HomeMy WebLinkAbout210 N Vine St - Building CITY OF PORT ANGELES
FIRE DEPARTMENT PERMIT
321 East 5~ Street, Port Angeles, WA 98362
BUILDING PERMIT ISSUED: 4/11/2001 PERMIT NO: 12593
OWNER/APPLICANT PROPERTY LOCATION
HELEN EDER 210 VINE N
210 N VINE Lot:
Port Angeles, WA 98362 Block: [] Long Legal
360/000-0000 Subdivision:
T: S: Pamel No:
CONTRACTOR ARCHITECT
PETTIT OIL N/A
638 MARINE DR
PA, WA 98363-0000 , 98360-0000
800/972-7002 360/000-0000
PROJECT INFO
Project Value: $700.00 SFD Units: 0 Commercial: 0
Project Type: ABANDON OIL TNK SFD SQ FT: 0 Industrial: 0
Occupancy Type: RESIDENTIAL Garage: 0
Occupancy Group: MFD Units: 0
Construction Type: MFD SQ FT: 0
Zoning Use:
PROJECT NOTES
SLURRY FILL TANK &CAP
FEES ASSESSMENT
Building Permit: $0.00 Misc Fee 1: ABANDON OIL TA $15.00
Plan Check: $0.00 Misc Fee 2: $0.00
State Sumharge: $0.00 Misc Fee 3: $0.00
House Moving: $0.00
Manufactured Home: $0.00
Sign: $0.00 TOTAL FEE: $15.00
Plumbing: $0.00 AMOUNT PAID: $15.00
Mechanical: $0.00 BALANCE DUE: $0.00
Radon: $0.00
This permit becomes null and void if work authorized is not commenced within 180 days, if work is suspended or
abandoned for a period of 180 days afer the work has commenced, or if required inspections have not been requested with
180 days from the last inspection. I hereby certify that I have read and examin~l this application and know the same to be
true and correct. All provisions of recognized standards, laws and ordinances governing this type of work will be compled
with whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel
the pro, visions of any state or local law regulating the work specified in the permit.
Signature of Contractor or Authorized Agent Date Signature of Owner (if Owner is builder) Date
FIRE PERMIT INSPECTION RECORD
Call 360-417-4655 for fire inspections. Please provide a minimum 24-hour notice. It is unlawful to cover, insulate
or conceal any work before inspected and accepted. Post permit in a conspicuous location.
KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE
Inspection Type I Date Passed Comments
FIRE SPRINKLER
Underground piping hydrostatically tested
Underground piping flushed
Interior piping hydrostatically tested
Interior piping inspection
Dry system air tested at 40 psi (24 hours)
Sprinkler final
FIRE ALARM
Rough-in inspection
Alarm final
LP-GAS Completed by Contractor:
Underground piping inspection/pressure test Test # 1
Above ground piping inspection/pressure test Piping pressure test psi
Time initiated
Tank (container) inspection Test #2
Appliance inspection Piping pressure test psi
Time initiated
LP-gas final
UNDERGROUND STORAGE TANK (UST) ABANDONMENT
Removal of flammable/combustible liquids
Tank appropriately abandoned
UST abandonment final ~r" /'~ ~
PERMIT OTHER (specify)
permit final
GENERAL COMMENTS:
2/15/00