HomeMy WebLinkAbout315 E 1st St - Engineering
PUB/LIe WORKS & R/W PERM/T
o Attached Notes
OWNER/APPLICANT
KELLY GABRIEL
173 GANDALF RD.
Port Angeles, W A 98362
000/604-2623
PROJECT INFO
Work is:
Plans Required: Start Date:
Contractor: QWEST COMMUNICATIONS
Performance Bond Required: Amount:
Proof of Insurance:
Work to Perform:
Issued:
2/05/2002
Permit No:
Work Order:
1244
o
PROPERTY LOCATION
315 1ST ST E
Lot: 13&14
Subdivision: N R SMITH
Parcel No: 063000511850000
Block: 18
D Long Legal
Value Work:
$0.00
II
Finish Date:
360/000-0000
1 1
$0.00
D Install
D Repair
D Watermain
D Sanitary Sewer
D Storm Drain
c><J Underground Tele/Elec
D Mise
push
PROJECT NOTES
push under alley between Front & E. 1st Street approx 3D'
FEES ASSESSMENT
1.) RlW Excav: $0.00 15.) Other San Sewer: $0.00
2.) Sidewalk: $0.00 16.) Sew Tap Wye/Man Tap: $0.00
3.) Curb/Gutter: $0.00 17.) Sew Capl W/M Removal: $0.00
4.) Driveway: $0.00 18.) Alter Repair Sewer: $0.00
5.) Dwy Culvert: $0.00 19.) Storm Drain: $0.00
6.) Street Cut: $0.00 20.) Catch Basin per ea: $0.00
7.) Other RlW: $0.00 21.) Sewer System Dev: $0.00
8.) Fire Hydrant: $0.00 22.) Milwaukee Dr. Sew Ass: $0.00
9.) Res Water Serv: $0.00 23.) RlW Use Perm: $0.00
10.) Comm Water Serv: $0.00 24.) Admin Cost (D.R.A) $0.00
11.) Other Water Service: $0.00 25.) ORA $0.00
12.)Water System Dev: $0.00 26.) Mise: $0.00
13.) San Sewer SFR: $0.00 TOTAL FEE: $0.00
14.) San Sewer MFR: $0.00
add unit 0 Amount Paid: $0.00
Receipt No:
Inspection Fee: $0.00 Balance Due: $0.00