life.
tI
►®—
Chapter 5 - Utilities & Public Services Element 5.4
Goal
G -51D To provide utility services in an efficient and cost-effective manner.
Policies
P-511).01 Design urban services for the maximum planned density and/or land use
intensity of a given area as designated on the Comprehensive Plan Land
Use Map.
P-511).02 Provide urban services only in areas that are logical extensions of areas,
which are currently served by such services or needed to implement a
specific goal or policy of the Comprehensive Plan.
P-511).03 Promote and encourage energy conservation, renewable energy,
distributed energy generation, improved distribution efficiencies, and
recycling efforts throughout the community.
P-511).04 Promote the joint use of transportation rights-of-way and utility corridors
for all forms of transportation, including non -motorized.
P-511).05 Promote coordination, consistency, and concurrency at all stages of utility
development in the Port Angeles Urban Growth Area.
P-511).06 Planning for utility services should be consistent with the goals and
policies of the Capital Facilities Element.
P-511).07 Serve new development with sanitary sewers.
P-511).08 Consider the policies adopted in the Water Resources Inventory Area 18
Watershed Management Plan, including the provision of water supply to
the urban areas in and between the Elwha River and Morse Creek drainage
basins.
P-511).09 Provide infrastructure to all industrial lands to encourage development.
P-511).10 Encourage the use of renewable energy in both the private and public
sectors, providing all reasonable support and advocacy at the State level
for regulations and incentives that encourage such installations.
0
5.5 City of Port Angeles Comprehensive Plan ti
Housing Le...
The City recognizes the extreme importance of
available clean, safe, and affordable housing in the
community.
The results of the 2006 study and public input
provided during the 2016 update process, and 2019
Housing Action Plan influenced the development
of the following goals, policies and objectives,
which strive to achieve Port Angeles' long-range
vision for housing. Beyond improving the quality,
affordability, attainability, and availability of
housing for residents, this element is seen to
support community objectives related to economic
development, downtown growth, neighborhood
character, and service -efficient, more cost-effective
development patterns. The Actions related to
Housing are included in Chapter 11, Implementation.
0
Housing Goals & Policies
Goal
G -6A To improve the variety, quality, availability, and attainability of
housing opportunities in the City of Port Angeles.
Policies
P -6A.01 Expand the residential land use options in the Zoning Code by classifying
residential zones by allowed density rather than by housing types.
P -6A.02 Allow residential uses in all non -industrial zones. In situations where
a limited work/live environment is found to be compatible with an
underlying industrial zoning, limited work/live environments may be
deemed suitable when the living space is subordinate in nature to the
industrial use component and the integrity and intent of the industrial
zone is maintained.
P -6A.03 Encourage the retention and development of safe and attractive mobile
home parks.
P -6A.04 Plan for sufficient urban services to support future housing in a variety of
allowable densities.
P -6A.05 Allow accessory residential units in single family residential zones.
P -6A.06 Promote acceptance of low and moderate income housing.
P -6A.07 Consider the effect of impact fees on the affordability of housing prior to
establishing such impact fees.
P -6A.08 In accordance with RCW 59.18.440 and .450, require State and Federal
publicly assisted housing under current contracts who demolish,
substantially rehabilitate, change the use of residential property, or
remove use restrictions developments to provide relocation assistance
to those tenants displaced as provided for in sections 49 and 50 of the
Growth Management Act.
P -6A.09 Work with the County to increase densities in some areas of the sparsely
developed southwestern UGA along Lauridsen Boulevard from low density
to medium density, consistent with the recently developed airport safety
zones and FAA use recommendations.
P -6A.10 Investigate the appropriate siting of additional land to be designated
medium density and high density.
P -6A.11 Provide an appropriate balance between attainable market -rate housing
and affordable housing and ensure that affordable housing is provided in a
way that contributes to the physical appearance and economic and social
health of the neighborhoods and the City.
P -6A.12 Encourage the use of Green Building techniques for new developments
and support Green Built certification for new developments.
6.2 City of Port Angeles Comprehensive Plan ti
P -6A.13 Encourage the use of Low Impact Development stormwater management
techniques (such as vegetated roofs, permeable pavement, and bio -
retention) for all new developments.
P -6A.14 Allow for mixed-use opportunities in neighborhoods, including commercial
development and mix of housing densities.
P -6A.15 Identify opportunities for housing revitalization in targeted areas including
the downtown core.
P -6A.16 Promote and increase the number of downtown residential living units.
P -6A.17 Develop strategies to combat homelessness and housing insecurity
amongst residents.
P -6A.18 Develop and implement tools to support a range of housing types
including affordable housing options.
Goal
G-6113 To participate with Clallam County and other entities in programs
to increase the availability and affordability of public assisted
housing and rental units as well as other affordable housing
opportunities.
Policies
P-66.01 Participate in a county -wide housing task force comprised of
representatives from government, financial institutions, business,
construction, real estate, non-profit housing entities, and other citizens
interested in housing issues. A major goal of the task force should be
coordinating efforts to provide affordable housing, encouraging rapid
review of low and moderate income housing projects throughout the
County, and promoting public education and awareness regarding the
need for and nature of affordable housing.
P-66.02 Cooperate with the county -wide housing task force and other agencies in
assembling packages of publicly owned land, which could be used for low
and moderate income housing and for shelter or transitional housing.
P-66.03 Cooperate with the County to promote innovative housing techniques
and explore creative regulatory programs for the purpose of creating and
preserving existing affordable housing opportunities. P-66.04
P-66.04 Invite the Peninsula Housing Authority to participate in a variety of
affordable housing opportunities and seek representation on the Peninsula
Housing Authority and non-profit housing organizations.
P-66.05 Provide adequate low and moderate income housing opportunities within
the Port Angeles Planning Area.
P-66.06 Support affordable housing by developing utility cost savings programs
and the provision of transitional and temporary housing for the homeless
and/or displaced families.
Chapter 6 - Housing Element
�i
6.3
P-66.07 Designate specific medium and high density zones where increased
building height limitations could be increased.
Goal
G -6C To use the 2019 Housing Action Plan as a guide and
implementation tool for future City actions in support of providing
available State supported financing options, municipal code
revisions that promote innovative housing products and designs,
incentive zoning, and renovation/rehabilitation of existing of the
City's housing stock.
Policies
P -6C.01 Encourage innovative housing development based on Port Angeles'
forecasted demographic changes.
P -6C.02 Designate timelines for planning actions that adequately address housing
needs within the City and unincorporated UGA.
P -6C.03 Promote housing renovation and rehabilitation.
P -6C.04 Incentivize the provision of non-cash density offsets to assist in the
development of affordable housing options.
P -6C.05 Encourage the partnership and coordination of the City of Port Angeles,
Clallam County, Peninsula Housing Authority, Lower Elwha Klallam Tribe,
other local public agencies, and North Peninsula Builders Association to
continue focusing on solving issues with the developed and provision of
attainable housing on the North Olympic Peninsula.
P -6C.06 Encourage the issuance of annual and periodic updates to the Housing
Action Plan.
P -6C.07 Develop measureable standards to assess the progress and
implementation of the core recommendations of the Housing Action Plan.
11
6.4 City of Port Angeles Comprehensive Plan
0
Conservation
The Conservation Element establishes the
importance of quality of life to the people of Port
Angeles. A clean, healthy, and diverse natural
environment along with a variety of historical and
cultural amenities are critical elements of a high
quality community.
As with other elements, this chapter provides
a goal, policy and action framework to support
Port Angeles' long-range vision related to
conservation. This includes efforts to optimize the
city's relationship with its natural historic, and
cultural setting by protecting and enhancing the
environment and identifying and conserving sire and
entities of historic or cultural significance.
Actions related to conservation goals and policies
are included in Chapter 11, Implementation.
0
Conservation Goals & Policies
Goal
G -7A To promote sustainable development and land use that is
compatible with the overall natural environment, historical,
archaeological, and cultural amenities.
Policies
P -7A.01 Require all development, including the location and design of all structures
and open space areas, to be compatible with the unique physical features
and natural amenities of the land and complement the environment in
which it is placed, while recognizing the rights of private ownership.
P -7A.02 Promote compatibility between the land and its use by regulating the
intensity of the land use.
P -7A.03 Adopt development criteria, which promote the use of innovative design
techniques to provide for the use of the land in a manner compatible with
any unique physical features or valuable natural, historical, and/or cultural
amenities.
P -7A.04 Building density should decrease as natural constraints increase.
P -7A.05 Establish minimum standards for development of properties, which
contain or adjoin critical areas for the purpose of protecting such areas
and enhancing their natural functions.
P -7A.06 Regulate site design, preparation, and development to avoid or minimize
damage to wetlands and other environmentally sensitive areas.
P -7A.07 Use regionally consistent requirements for industrial and commercial
sewer discharge pretreatment and require new indirect dischargers to
locate where appropriate sewer service can be made available.
P -7A.08 Designate open space areas to preserve major or unique physical features,
to serve as natural greenbelts and wildlife corridors, and to establish an
urban edge to the PAUGA.
P -7A.09 Coordinate its environmental regulations with County, State, and Federal
regulations to simplify the permitting process and to reduce associated
costs to the land user.
P -7A.10 Review all new development for impacts on climate change and
adaptation to sea level rise.
P -7A.11 Implement site-specific requirements for individual development
proposals to mitigate any negative impacts created by the development,
particularly to an area identified as an environmentally sensitive area.
7.2 City of Port Angeles Comprehensive Plan ti
Goal
G-7113 To protect and enhance the area's unique physical features, its
natural, historical, archaeological, and cultural amenities, and the
overall environment.
Policies
P-76.01 Maintain and preserve the City's unique physical features and natural
amenities, such as creeks, streams, lakes, ponds, wetlands, ravines, bluffs,
shorelines, and fish and wildlife habitats.
P-76.02 Promote and highlight Port Angeles' plentiful natural beauty, amenities
and cultural history.
P-76.03 Recognizing the functions and values of wetlands, the City should strive to
achieve no net loss of wetlands.
P-76.04 Preserve uniquely featured lands, which still exist in their natural states
and which are notable for their aesthetic, scenic, historic, or ecological
features. Prohibit any private or public development, which would destroy
such qualities, or would subject features to damage from climatic change,
while recognizing the rights of private ownership.
P-76.05 Enhance and preserve the quality of the City's air and water as two of its
unique physical features.
P-76.06 Protect air and water quality by minimizing pollution from new and
existing sources including climatic change impacts.
P-76.07 Develop and implement a plan to improve water quality, which includes
measures to reduce and minimize stormwater pollutants and combined
sewer overflow pollutant discharges.
P-76.08 Maintain and enhance the quality of water resources through the
regulation of clearing, grading, dumping, discharging, and draining and the
provision of flood and erosion control measures and regulations to protect
wetlands and other environmentally sensitive areas.
P-76.09 Protect water quality and prevent erosion through the retention of
existing vegetation.
P-76.10 Encourage identification, preservation, and restoration of sites and
structures that have historical or cultural significance.
P-76.11 Give precedence to long-term environmental impacts and benefits over
short-term environmental impacts and benefits.
P-76.12 Promote and utilize environment enhancing conservation practices.
Those practices may include waste reduction, use of energy efficient and
conserving materials, and energy conservation techniques and should also
encourage the development and use of alternative forms of energy and
transportation.
Chapter 7 - Conservation Element
7.3
P-76.13 Reference the most recently adopted Washington State Citations of
Recommended Sources of Best Available Science for Designating and
Protecting Critical Areas and other research identified as more locally
appropriate and applicable when available as Best Available Science in the
Critical Areas Ordinance.
P-76.14 Avoid adverse impacts to archaeological sites by following and requiring
best management practices for archaeological preservation.
P-76.15 Publicly recognize the many values provided by trees in an urban setting
and identify opportunities to plant trees.
P-76.16 Establish and implement an urban tree management program intended
to retain and/or restore the overall tree canopy in the city by using plant
materials as a unifying element and tool to protect the health, safety and
welfare of the public, using the environmental services provided by trees
to mitigate the negative effects of impervious surfaces and vehicular
traffic such as increased temperatures, airborne particulates, carbon
dioxide, nose, and stormwater runoff.
P-76.17 Plant trees along residential streets, in parking lots, and in other areas
as opportunities arise. Trees should be retained whenever possible and
maintained using Best Management Practices as appropriate for each tree
type.
P-76.18 Seek strategies and technologies which reduce greenhouse gas (GHG)
emissions by city facilities and operations.
P-76.19 Promote the use of alternative energy, energy conservation technology,
and smart energy grid.
Goal
G -7C To promote community awareness and education of the
importance and responsible use of our environmental, historical,
and cultural amenities, with a focus on minimally impacting these
resources.
Policies
P -7C.01 Inform the public concerning the long-term benefits of protecting and
improving the quality of the region's air, land, and water.
P -7C.02 Encourage the development and implementation of environmental,
historical, and cultural awareness programs which focus on local and
regional issues, including climate change impacts and preparedness.
7.4 City of Port Angeles Comprehensive Plan ti
Goal
G -71D To preserve and enhance the City's shoreline, its natural vegetation
and wildlife and to mitigate for present and planned impacts in a
manner consistent with the State Shoreline Management Act and
the City's Shoreline Master Program.
Policies
P -7D.01 Preserve shoreline areas for future generations by restricting or
prohibiting development that would interfere with the shoreline ecology
or irretrievably damage shoreline resources.
P -7D.02 Maintain and restore riparian vegetation in shoreline areas and on tributary
streams, which affect shoreline resources wherever possible.
P -7D.03 Employ techniques to rehabilitate degraded shorelines for the purpose of
shoreline stabilization and habitat enhancement wherever possible.
P -7D.04 Preserve and protect aquatic habitats including shellfish habitat, and important
marine vegetation should be wherever possible.
P -7D.05 Development patterns and densities on lands adjacent to shorelines should be
compatible with shoreline uses and resources and reinforce the policies of the
Shoreline Management Act and the City's Shoreline Master Program.
P -7D.06 Utilize common utility corridors for urban service facilities located in shoreline
areas.
P -7D.07 Designate an adequate shoreline area for water -oriented commercial and
industrial development based on the Land Use Element.
P -7D.08 Locate shoreline uses and activities to avoid environmentally sensitive and
ecologically valuable areas and to insure the preservation and protection of
shoreline natural areas and resources.
P -7D.09 Locate utility facilities and rights-of-way outside of the shoreline area wherever
possible, and if unavoidable, protect shoreline ecology and resources.
0
Chapter 7 - Conservation Element 7.5
�i
(This page intentionally left blank)
7
Capital Facilities �
The Capital Facilities Element consists of two parts.
The first part is the listing of goals and policies
regarding the City's provision of urban services and
its planning of capital improvements. The second
part is the Annual Capital Facilities Plan which is
adopted separately from the Comprehensive Plan
but is included as part of the plan as an attachment.
The Comprehensive Plan defines urban services in
its definition section, which includes a listing of the
following services and facilities, which should be
available in an urban environment:
• Surface transportation facilities
• Water facilities
• Sewer facilities
• Stormwater facilities
• Solid waste facilities
• Parks and recreational facilities
• Emergency services (police, fire and medical
response)
Public Facilities within the City of Port Angeles
managed by outside agencies:
Public schools facilities
Regional facilities (libraries, corrections, and
mass transit).
The following goals and policies provide guidance on how these
services and facilities should be provided. This includes the
establishment of minimum levels of service standards for each
service. The policies also call for the development of individual
comprehensive service and facility plans which take an in-depth
look at the current status of each service and the projected future
demand for each service and which include a financial feasibility
analysis on the costs of providing each service.
The Capital Facilities Plan is a six-year plan, which establishes how,
where, and when the City will develop the facilities necessary to
provide its various services.
8.2 City of Port Angeles Comprehensive Plan ti
■ Capital Facilities Goals & Policies
Goal
G -8A To provide and maintain safe and financially feasible urban services
and capital facilities at or above stated levels of service to all City
residents and the general public.
Policies
P -8A.01 The Comprehensive Plan should establish general level of service
standards for each urban utility and service. Such standards should be
used to determine the impacts of development.
P -8A.02 Develop individual comprehensive service and facility plans for the
following capital facilities and/or services:
■ Transportation, including streets, and non -motorized (bikeways and
pedestrian walkways),
■ Water system,
■ Sanitary sewer system,
■ Electrical system,
■ Parks and recreation services, and
■ Emergency services (police, fire, and medical response).
P -8A.03 Each comprehensive service and facility plan should be consistent with
the Comprehensive Plan, the County -Wide Planning Policy, and the State
Growth Management Act.
P -8A.04 At a minimum, ensure the continuation of established level of service
standards for all urban utilities and services to the extent and in the
manner provided herein.
P -8A.05 Cooperate with the appropriate private and/or public agencies to develop
individual comprehensive service and facility plans for each of the
following utilities and/or services:
■ Telecommunications,
■ Schools,
■ Mass transportation, and
■ Solid waste collection and disposal.
P -8A.06 Create and maintain comprehensive service and facility plans
consistent with the general level of service standards established in the
Comprehensive Plan and establish detailed level of service standards
which, at a minimum, meet all local, state and federal health and safety
requirements.
Chapter 8 - Capital Facilities Element 8.3
�i
Establish desired level of service standards and should include an
inventory of current facilities, measurements of current and future service
capacities, the determination of future service and facility improvements
necessary to serve the twenty-year vision of the Comprehensive Plan Land
Use Map, and a financial feasibility analysis.
P -8A.07 Create and maintain comprehensive service and facility plan for streets
and non- motorized facilities (bikeways, trails, and pedestrian walkways)
that include specific actions and requirements for bringing into compliance
any street facilities that fall below the required level of service, including
demand management strategies which encourage reduced reliance on
single occupant vehicle trips and encourage use of alternate modes of
transportation such as the bicycles, walkways, and transit riding with
incentive programs for and from local businesses.
Include a future US 101 corridor to meet long- term local and regional
non -motorized transportation needs.
P -8A.08 The City should require concurrency and standards be met at the time of
new development for the following utilities and services:
■ Paved streets, curbs, and sidewalks
■ Water service,
■ Sanitary sewer service,
■ Electrical service
■ Solid waste collection,
■ Stormwater management,
■ Telecommunications services, and
■ Emergency services (police, fire and emergency medical response).
P -8A.09 Require the following services and facilities within six years from the time
of development:
■ Parks and recreation services and facilities, and
■ Transit system.
P -8A.10 Adopt an annual Capital Facilities Plan consistent with the Comprehensive
Plan and State Growth Management Act. The Capital Facilities Plan's
financing schedule may be corrected, updated, or modified without being
considered as an amendment to the Comprehensive Plan, following a
public hearing before the City Council.
P -8A.11 Adopt a Comprehensive Parks and Recreation Plan consistent with the
Comprehensive Plan and the Growth Management Act as an Element of
the Comprehensive Plan.
P -8A.12 Require sidewalks be included in all development and redevelopment
proposals where sidewalks do not exist at the time of application for
development. Permeable materials are preferred for sidewalk construction
where feasible.
8.4 City of Port Angeles Comprehensive Plan ti
P -8A.13 Develop and implement an Urban Forestry Program to properly manage
street trees, park trees, and forested environmentally sensitive areas
located within the City.
P -8A.14 Create a unified, coherent design element for signage, street lighting,
traffic control devices, and similar structures to be used throughout the
City and specifically in the downtown area as a method for improved way
finding and place identification for visitors and residents alike.
P -8A.15 Consider climatic change impacts and adaptation strategies in planning
and designing capital facilities.
P -8A.16 Development shall be served with adequate transit service as determined
in the comprehensive service and facilities plan for transportation within
six years from the time of development.
P -8A.17 Deny any development that will not be served at or greater than
a citywide level of service standard of 10 acres of parks per 1,000
population within six years from the time of development.
P -8A.18 Deny any development that will not be served at or less than the following
level of service standards at the time of development.
■ Police 600 persons per one officer
■ Fire Four -minute response time or residential sprinkler system installation
P -8A.19 Deny any development that will not be served with solid waste collection
service at or less than a city-wide level of service standard of 400 pick-
up accounts per 1000 population within six years from the time of
development.
P -8A.20 Participate with the County in the development, maintenance, and
implementation of a regional solid waste plan, which addresses collection,
disposal, and recycling of solid waste.
P -8A.21 Consider the cumulative effect of development on the City's need for
adequate public service buildings.
P -8A.22 Consider projected climatic change impacts and adaptation strategies to
determine whether adequate services can be provided into the future,
prior to approving any development.
P -8A.23 Support public education and Peninsula College, including initiatives for
rebuilding schools.
P -8A.24 Consider level of service standards for development based on the School
District's projected enrollment figures and residential growth as provided
for in the Land Use Element of the Comprehensive Plan:
■ High School 125 square feet of permanent, appropriate educational
space per student
■ Middle School 104 square feet of permanent, appropriate educational
space per student
■ Elementary School 100 square feet of permanent, appropriate
educational space per student
Chapter 8 - Capital Facilities Element 8.5
�i
City shall not approve any development that is not served with water
service at or greater than the following level of service standards at
the time of development
Goal
G-8113 To provide urban streets and utilities at minimum levels of service
for all city residents and the general public.
Policies
P-86.01 All arterial streets shall function at an average daily Level of Service (LOS)
of D or better.
P-86.02 Development on all arterial streets and any other streets identified as
school walking routes should include pedestrian sidewalks on both sides of
the street.
P-86.03 The City shall not approve any development that is not served with water
service at or greater than the following level of service standards at the
time of development:
■ Single family units: 2 gallons per minute @ 30 psi
(Fire - 1000 gallons per minute @ 20 psi for single family residential >
3,600 square feet)
(Fire - 500 gallons per minute @ 20 psi for single family residential <
3,600 square feet)
■ Multifamily units: 1 gallon per minute @ 30 psi (fire per Uniform Fire
Code)
■ Commercial: per Uniform Fire Code
■ Industrial: per Uniform Fire Code
P-86.04 The City shall not approve any development that is not served with sewer
service at or greater than a level of service standard of 300 gallons per day
per person at the time of development.
P-86.05 The City shall not approve any development that is not served with
electrical service at or greater than a level of service standard of 118 volts
(120 volt base) at the time of development.
P-86.06 The City shall not approve any development that increases a site's post -
development stormwater run-off beyond that allowed by the Department
of Ecology Stormwater Management Manual for Western Washington as
adopted by the City.
8.6 City of Port Angeles Comprehensive Plan ti
P-86.07 The City should not approve any development that cannot be served
with telecommunications service at or greater than the following level of
service standards at the time of development:
Telephone
Residential 1 service per unit
Commercial 1 service per business
Industrial 1 service per business
Cable Television
Residential 1 service per unit
Commercial 0 service per business
Industrial 0 service per business
Internet
Residential 1 service per unit
Commercial 0 service per business
Industrial 0 service per business
P-86.08 Highways of Statewide Significance (HSS) should function at Level of
Service (LOS) D or better, consistent with the Regional Transportation Plan
(RTP).
P-86.09 Develop a Capital Facilities Plan list, with public input, for prioritizing
pedestrian walkway needs.
P-86.10 Seek funding to increase the provision of sidewalks in already developed
areas where sidewalks do not occur.
Goal
G -8C To participate with the County, State, and Federal governments
as well as other public agencies to provide adequate regional
public services such as schools, highways, tie-ins to regional
communication networks, libraries, and correctional facilities.
Policies
P -8C.01 The City should cooperate with the County and the community's health
care providers to ensure quality health care facilities within the City that
serve the region as a whole.
P -8C.02 The City should cooperate with the County in planning regional library
facilities within the City.
P -8C.03 The City should cooperate with the County in planning for adequate
correctional facilities.
tI
Chapter 8 - Capital Facilities Element 8.7
P -8C.04 Essential public facilities of a county -wide or statewide nature must meet
existing state laws and regulations requiring specific siting and permit
requirements consistent with the City's Comprehensive Plan.
Goal
G-811) To reduce the amount of impervious surface created by new
developments and thereby reduce stormwater management costs and
environmental impacts to the City and its natural resources, reduce
development costs to private property owners, and provide safe
and more attractive streets through traffic calming, safe pedestrian
amenities, and improved street edge landscaping.
Policies
P -81D.01 Revise existing urban development standards in low density residential areas
to include low impact development standards for street, pedestrian and non -
motorized access, sewer, and fire suppression to more nearly reflect the needs
of suburban densities and conditions in outlying undeveloped areas of the City
and PAUGA.
P -811D.02 The City should invest in Green Infrastructure, Low Impact Development (LID),
and similar technologies to maintain and enhance environmental quality.
0
8.8 City of Port Angeles Comprehensive Plan ti
Economic I 41
Development
The intent of the Economic Development ElementMW__
is to guide decision-making and investments that s
diversify and strengthen the local economy.
Optimizing the city's relationship with its
natural setting
• Supporting safe, attractive and character -rich
neighborhoods
• Creating a more dynamic, successful I
downtown
• Improving Port Angeles' standing as a
regional hub for business and Port -related
enterprises.
• Recognizing and supporting the economic
impact of the college, Homeland Security,
and Department of Defense presence.
0
Economic Development Goals & Policies
Goal
G -9A To create and maintain a balanced and stable local economy with
full employment and emphasis on strengthening the community's
traditional natural resource related industries as well as
diversifying the overall economic base.
Policies
P -9A.01 Remain a major economic center on the North Olympic Peninsula, meeting
regional and local needs.
P -9A.02 Promote long-term economic stability by encouraging businesses
and industries to invest in modernization and environmentally sound
technology.
P -9A.03 Promote the diversification of the community's economic base by
encouraging the location, retention, and expansion of local small and
medium sized businesses.
P -9A.04 Promote the "traditional downtown feeling" of retail, dining, arts, culture,
and entertainment oriented activities that are attractive to both tourists
and local residents.
P -9A.05 Develop sufficient utilities, improve traffic circulation, and identify
environmental constraints in the airport industrial area in cooperation
with other governmental agencies.
P -9A.06 Encourage training and educational opportunities, which strengthen and
increase the variety of skills available in the work force.
P -9A.07 Promote the motivation and availability of the community's work force as
a major economic development strength.
P -9A.08 Encourage inter -jurisdictional discussion and cooperation with other
governmental agencies to foster the economic development of the
region and provide opportunities for civic cooperation by coordinating
and supporting local non -profits, associations, and community service
organizations to support economic development.
P -9A.09 Work with other community organizations in developing an effective
business assistance program directed toward the commercial business
owner.
P -9A.10 Support continued development of a strong marine related industry in the
Port Angeles Harbor.
P -9A.11 Promote the sustainability of the existing art and culture industry
encouraging community participation and involvement. Enhancement of
the creative economy contributes to the overall health of the community.
P -9A.12 Encourage businesses with low carbon footprints.
9.2 City of Port Angeles Comprehensive Plan ti
P -9A.13 Consider projected climatic change impacts and adaptation strategies
when encouraging new businesses to establish in Port Angeles.
P -9A.14 Develop and economy which provides opportunities for Port Angeles'
vulnerable and at -risk community members.
P -9A.15 Invest in training and education for local residents, by providing access to
state-of-the-art technology and training opportunities.
P -9A.16 Encourage and incentivize youth entrepreneurship as well as jobs and
businesses that attract young families.
P -9A.17 Attract and retain businesses and industries which create family wage jobs
for local residents.
P -9A.18 Prioritize the airport as major economic asset and identify specific
incentives to attract commercial services.
P -9A.19 Encourage the location and support for adequate venues for community
meetings, shows, music art, hobby and user groups, and professional and
business meetings and particularly supporting the location of low-cost
places where people (especially young people) can congregate and talk,
and ensure that these have up-to-date communication facilities.
P -9A.20 Recognize art, architecture, music, and performance as important
community resources and continue to encourage and support cultural
activities.
P -9A.21 Support decorating public spaces with more art from the community.
P -9A.22 Encourage the design of public spaces that encourage people to interact.
P -9A.23 Support the concept and encourage the establishment of Maker's Spaces.
(See definition) Public spaces where people make things and collaborate
on projects, spaces are usually equipped with tools, 3-D printers,
computers, design software, art and craft tools and supplies.
Goal
G-9113 To have a healthy local economy that co -exists with the
community's high quality of life through the protection,
enhancement, and use of the community's natural, historical, and
cultural amenities.
Policies
P-96.01 Promote the region's high quality environment and available natural and
cultural resources as factors in attracting and retaining business, industry,
and individual enterprises.
P-96.02 Promote the community's quality public school system and its diversity
of other educational opportunities as factors in attracting and retaining
business and industry.
Chapter 9 - Economic Development Element 9.3
�i
P-96.03 Encourage the enhancement of the existing four-year community college
through such means as the expansion of its technical curriculum and
additional four year degree opportunities.
P-96.04 Promote development of planned office, business, and industrial parks,
while conserving unique physical features of the land and maintaining
compatibility with other land uses in the surrounding area.
P-96.05 Encourage the availability of housing that meets the needs of the entire
spectrum of the community's residents.
P-96.06 Recognize, preserve and promote its historic and cultural properties as a
measure of its quality of life.
P-96.07 Support landscaping and detailing of the streetscape at the City's east and
west entries.
P-96.08 Utilize the Climatic Change Preparedness Plan in attracting businesses, to
demonstrate a proactive approach to climatic change in the area.
P-96.09 Encourage and pursue economic development with positive environmental
consequences, including non-polluting industries eco -friendly business,
and low carbon footprints.
Goal
G -9C To create and promote a strong tourism industry for Port Angeles,
as well as to recognize and support existing and prospective
tourism attractions.
Policies
P -9C.01 Support improved access to the Olympic National Park, particularly to
Hurricane Ridge.
P -9C.02 Work to enhance the public use of Ediz Hook.
P -9C.03 Take a leading role in enhancing visitors' first impression of the
community by maintaining and upgrading the City's public facilities, green
infrastructure, and strengthen the nuisance abatement program.
P -9C.04 Support development of an electric vehicle (EV) charging station network
and EV maintenance facilities around the Olympic Peninsula.
P -9C.05 Support tourism and recreation activities which highlights Port Angeles'
natural, cultural and historical amenities.
Goal
G-911) To strengthen and enhance the restoration and reinvigoration of
our downtown historic buildings, infrastructure improvements, and
beautification projects.
9.4 City of Port Angeles Comprehensive Plan ti
Policies
P-911).01 Consider best available science on sea level rise and recommended
mitigation and adaptation strategies in the development of downtown.
0
Chapter 9 - Economic Development Element 9.5
�i
(This page is intentionally left blank)
10.1 City of Port Angeles Comprehensive Plan t
��
Parks & N
k�l
Recreation
The intent of the Park Element is to provide a guide
for the development and management of City parks
in Port Angeles. The goal and policy framework that
follow provide direction in realizing Port Angeles'
vision regarding parks and recreation - including:
• Optimizing the city's relationship with its
remarkable natural setting
• Supporting a wide range of recreational
opportunities available to all
• Creating vibrant, well -valued neighborhoods
with access to parks, trails and natural areas
• Sustaining Port Angeles' rich arts and cultural
heritage and overall sense of community.
0
Parks & Recreation Goals & Policies
Goal
G -10A To acquire, develop, renovate and maintain a sustainable system
of parks, recreational facilities, and open spaces to ensure that
the contributions of natural resources and recreation to human
well- being are maintained and recognized as a value.
Policies
P -10A.01 Provide Port Angeles with a diversity of open spaces, parks, and
recreation facilities and programs appropriately distributed throughout
the City.
P -10A.02 Ensure that equality is achieved to the extent possible in the types and
variety of facilities, quality of maintenance, and the range of recreation
services provided.
P -10A.03 Retain and reflect the natural beauty that attracts visitors, business, and
residents to the area.
P -10A.04 Forge effective partnerships and strengthen ties with other public,
private, and non-profit providers including providing high quality
recreational opportunities.
P -10A.05 Identify waterfront improvements to increase marine transportation and
recreation.
P -10A.06 Identify appropriate locations for small (pocket) parks, community
gardens and food forests throughout the community and integrate them
into its Parks system.
P -10A.07 The City should continue to provide or participate with private sponsors
to provide high quality recreational opportunities.
P -10A.08 Continue to participate as a partner in the extension of the Olympic
Discovery Trail through the City to the western City limits.
Goal
G -10B To enhance the quality of life in the community by providing
facilities, services, and programs that offer positive opportunities
for building healthy, safe, and productive lives to the broadest
segment of the population.
Policies
P-106.01 Provide consistently high-quality recreational experiences to residents
and visitors through a wide variety of park types and features.
10.3 City of Port Angeles Comprehensive Plan ti
P-106.02 Strive for excellence through efficient, accurate, and skillful performance
in every process, service and product delivered by the Parks and
Recreation providers.
P-106.03 Keep citizens involved and informed about parks and recreation issues,
services, and family friendly features and amenities.
P-106.04 Manage park facilities in a manner that will ensure public safety, identify
family friendly features and amenities, and keep the parks free of misuse
to the greatest extent possible and resulting in a sustainable and resilient
park system.
P-106.05 Incorporate health and nutrition into parks and recreation programming.
P-106.06 Provide high quality services, emphasize the design of park areas to
reduce long-term maintenance and operating costs, and implement
improved technology to conserve limited resources such as water, power
and people.
P-106.07 Provide programs and opportunities that are sensitive to the needs
of all of its citizens, including those with limited financial resources,
disadvantaged youth, the elderly, the disabled, and those with other
special needs.
Goal
G -10C To establish and protect a visual character of the community
through open spaces, streetscapes, borrowed landscapes, and
publicly -owned natural resource areas.
Policies
P -10C.01 Strive to protect and retain the natural beauty of the area.
P -10C.02 Supplement and enhance the visual attractiveness of the city through
the use of formal landscaping in street medians, city entryways, and
along sidewalks, as well as the use of other public spaces, flower beds,
and street trees. Emphasize use of planter strips with drought tolerant
vegetation and bio -retention facilities.
Goal
G -10D To promote economic growth through recreational tourism and
attract visitors and new business by enhancing the image of the
community through beautification and recreation programs.
Policies
P -10D.01 To encourage efficient transportation systems, support the use of shuttle
services during events to move participants between venues.
Chapter 10 - Parks & Recreation Element 10.4
tIMP,
Goal
G -10E To provide a system of walking trails and bicycle paths to
complement and coordinate with the existing street system
and provide recreational opportunities and physical activity
while reducing the dependence on traditional automobile
transportation.
Policies
P -10E.01 The City should continue efforts to improve or provide access to Valley,
Tumwater, Peabody, Ennis and White's Creeks through the development
of an integrated trails system.
0
10.5 City of Port Angeles Comprehensive Plan t
��
4L 'AY*
"' t�"��
Implementation
MI)k
L_,A ..
The following pages (Table 11.01) list a series
of actions supporting the goals and policies
contained in this plan's elements, showcasing a
range of undertakings identified to implement
the community's long-range vision. These actions
constitute a part of the corresponding elements. It
is provided to help City staff and leadership track
progress, coordinate and combine various actions
where it makes sense to do so, and to help guide
budgeting of work and improvements in a more
realistic, strategic fashion. As with the rest of the
plan, this table represents the input, expressed
priorities and values of the community and its
leadership.
Each listing includes columns identifying the
anticipated timing of that action, as well as those
primary agencies likely to be involved. These
columns in no way obligate the City or identified
partners to act or participate according to the
timeframes described - rather, the table offers
a means for the community to see, at a glance,
its stated objectives in context of an intended
timeframe.
A 2019 Comprehensive Plan amendment identified
policies that were specific or action oriented enough
to justify placement into Chapter 11 Table 11.01 as
actions. These former policies have been placed
under each associated element in this chapter and
identified by a placeholder number XX. A future
Comprehensive Plan Amendment or Update will
include the full evaluation of each proposed action
for language, intent, timeline, partners and given a
formal number.
Li
� ,,` .
}_. .�
(This page intentionally left blank)
Measurable Actions
Number Action
C= Complete
O= Ongoing
N = Not Complete
Short Medium Long �a U 9 Y Action / Deliverable
(0-2 yr.) (2-4 yr.) (4+ yr.) OU U Oa _J Other Metric Date Complete
Growth Management Act
A-2.01
Periodically update the City's comprehensive
•
Ordinance
June 30, 2024
0
plan as required by Washington State's Growth
Passed
Management Act (GMA).
A-2.02
Review and update the City's Buildable Lands
•
Matrix
December 21,
0
Inventory on a biannual basis, helping inform
Produced
2018
land use decision-making.
A-2.03
Acquire no -protest annexation agreements
•
•
Number
N/A
0
for all utility connections occurring in the Port
Agreements
Angeles Urban Growth Area (PAUGA).
A-2.04
Recommend expansion of the southwestern
•
•
Parcel mapped
December 31,
0
Urban Growth Area (UGA) to include twelve
within UGA
2019
parcels located in an area bounded on the
north by US 101; on the east by Old Joe Road
(the western City limits at that location); on the
west by the existing UGA boundary, and on the
south by a line parallel to Old Joe Road right-of-
way extended west to the UGA boundary. Also
to be included are parcels 063017230050 and
063018120210.
Land Use
A-3.01
Review and revise City development regulations
•
Ordinance
December 31,
0
for consistency with each major update of the
Passed
2024
Comprehensive Plan.
A-3.02
Continue to develop programs encouraging
•
PADA Farmers
Number of
N/A
0
the use of downtown for community events,
Market
New Events
gatherings, displays, and public markets..
A-3.03
Research and develop a program for
•
North Olympic
Ordinance
December 31,
N
consideration addressing approaches to open
Land Trust
Passed
2020
space preservation, including:
• Land banking
• Transfer of Development Rights (TDR)
• Purchase of Development Rights (PDR).
Abbreviations: COPA =City of Port Angeles; CLC = Clallam County; POPA =Port of Port Angeles; LEKT = Lower Elwha Klallam Tribe; WSDOT - Washington State
Department of Transportation; WA DAHP = Washington State Department of Archeology and Historic Preservation; WA DOE = Washington State Department
of Ecology; SP = City of Port Angeles Strategic Plan 2017-2018; AIA = American Institute of Architects
City of Port Angeles
Measurable Actions
Number Action
C= Complete
O= Ongoing
N = Not Complete
Short Medium Long Ma U 0. x Action / Deliverable
(0-2 yr.) (2-4 yr.) (4+ yr.) OU U 0. Other Metric Date Complete
A-3.04
Review and update the City's Urban Services
•
Number of
December 31,
0
Standards and Guidelines to provide for
trail Miles
2021
development of low -impact trails in designated
Completed
open spaces, including permeable materials
where feasible.
A-3.05
Adjust zoning to protect the prime commercial
•
Ordinance
December 31,
C
(S P)
corridor
Passed
2017
A-3.06
Rewrite sign code (less clutter, more character)
•
Ordinance
December 31,
N
(S P)
Passed
2019
A-3.07
Consider adoption of an overlay district for
•
Budget for
December 31,
N
(AIA)
downtown to respond to sign, design, and
Form Based
2018
parking issues.
Code
Transportation
A-4.01
Design and develop the following segments of
•
•
•
Peninsula
100%
May 31,
0
the Olympic Discovery Trail:
Trails
Design
2019
• Marine Drive to 10th Street
Coalition
Grant
December
• City Pier along Railroad Avenue to Laurel
Obtained
31, 2018
Street
Number
December
• Other segments as funding and opportunity
of Miles
31, 2021
provide, coordinated with the City's park,
Complete
street and trail systems.
A-4.02
Identify funding and implementation strategies
•
•
Washington
Grant
December 21,
N
for the Valley Creek Loop Trail, connecting the
State Parks
Obtained
2020
Valley and Peabody Creek corridors with the
Foothills Trail system.
A-4.03
Review and update the City's Urban Services
•
Clallam
Biannual
December 31,
0
Standards and Guidelines, including direction for
Transit
Review
2018
transportation facility improvements that:
Complete
• Include including bike path development and
maintenance, signage, and storage
• Assess cost/benefits of bicycle -friendly
infrastructure.
Abbreviations: COPA = City of Port Angeles; CLC = Clallam County; POPA = Port of Port Angeles; LEKT = Lower Elwha Klallam Tribe; WSDOT - Washington State
Department of Transportation; WA DAHP = Washington State Department of Archeology and Historic Preservation; WA DOE = Washington State Department
of Ecology; SP = City of Port Angeles Strategic Plan 2017-2018; AIA = American Institute of Architects
C
ro
r1
O)
C
O)
t
O)
L
Q
E
O
U
V)
O)
O)
dA
C
Q
L
O
a-
4-
0
-
4—
O
.M
c -I
c -I
F�
F�
Ln
Measurable Actions
Number Action
C= Complete
O= Ongoing
N = Not Complete
Short Medium Long 0< Qa Y Action / Deliverable
(0-2 yr.) (2-4 yr.) (4+ yr.) OU U CL Other Metric Date Complete
A-4.04
Review and update the City's Urban Services
•
Biannual
December 31,
0
Standards and Guidelines, encouraging public
Review
2020
streetscape improvements including:
Complete
• Street trees
• Art and creative community -oriented
beautification efforts
• Pedestrian and bicycle amenities
• Sidewalks on both sides of streets.
A-4.05
Review and update the City's Urban Services
•
Biannual
December 31,
0
Standards and Guidelines, helping:
Review
2020
• Promote joint access and maintenance of
Complete
driveways
• Balance the needs for traffic movement and
access to properties immediately adjacent to
secondary and primary arterials.
A-4.06
Develop a "Complete Streets" program for
•
Ordinance
December 31,
C
Port Angeles, helping identified travelways
Passed
2018
accommodate all modes of transportation as
appropriate for the needs and conditions of each
neighborhood or district.
A-4.07
Prepare a study evaluating options for easterly
•
WSDOT
Completed
December 31,
N
access across Whites and Ennis Creeks in the
Report / Study
2020
vicinity of Golf Course Road.
A-4.08
In coordination with the County, RTPO and state
•
•
WSDOT;
Completed
December 31,
N
and federal agencies, study a future US 101
Clallam
Report / Study
2020
corridor alignment including evaluation of the
Transit
Heart of the Hills Parkway and Coastal Corridor
concepts. (Route along Lauridsen Boulevard
east of Race Street will not be considered.)
A-4.09
Plan and integrate the following into the Capital
•
Program as a
December 31,
N
Facilities Plan:
CFP Item
2018
• Multi -modal street improvements along
Edgewood Drive (south side of the airport),
Lauridsen Boulevard, Airport Road (west side
of the airport), and along Milwaukee Drive to
Lower Elwha Road.
A-4.10
Review and assess progress per AIA Urban
•
Status Report
December 31,
0
(S P)
Design Study; consider proposals to transform
2019
First and Front Streets
Abbreviations: COPA = City of Port Angeles; CLC = Clallam County; POPA =Port of Port Angeles; LEKT = Lower Elwha Klallam Tribe; WSDOT - Washington State
Department of Transportation; WA DAHP = Washington State Department of Archeology and Historic Preservation; WA DOE = Washington State Department
of Ecology; SP = City of Port Angeles Strategic Plan 2017-2018; AIA = American Institute of Architects
Measurable Actions
Number Action
C= Complete
O= Ongoing
N = Not Complete
Short Medium Long Ma 0. Y Action / Deliverable
(0-2 yr.) (2-4 yr.) (4+ yr.) OU U Oa _J Other Metric Date Complete
A-4.11
Transportation Benefit District on ballot
•
Ballot Measure
August 31,
C
(S P)
2017
Housing
A-6.01
Identify appropriate areas of the city for
•
List / Map
December 31,
0
higher -density housing, converting low-density
Areas for
2019
residential areas into medium and high-density
Upzone
designations.
A-6.02
Evaluate revisions to height limitations in all
•
Ordinance
December 31,
0
commercial, medium, and high-density zones,
Passed
2020
helping accommodate increased residential
densities without impacting viewsheds.
A-6.03
Align Municipal Code for high density
•
Amending
March 31,
0
(S P)
development zones.
Ordinance
2017
Passed
A-6.04
Partner with the Port Angeles Downtown
•
PADA
List / Map
March 31,
C
(S P)
Association to promote 2nd Story and above
Available
2018
residential occupancy downtown
A-6.05
Pursue partnership for a demonstration project
Resolution
December 31,
N
(HAP)
that will provide:
Passed/Project
2022
• A catalytic mixed-use project with affordable
identified
units.
• A demonstration project to create a mixed-
use prototype for market rate and
affordable units in the downtown, medical
center, commercial and/or residential
neighborhood zones.
A— 6.06
Assist in the development of accessory
Amending
December 31,
N
(HAP)
residential units by:
Ordinance/
2020
• Developing a design manual and
Resolution
prototypes for ARU's
Passed
• Allowing the R-7 zone to increase the size
of ARU's attached to primary dwelling
units.
• Partnering with local lenders to establish
an ARDU low cost loan program.
Abbreviations: COPA = City of Port Angeles; CLC = Clallam County; POPA = Port of Port Angeles; LEKT = Lower Elwha Klallam Tribe; WSDOT - Washington State
Department of Transportation; WA DAHP = Washington State Department of Archeology and Historic Preservation; WA DOE = Washington State Department
of Ecology; SP = City of Port Angeles Strategic Plan 2017-2018; AIA = American Institute of Architects
City of Port Angeles 1 4
C
ro
r1
O)
C
O)
t
O)
Q
E
O
U
O)
O)
dA
C
Q
4-
O
a-
4-
0 4—
O
.M
l0
c -I
c -I
Measurable Actions
Number Action
C= Complete
O= Ongoing
N = Not Complete
Short Medium Long 0< Qa Y Action / Deliverable
(0-2 yr.) (2-4 yr.) (4+ yr.) OU U CL Other Metric Date Complete
A-6.07
Encourage mixed use development and
Ordinance
December 31,
N
(HAP)
affordable housing units by:
Passed/ Study
2020
• Allowing Multi -family zones to create
Completed
mixed housing type developments with
internal drives (via circulation plan) as an
alternative to public rights-of-way.
• Allow ground floor residential and
convertible space in CA, CN and CSD zones.
• Identify Commercially -zoned properties
that have multi -family capabilities on site.
• Amend zoning code to adjust setbacks,
maximum site coverage allowances, and
other restrictions that prevent the use
of to expand the definition of allowable
innovative, functional, and cost effective
housing products.
• Amend zoning code to eliminate larger lot
size requirement for duplexes and assess
the value of incentive zoning allowance
beyond existing overlay zones
A— 6.08
Continue to use Housing Rehabilitation Fund
Number
Ongoing
0
(HAP)
to match grants, offer low-cost loans to allow
of grants
homeowners meeting income guidelines to
provided
remain resident in their home, maintain the
value of a home, or upgrade to increase its
market value.
A— 6.09
Partner with Peninsula Housing Authority to
Study
December 31,
C
(HAP)
identify and address barriers to affordable
completed
2019
housing and funding opportunities for affordable
housing projects.
A— 6.10
In conjunction with local lenders and housing
Program
December 31,
N
(HAP)
agencies identify rehabilitation program
Adopted and
2020
requirements including the potential number
Funded
of housing projects, deferred or limited equity
program participants, and required number and
skill of renovation contractors or agents.
Conservation
Abbreviations: COPA = City of Port Angeles; CLC = Clallam County; POPA =Port of Port Angeles; LEKT = Lower Elwha Klallam Tribe; WSDOT - Washington State
Department of Transportation; WA DAHP = Washington State Department of Archeology and Historic Preservation; WA DOE = Washington State Department
of Ecology; SP = City of Port Angeles Strategic Plan 2017-2018; AIA = American Institute of Architects
Measurable Actions
Number Action
C= Complete
O= Ongoing
N = Not Complete
Short Medium Long Qa Qa Y Action / Deliverable
(0-2 yr.) (2-4 yr.) (4+ yr.) OU U 0. Other Metric Date Complete
A-7.01
Review and update the City's Fagade
•
Amending
December 31,
0
Improvement Program to encourage
Ordinance
2021
participation in streetscape beautification
Passed
projects and enhancements along entryway
corridors.
A-7.02
Develop and maintain an archaeological
WA DAHP
Establish
December 31,
0
database, allowing for review and monitoring
Budget Item
2018
of ground -disturbing activities. The database
for Geographic
should include:
Information
• Known archaeological and historical sites
Systems (GIS)
• A predictive model prescribing areas of
high, medium and low archaeological site
potential
• A waterfront archaeological overlay
A-7.03
Review and update the City's Urban Services
•
Amend Urban
January 31,
C
Standards and Guidelines, including
Services
2018
requirements for development to provide:
Standards and
• Dispersion, infiltration and/or retention
Guidelines
facilities necessary to protect water quality
and provide flood protection and flow
control
• LID techniques and BMPs where feasible
• Permeable paving materials for all sidewalks
where feasible.
A-7.04
Identify and inventory "habitats of local
•
•
WA DOE
Produce GIS
December 31,
N
importance" areas, helping ensure wildlife
Layer / Map
2021
corridors are not severed.
A-7.05
Develop and maintain an inventory of wetland
•
•
Produce GIS
December 31,
0
delineations completed as part of land use
Layer / Map
2019
permitting.
A-7.06
Develop and periodically update a stormwater
•
WA DOE
Program
December 31,
0
management plan consistent with NPDES Phase
Infrastructure
2018
II permit requirements.
in CFP
Abbreviations: COPA = City of Port Angeles; CLC= Clallam County; POPA = Port of Port Angeles; LEKT = Lower Elwha Klallam Tribe; WSDOT - Washington State
Department of Transportation; WA DAHP = Washington State Department of Archeology and Historic Preservation; WA DOE = Washington State Department
of Ecology; SP = City of Port Angeles Strategic Plan 2017-2018; AIA =American Institute of Architects
C
ro
r1
O)
C
O)
t
O)
L
Q
E
O
U
O)
O)
dA
C
Q
4-
L_
O
a-
4-
0 4—
O
.M
00
c -I
c -I
Measurable Actions
Number Action
C= Complete
O= Ongoing
N = Not Complete
Short Medium Long 0< Qa Y Action / Deliverable
(0-2 yr.) (2-4 yr.) (4+ yr.) OU U (L Other Metric Date Complete
A-7.07
Review and update the City's Urban Services
•
Pass
December 31,
N
Standards and Guidelines, including measures
Resolution
2021
to coordinate new development with the
/ Policy
protection of:
Document
• Scenic resources
• Environmentally -sensitive areas.
A-7.08
Develop and adopt regulations supporting
•
•
WA DAHP
Ordinance
December 31,
N
the preservation of identified, historically-
Passed
2019
significant buildings and sites.
A-7.09
Develop and adopt a tree management program
•
Pass
December 31,
N
including:
Resolution
2022
• Tree density targets
/ Policy
• Urban forest management procedures and
Document
guidelines.
A-7.10
Update the City's Shoreline Master Program by
•
Ordinance
June 30, 2020
0
2024.
Passed
Capital Facilities
A-8.01
Update the City's Capital Facilities Plan on an
•
Ordinance
December 31,
0
annual basis.
Passed
2017
A-8.02
Develop and implement a schedule for
•
LOS Plan
December 31,
0
preparation and adoption of all City service
2018
and facilities plans, coordinated with the
Comprehensive Plan.
A-8.03
Establish review procedures for capital facilities
•
•
WA DOE
Policy
December 31,
0
plan projects, ensuring projects address:
Document
2020
• Endangered Species Act requirements
• Climate change adaptability
• PAUGA impacts
• Established levels of service.
A-8.04
Deliver Capital Facilities Plan for 2018-2023
•
Resolution
July 31, 2017
C
(S P)
Passed
A-8.05
Secure municipal and industrial water rights
•
Settlement
December 31,
0
(S P)
Agreement
2019
A-8.06
Provide and publish year end reports for the
•
Report
December 31,
0
(S P)
Waterfront Improvement Plan Phase 3 Design
Published
2019
Abbreviations: COPA = City of Port Angeles; CLC = Clallam County; POPA =Port of Port Angeles; LEKT = Lower Elwha Klallam Tribe; WSDOT - Washington State
Department of Transportation; WA DAHP = Washington State Department of Archeology and Historic Preservation; WA DOE = Washington State Department
of Ecology; SP = City of Port Angeles Strategic Plan 2017-2018; AIA = American Institute of Architects
Measurable Actions
Number Action
C= Complete
O= Ongoing
N = Not Complete
Short Medium Long Qa CL Y Action / Deliverable
(0-2 yr.) (2-4 yr.) (4+ yr.) OU U Oa _J Other Metric Date Complete
A-8.07
Provide and publish year end reports for the
•
30% Design
December 31,
0
(S P)
Race Street Corridor Project 30% design
Published
2019
A-8.08
City Signage and Wayfinding Program - RFP and
•
RFP Released
December 31,
C
(S P)
design adjustments
2019
A-8.09
Complete downtown, parks, and trail
•
Enhancements
December 31,
C
(S P)
enhancements for Civic Field, Calisthenics Park,
Complete
2017
Georgiana Park
A-8.10
Complete downtown, parks, and trail
•
30% Design
December 31,
0
(S P)
enhancements for Hill Street Olympic Discovery
2021
Trail Project
A-8.11
Complete downtown, parks, and trail
•
Amenities
December 31,
0
(S P)
enhancements for adding amenities downtown
Added
2019
(e.g. tables and benches)
A-8.12
Complete downtown, parks, and trail
•
Analysis
December 31,
0
(S P)
enhancements for Bike routes: address funding,
Complete
2019
route maps, parking obstacles
A-8.13
East entrance monument
•
Added to CFP
December 31,
N
(AIA)
2018
A-8.14
Expand street art program
•
Ordinance
July 31, 2020
N
(AIA)
Passed
A-8.15
Replace light and signal poles in downtown with
•
Added to CFP
July 31, 2018
C
(AIA)
new structures at pedestrian scale
A-8.16
Place overhead utilities underground
•
Added to CFP
July 31, 2020
0
(AIA)
A-8.17
Create public view points and overlooks along
•
Added to CFP
July 31, 2020
0
(AIA)
bluff above downtown
Economic Development
A-9.01
Negotiate a vegetation easement with the Port
•
•
Execute
December 31,
0
of Port Angeles, providing long-term resolution
Easement
2019
to concerns regarding trees at Lincoln Park.
/ Interlocal
Agreement
A-9.02
Develop policy encouraging the creation of new
•
•
•
•
PADA
Pass
December 31,
C
tourism events, enhancing tourism during the
Resolution
2017
limited value season.
Abbreviations: COPA = City of Port Angeles; CLC = Clallam County; POPA = Port of Port Angeles; LEKT = Lower Elwha Klallam Tribe; WSDOT - Washington State
Department of Transportation; WA DAHP = Washington State Department of Archeology and Historic Preservation; WA DOE = Washington State Department
cf Ecology; SP = City of Port Angeles Strategic Plan 2017-2018; AIA = American Institute of Architects
C
ro
r1
O)
C
O)
t
O)
L
I?
E
O
U
O)
O)
t]A
C
Q
L
O
a-
4-
0 4—
O
.M
O
c4
c -I
c -I
Measurable Actions
Number Action
C= Complete
O= Ongoing
N = Not Complete
Short Medium Long 0< U Qa Y Action / Deliverable
(0-2 yr.) (2-4 yr.) (4+ yr.) OU U 0. Other Metric Date Complete
A-9.03
Review and update the City's Urban Services
•
Amend Urban
December 31,
0
Standards and Guidelines, including:
Services
2020
• Street and parking lot tree plantings
Standards
• Use of appropriate vegetation in planter
strips and bio -retention facilities.
A-9.04
The City will support the implementation of the
•
•
Number of
December 31,
C
Mount Angeles View Project including a new
Letter of
2018
Boys and Girls Club, recognizing that the overall
Support
project results in affordable housing and child
care for the local workforce.
A-9.05
The City will continue to make improvements
•
Number of
December 31,
0
as part of the Waterfront Development Plan
Letters of
2019
while providing support to abutting investments
Support,
made by the Port Angeles Waterfront Center
Number of
(Preforming Arts Center) and Feiro Marine Life
Permits Issued
Center.
A-9.06
The City will work with Clallam County to ensure
•
Number of
December 31,
0
enhancements to William Shore Memorial Pool
Letters of
2019
continue to provide benefits to the Port Angeles
Support,
community.
Number of
Permits Issued
A-9.07
Provide and publish year end reports for Fayade
•
Applications
December 31,
0
(S P)
Improvement Program — present 5 applications
Presented
Annually
to Planning Commission
A-9.08
If we continue to contract with PADA: Inventory
•
PADA
Execute
March 31,
0
(S P)
vacant downtown commercial properties and
Contract
2020
apply Buxton study to identify needed business
types.
A-9.09
Create plan motivating vacant property owners
•
Plan
March 31,
0
(S P)
to upgrade buildings or lots
Developed
2020
A-9.10
Improve the downtown banners at the entries to
•
PADA
Execute
December 31,
0
(AIA)
the downtown with PADA contract
Contract
2029
A-9.11
Infill development in downtown
•
Added to CFP
December 31,
0
(AIA)
and Comp.
2022
Plan
A-9.12
National Park Center in City
•
New Kiosk / DT
December 31,
0
(AIA)
Footprint
2022
Abbreviations: COPA = City of Port Angeles; CLC = Clallam County; POPA = Port of Port Angeles; LEKT = Lower Elwha Klallam Tribe; WSDOT - Washington State
Department of Transportation; WA DAHP = Washington State Department of Archeology and Historic Preservation; WA DOE = Washington State Department
of Ecology; SP = City of Port Angeles Strategic Plan 2017-2018; AIA = American Institute of Architects
Measurable Actions
Number Action
C= Complete
O= Ongoing
N = Not Complete
Short Medium Long Qa Qa Y Action / Deliverable
(0-2 yr.) (2-4 yr.) (4+ yr.) OU U Oa _j Other Metric Date Complete
Long -Range Financial Plan
A-LRFP.1
Update Long -Range Financial Plan for 2018-2023
Resolution
December 31,
C
(S P)
Passed
2018
A-LRFP.2
Sell Nichel and Lincoln Street Properties
•
Execute
December 31,
C
(S P)
Purchase/Sale
2018
A-LRFP.3
Sell Morse Creek property
•
Execute
July 31, 2020
N
(S P)
Purchase/Sale
A-LRFP.4
Increase EMS utility fee to cover additional
•
Ordinance
July 31, 2020
N
(S P)
paramedic resources
Passed
A-LRFP.5
Reexamine public safety funding option for tax
•
Ordinance
December 31,
N
(S P)
exempt propertiess
Passed
2020
CCitywide Work PlanN
CA-CWP.1
Professional development plans for Council
•
Plans
December 31,
C
N(SP)C
Complete
2018
A-CWP.2
Records management program - replace staff
•
Position Filled
December 31,
N
(S P)
position
2020
A-CWP.3
Records management program - bring three
•
Three Depts.
December 31,
C
(S P)
departments onto ECM system
on ECM
2018
A-CWP.4
Deliver and support new online tools for data
•
Online
September
N
(S P)
reporting and building permit process (public
Permitting
30, 2020
use)
Available
A-CWP.5
Confirm Council community agenda topics and
•
Agendas Set
September
C
(S P)
attendees
30, 2017
A-CWP.6
Education: Meet with superintendent, re:
•
Meeting
June 30, 2017
C
(S P)
November Ballot
Complete
Abbreviations: COPA =City of Port Angeles; CLC = Clallam County; POPA =Port of Port Angeles; LEKT = Lower Elwha Klallam Tribe; WSDOT - Washington State
Department of Transportation; WA DAHP = Washington State Department of Archeology and Historic Preservation; WA DOE = Washington State Department
of Ecology; SP = City of Port Angeles Strategic Plan 2017-2018; AIA = American Institute of Architects
C
ro
a
N
C
N
t
N
I?
E
O
U
N
N
dA
C
Q
L
O
a-
4-
0 4—
O
a-+
,M
This page is left intentionally blank
„r nom, r r f°������� f 1!4!l�,iP; � �>. � ...” �, � �� ��us��p��
f >+�
� ��lSi{��l�ll � ��+ 11
u, rifi��, � ���n ���
�} � ��� 1�� s ' � ��
�„
°� //��s�'����ii�f ����� �; � ��,x
.. �.m. � �� U�t,+ �a��� ` �1�
��� i �
,,
�j� 1
„ �,
,,: .� —� :.4e d
,.,.
-� __
�„
o� —
�,�v� ��"
,:
t
.. ':
**.,
. �.
I f,
City of Port Angeles
Comprehensive . .....
,a an en ices
2019 Amendment
(This page intentionally left blank)
Table of Contents: Appendices
Appendix A - Community Profile
CityHistory..............................................................................................................................A•1
Current Characteristics............................................................................................................A•6
Air.....................................................................................................................................................
A67
Water...............................................................................................................................................
A67
Wildlife.............................................................................................................................................
A68
NaturalResources............................................................................................................................
A69
Environmentally Sensitive Areas Map (Figure A.05)...............................................................................
A•6
Population........................................................................................................................................
A612
Population Projections, OFM (Table A. 01)..............................................................................................
A•13
LandUse..........................................................................................................................................
A013
Number of Parcels, by Zone (Figure A.06)..............................................................................................
A•11
Industrial Zone Land Use (Figure A. 07)...................................................................................................
A•11
Residential Zone Land Use (Figure A. 08)................................................................................................
A•11
CommunityFacilities........................................................................................................................
A•13
PlanningAreas..................................................................................................................................
A615
City Planning Areas Map (Figure A. 09)...................................................................................................
A•12
UrbanGrowth Areas........................................................................................................................
A618
Urban Growth Areas Map (Figure A.10).................................................................................................
A•14
Neighborhoods................................................................................................................................
A018
City Neighborhoods Map (Figure A.11)..................................................................................................
A616
Housing............................................................................................................................................
A028
Transportation.................................................................................................................................
A028
Arterial Street System Map (Figure A.14)...............................................................................................
A622
Clallam Transit System Map (Figure A. 15)..............................................................................................
A623
UrbanServices.................................................................................................................................
A032
Fire Four -Minute Response Map (Figure A. 17).......................................................................................
A•25
City Park Areas Map (Figure A.20).........................................................................................................
A•27
Public School Locations Map (Figure A. 21).............................................................................................
A•30
Appendix B - Definitions
Appendix C - GMA Requirements
GeneralComments.................................................................................................................. C•1
Requirements for the Land Use Element................................................................................. CO2
Requirements for the Land Use Element (Table C.01').............................................................................C•2
Requirements for the Housing Element................................................................................... CO3
Requirements for the Housing Element (Table C. 02)...............................................................................C•4
Requirements for the Capital Facilities Element...................................................................... C04
Requirements for the Capital Facilities Element (Table C. 03)..................................................................C•5
apx•i
City of Port Angeles Comprehensive Plane
Requirements for the Utilities & Public Services Element....................................................... C05
Requirements for the Utilities & Public Services Element (Table C.04)....................................................C•5
Requirements for the Transportation Element........................................................................ C05
Requirements for the Transportation Element (Table C.05).....................................................................C•7
Requirements for Siting Public Facilities.................................................................................. C97
Requirements for Siting Public Facilities (Table C.06)..............................................................................C•7
Appendix D - Transportation Analysis
GeneralComments..................................................................................................................D•1
DataCollection........................................................................................................................D•2
Traffic Growth Forecast...........................................................................................................D•2
Intersection Level of Service Analysis......................................................................................D•3
Intersection Level of Service Criteria (Table 1)........................................................................................ D•4
Intersection Operations Summary - PM Peak Hour (Table 2).................................................................. D05
Roadway Segment Level of Service Analysis............................................................................D•5
Roadway Segment Operations Summary - PM Peak Hour (Table 3) ....................................................... D07
MitigationMeasures................................................................................................................D•7
A Table of Contents apx•ii
if i
(This page intentionally left blank)
Community Profile
City History
The City of Port Angeles has long been the primary
urban center of the North Olympic Peninsula.
The earliest residents of the area were the Klallam
Tribe ("Strong People"), Native Americans who
were sustained by the region's abundant natural
resources. These same natural resources - the
naturally protected deep -water harbor, abundant
coniferous forests, prolific wildlife and marine
resources, and an overall natural beauty also
attracted the first non -natives to the area and
continue today to encourage visitors and new
residents alike from all walks of life.
Known variously as "Old Dungeness," "False
Dungeness," "Cherbourg," and "Port Angeles,"
settlement was intermittent and sporadic
throughout the early history of the city.
In 1862 (due largely to the efforts of one man: Victor
Smith, the "Father of Port Angeles"), President
Abraham Lincoln signed an executive order setting
aside 3,520 acres of land on the site as a U.S.
Government Lighthouse and Military Reservation.
Soon after, the original townsite layout was platted
0
poolam outm ULL CREt I
� qac i
i Carr
Parl Avoks Rubir
Mail
Figure A.01 — Port Angeles, as depicted in a 1917
Army Corps/USGS survey map (Image: University
of Texas, Perry- Cos taneda Library Map Collection)
by the US Army Corps of Engineers, and the
townsite of Port Angeles has endured to this
day.
Patterned after the plan of Cincinnati, Ohio
(substituting the Harbor for the Ohio River),
the streets are arranged and named the
same: Front, First, Second, etc.; at right angles
to these are Tumwater, Cedar, Pine, Valley,
Cherry, Oak, Laurel, Vine, and Race Street.
While the City has benefited greatly from
that original planning with its grid -pattern
street layout, various challenges were also
created such as utility service provision and
circulatory problems, due to the topography
of the land. Six different streams, with
associated ravines, travel through the
community flowing north from the foothills of
the Olympic Mountains as they quickly make
their way to the Strait of Juan de Fuca. They
are: Dry Creek, Tumwater Creek, Valley Creek,
Peabody Creek, Ennis Creek, White's Creek,
with Lee's Creek, and Morse Creek located
within the City's Urban Growth Areas.
Despite such early planning, major settlement
did not take place within the city until
1887, with the founding of the Puget Sound
Cooperative Colony. A social experiment in
communal living, the Colony contributed
greatly to the early expansion of Port Angeles.
Although short-lived, this settlement near
the mouth of Ennis Creek built a sawmill,
lath -mill and shipyard; constructed a 58 -foot
propeller -driven schooner ("The Angeles");
started the first newspaper in town ("The
Model Commonwealth"); and built the first
schoolhouse, office building and a city opera
house - in addition to founding four different
churches in Port Angeles. The colony was
largely disbanded by 1889 due to internal
disputes, but many of the colonists stayed
and blended with the rest of the thriving
community.
A93 City of Port Angeles Comprehensive Plan ti
By 1890, the city population had soared to over 3,000 people, and
the Government Reserve established 28 years earlier had become a
bottleneck to progress, completely restricting further development
of the city since it could not legally be homesteaded. The result was
a "land rush" onto the federal property, as citizens took matters
into their own hands as "Reserve Jumpers" - moving en- masse onto
the reserve, platting lots, and establishing homesteads. Eventually,
forced to recognize this matter officially, Congress conceded
ownership to the squatters and opened the Reserve for sale to the
public.
The year 1890 was also notable as the year Port Angeles was
officially incorporated as a city in the newly established State of
Washington, and that same year it also became the County Seat of
Clallam County.
Thereafter, the City grew more slowly and developed much as
other small towns in the Pacific Northwest. Gone were the early
pretensions of becoming a great seaport or second national city
patterned after Washington, D.C.
Logging and timber have long been important industries, and in
1914 Port Angeles was home to the world's largest sawmill. In 1920,
a large pulp and paper mill was built by Washington Pulp and Paper
Company. Purchased a few years later and operated by Crown
Zellerbach for over 60 years, the paper mill, located at the base of
Figure A.02 — This detail of the "Ennis Creek" mural depicts a 1700s -era Klallum village. (Image: Feiro
Marine Life Center)
Appendix A - Community Profile A94
�i
rnri nrppinc'
Neah gays '
Seklu
,y
i'Tr. Port Angeles
'� Port Townsend
F A� S q
Clallam County
r
Figure A.03 — Port Angeles, as located in Clallam
County and relative to Washington State.
Figure A.04 — Downtown Port Angeles was
dramatically transformed in 1914 when street -
level grades were raised 12 feet or more following
a massive sluice operation - effectively a man-
made mud slide using a nearby hillside for source
material.
Ediz Hook, is now owned and operated by
McKinley Co.
The City experienced sporadic growth
until the linking of Port Angeles with the
transcontinental railroad in 1914 brought
increased prosperity. As rail transport
increased and sea travel waned, Port Angeles
surpassed Port Townsend as the major center
for trade and commerce on the Olympic
Peninsula. Sustained largely by marine trades
and the forest products and fishing industries,
Port Angeles became a classic American small
town and the center of urban life on the
North Olympic Peninsula.
In1922, the Port of Port Angeles was formed.
The natural deep -water harbor has always
attracted shipping as well as commercial and
sports fishing. The Port now operates the
Boat Haven Marina and The William Fairchild
International Airport, in addition to managing
much of the shoreline properties west of
downtown Port Angeles.
The first Coast Guard air station on the Pacific
Coast was established at Ediz Hook on June
1, 1935. It is the oldest United States Coast
Guard Station in the country. The piece of
land currently occupied by the Coast Guard
Station is the one remaining part of the
military reservation that once included all
of what is now Port Angeles. The station
officially became Coast Guard Group Port
Angeles in September of 1944, and received
its first helicopter in 1946.
By far the largest civic project was the
regrading of the downtown streets, which
occurred in 1914. That project created the
current street elevation in the downtown
- which resulted in basement levels for then -
existing businesses (now the "Port Angeles
Underground"). The Olympic Power Company
was formed in 1911 to construct the Lower
Elwha Dam. The County Courthouse was built
A95 City of Port Angeles Comprehensive Plan ti
on Lincoln Street in 1915. A new fire station was built in 1931. A new
police station and jail was built in 1954, and a new City Hall in 1987.
In 1953, Port Angeles received the "All American City" award.
Over the past forty years, except for a few periods of more rapid
growth in the 1920s and 30s, the city has grown at a fairly stable
rate of approximately one percent per year, to its present population
of 19,370.
The City has used zoning to coordinate development and growth
since the 1930s, and in the early 1960s, made a determined effort
to improve planning efforts through development of a "701" master
plan along with a new zoning ordinance and subdivision ordinance.
In 1976, the City again reviewed its planning goals and processes,
and adopted the 1976 Comprehensive Plan, which is the immediate
predecessor of this Comprehensive Plan.
Even before the State passed the Growth Management Act (GMA) of
1990 requiring cities and counties to revise or adopt comprehensive
plans, the City of Port Angeles had decided it was time to revise the
existing Comprehensive Plan, and had already begun that process
when the GMA established new requirements for comprehensive
plans. In response, the City has continued to move forward,
consistent with the GMA, meeting all of its requirements, including
the mandated completion dates.
Appendix A - Community Profile A•6
�i
Enviiunnmmal y Ser siliveArnwr,
Gto Wan
MM it dol
MM P�M
M ,;keekztDW r
M Net or,
cr e U OM I
_ J4wrta1Cwmr$w
1 r�
-•s}.i�.x s•�rra.v��s,�.xr un r.. pfw e,.. �. w n.�;��r..ry s�w�o-M �n.,,•. ,e, yiati rh
Figure A.05 — This map of Port Angeles' "environmentally sensitive areas" shows general locations of
marine bluffs, ravines, shoreline buffers and modified fill areas.
Current Characteristics
An essential part of developing goals and setting directions for the
future lies in reviewing the past and evaluating the present. An
Environmental Impact Statement (EIS), prepared by the consulting
firm of Nancy A. Ryan and Company for the 1994 Comprehensive
Plan takes an in-depth look at the physical, social, and economic
aspects of Port Angeles. A second addendum to the original EIS was
prepared and adopted for the updates that have occurred over a
three-year period ending in 2004. The following descriptions are
intended to provide the users of this document with a general view
of the community. For a more detailed analysis, refer to the EIS and
the 2004 update addendum.
A97 City of Port Angeles Comprehensive Plan ti
f
i
1 r�
-•s}.i�.x s•�rra.v��s,�.xr un r.. pfw e,.. �. w n.�;��r..ry s�w�o-M �n.,,•. ,e, yiati rh
Figure A.05 — This map of Port Angeles' "environmentally sensitive areas" shows general locations of
marine bluffs, ravines, shoreline buffers and modified fill areas.
Current Characteristics
An essential part of developing goals and setting directions for the
future lies in reviewing the past and evaluating the present. An
Environmental Impact Statement (EIS), prepared by the consulting
firm of Nancy A. Ryan and Company for the 1994 Comprehensive
Plan takes an in-depth look at the physical, social, and economic
aspects of Port Angeles. A second addendum to the original EIS was
prepared and adopted for the updates that have occurred over a
three-year period ending in 2004. The following descriptions are
intended to provide the users of this document with a general view
of the community. For a more detailed analysis, refer to the EIS and
the 2004 update addendum.
A97 City of Port Angeles Comprehensive Plan ti
Location
The City of Port Angeles is located in Clallam County on the northern
coast of Washington's Olympic Peninsula (See Figure A.03). It is
less than three hours driving time (including the ferry ride) from
Seattle or Olympia, and is located at the base of the Olympic
Mountains' north slope. Immediately to the north is the coastal
marine environment of the Port Angeles Harbor, one of the deepest
naturally -protected harbors on the West Coast, and Strait of Juan
de Fuca. To the south are the pristine alpine wilderness areas of the
Olympic National Park, to the east is the semi -arid climate of the
Sequim-Dungeness Valley, and within two hours time to the west
is the Hoh Rain Forest and the beaches and rugged beauty of the
Pacific Coast.
Air
The circulation of air around the Olympic Mountains and through the
Strait of Juan de Fuca results in mostly easterly or westerly winds in
the vicinity of Port Angeles. Highest winds are generally associated
with intense winter storms, and may be from either an easterly or
westerly direction. On most summer afternoons, a moderate to
strong westerly breeze can be expected. Wind velocity and direction
vary with the season. Winds from the west predominate and are
strongest during the summer, averaging about 14 miles per hour.
Winds from the south and east occur more frequently during the
winter, with an average velocity of about nine miles per hour.
Water
Port Angeles is located in the Port Angeles watershed, which drains
65,000 acres (101.5 square miles). A gradually -descending slope
from the Olympic Mountains north to the Strait of Juan de Fuca
characterizes the topography of the immediate Port Angeles area.
Steep hillsides and bluffs of 50 to 150 feet in elevation mark the
northern edge of the slope. This region is segmented by streams,
which flow from the mountains toward the Strait and have formed
V-shaped ravines that are much lower in elevation than surrounding
areas. These ravines contain the following major creeks passing
through the community to Port Angeles Harbor and the Strait of
Juan de Fuca: Dry Creek, Tumwater Creek, Valley Creek, Peabody
Creek, Ennis/White's Creek; Lee's Creek and Morse Creek are
located east of the City limits in the UGA. The Elwha River is located
approximately 1.25 miles west of the City, and is the primary water
Appendix A - Community Profile A98
�i
source for the city. Very few sites in the City obtain potable water
from wells.
Wildlife
Port Angeles is located in an area replete with wildlife. The City is
located adjacent to Olympic National Park and the Strait of Juan
de Fuca. The drainages that pass through Port Angeles provide
wooded corridors and habitat for a wide variety of wildlife. Various
freshwater wetlands are scattered throughout the city. Port Angeles
Harbor is approximately 2,435 acres in size and is one of the deepest
natural harbors on the west coast. It provides habitat for many
aquatic species.
The wooded riparian areas provide food, cover, spawning,
breeding, and rearing areas for a wide variety of wildlife species.
Trees and other plants shade streams and help keep water cool
while stabilizing banks and providing food and habitat for insects,
amphibians, reptiles, mammals, birds and fish. Trees also provide
cover for wildlife. When trees die and fall into the streams, the logs
create small dams and pools that offer fish rearing habitat and cover
from predators. Logs that remain on land provide cover for wildlife.
Wildlife from the ravines also make use of surrounding developed
properties and undeveloped lands for foraging.
Within Clallam County, the Washington State Department of Wildlife
(Priority Habitats and Species program) has indicated that there are
15 "priority habitats" and 104 "priority species" listed in Clallam
County.2 Due to an agreement with the Department of Wildlife, the
location of these habitats is not made available. The locations have
been reviewed and considered as part of this analysis.
The location of other less sensitive species has been identified in the
Draft Environmental Impact Statement (DEIS). In particular, there
are three areas that harbor seals use for haul -out. Those sites are
the beach at the former Rayonier Mill site, Hollywood Beach near
downtown, and the south shore of Ediz Hook in Port Angeles Harbor.
Department of Wildlife maps identify an area along the Harbor side
of Ediz Hook that has "regular large concentrations" of shorebirds.
The bluff along the shoreline also provides a special and valuable
habitat for shorebirds and other wildlife.
Within the Olympic National Park, Roosevelt Elk roam the slopes of
the mountains. Other wildlife include black bears, cougars, coyotes,
mountain beavers, minks, raccoons, otters, wolves, eagles, hawks,
1. State of Washington Priority Habitats and Species List, August 2008
A•9 City of Port Angeles Comprehensive Plan
ravens, and grouse. Fisher have recently been reintroduced into the
Olympic National Park as well. Mountain goats were introduced to
the Olympic National Park during the last century and have become
well-established.
All of the creeks that make up the Port Angeles watershed are used
for fish habitat, but most have barriers to fish migration. Coho,
cutthroat and possibly steelhead use Dry Creek. Tumwater Creek
provides anadromous use by coho, cutthroat, and steelhead well -
upstream of the City limits. Valley Creek and Peabody Creek may
be used by sea -run cutthroat, however, these runs are not felt to
be self-sustaining. The stream ravines provide sections of relatively
high quality habitat, and are recognized by the State as sustaining
significant populations of resident fish and potentially having salmon
runs restored - once downstream impediments are removed. The
resident fish currently present in Ennis Creek are coho, sea -run
cutthroat, and steelhead. The fish migrate up to 4.9 miles from the
Port Angeles Harbor. White's Creek, which joins Ennis Creek, contains
coho, steelhead, and sea -run cutthroat only up to Front Street. The
estuary at Valley Creek was restored to its original condition as
a mitigation action in 1996. Extensive restoration of Valley Creek
has been accomplished upstream from the southern end of Valley
Street to the Highway 101 crossing. Restoration efforts have been
supported by City land acquisitions along the lower portions of
Valley Creek, with the intent of future restoration projects.
Natural Resources
There are very limited forest areas, and no mineral lands located
within the City. Much of the forested areas are located within
stream ravines or along the marine bluffs. Approximately 35 acres
of developable lands remain forested. Lincoln Park and Shane park
also contain forested areas that are protected from development,
however the trees in Lincoln Park are beginning to penetrate the
air space needed for approach to Fairchild Airport, and will likely be
removed in the future. The City of Port Angeles contains 26 miles of
marine shoreline including Ediz Hook, a four -mile -long sand spit, and
17 miles of streams.
Diverse scenic resources are abundant in Port Angeles. Notable
visual elements include the Strait of Juan de Fuca, Ediz Hook,
Vancouver Island, San Juan Islands, Mt. Baker, Hurricane Ridge, and
the Olympic National Park. Of special note are the views along the
bluffs above Port Angeles Harbor. The Ocean View Cemetery
Wt.—
Appendix A - Community Profile A910
�i
NUMBER OF PARCELS
by ZDN E
1331
34Ga
]mo 897 934
457 #45
4M ' 197 171 161 140
� 113 117 115 to 61
RS -9 P9P PS -7 RHO CA av CSD C1 IL NMD FNo H CIO MAU Derr
Figure A.06 — This chart shows the number of parcels associated with
Port Angeles zoning categories.
Ind u tTial Zone
Land Use
ADD
1400
iz0m
Woa
ao0
Wo
400
200
a
ustrinl0raado�ad Indusbiel UndEvdcW
Figure A.07 — Developed and undeveloped industrial -zoned land, in acres.
`J6 of Residentia Ity Zoned Parcels Remaining
Undeveloped
5D% 43�
4D%
3D%
2D% 14%
11`1
ID% 1
MA
RS -:7 R5'9 AHO RM® RS -11
Figure A.08 — Developed and undeveloped residential -zoned land, in
acres.
A911 City of Port Angeles Comprehensive Plan t
��
at the west edge of town provides views northward and along the
coastline. The beaches and beachfront trail along the shoreline also
offer views of Ediz Hook, the Strait of Juan de Fuca, and Vancouver
Island. Ediz Hook has superlative views of the Strait, mountains,
waterfront, and the city.
The vegetated creek ravines offer wooded open space, providing
wildlife habitat and corridors connecting the waterfront with the
foothills. Other open space amenities include wetlands, steep slopes,
marshes, hilltops, and even open fields.
Noise
The primary sources of noise in Port Angeles is air traffic from the
airport and the Coast Guard base, industrial activities along the
Port Angeles Harbor shoreline, vehicular traffic, and construction
activities. The ambient noise levels within the City of Port Angeles
would be expected to vary depending on location within the city.
In 1986, a Noise Compatibility Planning Study was conducted for the
Fairchild International Airport under the guidelines of the Federal
Aviation Regulations. The Planning Study included analyses of both
existing and projected noise levels associated with the aviation
traffic.
The one remaining mill along the waterfront is a source of noise
and is in a difficult place to provide noise attenuation. Since the mill
is visible from many residential areas on the bluff top to the south,
these residences can be expected to receive the greatest noise
impacts.
The Rayonier Mill closed in late 1990s, leaving no noise -producing
industries east of the downtown area. The K -Ply mill near downtown
closed in 2011, with site remediation completed in 2016. The Port
of Port Angeles intends redevelopment of the site for marine trades
industries.
Higher noise levels are allowed for motor vehicles operations on
public roads. Warning sirens and temporary construction equipment
are generally exempt from the noise regulations. Traffic levels would
be expected to be highest along major transportation routes of US
101, First Street, Front Street, Lincoln, Lauridsen Boulevard, Race
Street, Tumwater Truck Route, and Marine Drive.
tI
Appendix A - Community Profile A912
Population
The population for the City of Port Angeles in 1993 was 18,270; this
represented an increase of three percent over the 1990 population
of 17,710. The population for Clallam County in 1993 was 61,400. The
percentage of the County population residing in the City dropped
to 28.5% in 2004. The 2000 population of 18,397 marked a 3.7%
increase over the 1990 population. The population had risen to
18,740 by 2007, and was 19,090 in 2015.
The State Office of Financial Management (OFM) has projected a five
percent growth rate over the next 20 years for Clallam County; this,
along with a linear projection for Port Angeles, is illustrated in Table
A.01. The City population so far not grown at the projected rate.
Table A.01- Population Projections based on Office of Financial Management
Population 2010 2015 2025 2035 2045
Port Angeles 19,038 20,509 23,802 27,623 32,058
Clallam County 71,404 75,717 85,142 95,739 107,655
The population figures in Table A.01 are projections based on an
estimated 1.5% growth rate from 2010 census data. These numbers
are considered high due to the historic growth rate for the City of
0.36% per year. Using information from the 2015 OF estimate, the
percentage of Clallam County population attributed to the City of
Port Angeles was 26.3%.
Land Use
The City of Port Angeles contains 10.7 square miles or 6,856 acres
of land area. There are residential areas, industrial areas and
commercial areas with a fairly well defined Central Business District
(CBD). Figure A.06 shows the number of parcels within each zone.
Port Angeles currently has land available in each zone designation to
meet the anticipated future needs for developable lands. Figure A.07
and Figure A.08 indicate the amount of available land for industrial
and residential lands, respectively.
Currently, there are 567 parcels developed with infrastructure
available for residential development.
Community Facilities
Community facilities include a 126 -bed hospital, one public library,
one fire station, one police station, 22 developed parks, the Senior
A913 City of Port Angeles Comprehensive Plan ti
Services Community Center, a public swimming pool, the Vern
Burton Community Center, a publicly owned cemetery, one private
golf course, four cultural centers (Port Angeles Fine Arts Center,
Arthur D. Fierro Marine Lab, The Lower Elwha Klallam Cultural
Center, and the North Olympic Cultural Center).
The Port Angeles School District Number 121 serves the City of
Port Angeles and its surrounding community. The District operates
five elementary schools, one middle school (grades 7-8), one
high school, one alternative high school, and is host to the North
Olympic Peninsula Skills Center. Within the City of Port Angeles
there are three elementary schools; Franklin Elementary, Hamilton
Elementary, and Jefferson Elementary. Dry Creek Elementary School
is located west of the city limits and Roosevelt Elementary is located
east of the City limits. Stevens Middle School, Port Angeles High
School and Lincoln High School provide for secondary education.
The Skills Center, working closely with Peninsula College and five
neighboring school districts - Cape Flattery, Crescent, Quileute, Port
MA�
PUbIK Schools
GIy Umi.
RA 14arb-Y
A LMlim C.w.&W
&haul AWqr" RI
=� "Arr*M P-16rpcIMy $rhoaI
51u. C+�I�i
• °e +°� b Fs wed Iv. 4p.rdnosl-hiYm�Awv h+' C+r'IF'*-Wgr4t 44Ind We �q oft -ane prp F-w+�jrt4W'd WN.ex�ro4 Mr+Y�4r Cep
Figure A.21 — Public schools located in Port Angeles.
Appendix A - Community Profile A914
�i
Angeles and Sequim School Districts - provides the latest vocational/
technical education in a competency -based learning environment.
Peninsula College, with its main campus located in the foothills of
the Olympic Mountains and overlooking the Strait of Juan de Fuca,
provides a vital center for higher education and diverse cultural
opportunities, enhancing and strengthening community bonds for
the residents of the North Olympic Peninsula. College programs
include traditional academic transfer offerings, professional -
technical training, Basic Education for Adults, adult continuing
education, on-line learning courses and a center for baccalaureate
degrees, allowing students many educational options.
In addition to the many associate degree and certificate programs,
Peninsula College offers a baccalaureate degree in Applied
Management. The college also works with key university partners,
providing numerous opportunities for residents to earn bachelor
degrees locally. These partners include City University, Western
Washington University, Goddard College and Evergreen State
College.
Peninsula College is committed to providing college/community
connections and has numerous partnerships and collaborations
in the community with the City of Port Angeles, the Port of
Port Angeles, the Port Angeles School District, the Economic
Development Council, local tribes, private businesses and others.
The college offers classes, training and resources in support of
workforce development and community enrichment.
The college currently serves over 5,000 students and employs 145
full-time faculty and staff and approximately 390 part-time faculty
and staff.
The Port of Port Angeles operates a 16.1 -acre marina, with
approximately 375 boat slips and 3,000 feet of dock for tie-ups,
and a public boat yard for repair and maintenance. The Boat Haven
Marina was upgraded during 2007-2008. The port also operates the
William R. Fairchild International Airport.
Planning Areas
The Comprehensive Plan divides the City into eight planning areas.
For the purpose of description, the individual planning areas are
identified as the Harbor, Northwest, Southwest, North Central, South
Central, East, Eastern Urban Growth Area and Southwestern Urban
Growth Area planning areas. These areas are located on Figure A.09
and are described as follows:
A915 City of Port Angeles Comprehensive Plan t
��
Harbor
The Harbor planning area includes all shoreline areas adjacent to
Port Angeles Harbor and contains the Coast Guard Station, the City -
operated boat ramps, Harborview Park, and the McKinley Paper
Company Mill, all on Ediz Hook. The historic downtown and waterfront
are also essential parts of this sub -area. The boat haven marina, log
export terminal, the Coho Ferry terminal, and City Pier Park line the
waterfront. Entertainment activities (movie theater, bookstores,
antique shops, galleries, historic underground tour and restaurants)
abound within the pedestrian -oriented central business district.
Also in the Harbor planning area is the former Rayonier Mill site. The
mill has been closed since 1997, and has been demolished. The site is
undergoing remediation for clean-up of materials left from the previous
mill operation. In 2013, the City purchased a five million- gallon storage
tank that remained on the site and has incorporated the tank into its
facilities for the remediation of combined sewer overflows into Port
Angeles Harbor.
A4
�• Y
•vWr"� Ld�T�. }�� .m � .
Y
!al � •
Clry Planning Arims
�= eIInds
r�r�a+ar�+a LL—i
P dY lYYi lig Ar"D
7 Sy
.�ifYO'.11
e cg
�vdY writ■
-i..+ t -r-r' •- •,,kplYe4 iQ ,.",,. h'! l+ r+!!YY•P4 Jrych ti' °,— •+c o.'CrrvFc+ Lp ek+c.+nr -'„!Y„i kc 1tic.cwc �abYFr o"Y4c CJ}
Figure A.09 — Planning areas defined for purposes of this comprehensive plan.
� Appendix A - Community Profile A916
�i
s
Northwest
The Northwest planning area covers the western edge of the city lying
west of Tumwater Creek and north of Fairchild International Airport.
This area is comprised largely of older homes, however recent growth
pressure has led to new subdivisions and home construction in the
area. There is a commercial area located at 8th and "C" Street, serving
the residents of the west end of the City. A pocket of industrial/
commercial activities is located along the Tumwater Truck Route near
the US 101 junction. This area of town has limited access because of the
Tumwater Creek ravine and the bluffs. The Northwest Planning Area has
the largest segment of undeveloped residential land within the current
City limits.
Southwest
The Southwest planning area includes Fairchild International Airport,
the Clallam County Fairgrounds, Ocean View Cemetery, the Port
Angeles Regional Transfer Station, The Extreme Sports Park property,
ii
CRti'
UG
Ubtyp
EunA
•aJ7,A
MU 'A
'M1e raa�v +r� �n Ms eaed n a kpF cka.a sR v, r� a rn�s �mestics{ rir� CFr p�rr� sn.p Q�sa 4 •hs�n wxa�:v ■vax� =+res• �r s•�F�n +o �$r�q a'�++� bc��s �cans,.abMFr v"�5c C+r
Figure A.10 — Urban Growth Areas (UGAs) defined for purposes of this comprehensive plan.
A917 City of Port Angeles Comprehensive Plan ���
Fairchild International Airport and Lincoln Park. In 2005, the city
annexed 358 acres of land into the southwest planning area. Much
of the area is included in the Eclipse Industrial Park. Industrial
development is located at the airport industrial park, and the area was
annexed in 2005. A few homes lie within the City limits along Lower
Elwha Road, but otherwise this planning area contains predominantly
industrial and public land uses.
North Central
The North Central planning area is an older, denser portion of town.
It is an area bounded on the west by the Tumwater Creek ravine and
divided by Valley Creek and Peabody Creek ravines. It contains City Hall,
Clallam County courthouse, the William Shore pool and the Carnegie
Library museum. The commercial uses along Lincoln Street provide
community shopping opportunities. Recreation is provided by a number
of neighborhood parks. Much of the city's multifamily housing is within
this planning area.
South Central
The South Central planning area is the area of town with newer homes
on larger lots. This planning area was annexed into the City after much
development had occurred. The street pattern changes from traditional
townsite blocks to smaller lots in older areas and large blocks and cul-
de-sacs in newer areas. The Port Angeles High School lies within this
planning area. The Olympic National Park Headquarters and Visitors
Center is along the Heart of the Hills Road.
East
The East planning area is the area east of Race Street to the eastern
city limits. This area has a mix of older homes and newer residential
subdivisions and development, as well as a portion of the First and
Front Street commercial corridor. This planning area includes Peninsula
College facilities and Peninsula Golf Club.
Urban Growth Areas
Eastern UGA
The Eastern Urban Growth Area (UGA) is generally the area east of
the city limits. Remnant properties in the UGA that are located south
of the city limits and east of Valley Creek are considered to be in this
UGA until annexation occurs, whereby they will be considered to be
part of the adjacent planning area. Policies for this planning area are
adopted by Clallam County as a part of the Port Angeles Regional
Comprehensive Plan.
wn,.— Appendix A - Community Profile A918
�i
Figure A.12 — Downtown is Port Angeles' smallest
neighborhood, but it's also the city's most
dynamic, featuring dozens of shops, restaurants,
beach and community gathering areas, and the
Coho Ferry serving Victoria, BC. (Image: Studio
Cascade, Inc.)
Western UGA
The Western UGA is generally the area
west and south of the City limits. Remnant
properties in the UGA that are located south
of the pre -2005 city limits, north of Highway
101 and west of Tumwater Creek as far as
Reddick Road are considered to be in this
UGA until annexation occurs, whereby they
will be considered to be part of the adjacent
planning area. Policies for this planning area
are adopted by Clallam County as a part of the
Port Angeles Regional Comprehensive Plan.
Neighborhoods
The City's planning areas are made up of
18 separate neighborhoods. The distinct
neighborhoods are described in the following
sections.
Downtown
The downtown neighborhood is the smallest
neighborhood, extending north from the
marine bluff to the waterfront and east from
Valley Street to Chase Street on the east, and
extending east along the Waterfront Trail
to Vine Street (extended). The Downtown
neighborhood is the traditional community
center of the City. Many of the structures are
two stories tall, with a few having residential
uses on the second floor, or are used for
offices. Many others are in disrepair, or are
vacant. Buildings in the downtown area span
several decades and architectural styles,
some dating to the early 20th century. Few
structures are more than two stories tall. The
Lee Plaza is the major residential structure in
the downtown area, and is managed by the
Peninsula Housing Authority for low-income
individuals. The City's Comprehensive Plan and
zoning ordinance support increased residential
uses in the downtown.
The downtown is a walkable neighborhood,
with ample sidewalk areas, mid -block
crosswalks and a large variety of eateries and
gathering places. A locally -owned natural
A919 City of Port Angeles Comprehensive Plan ti
foods market, specializing in organic products and locally -grown
produce anchors the west end of the downtown area. Washington State
Department of Health and Human Services operates out of a downtown
location. Ample parking is scattered throughout the downtown area.
There are no longer any large anchor chain stores in the Downtown,
however there are many individual shops providing unique items, such
as clothing, books, candy, brewing supplies, boutique clothing, athletic
goods, auto parts, novelties, gifts, art and furniture.
Several City projects have been undertaken in the downtown in recent
years. Water mains, sewer lines, sidewalks and street trees have been
replaced. The sidewalks are constructed of pavers to enhance the
aesthetics of the area.
A recent project has replaced shoreline armoring along a portion
of Railroad Avenue west of the ferry landing. Improved waterfront
treatments and removal of hard armoring in favor of two pocket
beach areas has returned areas further west to a much more natural
A --
Ciiy NNOhbMhOi5d&
wayUrvels
u
-
!`du FI ooY
I
i
.o aur f�ffY
I
•.
4M Cmik
'A, Ang e4 ib
'
YAnLEnd
I
it*.s,o r c.r "A w:pw dwiow mwv� } i •, . rL. WM... .4*Aa f. -f.W,. •neo Ckh&WI,wAN v., Ii r.4
Figure A.11 — Port Angeles neighborhoods defined for purposes of this comprehensive plan.
IWC
�'�� Appendix A - Community Profile A920
Figure A.13 — 2016 updates to the Comprehensive
Plan support greater housing diversity in Port
Angeles neighborhoods, providing options for all.
(Image: Studio Cascade, Inc.)
appearance. This project also resulted in the
formal extension of the Olympic Discovery/
Waterfront Trail through the downtown area,
and created a block -long park on the west
end of the Downtown, which complements
City Pier Park located at the east end of the
Downtown.
The Downtown is an international port, hosting
the Coho Ferry, which provides direct access to
Victoria Canada.
Pine Hill
The Pine hill neighborhood extends from the
center of Valley Creek ravine on the east to the
center of Tumwater Creek ravine on the west.
The northern boundary of the neighborhood is
the marine bluff and the southern boundary is
Highway 101.
Pine Hill neighborhood is one of the older
central city neighborhoods. The urban
character of this neighborhood is similar to
several other older neighborhoods, typically
featuring 7,000 square -foot lots and standard
grid pattern streets. The homes in this area
typically are older structures built in the early
20th century, with a variety of more recent
infill homes scattered throughout the area.
The predominant style of house is typically
American Craftsman.
The area is generally level, with a slight rise
from north to south. This aspect limits views
towards the water (north) but many homes
have views of the Olympic Mountains to the
south.
Very few commercial uses exist in this
neighborhood. Those commercial uses that do
exist are located along the 8th Street corridor.
The Pine Hill neighborhood is only served by
transit along 8th Street. Sidewalks do exist
throughout the neighborhood.
West End
The West End neighborhood extends west
from 'M' Street to the marine bluff, and south
A921 City of Port Angeles Comprehensive Plan ti
from 10th Street to 18th Street, and is one of the least -developed
areas of the city. Larger -lot zoning (up to 11,000 square feet) and
the allowance for curvilinear streets and cul-de-sacs result in a
more suburban character. The neighborhood contains five different
zone designations, allowing a range of densities from less than four
dwelling units per acre to 12.44 dwelling units per acre. Two residential
manufactured home parks exist in the neighborhood. Serenity House
of Clallam County, Clallam County Housing Authority, and Habitat for
Humanity all have developed housing for low-income families in the
area.
Much of this area remains undeveloped with large tracts of forested
land. Two areas in the neighborhood have been set aside and used by
industrial interests to store low -hazard waste materials, making those
sites unlikely to be redeveloped in the near future.
Several newer (1970s to current) subdivisions have been developed in
this neighborhood, however not all of the developed lots are occupied
yet. Many excellent building sites are developed with urban services
but remain vacant. Homes in the area are newer, many of them single -
story, ranch style structures.
Although the development in this area is newer than other
neighborhoods, streets are developed with few sidewalks for
pedestrian use. No commercial services are available in the area. Due to
this limitation, the neighborhood is not considered highly walkable. The
Olympic Discovery Trail spans the neighborhood following Milwaukee
Drive from 10th Street to 18th Street. The City -owned Ocean View
Cemetery is located at the northwest limit of the neighborhood.
Views from this neighborhood are primarily to the Olympic Mountains;
the few developments west of Milwaukee Drive have outstanding views
of the Strait of Juan de Fuca.
Airport
The airport neighborhood extends west from 'M' Street to the western
City limit and south from 18th Street to the City's southern limits,
and is the City's largest neighborhood with 1,217 acres. The primary
land use is the William Fairchild Airport. The airport also contains an
industrial park situated on the north side of the runways and south of
18th Street. The neighborhood also contains the City's refuse transfer
station, recycling center, and compost facility. The Extreme Sports Park
is located in the neighborhood's southwest corner. Several large tracts
of forested land and farm sites exist in this neighborhood. This is the
least populated neighborhood in the City.
Appendix A - Community Profile A922
�i
Cherry Hill
The Cherry Hill neighborhood extends from Lincoln Street on the east
to Valley Creek on the west, and from Lauridsen Boulevard on the
south to marine bluff on the north. This is an older neighborhood, and
contains a large portion of the City's High Density Residential zoning
located at the north end of the neighborhood. The southern portion
of the neighborhood is primarily single-family residential zoning. The
8th Street commercial corridor separates the two zoning districts, and
a second commercial corridor extends north and south along the west
side of Lincoln Street.
The neighborhood contains three small parks and the east slope of the
Valley Creek ravine. Homes in the area are mostly older structures.
Peabody Creek
The Peabody Creek neighborhood extends east of Lincoln Street to
Race Street, and from 8th Street on the south to the Georgiana/Front
alley on the north. The boundaries of the Peabody Creek neighborhood
are all comprised of commercial corridors, with high-density residential
uses west of Peabody Creek and single family residential uses east of
the creek. Peabody Creek Ravine divides the neighborhood diagonally
from the southeast to the northwest. The neighborhood contains Jesse
Webster Park, Erikson Park, and the Dream Playground; it also contains
City Hall, Clallam County Courthouse, and the Senior Center.
Crown
The Crown neighborhood extends from 'I' Street on the east to the
marine bluff on the west and from 10th Street on the south to the top
of the marine bluff on the north. The Crown neighborhood contains
Crown Park which provides panoramic views from the bluff top.
Hamilton Elementary School is located within this neighborhood. The
neighborhood is primarily a single-family residential neighborhood
and contains no commercial zones. Much of the housing in the area is
newer and there are still areas that are undeveloped.
Ediz Hook
The Ediz Hook neighborhood is made up of Ediz Hook itself along with
the waterfront area extending west of Valley Street. The neighborhood
is unique in that there are no residential uses in the neighborhood,
with the exception of full-time residential use of boats in the marina.
The primary uses are industrial, with a few commercial activities that
support the industries. Several large industries make up the major
uses, including the McKinley Paper Company mill, Westport Marine
and Platypus Marine. Tesoro Petroleum provides fueling operations
for large ocean-going vessels. Icicle Seafoods and the Puget Sound
Pilots office and facility are located at the east end of Ediz Hook. The
A923 City of Port Angeles Comprehensive Plan t
��
Port of Port Angeles owns and operates several industrial/commercial
operations along the waterfront, including log storage and bark
removal, topside repair of large ocean-going vessels, and berthing of
navy support boats. They also own and operate the Boat Haven Marina.
The Native American village Tse -wit -wen is also located within the
Ediz Hook neighborhood. Ediz Hook itself provides outdoor recreation
opportunities through the Sail and Paddle Park at the west end of the
spit, and Harbor View Park at the east end. The parks are connected by
an extension of the Olympic Discovery Trail. A boat launch is provided
at the east end of the spit and at the Boat Haven Marina. Ediz Hook
has recently undergone extensive habitat restoration efforts led by the
Lower Elwha Klallam Tribe.
Georgiana
The Georgiana neighborhood extends north from the Georgiana/Front
Street alley to the waterfront, and extends from Vine Street on the
west to the Whites Creek Ravine on the west. Although this is primarily
a single-family residential neighborhood, the Olympic Medical Center's
hospital and associated medical support offices make up the bulk of
uses in the central portion of the neighborhood. Two parks are located
in the neighborhood - Georgiana Park and Francis Street Park - which
provide access to the Waterfront Trail. The abandoned Rayonier Mill
site is located on the waterfront at the east end of this neighborhood.
Harbor View
The Harbor View neighborhood extends from the Tumwater Creek
Ravine west to 'I' Street and north from 8th Street to the marine bluff.
This is also primarily a single-family residential zone, with commercial
uses located only at the intersection of 8th and 'C' Street. Shane Park is
the only park in the neighborhood.
Jefferson
The Jefferson neighborhood is located between Lincoln Street on
the west and Race Street on the east. It is bounded on the south by
Lauridsen Boulevard, and on the north by the 8th Street corridor. This
neighborhood is also primarily a single-family residential neighborhood,
with the exception of uses on the south side of the 8th Street corridor.
Jefferson Elementary School is located in the southwest corner of the
neighborhood.
CIVIC
The Civic neighborhood extends east from Race Street to the White's
Creek ravine, and north from Lauridsen Boulevard to the Georgiana/
Front Street alley. The neighborhood contains the major commercial
strip along First and Front Streets, but is otherwise a single-family
neighborhood. Low- intensity commercial uses are also located along
Appendix A - Community Profile A924
tIMP,
Race Street. This neighborhood contains Civic Field - the City's major
sports facility - the Fine Art Center, and Webster Woods, a premier art
venue providing unique outdoor art.
Lauridsen
The Lauridsen neighborhood extends south of Lauridsen Boulevard
to Park Avenue, and from the Valley Creek ravine on the west to Race
Street on the east. Commercial uses in this neighborhood are confined
to the western portion of Lauridsen Boulevard. The Housing Authority
of Clallam County manages Mount Angeles View, an affordable housing
project. Lyons Park is the only formal City park in the neighborhood.
Lincoln Park
The Lincoln Park neighborhood extends south from 8th Street to
Highway 101 and west from Tumwater Truck Route west to 'M' Street
(with some variation). Commercial areas are located along the 'C' Street
corridor, and at the west end of the neighborhood along Highway 101.
An industrial -zoned area exists at the south end of the Tumwater truck
route, where several small manufacturing and construction -related
industries exist. Park View Villas, a senior/retirement center, is located
in this neighborhood as well as a cluster of high-density apartments
found in the vicinity of the 'C' Street and Lauridsen Boulevard
intersection. The remainder of the neighborhood is single- family
residential.
Schools in the area include Stevens Middle School - the only middle
school in the City - the North Olympic Skills Center, and Choice
Alternative School. The former Lincoln School has become the Clallam
County Historical Society headquarters, and is planned to become the
Clallam County museum.
Lincoln Park is the City's largest park, and includes the Clallam County
Fairgrounds, baseball fields, two ponds, and a large wooded area. Big
Boy Pond, one of the City's largest wetland areas, is located west of
Stevens Middle School.
Mill Creek
The Mill Creek neighborhood extends south from Park Street to the
southern City boundary, and from the western City boundary to Race
Street and Hurricane Ridge Road on the east. This neighborhood
contains the northernmost portion of the Olympic National Park, and
the Park headquarters building and maintenance area. Also located in
this neighborhood is Port Angeles High School.
Areas directly surrounding the high school are primarily single-family
residential uses situated on standard -size lots. The southern portion
of the neighborhood is also single family residential, however those
A925 City of Port Angeles Comprehensive Plan t
��
lots are larger, less developed and are typified by newer homes. No
commercial uses are located within the Mill Creek Neighborhood.
Mt. Angeles
The Mt. Angeles neighborhood extends south from Lauridsen
Boulevard to the southern City limits, and from Hurricane Ridge Road
on the west to the White's Creek ravine and the eastern City limits. A
large portion of this neighborhood is occupied by Peninsula College, the
only institution of higher education in the City. The neighborhood also
contains Franklin Elementary School.
Land uses are primarily single-family residential on larger suburban -
size lots; however, some medium and high-density residential uses are
located near the college campus.
Southwest
The southwest neighborhood is located south of Highway 101 and
includes the entire area annexed into the City in 2005.
Fie"e 4 ni i hu r1. *&parl
FroN'� : iiWn auk rrrx..•:ra4t•
rur+.•1,00
A✓k-al GertSn?r�e i
I
t—J L_1 _I _ I 'Feel
+J 7.K4 iaJ4�3 I
-+Yi r rw ni. .{id war YjY li.ir�yl Wi I M1Y Y� i 1 i.+ .9 ®q Rk ^i}.IPwjdL}YYY... YV' il. }ai u¢e •Irf p.i w`.1.6 Air - . Qlmo Y'•FY&w.YQ Y.hAe nl}
Figure A.17 - Port Angeles'station and fire response map.
emow►
'�� Appendix A - Community Profile
�i
F—AM-1
White's Creek
The White's Creek neighborhood extends east from the White's
Creek ravine east to the City limits on the north, south and east.
This neighborhood contains a large private golf course, the only golf
course in the City. Also contained within this neighborhood is the
City's wastewater treatment plant, which now includes a five -million
gallon storage tank recently acquired from Rayonier corporation. The
area includes the eastern portion of the Rayonier mill site, which is
currently unused and awaiting further cleanup efforts. Recently, the
City constructed a new bridge spanning Ennis Creek to provide an
appropriate crossing for sewer and stormwater pipes. The bridge is
also capable of carrying vehicular traffic and the Olympic Discovery/
Waterfront Trail.
Housing
In 1990, 7,553 dwelling units were located in Port Angeles. By 1992, units
had increased by 422 (or 5.6%) to a total of 7,975 dwelling units. By 2004,
units had increased by another 797 (or 10%) to a total of 9,479 units. In the
decade of the 1990s, the City of Port Angeles grew at a slow rate of 3.9%.
The growth in the UGA during the same time was 6.3%. During the period
of 1996 to 2003, building permit activity showed that only 10.7% of the
county -wide residential building units were constructed in the City of Port
Angeles, while 14.2% of the county's residential construction was in rural
areas of the Port Angeles planning region. Recent amendments to the
Comprehensive Plan are intended to reverse the City's no -growth trend.
Currently, the City has 6,834 parcels that are zoned for residential use.
Of those residentially -zoned parcels, 761 are available for building. The
City currently has a number of large undeveloped areas, and based on
anticipated densities, currently undeveloped parcels would provide area
for 2,280 additional dwelling units.
Transportation
The Regional Transportation Planning Organization (RTPO) has designated
Port Angeles as a primary center of mixed-use development, and the City's
UGA has been identified as a secondary center of mixed use development
in the Regional Transportation Plan. Goals and policies in the Growth
Management Element of this plan support focusing new growth and
mixed-use opportunities in the City and UGA.
The road network in the City of Port Angeles is characterized by a gridded
street pattern that is oriented east to west (parallel to the waterfront)
and north to south. This pattern shifts slightly south of Lauridsen
Boulevard, where the street orientation shifts to match the platting
A927 City of Port Angeles Comprehensive Plan ���
pattern established by the County before City boundaries were expanded.
The regular geometry of this pattern is generally retained, except where
topography of the foothills, deep ravines or bluffs along the Strait of
Juan de Fuca force road realignment. Some areas located in the western
portion of the City also diverge from the grid pattern, forming a more
curvilinear, suburban -style pattern.
Street grades are moderate in most areas, adapting to area topography
- which rises from the waterfront and gently undulates as the foothills
flatten to meet the Strait of Juan de Fuca. The most unique characteristic
of the City's street network is the way it is interrupted by several deep
ravines, which bisect east -west street connectivity and results in a limited
number of streets that run continuously from one end of the City to the
other.
The RTPO identifies US 101 as the only Highway of Statewide Significance
in Port Angeles. The Level of Service (LOS) for Highways of Statewide
Significance is established by Washington State Department of
.ti I� ,�'° � •,qac t
i '� �' ire .*' �•• �•.
�r
e
• �' A ' 1 �i _...-. A mow! 'Y .. ,# �, u �
I r • � I— .
Arterial Sir -not Syrslum
CdY L rridm —
r... 1 .. ,� kp. rrrti ..y..rr Cr � i -.r. � ar.n.rtien r'r rr
Figure A.14 — Port Angeles' street system.
i
r
r'
Jr i, f
67 M-. A**Me6 r4° i4 Y M M*AWgaIkVbL Ai r 71Ahr .ih A I FM I R A; Mdida dM 0V LA i i n Y R Mph FJUWfb ff1)0h C. rr
Appendix A - Community Profile A928
�i
Transportation. There are five Highways of Regional Significance through
the City, including:
• us 101
• State Route 117 Tumwater Truck Route
• Race Street leading to the Olympic Park Visitor Center and
Hurricane Ridge
The First/Front Street couplet Marine Drive from US 101 to SR 117
Lincoln/Laurel/Oak Streets connecting US 101 with the Coho Ferry
landing on Railroad Avenue).
There is one designated truck route in the City that runs from east to west
along the Front/First Street couplet to Tumwater Truck Route (State Route
117) and along Tumwater Truck Route south to US 101. All roads in Port
Angeles including highways of statewide and regional significance operate
at LOS "D" or better.
The City of Port Angeles is served by Clallam Transit System (CTS), the
Public Transportation Benefit Area (PTBA) agency that serves Clallam
County with a combination of fixed -route, paratransit, and vanpool
services. Similar to trends seen by other rural transit providers during
times of low fuel prices and strong economic growth, ridership has
declined over the past several years.
The hub of CTS's fixed -route service is Gateway Transit Center, located
at the corner of Lincoln and Front Streets in downtown Port Angeles.
From Gateway Transit Center, passengers can board one of four routes
circulating within the city or three routes connecting Port Angeles with
Sequim, Forks, and Joyce. The Strait Shot, a regional express route started
by CTS in 2017, connects Gateway Transit Center with the Bainbridge
Island Ferry Terminal where travelers can make timed connections
to Seattle, Seattle -Tacoma International Airport, and other regional
destinations. An intermediate stop in Poulsbo provides connections with
Kitsap Transit for service to Silverdale and Bremerton.
Paratransit service is provided to all locations within the city for those
who qualify. Vanpools extend the reach of the transit network and are
frequently used by those commuting to locations which are difficult to
serve with fixed -route service
The Dungeness Line, a part of the Washington State Department of
Transportation's rural transit program, provides twice-daily service
between Port Angeles and the Seattle area, including regular stops at
major hospitals, Greyhound, Amtrak, and Seattle -Tacoma International
Airport.
A929 City of Port Angeles Comprehensive Plan ti
The Port of Port Angeles is responsible for most operations along the
waterfront, including ownership of the Black Ball Ferry Terminal, the
Boat Haven Marina, and other waterfront properties supporting water
related industry. The Port is also responsible for operations at Fairchild
International Airport and the Airport Industrial Park.
The William R. Fairchild International Airport is located approximately
three miles southwest of the central city and serves a combination of
commercial and private aviation demands in the region. The airport
is owned and operated by the Port of Port Angeles and is classified as
a commercial service airport by both Federal Aviation Administration
(FAA) and the Washington State Department of Transportation, Aviation
Division (WSDOT Aviation). The airport serves the commercial service
needs of the entire Peninsula including Clallam, Jefferson and portions of
Mason Counties and the general aviation needs of Clallam and portions of
Jefferson Counties. The airport has more than 800 acres of property, with
690 in aeronautical use, and 110 in industrial park use.
Two runways are available at the Airport for the needs of larger and
smaller aircraft. The Primary runway is 6,350 feet long by 150 feet wide
with the secondary smaller runway being 3,250 feet long by 50 feet
wide and available during daylight hours only. The primary runway has
the capacity for aircraft up to 115,000 pounds. The runway is equipped
with an instrument landing system, visual approach slope indicator,
eight runway -end identifier lights, medium intensity approach lighting
PORT
��_ - _-''- . +lr X71 �4 • in }4S-Rt+il _SIC
V L
•ry OCAr
CA
ZP
4
M
1 �
L 0311T _
Y 4li�4'Y1_ A'Y f.11J4 AIL � • N�IIeT�G _ 6
_nvrrl�-. url
Figure A.16 —Commercial flights to and from Fairchild Airport have ceased, but the facility remains an
important part of Port Angeles' economic development strategy.
Appendix A - Community Profile A930
�i
system with runway alignment indicator, runway and taxiway lighting, and
signage.
The 2011 Airport Master Plan describes the short, intermediate and long-
term plans for facility development and maintenance. A copy of this plan
is available on the Port of Port Angeles website at http://www.portofpa.
com/ index.aspx?NID=276
Land uses surrounding the William R. Fairchild International Airport
include residential, industrial and park/open space. The main landing
approach area for the airport is over the most densely populated portion
of the City, with the final approach over Lincoln Park located immediately
east of the airport. Due to the height of the trees growing in Lincoln Park,
debate over the future of Lincoln Park has been an on-going discussion.
The area to the west of the airport (the primary take -off area contains
the City's solid waste Transfer Station, recycling center and composting
facility. Farther to the west, the area is located in the County and is zoned
Rural Low and Moderate density and Rural Character Conservation (RCC3)
to maintain low-density residential areas in the flight
path area. The lands adjacent to the airport on both the north and south
are designated and zoned as industrial to buffer the impacts that may be
expected from airport use to less intense land uses adjacent to the airport.
Urban Services
Police
The Port Angeles Police Department provides the full range of police
services within the city limits of Port Angeles, operates PenCom (the
county wide 911 dispatch center for police, fire and EMS calls that
represents 18 agencies) and works with allied agencies on a regional
basis to include the Olympic Peninsula Narcotics Enforcement Team
r.an aK 4
hI I IIPo, CLAL LANI TRANSIT SYSTEM MAp
Figure A.15 — The Clallam Transit system provides service covering large
portions of the county. Four routes circulate within Port Angeles' city
limits.
A931 City of Port Angeles Comprehensive Plan ti
(OPNET), police k-9 response and the Major Incident Response Team
(MIRT). The police department provides patrol, crime prevention,
community policing, a school resource officer, police k-9, crisis
negotiators and criminal investigation services. The police operations
headquarters and PenCom are located at City Hall. The Department
has 62 personnel, which includes 32 authorized commissioned officers,
1 parking enforcement officer, 6 records specialists, 20 communications
officers, 1 administrative coordinator and an additional 25 civilian
police volunteers. The PenCom manager is a contracted position with
Jefferson County 911.
Fire
The Port Angeles Fire Department provides
fire response and advanced life support
emergency medical services within the city
limits of Port Angeles. The Fire Department
headquarters station is located at 5th and
Laurel Streets. The Department has 23
career personnel, including 21 firefighters
who are cross -trained as emergency
medical technicians, with 11 certified as
paramedics. In addition to career personnel,
the Department has an active volunteer
component that is consolidated with the
adjoining fire district.
City Parks & Recreation Facilities
Figure A.18 — The Port Angeles Police Department
also operates 911 dispatch services for police and
fire operations across Clallam County.
The City Parks and Recreation Department
maintains over 114 acres of developed park land, another 81.5 acres
of undeveloped land reserved for future park development, and 91.8
acres of undeveloped lands set aside for protection as open space.
The Parks Department maintains 14 playground equipment sites, 13
baseball and/or softball fields, 9 football and/or soccer fields, and 12
tennis courts. Approximately 10 acres are taken up by community
facilities. The Senior and Community Services Center and the Vern
Burton Community Center provide a wide range of year -around
recreational services.
Civic Field provides a full athletic complex for soccer, football and
baseball, with lighting for nighttime activities, concessions, covered
stadium seating, and locker rooms. The Carnegie Library has been
converted to a museum leased by the Lower Elwha Klallam Tribe and
neighbors the City's former fire hall. The City owns and operates the 41
acre Ocean View Cemetery.
Other city facilities include the Feiro Marine Life Center, located in City
Pier Park, and a traditional native long house, the Loomis Building and
several other log structures at Lincoln Park. The Port Angeles Fine Arts
Appendix A - Community Profile A932
Center is located in Webster Woods Park. Two
public walkways connecting the downtown
area with the residential area at the top of
the bluff are owned and maintained by the
City. One of those walkways terminates at the
Conard Dyar Memorial Fountain in downtown.
The City operates a boat launch ramp and
floats for boat moorage on the eastern end of
Ediz Hook. The City pier also provides moorage
for transient boaters.
The City maintains the Olympic Discovery/
Waterfront Trail from Morse Creek to the
Coast Guard Base entry on Ediz Hook and
through the city to the western city limits at
Lower Elwha Road.
Water Utility
The City of Port Angeles water service area
icludes the land within the city boundaries,
ong with services within Clallam County
UD No. 1, 52 Dry Creek customers, 5 Black
iamond customers, and one government
-count outside the city limits. The City also
rovides wholesale water to Clallam County
UD No. 1, subject to certain conditions
Dnsistent with GMA. In the City's 2002
omprehensive Water Plan, the future service
,ea limit was from Morse Creek to the Elwha
iver and bordered on the south by the
lympic National Park.
rigure H.17 — uncum rurrc 15 une ui rurL wnyeies
most diverse activity -oriented parks, including
disc golf, a BMX track, a dog park, event facilities,
fairground areas, wetlands and play fields. (Image
Studio Cascade, Inc.)
he current water supply for the City is from
ie Elwha River. The Elwha River Ranney Well
stem with a minimum yield of 11 million
3Ilons was originally constructed in 1977 with
iajor renovations made during the Elwha Dam
�moval project started in 2010. This source
rovides for domestic and commercial and
)me industrial needs of the City. There is also
separate industrial water supply line serving
ie McKinley Paper Co. Mill.
rmwater Management
The City maintains all public storm sewers,
culverts, and stormwater facilities, including
the WSDOT conduits, culverts, and stormwater
facilities along the US 101 corridor within the
A933 City of Port Angeles Comprehensive Plan t
��
city limits. The City is currently making a major shift in its approach
to stormwater management, moving away from the more traditional
system of hard surfaces draining to catch basins and being piped to
the nearest water body to a more natural acting system of allowing
stormwater to be absorbed into the earth through the installation of
rain gardens and enhancing vegetative cover, including vegetated roof
systems.
Wastewater Utility
The City's wastewater system includes a wastewater treatment plant
(WWTP) built in 1968-69 as a primary treatment facility, and upgraded
to a secondary wastewater treatment plant built in 1994. The plant
is the trickling filter/solids contact treatment system. Biosolids are
hauled to the City's composting facility where it is composted and sold
for beneficial reuse. The sewer conveyance system includes 119 miles
of sanitary and combined sewer pipe ranging from 4 to 36 inches in
diameter, 17 pump stations, and two marine out -falls. The treatment
Ci IV
Park Ar s
- NAT URAL AWE;+
-FriC+MRHCFM Wk
. .v- r °i m -2i rid rk
`q;i1 rCd-:ailaa
Ir4m" &fel IS&*. "A "M rua Y 4 i ir+uirr ur — —P -w -JN} " W' u'� A%r AW yid Allkfi gd$$ Aa j MdteW hi nM gb4tf'N h 1Lrr
Figure A.20 — Park and open -space areas in Port Angeles.
Appendix A - Community Profile A934
�i
_J
Ir4m" &fel IS&*. "A "M rua Y 4 i ir+uirr ur — —P -w -JN} " W' u'� A%r AW yid Allkfi gd$$ Aa j MdteW hi nM gb4tf'N h 1Lrr
Figure A.20 — Park and open -space areas in Port Angeles.
Appendix A - Community Profile A934
�i
Figure A.22 — Port Angeles is working to diversify
its local economy, growing marine trades and
industries as well as activities related to the
city's spectacular natural setting. (Image: Studio
Cascade, Inc.)
plant was modified most recently in 2014, when
the first phase of the CSO Reduction program was
completed. Modifications included a 4.9 million
gallon storage tank for temporary storage of peak
flows of sewage diluted by stormwater (combined
sewage) during rain events, a refurbished deep
water marine outfall providing improved dispersion
of WWTP effluent, improvements to the trickling
filters and headworks, and associated elements.
The wastewater treatment plant (WWTP)
located at the west end of Ennis Creek road, has
a treatment capacity expected to be adequate
beyond 2021. The wastewater treatment plant
(WWTP) is rated at 10.8 million gallons per day
(MGD) maximum month design flow, and can
handle peak combined sewer flows of up to 20
MGD. The WWTP treated an average of 2.5 MGD
of domestic sewage in 2014. Peak system flow
capacities average 3.3 MGD (dry weather) with a
maximum peak flow of 13.4 MGD. The peak system
flow for 2014 was 9.86 MGD.
The second and final phase of the CSO Reduction
program is under construction, and scheduled for
completion in 2016. When complete, combined
sewer overflows to Port Angeles harbor will be
reduced to less than once per year per outfall
location. By design, overflows will occur at the 8000
foot long refurbished marine outfall before they
occur at the two near -shore outfalls. One outfall
location will be eliminated entirely. This represents
a significant reduction, from an average of over
70 overflow events per year, and is a big pollution
control achievement for the City.
The Utility serves unincorporated areas of Clallam County (the Eastern
and Western Urban Growth areas, and the Lower Elwha reservation
land) and treats 2 million gallons annually of septage generated in
Clallam and Jefferson County that is trucked to the WWTP. The WWTP
treats about 0.5 million gallons of leachate generated by the COPA
landfill and the Rayonier Mount Pleasant landfill annually.
The sewer system serves approximately 3,700 acres in Port Angeles.
The city has mostly 8 -inch local sanitary sewers and even some small
6 -inch. However, the city's original collection system was designed
as a combined sewer system with storm water. There were no storm
sewers in the city until the 1950s. The existing storm sewer system
grew in bits and pieces as individual renovation projects and Local
Improvement Districts (LID) responded to local problems. The storm
A935 City of Port Angeles Comprehensive Plan tio
sewers are 6" and 8" diameter due to the steep terrain of the city.
The existing storm sewers run primarily in the north/south "short
block" orientation picking up catch basins, which happen to be at the
east/west "long block" intersections. In summary, the old downtown
has combined sewers and the rest of the city has varying degrees of
partially separated sewers.
The Wastewater Utility employs a Source Control Specialist as part of
the Pretreatment program, to better control what comes to the WWTP
and to provide education and technical assistance to business owners.
Several sources of grease and oils have been identified and remedied to
relieve sewer backups.
The Wastewater Utility staff operates, inspects, maintains and repairs
the sewer conveyance system, the pump stations, and the WWTP. The
Utility funds an organized program of Capital Improvement projects
that is approved by City Council each year and includes a six-year plan
for future projects.
Solid Waste Utility
The Solid Waste Utility operated by the Port Angeles Public Works
and Utilities Department provides solid waste services. Residential
customer's waste is picked up weekly or biweekly and collection is
mandatory. Commercial customers are picked up 6 days a week.
Curbside yard waste and recycling is offered and provided by a private
contractor. Current participation in the curbside recycling program
is 80% per cent of the residential customers. Curbside participation
in the yard waste program is around 50% per cent of the residential
customers.
The City of Port Angeles owns and operates the Port Angeles transfer
station. The Port Angeles Regional Transfer Station began operation
in 2007 after conversion from a landfill. The landfill conversion was
mandated by the Federal Aviation Administration because of the
potential for scavenger birds at the landfill interfering with air traffic
from the adjacent airport. This site accepts municipal solid waste from
residential, commercial, and industrial customers throughout Clallam
County. The Port Angeles Regional Transfer Station does not accept
out -of -county waste. Recycling drop boxes are provided and accept
glass, aluminum, and paper. Used oil, antifreeze, and batteries are also
accepted at the site. Municipal solid waste is transported to regional
landfills in Eastern Washington or Oregon.
A second issue related to the landfill has been the release of buried
refuse onto the beach as normal bluff erosion continued. Two major
projects have been undertaken by the City to relocate waste materials
and stabilize the bluff erosion to resolve the problem.
Appendix A - Community Profile A936
�i
A composting facility for managing green yard waste received from the
public, curbside yard waste pick-up and biosolids from the wastewater
treatment plant at the facility. Yard waste and biosolids are processed
then tested and becomes finished compost available for sale to the
public.
Electric Utility
The Light Division of the City of Port Angeles Public Works and Utilities
Department is the electric power provider within the city limits. Clallam
County PUD is the electric power provider for the unincorporated areas
surrounding Port Angeles. The Bonneville Power Administration (BPA)
via its transmission lines delivers the power used by both the City of
Port Angeles and Clallam County PUD The PUD has one substation
within the Eastern UGA at Monroe Street, and another in the Western
UGA near Benson Road and Highway 101. There are 7 electrical
substations owned by the City of Port Angeles within the City limits.
0
A937 City of Port Angeles Comprehensive Plan t
��
I'l-,", I./l,-, I
A
................................................................................................................
Action (Previously Objective)
A more specific subset of goals providing measurable and budgetable strategy.
Adequate Public Facilities
Facilities, which have the capacity to serve development without decreasing
levels of service below locally, established minimums.
Affordable Housing
The adequacy of the community's housing stock to fulfill the housing needs of
all economic segments of the population.
Accessory Residential Unit
A residential unit, which is subordinate in area, extent, or purpose to a principal
residential unit and is located on the same zoning lot as the principal residential
unit.
Available Public Facilities
That facilities or services are in place or that a financial commitment is in place
to provide the facilities or services within a specified time.
6
................................................................................................................
Best Available Science
That scientific information prepared by local, state or federal natural resource
agencies, a qualified scientific professional or team of qualified scientific
professionals, that is consistent with criteria established in WAC 365-195-900
through WAC 365-195-925.
Best Management Practices
Methods or techniques found to be the most effective and practical means
in achieving an objective (such as preventing or minimizing pollution) while
making the optimum use of available resources.
Bio -retention BMP
Engineered facilities that store and treat stormwater by passing it through
a specified soil profile, and either retain or detain the treated stormwater
for flow attenuation. Refer to Chapter 7 of Volume V of the Department
of Ecology's SWMMWW (2014) for Bio -retention BMP types and design
specifications.
C
................................................................................................................
City
The City of Port Angeles, Washington.
B92 City of Port Angeles Comprehensive Plan ti
Climatic Change
A change in global or regional climate patterns, especially a change due to
an increase in the average atmospheric temperature. Climatic change may
be attributed largely to the increased levels of atmospheric carbon dioxide
produced by the use of fossil fuels, but may also result from natural events
such as volcanic eruption or earth quake
Cluster Commercial Development
Retail or other commercial uses, usually arranged in a group of buildings, that
create a node of uses with a cohesive design plan and shared access points
on an arterial street. Cluster commercial development is characterized by a
cohesive design plan that includes at least two of the following elements: (1)
pedestrian connections, (2) shared parking concepts, (3) buildings arranged in
groups to create a node of commercial uses without individual street access
points rather than along the linear pattern of a strip commercial development,
and (4) common building design features and signage.
Community Services
Cultural, social and recreational services necessary to enhance the quality of
life, such as libraries, parks and recreation services, fine arts, and festivals.
Concurrency
That adequate public facilities are available when the impacts of development
occur. This definition includes the two concepts of "adequate public facilities"
and of "available public facilities" as defined above.
Consistency
Requires that no feature of a plan or regulation is incompatible with any other
feature of a plan or regulation. Consistency is indicative of a capacity for
orderly integration or operation with other elements in a system.
County
Clallam County, Washington.
X
District
A portion of a planning area, which is defined by the primary uses located in
that portion of the planning area.
Development
Any activity which would alter the elevation of the land, remove or destroy
plant life, cause structures of any kind to be installed, erected, or removed,
divide land into two or more parcels, or any use or extension of the use of the
land.
Development Rights
A broad range of less -than -fee -simple -ownership interests.
t
�
.�
Appendix B - Definitions B93
�i
Domestic Water System
Any system providing a supply of potable water, which is deemed adequate
pursuant to RCW 19.27.097 for the intended use of a development.
E
................................................................................................................
Essential Public Facilities
Public capital facilities of a county -wide or state-wide nature which are
typically difficult to site. Essential public facilities include the following:
. Airports
. Hazardous waste facilities
. State education facilities
. State or regional transportation facilities
. State and local correctional facilities
. Solid waste handling facilities
. In-patient facilities including
. Substance abuse facilities
. Mental health facilities
. Group homes
. Regional Transit Authority facilities.
Emergency Services
Services, which are a City responsibility, and consists of provisions for police,
fire, emergency medical and disaster services.
Environmentally Sensitive/Critical Areas
Environmentally Sensitive Areas means any of the following areas and their
associated buffers:
. Aquifer recharge areas
. Streams or Stream corridors
. Frequently flooded areas
. Geologically hazardous areas:
. Erosion hazard areas
. Landslide hazard areas
. Seismic hazard areas
. Habitat areas for priority species and species of concern
. Locally unique features
. Ravines
. Marine bluff
. Beaches and associated coastal drift processes
. Wetlands.
B94 City of Port Angeles Comprehensive Plan ti
F
..........................................................................................................
Facility
Something designed, built, installed or utilized for the specific purpose of
providing a service.
Financial Commitment
That sources of public or private funds or combinations thereof have been
identified which will be sufficient to finance public facilities necessary to
support development and that there is reasonable assurance that such funds
will be timely put to that end.
G
..........................................................................................................
Goal
A general expression or broad statement of desired outcome in the City.
Growth Management Act
The Growth Management Act as enacted in Chapter 17, Laws of 1990 1st ex.
sess., and chapter 32, Laws of 1991 sp. sess., State of Washington.
................................................................................................................
Impact Fees
Payments to the city for the acquisition and development of new infrastructure
or facilities, i.e., parks, schools, transportation systems, etc., based on a per
unit (impact) assessment.
Imprecise Margin
The area between land use designations is called an imprecise margin. The
margin is used to provide flexibility in determining the boundary between
various zones. When determining appropriate zoning designations for an area
near a margin, the goals, policies and objectives of the Land Use Element
should take precedence.
L
..............................................................................................................
Level of Service (LOS)
An established minimum capacity of public facilities or services that must be
provided per unit of demand or other appropriate measure of need.
Low Impact Development (LID)
A stormwater and land use management strategy that strives to mimic pre -
disturbance hydrologic processes of infiltration, filtration, storage, evaporation
and transpiration be emphasizing conservation, use of on-site natural features,
site planning and distributed stormwater management practices that are
integrated into a project design.
tW�
i Appendix B - Definitions B95
i
M
................................................................................................................
Manufactured Home
A factory built, single-family structures that meet the National Manufactured
Home Construction and Safety Standards Act (42 U.S.C. Sec. 5401), commonly
known as the HUD (U.S. Department of Housing and Urban Development) Code.
Manufactured homes placed in Port Angeles must also meets the following
requirements:
1) Consists of two or more fully enclosed parallel sections each of not
less than 12 feet wide by 36 feet long
2) Bears an insignia issued by the appropriate federal agency indicating
compliance with the construction standards of the U.S. Department of
Housing and Urban Development (HUD) as amended and as approved
by the State of Washington
3) Is placed on an on -grade permanent foundation or on footings and
piers or on blocks in accordance with HUD's specifications for the
specific home with skirting installed so no more than one foot of the
skirting is visible above grade
4) Has all travel appurtenances removed
5) Is served by underground electrical power
6) Was originally constructed with and now has a composition or wood
shake or shingle, coated metal, or similar roof of not less than 3:12
pitch.
Medical Services
Licensed professional medical services and retail services directly related to
medical services, such as hospitals, physicians' clinics, and pharmacies.
Mixed-use
A type of urban development that blends residential, commercial, cultural,
institutional, or industrial uses, where those functions are physically and
functionally integrated, and that provides pedestrian connections.
N
................................................................................................................
Neighborhood
An area located within a district or planning area where people live, and is
defined by the primary type and/or density of the residential units located in
that particular area of the district.
B96 City of Port Angeles Comprehensive Plan ti
P
................................................................................................................
Permeable Pavement
Pervious concrete, porous asphalt, permeable pavers or other forms of
pervious paving material intended to allow passage of water through the
pavement section. It often includes an aggregate base that provides structural
support and acts as a stormwater reservoir.
Planning Area
A large geographical area of the City which is defined by physical characteristics
and boundaries.
Policy
A topic -specific statement providing guidelines for current and future decision
making.
Public Capital Facilities
Existing, new or expanded physical facilities, which are owned, licensed or
sanctioned by a public entity, are large in size and serve a county -wide or
statewide population. Public capital facilities of a county -wide or state-wide
nature may include but are not limited to the following:
. Airports
. State educational facilities
. State and federal transportation facilities
. Regional transportation facilities
. State correctional facilities
. Local correctional facilities
. Solid waste handling, disposal and storage facilities
. In-patient facilities including:
. Abuse facilities
. Mental health facilities
. Group homes
. National, state and regional parks and recreational facilities
. Marine terminals
. Libraries
. Fairgrounds
. Hospitals
. County courthouse.
Public Services
Includes fire protection and suppression, law enforcement, public health,
education, recreation, environmental protection, and other governmental
services.
t
�
.�
Appendix B - Definitions B97
�i
Public Facilities
Includes streets, roads, highways, sidewalks, street and road lighting systems,
traffic signals, domestic water systems, storm and sanitary sewer systems,
parks and recreational facilities, and schools.
R
................................................................................................................
Rain garden
A non -engineered shallow, landscaped depression, with compost -amended
native soils and adapted plants. The depression is designed to pond and
temporarily store stormwater runoff from adjacent areas, and to allow
stormwater to pass through the amended soil profile.
Regional Transportation Plan
The transportation plan for the regional designated transportation system,
which is produced by the regional transportation planning organization.
Regional Transportation Planning Organization
The voluntary organization conforming to RCW 47.80.020, consisting of local
governments within a region containing one or more counties, which have
common transportation interests.
Regulatory Reform Act
Engrossed Substitute House Bill, ESHB 1724 was enacted in 1995 to establish
new approaches to make government regulation more effective, and to make
it easier and less costly for citizens and businesses to understand and comply
with requirements. ESHB 1724 amended a number of laws, including the
Growth Management Act (GMA), Shoreline Management Act (SMA), and State
Environmental Policy Act (SEPA). Commonly referred to as the Regulatory
Reform Act, ESHB 1724 amended the Growth Management Act and State
Environmental Policy Act to more thoroughly integrate the SEPA process into
the planning process. Appeals of SEPA determinations or permits must also be
consolidated so that only one public hearing is held. ESHB 1724 is codified by
the City of Port Angeles in Chapter 18.02 PAMC.
Residential Care Services
The providing of residential care on a daily or live-in basis including special
needs housing such as group homes, adult -care homes and day-care facilities.
S
Sanitary Sewer Systems
All facilities, including approved on-site disposal facilities, used in the
collection, transmission, storage, treatment, or discharge of any waterborne
waste, whether domestic in origin or a combination of domestic, commercial,
or industrial waste.
B98 City of Port Angeles Comprehensive Plan ti
School District
The Port Angeles School District No. 121.
Service
The supplying or providing of utilities, commodities, accommodations and/or
activities.
Shall
Means the statement is mandatory, and the action so stated is required to be
done without discretion by decision -makers. The use of "shall" in a statement
indicates that the action is imperative and ministerial.
Should
Means the statement ought to be done, but the action so stated is not required
to be done by decision -makers. The use of "should" in a statement indicates
that discretion may be used in deciding whether or not to take action. The use
of "should" is intended to give decision -makers discretion in matters where
exceptions are warranted by such factors as physical hardships and special
circumstances or when funding must be taken into consideration.
Solid Waste Handling Facility
Any facility for the transfer or ultimate disposal of solid waste, including
landfills, waste transfer stations and municipal incinerators.
Social Services
Those services necessary to support life and health, such as food banks,
hospices, home health, congregate care, and day care services.
Strip Commercial Development
Retail or other commercial uses, usually one-story high and one -store deep,
that front on an arterial street with individual access points. Strip commercial
development differs from central business districts, shopping centers, or
other cluster commercial developments in at least two of the following
characteristics:
1) There are no provisions for pedestrian access between individual uses
2) The uses are only one -store deep
3) The buildings are arranged linearly with individual street access points
rather than clustered, and
4) There is no design integration among the buildings.
T
..........................................................................................................
Transfer of Development Rights
The conveyance of development rights by deed, easement, or other legal
instrument to another parcel of land and the recording of that conveyance.
t
�
.�
Appendix B - Definitions B99
�i
Transportation Facilities
Facilities related to air, water, or land transportation.
Transportation Systems Management
The use of low capital expenditures to increase the capacity of the
transportation system. TSM strategies include but are not limited to
signalization, channelization, and bus turnouts.
U
.......................
Urban Growth
Refers to growth that makes intensive use of land for the location of buildings,
structures, and impermeable surfaces to such a degree as to be incompatible
with the primary use of the land for the production of food, other agricultural
products, or fiber, or the extraction of mineral resources. When allowed to
spread over wide areas, urban growth typically requires urban governmental
services. "Characterized by urban growth" refers to land having urban growth
located on it, or to land located in relationship to an area with urban growth on
it as to be appropriate for urban growth.
Urban Growth Area
Those areas designated by the County to accept future urban population
densities with the intent of future annexation into the city pursuant to RCW
36.70A
Urban Services
Services that are normally available in an urban environment which include
provisions for sanitary waste systems, solid waste disposal systems, water
systems, urban roads and pedestrian facilities, transit systems, stormwater
systems, police and fire and emergency services systems, electrical and
communication systems, school and health care facilities, and parks.
Utilities
Enterprises or facilities serving the public by means of an integrated system of
collection, transmission, distribution, and processing facilities through more or
less permanent physical connections between the plant of the serving entity
and the premises of the customer. Included are systems for the delivery of
natural gas, electricity, telecommunications services, and water, and for the
disposal of sewage.
W
................................................................................................................
Will
The statement is an action decision -makers intend to do to implement plan
goals and policies. The use of "will" in a statement indicates that the outcome
can be measured.
B910 City of Port Angeles Comprehensive Plan ti
Work/live space
A living arrangement where the residential use and living area is subordinate in
size to the work space.
0
t
�
.�
Appendix B - Definitions Bell
�i
(This page intentionally left blank)
GMA
Requirements
The following pages list the minimum requirements
for the various elements as listed in the State of
Washington Revised Code of Washington (RCW) and
Washington Administrative Code (WAC). Included
with the requirements for each mandated element
is a table, which shows how this comprehensive plan
meets these requirements.
Requirements for the Land Use Element
This element shall contain at least the following features:
a) A future land use map showing city limits and urban
growth area (UGA) boundaries. [RCW 36.70A.070(1), RCW
36.70A.110(6) and WAC 365-196-400(2), WAC 365-196-405(2)
(i)(ii)]
b) Consideration of urban planning approaches that increase
physical activity. [RCW 36.70A.070(1), WAC 365-196-405(2)(f)]
c) A consistent population projection throughout the plan which
should be consistent with the Office of Financial Management
forecast for the county or the county's sub -county allocation
of that forecast. [RCW 43.62.035; WAC 365-196-405(2)(i)]
d) Estimates of population densities and building intensities
based on future land uses, [RCW 36.70A.070(1); WAC 365-
196-405(2)(i)]
e) Provisions for protection of the quality and quantity
of groundwater used for public water supplies [RCW
36.70A.070(1)]
f) Identification of lands useful for public purposes such as
utility corridors, transportation corridors, landfills, sewage
treatment facilities, stormwater management facilities,
Table C.01- GMA Requirements for the Land Use Element
Legislative
Requirement How requirements are addressed
1a Land Use Element text
1a Land Use Map, GIS database
1b Community profile text
1b Appendix A, EIS and addenda
1b Land Use Element text
1b Land Use Map, GIS database
1c & d Community profile text
1e Conservation Element: goals, policies and objectives
1d Appendix A, EIS and addenda
1j Conservation Element: goals, policies and objectives
1i Shoreline Master Program
1j Appendix E: Stormwater Management Plan
1k PAMC 15.20: Environmentally Sensitive Areas Protection Ordinance
1k Conservation Element: goals
C92 City of Port Angeles Comprehensive Plan
recreation, schools, and other public uses. [RCW 36.70A.150;
WAC 365-196-340]
1) Identification of open space corridors within and between
urban growth areas, including land useful for recreation,
wildlife habitat, trails, and connections of critical areas.
[RCW 36.70A.160, WAC 365-196-335]
2) Policies, land use designation (and zoning) to discourage
the siting of incompatible uses adjacent to general aviation
airports. [RCW 36.70A.510, RCW 36.70A.547; WAC 365-196-
475]
3) Policies, land use designation, and consistent zoning to
discourage the siting of incompatible uses adjacent to
military bases. [RCW 36.70A.530(3); WAC 365-196-475]
4) A review of drainage, flooding, and stormwater run-off in
the area and nearby jurisdictions, and provide guidance for
corrective actions to mitigate or cleanse those discharges
that pollute water of the state. [RCW 36.70A.70(1), WAC
365-196-405(2)(c)]
5) Policies to designate and protect critical areas including
wetlands, fish and wildlife habitat protection areas,
frequently flooded areas, critical aquifer recharge areas and
geologically hazardous areas. [RCW 36.70A.030(5), RCW
36.70A.172; WAC 365-195-900 through 925, WAC 365-190-
080]
Requirements for the Housing Element
This element shall contain at least the following features:
a) Goals, policies, and objectives for the preservation,
improvement, and development of housing. [RCW
36.70A.070(2)(b); WAC 365-196-410(2)(a)]
b) An inventory and analysis of existing and projected housing
needs. (RCW 36.70A.070(2)(a); WAC 365-196-410 (2)(b) &(c)]
c) Identification of sufficient land for housing, including, but
not limited to, government -assisted housing, housing for
low-income families, manufactured housing, multifamily
housing, and group homes and foster care facilities [RCW
36.70A.070(2)(c)]
d) Adequate provisions for existing and projected housing
needs of all economic segments of the community. [RCW
36.70A.070(2)(d); WAC 365-196-410]
e) Identification of land use designation within a geographic
area where increased residential development will assist
Appendix C - GMA Requirements C•3
�i
Table C.02- GMA Requirements for the Housing Element
Legislative
Requirement
How requirements are addressed
2a
Community profile text
2a
Appendix A, Els and addenda
2a
Appendix C, Measuring Housing Need: A Data Toolkit for Clallam County
2a
Housing Element: goals, policies, and objectives
2b
Community profile text
2c
Community profile text
2c
Land Use Map, GIs database
2c
Appendix A; Els and addenda
2d
Housing Element: goals, policies and objectives
2d
Land Use Map, GIs database
2e
Land Use Map, GIs database
2f
Land Use Element, Policy C6
achieving local growth management and housing policies.
[RCW 36.70A.540; WAC 365-196-870]
f) Policies so that manufactured housing is not regulated
differently than site built housing. [RCW 35.21.684, 35.63.160,
35A.21.312 &36.01.2251
Requirements for the Capital Facilities Element
This element shall contain at least the following features:
a) Policies or procedures to ensure capital budget decisions
are in conformity with the Comprehensive Plan. [RCW
36.70A.120]
b) An inventory of existing capital facilities owned by public
entities showing the locations and capacities of the capital
facilities. [RCW 36.70A.070(3)(a); WAC 365-196-415(2)(a)]
c) A forecast of the future needs for such capital facilities. [RCW
36.70A.070(3)(b); WAC 365-196-415(b)]
d) The proposed locations and capacities of expanded or new
capital facilities. [RCW 36.70A.070(3)(c); WAC 365-196-415(3)
(C)]
e) At least a six-year plan identifying sources of public money
to finance planned capital facilities. [RCW 36.70A.070(3)(d)
&36.70A.120; WAC 365-196-415]
f) A policy or procedure to reassess the Land Use Element if
probable funding falls short of meeting existing needs and to
C94 City of Port Angeles Comprehensive Plan ti
Table C.03- GMA Requirements for the Capital Facilities Element
Legislative
Requirement How requirements are addressed
3a Capital Facilities Element: goals and policies
3b Community Profile
3b Appendices: E - Stormwater Management Plan; F - Comprehensive Water System
Plan 2010; G -Transportation Services and Facilities Plan; H - Facility Plan for Port
Angeles Secondary Level Wastewater treatment Facilities
3b GIS database
3c Appendix A; EIS and addenda
3d Appendix A; EIS and addenda
3e Capital Facilities Plan
3f Capital Facilities Element: goals and policies
ensure that the Land Use Element, Capital Facilities Element,
and financing plan within the Capital Facilities Element are
coordinated and consistent. [RCW 36.70A.070(3)(e); WAC
365- 196-415]
Requirements for the Utilities & Public Services
Element
This element shall contain at least the following features:
a) The general location, proposed location, and capacity of all
existing and proposed utilities, including, but not limited to,
electrical lines, telecommunication lines, and natural gas
lines. [RCW 36.70A.070(4); WAC 365-196-420]
Table C.04 - GMA Requirements for the Utilities and Public Services Element
Legislative
Requirement How requirements are addressed
4a Capital Facilities Element: Goals, policies and objectives
4a Appendices: E - Stormwater Management Plan; F - Comprehensive Water System
Plan; G -Transportation Services and Facilities Plan; H - Facility Plan for Port Angeles
Secondary Level Wastewater Treatment Facilities; I. Capital Facilities Plan.
4a GIS database
Requirements for the Transportation Element
This element shall contain at least the following features:
Appendix C - GMA Requirements C95
�i
a) An inventory of air, water, and land transportation facilities
and services, including transit alignments, state owned
transportation facilities, and general aviation airports, to
define existing capital facilities and travel levels as a basis for
future planning.
b) Adopted levels of service (LOS) standards for all arterial
streets, transit routes and highways to serve as a gauge to
judge performance of the system. These standards should
be regionally coordinated. [RCW 36.70A.070(6)(a)(iii)(B); WAC
365-196-430]
c) Identification of specific actions to bring locally -owned
transportation and services to established Levels of Service
(LOS). [RCW 36.70A.070(6)(iii)(D); WAC 365-196-430]
d) A forecast of traffic for at least ten years including land use
assumptions used in estimating travel. [RCW 36.70A.070(6)(a)
(i), 36.70A.070(6)(a)(iii)(E); WAC365-196-430(2)(f)]
e) A projection of state and local system needs to meet current
and future demands. [RCW 36.70A070(6)(a)(iii)(F); WAC 365-
196-430(2)(F)]
f) f)A pedestrian and bicycle component. [RCW 36.70A.070(6)
(a) (vii); WAC 365-196-430(2)(k)(iv)]
g) A description of any existing and planned Transportation
Demand Management (TMD) strategies, such as High -
Occupancy Vehicle (HOV) lanes or subsidy programs, parking
policies, etc. [RCW 36.70A.070(6)(a)(vi); WAC 365-196-430(2)
(k)(iv)]
h) An analysis of future funding capability to judge needs
against probable funding resources. [RCW 36.70A.070(6)(a)
(iv) (A); WAC 365-196-430(2)(k)(iv)]
i) A multi-year financing plan based on the needs identified
in the comprehensive plan, the appropriate parts of which
shall serve as the basis for the six-year street, road, or transit
program. [RCW 35.77.010 & RCW 36.70A.070(6)(a)(iv)(B); WAC
365-196-430(2)(k)(ii)]
j) If probable funding falls short of meeting identified needs,
a discussion of how additional funding will be raised or how
land use assumptions will be reassessed to ensure that level
of service standards will be met [RCW 36.70A.070(6)(iv)(C);
WAC 365-196-430(2)(L)(ii)]
C•6 City of Port Angeles Comprehensive Plan ti
k) A description of intergovernmental coordination efforts,
including an assessment of the impacts of the transportation
plan and land use assumptions on the transportation systems
of adjacent jurisdictions and how it is consistent with the
regional transportation plan. [RCW 36.70A.070(6)(a)(v); WAC
365-196-430(2)(a)(iv)]
Table C.05 -GMA Requirements for the Transportation Element
Legislative
Requirement How requirements are addressed
5a Appendix A, EIS and addenda
5a Appendix G: Transportation Services and Facilities Plan
5a GIS database
5b Capital Facilities Element: Goals, policies and objectives
5b Transportation Element: Goals, policies and objectives
5b Appendix A; EIS and addenda
5b Appendices: E - Stormwater Management Plan; F - Comprehensive Water System
Plan; G -Transportation Services and Facilities Plan; H - Facilities Plan for Port
Angeles Secondary Level Wastewater Treatment Facilities, I - Capital Facilities Plan
5c Capital Facilities Element: Goals, policies and objectives
5c Appendices: E - Stormwater Management Plan; F - Comprehensive Water System
Plan; G -Transportation Services and Facilities Plan, H - Facilities Plan for Port
Angeles Secondary Level Wastewater Treatment Facilities; I - Capital Facilities Plan
5d Transportation Element: Goals, policies and objectives
5e Transportation Element: Goals, policies and objectives
Requirements for Siting Public Facilities
The Comprehensive Plan shall be consistent with the following:
a) A process or criteria for identifying essential public facilities.
(EPF). [RCW 36.70A.200; WAC 365-196-550(d)]
b) Policies or procedures that ensure the Comprehensive Plan
does not preclude the siting of essential public facilities.
[RCW 36.70A.200(5); WAC 365-196-550(3)]
Table C.06 - GMA Requirements for Siting Public Facilities
Legislative
Requirement How requirements are addressed
6a Definitions
6b Capital Facilities Element: Goals, policies and objectives
Appendix C - GMA Requirements C97
�i
(This page intentionally left blank) ■
Transportation
Analysis
The following pages present a detailed analysis of
Port Angeles' transportation system, evaluating
system performance and likely impacts to it as a
result of this comprehensive plan's adoption and
implementation.
This matrerarElim mmmarms an inhrseEbm and roadway &BWrjak least of smvice [LOS]
ammmsmM 9LqqAwnerdad to Part Angeles Compr #kemsi re Plan Transportation BeRrer K for SI-
I io map vrMiti the City of Port This asgmnw t i dudes a disnrgan dam seance%
baffi€ gwowth fiorermhL edwtrg and fnm w year X39 L3FL and how LOS deSdendes wi be
addre_mied by the Tnampw on Ekw wrt
DATA COI I EETFCNx!
Ewswq Uaffi€ dam wKI ding weekday PM peat Four imasemon coums and zewaW dalyr trifk
QUJ" WWq FDMfgffly sagwenris wim aMpMd iiQn tris io■owrg sour
■ Port Angdem MUerfrant aril TnasportrbM bnpMUMONt PUnGM12)
■ Laundsm Roulewwd bmige MpWamnat PrWrtCM4D
■ Nq*mm Pipe kKLuu es USA Can Www Biarras Cogmuszbm PrEpa EIS CW
■ tWMW Traffic Data metal f counts arra* la 2015
AddiUcnally a weekday Phil peat haw intasaMm mrrk at E Bit Street (LLS 191) / E HTM -Wi!t I
S f df Comm Mad count vam cordnaed in April 2MT_
TWFK C3f H FORKAST
The Growth Managernwd AU requires a dty s- Tranisport36m Homent to irrdude traffic farms
that are mrsiMM with Land Lhe Hernud gn h aoxwptiw6 and desa*,e mmk icm at least
D92 City of Port Angeles Comprehensive Plan
111 ymm iso the Mum- Prommtsfy. Fehr & Peers dewdaped a dtywide tr mvdd for the Part
r ngwiea VkW afi3t and TFampartadon Plain Oka indmda evswq and 205 fnreuwwq Firm
For the M35 sDmsww d was assumed the �!Mng lad uses and reQorrd tnp-rnalkirg vAMM
gmw at a Fam of 15% Per yea_ These growth a mwr4t wa are in fie with the Com prehersMe
Plain kKal population gFcwt:h projections} whidr abo eshn anal gFcmKh bear ffig and
MIS U3 ovnu at I-%% Per YMr {Pg_ 3a Table 4 I I rwieww, it *n kl be no+md dud hefween 20111
a El 2MS!, the City popuFation grew from l%iM tc3 an estirrwmd 19,44ff6 a rate of lL4% per Year-
BeousP gmmth has been s.,ewhar kxmw than projected, the traff-ic grr wth iareosts dewelaped
horn the db7wide travel model nmay be nam dered rorser ouve-
RGE} EETION LEVEIE1 OF SERME ANALYSIS
The fod a irrtBrsBbas was a nal med f w PM plc haw under � iang and fatemmWd 205
L LAS IM ISR 117
2- US IM CE Lamidsen Boulemrdj IS Linaein Street
3- US 101 CS Limin SSI ! E Mth Street
4- LIS 101 PI Li nmin Sheeq f E 1st Sbwet
5- US 101 CI Linin ifE Front
ik US 101 CE 1st SaBe$15 Ram Street
7- US 101 CE Fart SUM) ! S Race SUM
B_ LAS 101 CE 1st SaBet & E Fart Stree# } Gdf Cain Road
9- SR 117 {Maxim Crim
Level of gra {LOSS) and average inursemon delay vam caa&ted for earn iewsamon by dw
ntedr— domiihed in the following sedtorIs-
S a'd &9knodum Afedwduhmff Traffic cperaftra at sisrm med iorseMmm am esaluaced
unng the LOS nredwd desQibed in Chapter 16 of the Fighr y CWm3L.g Marruai WK A
signafined k"fm kwfs LOS is based an the weighted average control delay measured in sBamdi
per vaNde and i,mrdes initial dertlaafion dPW queue nrove`up tine, steed delay. and filial
Appendix D - Transportation Analysis D93
aoukramm Table 1 surn ani the reladorkshqp bet eery the ootrttd deW and LOS for
siffrafraed kftf edtiortF.,.
Wsigrreikud fewrmeaon A%9FndbftW- Tra iio mrrdrtiam at unspmLied i'urserfimm are
equated Ltwq the method irm Chapter 17 orf the HClll_ Wrth itis rrrmtmxt operamm are
defined by the anrerage ooutrd delay per vehiie [nuNtmred it 9eonn1} for &wh nwvenratt timet
nwst yield the rE t-cf- ay: F w al vmy sftq:�--mmnAed i•avvwrt tm the av rage ootitrnl delay m
oalnrllawd fm the iaprseeton as a while_ At giro -gray or side sueet-armdled iintom mm dw
mrmd deW (aril LOS) m c4nAnml for eadr mrmdied rrowerneut the Idk from nmwern em from
the nw*w street and the ondre irmrsedtien_ Table 1 swr omrum the rdatian¢Q between delay
aril LOS for unsUnWh d rRm90 bom.
TABLE 1: ACTERSECMN LEVEL OF SERVICE GOERk
Averag a Co ntro I Delay (sero nds Pe r vie h icle1
Leve I of Description
Service Signalized Unsignalized
Intersection Intersection
9 Short traffE ddap
} l&Ota 20A
} 3BLD to ]SD
�.tier�_ a trtff c vela.af
'0.0:C _� 4X
_s � kv ��.��
Q Lang iritic demos
x 35 -Oto 55A
} 25D to 3S0
Edianeudk
F
} IM
3--90
.. .. i°a:,' �, .J.°•'.�°'': �•.. r.J� r ....
1 .',7'Ch L~°f}] Ni. 263l}o
!CS Smndmk The Capital Fadlibes ElOTMA of the Port A ujohm Cmrpfdwrmw Plan std that
-all amdal sueem shtil frrd:dm at an average daffy Leel of 5avim {LOS} of D or btu.' fn
addrtikwL it rotor that Hi*wap of Sunewde Sqri5urom OM M) should funrot m at LOS D or
better per the WW3EX T aril the Pmnnnb Regional Tmnqmmtamn PLwvw g Ugarmdoa
LOS Rkmaftm Tra it opaarbum were analyasd Heng the Sin'rdtrn 9 saft�nre pmts Symtm
dnrkFbm s ate hawed an pnomdrrg outined in the HEM and dmmbmll in the pteoeding
sego far sKpmL ed and unugtalliimed w1ermmmD sTable 2 du ms the LOS result for d -e
D94 City of Port Angeles Comprehensive Plan ti
esisfin4 and forEcasl>d 21EIS vaemAmlay PISA peat horn_ Lkda ecktr4 anndrtium all it s
cp rae at LOS C or 6ettiec Lkider the 21135 fere¢as;t oaditiom several inks along the Us
M corridor womid degrrde in LESS a cporAmns6 bLX nDm vrordd emceed the LC39 D diveshdd
evaNEt d by Yn31OT and the Peninsula Regional Transportation P4rrwg Orsi
TSE OrElPP1TKIINS 51lRIIRL RY—PM PEPSIC MW
JA Intersection
1 US10L; SF.L17
to ud (I l"1*0 QdU(1i4�1 5 Ii1MdC�11
r US 1-0 L S Lsn:aln Streal I C 0th Slrc,-i
# US M PiLin r -in Mr*K f E 1051NO
1 US 1-0 1. N Lincoln Slrccl ' C rront
7 US 10L -C (rant S�rvcl S mace Street
8 us 1d (E10%"& E Rom SItIMQ f 5
6* CRM11F 101 d
SP, 11.72 M.3 Dine Cro &o
Ill
ryL ppm - 1� ip.,,u
1: � :1 ��� : '�+� 'I IV:Is1VAIMir &19Coriroori0 R:1WdPIw'
The folawirq rioadway 9egmem wem ariatsmid for PM peak hour ceder exh" and fvreasted
2H35 cwtdrk" rs
L SR 117 horn l &wwe Qrim w US 101
2- U5 101 from Cz-WT am Mad {40ie5t City LirwN to SR 117
Appendix D - Transportation Analysis D95
Existing Conditions
2035 Forecast
Control
Delay'
LOS'
Delay'
LOS.,
ss�cl
_°
C
5111"ll
11
R
14
d
SLjnal
_
C
Ll -L
D
5111"ll
25
C
36
a
Sizpal
22
C
45
D
5111"ll
21
C
47
a
Skjnal
1C
A
1_
0
5111"ll
11
R
17
d
3kUnal
16
g
27
C
1: � :1 ��� : '�+� 'I IV:Is1VAIMir &19Coriroori0 R:1WdPIw'
The folawirq rioadway 9egmem wem ariatsmid for PM peak hour ceder exh" and fvreasted
2H35 cwtdrk" rs
L SR 117 horn l &wwe Qrim w US 101
2- U5 101 from Cz-WT am Mad {40ie5t City LirwN to SR 117
Appendix D - Transportation Analysis D95
3- US 101 from SR 117 to E LaurkAwn Bo&ieprd { S Lirrmarti Street
4- US 101 from 5 E Larridgen Borderard f S Linmin Street to E 141 Street l E Front Strom
& US 101 CE Front Street) fnkrrr -S LirKzM Dzuet to S Gulf Caurm Rood
ilk US 101 CE 1st RrBff* from S Linmin Stmt in 5 Goff Course Road
T- US 101 from 5 U f Course Road ta N Balker Stmt (East Chy LiriN
Level of seivim SOS) vras cAnA ml for ®dr imasemorr by the rrrethods desimbed m die
i illrwing seddors,
MKWk RW 5eOrreM LM Mirodvti ff R adwey se nm" LES on be measrrd by mmparing bi-
drreddDnd trafTi€ vdume to Ilwrrum Servim Vnknre (MWI For Itis walysm nach study
segmerit is wed a namiriwm PFA plc hiour sewkp volurm or capacity. IF the actual two-way
Plkl punt hair volurrie on the mq nest esmeds the MW, tFer the segfrort does riot Feet die
LOS standard WSDQT does not rrrairrtair a praummi for sehmn4 NIWS iar sI I routes. so a SM
of Whim detireloped by the Florida qtr m% of Traepertrtim (FEKYbased on the fAhjhway
Cqpadfy PlanuW P Edimm (Transportation Re9eadh Boarct ffiG) vras rsed to a®gn NIWs tin
the FuadWW segrnats and detanine grade A — F LOS tfrmroldL Th®e FQQT tabes cm be
torrid in Appwdor A The Nl3W dwell ld b dearened by iacdrs sudr as arm type (urban or
rural cucMmij numbw of Lwm!!;, pr®arm of rrredan, speed: and preurmr of turnn Wrier,
LM Sffindwsk The Capital Fauktim Eiernent of the Port Angaks CmrVmtwmw Pian sates tF at
-all anerial stfeft SII lima~ at an awf.W daily LEvL4 of Savior {LQS� of D or bre"' In
ad*bwL it motes that H4Nhmp of Statewide Signi mr m (M 101) should functim at LOS D nr
defter per the VW3IX T and the Pe nsWa Regional Tmnspartabon Plarwar%g -
LCK Nmmft The ralndarbm of roadway art MW dve!kiolds and LOS grew es a mmirrianwd
in Table 3_ Urider edsiting tadrtierg. A roadway segrnaim operate at LOS D or better" L kkder due
2m5 finecst aondnomL kine r y saprent OA 1[fl from -S Calf Course Road to N Bahr
Shmeq %arid opaaae at LOS F. ezeeding the LOS D threshdd established by VWMQT and due
Parrearla ftgc W Trampm%a bn Rwwa g OrgarizahwL As dimmed in the following mrm%
the Port Angeles TransporMikrr Dement and Capital Facilities Ekaw a contain several poles
and objedt vest that wmdd address corgesbon and caparily an Itis corridor- AN ottra rmdwey
segment wadd opaate at LOS a or better under 2035 nwditimn&
D96 City of Port Angeles Comprehensive Plan
TABLE 3: ROJtID4WAY -WGW T OPEIIATMW M — PY PIEAX BMW
Existing CGnditiGns
2035 Forecast
-N Roadway Segment
Bi-
Bi-
directional
MSvI
LOS
d irecdonal
IVISVI
LOS
Volume
Volume
31111.7 horn Marine Dnwe
1
0102.17
C
3
,`S
c. 7D
C
is SIS 1.01W
= 6m Q ro -ifK ,
2 Iftw CW aht LifiM" 10
1.2m
U70
E
L470
2,170
C
M ]31
LIS ML Irom SR Ly? to- I"
3 LaurkInani Dauk wd r 3
9&0
L.3 3C
D
_.2 SC
1.33.0
3
Unr=ln Street
6M 5 E �Id�M
UUP_
•L�d
6K*WdI5
# ,°i NA -W 110~1 E
Wo
7 IM
D
9M
3-330
a
ROM so"
05 10L -C front Street'+
5 irom S Lincoln Sirm to F.
.1.500
L.927
D
.7X
1.9.1
3
Golf Cause Raved
USUd(110*
6 S ww*C SI MaIti}s"
IJIM
],9Z7
D
1.1m
1977
D
Cmm
JS 10 L Irom S tali Course
Load to N 6a ken 31 oeel
3.—
3,580
C
3.970
3,5&D
Tar,i City Lim hf.:
�. MRS � ,nrw �wa'tK�tMM� #Jk dlM�rf�r�d b� Fi01Id1 �wl�*rfta�T�
�Md /*A+i[*
'SOWNUbIlin PPPON& A)
F*a POW MR 2W
N frAMN MEASURES
As dsmmwod in the prettio m seEficn the rcadvmg sapnon of 115101 frarn 5 Odf Coarse Rmd ta
M M*w Strut vmuld qprrw at LOS F. mKmR!drq the ena6fr_dred LOS 0 tliedidd- The Port
Appendix D - Transportation Analysis D97
r4ngEim Trarspxwbrfion Element Crit CapiLd Fadrt ws EContin SOVETaI PdMM grid
cbjeEbwEs that vmL d addmm flus defic nnry through paring aril utw-agency Cmrdinaw
■ TFa nWwbSm Bmmik Goal OL PdU 3- The Cfy dmLM as mhkcwa =M
for ionf .�..� :.� Ing -e Cams iaLfts Chmk rola L& WL
■ TFansF=rhF§ r Elf =NML God K PolKY 19 - The City shoed wart MM* oOer
I ds da id4d& aW P+zkrf r daft' ftir a mmmrd sheet awry dire Cay
err the �
■ Tra rrs�ivr �re� �aai Bti �erire 5 - TJre C� rrrT e d say � rr�a�
qgwm far ems arms anwir. VM brWF Crud breis Cars w the vwLwV of Gof Cmwm
Mod
■ TFangMWU M Elerrrerrk Gaal % cwmfiM 1'I - LJre Cay ww Mwaww ui1h the
CuuwX ffTPQ arad Saaw arad federal agvrci5 in the wu* of a AuzQ& fLeww i5 IM
carer umkWkV bhe Hevrr of d re H&s Partway and Cumad CmAdar umceptiL Ent of
Jwe Sbem ON Ran beeat ffMW W ri MUW (WWW Larrrikr AM&WMQ Wff FW be
MXM&kred a; d tae i5 ICU cwDiCbr_
■ GWAai Faadi Bwr t Gaal A Pdkx T - 71ra OMWOOMFM MVMZE and &MMWES
Pfim ftr s&EwM hibww^ a0 dxxM arae a fiawe fry 20 Carzh*w
so Dime forth -Wm feud MW rind mmnlk
D98 City of Port Angeles Comprehensive Plan
City -Wide
Performance
Measures
The adoption of performance standards can be
useful for the objective evaluation of organizational
effectiveness, with the end result being the
attainment of desirable outcomes. Performance
standards are observable, measurable, specific
measures of expectations that are typically
expressed in terms of quantity, timeliness, quality or
cost.
• Quantity addresses how much work is produced.
• Quality addresses how well the work is
performed and how effective it is.
• Timeliness addresses how quickly or when the
work is accomplished.
• Cost -Effectiveness addresses working within a
budget or saving money.
In order to be most useful, performance standards
written to address these measures should be
reasonable, attainable and when possible, based
upon a recognized standard. The standards should
be designed in order to provide a result that can
directly lead to the determination of whether or not desirable
outcomes have been achieved.
Within the City organization, there is no "one size fits all" set of
performance standards that can be adopted. That said, it is assumed
that there are a number of "universal" performance standards that
will apply to all City Departments. Clearly, the provision of excellent
customer service, fiscal responsibility, stewardship of resources and
the recognition of achievement are all standards that should be
expected and they are reflections of the values of the organization.
Beyond the performance standards that reflect core organizational
values, each individual department within the City will have unique
performance standards that are tailored to the specific outcomes
that are desired. As was mentioned above, these standards could
take into consideration the results (outcomes) that are desired,
however specific budget constraints, regulatory requirements,
measures of success and measures of quality should also be
considered
E•2 City of Port Angeles Comprehensive Plan
Community and Economic Development Department Performance
Standards Results
Port Angeles Fire Department Performance Standards Results
Measured
Standard
Met?
Actual YTD
Turnout Time
Result
Standard
Met?
Actual YTD
Number of building permits issued within 30 days
30 days
90%
Yes
5:20
Number of land use applications issued within 90
90 days
80%
N/A
days
8 min
90%
Yes
6:20
Total number of new residential units approved
27
80%
Yes
7:00
*Subject to private sector investment decisions
8 min
90%
N/A
Total number of grants dollars awarded
$250,000
>250,000
N/A
Linear feet of facade changes approved through
8 min
90%
Yes
6:59
the Facade and Sign Grant Program
350
80%
*Subject to private sector investment decisions
Total number of lodging tax events awarded
funding October 15th to May 15th
7
85%
*Subject to LTAC & Council Approvol
Port Angeles Fire Department Performance Standards Results
Appendix E - City -Wide Performance Measures E•3
Measured
Result
Standard
Met?
Actual YTD
Turnout Time
2 min
90%
Yes
1:16
First Arriving Apparatus at Fire
8 min
90%
Yes
5:20
Full First Alarm Fire Response (14 or 15 people)
18 min
90%
N/A
EMS Response
8 min
90%
Yes
6:20
Hazardous Materials (Operations)
8 min
90%
Yes
7:00
Technical Rescue (Operations)
8 min
90%
N/A
Marine Response
28 min
90%
N/A
Wildland Fire -First Engine
8 min
90%
Yes
6:59
Appendix E - City -Wide Performance Measures E•3
Port Angeles Police Department Performance Standards Results
Parks Department Performance Standards Results
Measured
Standard
Met?
Actual YTD
Improve aging/existing infrastructure
Result
Standard
Met?
Actual YTD
Increase Cemetary Revenues
Yearly
5% Increase
Use of force incidents reviewed and within policy
total
99%
Increase Sports Player Revenues
numbers
5% Increase
Increase Senior Center Membership Revenues
Yearly
5% Increase
Pursuits reviewed and within policy
total
99%
numbers
Yearly
Yearly reduction in property crime
total
5% reduction
numbers
Yearly
Yearly increase in DUI arrests
total
5% increase
numbers
Yearly
Yearly increase in community interactions
total
5% increase
numbers
Meet standards and maintain WASPC
Maintain
Meet 135
Accredidation
WASPC
standards
Accred.
Parks Department Performance Standards Results
Legal Department Performance Standards Results
Measured
Result
Standard
Met?
Actual YTD
Improve aging/existing infrastructure
3 Projects
CFP Projects
Complete
Met?
Actual YTD
Increase Cemetary Revenues
$125,000
5% Increase
Increase Rental Revenues
$80,000
5% Increase
Increase Sports Player Revenues
$60,000
5% Increase
Increase Senior Center Membership Revenues
$25,000
5% Increase
Legal Department Performance Standards Results
E•4 City of Port Angeles Comprehensive Plan
Measured
Result
Standard
Met?
Actual YTD
Respond w/in
Public Records Requests
standard
E•4 City of Port Angeles Comprehensive Plan
Public Works Department Performance Standards Results
Finance Department Performance Standards Results
Measured
Result
Standard
Met?
Actual YTD
Maintain local streets and sidewalks to safe
Respond
No
Yes
Yes
standards
within 24
Complaints
CFP Completed
hours
Yes
Yes
Maintain street signage in accordance to Federal
100%
10% of signs
Highway Administration (FHWA)
Compliance
replaced
requirements/standards
reference
annually
Yes
Yes
Perform roadside safety improvements such as
Complete
Meet WSDOT
guardrail, handrail and traffic delineator
on time
standards
Yes
Yes
installation/repair
on time
Perform Citywide roadside vegetation
Complete
No
Pending
management program
on time
complaints
Yes
Yes
Meet regulatory permit requirements with
100%
Department of Health and Department of
Compliance
No violations
Yes
Yes
Ecology
on time
Perform de-icing and snow removal on City
o
Meet goals
Streets as necessary to ensure safe driving
Com
Compliance
within Snow
conditions
plan
Respond to after -hour callouts
30 minutes
90%30
mins.
.
Finance Department Performance Standards Results
0
' Appendix E - City -Wide Performance Measures E•5
''17A .
Measured
Result
Standard
Met?
Actual YTD
CAFR Filed
Filed on
Annual
Yes
Yes
time
CFP Completed
Filed on
Yes
Yes
time
Cross
CFP with Comp Plan Integration
reference
Yes
Yes
included
Budget Amendments Completed
Completed
Tri -annual
Yes
Yes
on time
GFOA CAFR Award
Awarded
Annual
Pending
Clean SAO Audit
No
Annual
Yes
Yes
findings
Payroll and AP Processing
Completed
Biweekly
Yes
Yes
on time
0
' Appendix E - City -Wide Performance Measures E•5
''17A .
(This Page is intentionally left blank)
Comprehensive
A. Final Supplemental Environmental Impact Statement
November 14, 1995 & Second Addendum to the 1993
EIS for the City of Port Angeles 2004 Comprehensive
Plan update.
B. SEPA review/ Determination of Non Significance
#1374 dated May 23, 2016
C. Clallam County Wide Planning Policy, June 30, 1992
D. Background Report Clallam County Housing Needs
Assessment; April 1991
E. Measuring Housing Need: A Data Toolkit for Clallam
County; May 2006
F. Peninsula RTPO Comprehensive Plan Consistency and
Certification Checklist
G. Public Surveys and Response Summaries from 2016
Comprehensive Plan Update
H. Stormwater Management Program
I. Water System Plan
J. Facility Plan for Port Angeles Secondary Level
Wastewater Treatment Facilities
K. Capital Facilities Plan & Transportation Improvement
Plan
L. Port Angeles Preliminary Park and Recreation
Inventory & Year 2010 Level of Service Analysis,
M. Community Bicycle Meeting and Survey and
Mapping Exercise
„r nom, r r f°������� f 1!4!l�,iP; � �>. � ...” �, � �� ��us��p��
f >+�
� ��lSi{��l�ll � ��+ 11
u, rifi��, � ���n ���
�} � ��� 1�� s ' � ��
�„
°� //��s�'����ii�f ����� �; � ��,x
.. �.m. � �� U�t,+ �a��� ` �1�
��� i �
,,
�j� 1
„ �,
,,: .� —� :.4e d
,.,.
-� __
�„
o� —
�,�v� ��"
,:
t
.. ':
**.,
. �.
t2 � P ORTANGELES CITY COUNCIL
WASH I N G T o N, u. s. MEMO
Date: June 18, 2019
To: City Council
From: Shailesh Shere, Acting Director of Public Works & Utilities on behalf of
Thomas Hunter, Director ofPublic Works & Utilities
Subject: Changes to Electric Utility Port Angeles Municipal Code
Summary: The purpose of this memo is to gain City Council approval to update several sections of the
City's municipal code relating to the electric utility. These changes seek to simplify sections of the code
and/or to update sections to reflect current operational costs and processes.
The Utility Advisory Committee reviewed these changes and forwarded a favorable recommendation for
the proposed updates on April 9, 2019.
Funding: There is no rate impact due to the proposed changes. These changes are bundling existing
services at established rates.
Recommendation: 1.) Conduct the first reading of the ordinance making changes to the municipal
codes: 13.12.020 —13.12.066, 13.12.072, and 3.70.100. 2.) Continue to the July 2 Meeting.
Background / Analysis: Several parts of the Port Angeles Municipal Code (PAMC) require updating:
• Time of Use
A Time of Use (TOU) electric rate charges higher electric rates during busy, high -use times (6:00 am
through 10:00 pm) and lower electric rates during slow, light -usage times (10:00 pm through 6:00
am) as a way to decrease peak loads.
In the seven years this rate has been in effect, no customers have requested this rate. In addition, very
few utilities in the country, much less the Pacific Northwest, offer TOU pricing. For those who do,
the results have been inconclusive.
Removing the TOU rates from PAMC 13.12.020 — 13.12.066 would simplify City utility rates.
• Yard Lighting Efficiency
LED lights use less energy while providing stable directional lighting. Port Angeles is moving yard
lighting to energy efficient LED lights. PAMC 13.12.072 is updated with the energy efficient watts
and lumens to reflect the use of LEDs.
• Lockbox
Lockboxes provide utility staff access to secured locations to read meters or perform utility tasks.
PAMC 3.70. 100(0) is updated to show the current installation costs.
On April 9, 2019 the Utility Advisory Committee reviewed these changes and forwarded a favorable
recommendation for the proposed updates to the municipal code.
June 18, 2019 G-1
Funding Overview: These changes are bundling existing services at established rates, with no rate
impact due to the proposed changes.
June 18, 2019 G - 2
ORDINANCE NO.
AN ORDINANCE of the City of Port Angeles, Washington amending
sections of the Port Angeles Municipal Code relating to electric
services and charges.
THE CITY COUNCIL OF THE CITY OF PORT ANGELES DO HEREBY ORDAIN
AS FOLLOWS:
Section 1. Ordinance 3085 as amended, and Chapter 3.70.110 of the Port Angeles
Municipal Code relating to electric utility inspections and review fees is hereby amended by
amending Chapter 3.70. 110 as follows:
3.70.110 - Public Works and Utilities Department fees and deposits.
O. Electric utility fees.
1. Electrical work permits and fees. The fees for residential electrical inspections performed by
the City, including all applicable taxes, shall be as follows:
a. Service/feeder 200 amp...... $120.00
b. Service/feeder 20100 amp...... $146.00
c. Service/feeder 401-600 amp...... $205.00
d. Service/feeder 601-1,000 amp...... $262.00
e. Service/feeder over 1,000 amp...... $373.00
f Branch circuit with service feeder ..... $5.00
g. Branch circuit without service feeder ..... $63.00
h. Each additional branch circuit ..... $5.00
i. Temporary service/feeder 200 amp...... $93.00
j. Temporary service/feeder 20100 amp...... $110.00
k. Temporary service/feeder 401-600 amp...... $149.00
1. Temporary service/feeder 601-1000 amp...... $168.00
m. Hourly inspection fee $96.00 as authorized by the Public Works and Utilities Director.
n. Signal circuit/limited energy -1 and 2 family dwellings ..... $64.00
o. Signal circuit/limited energy -multi -family dwellings ..... $64.00
p. Manufactured home connection ..... $120.00
q. Renewable electrical energy -5 KVA system or less ..... $102.00
r. Single and multi -family dwellings first 1,300 square feet ..... $120.00
s. Each additional 500 square feet or portion of single or multi -family dwelling ..... $40.00
t. Each outbuilding or detached garage ..... $74.00
u. Each swimming pool or hot tub ..... $110.00
V. Low -voltage thermostat $56.00, each additional low voltage thermostat ..... $5.00
W. City lockbox for access to electric meter ..... $75.00 185.00
X. Each additional inspection or site visit required as a result of an enforcement issue or safety
violation ..... $56.00
1
June 18, 2019 G-3
y. Requests by property owners to inspect existing installations ..... $110.00
Z. Addition of up to four circuits ..... $75.00
2. Electrical work permits. The fees for non-residential electrical inspections performed by the
City, including all applicable taxes, shall be as follows:
a. Service/feeder 200 amp...... $132.00
b. Service/feeder 201-400 amp...... $160.00
c. Service/feeder 401-600 amp...... $225.00
d. Service/feeder 601-1,000 amp...... $288.00
e. Service/feeder over 1,000 amp...... $410.00
f. Branch circuit with service feeder ..... $5.00
g. Branch circuit without service feeder ..... $74.00
h. Each additional branch circuit ..... $5.00
i. Temporary service/feeder 200 amp...... $102.00
j. Temporary service/feeder 20100 amp...... $121.00
k. Temporary service/feeder 401-600 amp...... $164.00
1. Temporary service/feeder 601-1000 amp...... $185.00
in. Hourly inspection fee ..... $96.00
n. Sign/outline lighting ..... $88.00
o. Signal circuit/limited energy -commercial first 1,500 square feet ..... $96.00
p. Each additional 1,500 square feet or portion of commercial ..... $5.00
q. Renewable electrical energy -5 KVA system or less ..... $113.00
r. Each swimming pool or hot tub ..... $121.00
s. Low -voltage thermostat $56.00, each additional low voltage thermostat ..... $5.00
t. Each carnival ride and generator truck ..... $28.00
u. Each remote distribution equipment, concerts or gaming show ..... $9.00
V. First field inspection each year or a single concession or ride, not part of a carnival .....
$121.00
W. Subsequent inspection of a single concession or ride, not part of a carnival ..... $81.00
X. Berth at a marina or dock ..... $81.00
y. Each additional berth inspected at the same time ..... $54.00
Z. Industrial block permit ..... $2,309.00
aa. Each additional inspection or site visit required as a result of an enforcement issue or safety
violation ..... $56.00
bb. City lockbox for access to electric meter ..... $75.00 185.00
cc. Requests by property owners to inspect existing installations ..... $121.00
dd. Addition of up to four circuits ..... $86.00
3. Pole attachment rate. The pole attachment rate shall be $15.85 per contract, which includes
all taxes.
4. Connects/disconnects. The fee for special emergency connects or disconnects shall be $80.00
during regular hours and $140.00 outside of regular hours.
2
June 18, 2019 G-4
Section 2. Ordinance 2054 as amended, and Chapter 13.12 of the Port Angeles Municipal
Code relating to electric rates are hereby amended by amending Chapter 13.12 as follows:
CHAPTER 13.12 - ELECTRICITYSERVICES AND CHARGES
13.12.010 - General provisions applicable to all services.
13.12.015 - Time of use electric rate.
13.12.020
- Uniform electric rate.
13.12.021
- Point of delivery.
13.12.025
- Rate class assignment.
13.12.030
- Schedule R-03—Residential service.
i i 03 i c edule n 03 Resi fia e time o f tis
r��-viz—a �v��c��nxE'ii cim�ci�rc ""
13.12.040 - Schedule GS-03—General service.
13., n�-Se43oa Genefal sefviee fifne „f„"o "tom
13.12.041 - Schedule GD-03—General service demand.
13.,x-Se43oa Genefal sei=viee demctfid time of tise te.
13.12.042 - Schedule NP-03—Nonprofit.
13.12.0421 Sehe"Ie NP 03 Neopfefit Time of tise fate.
13.12.043 - Schedule GD-04—General service demand—Primary metered
13.12x-Se4 e&le GD 04 renefal serviee demand nritered
13.12.060 - Schedule PS-03—Primary service—Customer owned.
13.12.061 Sehedtile PS 03 Pfiffia.
13.12.065 - Schedule PS-04—Primary service—City owned.
13.12.071
-Schedule IT- 11Industrial transmission.
13.12.072
- Schedule L-03—Lighting.
13.12.073
- Schedule MW-03Municipal water pumping.
13.12.075
- Reserved.
13.12.090
- New or expanded loads.
13.12. 100
- Contract sales and purchases.
13.12.110
- Electrical work permits and fees.
13.12.120
- Contract and administration charge.
13.12.015 - Time of use electric rate.
For customers requesting an optional time of use electric rate schedule, the monthly rates for
electricity consumed shall be in accordance with sections 13.12.031, 13.12.0401, 13.12.0411,
13.12.0421, 13.12.044, and 13.12.061. The monthly rate includes all applicable taxes. For all
time of use rates in these sections, heavy load hours are all hours from 6:00:00 a.m. to 1:59:59
p.m., Monday through Saturday. Medium load hours are all hours from 2:00:00 p.m. to 9:59:59
p.m., Monday through Saturday. Light load hours are all other hours Monday through Saturday,
all day Sunday and all day on North American Electric Reliability Corporation specified
holidays. Pacific Prevailing Time applies (Pacific Standard Time or Pacific Daylight Time, as
applicable).
June 18, 2019 G-5
13.12.020 - Uniform electric rate.
The monthly rate for electricity consumed
shall be in accordance with sections 13.12.030, 13.12.040, 13.12.041, 13.12.042, 13.12.043,
13.12.060 and 13.12.073. The monthly rate includes all applicable taxes. For all rates in these
sections, heavy load hours are all hours from 6:00:00 a.m. to 9:59:59 p.m., Monday through
Saturday. Light load hours are all other hours Monday through Saturday, all day Sunday and all
day on North American Electric Reliability Corporation specified holidays. Pacific Prevailing
Time applies (Pacific Standard Time or Pacific Daylight Time, as applicable).
.eesefe�:er��t��eefrse�e�srrsasee�:e�e�rs�:e�e�e��:rerrr�.es�
.
r��
•
..
.. ..
s
.
Ms .�eIeeeee:��s�srr�
... -
...
.. ..
MIATOMMIIIIII MIATARA.
IW
...
11111
giffiffiffilli
4
June 18, 2019 G-6
WISTOMMIIII WISTARM FAIRTME
♦
i i • i
IM III
' t a
Ml�lll
June 18, 2019 G-7
♦
' A
1 .1' 11
' t a
Ml�lll
• i
•01,11.
June 18, 2019 G-7
lfTf
�S
.
lEfff!*SISiffT�@!li�l.T.�i.
.
. ........... . ...... . ......
. . .....i.
.. . ...... ..
... . ........
lfTf
. �Efff!*� �flSifiR!l�lT
June 18, 2019 G-8
,,.
pno
..
.. .11
,,.
pno
,,.
�...
June 18, 2019 G-9
a. Billing demand for- eaeh menth shall be based en th- - hE)t+r- Of KVA (appar-efit
.
6. Monthly demand ehar-ge between Jttae 1 and Attgzttst 3 1, shall be $4.79 per- KVA for- 95
13.12.072 - Schedule L-03—Lighting.
A. Applicability. This schedule applies to all approved unmetered yard and area lights.
B. Installation. Yard or area lights are available upon request. Upon approval by the Public
Works and Utilities Department, lights will be installed only on existing utility -owned poles for
the use and convenience of customers. A one-year contract for service will be required before the
light will be installed. Customer ownership of lighting is limited to existing lights only.
C. Maintenance. The Public Works and Utilities Department retains ownership of the area
lighting; maintenance of City owned lights shall be the responsibility of the Public Works and
Utilities Department, maintenance of customer owned lights shall be the responsibility of the
customer.
D. Rates effective Awmwg June 1, 20149:
1. Lighting owned by the Public Works and Utilities Department:
a. 489 40 watts/4,100 lumens or less: $12.43 per month.
b. More than 489 40 watts/4.100 lumens, but 4-59 70 watts/7.500 lumens or less: $17.94 per
month.
c. More than 4-59 70 watts/7.500 lumens, but 289 110 watts/12.500 lumens or less: $19.96 per
month.
d. More than 289- 110 watts/ 12,500 lumens: $23.16 per month.
2. Existing lighting which remains owned by the customer:
a. 489- 40 watts/4,100 lumens or less: $9.94 per month.
b. More than 489 40 watts/4,100 lumens, but 4-58 70 watts/7,500 lumens or less: $14.37 per
month.
c. More than 4-58 70 watts/7,500 lumens, but 289 110 watts/12,500 lumens or less: $15.95 per
month.
d. More than 289 110 watts/12.500 lumens: $18.50 per month.
Section 3 - Corrections. The City Clerk and the codifiers of this ordinance are
authorized to make necessary corrections to this ordinance including, but not limited to,
the correction of the scrivener's/clerical errors, references to other local, state, or federal laws, codes,
rules or regulations, or ordinance numbering, section/subsection numbers and any references thereto.
F-1
June 18, 2019 G-10
Section 4 - Severability. If any provisions of this Ordinance, or its application to any person
or circumstances, are held invalid, the remainder of the Ordinance, or application of the provisions
of the Ordinance to other persons or circumstances, is not affected.
Section 5 - Effective Date. This Ordinance, being an exercise of a power specifically delegated
to the City legislative body, is not subject to referendum. This ordinance shall take effect five
(5) days after passage and publication of an approved summary thereof consisting of the title.
PASSED by the City Council of the City of Port Angeles at a regular meeting of said Council
held on the day of , 2019.
Sissi Bruch, Mayor
APPROVED AS TO FORM:
William E. Bloor, City Attorney
ATTEST:
Kari Martinez -Bailey, City Clerk
June 18, 2019 G-11
t2 � P ORTANGELES CITY COUNCIL
WASH I N G T o N, u. s. MEMO
Date: June 18, 2019
To: City Council
From: Shailesh Shere, Acting Director of Public Works & Utilities on behalf of
Thomas Hunter, Director ofPublic Works & Utilities
Subject: Changes to Wastewater Utility Port Angeles Municipal Code
Summary: The purpose of this memo is to receive approval to update several sections of the City's
municipal code related to the wastewater utility. The utility seeks to:
• Raise the allowable pH level for dischargers,
• Clarify language regarding food service establishments and general discharge standards, and
Fix typographical errors.
Funding: No rate impact due to the proposed changes.
Recommendation: 1) Conduct the first reading of the ordinance making changes to the municipal
code 13.06.030; 13.06.032; 13.06.33, 13.06.034, 13.06.036, 13.06.041, 13.06.44 2) Continue to the July
2, 2019 meeting.
Background / Analysis: Several sections of the Port Angeles Municipal Code (PAMC) require
updating for the reasons stated below:
• Upper pH discharge limit
PANIC 13.06.030
State law requires Port Angeles to have pH limits at least as stringent as the state's pH limits; the
Washington State upper pH limit is 11.0. PANIC 13.06.030 prohibits wastewater discharges with a
pH below 5.0 and above 10.0 making the current PANIC upper pH limit more stringent than
Washington State's. Amendment # 1 would increase the City's upper pH discharge limit from 10.0 to
11.0, for all users of the sanitary sewer system to make the City's municipal code consistent with the
state's code.
Grease Interceptors & Garbage Disposals
PANIC 13.06.032 & 13.06.033 & 13.06.034 & 13.06.036. (Wordsmithing changes)
These changes are intended to remove conflicting language regarding hydro -mechanical grease
interceptors, garbage disposals, and solids separators. In several places, for the sake of consistency,
the term "grease interceptor" has been replaced with the acronym "GI".
• National Pretreatment Standards
PANIC 13.06.041 (Wordsmithing changes)
This section of the Code incorporates Federal wastewater discharge standards by reference. Deleting
the word "categorical" clarifies that all pretreatment standards, both General and Categorical, apply to
users of the City's sanitary sewer system.
June 18, 2019 G-12
• Dilution & Mass -Based and/or Concentration -Based Limits
PANIC 13.06.044 (Wordsmithing changes)
Being able to impose equivalent mass -based limitations in lieu of concentration -based limits will
allow the City regulatory flexibility to work with businesses wishing to conserve water without
"conserving themselves into violation" of a concentration -based limit.
• Typographical errors — Typographical corrections in PANIC 13.06.
The Utility Advisory Committee reviewed wastewater municipal code changes which included one
additional change to PANIC 13.06.045 Local Limits. Changes to 13.06.045 are removed and will be
presented separately to the UAC following concerns on impacts to local businesses.
The UAC provided a favorable recommendation for the City Council to adopt the following updated
municipal codes and to make any minor modifications as needed: 13.06.030; 13.06.032; 13.06.33,
13.06.034, 13.06.036, 13.06.041, 13.06.44
Funding Overview: The proposed changes do not impact costs or rates.
June 18, 2019 G-13
ORDINANCE NO.
AN ORDINANCE of the City of Port Angeles, Washington
amending Chapter 13.06 Industrial Wastewater
provisions of the Port Angeles Municipal Code.
THE CITY COUNCIL OF THE CITY OF PORT ANGELES DO HEREBY
ORDAIN AS FOLLOWS:
Section 1. Ordinance 3397 as amended, and Chapter 13.06 of the Port Angeles
Municipal Code relating to industrial wastewater are hereby amended by amending
Chapter 13.06 as follows:
CHAPTER 13.06 - INDUSTRIAL WASTEWATER PRETREATMENT
13.06.030 - Discharge prohibitions.
The following discharges are prohibited:
A. No user shall introduce or cause to be introduced into the POTW any pollutant or
wastewater that causes pass through or interference. These general prohibitions apply to
all users of the POTW whether or not they are subject to categorical pretreatment standards
or any other National, State, or local pretreatment standards or requirements.
B. No user shall introduce or cause to be introduced into the POTW the following
pollutants, substances, or wastewater:
1. Pollutants that either alone or by interaction may create a fire or explosive hazard in
the POTW, a public nuisance or hazard to life, or prevent entry into the sewers for their
maintenance and repair or are in any way injurious to the operation of the system or
operating personnel. This includes waste streams with a closed -cup flashpoint of less than
140 degrees F (60 degrees C) using the test methods specified in 40 CFR 261.21, or its
successors.
2. Any soluble waste or wastes having a pH lower than 5.0 or higher than 44-11_0 or
having any other corrosive property that reasonably could be hazardous to structures,
equipment, or personnel of the City, such as, but not limited to, battery or plating acids and
wastes, copper sulfate, chromium salts and compounds, or salt brine.
3. Solid or viscous substances in amounts that may cause obstruction to the flow in the
sewer or other interference with the operation of the system. In no case shall solids greater
than one-quarter inch (0.64 cm) in any dimension be discharged.
4. Pollutants, including oxygen -demanding pollutants (BOD, etc.), released in a
discharge at a flow rate and/or pollutant concentration that, either singly or by interaction
with other pollutants, will cause interference with the POTW.
June 18, 2019 G-14
5. Wastewater having a temperature that will interfere with the biological activity in the
system, has detrimental effects on the collection system, or prevents entry into the sewer.
In no case shall wastewater be discharged that causes the wastewater temperature at the
treatment plant to exceed 104 degrees F (40 C).
6. Petroleum oil, non -biodegradable cutting oil, or products of mineral oil origin, in
amounts that will cause pass through or interference.
7. Pollutants that result in the presence of toxic gases, vapors, or fumes within the POTW
in a quantity that may cause acute worker health and safety problems.
8. Trucked or hauled pollutants, except at discharge points designated by the Director in
accordance with section 13.06.051 of this chapter.
9. Noxious or malodorous liquids, gases, solids, or other wastewater that either singly or
by interaction with other wastes, are sufficient to create a public nuisance or a hazard to
life, or to prevent entry into the sewers for maintenance or repair.
10. Wastewater that imparts color that cannot be removed by the treatment process, such
as, but not limited to, dye wastes and vegetable tanning solutions, that consequently imparts
color to the treatment plant's effluent, thereby violating the City's NPDES permit.
11. Wastewater containing any radioactive wastes or isotopes except in compliance with
applicable State or Federal regulations.
12. Wastewater causing, alone or in conjunction with other sources, the treatment plant's
effluent to fail toxicity test.
13. Detergents, surface-active agents, or other substances that may cause excessive
foaming in the POTW.
14. Wastewater causing two readings on an explosion hazard meter at the point of
discharge into the POTW, or at any point in the POTW, of more than ten percent or any
single reading over 20 percent of the lower explosive limit based on an explosivity meter
reading.
C. The following classes of discharge are prohibited unless approved by the Director
because of extraordinary circumstances, such as lack of direct discharge alternatives due
to combined sewer service or need to augment sewage flows due to septic conditions:
I. Noncontact cooling water in significant volumes.
2. Stormwater, or other direct inflow sources.
3. Wastewaters significantly affecting system hydraulic loading that do not require
treatment or would not be afforded a significant degree of treatment by the system.
4. New discharges of stormwater, surface water, groundwater, artesian well water, roof
runoff, subsurface drainage, condensate, deionized water, noncontact cooling water, and
unpolluted wastewater, unless specifically authorized by the Director.
5. Sludges, screenings, or other residues from the pretreatment of industrial wastes,
unless specifically authorized by the Director.
6. Medical wastes, except as specifically authorized by the Director in a wastewater
discharge permit.
June 18, 2019 G-15
D. Pollutants, substances, or wastewater prohibited by this section shall not be processed
or stored in such a manner that an unintended discharge to the sanitary sewer or the storm
sewer could occur.
13.06.032 - New construction.
,A. Prior to construction of a new FSE or NFD, a building permit shall be oI
from the appropriate jurisdiction. Plan submittals shall include kitchen fixture plan
and kitchen waste plans showing all potential grease discharging lines, all GI
connecting piping. The application shall be routed to the Director or his designee for i
and approval prior to connecting new construction to the POTW.
B. X All new single occupancy food service establishment buildings shall be const
with properly sized GIs. All kitchen drains and any other drai:
may carry grease -laden waste shall be connected to a GI. A dishwasher shall
connected to hydro -mechanical ^r^as^ i^*^r^^^*^r GIs. If a garbage disposal/g
grinder/macerator or similar unit is installed in a kitchen_ it must discharge to
C. All new construction, multiple occupancy, and food service establish me
buildings, shall include a separate waste line for all leasable spaces that discharge to
common 2,000 gallon or larger interceptor. This waste line shall be permanently marke
to identify it as required by the Director. When a space is leased, sold, or rented to a FSE
or NFD, all kitchen drains and any other drains that may carry grease -laden waste shall be
connected to this waste line; no domestic sewage may be connected to this line. The
property owner shall be responsible for proper maintenance of this interceptor in
accordance with the provisions of this chapter.
Formatted: Font: (Default) Times New Roman, 12 pt,
Bold, Font color: Text 1
Formatted: Right: -0.5"
Formatted: Font: (Default) Times New Roman, 12 pt,
Font color: Text 1
Formatted: Font: (Default) Times New Roman, Font
color: Text 1
Formatted: Font: (Default) Times New Roman, 12 pt,
Font color: Text 1
Formatted: Indent: Left: 1", First line: 0", Right: -0.5"
Formatted: Font: (Default) Times New Roman, 12 pt,
Font color: Text 1
Formatted: Font: (Default) Times New Roman, 12 pt,
Font color: Text 1
Formatted: Font: (Default) Times New Roman, 12 pt
Formatted: Font: (Default) Times New Roman, 12 pt,
Font color: Text 1
D. All new single occupancy NFD buildings shall install a properly sized GI. Gr Formatted: Font: (Default) Times New Roman, 12 pt,
GIs are recommended, but hydro -mechanical GIs are permissible. All kitchen drains an Font color: Text 1
any other drains that may carry grease -laden waste shall be connected to this GI (except
the dishwasher if a hydro -mechanical GI is installed). If a hydro -mechanical GI is installed,
the kitchen may not have a garbage disposal/garbage grinder/macerator or similar unit
installed.
E. Any FSE or NFD undertaking a substantial remodel will be considered to
construction for the purposes of this chapter.
13.06.033 - Existing construction.,
A. Xvery person owning or operating an FSE without a functional GI shall be rt
to install a functional GI. The type of GI required will be determined by the Director,
into account cost, available space and gradient, and any other pertinent information.
feasible, all kitchen drains and any other drains that may carry grease -laden waste s
connected to the GI. Dishwashers shall not be connected to hydro -mechanical
interceptors. If a garbage disposaUgarbage grinder/macerator or similar unit is inst,
Formatted: Font: (Default) Times New Roman, 12 pt,
Font color: Text 1
1 Formatted: Font: (Default) Times New Roman, 12 pt,
Font color: Text 1
Formatted: Font: (Default) Times New Roman, 12 pt,
Bold, Font color: Text 1
Formatted: Font: (Default) Times New Roman, Bold,
Font color: Text 1
Formatted: Indent: Left: 1", Right: -0.5"
Formatted: Font: (Default) Times New Roman, 12 pt,
Font color: Text 1
June 18, 2019 G-16
after the garbage disposal/garbage grinder/macerator or similar unit. The solids interceptor
shall be maintained in groper operating condition at all times.
Formatted: Indent: Left: 0.94", First line: 0", Right:
or simlilmar- u444 B. Any existing NFD without -0.5
functional GI may be required to install one. The type of GI required will be determine Formatted: Font: (Default) Times New Roman, 12 pt,
the Director, taking into account cost, available space and gradient, whether the user is in Font color: Text 1
grease impact area, and any other pertinent information. Where feasible, all kitchen drains
and any other drains that may carry grease -laden waste shall be connected to this GI (except
the dishwasher if a hydro -mechanical GI is installed). If a hydro -mechanical GI is installed,
the kitchen may not have a garbage disposal/garbage grinder/macerator or similar unit
installed.
13.06.034 - Grease interceptor maintenance.
A. All GIs shall be maintained to ensure proper operati
minimum, gravity GIs shall be cleaned at least once every 90 days and hydro -nice
GIs cleaned at least once per week. These required frequencies may be extended wi 1
approval of the Director. GIs must be cleaned whenever the comb
thickness of the floating greases and settled solids is equal to, or greater than, 25 percen
the total liquid depth in the GI.
B. When cleaned, a gravity GI must be completely pumped out, all solids remova
solidified grease scraped from the interior and the structure and all internal plumbi
inspected for damage and corrosion. The gravity GI shall be refilled with water prior
being placed back into operation. If repairs are required, they shall be performed wit]
seven days.
C. When
have surface
removed, settled solids removed, all sides scraped, removable parts removed and cle
be inspected for damage and corrosion, and be properly reassembled. If repairs are reqs
they shall be performed within seven days.
D. The grease and solids that are removed in the process of cleaning a GI shall f/
discharged back into the GI, any part of the POTW, any private sewer, any drainage pi
or storm sewer system. All grease and solids removed shall be handled and disposed
accordance with Federal, State, County and Local laws, rules and regulations. Treated
inside a hydro -mechanical GI may be temporarily removed during cleaning and rete
into the hydro -mechanical GI following complete cleaning.
E. jn addition to the maintenance required above, automatic
be maintained in accordance with the manufacturers' guidelines.
13.06.035 - Grease interceptor additives.,
No additive may be introduced to the plumbing system that would reduce the effects
GI.
Formatted: Font: (Default) Times New Roman, 12 pt,
Bold, Font color: Text 1
Formatted: Font: (Default) Times New Roman, Bold,
Font color: Text 1
Formatted: Right: -0.5", Tab stops: 0.94", Left
Formatted: Indent: Left: 0.94", First line: 0.01", Right:
-0s,
Formatted: Font: (Default) Times New Roman, 12 pt,
Font color: Text 1
Formatted: Font: (Default) Times New Roman, 12 pt,
Font color: Text 1
Formatted: Font: (Default) Times New Roman, 12 pt,
Font color: Text 1
Formatted: Font: (Default) Times New Roman, 12 pt,
Font color: Text 1
Formatted: Font: (Default) Times New Roman, 12 pt,
Font color: Text 1
Formatted: Right: -0.5", Tab stops: 0.94", Left
Formatted: Font: (Default) Times New Roman, 12 pt,
Bold, Font color: Text 1
Formatted: Font: (Default) Times New Roman, Bold,
Font color: Text 1
Formatted: Font: (Default) Times New Roman, 12 pt,
Font color: Text 1
Formatted: Indent: Left: 0.94", Right: -0.5"
Formatted: Font: (Default) Times New Roman, 12 pt,
Font color: Text 1
Formatted: Indent: Left: 0.94", Right: -0.5", Tab stops:
0.94", Left + 1.25", Left
Formatted: Font: (Default) Times New Roman, Font
color: Text 1
Formatted: Font: (Default) Times New Roman, 12 pt,
Font color: Text 1
June 18, 2019 G-17
J3.06.041 - National rV +^-~ ^~' Pretreatment Standards.,
The eate�pretreatment standards found at 40 CFR Chapter I Subchapter N
495403-471, and its successors, are incorporated herein by this reference.
A. Where a ^pretreatment standard, local limit, or permit limit is expre SIC
only in terms of either the mass or the concentration of a pollutant in wastewater
Director may impose equivalent concentration or mass limits in accordance with sec io
13.06.041(D)(3) and (E) (see 40 CFR 403.6(c)).
B. When ^^=pretreatment standards are expressed in terms of a ss
pollutant that may be discharged per unit of production, the Director may either i po
limits based on mass or equivalent effluent concentrations. The user must s 1
appropriate actual or projected long term production rates for the unit of produc i
specified in order to facilitate this process (see 40 CFR 403.6(c)(2)).
C. The Director may permit wastewater subject to a categorical pretreatment stand
to be mixed with other wastewaters prior to treatment. In such cases, the user shall i ti
all categorical waste streams and provide sufficient information on each non-categori
waste stream to determine whether it should be considered dilute for each pollutant. Abse
Formatted: Font: (Default) Times New Roman, 12 pt,
Il Bold, Font color: Text 1 11
Formatted: Font: (Default) Times New Roman, Bold,
Font color: Text 1
Formatted: Indent: Left: 0.94", Right: -0.5"
Formatted: Font: (Default) Times New Roman, 12 pt,
Font color: Text 1
F
ormatted: Indent: Left: 0.94", Right: -0.5", Space
fter: 0 pt
Formatted: Font: (Default) Times New Roman, 12 pt,
Font color: Text 1
Formatted: Font: (Default) Times New Roman, 12 pt,
Font color: Text 1
Formatted: Indent: Left: 0.94", First line: 0", Right:
-0.5°
Formatted: Font: (Default) Times New Roman, 12 pt,
Font color: Text 1
information showing that non -categorical waste streams contain the pollutant in question a
levels above that of the supply water, such waste streams shall be considered dilute. In such
situations, the Director shall apply the combined waste stream formula as found at 40 CFR
403.6(e), and its successors, to determine appropriate limits.
D. When a ^pretreatment standard is expressed only in terms of poll Formatted: Font: (Default) Times New Roman, 12 pt,
concentrations, an industrial user may request that the City convert the limits to equivalFont color: Text 1
mass limits.
13.06.044 - Dilution.,
Flo user shall increase the use of process water, or in any way attempt to dilute a disci
as a partial or complete substitute for adequate treatment to achieve compliance A
discharge limit, unless expressly authorized by an applicable pretreatment Stan&
requirement. The Director may impose equivalent mass limitations on users where de
appropriate to safeguard against the use of dilution to meet applicable pretrea
standards or requirements, or in other cases when the imposition of equivalent
limitations in lieu of, or in addition to, concentration based limitations is appropriate.
Formatted: Font: (Default) Times New Roman, 12 pt,
Bold, Font color: Text 1
Formatted: Indent: Left: 0.94", Hanging: 0.06", Right:
-0.5", Tab stops: 0.94", Left + 1.56", Left
Formatted: Font: (Default) Times New Roman, Bold,
Font color: Text 1
Formatted: Font: (Default) Times New Roman, 12 pt,
Font color: Text 1
Formatted: Font: (Default) Times New Roman, Bold,
13.06.170 - Supplemental enforcement action. l Font color: Text 1
A. Penalties for late reports. The Director may assess a penalty of $100.00 to any user
for each day that a report required by this chapter, a permit or order issued hereunder is late.
Penalties accrue beginning the fifth day after the report is due. The Director's actions to
June 18, 2019 G-18
collect late reporting penalties shall not limit the Director's authority to initiate any other
enforcement action.
B. Performance bonds. The Director may require a satisfactory bond, payable to the
City, in a sum not to exceed a value determined by the Director as necessary to assure the
user will achieve consistent compliance with this chapter. The Director may require this
bond as an enforcement response or as a prerequisite to issue or reissue a wastewater
discharge permit. Any user who has failed to comply with any provision of this chapter, a
previous permit or order issued hereunder, or any other pretreatment standard or
requirement may be subject to this requirement.
This bond may also be required of any category of user which has led to public burdens in
the past regardless of the compliance history of the particular user. The City may use this
bond to pay any fees, costs, or penalties assessed to the user whenever the user's account is
in arrears for over 30 days. This includes the costs of cleanup of the site if the user goes out
of business, sells the business to a person that does not first assume the bond, or goes
bankrupt. Users may petition the Director to convert their performance bond to a
requirement to provide liability insurance, or to forego any such safeguard based on their
performance. User may petition no more frequently than once in any 12 -month period.
C. Liability insurance. The Director may require a user to provide insurance if it
previously failed to comply with any provision of this chapter, a previous permit, or order
issued hereunder, or any other pretreatment standard or requirement. The Director may also
require users in businesses which historically have left a public burden to clean up pollution
to obtain this insurance, regardless of their compliance history. In such cases, users must
provide proof that the insurance is sufficient to cover any liabilities incurred under this
chapter, including the cost of damages to the POTW and the environment caused by the
user. The Director may require users to provide the proof of such insurance either in
response to noncompliance or prior to issuing or reissuing a wastewater discharge permit.
D. Payment of outstanding gee;s,, ees and penalties. The Director may decline to issue
or reissue a wastewater discharge permit to any user who has failed to pay any outstanding
fees, fines or penalties incurred as a result of any provision of this chapter, a previous permit
or order issued hereunder.
E. Water supply severance. The Director may order water service to a user severed
whenever a user has violated or continues to violate any provision of this chapter, a permit,
or order issued hereunder, or any other pretreatment standard or requirement. Users wishing
to restore their service must first demonstrate their ability to comply with this chapter and
pay the related costs of this action.
Section 2 - Corrections. The City Clerk and the codifiers of this ordinance are
authorized to make necessary corrections to this ordinance including, but not
limited to, the correction of the scrivener's/clerical errors, references to other local, state, or
federal laws, codes, rules or regulations, or ordinance numbering, section/subsection numbers
and any references thereto.
June 18, 2019 G-19
Section 3- Severability. If any provisions of this Ordinance, or its application to any
person or circumstances, are held invalid, the remainder of the Ordinance, or application of the
provisions of the Ordinance to other persons or circumstances, is not affected.
Section 4 - Effective Date. This Ordinance, being an exercise of a power specifically
delegated to the City legislative body, is not subject to referendum. This ordinance shall
take effect forty-six (46) days after notice of the ordinance adoption is given to
Department of Ecology.
PASSED by the City Council of the City of Port Angeles at a regular meeting of said Council
held on the day of 2019.
APPROVED AS TO FORM:
William E. Bloor, City Attorney
ATTEST:
Sissi Bruch, Mayor
Kari Martinez -Bailey, City Clerk
7
June 18, 2019 G - 20
Twelve Steps to a Compassionate Life — by Karen Armstrong
THE FIRST STEP - Learn about Compassion
Being kinder, gentler, and less fearful of others." The Golden Rule. Practice honor and respect for
the dignity of every human. "Do not do to others what you would not like yourself". Appreciate the
contribution that other traditions have made throughout history and let go of preconceptions that
have allowed us to consider them as "other."
THE SECOND STEP - Look at Your Own World
What are the signs of strength and resilience? What matters still need forgiveness or reconciliation?
Is anyone excluded from the circle? Are decisions and responsibilities shared equitably? Do all
members in need receive compassionate care'? Is any consideration given to impacts on local
environment and social issues or to global concerns'?
THE THIRD STEP - Compassion for Self
The Golden Rule requires self-knowledge. If we treat ourselves harshly, this is the way we are
likely to treat other people. So we need to acquire a healthier and more balanced knowledge of our
strengths as well as our weaknesses." Free of self-destructive emotion, one is more able to become a
fulfilled and mature human being. Setting the self aside takes courage, yet with commitment to
lifelong practice, can bring great joy and freedom.
THE FOURTH STEP - Empathy
Empathy begins in recognizing the reality of suffering in the world, rather than denying or avoiding
it. The desire to prevent others from experiencing the pain one has suffered, or to relieve its
consequences, has driven countless acts of intervention, service and care. The sharing of grief
strengthens the bond of citizenship and reminds each of us that we are not alone in personal sorrow.
THE FIFTH STEP
Mindfulness
Through mindfulness practice, it becomes apparent that much suffering is rooted in feelings such as
anger, resentment or envy, and is therefore caused by ourselves rather than others. If self-
centeredness increases, one's perspective shrinks; then both compassion and creativity diminish as
well. Mindfulness does not need to be a source of regret about the past, or of anxiety for the future.
Instead, by helping us to live in the present, mindfulness can provide a strong grounding for action
that is timely and appropriate. With each new insight or level of awareness, we have the opportunity
for growth in freedom and compassion, and thus can discern a wider range of options.
3O19Governor's Smart Communities Award Winners
Smart Vision Award - Outstanding comprehensive plan, sub -area plan or county -wide planning policies.
City of Prosser: City of Prosser Comprehensive Plan 2018. The rewrite of the city's comprehensive plan
was a large undertaking, not only to satisfy the requirement for periodic update, but also to implement new
approaches to old problems. Prosser has taken bold steps to address housing needs, new approaches to
inclusionary housing, and innovative student engagement in the planning process. The judges recognized
Prosser's broad public visioning process as an outstanding model for other communities: "The visioning
process, and resulting plan, were exceptional at simplifying zoning, addressing housing issues head-on,
eliminating 20 -year deed restrictions and creating incentive policies for housing."
City ofLakewood: Lakewood Downtown Plan. Over 2017and 2O10.Lakewood developed adowntown
plan reflecting aspirations of multi -generations, ethnicities, residents, businesses and property owners. The
plan envisions awe||-deoignmd mixed-use place to live, work and shop. Downtown is enriched by parks that
are accessible and traversable by all travel modes, and offers a rich quality of life and strong economy.
Lakewood's robust public outreach and development program were excellent for the community members -
the decision -makers involved in the planning process.
Smart Choices Award - Recognizing excellence in implementation of a comprehensive plan.
|y|ond County: Rural Lands Regulatory Updates -2018. "Excellent example of how to actually protect
maounm lands," said one judge. Island County prepared mm| lands regulatory updates in response to
overwhelming public input provided in the 2016 comprehensive plan update. Community responses called
for regulations that found a balance among economic development, long-term commercial viability of
resource lands, impacts to surrounding property owners and mna| character. The county did an excellent job
conducting a public process that addressed conflicting factors and tension points, and provided a new
regulatory structure that encourages economic development while protecting and retaining important
resource lands.
City ofBlaine: Blaine Strategic Economic Initiative (8E|)-3017. "This strategic process demonstrated
innovative, thorough, and meaningful public participation. This was a smart use of household surveys for
targeted community outroaoh.^noted one judge. The SEI identified six strategic objectives, including 43
specific action tasks, lead participants, schedules and performance measures. Thanks to excellent
community outreach during this strategic process, Blaine voters overwhelmingly approved a Transportation
Benefit District, opened a new downtown welcome center, and adopted proposals to create supportable,
effective and holistic action -oriented capital facilities programs.
City of Vancouver: Vancouver Housing Strategy. "Vancouver delivered on the goods in the form of a
housing strategy toolkit for other communities to use! This is a great use of municipal money per capita,"
applauded one judge. The Vancouver housing strategy addresses housing needs across a broad range of
income levels through direct funding programs, development incentives, zoning code changes and renter
protections. This strives to keep Vancouver a vibrant, livable place for all current and future residents by
creating and preserving affordable and market -rate housing. It also implements zoning initiatives toincrease
density and expand the range of available housing types, and leverages partnerships with the Vancouver
Housing Authority, nonprofit housing providers and private developers to meet housing needs.
Smart Projects Award - Outstanding project inthe implementation ofacomprehensive plan.
Intercity Transit: Thurston County and the cities ofLacey, [Vympio.TumwaterandYem--Tranmit
Road Trip Project 2O1$.The Road Trip project was atwo-year program combining technical analysis and
unprecedented public engagement to involve residents in transportation solutions. The effort by the multi -
jurisdictional authority board launched in response to anticipated budget shortfalls. The potential results
include realization of the goal of high-density corridor development and reduction of sprawl, improving
access to employment centers and increasing the number of people using transit. "The over 10,000
individual comments, and 66% of votes, validated their two-year public participation process. This was a
smart strategy for gaining community support for raising taxes to support local growth management needs,"
one judge noted.
City ofBellingham: Rapid implementation of Bellingham's Bicycle Master Plan. Bellingham's rapid
implementation of the 2014 Bicycle Master Plan has created more city-wide bicycle connectivity than any
other city of a similar size in Washington. In the five years since adoption, Bellingham Public Works funded
and completed over 111 of the 215 individual prioritized bicycle infrastructure projects. Bellingham's public
engagement and annual report on mobility allow for a series of comprehensive actions and opportunities to
partner with other agencies and jurisdictions, as well as private developers, to maximize the amount of
bicycle connectivity that iefunded and constructed each year.
Smart Partnership Award – Achievement by a joint public project that implements a comprehensive plan.
City of Walla Walla and partners: Blue Mountain Region Trails Plan 2018. Developed within 16 months
and finalized in February 2018, the Blue Mountain Region Trails Plan is the culmination of a collaborative
effort, involving 30 city, county, regional, state, federal and tribal entities. The plan outlines a region -wide,
non -motorized transportation and trails network that spans southeast Washington and northeast Oregon. It
stimulates economic development; encourages walking, biking, and hiking; provides more access to outdoor
recreation, and increases the overall quality of life for area residents. This is a unique and unprecedented
regional effort, where many regional partners joined forces to complete the development of a non -motorized
plan, and recreation network. "Impressive effort! A shining star for growth management, mobility and open
space pmtectinn.^acknowledged one judge.
City ofColville and partners: Colville Downtown Vitalization Plan -- "Colville Together" 2U18.The
City of Colville, the Tri -County Economic Development District (TEDD) and the Main Street Partnership
worked together to transform downtown Colville. The strong design vision of the plan was assisted by a
Community Development Block Grant (CDBG) from the Department of Commerce, and a Complete Streets
grant from the Transportation Improvement Board (TIB). "As the heart of the planning effort, the partnerships
are a benefit to the community, and now the city has a downtown 'public space activation program' attracting
tourists to the downtown nearly every weekend in the civic square. Great example of a regional focus to
improve the regional community, economic development, and create a central gathering space for all,"
judges commented.
City of Tukwila and partners: Tukwila Village 2018. "This is the definition of a successful public-private
partnership," wrote one judge. The Tukwila Village project is a new multicultural and multi -generational
community and neighborhood center. The tangible benefits are already visible in the form of commercial
spaces, high-density residential housing, shared parking, a new public library, and a new public space for
community events and gatherings. The pieces of the project fit together and smoothly transition from one
use to another. The design requires an ongoing partnership, so the city and its partners took an innovative
approach and agreed to jointly form the Tukwila Village Community Development Association (TVCDA). The
mission of association is to improve the social welfare of the community and residents of Tukwila Village by
promoting arts, economic development, education, health and community building.
Smart Housing Strategies Award — Creative plans, policies, programs and/or actions to address affordable
housing.
Island County: Housing Element 2018. The county studied housing conditions and reviewed existing
policies with the goal of updating the housing chapter of its comprehensive plan, developing a reasonable
measures addendum and creating an implementation plan. The research and analysis guided the
development of broad goals and policies empowering the county to consider creative solutions. The award
submission noted the solutions were innovative out of necessity. Island County is characterized by very
small urban growth areas (UGA) and includes an entirely separate island with no UGAs. The results
provided unprecedented public engagement from all areas of the county. The resulting housing element
brought together and unified very divergent opinions across the county. It became a tool that engaged the
community, empowered immediate action and cultivated a greater understanding of the Growth
Management Act (GMA).
City of Tacoma: Affordable Housing Action Strategy. For many years, the city of Tacoma has worked to
tackle its challenges relating to housing affordability, while also working to address a need for a more
strategic and sustainable long-term approach to its housing investments. From March to September 2018,
the city partnered with other agencies, organizations and community members to develop a comprehensive
affordable housing action strategy. The strategy is an equitable response to Tacoma's accelerating housing
market, which has increased displacement pressure and the need for quality, affordable housing. It was
informed by available data, extensive community engagement and input from a core stakeholder group of
eu�ectmatter experts.
Judges' Merit Award—Highlighting onomination that the Judges believed 1nbeamodel urshining example ofthe
best work inmparticular topic.
City of Bonney Lake: Watershed Protection and Land Use Planning (WPLUP) 2017. "Their approach to
storm water planning is impressive," was one judge's comment. The WPLUP project represents a holistic
approach to addressing multiple goals of the GMA: preserving and protecting water quality and habitat,
encouraging citizen participation, facilitating economic development, promoting healthy lifestyles and
accommodating growth in urban areas. The WPLUP project is an example of how a local jurisdiction can
create a synergistic relationship between these often competing objectives in a proactive manner that
furthers the implementation of the GMA. It is an example of how a local jurisdiction can implement the
Department ofCommerce's Building Cities inthe Rain.
Original: 6/ 12/2018
Updated: 6/18/2019
(Sur Co Topic
Status
Council Thinktank
Done
18 H NPDES —Storm water regulations — City should comment to ecology Permit good until 7/11`2019. Meeting with in progre
Ecology. Planning Dept. to work on
implementation requirements. Wait on
gathering builders.
17
16
16
15
15
15
15
15
15
15
14
14
14
13
H
H
H
E
H
H
H
H
H
H
H
H
H
E
13 H
13 H
13 O
Increase affordable housing for working families
Increase mixed used zoning
inccntivize vacant lots
Address housing
Vacant homes and regulations - Incentivize vacant houses
Increase infill development in central district and Race St.
Multi -family tax exception
Second story (and more) dwellings downtown and everywhere
Public/Private partnership — what can city do to help this?
Need round table with developers
Rentals and Airbnb regulations
Town hall with County
Code enforcement
PADA. PABA, Chamber, Association of Realtors, FDC — how can the city
be a good partner — increase communications. round table. etc.
Tenant protection ordinance — review regulations
Churches — for shelter
Prioritize bike -ability and walk -ability
13 O Prioritize transit in the city
Page 1
Create affordable housing task force
Add Zoning 101 class to Council agenda
County is taking lead
being reviewed by Legal
Council/County meeting
Workshop
Make it a priority long-term. Planning
Commission will address bike traffic. Pass
complete street ordinance. Use parked cars
to protect bikes from traffic.
Clallam County is looking into new routes.
Change perception of bus riding. Need
strategy and agreement for bus stops.
Address transit issues in comprehensive plan
Done
Class Doni
1\ro
In progress
No
No
Done
No
No
In progress
In progress
Done
progress,
ordinance
passed
In progres!
Original:611212018
Updated: 6/18/2 0 19
Council Thinktank
12
E
LTAX policy
LTAX committee looking at policy In progress
recommendations to Council. Workin- with
county.
12
E
Safety on the Olympic Discovery Trail
12
G
Emergency preparedness - earthquake plan — long term - critical
infrastructure — ex. Hazardous material location
12
G
Urban growth areas — coordinate policy with County
12
G
Increase education of Council on Zoning
Add Zoning 101 class for Council Done
12
G
Think how to be proactive to increase communications between Council
and citizens
12
H
Accessory dw=elling units regulations — adjust for issues
12
S
Climate action plan
In progress
I 1
G
Levels of Service for— parks, utilities, etc. (measures)
Comprehensive plan address most Partial
I I
G
Weatherization of homes
Program ongoing
1 1
G
List— Projects displayed at City Hall
11
H
Partner with County for regulations on rentals
1 l
N
PAPA - funding - ensure they survive until negotiations are complete
Negotiations completed Done
I 1
O
21 year old — tobacco — with County
11
O
Coast guard communities
10
H
Short term housing crisis — use available shelters (temp)
10
N
Create a home fund to build safe and affordable housing
10
N
Create a home fund to help make homes energy efficient
10
O
Relationships with all (Victoria, etc.)
10
S
Stvrofoam Ban
10
S
100% off fossil fuels
9
G
utility rates - "social engineering"
9
H
1110th of I % - (for affordable housing) — talk with County
9
H
Campaign in a box — Olympia Mayor — increase housing for vulnerable
population - get info
9
H
Amount of land available for housing
Map created by City Done
9
N
Culvert rule - how does this affect us and will this be something that we
need to plan for (modify culverts impeding salmon passage)
9
O
Solid waste pickup — review- and maybe change to increase composting
Page 2
Original:6/ 12/2018
I Tpdated: 6/19/2019
Council Thinktank
9
O
increase and help facilitate in case of disaster —take lead —to help to get to
know your neighbors
9
S
Electric vehicles for city —220-30 year electrification of all vehicles
8
G
Youth panel — YMCA program
8
H
Affordable housing policy -% of construction—how long affordable?
8
H
Lobby State for rental regulations
8
N
Trees that were cut on Peabody street - policy to ensure this doesn't happen On workplan In progress
again
8
N
Workplan discussion - topics. Ex. Dry Creek water/PUD in city areas
8
N
Bonneville Power - Phil Lusk advice
8
N
Is GMA effective - annexation areas vs. services and infrastructure
8
N
Volunteer coordinator - find person (Travis Berglund)
8
N
Kinder Morgan pipeline expanding on increased tanker traffic on the strait.
This will affect us - do we want to address this?
8
S
Plastic Ban - straws. cups/etc.
8
S
Sewage sludge - alternatives
7
G
Elders panel
7
G
Values
7
H
Use vacant building — Fairview — address regulations to help make that
happen
7
O
Opioid lawsuit — should we do this
6
E
I% for art for construction
6
H
Height restrictions (45') regulations
6
H
International Building Codes
6
N
Campaign signs in the city - sign ordinance update
6
N
Calendar - ceremonial/proclamations and important topics
6
O
Sugar/Soda tax
6
S
Food forest
6
S
Zero waste
5
E
Chainsaw carving competition
5
N
Accessibility of Park behind Swains - for wheelchairs- loose gravel is the
issue
5
N
Garbage cans being dumped in alleys
Page
Original: 6/12/2018
Updated: 6/18/2019
Council Thinktank
5
N
Locomotive restoration Partial - Asbestos removed Partial
5
N
Skill center - should we try again
5
O
No smoking rule — 25' from apartments
4
E
Parking — do we have enough
4
N
Solar in all city buildings
4
N
Tourism - create a map where locals identify= "Our favorite places"
4
N
Indoor child play - everyone goes to McDonalds and no other options
4
O
Methane — sell? For buses — transit — for city buildings?
4
O
Traffic signs at unmarked intersections
4
S
Sustainability officer
3
N
Walmart & McDonalds (sustainable practices - flight hunger/reduce waste)
make contact.
3
O
Background check on all committee members
2
N
taxes on disposable food service items as a way of discouraging so much
waste and potential litter
2
N
Abolish Dillon's Rule
2
N
AWC board - anyone interested
0
N
Use rock for foundation of houses
B=Housin
, E=Economic Dev.. S=Sustainabilit & Environment, G=Governance, O=Other, N=New
Page 4
PUBLIC WORKS CONTRACT STATUS REPORT
April 2019 / May 2019
(COSTS SHOWN INCLUDE APPLICABLE TAXES)
ACTIVE CONSTRUCTION CONTRACTS AWARDED BY CITY COUNCIL EXCEEDING $35,000
PURCHASE ORDER CONTRACTS $7,500 - $25,000 AND LIMITED PUBLIC WORKS PROCESS OR SMALL WORKS
ROSTER CONTRACTS UNDER $25,000 AWARDED SINCE LAST COUNCIL REPORT
(QUOTATIONS AVAILABLE FOR INSPECTION AT CONTRACT SPECIALIST'S OFFICE)
CONTRACTOR
OR VENDOR
ORIGINAL
ORIGINAL
PRIOR
APR. TO MAY
REVISED
PROJECT TITLE
BUDGET
CONTRACT
CHANGE
CHANGE
CONTRACT
(Construction)
AMOUNT
ORDERS
ORDERS
AMOUNT
TRI 1-00 (CON -2018-31)
10' Street Reconstruction
$2,580,000
$2,523,592.15
$31,374.41
$0.00
$2,554,966.56
TRO1-11 (CON -2018-32)
Marine Drive Channel
$739,000
$641,372.61
$11,445.05
$0.00
$652,817.66
Bridge Improvements
CON -2018-60 Peabody
Heights Reservoir Cover
$60,000
$50,654.20
$0.00
$0.00
$50,654.20
Cleaning & Repair
PURCHASE ORDER CONTRACTS $7,500 - $25,000 AND LIMITED PUBLIC WORKS PROCESS OR SMALL WORKS
ROSTER CONTRACTS UNDER $25,000 AWARDED SINCE LAST COUNCIL REPORT
(QUOTATIONS AVAILABLE FOR INSPECTION AT CONTRACT SPECIALIST'S OFFICE)
CONTRACTOR
OR VENDOR
CONTRACT/
PO #
DESCRIPTION
DATE AWARDED
AMOUNT
*Limited Public Works Process
June 18, 2019 L - 1
PUBLIC WORKS GRANT & LOAN STATUS REPORT
April 2019 — May 2019
PROJECT
PROJECT
GRANT/LOAN
AMOUNTAWARD
DESCRIPTION
COST
SOURCE & ID
GRANT MATCH/
LISTING
STATUS
LOAN DATA
Stormwater
$102,000 from
Grant
Stormwater
Grant acceptance
City Hall Parking Lot
$102,000
DOE
Financial
February
approved by
LID Retrofit
(design only)
#WQSWPC-2016-
Assistance
2018
Council March
PoAnPW-00001
Program;
2019. Grant
No City match
agreement in place.
required
$160,000 from
Grant
Stormwater
Grant acceptance
DOE
Financial
February
approved by
1611 Street LID Retrofit
(designonly)
(design y)
#WQSWPC-2016-
Assistance
2018
Council March
PoAnPW-00014
program;
2019. Grant
No City match
agreement in place.
required
$474,300 from
Grant acceptance
$680,554
Grant
Stormwater
approved by
Decant Facility
(including
DOE
Financial
Assistance
July 1,
Council Feb 2016,
grant -funded
#WQC-2016-
Program;
2015
Grant awarded Feb
design)
PoAnPW-00368
$83,700 minimum
2018. Agreement
City match required
in place.
$50,000 from
Grant
Stormwater
Agreement in
Capacity Grant
N/A
DOE
Financial
September
place. Grant
#WQSWCAP-1719-
Assistance
2017
expired March
PoAnPW-00121
Program; No City
2019.
match required
Wastewater
Transportation
Grant agreement
Grant
$200,000 from
approved by
Hill Street ODT
$200,000
WSDOT
Pedestrian and
June 2015
Council Sept 2016.
(design only)
#LA8992
Bicycle Safety
Consultant contract
Funding
signed. 60% design
completed.
$1,421,700 from
Grant award
RCO WWRP —
notification letter
Trails
received.
$609,300 (30%)
This grant will be
$2,031,000
Grant
required City match
September
awarded upon State
Hill Street ODT
(construction
RCO
(composed of
2018
budget approval by
only)
#TBD
$203,100 cash and
the State
$406,200 grant
Legislature.
funds from a TBD
Anticipated
secondary source)
distribution June
2019.
June 18, 2019 L - 2
PROJECT
PROJECT
GRANT/LOAN
.AMOUNT
AWARD
DESCRIPTION
COST
SOURCE & ID
GRANT MATCH/
LISTING
STATUS
LOAN DATA
Transportation
$398,540 from WA
Grant Agreement
$462only)
Grant
Federal Lands
January
signed. Alta design
Race Street Complete
,000
(design
FHWA
Access Program;
2015
contract signed.
4DTFH70IE3002
$63,761 City
30% design
minimum match
completed.
Grant award
$2,000,000 from
notification letter
Race Street Complete
$2,890,000
Grant
WA Federal Lands
June
received.
This grant will be
Phase 1- Lauridsen to
(construction
FHWA
Access Program;
2018
used to construct
Olympic Park
only)
#TBD
13.5% minimum
this phase and will
City match
run from 2021-
2023.
Race Street Complete
Grant FHWA/
$113,348 HIP
Grants accepted by
Phase 1- Lauridsen to
$3,352,000
WSDOT
$568,000 STP
April 2019
Council May 2019.
Olympic Park
#TBD
o
13.5% minimum
Agreements in
City match
process.
$75,000 (design)
and $510,000
Signed agreement
Grant
(construction) from
May 2016. Signed
Marine Drive Channel
$759,583
FHWA/WSDOT
S
Surface
March
supplement May
Bridge
#LA -8898
Transportation
2015
2018. Under
Program;
13.5% minimum
construction.
City match
Grant agreement
approved at
Council Feb 2018.
$1,250,001 from
Grant Agreement
W. 10 to Street (S. I
Grant
TIB;
November
signed. Additional
Street to S. N Street)
$2,554,967
TIB
$839,999 minimum
2017
$100k awarded
#8-1-150(009)-1
City match
from TIB and
accepted at Council
July 2018.
Construction
completed.
Agreement in
$580,800 from TIB
place. This CFP
$300,000 minimum
project, originally
Lauridsen Boulevard
Grant
City match
November
scheduled for
Overlay
$980,800
TIB
$100,000 City
2018
construction in
#3-W-150(002)-1
funds for non -grant
2020, will be built
eligible items
in 2019 with the
receipt of this
grant.
Complete Streets
$300,000 from TIB
March
Present to Council
Award
$300,000
Grant TIB # TBD
no match
2019
June 2019.
requirements.
FEMA
June 18, 2019 L - 3
List of Acronyms
AIP: Arterial Improvement Program
BPA: Bonneville Power Administration
BRAC: Bridge Replacement Advisory Committee
DOE: Department of Ecology
DWSRF or SRF: Drinking Water State Revolving Fund or State Revolving Fund
FEMA: Federal Emergency Management Agency
FHWA Federal Highway Administration
NOANet: Northwest Open Access Network
NOSC: North Olympic Salmon Coalition
PASD: Port Angeles School District
PSP: Puget Sound Partnership
PSMP: Pedestrian Safety and Mobility Program
PWB: Public Works Board, administers the PWTF Program
PWTF: Public Works Trust Fund
RCO: Recreation and Conservation Office
RCO WWRP — Trails: Recreation Conservation Office Washington Wildlife and Recreation Program — Trails
SRF: Salmon Recovery Funding
TIB: State of Washington Transportation Improvement Board
TBD To Be Determined
WSDOT: Washington State Department of Transportation
June 18, 2019 L - 4
t2 � P ORTANGELES CITY COUNCIL
WASH I N G T o N, u, s, MEMO
Date: June 18, 2019
To: City Council
From: Shailesh Shere, Acting Director of Public Works & Utilities on behalf of
Thomas Hunter, Director ofPublic Works & Utilities
Subject: Stage I Water Shortage Declaration
Summary: On May 20, 2019, Governor Jay Inslee declared a drought emergency for Clallam County.
This declaration was due to the extremely low snow pack in the mountains and record -low flows in many
rivers across the state. Therefore, the City Manager is implementing Stage I of the City's Water Shortage
Response Plan.
Funding: N/A
Recommendation: Information only.
Background / Analysis: Below-average snowpack combined with drier than normal summer weather
forecasts resulted in Governor Inslee's decision to expand a drought declaration into Clallam County.
The May 20, 2019 declaration allows the State to make funds available to municipalities if needed to
address drought -related hardships and to expedite emergency water right permits.
The City Manager is therefore implementing Stage I of the City's Water Shortage Response Plan. City
staff will monitor the situation and review the City internal water conservation plan. Additionally, staff
will conduct public education and outreach concerning the benefits and necessity of water conservation.
City Council will be kept updated as to water conservation efforts.
The City's current Water Shortage Response Ordinance, PANIC 13.46, has five stages as summarized in
the following table:
Stage
Water Shortage Condition
Action
Declaration by
I
Anticipated
Internal Preparations
City Manager
II
Serious
Voluntary Conservation
City Manager
III
Critical
Limited Outdoor Restrictions
City Council
IV
Emergency
Mandatory Outdoor Restrictions and
City Council
Indoor Conservation
V
Regional Disaster or Infrastructure
Water Rationing
City Council
Failure
Funding Overview: N/A
June 18, 2019 L - 5
PORT ANGELES PARKS, RECREATION & BEAUTIFICATION COMMISSION MEETING
Port Angeles, Washington
May 16,2019
CALL TO ORDER - REGULAR MEETING: Commission Chair Winslow called the meeting to order at 6:00 p.m.
ROLL CALL: Members Present: Student Representative Bailey; Commissioners Tucker, Forrest, Kirsch, Milburn, Sinton; Chair
Winslow.
Members Absent: Commissioner Wojnowski
Staff Present: Director Delikat, Secretary Straits & Senior Center Manager Bright.
APPROVAL OF THE MINUTES: It was moved by Commissioner Tucker and seconded by Commissioner Forrest to approve the
April 18, 2019 meeting minutes. The motion passed unanimously.
LATE ITEMS: None.
PUBLIC COMMENT: All public comment was made to express opinions regarding the protection of the Liberty Bell within
Veteran's Park. Speakers included Gary Velie, Jim McEntire, Susan Hillgren, Bill Benedict, Strait View Credit Union, Karen Rogers
and Brendan Meyer.
FINANCE & PACKET ITEMS: Director Delikat reviewed the current revenue and expenditure report.
LEGISLATION:
1. Veteran's Memorial Park- Director Delikat updated Commissioners on the process that has taken place since the
previous April 18th Commission meeting. He explained the final motion that was made at the previous meeting, details
of the first sub -committee meeting, and the outcome that lead to a community meeting with five selected individuals
that spoke during the April 18th Public Comment period. After Delikat's comments, Commissioner Winslow spoke on
behalf of the Commissioners Sub -Committee that led to their determination and outcome. During the process it was
ultimately decided on that the protection of the Liberty Bell is the responsibility of the Parks and Recreation
Department, not City Council. Commissioner Sinton presented the following recommendation: The Parks and
Recreation Director should proceed with a project to install an ornamental security fence around the Liberty Bell at
Veteran's Memorial Park, not the park itself. The project scope includes an ornamental security fence from pillar to
pillar around the Liberty Bell that compliments the park design and neighborhood structures. The fence should include a
locking gate of ornamental design, in keeping with the theme of the park. Additional features, which could be installed
in tandem with the fence or in later phases, include lighting for security and aesthetic purposes, and a security camera
connected to the City system. Funding for the purchase and installation of the fence, lighting and camera system must
be sourced from community donations and/or other sources that do not negatively impact the Parks and Recreation
budget, staffing hours, and prioritized list of capital maintenance projects. Final approval for the design will be the
responsibility of the Parks and Recreation Director.
GUEST SPEAKERS: Aubry Bright, Senior Center Manager: Manager Bright gave an update to the Commission regarding the
current state of the Senior Center. She discussed the observations she's made during her first five months, the projects that will
occur during the next six months, and the importance of the Senior Center volunteers. She also discussed upcoming events and
answered questions held by the commissioners.
DIRECTOR'S REPORT:
1. Park Maintenance Shop- Delikat discussed the possibility of purchasing a new Parks Maintenance building from
Platypus Marine. He will be taking a proposal to City Council in June.
2. Facility Use Agreement- Delikat announced a new, 5 -year renewable Facility Use Agreement with MACK Athletics, Inc.
that he will be taking to City Council on May 21, 2019.
3. Generation II Dream Playground- The playground design unveiling will be held on June 5th at the Vern Burton Center.
4. Public Restrooms- Delikat announced his May 215' presentation to the Council regarding public restrooms plans and
encouraged Commissioners to attend.
S. Capital Facilities Plan- Delikat discussed the updated version of the CFP that will be discussed at an upcoming City
Council Work Session.
6. Flag Pole- A flag poles at City Pier was recently hit by a vehicle. A new flag pole will be purchased to replace the
removed pole.
Page 1 of 2
June 18, 2019 L - 6
7. Board of Directors- Delikat mentioned that the Senior Center Board of Directors were recently recognized during
Volunteer Appreciation Month during a City Council meeting for all of their efforts during the six month absence of a
Senior Center Manager.
8. Ordinances- Delikat discussed ordinances to occur during summer hiatus, including the name change of West End to
Pebble Beach Park and tobacco -free parks and facilities.
9. 2nd Annual Day of Play- Intern Hailey Lester discussed the changes and improvements made to this year's Day of Play
event happening on July 23rd, including passports, prizes and new partners.
Questions/Comments: None.
ADJOURNMENT: Chairperson Winslow adjourned the meeting at 7:20 p.m. The next meeting is September 19, 2019, at 6:00
p.m. in 1he CityC uracil Chambers.
k 0 NKAA
Iris Winslow, Chairperson essi a Straits, Secretary
June 18, 2019 L -=ffage 2of2
t2 � P ORTANGELES CITY COUNCIL
WASH I N G T o N, u. s. MEMO
Date: June 18, 2019
To: City Council
From: Shailesh Shere, Acting Director of Public Works & Utilities on behalf of
Thomas Hunter, Director ofPublic Works & Utilities
Subject: Surplus 2009 Tar Heater Trailer, Equipment #940
Summary: Equipment #940 Cimline Tar Heater Trailer is no longer needed for future City operations; it
has been replaced by newer equipment.
Funding: N/A
Recommendation: Declare Equipment #940 as surplus, and authorize the Public Works Director to
dispose of it per established procedures.
Background / Analysis: In 2009, Equipment #940 (Cimline Tar Heater Trailer) was purchased to seal
the seams of new asphalt patches. The unit is a trailer -mounted, diesel -fired tar melting pot and is used by
hand -pouring melted tar onto the seams of an asphalt patch.
In 2013 the City purchased Equipment #1341 to promote the Street Departments new Asphalt Crack
Sealing Program. This unit is also a trailer -mounted, diesel -fired tar melting pot. The new equipment
incorporates additional features including heated hoses, a distribution nozzle and an air compressor for
debris removal which provide improved sealing.
By purchasing equipment #1341, the Cimline Tar Heater Trailer was rendered obsolete and is no longer
needed by the City.
Funding Overview: N/A
June 18, 2019 L - 8
June 18, 2019 L - 9
2019 Building
Report - Number of Permits Issued
JAN
FEB
MAR
APR
MAY JUN JUL AUG SEP
OCT NOV DEC Total
NEW CONSTRUCTION
1
1
2
Comm.
REPAIR AND ALTERATION
23
8
19
11
14 - - - -
- - - 75
NEW CONST.
-
-
-
2
-
2
Ind.
REPAIR AND ALTERATION
1
1
2
1
1
6
NEW CONSTRUCTION
-
-
-
-
0
Public
REPAIR AND ALTERATION
1
1
NEW MULTI FAMILY
-
-
-
-
0
NEW MANUFACTURED HOME
-
1
1
-
2
4
Res.
NEW SINGLE FAMILY RESIDENCE
5
1
3
2
1
12
NEW ACCESSORY STRUCTURE
1
2
1
-
2
6
REPAIR AND ALTERATION
62
37
48
56
60
263
DEMOLITION AND MOVING
-
2
1
-
3 - - - -
- - 6
Total:
92
53
75
74
83 0 0 0 0
0 0 0 377
CERTIFICATES OF OCCUPANCY
4
1 1
1
5
5 - - - -
- - - 16
2019 Building
Report - Permit Valuation
JAN
FEB
MAR
APR
MAY JUN JUL AUG SEP
OCT NOV DEC Total
NEW CONSTRUCTION
-
$9,000.00
-
$54,000.00
$ 63,000
Comm.
REPAIR AND ALTERATION
$1,401,903.00 $605,596.00 $1,105,779.00 $239,741.00 $4,483,127.00
$ 7,836,146
NEW CONST.
-
-
$360,000.00
$ 360,000
Ind.
REPAIR AND ALTERATION
$3,000.00
$500.00
$350.00
$60,000.00
$75,000.00
$ 138,850
NEW CONSTRUCTION
-
-
$ -
Public
REPAIR AND ALTERATION
$7,000.00
$ 7,000
NEW MULTI FAMILY
$
NEW MANUFACTURED HOME
$209,425.001
$60,000.00
$455,098.00
$ 724,523
Res.
NEW SINGLE FAMILY RESIDENCE
$664,407.00
$135,130.001
$510,021.00
$505,000.00
$95,200.00
$ 1,909,758
NEW ACCESSORY STRUCTURE
$29,317.00
$12,775.00
$23,000.00
-
$62,000.00
$ 127,092
REPAIR AND ALTERATION
$717,165.00
$250,059.00
$315,246.00
' $519,982.00
$590,491.00
$ 2,392,943
DEMOLITION AND MOVING
-
$0.00
$7,000.00
-
$26,000.00
$ 33,000
Total:
$ 2,815,792
$1,222,485
$ 2,021,396
$1,745,723
$ 5,786,916 $ $ $ $
$ $ $ $13,592,312
June 18, 2019 L - 9
ANNUAL REPORT YEAR 2018
CITY OF
PORT ANGELES
FIRE DEPARTMENT
102 EAST STH STREET
PORT ANGELES. WA 98362
360.4 17,4 6 5 5
THE CITY OF
-0�
TNGELES
-AW A S H I N G T O N
City Council
Sissi Bruch, Ph.D
Mayor
Kate Dexter
Deputy Mayor
Mike French
Councilmember
Cherie Kidd
Councilmember
Michael Merideth
Councilmember
Jim Moran, MA, CLU, ChFC
Councilmember
Lindsey Schromen-Wawrin
Councilmember
Nathan West
City Manager
ANNUAL REPORT YEAR 2018
Contents
A Message from the Chief ....................................................
1
Public Safety Advisory Board ..............................................
2
2018 Organizational Chart ..................................................
3
StrategicGoals...................................................................
5
Fire Department Goals ........................................................
6
Goal Supported Accomplishments ......................................
8
Performance Measures.......................................................
9
Performance Indicators....................................................
11
DivisionReports................................................................
19
Personnel Highlights.........................................................
27
Department Highlights.....................................................
29
Paramedic Tyler Gage proudly takes a photo beside the flag he made for the Fire Hall.
ANNUAL REPORT YEAR 2018
A Message From The Chief
It is my pleasure to once again write a Fire Chief's message for the
Port Angeles Fire Department Annual Report.
I wear a Port Angeles Fire Department uniform every day. This is
partly because I have no sense of style whatsoever. I have
embarrassed my poor, long-suffering wife Teresa way too many times
when I have attempted to leave the house in what I thought was a
perfectly acceptable combination of clothing. Teresa's patience for
me, and for the demands of the job, has been incredible and I will
always be in debt for her support, but that is another story...
Anyway, I wear the uniform every day and I am proud to do so. Mainly I am proud to wear it
because on an almost daily basis I am stopped by someone who recognizes the uniform and
cannot wait to tell me about some fantastic act of kindness or compassion that they either
witnessed or received from a member of the Port Angeles Fire Department. I am not
exaggerating when I say that this. It happens all the time.
Hearing these stories is incredibly gratifying. I am humbled by the praise that the Department
personnel receive, but to be honest, I am not terribly surprised. The citizens of Port Angeles
are lucky to be served by some of the most professional, competent, compassionate and truly
nice fire department personnel that I have ever had the pleasure to serve with.
This has not happened by accident. We have set a standard for recruit personnel that is
difficult to achieve. This has meant that all of our personnel have had to work with reduced
staffing because we refuse to lower the bar and hire folks simply to fill empty positions.
Everyone in the Department has pitched in and agreed that they would rather work harder and
wait longer than hire the wrong person. We believe that this short term pain is worth the long
term gain and I can tell you that the positive, unsolicited comments I receive from the public
are an indication that we are headed in the correct direction.
I am well aware that we are not in this alone. This Department would not be what it is without
the support of our families and without the support of a very dedicated cadre of volunteers. I
am not very good at showing my gratitude — I sincerely hope that all of our personnel, all of our
family members and all of our volunteers know how very much I value and appreciate their
dedication and support.
So, please enjoy our 2018 Annual Report. There are many pages of information that illustrate
just how much the Department accomplished during the year, but there are not nearly enough
pages to accurately record the thousands of positive interactions that our personnel have had
with our citizens.
- Ken Dubuc
PAGE 1
ANNUAL REPORT YEAR 2018
Public Safety Advisory Board
It is clear I think to all of us that the mission and conduct of Public Safety changes over
the years as society changes. It is, or course, critical that Police and Fire Departments
be in touch with the nature these local, regional and national changes and adjust their
operations accordingly overtime.
As members of the Port Angeles Public Safety Advisory Board, we follow the evolution
of both Police, Fire and Medical response as part of our citizen liaison function. As
such we have a great deal confidence that the critical aspects of Public Safety in Port
Angeles not only adjust to these changing trends, but are often ahead of the curve.
The insight, dedication and professional expertise of all who serve our Police and Fire
Departments protects our quality of life by protecting our safety to live in a free
society.
On the Fire and Medical side of Public Safety, it is noteworthy that the early emphasis
on prevention over the years and the proactive and ongoing inspection programs have
resulted in a drastically reduced instance of structure fires and shifted much of the
emphasis to medical response. Commercial building safety is a large part of that
emphasis as the close proximity of many commercial buildings, particularly in the
downtown area, can create catastrophic fire dangers, something now extremely rare
as a result of our diligent prevention programs.
On the Police side of Public Safety, embracing the concept of "community policing" is
also preemptive by anticipating issues and circumstances that can lead to criminal
activity and addressing them in many cases before they become dangerous. Often this
approach has been instrumental in reducing crime rates in general and creating a
safer environment and quality of life for us all.
While these and many other valuable and insightful changes over the years have
added immeasurably to effectively reducing crime and injury to our citizens, the
everyday hard work and diligence of our Police and Fires professionals goes on. There
is no substitute for training and hard work.
On behalf of the Public Safety Advisory Board,
it is an honor to serve on this important Board
and to support our local Public Safety professionals.
Alan Barnard
Chairman
Port Angeles Public Safety Advisory Board
PAGE 2
Ken Dubuc
Fire Chief
' ['
Catherine
Dewey
Administrative
Assistant
Michael
Keith Bogues Sanders
Assistant Chief/ Assistant Chief
Operations
J Fire Marshal
Jamie Mason Kelly Ziegler Terry Reid
Captain Captain Captain
A Shift
BS Shift C Shift
» teremy ,FT Andrew
Bryant Kroh •' Church Cooper
Lieutenant
Lieutenant Lieutenant
Travis
John Hall ToGerman McFarland
Firefighter Firefighter firefighter
f]]
Pararnedic EMT Pararnedic
Mark Doug Eaton Dayvid
Karjalamen Firefighter Ryp!nski
Firefighter Paramedic F, rcf iZh to r
paramedic Paramedic
Daniel Mike Bruce
Montana Ingrah m 5yrrrjnds
F�icfighter Firefighter Fc c ibhter
Paramedic Pararnedic EMT
Chase Laubach Tyier Gage Geese
Firefighter Firefighter �nardata,
Ga me.7ic Pararnedic ar, lite !EMT
Ty4er iaeot»an Harry Hause
Firefighter Frreflgh to r
Paramedic EMT
rpSeng iy!er
VV,1dcman
Rrefightcr
Pararied+c
Mike Adamich
Volunteer Captain
Mike Hansen Trevor Warren
Volunteer Volunteer
Lieutenant Lieutenant
Scott Janes'� Shaunna Olson
Firefighter/EMT EMT
Patricia
Reifenstahl Jillian Munger
Firefighter/EMT Firefighter/EMT
11
Andrew Pittman IM Chase Adamich
Firefighter/EMT Firefighter/EMT
Tim Davis is Michael Wheeler
Firefighter/EMT IN Firefighter/EMT
Phillip VanKessel Andrew Lyon
EMT Is EMT
Jaisal White'� Sanad Olwan
EMT EMT
Anthony
Quinones
EMT
ANNUAL REPORT YEAR 2018
Strategic Goals
Public Safety
• All calls for assistance are
responded to in a timely manner
by highly trained personnel with
necessary resources that are
properly deployed.
• Appropriate disaster
preparedness planning and
training is provided for all levels
of City Government.
• Complete interoperability is
achieved through the
appropriate provision of
equipment and technology that
enhances agency effectiveness
and employee safety.
• Prevention and volunteer
programs are an integral part of
the public safety mission.
• Public, private and
intergovernmental partnerships
are actively pursued to maximize
the effectiveness of public safety
resources.
PAGE 5
ANNUAL REPORT YEAR 2018
Focus Area: Preserving and Protecting Our Assets
Physical Infrastructure
• Maintain facilities so that they are safe and close to original condition
Financial Infrastructure
• Continually explore potential grant funding opportunities
• Participate in Ground Emergency Medical Transport (GEMT) Program
Employee Infrastructure
• Provide training to maintain certifications in EMS and fire prevention
• Encourage and support firefighters to pursue college educations
• Enable career and volunteer personnel to attain 100% of mandated training
Focus Area: Strengthening Community Safety and Welfare
Public Safety/Emergency Services
• Respond to calls for service in a timely manner with highly trained and
compassionate personnel
• Provide responders with equipment and training to allow them to perform their
mission effectively and safely
• Disaster preparedness, planning and training is provided to City government
• Participate in state and regional emergency management planning to allow for
effective coordinated response to catastrophic events
• Maintain City Emergency Operations Center
PAGE 6
ANNUAL REPORT YEAR 2018
Economic Development
• Continue to work with Planning and Economic Development to ensure that
innovative, collaborative approaches are considered when dealing with
proposed projects
Partnerships
• Public, private and inter -governmental partnerships are actively pursued in
order to maximize the availability of public safety resources
• Continue to explore cooperative service opportunities with the adjoining fire
districts where operational, financial or organizational efficiencies can be
achieved
• Build and maintain partnerships with the business community and public
agencies to assist with the Fire Department mission
Sustainability
• Continue to explore methods aimed at reducing unnecessary emergency
responses - both medical and fire
• Provide programs aimed at reducing the impact upon persons affected by
emergency incidents
• Expand possibilities for increased community interaction through venues such
as the County fair and community safety day
PAGE 7
ANNUAL REPORT YEAR 2018
The development and participation in regular training and exercises designed to
test roles, responsibilities , capabilities and protocols is an essential component
of the pre -planning process and provides opportunities for the development of an
integrated response to natural and man-made emergency incidents.
in June of this year the Port
Angeles Fire Department
participated in a National
Guard exercise held at
Fairchild Airport.
Life Flight now has an office
and operating services here in Port
Angeles. The Port Angeles Fire
Department is called on to assist
them if needed in order to provide
the best care to the citizens of our
county. Their presence here on the
peninsula has been a great addition
to the EMS community.
PAGE 8
ANNUAL REPORT YEAR 2018
Performance Measures
Performance measures are used to gauge the Fire Department's program efficiency and
effectiveness relative to a meaningful standard or baseline. These measures allow us to
compare the department with other cities and other fire departments.
In order to do this we group the measures into four categories:
1. GENERAL
2. SPENDING AND
INFORMATION
STAFFING
(INPUTS)
• Total number of calls
for service
• Staffing for all
• Calls per day and
programs
calls per time of day
• Spending for all
• Activities by type
Programs
• Sources of funding
• Fund allocation
3. WORK LOAD 4. RESULTS
(OUTPUTS) (OUTCOME)
• Average daily • Fires per 1,000
responses population
• Average weekly • Fire casualties
callback responses • Response times
PAGE 9
ANNUAL REPORT YEAR 2018
Performance Measures
Spending and Staffing - Staffing For All Programs
2
1.8
1.6
1.4
1.2
e
O's
0.6
0.4
0.2
ED
CAREER FIREFIGHTERS PER 1,000 POPULATION
2013 2014 2015 2016 2 017 2018
■ F~A F'D ■ Cern parab les
In 2018, In addition to a Fire Chief, Assistant Chief/Fire Marshal, Assistant
Chief/Operations, and Administrative Assistant the Port Angeles Fire Department
had 22 career firefighters. Assuming a population of 19,872, with 26 career
personnel, the ratio is 1.34 per 1,000 population.
Career firefighters per 1,000 Population utilizing comparable cities of Aberdeen,
Mt. Vernon, Mukilteo and Tumwater. The average number of career firefighters per
1,000 population was 1.73 in 2016 and 1.74 in 2017. That average increased to 1.81
in 2018.
*Populations reflects census.gov
PAGE 10
ANNUAL REPORT YEAR 2018
Performance Indicators
General Information: Calls For Service
COST PER CAPITA
■PAFD ■Comparables
2018, the cost per capita for fire protection and emergency medical services in
Port Angeles was $218.20. This is based upon a total Departmental budget of
$4,336,045.00 and a population of 19,872.
The cities used as comparable were: Aberdeen, Mt. Vernon, Mukilteo and
Tumwater. In 2018, the average cost per capita for these cities to provide fire
protection and emergency medical services was $223.64
PAGE 11
0
0
M
C
M
�
01
N
ry C
cl
M
r M
lf1
V?
N
rn N
M N
N
'.
M N ry
N N b ry
2012
2013
2014
7015
2016
2017 2018
2018, the cost per capita for fire protection and emergency medical services in
Port Angeles was $218.20. This is based upon a total Departmental budget of
$4,336,045.00 and a population of 19,872.
The cities used as comparable were: Aberdeen, Mt. Vernon, Mukilteo and
Tumwater. In 2018, the average cost per capita for these cities to provide fire
protection and emergency medical services was $223.64
PAGE 11
ANNUAL REPORT
Performance Indicators
General Information: Calls For Service
5,500 �--
5,000
4,500 �— --
4,000
3,635
3,500
3,000
TOTAL NUMBER OF CALLS FOR SERVICE
_ .._ 3,552
YEAR 2018
5,076
4,944
4,79D —
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
5YO76calis in 2018 represents an average of 13.9 calls
for service each day. 2018 was the single busiest
year for call volume in the history of the Port
Angeles Fire Departmetn. This equates to a 2.7%
increase in number of calls over the previous
year.
■Calls
PAGE 12
ANNUAL REPORT YEAR 2018
Performance Indicators
General Information: Calls Per Day and Per Time of Day
e
M.,
--
I
I
5pp
Sunday Monday
CALLS PER DAY OF THE WEEK
350
300
250
200
150
100
s0
Tuesday Wednesday Thursday Friday Saturday
INCIDENTS RESPONDED TO BY HOUR OF THE DAY
■ Cabs
--*—# of incidents
PAGE 13
ANNUAL REPORT YEAR 2018
Performance Indicators
General Information: Activities by Type
MAJOR INCIDENT TYPE # OF INCIDENTS % OF TOTAL
Rescue & Emergency Medical Service Incident
3,952
77.86%
Service Call
472
9.30%
Good Intent Call
330
6.50%
False Alarm & False Call
203
4.00%
Fire
58
1.14%
Hazardous Condition (No Fire)
48
.95%
Special Incident Type
13
.26%
% OF TOTAL
■ Rescue & Emergency Medical Service incident
Service Call
■ Good intent Call
■ False Alarm & False Call
Fires
■ Hazardous Condition (No Fire)
■ Special incident Type
PAGE 14
ANNUAL REPORT YEAR 2018
Performance Indicators
General Information: Funding Allocation
HOW THE FUNDS ARE ALLOCATED
■ Emergent; Res�n,e 69'4
Managernen: and Tran ng 7.4
■ Fre Pre;err, Fon 0-544
■ VC; un?ec 5uDaort ;-5%
Facurtes Maintenance 0-5%
General Information - Sources of Funding
The total budget for the Fire Department in 2018 was $4,336,045.00. The Fire
Department contributed 63.58% of its own budget or $2,756,700.00. The City's
General Fund contribution to the Fire Department, less revenue generated, was
$1,740,600.00.
Funds are allocated to one of five major functional areas:
• Emergency Feadiness
• Fire Suppression
• Emergency Medical Services
• Technical Rescue
• Includes Emergency Management
PAGE 15
9T 3!)Vd
saagwnu
STOZ pUe LTOZ aul ui paTaaIjaa se apew }uawliedaa ayj }eql sjaeqjjea jo Aagwnu
ayj paseaaaap Alleailseap pue ssauani4aa}3a asuodsa.i paseaaaui ppow asuodsaa
s,juauajaedaa ayj ui aSuep sigi -19pow 2uij}els wnwiuiw uosaad S e paldope
juawliedaQ 3AIJ ayl `9TOZ ul 's}uap!DUI pa}aea}oid ao aa2ael Alleaaua2 aae asagj
`sjuappui aai3 ao3 •delaano aainaas aol silex uaq m papaau Alleaaua2 aae s�aeqjjeu
`sluapiaui SW3 ao3 -jauuosaad aaaaea Ajnp-jjo Ao aaa}un]on aainbaa jeyj sluapiaui
asogl aae ,slaeqlleD,, -pad ui aae sasuodsad aai3 `an1q ui aae sasuodsad SW3
8TOZ LTOZ 9TOZ STOZ bTOZ £TOZ 0
3ald
SW3
3211d'8 SW3 3SNOdS3?J Al)133M
8TOZ STOZ OTOZ SON OOOZ S66T 0
S
3N13
SW3 3HIJ18 SW3 3SNOdS3H Alldd 39V83AV
Z
b
9
8
OT
ST
PUoiK-10A&
siolumpul aauu. ujoljad
STOZ dV3A idOdRf ivnNNV
ANNUAL REPORT YEAR 2018
Performance Indicators
Results
FIRES PER 12000
4
F
0
2010 2011 2012 2013 2014 2015 2016 2017 2018
There were 2.91 fires per 1,000 population in 2018.
PACE 1
ANNUAL REPORT YEAR 2018
Performance Indicators
Results: Response Times
For 2018, the average overall response time for calls, for initial dispatch to arrival
was 5.69 minutes.
Time Standard Met? Actual
Turnout Time
First Arriving Apparatus at Fire
Full First Alarm Fire Response (14-15 people)
EMS Response
Hazardous Materials (Operations)
Technical Rescue (Operations)
Marine Response
Wildland Fire - First Engine
2 min
90%
Yes
1:16 min
8 min
90%
No
8:27 min
18 min
90%
N/A
N/A
8 min
90%
Yes
6:27 min
8 min
90%
No
9:17 min
8 min
90%
No
2:24 min
28 min
90%
N/A
N/A
8 min
90%
Yes
7:12 min
Firefighters respond to a wide variety of situations, including medical emergencies,
fires, traumatic injuries, rescues and hazardous materials incidents. The incidents
are never scheduled, and the response required is often urgent. The common factor
in all of these incidents is the requirement for the rapid response of trained
personnel with adequate resources and equipment. Measuring this response time is
a key to judging the performance of the Department. Positive outcomes are
maximized when response times are reduced.
Legislation requires that career fire departments establish response time standards
and report those outcomes annually. The table above illustrates the response time
standards that were adopted by the Port Angeles City Council in 2008, and whether
those standards were met in 2018.
ANATOMY OF A 9-1-1 CALL
CALL
DISPATCH
TURNOUT
TRAVEL
Citizen Calls 9-1-1
9-1-1 center processes
From when units are
From when the unit starts
call and dispatches
dispatched to when crews
moving to arrival on -
units
are dressed in appropriate
scene.
protective gear and in the
apparatus ready to go
PAGE 18
ANNUAL REPORT YEAR 2018
Division Reports
Training
The Department is mandated to provide training, education and ongoing
development for all personnel commensurate with their duties and functions that
they are expected to perform. Both career and volunteer personnel receive training
that includes emergency vehicle operations, firefighting, hazardous materials and
emergency medical. Initial and on-going training is essential for the safe and
effective provision of emergency services. Tasked with protecting emergency
responders as they perform their duties, the general public, and the preservation of
property and the environment; the demand and complexity of training has grown in
response to an ever increasing expectation and responsibility to respond to natural
and man-made incidents. To meet this need it is essential that personnel receive
training that is current, relevant, reliable and available at the appropriate level for
the various skill levels of our personnel.
Volunteer Recruit Training
Port Angeles relies upon a combination of career and volunteer personnel for the
delivery of emergency services. Entry level volunteer members must successfully
complete:
175 hours of Emergency Medical Technician training
• 250 hours of basic firefighting skills training
These training activities are provided in conjunction with our partner fire and EMS
agencies through mutual assistance agreements. In addition to basic State
recognized certifications, volunteer personnel also receive college credit for
completing the Emergency Medical Technician program.
PAGE 19
ANNUAL REPORT YEAR 2018
Division Reports
Training
Fire Training
On-going fire training is provided through a combination of classroom and practical
application, specific skills evaluations and web -based training courses. This
combination approach provides approximately 90 hours of hands-on skills training
annually. Web based training provides members the ability to complete course
materials online, at their convenience 24/7. Historically, in -classroom instruction
required multiple classroom sessions specific to a single topic to accommodate the
multi shift and volunteer structure our members operate within. The Port Angeles
Fire Department trains in many areas such as:
• Incident management
• Firefighter safety
• Building construction
• Forcible entry
• Fire suppression
• Hazardous materials
• Emergency vehicle operations
• Emergency medical
• Vehicle extrication
• Special operations
• Confined space
• Water rescue
• Rope
PAGED
ANNUAL REPORT YEAR 2018
Division Reports
Fire Prevention: Inspection
Fire inspections are an integral part of an overall fire prevention program. Fire
inspections are conducted by on duty fire suppression personnel and the Fire
Marshal's office. When fire fighters visit a local business to conduct a fire
inspection they accomplish several objectives:
• The firefighters are meeting directly with the citizens who they serve. They
provide a direct connection between the community and the Department,
during a non -emergency event. These connections help foster a spirit of
teamwork.
• The firefighters are identifying items that could potentially start a fire,
contribute to the spread of a fire or endanger occupants. The prevention of
fires not only protects people, it keeps businesses in business. The fire
Department recognizes that as part of the community, we are essentially "all in
this together". We recognize that it is in our collective best interest to prevent
fires and keep businesses operating safely.
• The firefighters are familiarizing themselves with the structures in the
community, taking note of the type of construction, the ingress and egress
points, the locations of utilities and the contents inside. All of these pieces of
information can come into play when a fire officer is developing a strategy for
mitigating an incident in a building.
•Assembly
-certificate, of Occupancy
•C.cr)plamt & ccurr y
• Daycare
-Fire Alarm Acceptance, Annual Test & Halon Sy;tem Tact
-Hood & Duct Semi Annual v Acceptance
•
-Plan Reviews (auildine, =ire Alarm, =ire Sprinkler, Hoed and Duct;
•Re`errls
•
-Gccupancy inspec7icn,
•Spnnkiet nspect+cnr i -vdre =unai =1e:4 01„cernen; ArnuA Te_:f
-Tier 2 Reporun
-UST Abandcnment
-Permit Apphc_tion Reviews
• TOTAL INSPECTIONS
PAGE 21
ANNUAL REPORT YEAR 2018
Division Reports
Fire Prevention: Plan Review
As a part of the overall prevention effort, the Fire Department conducts reviews of
plans that are submitted for construction of various structures and systems. The
plan review process ensures that the proposed project meets the requirements of
the current edition of the International Building and Fire Codes, as well as
applicable provisions within the City Municipal Code.
The Department routinely reviews plans for structures, fire sprinkler systems, fire
alarm systems and restaurant hood and duct suppression systems. In addition, the
Department will assist the Planning Department by conducting reviews of
proposed variances, subdivisions, parcel changes, street vacations and special
event plans
Community Outreach
The Department enjoys
interacting with the
community and keeps its
doors open for community
events and opportunities to
engage with the public.
In 2018 the Port Angeles Fire
Department taught 4 Fire
Extinguisher Classes, monthly
First Aid and CPR courses and
gave many educational Station
Tours. The Department was
also able to participate in the
Port Angeles High School
Career Day as well as the
Peninsula College Safety Fair.
In July of 2018 we hosted the North Olympic Library System for their Summer
Reading program for the second year in a row, we had such a great time reading and
interacting with all of the children and their parents. We look forward to hosting
NOLS again in 2019.
PAGE 22
ANNUAL REPORT YEAR 2018
Division Reports
Fire Prevention: Public Education
Public Education is a critical element in any successful fire prevention program.
Surely "an ounce of prevention is always better than a pound of cure" and this is
especially true when it comes to the cost effectiveness of fire prevention efforts.
Public education about the causes and effects of fire is important for both young
persons and adults, and it is a message that needs to be spread whenever
possible. Firefighters are essentially doing fire prevention education every time
they point out issues during fire inspections. The fire prevention message is also
provided during tours of the fire station and at various community events
throughout the year.
Perhaps the single largest public education event we sponsor every year is Sparky
Week. In 2018, we sponsored the 66th Annual Sparky Week, an event where we
travel to every elementary school in the City and collect all of the second -graders
to bring them to the fire station for a fun and informative fire safety presentation.
This year we had 332 second -graders plus teachers and parents visit the Station.
PAGE 23
ANNUAL REPORT YEAR 2018
Division Reports
Fire Prevention: Fire Investigations
The Fire Department investigates all significant fires in order to determine where
the fire originated, and when possible, what caused it. Fire investigations can be
very labor intensive and, considering most investigations are taking place inside
burned structures; they can be hazardous as well. It is important to investigate
significant fires so that we can determine whether or not a crime may have
occurred, but perhaps more importantly, once we know what caused a fire, we
want to be able to take steps to prevent it from happening again.
In 2018 the Port Angeles Fire Department responded to 58 fire incidents and
conducted 8 extensive origin and cause investigations. All of the 8 investigated
fires occurred in residential occupancies. With exception to one incident involving
a fatality, each of these fires were limited to property damage only.
In large part due to the presence of heating, cooking, and smoking, a majority of
structure fires occur in residential occupancies. Unfortunately, residential
occupancies also account for the greatest occurrence of fire fatalities. Through
continued fire code enforcement, including smoke detectors, residential fire
sprinkler systems, and public education we continue to work toward making our
community and residents safer.
PAGE 24
SZ 30Vd
uoi}eanp3-aiignd/�ao•ed}u•nnmm//:sdITg
:aIisgann
2uinnollo} ay} le puno} aq uea uoileuaaojui Atales pue uoiJuanaad axil jo A aiaen y
•pazisegduaa
aano aq jouuea sw@IsAs aallulads leiluapisaa se Bans saanjeaj Ajales pappe pue
`ueld adeasa A:)ua2aauaa ue `saopajap a�ouas 2ui�aonn 2uineg jo aauejaodwi agl
'SUIUana 1egj sjuaw4mde Aiag} of uanjaa ol pannolle aaann sivapisaa
lie `aail agj Sulnnollol, aaeld ui ind sainseaw aaueuajuieuA pue anQaajoad awos
gjiM •nnolaq A IID@Aip auo ay} pue }uawliede leuiSuo ay} of pauie}uoa AlaniTelaa
seen a2ewep A@Ienn pue aall, pue juaplaui sigj o} anp paaeldsip a.iann sivapisaa agl jo
auou `WaISAS aalIuiads agl jo asuodsaa �ainb pue uoi}enijae a14ewolne agj o} ana
•juapiaui siyj uo saapuodsaa ADua2.lawa Aou s}uapisaa of saianfui ou aaann aaagl
`Ailnj� uegl *spaezeg Ouiuiewaa Aue aje2p!w pue aniaae o} lauuosiad 2uipuodsaa
pue adeasa of sjuednaao Molle o} aaij agj pauieluoa pue pajenljae Alpinb
walsAs aaijuiAs agj `uoilaaIoad Ajal.es alit pue asuodsaa isel aoj pau2isaa -wa}sAs
aal�uiads axil leijuapisaa aiTewolne ue glint\ 11inq pue pau2isap seen xaldwoa
juawliede sig} `Alajeunjao3 -Aial.es ajil luednaao of Asia pue anasaa aol lequalod
snoiaas agj paziuSoaaa Alaleip@wwi snnaaa asuodsaa GJVd `suoijejluail Al!ligow
gjinn sluapisaa awos of awoq si 1eg} xaldwoa juawlAede Al!wel -i}lnw e si ainlanals
sigj sy -uagali71 agj jo slauigea Aaddn agj o4 peaads Alpidea pue pallu2i q:)Igm
aauanq agj oluo palilds ued dol anoIs e ui llo jog `}uapiaui Bans auo up u@gDi! l
agj ui 2uileui2iao saiij lepuapisaa leaanas of papuodsaa snnaaa Aaua2aauaa `gTOZ ui
suoTjLI2T SaAUj aai3 :UOIIUaAa.ld a-IIJ
slaodag uoisinrQ0
8TOZ ?JV3A idod3a IVnNNV
ANNUAL REPORT
Division Reports
YEAR 2018
Support Officers
The Port Angeles Fire Department is extremely fortunate to have a Support Officer
Program. Support Officers are individuals who volunteer their time to the
community in order to provide much needed support to citizens who are
experiencing significantly difficult times in their lives. Working as Fire Department
volunteers, Support Officers provide assistance to friends and family members who
are in the midst of tragic circumstances.
Drawing upon their backgrounds in crisis management and counseling, Support
Officers tend to folks who might otherwise be overlooked in the confusion of a
chaotic event. Imagine the helpless feeling that a spouse must have as they watch
emergency personnel work to care for a long-time companion who may be
seriously ill or injured. There are countless questions, never -imagined issues and
often horrible uncertainties. Support Officers provide a caring, compassionate
position from which they can assist.
During 2018, Support Officers were called to 5 scenes. The Port Angeles Fire
Department initiated 4 of those requests, Clallam County Fire District 2 utilized our
Support Officer services once during the year.
The Support Officers give freely of their time - They are volunteers in the truest
sense of the word - and their services are incredibly appreciated.
Jerry Dean
Tim Hughes
Patrick Lovejoy
Gail Wheatle
�x
PAGE 26
ANNUAL REPORT YEAR 2018
Personnel Highlights
In 2018 the Department said
good bye to two retiring
firefighters. Paramedic Rob
Gunn served 22 years with the
Port Angeles Fire Department ,
while Lieutenant Kevin Denton
served 19 years. PAFD thanks
them for their dedication to our
community, they will be missed.
The Department was busy hiring in 2018. Chief Dubuc has always stressed the
importance of taking the time to find the right people rather than rushing to fill a
position. Nearly half of the entire Department has been here a year or less, there is
definitely a new energy in the station and we are proud of the new hires that have
been made. We hired three new Firefighters in 2018.
Harry Hause joined us as an EMT from North Kitsap Fire and
Rescue where he spent the last 2 years. He was born and raised
in the Seattle area. In his free time Harry enjoys fishing, hiking,
and playing with the family dog.
PAGE 27
ANNUAL REPORT YEAR 2018
Personnel Highlights
George Kourdahi come to us as an EMT from North Kitsap
Fire and Rescue. George was raised in Edmonds, he is
American -Lebanese and speaks Lebanese fluently. George
is currently completing , his AA in Fire Science at Everett
Community College. In his free time he enjoys playing
basketball, reading, traveling and spending time with his
family
Tyler Wildeman is not only new to the
Department but also new to Washington
State, in October he made the long drive
here from Denver, CO to accept the
position. Tyler served in the Marines for
7.5 years, he loves snowboarding, hiking,
hunting and spending time outdoors with
his dog.
PAGE 28
ANNUAL REPORT YEAR 2018
Department Highlights
In December of this year a severe
windstorm struck the Peninsula and had a
huge impact on the Department. The
Emergency Operations Center was initiated
and staffed. There was some significant
damage in our area, with the help of
Clallam County Emergency Management
and the State we were able to work
together to ensure the safety and well-
being of our community.
The Port Angeles Fire
Department Auxiliary hosted
the Annual Pancake Breakfast
with proceeds to benefit PAFD
Auxiliary scholarships, fire
relief baskets and community
outreach.
Operation Candy Cane was such a success this
year, these events wouldn't be possible without
our Volunteer and Career personnel who donate
their evenings to run through the streets of Port
Angeles collecting food and money donations to
help the local food banks.
I his is such a fun community
event and people truly look
forward to attending each
year.
v
r fl f
Rs
OPERATION q
CANDY L CANE
A mss. -401s '�'A % .�.
PAGE 29