HomeMy WebLinkAbout3654 5q
ORDINANCE NO.
AN ORDINANCE of the City of Port Angeles, Washington amending a
section of Chapter 17.10 and a section of Chapter 17.11 of the Port
Angeles Municipal Code relating to zoning.
THE CITY COUNCIL OF THF CITY OF PORT ANGELES DO HEREBY ORDAIN
AS FOLLOWS:
Section 1. Ordinance 1709 as amended, and Chapter 17.10 of the Port Angeles Municipal
Code are hereby amended by amending a section of Chapter 17.10 as follows:
17.10.050 - Area, dimensional, and density requirements.
A. The following area and dimensional requirements apply to all R7 zones:
Table 17.10.050-1: Area and Dimensional Requirements
Measurement Type Limit
Minimum lot area 5,000 sf
Minimum lot width/frontage 35 feet
Density, minimum net n/a
Density, maximum net n/a
Maximum building height 30 feet
Maximum lot coverage 45%
Maximum site coverage 65%
Minimum front setback 2-0 15 feet
Garage entrance setback 20 feet
Minimum rear setback 20 feet
Minimum side setback 5 feet
Minimum side setback (street) 13 feet
Minimum side setback (alley) 5 feet
Detached Accessory Structure Requirements _
Minimum rear setback for accessory structures in the rear one-third of 10 feet
the lot
Minimum side setback for accessory structures in the rear one-third of'! 3 feet
the lot
Not to exceed the
Maximum building height primary
structure building height
Not to exceed the
I
Maximum building footprint primary
� structurerebuilding
footprint
1 A 25% height bonus is available if the detached structure is within the building envelope
required of a principal structure in the zone that the property is located. Provided,
however,that additional minimum setbacks to ensure a safe building site may be required f
when the property contains a bluff, ravine, stream, or similar feature as specified in Title
i
15 PAMC.
B. In locations where stormwater runoff from structures, paved driveways, sidewalks, patios and
other surfaces is designed to infiltrate on-site, according to the requirements in Chapter 5 of
the City of Port Angeles Urban Services Standards and Guidelines manual, portions of the
project can be exempt from lot and site coverage calculations. (See PAMC 17.94.135 for
exemptions.)
C. Conditional uses shall comply with the development standards in subsection 17.94.065.
Section 2. Ordinance 1709 as amended, and Chapter 17.11 of the Port Angeles Municipal
i
Code are hereby amended by amending a section of Chapter 17.11 as follows:
17.11.050 - Area, dimensional, and density requirements.
A. The following area and dimensional requirements apply to all R9 zones:
Table 17.11.050-1: Area and Dimensional Requirements
{ Measurement Type Limit
Minimum lot area 7,000 sf
2
I
Minimum lot width/frontage 50 feet
Density, minimum net _ n/a
Density, maximum net n/a
Maximum building height 30 feet
Maximum lot coverage 40%
Maximum site coverage 60%
Minimum front setback 2-5 20 feet
Garage entrance setback 20 feet
Minimum rear setback 25 feet
Minimum side setback 7 feet
Minimum side setback(street) 13 feet
- Minimum side setback (alley) _ 7 feet
j Detached Accessary Structure Requirements
Minimum rear setback for accessory structures in the rear one-third of 10 feet
the lot
Minimum side setback for accessory structures in the rear one-third of 3 feet
the lot
Not to exceed the
Maximum building height r primary C
structure building height
Not to exceed the
primary
Maximum building footprint structure building
footprint
1 A 25%height bonus is available if the detached structure is within the building envelope
required of a principal structure in the zone that the property is located. Provided, however,
that additional minimum setbacks to ensure a safe building site may be required when the
property contains a bluff, ravine, stream, or similar feature as specified in Title 15 PANIC.
B. In locations where stormwater runoff from structures, paved driveways, sidewalks, patios and
other surfaces is designed to infiltrate on-site, according to the requirements in Chapter 5 of
the City of Port Angeles Urban Services Standards and Guidelines manual, portions of the
», 3
project can be exempt from lot and site coverage calculations. (See PAMC 17.94.135 for
exemptions.)
C. Conditional uses. Conditional uses shall comply with the development standards in
17.94.065 PAMC.
Section 3. - Corrections. The City Clerk and the codifiers of this ordinance are
authorized to make necessary corrections to this ordinance including, but not limited to,
the correction of the scrivener's/clerical errors, references to other local, state, or federal laws, codes,
rules or regulations,or ordinance numbering,section/subsection numbers and any references thereto.
Section 4. -Severability. If any provisions of this Ordinance, or its application to any person or
circumstances,are held invalid,the remainder of the Ordinance,or application of the provisions of the
Ordinance to other persons or circumstances, is not affiected.
Section 5.-Effective Date. This Ordinance,being an exercise of a power specifically delegated to
the City legislative body, is not subject to referendum. This ordinance shall take effect five (5)
days after passage and publication of an approved summary thereof consisting of the title.
PASSED by the City Council of the City of Port Angeles at a regular meeting of said Council
held on the 17th day of December,2019.
Sissi Bruch, Mayor
APP VEDAS TO:,;
William E. Bloor, City Attorney
ATI
Kari Martinez-Bailey, City Clerk
4
Summary of Ordinances Adopted by the Port Angeles City Council on December 17, 2019
ORDINANCE NO.3653
AN ORDINANCE of the City of Port Angeles,Washington,AN ORDINANCE of the City of Port Angeles,
Washington,amending Title 13,Chapter 13.12 of the Port Angeles Municipal Code relating to the Industrial
Transmission electric rate classification.
This ordinance is not subject to referendum and shall take effect on January 1, 2020 after passage and publication of
summary.
ORDINANCE NO.3654
AN ORDINANCE of the City of Port Angeles,Washington,AN ORDINANCE of the City of Port Angeles,
Washington amending a section of Chapter 17.10 and a section of Chapter 17.11 of the Port Angeles Municipal
Code relating to zoning.
This ordinance is not subject to referendum and shall take effect 5 days after passage and publication of summary.
The full texts of Ordinances are available at City Hall in the Clerk's office, on the City's website at
or will be mailed upon request. Office hours are Monday through Friday 8:00 a.m. to
5:00 p.m.
Kari Martinez-Bailey
City Clerk
Published by summary: Sunday, December 22, 2019