HomeMy WebLinkAbout131 E 1st St - Engineering CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY DEVELOPMENT - BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Application Number ..... 03-00000131 Date 10/13/03
Property Address ...... 131 E 1ST ST
ASSESSOR PARCEL NUMBER: 06-30-00-5-1-1675-0000-
Tenant nbr, name ...... ABATE OF WASHIGNTON
Applicat±on description . . . PUBLIC WORKS UTILITES
Subdivision Name ......
Property Zoning .......
Application valuation .... 0
Owner Contractor
NAVAL LODGE BPOE OWNER
131 E 1ST STREET
PORT ANGELES WA 98362
( 36) 457-3355
Permit ...... RIGHT OF WAY
;~ditional desc . . RIGHT OF WAY USE %03-26
Permit Fee .... 5.00 Plan Check Fee . . .00
Issue Date .... 10/13/03 Valuation .... 0
Expiration Date . . 4/11/04
Qty Unit Charge Per Extension
BASE FEE 5.00
Fee sunmlary Charged Paid Credited Due
Permit Fee Total 5.00 . 5.00 .00 .00
Plan Check Total .00 .00 .00 .00
Grand Total 5.00 5.00 .00 .00
Separate Permits am required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes
null and ,void if work or construction authorized is not commenced within ~180 days, if construction or work is suspended or abandoned
[or a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last
inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of
laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Signature of Contractor or Authorized Agent Date Signature of Owner (if owner is builder) Date
T:\PLANNING\FOKMS\I 102.15 [4/2002]
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY DEVELOPMENT - BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
Application Number
pin number
Property Address
ASSESSOR PARCEL NUMBER:
Tenant nbr, name
Application description
Subdivision Name
Property Use
Property Zon~ng . . .
Application valuation
04-00000274 Date
.994680
131 E 1ST ST
06-30-00-5-1-1675-0000-
ELKS LODGE
PUBLIC WORKS UTILITES
4/08/04
CENTRAL BUSINESS DISTRICT
o
Owner
Contractor
NAVAL LODGE BPOE
131 E 1ST STREET
PORT ANGELES
( 36) 457-3355
WA 98362
HOCH CONSTRUCTION
4201TUMWATER TRUCK TRAIL
PORT ANGELES WA 98363
(360) 452-5381
Permit
Additional desc
Permit Fee
Issue Date
Expiration Date
RIGHT OF WAY
RUP # 04-12
60.00
4/08/04
10/05/04
Plan Check Fee
Valuation
.00
o
BASE FEE
Extension
60.00
\)J
Qty Unit Charge Per
""'-.
Fee summary Charged Paid Credited Due
----------------- ---------- ---------- ---------- ----------
Permit Fee Total 60.00 60.00 .00 .00
Plan Check Total .00 .00 .00 .00
Grand Total 60.00 60.00 .00 .00
\1)
"
----
~
'1
~
Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned
for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last
inspection. I hereby certify that I have read and examined this application and know the same to be true and correct All provIsions of
laws and ordinances governing this type of work Will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Signature of Owner (if owner is builder)
Date "
Signature of Contractor or Authorized Agent
Date
T \PLANNING\FORMS\1102 15 [11/14/2003]