HomeMy WebLinkAbout600 Block E 1st St - Building
MEMO
DEPARTMENT OF
COMMUNITY
DEVELOPMENT
Brad Collins,
Planning Director
417-4751
Sue Roberds,
Planning Specialist
417-4750
Debra Barnes,
Associate Planner
417-4752
Lou Haehnlen
Building Official
417-4816
Roger Vess
Penn it Technician
~ORTANGELES
WAS H I N G TON, U.S. A.
August 23,2001
j:~
\'
\\",
To:
Sue Roberds, Planning Specialist A
Lou Haehnlen, Building OffiCi~ If .
CUP - 01-06 Alpine Auto, rnc - 600 Block E. pt Street
~
~
1\
,C1j
,\
From:
Subject:
The Building Division has reviewed the application and has no comments.
f
Applicant:
Address:
APPLICANT/OWNER INFORMATION:
Jain
r:nnf
1l~,'hP
c7, .J D E:
Xr_
'Applicant's representative (if other than applicant):
Address: 0 E f-
a
Daytime phone #: Y 57 - If '18 !
Ja.Me~ IE' JOJ11160/1
Daytime phone . 'I Ii 7- 'I LI Q'1
Property owner (if other than applicant):
Address:~ J &l-:- /1-iIJ
Daytime phone #: /f52 -17 to 6
PROPERTY INFORMATION:
Street address: ;; C; 0 jJ It:) t: /( .J! FI' p1 " f
.
Legal description: Not'''''''''' A :?M;/I. L.-/" 1<1-)/ l1;;'ck2t)
Zoning: L 4- Comprehensive Plan designation: r: 61"1 <"A,_ I'.;; /
Property dimensions: } 00 X / 'f () Property area (total square feet): J :j 00 0
Physical characteristics (i.e., flat, sloped, vacant, developed, etc.):
r) ct +-
PROPOSED USE INFORMATION:
Please describe the proposed use:
QJ1,./ C" t" S .et/l oJ 11 >'<' j(';r> (
I f
.pI''' (jT J.. /{l/.J,If1 'J Ct1
1.1/
70
04(' J: -'j-"'''I1S4'Jt"r f-
I 01'
-to loan! ,II'} t!?"fp
7'-,.."",-/(( ,
,
;;'c n ':7',,/'-A
{)l"j'OF'
I
Number of employees: J? Hours of operation: oJ 'J
Number of on-site parking spaces: N m Number of off-site parking spaces: p
Building area (total square feet of floor area for the proposed activity):
SIGNATURES:
Applicant: I certify that all of the above statements are true and complete to the best of my knowledge and
acknowledge that wilful misrepresentation of infamation will terminate this permit application. I have read this
application in its entirety and understand my that submittal will be reviewed for completeness and, if found to
be complete, will be scheduled for the next available Planning Commission meeting.
Applicant's Signature ~~ ~ ~~_ Date '3 - /0 '0 I
,/ 7
Owner's Signature (if other than applicant).
Date
0/;0/07
I I
.5i.zf +
f, '( '7 -;-
--r----~~-.--- - ~~-----~__r_-.~~---
I
------ . (
-,---'
\
~
[:)
,-
"
.::,
0\
:>-
'J
"D
~
'"
~
'"
J
'"
p
'1\
"
)
"
'"
~
,
'"
II
I,
! I
I
,...
....'"""'\ I
~. Y \r-!
~:('~
y....:Pf'^'i'
\
\
fv"cfO?(~
Lc." dSI "-
qfi
~? "
"
5'"Jo/./ f; ~
t f ,c'B\vJ
,,/
\(ytl
yX c,\\\
\ ,\1.
II' r
t~ Ie
\,\
CG
rDV!~ PO I ~
Q
- "'-------- .--------- -
;J!/ -fl
,
,
,
,
'.
f'rtrJ'05P), I
L4'I'1 JSC"?b I
r I
fill it
E;../~ 7,.,,?
L/,o",'1
J!..e" --:.......
'.. ~
'"
'^
'"
.,J~,.~
):1,.,..,t-, ;
~. I~
,t- "":'9"">"1 I"
;t; i! '" I :-:-
, ,.
\ I\"'
I
I
~ ,
~
a
0:>
"
<:
""
~
<S'.
\"'--
""--
"".
'"
-,
'"
.-'
"
-.
~ORTANGELES
Filing Fee; *$150.00
*Admin. $ 75.00.
WAS H 1 N G TON, U. S. A.
CITY OF PORT ANGELES
ENVIRONMENTAL CHECKLIST
Purpose of Checklist:
The State Environmental Policy Act (SEPA), Chapter 43.21C RCW, requires all governmental
agencies to consider the environmental impacts of a proposal before making decisions. An environmental
impact statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the
quality of the environment. The purpose of this checklist is to provide information b help you and the agency
identify impacts from your proposal (and to reduce oravoid impacts from the proposal, if it can be done) and
to help the agency decide whether an EIS is required.
Instructions for Applicants:
This environmental checklist asks you to describe some basic information about your proposal.
Governmental agencies use this checklist to determine whether the environmental impacts of your proposal
are significant, requiring preparation of an EIS. Answer the questions briefly, with the most precise informaticn
known, or give the best description you can.
You must answer each question accurately and carefully to the best of your knowledge. In most
cases you should be able to answer the questions from your own observations or project plans without the
need to hire experts. If you really do not know the answer, or if a question does not apply to your proposal,
write "do not know" or "does not apply" (N/A). Complete answers to the questions now may avoid
unnecessary delays later.
Some questions ask about governmental regulations, such as zoning, shoreline, and landmark
designations. Answer these questions if vou can. If you have problems please ask the City Planning
Department employees to assist you.
The checklist questions apply to all parts of your proposal, even if you plan to do them ov~ a period
of time or on different parcels of land. Attachany additional information that will help describe your proposal
or its environmental effects.
BACKGROUND
1. Name of proposed project:
A.
Address or general location of site:
6('['
jj IN/( $.,u,r .p,'df
2. Name, address, and phone number of applicant: ;}"~<. $. ;y"J",.N.
8;; t' E.',.. t r,.", t' ,P/l
]it" - g'N:? - H'1'1
3. Name, address and phone number of contact person if other than applicant: NIA
4. Date checklist prepared: 8 - '1- c }
5. Agency requesting checklist:
CITY OF PORT ANGELES
6.
Proposed timing or schedule (including phasing, if applicable):
A. What is the long term Objective of this prop~sal?
/0 6 Ie 0. '1 P"Bffl'f'j .,t' eM fcuY/;,-.",eYJ'!-s
,h",:(d""'1 ~/' f"+,, ,0"- SC{ /e-. I'D ~s e (JO/'
fc.r)c""'l lo+- c/.""""9 -fJa...."",'-17 On ::;,-.;.., t'Jt-
-1'." f'''~5 ,), Ie..
'Tr<<;1 fttFtI,.,1-
c6....ior"'>,e"'f5
Environmental Checklist
Page 3
PROJECT SPECIFIC ACTIONS:
Complete this section if your proposal involves a project specific action such as
a subdivision, new construction, a new or expanding business, a site specific rezone
(not area-wide), a conditional use permft, a shoreline permit, or similar action:
ENVIRONMENT
1. Earth
A. General description of the site (circle one):
lfwrolling, hilly, steep slopes, mountainous,
ot er
B. What is the steepest slope on the site (approximate percent slope)?
o - / %
C. What general types of soils are found on the site (for example,clay,
sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify
them and note any prime farmland. ( C . L
e dl.) etY1 "'/IT
D.Are there surface indications or history of unstable soils in the immediate
vicinity? If so, describe.
^ie
E. Describe the purpose, type, and approximate quantities of any
filling or grading proposed. Indicate source of fill: .8 /q?/( fw> fa r k, 11 i
C{ll-f"[. ani p,')( fel" /JoE
F. Could erosion occur as a result of clearing, construction, or use?
If so, generally describe.
Ale {;t.. be /04< NR1'1'/1ho'.'^9 Irojwi,!
G. About what percent of the site will be covered with impervious surfacES
after project construction (for example, asphalt or buildings)?
7{1~
H. Proposed measures to reduce or control erosion, or other impacts to
the earth, if any: r . f {)o c:
r({(II""'1.....'\; e'(/l'" b-
2. Air
A. What types of emissions to the air would result from the proposal (i.e,
dust, automobile, odors, industrial wood smoke) during construction and when the
project is completed? If any, generally describe and give approximate quantities if
known. c /. J-
pc. ;<//)('l/.t 'J 7
B. Are there any off-site sources of emissions or odor that may affect you
proposal? If so, generally describe.
No
C.
to air, if any:
Proposed measures to reduce or control emissions or other impacts
r (j n die. "-f""'1
EVALUATION FOR
AGENCY USE
Env:ironmental Checklist
Page 5
ii.) Could waste materials enter ground or surface waters?
If so, generally describe. ;/0
D. Proposed measures to reduce or control surface, ground, and runoff
water impacts, if any: .5 u . -"' ~ j),.. /
M-JY} /7 l'Or .q ~ ,,"'-
4. Plants
A. Check or circle the type of vegetation found on the site:
/ deciduous tree: alder, maple, aspen, other
V'evergreen tree: fir, cedar, pine, other
shrubs
7grass
pasture
crop or grain
wet soil plants: cattail, buttercup, bullrush, skunk cabbage,
water plants: water lily, eelgrass, milfOil, other
,/Other types of vegetation
B. What kind and amount of vegetation will be removed or
altered? fJlc;cK 1.,("'''7 1/..',><2"
C. Proposed landscaping, use of native plants, or other measures to
preserve or enhance vegetation on the site, if any. f,,--':;/'~ b~,...6~ '" I'I"",~
Ci" j> I't;f ,."h; $Jq, I,
5. Animals "
A. Circle any birds and animals which have been observed on or near the
site or are known to be on or near the site:
Birds: hawk, heron, eagle~ongbird~ other
Mammals: deer, bear, elk, beaver, other
Fish: bass, salmon, trout, herring, shellfish, other
B. Threatened or endangered species known to be on or near the site.
/Y~Yl c...
C. Is the site part of a migration route? If so, explain.
No
D. Proposed measures to preserve or enhance wildlife, if any.
JVc v"'-
6. Energy and Natural Resources
A. What kinds of energy (electric, natural gas, oil, wood stove, solar) will
be used to meet the completed project's energy needs? Describe whether it will be
used for heating, manufacturing, etc.
$-/Uf;,IL L 'fhh
EVALUATION FOR
AGENCY USE
Environmental Checklist
Page 7
- G. What is the current Shoreline Master Program designation of the site?
~ H. H~y part of the site been classified as an "environmentally
sensitive" area? If so, specify.
N4
I. How many people would reside or work in the completed project?
lS
EVALUATION FOR
AGENCY USE
J.
displace?
Approximately how many people would the completed project
D
K.
Proposed measures to avoid or reduce displacement impacts,
if any:
N€'>1 ~
L Proposed measures to ensure the proposal is compatible with
existing and projected land uses and plans, if any: H)} J
. C;+'1 q ell V.' re
9. Housing
A. Approximately how many units would be provided, if any?
Indicate whether high, middle, or low-income housing.
/'! DYlC-
B. Approximately how many units, if any, would be eliminated?
Indicate whether high, middle, or low-income housing.
A!o,rtc:::.....
C. Proposed measures to reduce or control housing impacts, if any.
10. Aesthetics
A. What is the tallest height of any proposed structure(s), not including
antennas; what is the principal exterior building material(s) proposed?
) i r ~h r ovA /Oc(dLd '[;t.<<Jr J
'penCC ProfJe...r7 /;tJl!." 4cCM'J.'M/'1
B. What views in the i'nmediate vicinity would lie altered or obstructed1
None..
None...
11.
C. Proposed measures to reduce or control aesthetic impacts, if any.
rrht.e j;"f/j frrl~f'J /;~es/. 1a.(IJ7GQp;(\1
Light and Glare
A. What type of light or glare will the proposal produce? What time of dq>
it mainly occur? /'1.'7 h f-
would
B. Could light or glare from the finished project be a safety hazard
or interfere with views?
No
Environmental Checklist
Page 9
E. Will the project use (or occur in the immediate vicinity of)water,
rail, or air transportation? If so, generally describe. )~
F. How many vehicular trips per day would be generated by the
completed project? If known, indicate when peak volumes would occur.
1 rn ;"J r?@""''''J
G.
Proposed measures to reduce or control transportation impacts,
if any.
JI(!~
15. Public Services
A. Would the project result in an increased need for public services
(for example: fire protection, police protection, health care, schools, other)? If sq
generally describe.
)/0
B.
services, if any.
Proposed measures to reduce or control direct impactson public
ND(1.f'.
16. Utilities
A. Circle utilities currently available at the site: electricity, natural
gas, water, refuse service, telephone, sanitary sewer, septic system, other.
B. Describe the utilities that are proposed for the proje:;t, the utility
providing the service, and the general construction activities on the site or in the
immediate vicinity which might be needed.
121 e c.fv. ,I c...
17. Economics
A. If the proposal will result in expansion of an existing business,
please describe the nature of the expansion: (e.g., additional land and/or
buildings, new equipment, new employees).
Nc'ne.
B. If the proposal is the creation of a new business, please describe
(e.g., re-use of an existing building and site, construction of a new building).
C. . Describe if the proposal is the first of its type in the com.wunity,
or what the similar uses are. par"J<I'" '7 77p)<:q! of"
C(&fo dett1eY/.,A:fJ5 7
D. How many people will the proposal provide employment for at
its completion and what types of jobs will be created (e.g., sales clerks, factory
"3 .01/\';"1
EVALUATION FOR
AGENCY USE
Environmental Checklist
Page II
4. What is the current land use between the project and the
potentially affected water body (parking lot, farmland, etc.)? Pnl,l,'OdH'
5. Is the project above a: ( ) natural permanent barrier (waterfall)
natural temporary barrier (beaver pond); ( ) man made barrier (culvert,
dam); ( ) other (explain)
6. If you checked any of the items listed in the above question #5,
are there any resident salmonid populations above the blockage? Yes_
No Don't know
7. What percent of the project will be impervious surface (including
pavement and roof area)? 70 "/0
.
B. FISH MIGRATION: The following questions will help determine if this
project could interfere with migration of adult and juvenile fish. (Both
increases and decreases to water flow can affect fish migration.)
1. Does the project require the withdrawal of:
Surface water? Nt' Name of surface water body
Ground water? No Amount
From where? Depth of well
2. Will any water be rerouted? lYe
3. Will there be retention ponds? No
If yes, will this be an infiltration pond or a surface discharge to
either a municipal storm water system or a surface water body?
If a surface water discharge, name of waterbody
4. Will new roads be required? !yr (Increased road
mileage
may affect the timing of water reaching a stream and may impact fish
habitat.)
5. Are culverts proposed as part of the project? JVo
6. Will topography changes affect the duration/direction of runoff
flows? If yes, describe: IV b
7. Will the project involve any reduction of the f100dway or
floodplain by filling or other partial blockage of flows? N(l If yes,
how will the loss of flood storage be mitigated by your project?
EVALUATION FOR
AGENCY USE
Environmental Checklist
Pagl> 13
Proposed measures to protect or conserve plants, animals, fish,
or marine life: "'. j. I
VYlOfP_ "'I' ""'."
, -I I Q~. )
3. How would the proposal be likely to deplete energy or natural
resources? 0~ y,] ~ ;;--r
Proposed measures to protect or conserve energy and natural
resources:
4. How would the proposal be likely to use or affect
environmentally
sensitive areas or areas designated (or eligible or under study) for
govemmental protection; such as parks, wildemess, wild and scenic rivers,
threatened or endangered species habitat, historic or cultural sites,
wetlands, floodplains, or prime farmlands? ,V 17 A-.f+' ~~ i-
Proposed measures to protect such resources or to avoid or reduce
impacts:
5. How would the proposal be likely to affect land and shoreline
use, including whether it would allow or encourage land or shoreline uses
incompatible with existing plans?
Ne 11 (
Proposed measures to avoid or reduce shoreland and land use
impacts:
6. How would the proposal be likely to increase demands on
transportation or public services and utilities?
N:- 41+-: '. P--
Proposed measures to reduce or respond to such demand(s):
EVALUATION FOR
AGENCY USE