HomeMy WebLinkAbout711 S N St - Building CITY OF PORT ANGELES
PUBLIC WORKS - ELECTRICAL DIVISION
t21 EAST STH STREET. PORT AN( El ES. WA 983¢,2
ELECTRICAL PERMIT ISSUED: 8/03/2001 PERMIT NO 7359
OWNER/APPLICANT PROPERTY LOCATION
HARRIS 711 N ST S
711 SOUTH N ST Lot: 13
Port Angeles, WA 98363 Block: II [] Long Legal
360/000-0000 Subdivision: Seamount Div
T: S: Parcel No: 063000980120000
CONTRACTOR ARCHITECT
OLYMPIC ELECTRIC N/A
1805 TUMWATER
PORT ANGELES, WA 98362 , 98360-0000
360/457-5303 360/000-0000
PROJECT INFO
Project Type: RES.REMODEL Project Value: $0.00
Occupancy Type: Construction Type: ADD CIRCUITS
Occupancy Group: Zoning Use:
Electrical Heat:
[] Baseboard 0 KW [] Riser [] Underground Service
[] Furnace 0 KW [] Overhead Service Voltage: 120,240
[~ Heat Pump 0 KW [] TempService Phase: [] 1 [] 3
[] Fan Wall 0 KW Service Size: 0
Feeder Size: 0
PROJECT NOTES
FEES ASSESSMENT Service: $0.00
Additional Feeders: $0.00
Circuit Wiring: $45.50
Temp Service: $0.00
Misc Fee: $0.00
TOTAL FEE: $45.50
AMOUNT PAID: $45.50
BALANCE DUE $0.00
(_'Q ~ _I M t~ix 'I'S/ACTION NEEDED
ELECTRICAL PERMIT INSPECTION RECORD
CALL 4 ! %4735 FOR ELECTRICAL INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. IT IS UNLA t4~FUL TO CO
INSULATE OR CONCEAL ANY WORK BEFORE IT IS INSPECTED AND ACCEPTED.
KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE
DITCH
ROUOH-IN / COVER ff6/'o t
SERVICE
GENERAL COMMENTS:
CITY OF PORT ANGELES
LIGHT DEPARTMENT
ELECTRICAL PERMIT
N~
18021
e2. - / '1 - pc:,!
Port Angeles, Washlngton..___u_u___u___._.._...___......___...___u___...___.___, 19'hhm'
In accordance with the City Ordinance to regulate the Installation, extension, or repair of elec-
trical equipment In, on, or about any building or other structure In the City of Port Angeles, per-
mission Is hereby granted to do electrical work as listed below.
Address uf.Llh:___.~un.Nm..uh___u...Uu___u.___uum.__u.___u___ occupancy___if..'?:-::?:::.___._muuu____..._u.u
Owner uu_.m_...~u.(___.: .__nuul9.__~.,?:u,..:.,,::<!___u. Tenant.___u._________u______mu____.______.un.___n.u.__..__.______uu
. .r)"nu. ,- -a".-. ..
Wiring Contractor ---~tJ'.LL!.~,-::---uuu,~<uh' By.__u____m__.__h____._____.____mu.___uh_h.._____._____n___u
Light OUtletB.......................~__..... Service, volts ...m................................. Type of Wiring:
V
Receptacle Outlets___.nn....................... No. wires .........................00.......__... Armored Cable ................-.............
Dryer, KW nn........n...__.______..______________
SIze wlres...___..__nm._..._mm___.....__.
Ra,ge, KW.._.____._....____..___..______.___..
Main fuse ..............................00.00....
Water Heater:
Enclosure n__............m__n....m___
KW.____m_______m____________________mm__.
Type of wIring:
Entrance Cable n.....m....mnm.......
He:lt: KW...._n._........_____....._n._..__..___...__...__
Motors: size, vol ts and phase:
Rigid Conduit ....__mm...__
MetallIc Tubing _.00_____............._....
Current transformers:
No. & Size.mm..mmm.m.............__..
Ser. No............--...................__.....__....
Ser. No. 0000__..00__..0000__.....00__....._....___...
Ser. No. ........00.....00.._000000.___._00_.__.......
Total Load.______________..............
Ser. No. .0000..00_...0000__..00___.__.._............
Remarks: ___uuuuu___UUUUUUhn__..____n_n_u____m__.u_______.________u___u.____________.u....Uh__u.n__u______u_________u___u___u_________
Total _....___._...___....____......_........
Non-Metallic ................................_
Knob & Tub....___...__..__.......____.......
Rigid Conduit ................y-
Metallic Tubing .mm__:n...............
- \
Raceway ..............................._._..._
Circuits, Light.............__.............._.........
Utility....n__n.nn___.._n___..____..........._.
Heat _____...._.....____..........___......._......
Range __.._______....__..________.____..._____.____
Water Heater ...............___....00.......
Motor ..._..........._.......__...__......__...._.
Dryer...____..._____..........._______.___._______..._
Furnace __..........._........._.'_......_........._.
......nnn..nUUn__nunn__h_____n__n_uuuu_unu.h._._.nn.n_n..nn__..n_.nu_u____...n_..n__un__nnnu_Un_nn___.___nunu_h.nn..__Un___
Permit Fee
. I,A- tfI (j
$___.__~.../.~_..===________u__.
Treas. Receipt p/
NO...Q...(q,).~....___
By ...1!:t..ud.~_~.~__.~:uu___u
- /'
NOTICE-Current must not. be turned on until Certificate of Inspection has been issued. It work is to be con-
cealed due notice must be given the Inspector so that work may be inspected before concealment.
NOTIFY THE INSPECTOR BY PERMIT NUMBER WHEN READY FOR INSPECTION
N~ 1 8 0 2 1
ELECTRICAL PERMIT
....7IL.......4..__......_'.~Nm'__'m.m._._._.......m..__.....m__.........._..............D.tem_"~...=.j...1.....=---e..':i.....
Address
::=::~~=;~~~~~~::::::22~~A;.~:::.::::~~:_::::::::::::::::.:::::_....~:~~_~t.:~:::::::::::::::::::::::::::::::::::::::::::::::.::::.::.::::
V
NOTICE-Current must not be turned on until Certificate ot Inspection has been issued. It work Is to be con-
cealed due notice must be given the Inspector so that work may be inspected before concealment.
1M Olympic Printers, Inc.
CITY OF PORT ANGELES
LIGHT DEPARTMENT
ELECTRICAL PERMIT
N? 16348
. ~-~O~,
Port Angeles, Washlngtonm:m_nm_mmn________m__m_____.__mm__m__m, 19__00000_
In accordance with the City Ordinance to regulate the installation, extension, or repair of elec-
trical equipment In, on, or about any building or other structure In the City of Port Angeles, per-
mission Is hereby granted to d6 electrical work as listed below.
Address _..__:!ll.n~~mnf)/.hnmmm_mnn___.__.hmn___mmn.m Occupancy---L!..L:-,-?.m..-m-.-.--h-h--mm
~; ...... 1': If') jJy
Owner __..__m-.::~d:~!:;~c:.__L.t:".:.._mL_:...:n::!:i::!J'..___...___...._ Tenant~___nnm..m_...._.mu...._u________..Udn.U.______.u.n...__
, " V
Wiring Contractor __.~{/{,,__::'::{':;__~_'_n.,_"__.":~'-"=__f*_~~~By..nmnmm--m--m--h.n_n__nmnnm__mn_____.n_.n__
- r- Ii -- I,' I
/ '} /_'-{.'" -' ;''.-i/.r.,
Light Outlets....................n.n......_.._..._ Service, volts ._.......n...~..._..................
J (i ~ ~ J
::;:::~-.._~;~~__:.:.:.-:.:::.:.:~:::::~:.::...:::.:. ::.~nw::::~~~~:if!~.~~:.
"-
-:'.;)
Enclosure ..........00..............00...........
V\Tnter FIeater: ~
.~.,;. .c.~
KW...nuu..:..~...-!.Uh.......U..h....n._
Heat: KW..../.~.E.:..~.~.~~;e:-:L~~....
Type of wiring:
Entrance Cable ......mnnno......
Motors: sIze, volts and phase:
/ f .
J r:. '".~.LA
h........;...~;;;..'j............................
....0000,.....,::......._:;:....._..........................
Rigid Conduit ...............................
MetalUc Tubing m..n
Current transformers:
No. & Size..........................n...........
Ser. No...............................................
SerA No..............................................
Ser. No. ..0000.........................._......00....
Total wad.............................
Type 01 Wiring:
Armored Cable ..moo.......................
Non.Metallic ................_m.....m..h.
Knob & Tube................n.....nn.....~.
RIgid Conduit ..........................._.h
M,etalllc Tubing ...........................
C lrc:::,e ::;h.~:::r[~~~:::~~:~~~~:~:~:~:~~=~::~
?
Utlllty......_..,...................................
Heat ....../..2......._.............__......
.,
Range .....~.:......................_._........._
-,
Water Heater ..~.~.......m......._.....
Motor .............................................
,)
Dryer ..........,....................................._
Furnace .........................._......_...........
.j"? ~/.
Total..........:!...........................
Ser. No. ..................h..........__.............
- P!
Remarks: __.__u____.__.:"2.~~_.~_-:=::.._~d!:::hn.___n(_~.:;l___:.!.."___~_ht.__.__u_..n__u..___.________nu.___________.____._______________.______OUd04__.
( -
nm_mmmu.._mnmnm.mnnnmnmmmmmumu.mhnumu_mn_u_.__n_____._.mmm-mn;;---;;v--mm-;;hmmm7T--m-m-
:.:=~_:;~_________________. ::~~_~:__~_~_~_~~~_~______n By ._g~l~:;:;~,~!.~_:~::~__:!:.~:::~.~{/..L1:,~_
" -
NOTICE-Current must n()t: be turned on until Certificate of Inspection has been issued. If work Is to be con.
cealed due n.otlce must be given the Inspector so that work may be inspected before concealment.
NOTIFY THE INSPECTOR BY PERMIT NUMBER WHEN READY FOR INSPECTION
.'
,
ELECTRICAL PERMIT / N,~,./16348
( ~I~
Address................_.._._......._..........................................................._......___........n..........................Date..._..._.__.._.._.._.__......._.,.~____....._.........
Owner ...............__.................._.........._......_......_.._........................................................... Tenant_...................................................................
Wiring Contractor........................................ ........................_....................................................._...By..............................................................
NOTICE-Current must not be turned on until Certlflcate of Inspection has been issued. If work is to be con-
cealed due notice must be given the Inspector so that work may be inspected berore concealment..
1M Olympic Printers, Inc.