Loading...
HomeMy WebLinkAboutCC Agenda Packet 07192022 July 19, 2022 Port Angeles City Council Meeting Page 1 July 19, 2022 City of Port Angeles Council Meeting Agenda This meeting will be conducted virtually. The City determined the meeting shall be held virtually when the July 19, 2022 City Council agenda was created on July 14, 20 22. The City will hold virtual meetings when a meeting cannot be held with “reasonable safety”. “Without reasonable safety” means that the COVID-19 risk is Moderate or High, per the dashboard located at https://www.clallam.net/coronavirus at the time the meeting is advertised. Listening and webcast options will be available at www.cityofpa.us The Mayor may determine the order of business for a particular City Council meeting. The agenda should be arranged to best serve the needs and/or convenience of the Council and the public. The Mayor will determine time of break. Hearing devices are avail able for those needing assistance. The items of business for regular Council meetings may include the following: A. Call to Order – Special Meeting at 5:00 p.m. – Budget Goal Work Session Call to Order – Regular Meeting at 6:00 p.m. B. Roll Call, Pledge of Allegiance Ceremonial Matters, Proclamations & Employee Recognitions C. Public Comment The City Council desires to allow the opportunity for Public Comment. However, the business of the City must proceed in an or derly and timely manner. Visit https://www.cityofpa.us/Live-Virtual-Meetings to learn how to participate during public comment and or watch the meeting live. Written public comments can be submitted to: council@cityofpa.us, comments will not be read aloud. To provide pre-recorded messages to the City Council by phone, please call 360 -417-4504. Messages received will be made a part of the final record. Comments should be received by 2:00 p.m. Tuesday, July 19, 2022. For audio only please call: 1-844-992-4726 Use access code: 2556 834 4778 Once connected press *3 to raise your virtual hand, if you wish to make a comment or public testimony. You will be notified when it is your turn to speak. This access code is good for the July 19, 2022 meeting only. If you are joining in through the Webex link: https://cityofpa.webex.com/cityofpa/onstage/g.php?MTID=ed7183718490f772d517226625b4a50cb and wish to make a comment or public testimony, please use the “raise your hand” feature in Webex. You will be notified when it is your turn to speak. Members of the public may address the City Council at the beginning and end of any Regular Meeting under "Public Comment ." During the "Public Comment" portion of the meeting, individuals may speak to agenda items, except those scheduled for a Publi c Hearing. The City Council desires to allow the opportunity for Public Comment. However, the business of the City must proceed in an orderly, timely manner. At any time, the presiding officer, in the presiding officer's sole discretion, may set such reaso nable limits as are necessary to prevent disruption of other necessary business. At its most restrictive, Public Comment shall be limited to a total of 15 minutes for the first Public Comment period and shall be concluded not later than 9:45 for the second Public Comment pe riod. Individuals may speak for three (3) minutes or less, depending on the number of people wishing to spe ak. If more than 20 people are signed up to speak each speaker may be allocated two (2) minutes. Individuals who are residents of the City or own businesses within the City will be called to speak first, with preference gi ven to those who wish to speak to an item on the meeting’s agenda. If time remains, the presiding officer will call other individuals wishing to speak, generally in the order in which they have signed in. If time is available, the presiding officer may call for addition al unsigned speakers. July 19, 2022 Port Angeles City Council Meeting Page 2 Persons speaking shall state their name, whether they reside within the City limits, whether they have any other pertinent co nnection to the City, and whether they are appearing as the representative of an organization. Excerpts: Council Rules of Procedure Section 12 D. Late Items To be placed on this or future agendas, including any executive session needed during or at the end of the meeting. E. Consent Agenda | Approve 1. City Council Minutes of June 7 and June 21, 2022 / Approve ......................................................................................... E-1 2. Expenditure Report: From June 25, 2022 to July 8, 2022 in the amount of $2,097,874.99/ Approve ............................. E-9 3. 2022 Landfill Beach Nourishment Project CON-2022-39 / Award a construction contract with 2 Grade LLC of Port Angeles, WA, for the 2022 Landfill Beach Nourishment Project, CON-2022-39, in an amount not to exceed $34,752.35; and authorize the City Manager to sign all documents necessary to execute the construction contract for the project and to make minor modifications to the contract, as necessary. .................................................................................................................... E-35 4. Electric Utility 2022 Resource Plan / Pass the attached resolution to set a public hearing on the City’s proposed biennial update to its Power Resource Plan for the regular Council meeting on August 16, 2022 and give notice of that hearing ......................................................................................................................................................................................... E-36 5. Letter of Support and Partnership for National Endowment for the Arts (NEA) Grant / Approve the letter of support of the Port Angeles Fine Arts Center seeking an Our Town grant through the National Endowment of the Arts to formalize a new arts district in Port Angeles ............................................................................................................................................ E-41 6. Harbor Cleanup Process –Authorizing Payment of City Deposit to Port in the Amount of $14,000 / Harbor Cleanup Work Order #4 / Authorize payment of $14,000 to the PLPs group account ............................................................................ E-42 7. Sub-recipient Agreement with OlyCAP for Federal CARES Act CDBG-CV Funding for Clallam County (including Cities of Forks, Port Angeles and Sequim) / Approve and authorize the City’s Community Development Block Grant responsible official to sign and execute a standard sub-recipient agreement with OlyCAP and make minor modifications as necessary ......................................................................................................................................................................................... E-44 F. Public Hearings | 6:30 p.m. or Soon Thereafter ................................................................................................... None G. Ordinances Not Requiring Council Public Hearings 1. Ordinance Amendments – Accessory Dwelling Unit Utility Connections / Conduct 1st Reading / Waive 2nd Reading / Adopt Ordinance.............................................................................................................................................................. G-1 2. Building Permit Fee Reductions / Conduct 1st Reading / Waive 2nd Reading / Adopt Ordinance .................................. G-7 3. Second Amendment to the 2022 Budget/ Conduct 1st Reading / Continue to August 16 ................................................ G-15 H. Resolutions Not Requiring Council Public Hearings 1. American Rescue Plan Act Funding Approval and Subrecipient Agreement with the Olympic Peninsula YMCA / Pass Resolution / Approve and Authorize ................................................................................................................................ H-1 I. Other Considerations 1. Fleet Presentation / View Presentation 2. Bird Rides, LLC. / Council Discussion ........................................................................................................................... I-1 J. Contracts & Purchasing 1. Signal Controller Upgrades – Professional Services Agreement PSA-2022-24 / Award and Authorize ......................... J-1 2. Amendment to Water Contract between City of Port Angeles and McKinley Paper Company / Approve and Authorize.......................................................................................................................................................................... J-81 3. Equipment Purchase – Replacement of Police Vehicles / Approve Purchases ............................................................... J-83 K. Council Reports July 19, 2022 Port Angeles City Council Meeting Page 3 PUBLIC HEARINGS Public hearings are set by the City Council in or der to meet legal requirements. City Council may set a public hearing in order to receive public input prior to making decisions which impact citizens. Certain matters may be controversial and City Council may choose to seek public opinion through the public hearing process. L. Information City Manager Reports: 1. Monthly Update on Past Due Utility Accounts - June ........................................................................................... L-1 2. 2021 Year End Financial Report .................................................................................................................................... L-2 M. Second Public Comment Follow the instructions from the first public comment period. Adjournment v J W M� W z N w W �C o M ON op O � °� w r., O �n - Ll LV >% m 4. nPik- O li ' t s 'e E 'l �i WON 4 N N N O N o L I �M cz LU M � by0 N X W Z -° o � a� O 0 M m N Z U � W D oM m Q � M O N M OZ J >- CL U U v, a � a ~ Ja a Q u a N H u O w � C7uz N 04Qa a J W Z s O U �-j aA Z � �� zW Z 4O -L- �1 5 c: u _ m W to Zuj � O Q Q � Z 0 a Q o �> s 4 .0 (1) Co a, � 0Ln _I- LU o E s m L O +� N W (� 0- -a U 0 Q N U c - m +�+ _0 =3 - M U -0 U .� O N d N N O N O� I O r ui Z v O 4-1 CL — N � v .� N � � > O U Lu L7 bn U •� +� N N ca U v CL U O m O U i cn oO Q a--+ }, ON a-J M � N O N U L J � N }' Q Q OL > •v � � � M N N •Q U L � O 41 0 � � 41 N � LO •� � � v � tL0 •— � Y � N '� '} 'n cn O 41 X U Q 3 cB O 41 O 41 � N �+ • � � � L O 41 � •L U � +' � O N O p 41 L1 O O N r-I • N U � L � N � N L � � • f�6LU �O �n `O E O N a dOA 0 — O co 'a N O co 0 ++ Ln •— . N � t O •� N Q v N 0 O 04% +, �n co � on o O v co N ++ j z U •> � s ° ° " " LL� � � o ( i � is W U cOn 02 0 ,0 ++ V� z O O z •`=' o O Q 4-J 3 O m CA a x Q o vCA 0O W CA a W CA M CA V , a--� ca 0 v v wo O _ Em N �! M N 0 0 0 0 0 o^ 0 0 CD oN o Z o 60L`b91$ ■ Z89`ti5 I$ W orti`Lz$ o ° L IOL 6Z£$ _ .ro t� o 106`60£$ 0 , z 8£0`l sz$ " c N � m N W O I`9£ti$ M � �j N Z8£`£9Z$ c = 'o •► 00 I`S9 I$ w � W - Lti9`1£z$ blo Sb£`b61$ o ' 806`6L$ o N N I W ` � z 1£`tioz$ r ' Z 0£6`I£I$ v O L91`Sbl$ z' U o Q `O Q cz o 16L`I L$ ' ~ H W 9LZ`9L$ N O N ELO`66E`Z$ ~, ILE`E81`Z$ o cz W N N N J 1 1 d C tl O u 19L`ZOS`I$ N U L � QL 10`9hZ`I$ L, .5 U , O 19L`E9L`Z$ W b£h`Z S S`Z$ o r n W CL V N o 0 0 0 0 0 N o Lq C L o L m ri N O N b4� � � � b O N 00 W L o E O O ca -0 = c,rj � E o a) z � ( •o by N W >' 0, N No O N a ( Sri o: x W _0 •L, V ° � o L N � a� V f6 I W � cn 4-' cn V O _� a)'V o Q Vf Q N •V) Ln ro 4' p 0 V � LU a 0 c �_ � _0r Q Q c O ca ca ca O �? IME X (3) _0 N CON Q 7 (3) Q -0 LU Q X 0 LL � a' O '� =3 Q Q cn — O +_+ O � ca �' 4-10 CL X _ N > 0 LA aJ L7 Q ca Q N � m O M 0 N 014 V O _.+ V O 4-j i = V � J o 0 u ,o N zL. N Q o u � _ z z _ Lnn o� LU o� Q O soft 0� W � J Or � � Q �, 4-, o a >00 S o W oj 0 > o = m o a M m 0 N O I f� �O — Q i _0cn .— .- aA E ca 0 -0 U ca a--+ O N }, ._ N cn ca O U > ?� � N N N =4-0 N O N N •> O O O J Q O cn Om � 0 0 0 Q) � -I-- � •j u � � � � N ° ° roU �n N � � +j p `n N N � }' N M eq z � — " +� N O N p cn ._ ca +-+ � N p O ca p 'N •c_n U Q ro Q O C: o o u0 Ln -0 4- — — — �U a--' O N Q ca O C ca p •� E N aA U Z o Z +�-+ N U N aA — `� O U v 0 E •� N : p U X V� On E ro U W _ O ° O U 0 � N p V� Q _ � � ate--+ � � N p '� O O O a--+ N }' - o o -0 Q >. o ° a� _ _ -0 . J i O ° a) a Q W _ CD � m - o LU •— 0 U U m M N O N U 4O 4--+ N O � ca fL. 4-J N 0 M a � 4- U H Q > C)- C: U N M CL t0 U � 4- . . -0 O CL � a� �• `'� O N -0 +- O CL U U U i O U U N z N o� O _� a O 4 z km 0Foo iLU O oj a LV _ L p E E 5 a .Qa L. Q p U �L. L. O G . p , cu a f� W GJ m +' V W a ' i a Z W ' = a L U � , , 0 'a 0� a J DC 4-j a N a N c� U N O N � 0� N a i J � z O ki OCT M a Z O Z W � a � O Wsoft a4 a ao 0 � _ s U W � 3 � > o Q � M 0 N M a) 4-0 (, z O N CAA N a) 4- 4- a_-+ a) _ � vi V � ° � � � � 'ca a0io •� � N 4-0 Z •- � -0 o i � `n 4-0 E o o — 0N CL O J m a) o N CL LID N Z (� }' }' — z � -0 _ a) � Q) a) a) O " O O W — N Cep O 4-1 O — O � N U � U � •7 cn N ro UP 0 }, cA " (A O +-1 a) a) •_ •� � o Q a ': a) ca }, i O O a) a--0 a) +� 4-0 0 4-0ca 0 �, � o o U a) � O �' p M O N o o J 'o u i N Z ° N u o LU � � z o � Z O 4-j' = 0 3 W 4,, o a a � o 0 Qj :� 0 >= a a W W ' 0 DC 4-j '� m i � M N Ln a..r N = cn =3 C6 O E ate-1 O �' 4-' X . O .v O O Q 0 J 0 c N •O V O O rp N � ago N N z °' Ln N C O c O DC > V O O` a--+ ate- O _ J ° u N a✓ V Q cn O O • • a� J �, can CAA � aJ � •� p Z � O Z a✓ O ro (3) W NO E , Q v O 0 O 0 OC V� •ago �, �, �, a� o E O LV ° — 4-1 1 can 4-+ +�-+ N Q p =3 0 � •tn 0 m M N O N �O L � p N o� u V W N N z Ln 4-j o` u � m 111 N °' 4-2 �� z a `n LU 0 soft V) p 4-j of = O 4-j p ° soft �W a a Q LU •p ul > o a o N cL, +j ca _ 4-j - O w a c ,� O E 4-j 0 -a H a V V =3 � V N u a o� � � " N z a � WUCLCL � M � N 4-j `� O •� 0 C O o� _ �'ts m = O O V > V J ate--+ 0 E S V . .� ' Ln CZO _� ZO a-+ ca a-J u -a 0 L:) 10 -1-- 4-J LU U 4-J U soft 4-j -0 CAA 'Q � 4-J soft 0 � \ " p 2 E cl O � O o D o 0 soft o 0 0 V'f M Q •� � o N 00 C6 -0 C6 a--+ a-J a-J r •V Q ateJ cn Ln O ca =3 Ln V n c O Q O 4-J a a� o n ° °� N Q N ago 'aA o 0 4-J < � � 4 � 0 � ,V O uLn 0 4-J ro Ln (3) ca bn �p ca a.� -0 c O C '(3) N N V �_ O = W CL 4O 0 O � �, r Ln W , _ 0 (3) n V J 4-+ C�0 0 16 - - W _ -0 0- m -0 Ln U -0 -0Z CL w � o � m M N O N O� Ln 1 // J W _O ca cn t V I..L � a-�+ ate-+ DC C�0 cn •N ca •c �. > c X a) •— > Q a V D uLn •" � - N z .�'D bn C D N -C O c6 0 W O 4-J V w E E • • u a) O O •� Ov N Z '=3 >, (3) O 1 z _Q -0_ c O � � W '=3 V V -c Ln r � N W 3 O p - � J 0 •r Ln Q W Q o C:L w m M N O N O N v O E V p M � 0- 0- O 4-j =3 =3 i V. a) � a o� = o o � 2, ,o � N LV •� _.+ R4 Q W O J � •o � � _ z a o ,a Z _ H W O W � O Q s a >00o � W LU of of ' o = m o a M m Q M N N 0 N N O cif � � O •� � .� p � vi L N > O }+ }, w U Q 2 }, Q cn 2 a •_ O � N � N W o� Q � W i 4 z (A OW O 3 � H 4-j 0jLU a a a� c c a� L o E = O c E E a LL J V i GLN1 L .2 _ " LL ° O a a 0 w a� wLLI a a� > •� ° a Z W W -0 � L Y = Oo o +' � 0 a .a � c Q JLA � Q DC 'a N U N N N aA } -0 N •� ca z j I a--+ � cn c4-ji� O E N f� U Q� cn Q E cu E u ro soft }' cn 0 cn ca - 'L R 4-J 4-j Q 4-j V •N EU O N O •� N � O` -0 a) aA W N •� a v a� � a� 4- J z 0 0 ° .� z �° a z O W soft0 ,0 3 W a Z 4-j>= 4-j Q a s �G soft W � 3 � > o 0 N M N O 0� O .soft li i N W O o '1•+ N Q W Z � o O 4-j t O "' �1 1ME, `w W 0 3 o a O a0i :4%p 0 W W ' 0 s DC � '- m i H M Q � o N N N 0 4- U C6 +-+ +-+ a--+ . Q N +-+ aN-+ Q 0 0 0 N 0 v vi .- - C � N U +� N ca E fu � �. N }' N o 0- M M C C aA p H ca O N Z, 0 +-+ E 0 cn ca N E O O U ca — .ca ._ -o E N LJ.I a� _ " o - � 0 N o w o o- +, m E m U o% Q O � W = J Co 00 I.A - N Z o, O z 4-j OW p _4-j V� -j c O soft W '— 4%p a4-ja o 0 0 >= LU .o w ' — 0 o a o DC� 4-j i � M N tD Ln M N rl O N Ln N � N H O N •� a_' � a L N E V� O bn ca N N •� •� O N > N R O� 4-0 a � U N ca � can bn 4-0 - .�,� 0 •— O O 0 O of O cn N W a i v E o 0 a a `� N +- N 4-0 : ca +-0 cn W ° ° �+� }, a) 4-0J J 3 -0 • • {,, i 4-0 %0 �_ Z V = N � > '� O O O O O ' Z p L �O O� O O — ui � � Q Osoft u O Ol +-' . v a--+ O 0� � Q 4 W = a CL c ° 3 0 O o O > � ' H > 2 4S aj o km soft O V'f M Q •� � o N �O N O vi O � � U aA N O ca _0 •� O U O O O O E — N N +j C: 4-1 C O O ca -0 CD CDO _0 E }; -a — — O _ — U N U U }' Q w , cn N 0 aA — (f) W a, • N N o f wo i E 0 o a) o o .i •o 0 o N Q � � N }, aA � N ,� ca O� }' N a , c) U LU E .N c 'R •S c O a) o a) -I-- + N + , " m U • • — � U ca Ln - � '� N i O zC E _0 M -J O Ov " L W Ln O � Q Q U N DC O -0 fu N N a) U +O U C6 O Ca cn a--+ O 7 CD LU C: � 4 �, _0'� CL `� i = Cep }' c4n Q a o U >- � O a) -0 � � O O Q o i > 0 •E o � 00 a) H m M N O N N ul) =3 _O 'Ln E N L � Q M o � o � � N N O� W � +, �, +, O � O N w 0 Ln N 3 dJ N =3 C�0 � m Z m a •� O O O = m aA VL 4 Q U coN O NO J a U W p H � N Z � W � w V � VLM : x > ) a � p pN o W m z 0 N 00 N O O _0 4-J v O � �O •v N O E M E0 A-i N U N cn V CAA E ate-+ w +O m •� � u - (3) N I O �' (3) O = 0 0- LU O bn N _0 � Q c � O V 5- ° °° > � ° o —03 +j C O Q Z W ci Q tZ0 0 O � m 0 N CITY COUNCIL MEETING Port Angeles, Washington June 7, 2022 This meeting was conducted virtually. CALL TO ORDER SPECIAL MEETING Deputy Mayor Meyer called the special meeting of the Port Angeles City Council to order at 5:30 p.m. Members Present: Deputy Mayor Meyer, Council Members Carr, French, McCaughan, Schromen-Wawrin and Suggs. Members Absent: Mayor Dexter. Staff Present: City Manager West, Attorney Bloor, Clerk Martinez-Bailey. EXECUTIVE SESSION Based on input from City Attorney William Bloor, Deputy Mayor Meyer announced the need for an Executive Session under RCW 42.30.110(1)(i) to discuss potential litigation with legal counsel until 5:55 p.m., stating no action to follow. The Executive Session convened at 5:30 p.m. ADJOURNMENT Deputy Mayor Meyer adjourned the Special Meeting at 5:55 p.m. CALL TO ORDER-REGULAR MEETING Deputy Mayor Meyer called the regular meeting of the Port An geles City Council to order at 6:00 p.m. ROLL CALL Members Present: Deputy Mayor Meyer, Council Members Carr, French, McCaughan, Schromen-Wawrin and Suggs. Members Absent: Mayor Dexter. Staff Present: City Manager West, Attorney Bloor, Clerk Martinez-Bailey, C. Delikat, D. Sharp, B. Smith, E. Bolin, T. Hunter, and S. Carrizosa. Deputy Mayor Meyer added Council Member Attendance to the consent agenda. PLEDGE OF ALLEGIANCE Deputy Mayor Meyer led the Pledge of Allegiance to the Flag. CEREMONIAL MATTERS, PROCLAMATIONS & EMPLOYEE RECOGNITIONS Deputy Mayor Meyer read proclamations recognizing June 19th as Juneteenth, June as Pride Month, and Ride Transit Month. PUBLIC COMMENT No public comment was received. CONSENT AGENDA Council member McCaughan asked the Mayor to consider moving J-1 Golf Course Road Property Purchase and Sale Agreement to the Consent Agenda. Deputy Mayor Meyer asked Council to consider moving I-3 IAFF LOCAL #656 One Year Contract to the Consent Agenda. Hearing no opposition, Deputy Mayor Meyer added the items to the Consent Agenda. At the request of Council member Schromen-Wawrin, Deputy Mayor Meyer pulled Stormwater Education and Outreach Services – 2023 Interlocal Agreement with Kitsap from the Consent Agenda. July 19, 2022 E - 1 PORT ANGELES CITY COUNCIL MEETING – June 7, 2022 Page 2 of 4 It was moved by Schromen-Wawrin and seconded by McCaughan to approve the Consent Agenda to include: 1. City Council Minutes of May 3, 2022 / Approve 2. Expenditure Report: From May 7, 2022 to May 27, 2022 in the amount of $4,575,383.98 / Approve 3. 4th Street and Chambers Street Repair - Final Acceptance / Accept the 4th & Chambers Repair project CON 2021-38 as complete, and authorize staff to proceed with project closeout, and release the retainage bond in the amount of $5,351.15 upon receipt of all required clearances 5. ADDED TO CONSENT / Council Member Attendance / Excuse Mayor Dexter from the June 7, 2022 Meeting 6. ADDED TO CONSENT / IAFF LOCAL #656 One Year Contract / Staff recommends the City Council approve the terms of the IAFF Local 656 one-year contract as outlined in this memo and authorize the City Manager to approve the attached Memorandum of Understandings and to make minor modifications to the agreement as necessary 7. ADDED TO CONSENT / Golf Course Road Property Purchase and Sale Agreement / 1. Consider adopting a motion declaring the subject property located on Golf Course Road to be surplus to the needs of the City; 2. Approve the attached Purchase and Sale Agreement; and 3. Authorize the City Manager to execute all documents necessary to effectuate the sale of the property to the PUD and make minor modifications to the documents as he deems appropriate. Council discussion followed. PULLED FROM CONSENT AGENDA 4. Stormwater Education and Outreach Services – 2023 Interlocal Agreement with Kitsap County City Engineer Jonathan Boehme provided background on the agenda item. It was moved by Schromen-Wawrin and seconded by Carr to approve the Consent Agenda to include: Approve and authorize the City Manager to sign the 3 -year Interlocal Agreement with Kitsap County with an annual amount not to exceed $12,538 and a total amount not to exceed $37,614, and to make minor modifications to the agreement, as necessary. The Mayor asked if there was unanimous consent, hearing no opposition, the motion carried 6 -0. OTHER CONSIDERATIONS 1. Planning Commission Recommendation on Affordable Housing Interim Director of Community and Economic Development Emma Bolin provided background on the agenda item. Council discussion followed. It was moved by Schromen-Wawrin and seconded by Carr to: Direct staff to prepare an ordinance to suspend permit fees until September 1, 2023, for ADUs, duplexes, triplexes, townhouses, cottage developments, and multifamily developments that are used for residential housing available for families at or below 80% AMI. It was moved by French and seconded by Carr to: Postpone the discussion until after the public hearings. The Mayor asked if there was unanimous consent, hearing no opposition, the motion carried 6 -0. PUBLIC HEARINGS 1. The 2023-2028 Capital Facilities Plan and Transportation Improvement Plan Finance Director Sarina Carrizosa presented slides that described the Capital Facilities Plan and Transportation Improvement Plan which included information on opportunities for public comment and Council work sessions. Director Carrizosa spoke about capacity components from a funding and staff availability aspect and spoke about specific staff positions that have been added using ARPA funds that will help the City reach some of its goals. At 7:03, Deputy Mayor Myer opened the public hearing. Deputy Mayor Meyer conducted a first reading of the resolution by title, entitled, RESOLUTION NO. ____ July 19, 2022 E - 2 PORT ANGELES CITY COUNCIL MEETING – June 7, 2022 Page 3 of 4 A RESOLUTION of the City Council of the City of Port Angeles, Washington, adopting the City’s Capital Facilities Plan for 2023-2028, which includes the City’s Transportation Improvement Program for the years 2023 - 2028. Hearing no comments, Deputy Mayor Meyer continued the public hearing to June 21. 2. Draft Climate Resiliency Plan Interim Director of Community and Economic Development Emma Bolin provided background on the agenda item and spoke about community outreach. She referenced recommendations on the plan from the Planning Commission. Deputy Mayor Meyer conducted a first reading of the ordinance by title, entitled, AN ORDINANCE of the City of Port Angeles, Washington, adopting the Climate Resiliency Plan and amending the Port Angeles Comprehensive Plan to incorporate the Climate Resiliency Plan. ORDINANCE NO. ____ Brian M., city property owner, spoke in support of changes to the draft Climate Resiliency Plan. Bob Vreeland, city resident, spoke in favor of the draft Climate Resiliency Plan. Ben Stanley, Chair of the Planning Commission, but speaking independently of the Commission, spoke in favor of the draft the Climate Resiliency Plan. David Freed, residing outside city limits, spoke in favor of the draft Climate Resiliency Plan. Ed Chadd, city limits, spoke in favor of the draft Climate Resiliency Plan. Sissi Bruch, city limits, spoke in favor of the draft Climate Resiliency Plan. After asking if there were additional comments. Deputy Mayor Meyer closed the public hearing. Council discussion followed. Deputy Mayor recessed the meeting for a break at 8:20 p.m. The meeting reconvened at 8:25 p.m. OTHER CONSIDERATIONS CONTINUED Council continued their discussion on the Planning Commission Recommendation on Affordable Housing agenda item. Deputy Mayor Meyer restated the motion that was made and seconded: Direct staff to prepare an ordinance to suspend permit fees until September 1, 2023, for ADUs, duplexes, triplexes, townhouses, cottage developments, and multifamily developments that are used for residential housing available for families at or below 80% AMI. After a roll call vote, the final motion carried 5-1, with Meyer opposed. 2. Comparative Research on Employee Rights Human Resources Manager Abbi Fountain spoke about the agenda item and provided information . CITY COUNCIL REPORTS Council member McCaughan stated his report would be covered at the next meeting. Council member Suggs spoke about the joint EOC meeting between the City Council and the County Commissioners and spoke about the Dungeness Nature Center opening. July 19, 2022 E - 3 PORT ANGELES CITY COUNCIL MEETING – June 7, 2022 Page 4 of 4 Council member Schromen-Wawrin spoke about the new bus runs to Hurricane Ridge by Clallam Transit System, the recent Utility Advisory Committee meeting, and the Peninsula Transportation Committee updates. Council member French spoke about recent Utility Advisory Committee and Lodging Tax Advisory Committee meetings. Council member Carr spoke about an NODC meeting and a recent June Pride event. Council member Meyer provided an update on a local 4 th of July event, the benefits of scooters, and his thoughts on his first meeting. No other reports were given. INFORMATION Manager West spoke regarding the reports included in the packet and spoke about a Housing Solutions Committee meeting and a presentation by Craft3, a recent Field Hall event, and shared an update regarding the Fire Department with the retirement of Fire Chief Ken Dubuc. SECOND PUBLIC COMMENT Bob Vreeland, city resident, spoke about the draft the Climate Resiliency Plan. ADJOURNMENT Mayor Dexter adjourned the meeting at 9:44 p.m. _____________________________________ _______________________________ Brendan Meyer, Deputy Mayor Kari Martinez-Bailey, City Clerk July 19, 2022 E - 4 CITY COUNCIL MEETING Port Angeles, Washington June 21, 2022 This meeting was held virtually. CALL TO ORDER-REGULAR MEETING Mayor Dexter called the regular meeting of the Port An geles City Council to order at 6:00 p.m. ROLL CALL Members Present: Mayor Dexter, Deputy Mayor Meyer, Council Members Carr, French, McCaughan, Schromen- Wawrin and Suggs (joined at 6:13 p.m.). Members Absent: None Staff Present: City Manager West, Attorney Bloor, Clerk Martinez-Bailey, C. Delikat, D. Sharp, E. Bolin, T. Hunter, S. Carrizosa, J. Boehme, V. McIntyre, T. Weeks and K. Hatton. PLEDGE OF ALLEGIANCE Mayor Dexter led the Pledge of Allegiance to the Flag. PUBLIC COMMENT No public comment was received. CONSENT AGENDA Hearing no objection, Mayor Dexter added J-1 and J-2 to the Consent Agenda as items E-8 and E-9. It was moved by McCaughan and seconded by Meyer to approve the Consent Agenda to include: 1. City Council Minutes of May 17, and May 24, 2022 / Approve 2. Expenditure Report: From May 28, 2022 to June 10, 2022 in the amount of $1,320,987.63 / Approve 3. Amendment 01 | PSA-2020-48 Stormwater Permit Implementation Support / Approve: 1. WQC-2022- PoAnPW-00169, Enhanced Source Control Program Development Grant Agreement with Ecology; 2. WQC- 2022-PoAnPW-00164, Stormwater Management Action Plan Grant Agreement with Ecology; and, 3. Amendment 01 to PSA-2020-48 with Osborn Consulting, Inc., thereby, increasing the original agreement’s not- to-exceed amount from $295,806.00 to $643,001; an increase of $347,195. And authorize the City Manager to sign all documents necessary to execute and administer the above agreements and amendment and to make minor modifications to them, as necessary 4. Olympic Public Safety Network (OPSN) Firewall Hardware and Software / Approve and authorize the purchase of FortiGate 101F firewall hardware and software in the amount of $72,840 with Development Group, Inc. (DGI) and authorize the City Manager to execute all documents necessary to complete and administer this purchase and to make minor modifications to the documents as necessa ry 5. Three-Year Agreement for Cisco Umbrella (OpenDNS) Services / Authorize the City Manager to approve payment to Port53 Technologies, Inc. to enable three -years of the Cisco Umbrella DNS Security Advantage Software Package for 250 users; and to make minor modifications as needed 6. 2022 Lodging Tax Budget Amendment Proposal – Hurricane Ridge Winter Sports Club / Accept the recommendation of the LTAC to approve an amendment to the 2022 Lodging Tax (LTAX) Budget in the amount of $13,800 to award the HRWSC funds in order to operate a shuttle service to Hurricane Ridge in the winter season. 7. Stancil Recorder Refresh / Approve and authorize the software/hardware refresh of the City’s CAD system with Stancil in the amount of $28,985.60 and authorize the City Manager to sign all documents necessary to perform this refresh and make minor modifications as necessary subject to approval of the 2023 – 2028 Capital Facilities Plan. 8. MOVED FROM J-1 - Intrado “Viper” Software Refresh and Upgrade of Existing 9-1-1 Phone System Approve and authorize the City Manager to sign a Viper phone system upgrade agreement in the amount of July 19, 2022 E - 5 PORT ANGELES CITY COUNCIL MEETING – June 21, 2022 Page 2 of 4 $160,251.50 plus tax with Intrado Life & Safety Solutions Corporation and to make minor modifications to the documents as necessary subject to approval of the proposed 2023- 2028 Capital Facilities Plan 9. MOVED FROM J-2 - Virtual System Hosts Replacement - CFP Item #0618 / Approve and authorize the purchase of four (4) DELL PowerEdge R840 Servers and allow the City Manager to administer the purchase and make minor modifications as necessary Council discussion followed. The Mayor asked if there was unanimous consent, hearing no opposition, the motion carried 7 -0. ORDINANCES NOT REQUIRING COUNCIL PUBLIC HEARINGS 1. Draft Climate Resiliency Plan Interim Community and Economic Development Director Emma Bolin spoke to the agenda item and walked Council through changes from the previous version. She walked through the Plan and noted all changes since the previous version that went before Council. She included input from Council, staff and community. Mayor Dexter conducted a second reading of the ordinance by title, entitled, ORDINANCE NO. 3692 AN ORDINANCE of the City of Port Angeles, Washington, adopting the Climate Resiliency Plan and amending the Port Angeles Comprehensive Plan to incorporate the Climate Resiliency Plan. It was moved by Meyer and seconded by Schromen-Wawrin to: Adopt the Climate Resiliency Plan A motion to amend was made by Schromen-Wawrin and seconded by Suggs to: Strike the last sentence of Action Item #47, Consider hard shoreline protection in certain areas, such as bluff crests where infrastructure needs to be realigned and protected. Without hearing an objection, the Mayor postponed discussion and vote until after the Public Hearings were completed. PUBLIC HEARINGS 1. Stormwater Ordinance Update / New Source Control Program Director of Public Works & Utilities Thomas Hunter presented the agenda item and introduced Civil Engineer Jonathan Boehme, Civil/Utility Engineer Vince McIntyre, and Tarelle Osborn of Osborn Consulting, Inc. Civil/Utility Engineer McIntyre presented slides that explained the source control program. He stated the program was intended to reduce impacts of existing development to prevent and reduce pollutants in runoff from areas that discharge to the City’s municipal separate storm sewer system. He said the City would work with local business owners to evaluate their sites and activities routinely being performed against current standards and best management practices for pollutant control and pollution prevention. He provided background and timelines for the project. At 6:50 p.m., the Mayor opened the public hearing. There being no public comment, the Mayor continued the matter to the July 5 meeting. Mayor Dexter conducted a first reading of the ordinances by title, entitled, ORDINANCE NO. ____ AN ORDINANCE of the City of Port Angeles, Washington amending Chapters 3.70 of the Port Angeles Municipal Code as follows. ORDINANCE NO. ____ AN ORDINANCE of the City of Port Angeles, Washington amending Chapters 13.62 and Chapter 13.63 of the Port Angeles Municipal Code relating to stormwater-utility and regulations. July 19, 2022 E - 6 PORT ANGELES CITY COUNCIL MEETING – June 21, 2022 Page 3 of 4 The Mayor continued the matter to the July 5 meeting. 2. 2023-2028 Capital Facilities Plan and Transportation Improvement Plan Finance Director Sarina Carrizosa presented the Plan and spoke to a correction to the titles of three projects and to capacity and staffing challenges. She said Council had requested additional information and criteria regarding the present condition of assets be provided to ensure clarity and consistency throughout the document. She spoke to statuses and prioritization, capacity, staffing. She spoke to the proposal to include TR0322 - Intersection Control Study for Council consideration. $50,000 in funding for this project is proposed from REET. The Mayor continued the Public Hearing at 7:16 p.m. There being no public comment, the Mayor closed the public hearing. Mayor Dexter conducted a second reading of the resolution by title, entitled, RESOLUTION NO. 13-22 A RESOLUTION of the City Council of the City of Port Angeles, Washington, adopting the City’s Capital Facilities Plan for 2023 – 2028, which includes the City’s Transportation Improvement Program for the years 2023 - 2028. It was moved by Schromen-Wawrin and seconded by Suggs to: After the motion was amended and approved, the final motion was: Pass the ordinance as read and include TR0322 - Intersection Control Study for Council consideration. $50,000 in funding for this project is proposed from REET and amended language to amend PK0719 to replace "The next step of the process is to hire a consultant for the design of the placement of the facility on existing City property. The main focus will be land space, utilities, and tree canopy so that this type of event will not happen in the future," with "The next step of the process is to do site analysis to find an appropriate location for the Parks Maintenance Building." The Mayor asked if there was unanimous consent, hearing no opposition, the motion carried 7 -0. Mayor recessed the meeting for a break at 8:12 p.m. The meeting reconvened at 8:17 p.m. ORDINANCES NOT REQUIRING COUNCIL PUBLIC HEARINGS CONTINUED It was moved by Meyer and seconded by Schromen-Wawrin to: After the motion was amended and approved, the final motion was proposed: Adopt the Climate Resiliency Plan and amending the Port Angeles Comprehensive Plan to incorporate the Climate Resiliency Plan and strike the last sentence of Action Item #47, Consider hard shoreline protection in certain areas, such as bluff crests where infrastructure needs to be realigned and protected and on page 6, add to the right sidebar, to the bottom of the Carbon Neutrality definition "The City will prioritize emission reduction to reach carbon neutrality." The Mayor asked if there was unanimous consent, hearing no opposition, the motion carried 7 -0. CITY COUNCIL REPORTS Mayor Dexter provided two updates relative to recent events in Port Angeles and Olympia. Council member Meyer provided an update on Fourth of July activities downtown. Council member McCaughan spoke about his tour of the Fire Department, provided an update on Peninsula Area Public Access live feed events, attendance at a recent Habitat for Humanity and BMX event. Council member Suggs spoke about the Dungeness River Nature Center and a recent event held for middle schoolers. Council member Schromen-Wawrin spoke about a PRTPO meeting, spoke about his trip to Vancouver through AWC, spoke about healthy living, scooters, and the passing of Ryan Malane. July 19, 2022 E - 7 PORT ANGELES CITY COUNCIL MEETING – June 21, 2022 Page 4 of 4 Council member French spoke about updates on travel reported by a member of the Olympic Peninsula Tourism Commission. Council member Carr provided updates from the Board of Health meeting. Mayor Dexter spoke about the upcoming AWC conference. No other reports were given. INFORMATION Manager West spoke about the passing of Ryan Malane and expressed his appreciation for his work in Port Angeles and spoke about an upcoming City Council Work Session in July. SECOND PUBLIC COMMENT Bob Vreeland, city resident, spoke about the Climate Resiliency Plan. Ed Chadd, city resident, spoke about the Climate Resiliency Plan. ADJOURNMENT Mayor Dexter adjourned the meeting at 9:15 p.m. _____________________________________ _______________________________ Kate Dexter, Mayor Kari Martinez-Bailey, City Clerk July 19, 2022 E - 8 CITY OF JORT NGELES A WASH I NHS GTON, U. S,. A. MEMO July 19, 2022 Finance Department We, the undersigned City Officials, of the C�iity of Port Angeles, do hereby certify that the merchandise and/or services herein specified have been received and that these clairns are approved for payment in the amount of Safina Camizosi $2,,097,874.99 this 19th day,of July, 2022, finance Divvctoi Tnnit McKee el Senior AcCOUnwit ktaryl;uv Frendi Mayor City Manager Settim Accountant Linda Khenatv Financial Systenis'�nalysl Melody Schneider Management Accoununt M�cah Rose. Financial Analyst .lane Perkins 1)aynAl six-6alist Jason Jones,; Accountant Uic Powell Accountingr,ccimieian Luke Ando-son Accounting T4vhnician Nicole Blank Adannku-rune Analyst Kathyellert flane Custonier Semites Mariager Tiraev IRooks Ufihty Billing Specialist City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount JOAQUIN'S TREE EXPERT CO Release Retainage 001-0000-223.40-00 250.19 US BANK CORPORATE PAYMENT SYSTEM City Credit Card 001-0000-213.10-95 (29,481.42) City Credit Card 001-0000-213.10-95 (30,462.34) City Credit Card Pmt 001-0000-213.10-95 26,763.24 WA STATE PATROL JUNE 2022 WSP FINGERPRINT 001-0000-229.50-00 159.00 WASHINGTON (DOL), STATE OF JUNE 2022 CPL'S 001-0000-229.60-00 726.00 Division Total:($32,045.33) Department Total:($32,045.33) NEURATH PHOTGRAPHY, ERIC COMMUNICATIONS/MEDIA SERV 001-1160-511.31-01 467.84 US BANK CORPORATE PAYMENT SYSTEM Jurassic Parliament Reg-M 001-1160-511.43-10 47.00 Chamber Luncheon-Deputy M 001-1160-511.43-10 18.00 Mayor & Council Division Total:$532.84 Legislative Department Total:$532.84 US BANK CORPORATE PAYMENT SYSTEM Community recognition car 001-1210-513.31-01 6.15 Cascade Locks toll-West 001-1210-513.43-10 2.00 Lodging-West 001-1210-513.43-10 405.10 Breakfast-West/Dexter 001-1210-513.43-10 26.01 Chamber luncheon-Straits/001-1210-513.43-10 36.00 eSignature subscription-C 001-1210-513.41-50 239.57 Chamber Luncheon-Mayor De 001-1210-513.43-10 18.00 Chamber Luncheon-West 001-1210-513.43-10 18.00 Legal pads 001-1210-513.31-01 17.51 Clips/Post-it notes/pens 001-1210-513.31-01 88.41 City Manager Division Total:$856.75 US BANK CORPORATE PAYMENT SYSTEM Lodging reservation fee-F 001-1220-516.43-10 19.99 Lodging-Fountain 001-1220-516.43-10 337.07 Labor Relations Institute 001-1220-516.43-10 345.00 eSignature subscription-H 001-1220-516.41-50 239.57 Human Resources Division Total:$941.63 LEMAY MOBILE SHREDDING MANAGEMENT SERVICES 001-1230-514.41-50 212.07 US BANK CORPORATE PAYMENT SYSTEM WAPRO Membership-KM Baile 001-1230-514.49-01 25.00 WAPRO Reg-KM Bailey 001-1230-514.43-10 65.00 eSignature subscription-C 001-1230-514.41-50 239.57 Classified Ad-ORD 3690 001-1230-514.44-10 21.33 City Clerk Division Total:$562.97 Page 1 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 9 City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount City Manager Department Total:$2,361.35 US BANK CORPORATE PAYMENT SYSTEM Webcam-Kheriaty 001-2020-514.31-01 73.68 Finance Administration Division Total:$73.68 MISC EMPLOYEE EXPENSE REIMBURSEMENT ANDERSON-TUITION REIMBURS 001-2023-514.43-10 1,772.25 PACIFIC OFFICE EQUIPMENT INC OFFICE SUPPLIES, GENERAL 001-2023-514.31-01 1.89 OFFICE SUPPLIES, GENERAL 001-2023-514.31-01 81.64 OFFICE SUPPLIES, GENERAL 001-2023-514.31-01 46.67 US BANK CORPORATE PAYMENT SYSTEM 2022 Budget award app-Sch 001-2023-514.31-01 445.00 GFOA Reg-Schneider 001-2023-514.43-10 315.00 eSignature subscription-F 001-2023-514.48-02 239.57 WFOA Webinar-Anderson 001-2023-514.43-10 35.00 WFOA Webinar-Anderson 001-2023-514.43-10 35.00 Accounting Division Total:$2,972.02 DATABAR INCORPORATED MISC PROFESSIONAL SERVICE 001-2025-514.41-50 2,267.29 MISC PROFESSIONAL SERVICE 001-2025-514.41-50 2,707.06 MISC PROFESSIONAL SERVICE 001-2025-514.41-50 2,572.22 MISC PROFESSIONAL SERVICE 001-2025-514.41-50 2,549.30 MISC PROFESSIONAL SERVICE 001-2025-514.41-50 2,722.03 MISC PROFESSIONAL SERVICE 001-2025-514.41-50 2,255.84 MISC PROFESSIONAL SERVICE 001-2025-514.41-50 2,598.65 PACIFIC OFFICE EQUIPMENT INC COMPUTER ACCESSORIES&SUPP 001-2025-514.31-01 246.05 OFFICE SUPPLIES, GENERAL 001-2025-514.31-01 3.79 US BANK CORPORATE PAYMENT SYSTEM AWWA Membership-Iyulores 001-2025-514.49-01 248.00 AWWA Membership-Sharnbroi 001-2025-514.49-01 248.00 AWWA Reg-Iyulores 001-2025-514.43-10 90.00 AWWA Reg-Sharnbroich 001-2025-514.43-10 90.00 Book-Backflow Prevention/001-2025-514.43-10 106.50 WETRC Reg-Iyulores 001-2025-514.43-10 210.00 WETRC Reg-Sharnbroich 001-2025-514.43-10 210.00 Job posting-Customer Serv 001-2025-514.41-15 50.00 Refund-WETRC Reg-Sharnbro 001-2025-514.43-10 (210.00) Prepaid message service 001-2025-514.49-01 250.00 Customer Service Division Total:$19,214.73 Page 2 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 10 City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount OLYMPIC PRINTERS INC ENVELOPES, PLAIN, PRINTED 001-2070-518.31-01 1,355.65 PACIFIC OFFICE EQUIPMENT INC OFFICE SUPPLIES, GENERAL 001-2070-518.31-01 5.65 US BANK CORPORATE PAYMENT SYSTEM Labels-postage machine-ma 001-2070-518.31-01 30.99 Reprographics Division Total:$1,392.29 Finance Department Total:$23,652.72 LEXISNEXIS LEGAL RESEARCH FOR JUNE 001-3030-515.49-01 384.06 US BANK CORPORATE PAYMENT SYSTEM Beirne pedestrian veh col 001-3030-515.49-90 10.50 Virtual Wkshp Reg-Molay/D 001-3030-515.43-10 420.00 Ferry-Bloor/Cowgill 001-3030-515.43-10 67.20 WSAMA Conf Reg-Bloor/Cowg 001-3030-515.43-10 488.80 WAPRO Reg-Defrang 001-3030-515.43-10 65.00 WAPRO Reg-Molay 001-3030-515.43-10 65.00 Chamber luncheon-Bloor 001-3030-515.43-10 18.00 Refund-WAPRO Reg-Molay 001-3030-515.43-10 (65.00) City Attorney Division Total:$1,453.56 City Attorney Department Total:$1,453.56 SHI INTERNATIONAL CORP COMPUTER HARDWARE 001-4060-558.31-60 (79.60) COMPUTER HARDWARE 001-4060-558.31-60 (79.60) COMPUTER HARDWARE 001-4060-558.31-60 79.60 COMPUTER HARDWARE 001-4060-558.31-60 79.60 US BANK CORPORATE PAYMENT SYSTEM PDN news subscription 001-4060-558.49-01 9.60 Job posting-CED Director 001-4060-558.49-01 100.00 Job posting-CED Director 001-4060-558.49-01 199.00 Job posting-CED Director 001-4060-558.49-01 295.00 MRSC webinar-Bolin 001-4060-558.43-10 35.00 CED Technician job postin 001-4060-558.49-01 50.00 eSignature subscription-C 001-4060-558.31-60 239.57 Public Sign numbering sti 001-4060-558.35-01 3.69 CED Assistant Planner job 001-4060-558.49-01 50.00 CED Assistant Planner job 001-4060-558.49-01 295.00 CED Assistant Planner job 001-4060-558.49-01 99.95 PDN monthly subscription 001-4060-558.49-01 9.60 Legal ad 001-4060-558.41-15 93.22 Legal ad 001-4060-558.41-15 104.28 Page 3 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 11 City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount US BANK CORPORATE PAYMENT SYSTEM Legal ad 001-4060-558.41-15 116.92 Planning Division Total:$1,700.83 US BANK CORPORATE PAYMENT SYSTEM Chamber luncheon-Bolin 001-4071-558.43-10 18.00 AWCPD dues-Planning Dir 001-4071-558.43-10 100.00 Economic Development Division Total:$118.00 Community Development Department Total:$1,818.83 GALLS CLOTHING & APPAREL 001-5010-521.31-11 319.10 LEXISNEXIS LIBRARY SERVICES(EXCL 908 001-5010-521.49-01 54.40 MISC TRAVEL B SMITH-PRESENTOR-AWC CON 001-5010-521.43-10 37.00 C RIFE-EVALUATOR-HOQUIAM 001-5010-521.43-10 86.49 K MILLER-EVALUATOR-HOQUIA 001-5010-521.43-10 55.50 B SMITH-CJTC GRAD OFFICER 001-5010-521.43-10 19.75 OLYMPIC PENINSULA HUMANE SOCIETY MISCELLANEOUS SERVICES 001-5010-521.41-50 16,250.00 OLYMPIC STATIONERS INC OFFICE SUPPLIES, GENERAL 001-5010-521.31-01 18.88 PUBLIC SAFETY TESTING INC HUMAN SERVICES 001-5010-521.41-50 431.00 US BANK CORPORATE PAYMENT SYSTEM Airfare fee-C Rife 001-5010-521.43-10 15.00 Airfare-C Rife 001-5010-521.43-10 547.20 Lodging-C Rife 001-5010-521.43-10 548.10 Pre-employment poly-D Mil 001-5010-521.41-50 406.85 Chamber luncheon-B Smith 001-5010-521.43-10 18.00 Duty holster-C Rife 001-5010-521.31-11 111.30 WA ASSN OF SHERIFFS & POLICE COMMUNICATIONS/MEDIA SERV 001-5010-521.43-10 700.00 Police Administration Division Total:$19,618.57 LINCOLN STREET STATION SHIPPING AND HANDLING 001-5021-521.42-10 12.52 THOMSON REUTERS-WEST SECURITY,FIRE,SAFETY SERV 001-5021-521.49-01 184.68 TYLER TECHNOLOGIES, INC DATA PROC SERV &SOFTWARE 001-5021-521.31-60 4,352.00 US BANK CORPORATE PAYMENT SYSTEM Lodging-Cameron 001-5021-521.43-10 658.46 Drone license renewal 001-5021-521.49-01 5.00 WA college grant 001-5021-521.43-10 (36.00) Lodging-J Powless 001-5021-521.43-10 452.46 Ferry-Cameron/Malone/Ordo 001-5021-521.43-10 29.95 Ferry-Cameron/Malone/Ordo 001-5021-521.43-10 36.25 Fuel-Cameron 001-5021-521.43-10 59.30 Page 4 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 12 City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount VIKING SEW & VAC MISCELLANEOUS SERVICES 001-5021-521.31-11 20.67 Investigation Division Total:$5,775.29 GALLS POLICE EQUIPMENT & SUPPLY 001-5022-521.31-11 119.68 POLICE EQUIPMENT & SUPPL 001-5022-521.31-11 (241.53) POLICE EQUIPMENT & SUPPL 001-5022-521.31-11 241.53 POLICE EQUIPMENT & SUPPLY 001-5022-521.31-11 241.53 LINCOLN STREET STATION SHIPPING AND HANDLING 001-5022-521.42-10 13.30 SHIPPING AND HANDLING 001-5022-521.42-10 46.19 SHIPPING AND HANDLING 001-5022-521.42-10 33.13 SHIPPING AND HANDLING 001-5022-521.42-10 46.28 MISC EMPLOYEE EXPENSE REIMBURSEMENT REIMBURSEMENT FOR SUIT M 001-5022-521.31-11 450.97 MISC TRAVEL PERRY-K9 DECOY SEMINAR 001-5022-521.43-10 276.50 OLYMPIC PENINSULA COMMUNITY CLINIC MISC PROFESSIONAL SERVICE 001-5022-521.41-50 9,500.00 SWAIN'S GENERAL STORE INC FARE COLLECTION EQUIP&SUP 001-5022-521.35-01 56.35 FARE COLLECTION EQUIP&SUP 001-5022-521.35-01 69.34 HOSP SURG ACCES & SUNDRIS 001-5022-521.31-80 135.29 TYLER TECHNOLOGIES, INC DATA PROC SERV &SOFTWARE 001-5022-521.31-60 4,352.00 US BANK CORPORATE PAYMENT SYSTEM Notebooks-Patrol 001-5022-521.31-01 182.72 Standard glock 17 MOS arm 001-5022-521.35-01 80.00 K-9 bed 001-5022-521.49-80 184.85 K-9 trainer task light 001-5022-521.49-80 75.45 Lodging-Arand 001-5022-521.43-10 548.10 eSignature subscription-P 001-5022-521.41-50 239.56 Lodging-B Stamon 001-5022-521.43-10 395.04 Magpul MBUS flip-up backu 001-5022-521.35-01 43.29 Seminar Reg-K Miller 001-5022-521.49-80 300.00 Seminar Reg-W Fairbanks 001-5022-521.49-80 300.00 Lodging internet fee-K Pe 001-5022-521.43-10 19.80 Lodging-K Perry 001-5022-521.43-10 595.70 Wireless keyboard/mouse 001-5022-521.31-01 32.63 Training Reg-K Cooper 001-5022-521.43-10 949.00 Tasers (3)/holsters (7) 001-5022-521.35-01 179.36 Lodging-N Clark 001-5022-521.43-10 548.10 Page 5 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 13 City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount US BANK CORPORATE PAYMENT SYSTEM Registration-new vehicle 001-5022-521.45-21 63.57 Registration-new vehicle 001-5022-521.45-21 63.57 Registration-new vehicle 001-5022-521.45-21 63.57 Lodging-K Miller 001-5022-521.43-10 585.87 Airfare-Cooper 001-5022-521.43-10 507.20 Gun magazine release (2) 001-5022-521.31-01 55.95 K9 training reg-Perry 001-5022-521.43-10 450.00 Travel insurance-Cooper 001-5022-521.43-10 31.70 VIKING SEW & VAC MISCELLANEOUS SERVICES 001-5022-521.31-11 10.88 VOIANCE LANGUAGE SERVICES, LLC MISC PROFESSIONAL SERVICE 001-5022-521.42-10 12.50 Patrol Division Total:$21,858.97 TYLER TECHNOLOGIES, INC DATA PROC SERV &SOFTWARE 001-5029-521.31-60 1,506.88 US BANK CORPORATE PAYMENT SYSTEM Virtual Wkshp Reg-O Hatto 001-5029-521.43-10 140.00 Training Reg-C Jacobi 001-5029-521.43-10 25.00 Records Division Total:$1,671.88 Police Department Total:$48,924.71 MISC TRAVEL SANDERS-PANELIST-AWC CONF 001-6010-522.43-10 37.00 PEN PRINT INC OFFICE SUPPLIES, GENERAL 001-6010-522.31-01 254.59 US BANK CORPORATE PAYMENT SYSTEM Breakfast items-Officers 001-6010-522.31-01 20.75 Starlink wireless 001-6010-522.42-10 99.00 Flashdrives (10pk) 001-6010-522.31-01 42.42 Uniform shorts (6) 001-6010-522.20-80 148.67 Uniform pants (12) 001-6010-522.20-80 178.42 Binders/ruled paper/prote 001-6010-522.31-01 91.57 Envelopes-flag/clasp 001-6010-522.31-01 83.83 Notepads 001-6010-522.31-01 11.66 Breakfast items-Officers 001-6010-522.31-01 31.73 Employee photo backdrop 001-6010-522.31-01 79.98 eSignature subscription-F 001-6010-522.41-50 239.57 Starlink internet 001-6010-522.42-10 99.00 Registration-new vehicle 001-6010-522.45-21 63.57 Fire Administration Division Total:$1,481.76 CURTIS & SONS INC, L N CLOTHING & APPAREL 001-6020-522.35-01 2,251.86 INDUSTRIAL SCIENTIFIC MISCELLANEOUS SERVICES 001-6020-522.41-50 1,325.12 Page 6 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 14 City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount CORPORATION JIFFY CLEANERS LAUNDRY/DRY CLEANING SERV 001-6020-522.31-11 10.88 LAUNDRY/DRY CLEANING SERV 001-6020-522.31-11 21.76 MISC ONE-TIME VENDORS HAGAMAN FIRE SVC INSTRUCT 001-6020-522.43-10 395.00 NAPA AUTO PARTS SUPPLIES 001-6020-522.35-01 41.32 US BANK CORPORATE PAYMENT SYSTEM Shipping-bunker repairs-H 001-6020-522.42-10 18.27 Spare keys-FD medic units 001-6020-522.35-01 11.33 Spare keys-FD medic units 001-6020-522.35-01 25.92 Bridge toll-Sharp 001-6020-522.43-10 6.25 Lodging-Schoonhoven 001-6020-522.43-10 866.79 Res-Q-Rench (6) 001-6020-522.31-01 152.78 Shipping-Class A upgrades 001-6020-522.42-10 28.01 PM school books (4)-Carls 001-6020-522.43-10 467.65 PM school ebooks-Carlson 001-6020-522.43-10 114.24 Passport tags 001-6020-522.45-21 78.83 Name tags for helmets 001-6020-522.31-11 15.78 New employee clothing 001-6020-522.20-80 372.48 Shipping-SCBA air sample 001-6020-522.35-01 22.86 Instructor renewal fee-Go 001-6020-522.49-90 38.09 Airbag regulator 001-6020-522.31-01 353.49 Fire Suppression Division Total:$6,618.71 BRD FOR VOLUNTEER FIREFIGHTERS 2020 PAYMENT BALANCE 001-6045-522.49-01 190.52 MISC ONE-TIME VENDORS GAGLIANO CONF 001-6045-522.43-10 3,245.30 US BANK CORPORATE PAYMENT SYSTEM Online instructor re-auth 001-6045-522.49-01 16.33 CPR/AED cert cards (2) 001-6045-522.49-01 137.05 Graph paper-Sharp 001-6045-522.31-01 26.10 Lodging-Gagliano 001-6045-522.43-10 1,148.64 APX 7000 replacement batt 001-6045-522.31-01 1,952.25 Shipping-headset repairs 001-6045-522.31-14 42.33 Fire Training Division Total:$6,758.52 A-1 PERFORMANCE, INC BUILDING MAINT&REPAIR SER 001-6050-522.41-50 371.00 ANGELES MILLWORK & LUMBER SUPPLIES 001-6050-522.31-20 6.33 ANGELES PLUMBING INC CONSTRUCTION SERVICES,TRA 001-6050-522.48-10 176.26 OLYMPIC PARTY & CUSTODIAL EQUIP MAINT & REPAIR SERV 001-6050-522.31-01 290.82 Page 7 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 15 City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount SUPPLIES SWAIN'S GENERAL STORE INC SUPPLIES 001-6050-522.31-20 12.96 US BANK CORPORATE PAYMENT SYSTEM Repair parts-weed eater 001-6050-522.31-20 32.61 Facilities Maintenance Division Total:$889.98 Fire Department Total:$15,748.97 MISC TRAVEL BOEHME-ITE WESTERN DIST A 001-7010-532.43-10 919.59 US BANK CORPORATE PAYMENT SYSTEM LED/LCD Office TV monitor 001-7010-532.31-60 326.39 Job posting-Eng Tech/Civi 001-7010-532.44-10 50.00 Job posting-Eng Tech/Civi 001-7010-532.44-10 375.00 Refund-duplicate job post 001-7010-532.44-10 (325.00) Parking-Hunter 001-7010-532.43-10 148.00 Chamber luncheon-Hunter 001-7010-532.41-50 18.00 Microwave shelf 001-7010-532.48-10 106.34 eSignature subscription-E 001-7010-532.48-02 239.57 Screen cleaner kit/HDMI c 001-7010-532.31-01 29.90 Airfare-Boehme 001-7010-532.43-10 467.21 2022 standard specs manua 001-7010-532.31-01 565.03 Wall hooks/trash can/surg 001-7010-532.31-01 108.76 Stormwater Engineer job p 001-7010-532.44-10 199.00 Public Works Admin. Division Total:$3,227.79 Public Works & Utilities Department Total:$3,227.79 US BANK CORPORATE PAYMENT SYSTEM Case for Suface Pro-A How 001-8010-574.31-01 19.57 Headphones-A Howell 001-8010-574.31-01 10.87 Chamber luncheon-Delikat/001-8010-574.43-10 36.00 eSignature subscription-P 001-8010-574.49-01 239.56 Film for ID card printer 001-8010-574.31-01 58.15 Parks Administration Division Total:$364.15 US BANK CORPORATE PAYMENT SYSTEM Lodging-Bright 001-8012-555.43-10 364.36 Senior Center Division Total:$364.36 QUIRING MONUMENTS INC SUPPLIES 001-8050-536.34-01 2,575.00 SWAIN'S GENERAL STORE INC SUPPLIES 001-8050-536.31-20 60.58 US BANK CORPORATE PAYMENT SYSTEM Registration-new vehicle 001-8050-536.45-21 63.57 Ocean View Cemetery Division Total:$2,699.15 Page 8 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 16 City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount AIRPORT GARDEN CENTER SUPPLIES 001-8080-576.31-40 390.70 ANGELES MILLWORK & LUMBER SUPPLIES 001-8080-576.31-20 40.09 SUPPLIES 001-8080-576.31-01 49.87 SUPPLIES 001-8080-576.31-20 63.14 SUPPLIES 001-8080-576.31-20 366.97 SUPPLIES 001-8080-576.31-20 10.63 SUPPLIES 001-8080-576.31-20 39.43 BAILEY SIGNS & GRAPHICS SUPPLIES 001-8080-576.31-20 1,006.40 BAXTER AUTO PARTS #15 SUPPLIES 001-8080-576.31-01 9.38 BILL'S PLUMBING & HEATING INC SUPPLIES 001-8080-576.45-30 100.00 EAST SIDE LANDSCAPING SUPPLY SUPPLIES 001-8080-576.31-40 (130.20) SUPPLIES 001-8080-576.31-40 130.20 SUPPLIES 001-8080-576.31-40 130.20 SUPPLIES 001-8080-576.31-40 130.20 GOODMAN SANITATION SUPPLIES 001-8080-576.45-30 200.00 SUPPLIES 001-8080-576.45-30 106.61 SUPPLIES 001-8080-576.45-30 106.61 SUPPLIES 001-8080-576.45-30 213.21 SUPPLIES 001-8080-576.45-30 319.82 PORT ANGELES POWER EQUIPMENT SUPPLIES 001-8080-576.31-01 23.85 RYDIN SUPPLIES 001-8080-576.31-20 336.80 SWAIN'S GENERAL STORE INC SUPPLIES 001-8080-576.31-01 245.50 SUPPLIES 001-8080-576.31-01 139.16 SUPPLIES 001-8080-576.31-01 27.03 SUPPLIES 001-8080-576.31-01 178.32 SUPPLIES 001-8080-576.31-20 16.02 SUPPLIES 001-8080-576.31-01 160.92 SUPPLIES 001-8080-576.31-20 58.15 SUPPLIES 001-8080-576.31-01 21.69 SUPPLIES 001-8080-576.31-01 168.50 THURMAN SUPPLY SUPPLIES 001-8080-576.31-20 66.78 SUPPLIES 001-8080-576.31-20 36.13 SUPPLIES 001-8080-576.31-20 38.92 US BANK CORPORATE PAYMENT Crescent 170 piece tool s 001-8080-576.35-01 239.36 Page 9 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 17 City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount SYSTEM Reel measure tape-Cox/Ham 001-8080-576.31-20 81.24 Fire hoses (7) 001-8080-576.35-01 1,184.58 Parts for Tom Morse 001-8080-576.31-01 248.42 Parks Facilities Division Total:$6,554.63 Parks & Recreation Department Total:$9,982.29 HD SUPPLY SUPPLIES 001-8112-555.31-20 180.37 SUPPLIES 001-8112-555.31-20 189.27 MAYDA AND SONS MECHANICAL SUPPLIES 001-8112-555.48-10 15.50 SUPPLIES 001-8112-555.48-10 471.92 Senior Center Facilities Division Total:$857.06 ANGELES MILLWORK & LUMBER SUPPLIES 001-8131-518.31-20 116.58 CED/CONSOLIDATED ELEC DIST SUPPLIES 001-8131-518.31-20 75.07 FIRE CHIEF EQUIPMENT CO, INC SUPPLIES 001-8131-518.48-10 60.38 GRAINGER SUPPLIES 001-8131-518.31-20 229.09 HARTNAGEL BUILDING SUPPLY INC SUPPLIES 001-8131-518.31-20 86.41 HD SUPPLY SUPPLIES 001-8131-518.31-20 211.03 SUPPLIES 001-8131-518.31-20 24.81 JOHNSTONE SUPPLY INC SUPPLIES 001-8131-518.31-20 283.54 SWAIN'S GENERAL STORE INC SUPPLIES 001-8131-518.31-20 14.49 US BANK CORPORATE PAYMENT SYSTEM Allen bolt-Petty 001-8131-518.31-20 29.42 Gasket w/ washer-Petty 001-8131-518.31-20 8.15 Charging station 001-8131-518.31-20 1,178.89 Central Svcs Facilities Division Total:$2,317.86 Facilities Maintenance Department Total:$3,174.92 PACIFIC OFFICE EQUIPMENT INC SUPPLIES 001-8221-574.31-01 18.72 US BANK CORPORATE PAYMENT SYSTEM Case for Suface Pro-C Dro 001-8221-574.31-01 19.57 Headphones-C Droz 001-8221-574.31-01 10.87 Lodging-Tucker 001-8221-574.43-10 364.36 Sports Programs Division Total:$413.52 Recreation Activities Department Total:$413.52 General Fund Fund Total:$79,246.17 JOAQUIN'S TREE EXPERT CO Release Retainage 102-0000-223.40-00 521.98 RHOMAR INDUSTRIES, INC JANITORIAL SUPPLIES 102-0000-237.00-00 (80.53) Division Total:$441.45 Department Total:$441.45 Page 10 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 18 City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount ANGELES MILLWORK & LUMBER BUILDER'S SUPPLIES 102-7230-542.35-01 33.22 ROOFING MATERIALS 102-7230-542.31-25 28.93 CINTAS CORPORATION NO. 2 FIRST AID & SAFETY EQUIP.102-7230-542.31-01 21.50 CORAL SALES COMPANY METALS,BARS,PLATES,RODS 102-7230-542.31-20 3,261.04 HERMANN BROS LOGGING & CONST BUILDING MAINT&REPAIR SER 102-7230-542.31-20 108.60 LAKESIDE INDUSTRIES INC ROAD/HWY MATERIALS ASPHLT 102-7230-542.31-20 215.42 ROAD/HWY MATERIALS ASPHLT 102-7230-542.31-20 889.01 PUD #1 OF CLALLAM COUNTY MISC PROFESSIONAL SERVICE 102-7230-542.47-10 21.69 RHOMAR INDUSTRIES, INC JANITORIAL SUPPLIES 102-7230-542.31-01 995.69 SWAIN'S GENERAL STORE INC PAINTS,COATINGS,WALLPAPER 102-7230-542.31-01 71.58 RADIO & TELECOMMUNICATION 102-7230-542.31-01 20.64 TRAFFIC SAFETY SUPPLY CO MARKERS, PLAQUES,SIGNS 102-7230-542.31-25 2,518.72 US BANK CORPORATE PAYMENT SYSTEM Subscription for Sign Sho 102-7230-542.48-02 719.99 Ferry-veh #7505 102-7230-542.45-21 21.40 Ferry-veh #7505 102-7230-542.45-21 41.75 Registration-new vehicle 102-7230-542.45-21 56.56 Ferry crossing-vehicle #7 102-7230-542.45-21 20.90 Ferry crossing-vehicle #7 102-7230-542.45-21 52.00 WASHINGTON (DOT), STATE OF CONSTRUCTION SERVICES,GEN 102-7230-542.48-10 653.77 Street Division Total:$9,752.41 Public Works-Street Department Total:$9,752.41 Street Fund Total:$10,193.86 HOT START SALES, LLC AIR CONDITIONING & HEATNG 107-0000-237.00-00 (10.33) Division Total:($10.33) Department Total:($10.33) HOT START SALES, LLC AIR CONDITIONING & HEATNG 107-5160-528.31-80 127.76 JAMESTOWN NETWORKS DATA PROC SERV &SOFTWARE 107-5160-528.42-12 510.00 MCFALL, BARBARA MISC PROFESSIONAL SERVICE 107-5160-528.41-50 400.00 MISC EMPLOYEE EXPENSE REIMBURSEMENT 100% TUITION REIMBURSEMEN 107-5160-528.43-10 1,795.50 PUBLIC SAFETY TESTING INC HUMAN SERVICES 107-5160-528.41-50 184.00 QUILL CORPORATION OFFICE SUPPLIES, GENERAL 107-5160-528.31-01 87.11 RADIO PACIFIC INC (KONP) COMMUNICATIONS/MEDIA SERV 107-5160-528.41-15 770.00 TYLER TECHNOLOGIES, INC DATA PROC SERV &SOFTWARE 107-5160-528.41-50 1,088.00 Page 11 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 19 City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount US BANK CORPORATE PAYMENT SYSTEM WAPRO Reg-Craig 107-5160-528.43-10 65.00 WAPRO Reg-OConnor 107-5160-528.43-10 65.00 APCO 2022 Reg-Hatton 107-5160-528.43-11 430.00 Logo shirts-PenCom 107-5160-528.31-61 530.55 O&O DiskImage 17 pro soft 107-5160-528.35-01 43.47 ACCIS Dues-J Christopher 107-5160-528.49-01 75.00 911 Dispatchers job posti 107-5160-528.41-15 349.00 Wireless router-PenCom 107-5160-528.35-01 96.83 Dome Magnifier 107-5160-528.31-01 15.66 Dome Magnifiers (2) 107-5160-528.31-01 47.20 Computer cable (100 ft) 107-5160-528.35-01 313.36 Peroxide cleaning wipes 107-5160-528.31-01 63.10 Tyler Connect Conf- Lemon 107-5160-528.43-11 1,349.00 Airfare-Lemon 107-5160-528.43-11 1,120.20 Clorox wipes 107-5160-528.31-01 17.38 Seat selection-Lemon 107-5160-528.43-11 11.00 Wireless keyboard/mouse 107-5160-528.31-01 76.15 Wireless keyboard/mouse (107-5160-528.31-01 64.72 VOIANCE LANGUAGE SERVICES, LLC MISC PROFESSIONAL SERVICE 107-5160-528.42-11 12.50 WA STATE PATROL COMPUTER SOFTWARE FOR MIN 107-5160-528.41-50 1,200.00 Pencom Division Total:$10,907.49 Pencom Department Total:$10,907.49 Pencom Fund Total:$10,897.16 CONSOLE CLEANING SPECIALISTS BUILDING MAINT&REPAIR SER 310-5950-594.65-10 652.80 JOHNSON ELECTRIC COMPANY EXTERNAL LABOR 310-5950-594.65-10 9,764.80 US BANK CORPORATE PAYMENT SYSTEM Anchors 18" penetrator w/310-5950-594.65-10 341.58 Shipping-container lifter 310-5950-594.65-10 1,544.96 Homeland Security Division Total:$12,304.14 Public Safety Projects Department Total:$12,304.14 Capital Improvement Fund Total:$12,304.14 PARAMETRIX INC CONSULTING SERVICES 312-7930-595.65-10 3,901.07 CONSULTING SERVICES 312-7930-595.65-10 3,430.22 WESTERN SYSTEMS, INC RADIO COM & TELE TEST EQP 312-7930-595.65-10 3,808.00 GF-Street Projects Division Total:$11,139.29 Page 12 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 20 City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount Capital Projects-Pub Wks Department Total:$11,139.29 Transportation Benefit Fund Total:$11,139.29 A/R MISCELLANEOUS REFUNDS OVRPMNT OF ESTIMATE 401-0000-213.10-90 2,035.02 BORDER STATES INDUSTRIES INC ELECTRICAL EQUIP & SUPPLY 401-0000-141.41-00 772.80 FASTENERS, FASTENING DEVS 401-0000-141.41-00 728.25 CED/CONSOLIDATED ELEC DIST ELECTRICAL EQUIP & SUPPLY 401-0000-141.42-00 1,309.96 ELECTRICAL EQUIP & SUPPLY 401-0000-141.42-00 45.96 JOAQUIN'S TREE EXPERT CO Release Retainage 401-0000-223.40-00 690.43 Release Retainage 401-0000-223.40-00 5,742.39 MISC UTILITY DEPOSIT REFUNDS FINAL BILL REFUND 401-0000-122.10-99 25.87 FINAL BILL REFUND 401-0000-122.10-99 38.70 FINAL BILL REFUND 401-0000-122.10-99 62.86 FINAL BILL REFUND 401-0000-122.10-99 70.79 FINAL BILL REFUND 401-0000-122.10-99 295.90 FINAL BILL REFUND 401-0000-122.10-99 13.01 FINAL BILL REFUND 401-0000-122.10-99 68.20 FINAL BILL REFUND 401-0000-122.10-99 70.84 FINAL BILL REFUND 401-0000-122.10-99 164.66 FINAL BILL REFUND 401-0000-122.10-99 171.56 FINAL BILL REFUND 401-0000-122.10-99 249.91 FINAL BILL REFUND 401-0000-122.10-99 267.48 FINAL BILL REFUND 401-0000-122.10-99 576.07 FINAL BILL REFUND 401-0000-122.10-99 622.55 OVERPAYMENT-120 W 5TH #6 401-0000-122.10-99 7.59 OVERPAYMENT-127 E 1ST 1W 401-0000-122.10-99 119.14 OVERPAYMENT-1532 W 12TH 401-0000-122.10-99 114.91 OVERPAYMENT-507 W 5TH ST 401-0000-122.10-99 452.81 OVERPAYMENT-619 VASHON AV 401-0000-122.10-99 564.62 Division Total:$15,282.28 Department Total:$15,282.28 MISC TRAVEL SAIZ-NWPPA STAKING TECH C 401-7111-533.43-10 66.20 SWAIN'S GENERAL STORE INC SHOES AND BOOTS 401-7111-533.31-01 165.27 SHOES AND BOOTS 401-7111-533.31-01 244.66 US BANK CORPORATE PAYMENT SYSTEM Job posting-Industrial El 401-7111-533.31-01 50.00 Lodging-Saiz 401-7111-533.43-10 883.15 Page 13 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 21 City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount US BANK CORPORATE PAYMENT SYSTEM Job posting-Electrical En 401-7111-533.31-01 50.00 Job posting-Electrical En 401-7111-533.31-01 495.00 eSignature subscription-E 401-7111-533.49-90 239.57 Engineering-Electric Division Total:$2,193.85 EES CONSULTING INC MISC PROFESSIONAL SERVICE 401-7120-533.49-01 436.39 Power Systems Division Total:$436.39 AMAZON CAPITAL SERVICES ELECTRICAL EQUIP & SUPPLY 401-7180-533.35-01 41.46 HARDWARE,AND ALLIED ITEMS 401-7180-533.31-01 62.24 ELECTRICAL EQUIP & SUPPLY 401-7180-533.31-01 3.70 ELECTRICAL EQUIP & SUPPLY 401-7180-533.35-01 91.37 ANGELES MILLWORK & LUMBER BUILDER'S SUPPLIES 401-7180-533.31-01 14.27 BILL'S PLUMBING & HEATING INC RENTAL/LEASE EQUIPMENT 401-7180-533.45-30 200.00 BUCK'S NORTHWEST LANDSCAPING, LLC ROADSIDE,GRNDS,REC, PARK 401-7180-533.48-10 3,175.14 CED/CONSOLIDATED ELEC DIST ELECTRICAL EQUIP & SUPPLY 401-7180-533.34-02 351.46 ELECTRICAL EQUIP & SUPPLY 401-7180-533.35-01 239.36 ELECTRICAL EQUIP & SUPPLY 401-7180-533.34-02 391.68 GENERAL PACIFIC INC ELECTRICAL EQUIP & SUPPLY 401-7180-533.34-02 2,480.64 INDUSTRIAL SCIENTIFIC CORPORATION MISCELLANEOUS SERVICES 401-7180-533.41-50 1,325.12 LUTZCO, INC. FIRE PROTECTION EQUIP/SUP 401-7180-533.31-01 484.74 FIRE PROTECTION EQUIP/SU 401-7180-533.31-01 (346.27) FIRE PROTECTION EQUIP/SU 401-7180-533.31-01 346.27 FIRE PROTECTION EQUIP/SUP 401-7180-533.31-01 346.27 MATT'S TOOLS USA, LLC ELECTRICAL EQUIP & SUPPLY 401-7180-533.35-01 40.44 ELECTRICAL EQUIP & SUPPLY 401-7180-533.35-01 84.80 ELECTRICAL EQUIP & SUPPLY 401-7180-533.35-01 23.88 MISC EMPLOYEE EXPENSE REIMBURSEMENT HAINSTOCK - MEAL REIMBURS 401-7180-533.31-01 18.50 NORTHWEST SAFETY SERVICE, LLC SECURITY,FIRE,SAFETY SERV 401-7180-533.41-50 1,123.20 PLATT ELECTRIC SUPPLY INC ELECTRICAL EQUIP & SUPPLY 401-7180-533.34-02 362.01 PORT ANGELES POWER EQUIPMENT ELECTRICAL EQUIP & SUPPLY 401-7180-533.35-01 1,857.51 ELECTRICAL EQUIP & SUPPLY 401-7180-533.35-01 1,224.97 ELECTRICAL EQUIP & SUPPLY 401-7180-533.35-01 382.27 US BANK CORPORATE PAYMENT SYSTEM Training CEUs-Peppard 401-7180-533.43-10 166.00 Page 14 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 22 City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount US BANK CORPORATE PAYMENT SYSTEM Bridge toll-veh #1950 401-7180-533.45-21 7.25 eSignature subscription-L 401-7180-533.49-90 239.56 Lodging-Amiot 401-7180-533.43-10 790.40 Shipping-Ampact tool repa 401-7180-533.31-01 36.00 Water for Light Ops 401-7180-533.31-01 208.37 Bracket-jumping jack 401-7180-533.35-01 567.65 WESCO-ANIXTER ELECTRICAL EQUIP & SUPPLY 401-7180-533.35-01 1,148.93 ELECTRICAL EQUIP & SUPPLY 401-7180-533.35-01 962.88 Electric Operations Division Total:$18,452.07 Public Works-Electric Department Total:$21,082.31 Electric Utility Fund Total:$36,364.59 FERGUSON ENTERPRISES INC PIPE FITTINGS 402-0000-141.40-00 15,093.43 PIPE AND TUBING 402-0000-141.40-00 288.10 PIPE FITTINGS 402-0000-141.40-00 1,750.65 INDUSTRIAL BRUSH CORPORATION BROOM,BRUSH,MOP MFG MACH 402-0000-237.00-00 (49.08) THURMAN SUPPLY PIPE FITTINGS 402-0000-141.40-00 106.47 Division Total:$17,189.57 Department Total:$17,189.57 AMAZON CAPITAL SERVICES CHEMICAL, COMMERCIAL,BULK 402-7380-534.31-20 74.04 CASCADE COLUMBIA DISTRIBUTION, INC CHEMICAL LAB EQUIP & SUPP 402-7380-534.31-05 6,238.78 ENGINEERING SERVICES 402-7380-534.31-05 27.95 SHIPPING AND HANDLING 402-7380-534.31-05 1,868.60 CINTAS CORPORATION NO. 2 FIRST AID & SAFETY EQUIP.402-7380-534.31-01 21.50 DEPARTMENT OF COMMERCE FINANCIAL SERVICES 402-7380-582.78-10 126,687.32 FINANCIAL SERVICES 402-7380-592.83-10 1,900.30 EDGE ANALYTICAL MISC PROFESSIONAL SERVIC 402-7380-534.41-50 (432.00) MISC PROFESSIONAL SERVIC 402-7380-534.41-50 432.00 MISC PROFESSIONAL SERVICE 402-7380-534.41-50 432.00 PUD #1 OF CLALLAM COUNTY MISC PROFESSIONAL SERVICE 402-7380-534.47-10 86.23 SHI INTERNATIONAL CORP Computer Items 402-7380-534.31-60 331.62 SPECTRA LABORATORIES-KITSAP TESTING&CALIBRATION SERVI 402-7380-534.41-50 207.00 TESTING&CALIBRATION SERVI 402-7380-534.41-50 239.00 SWAIN'S GENERAL STORE INC NURSERY STOCK & SUPPLIES 402-7380-534.31-20 25.98 THURMAN SUPPLY PIPE AND TUBING 402-7380-534.31-20 108.93 Page 15 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 23 City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount US BANK CORPORATE PAYMENT SYSTEM AWWA Conf Reg-J Groves 402-7380-534.43-10 400.00 eSignature subscription-W 402-7380-534.48-02 239.57 USA BLUEBOOK PW CONSTRUCTION & RELATED 402-7380-534.31-20 1,327.54 Water Division Total:$140,216.36 INDUSTRIAL BRUSH CORPORATION BROOM,BRUSH,MOP MFG MACH 402-7382-534.31-20 606.86 PLATT ELECTRIC SUPPLY INC ELECTRICAL EQUIP & SUPPLY 402-7382-534.31-20 90.67 Industrial Water Treatmnt Division Total:$697.53 Public Works-Water Department Total:$140,913.89 Water Utility Fund Total:$158,103.46 AQUATIC INFORMATICS DATA PROC SERV &SOFTWARE 403-0000-237.00-00 (213.22) Division Total:($213.22) Department Total:($213.22) AQUATIC INFORMATICS DATA PROC SERV &SOFTWARE 403-7480-535.48-02 2,636.22 BEAVER EQUIPMENT SPECIALTY CO, INC CONSTRUCTION SERVICES,HEA 403-7480-535.48-10 2,807.04 BRANOM INSTRUMENT COMPANY WATER SEWAGE TREATMENT EQ 403-7480-535.35-01 1,399.17 BUCK'S NORTHWEST LANDSCAPING, LLC ROADSIDE,GRNDS,REC, PARK 403-7480-535.48-10 1,233.56 CINTAS CORPORATION NO. 2 FIRST AID & SAFETY EQUIP.403-7480-535.31-01 21.50 CUES MISC PROFESSIONAL SERVICE 403-7480-535.48-02 900.00 EDGE ANALYTICAL MISC PROFESSIONAL SERVICE 403-7480-535.41-50 414.00 MISC PROFESSIONAL SERVICE 403-7480-535.41-50 414.00 MISC PROFESSIONAL SERVICE 403-7480-535.41-50 448.00 FIELD INSTRUMENTS & CONTROLS INC WATER SEWAGE TREATMENT EQ 403-7480-535.31-20 708.29 GRANICH ENGINEERED PRODUCTS INC EQUIP MAINT & REPAIR SERV 403-7480-594.64-10 10,747.26 WATER SEWAGE TREATMENT EQ 403-7480-535.31-20 929.72 HARTNAGEL BUILDING SUPPLY INC PAINTING EQUIPMENT & ACC 403-7480-535.31-01 199.80 HEARTLINE HARDWARE,AND ALLIED ITEMS 403-7480-535.31-20 254.48 JOHNSON CONTROLS SECURITY SOLUTIONS FIRE PROTECTION EQUIP/SUP 403-7480-535.41-50 319.49 FIRE PROTECTION EQUIP/SUP 403-7480-535.41-50 345.24 KENNEDY/JENKS CONSULTANTS CONSULTING SERVICES 403-7480-535.41-50 18,903.87 MISC EMPLOYEE EXPENSE REIMBURSEMENT WILLIAMS - MEAL REIMBURSE 403-7480-535.31-01 18.50 POLYDYNE INC WATER&SEWER TREATING CHEM 403-7480-535.31-05 4,273.60 SEATTLE PUMP & EQUIPMENT COMPUTERS,DP & WORD PROC. 403-7480-535.35-01 1,713.60 Page 16 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 24 City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount SEATTLE PUMP & EQUIPMENT ELECTRICAL EQUIP & SUPPLY 403-7480-535.35-01 2,118.88 ELECTRONIC COMPONENTS 403-7480-535.35-01 214.34 PHOTOGRAPHIC EQUIPMENT 403-7480-535.35-01 4,439.04 SNAP-ON TOOLS - SARGENT TOOLS LLC HAND TOOLS ,POW&NON POWER 403-7480-535.35-01 184.96 SWAIN'S GENERAL STORE INC SHOES AND BOOTS 403-7480-535.31-01 (256.23) JANITORIAL SUPPLIES 403-7480-535.31-01 175.34 TECHNICAL SYSTEMS, INC ENGINEERING SERVICES 403-7480-535.48-02 340.00 US BANK CORPORATE PAYMENT SYSTEM eSignature subscription-W 403-7480-535.48-02 239.57 USB hub kit/fuses (4) 403-7480-535.31-20 278.93 Wastewater Division Total:$56,422.17 Public Works-WW/Stormwtr Department Total:$56,422.17 Wastewater Utility Fund Total:$56,208.95 AMAZON CAPITAL SERVICES SUPPLIES 404-7538-537.31-01 39.80 SUPPLIES 404-7538-537.31-01 74.51 CED/CONSOLIDATED ELEC DIST SUPPLIES 404-7538-537.35-01 52.17 SUPPLIES 404-7538-537.35-01 52.17 SUPPLIES 404-7538-537.35-01 (52.17) CLEAN EARTH EVIRONMENTAL SOLUTIONS PW CONSTRUCTION & RELATED 404-7538-537.41-51 790.43 PW CONSTRUCTION & RELATED 404-7538-537.41-51 790.43 PW CONSTRUCTION & RELATED 404-7538-537.41-51 790.43 HEARTLINE AUTO SHOP EQUIPMENT & SUP 404-7538-537.35-01 181.46 HI-TECH ELECTRONICS INC SECURITY,FIRE,SAFETY SERV 404-7538-537.41-51 783.36 LES SCHWAB TIRE CENTER AUTO & TRUCK MAINT. ITEMS 404-7538-537.48-10 573.05 EXTERNAL LABOR SERVICES 404-7538-537.48-10 109.85 FINANCIAL SERVICES 404-7538-537.48-10 1.09 MISC EMPLOYEE EXPENSE REIMBURSEMENT ADOLPHSEN-MILEAGE REIMBUR 404-7538-537.43-10 95.30 EVANS - MILEAGE REIMBURSE 404-7538-537.43-10 163.80 HOWELL - MILEAGE REIMBURS 404-7538-537.43-10 63.47 PACIFIC OFFICE EQUIPMENT INC FURNITURE, OFFICE 404-7538-537.31-01 306.99 PORT ANGELES CITY TREASURER Blue Mountain 404-7538-537.31-01 50.00 Blue Mountain 404-7538-537.31-01 300.00 SELLETON.COM SCALES/WEIGHING APPARATUS 404-7538-537.35-01 7,439.70 SWAIN'S GENERAL STORE INC PAPER & PLASTIC-DISPOSABL 404-7538-537.31-01 64.03 LAWN MAINTENANCE EQUIP 404-7538-537.35-01 236.24 Page 17 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 25 City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount SWAIN'S GENERAL STORE INC SHOES AND BOOTS 404-7538-537.31-01 168.50 FURNITURE, OFFICE 404-7538-537.35-01 239.71 HARDWARE,AND ALLIED ITEMS 404-7538-537.31-01 6.46 HARDWARE,AND ALLIED ITEMS 404-7538-537.31-01 32.91 ULINE, INC FIRE PROTECTION EQUIP/SUP 404-7538-537.35-01 1,560.97 FURNITURE, OFFICE 404-7538-537.35-01 2,768.11 US BANK CORPORATE PAYMENT SYSTEM Rental truck 404-7538-537.35-01 1,818.61 Rental truck 404-7538-537.35-01 280.14 Parts for compactor at Tr 404-7538-537.35-01 214.72 Parts for compactor at Tr 404-7538-537.35-01 0.26 Parts for compactor at Tr 404-7538-537.35-01 96.75 Parts for compactor at Tr 404-7538-537.49-01 125.00 SW - Transfer Station Division Total:$20,218.25 CINTAS CORPORATION NO. 2 FIRST AID & SAFETY EQUIP.404-7580-537.31-01 21.50 MISC EMPLOYEE EXPENSE REIMBURSEMENT COOK - MEAL REIMBURSEMENT 404-7580-537.31-01 37.00 COOK - MEAL REIMBURSEMENT 404-7580-537.31-01 37.00 CRENSHAW - MEAL REIMBURSE 404-7580-537.31-01 37.00 CRENSHAW - MEAL REIMBURSE 404-7580-537.31-01 37.00 CRENSHAW-MEAL REIMB HOLID 404-7580-537.31-01 37.00 DICKINSON - MEAL REIMBURS 404-7580-537.31-01 37.00 DICKINSON - MEAL REIMBURS 404-7580-537.31-01 37.00 DICKINSON-MEAL REIMB HOLI 404-7580-537.31-01 37.00 FROJEN - MEAL REIMBURSEME 404-7580-537.31-01 18.50 HENKE - MEAL REIMB HOLIDA 404-7580-537.31-01 37.00 HENKE - MEAL REIMBURSEMEN 404-7580-537.31-01 37.00 HENKE - MEAL REIMBURSEMEN 404-7580-537.31-01 37.00 HEUSTIS - MEAL REIMBURSEM 404-7580-537.31-01 18.50 HOWELL-MEAL REIMBURSEMENT 404-7580-537.31-01 37.00 PERRY - MEAL REIMBURSEMEN 404-7580-537.31-01 18.50 PETTY-HOLIDAY OT MEAL REI 404-7580-537.31-01 18.50 PETTY-VACA COVERAG OT MEA 404-7580-537.31-01 37.00 SCOTT - MEAL REIMBURSEMEN 404-7580-537.31-01 37.00 SEIGLER - MEAL REIMB HOLI 404-7580-537.31-01 37.00 SHOWERS-MEAL REIMBURSEMEN 404-7580-537.31-01 18.50 Page 18 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 26 City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount MISC EMPLOYEE EXPENSE REIMBURSEMENT ADOLPHSEN-MEAL REIMBURSEM 404-7580-537.31-01 37.00 ADOLPHSEN-MEAL REIMBURSEM 404-7580-537.31-01 37.00 COBURN - MEAL REIMBURSEME 404-7580-537.31-01 37.00 CRENSHAW - MEAL REIMBURSE 404-7580-537.31-01 37.00 DICKINSON - MEAL REIMBURS 404-7580-537.31-01 37.00 FROJEN - MEAL REIMBURSEME 404-7580-537.31-01 18.50 FROJEN - MEAL REIMBURSEME 404-7580-537.31-01 37.00 HENKE - MEAL REIMBURSEMEN 404-7580-537.31-01 37.00 HEUSTIS - MEAL REIMBURSEM 404-7580-537.31-01 18.50 HEUSTIS - MEAL REIMBURSEM 404-7580-537.31-01 37.00 PERRY - MEAL REIMBURSEMEN 404-7580-537.31-01 37.00 PETTY - MEAL REIMBURSEMEN 404-7580-537.31-01 18.50 PETTY - MEAL REIMBURSEMEN 404-7580-537.31-01 37.00 SAGE - MEAL REIMBURSEMENT 404-7580-537.31-01 18.50 SCOTT - MEAL REIMBURSEMEN 404-7580-537.31-01 37.00 SHOWERS-MEAL REIMBURSEMEN 404-7580-537.31-01 18.50 SIEGLER - MEAL REIMBURSEM 404-7580-537.31-01 37.00 SIEGLER - MEAL REIMBURSEM 404-7580-537.31-01 37.00 SIEGLER - MEAL REIMBURSEM 404-7580-537.31-01 37.00 WRIGHT - MEAL REIMBURSEME 404-7580-537.31-01 37.00 WRIGHT - MEAL REIMBURSEME 404-7580-537.31-01 37.00 WRIGHT - MEAL REIMBURSEME 404-7580-537.31-01 37.00 WURZ - MEAL REIMBURSEMENT 404-7580-537.31-01 37.00 WURZ - MEAL REIMBURSEMENT 404-7580-537.31-01 37.00 WURZ - MEAL REIMBURSEMENT 404-7580-537.31-01 37.00 OFFICE DEPOT SUPPLIES 404-7580-537.31-01 31.87 SUPPLIES 404-7580-537.31-01 34.54 SOLID WASTE SYSTEMS, INC RENTAL/LEASE EQUIPMENT 404-7580-537.45-30 8,468.10 RENTAL/LEASE EQUIPMENT 404-7580-537.45-30 8,476.60 SWAIN'S GENERAL STORE INC FIRST AID & SAFETY EQUIP.404-7580-537.31-01 114.46 US BANK CORPORATE PAYMENT SYSTEM Parts for compactor at Tr 404-7580-537.49-01 125.00 License fee-veh #2189 404-7580-537.45-21 64.00 Solid Waste-Collections Division Total:$18,816.07 ASPECT CONSULTING, LLC CONSULTING SERVICES 404-7585-537.41-50 1,106.01 Page 19 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 27 City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount NTI SURVERYING ENGINEERING SERVICES 404-7585-537.41-50 3,975.00 Solid Waste-Landfill Division Total:$5,081.01 Public Works-Solid Waste Department Total:$44,115.33 Solid Waste Utility Fund Total:$44,115.33 JJC RESOURCES, LLC ROAD/HWY MAT NONASPHALTIC 406-7412-538.31-20 477.05 MISC CITY CONSERVATION REBATES STORMWATER RAIN GARDEN RE 406-7412-538.41-50 337.21 OSBORN CONSULTING, INC CONSULTING SERVICES 406-7412-538.41-50 18,244.43 US BANK CORPORATE PAYMENT SYSTEM Conf Reg-McIntyre 406-7412-538.43-10 107.72 eSignature subscription-S 406-7412-538.41-50 239.57 Stormwater Division Total:$19,405.98 Public Works-WW/Stormwtr Department Total:$19,405.98 Stormwater Utility Fund Total:$19,405.98 A/R MISCELLANEOUS REFUNDS OVRPMNT OF MEDIC 1 FEES 409-0000-213.10-90 824.73 Division Total:$824.73 Department Total:$824.73 CLALLAM CNTY EMS MEMBERSHIPS 409-6025-526.41-50 1,140.00 TELEFLEX, LLC SALE SURPLUS/OBSOLETE 409-6025-526.31-01 560.58 SALE SURPLUS/OBSOLETE 409-6025-526.31-01 1,219.51 US BANK CORPORATE PAYMENT SYSTEM Helmet shield-Gage 409-6025-526.20-80 63.74 WA STATE HEALTH CARE AUTHORITY 2018 GEMT FINAL SETTLEMNT 409-6025-332.93-40 11,189.98 Medic I Division Total:$14,173.81 US BANK CORPORATE PAYMENT SYSTEM Dry erase board 409-6027-526.31-01 61.91 Community Paramedicine Division Total:$61.91 Fire Department Total:$14,235.72 Medic I Utility Fund Total:$15,060.45 AIR FLO HEATING COMPANY INC CITY REBATE-DUCTLESS HEAT 421-7121-533.49-86 800.00 ALL WEATHER HEATING AND COOLING CITY REBATE - DUCTLESS HE 421-7121-533.49-86 2,000.00 CITY REBATE-DUCTLESS HEAT 421-7121-533.49-86 800.00 CITY REBATE-DUCTLESS HEAT 421-7121-533.49-86 800.00 CITY REBATE-DUCTLESS HEAT 421-7121-533.49-86 800.00 CITY REBATE-DUCTLESS HEAT 421-7121-533.49-86 800.00 CITY REBATE-DUCTLESS HEAT 421-7121-533.49-86 800.00 Page 20 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 28 City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount ALL WEATHER HEATING AND COOLING CITY REBATE-DUCTLESS HEAT 421-7121-533.49-86 1,600.00 DAVE'S HEATING & COOLING SVC CITY REBATE-DUCTLESS HEAT 421-7121-533.49-86 800.00 CITY REBATE-DUCTLESS HEAT 421-7121-533.49-86 800.00 CITY REBATE-DUCTLESS HEAT 421-7121-533.49-86 800.00 CITY REBATE-DUCTLESS HEAT 421-7121-533.49-86 800.00 GLASS SERVICES CO INC CITY REBATE-WINDOW REPLAC 421-7121-533.49-86 724.50 MATHEWS GLASS CO INC CITY REBATE-WINDOW REEPLA 421-7121-533.49-86 55.75 CITY REBATE-WINDOW REPLAC 421-7121-533.49-86 25.33 PENINSULA HEAT INC CITY REBATE-DUCTLESS HEAT 421-7121-533.49-86 700.00 CITY REBATE-DUCTLESS HEAT 421-7121-533.49-86 800.00 Conservation Division Total:$13,905.58 Public Works-Electric Department Total:$13,905.58 Conservation Fund Total:$13,905.58 VET INDUSTRIAL INC PW CONSTRUCTION & RELATED 456-7688-594.65-10 1,652.00 Stormwater Util CIP Projs Division Total:$1,652.00 Public Works Department Total:$1,652.00 Stormwtr Util Projects Fund Total:$1,652.00 DEPARTMENT OF COMMERCE FINANCIAL SERVICES 463-7489-582.78-10 31,052.64 FINANCIAL SERVICES 463-7489-582.78-10 120,698.38 FINANCIAL SERVICES 463-7489-582.78-10 609,727.43 FINANCIAL SERVICES 463-7489-592.83-10 776.32 FINANCIAL SERVICES 463-7489-592.83-10 3,620.96 FINANCIAL SERVICES 463-7489-592.83-10 21,340.46 CSO Capital Division Total:$787,216.19 Public Works-WW/Stormwtr Department Total:$787,216.19 CSO Capital Fund Total:$787,216.19 AMAZON CAPITAL SERVICES RADIO & TELECOMMUNICATION 501-0000-141.40-00 71.79 ASSOCIATED PETROLEUM PRODUCTS, INC FUEL,OIL,GREASE, & LUBES 501-0000-141.20-00 16,434.38 FUEL,OIL,GREASE, & LUBES 501-0000-141.20-00 14,946.65 FUEL,OIL,GREASE, & LUBES 501-0000-141.20-00 18,173.69 FUEL,OIL,GREASE, & LUBES 501-0000-141.20-00 20,339.35 BAILEY SIGNS & GRAPHICS AUTO & TRUCK ACCESSORIES 501-0000-141.40-00 435.20 HEARTLINE AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 176.20 HERMANN BROS LOGGING & AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 319.59 Page 21 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 29 City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount CONST IRONCLAD COMPANY AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 2,839.68 KAMAN INDUSTRIAL TECHNOLOGIES AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 178.04 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 700.23 POWER TRANSMISSION EQUIPM 501-0000-141.40-00 299.95 N C MACHINERY CO AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 41.28 NAPA AUTO PARTS AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 20.02 O'REILLY AUTO PARTS AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 210.50 PAPE-KENWORTH NORTHWEST, INC AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 25.64 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 865.42 AUTO & TRUCK MAINT. ITEMS 501-0000-141.40-00 2,077.97 PETROCARD, INC FUEL,OIL,GREASE, & LUBES 501-0000-141.20-00 928.93 Division Total:$79,084.51 Department Total:$79,084.51 ARAMARK LAUNDRY/DRY CLEANING SERV 501-7630-548.49-90 20.28 LAUNDRY/DRY CLEANING SERV 501-7630-548.49-90 20.28 CENTRAL WELDING SUPPLY AUTO & TRUCK MAINT. ITEMS 501-7630-548.49-90 255.84 GASES CONT.EQUIP:LAB,WELD 501-7630-548.49-90 427.50 CINTAS CORPORATION NO. 2 FIRST AID & SAFETY EQUIP.501-7630-548.31-01 50.71 EVERGREEN COLLISION CENTER AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 275.92 EXTERNAL LABOR SERVICES 501-7630-548.34-02 883.67 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 354.66 FAR-WEST MACHINE & HYDRAULICS AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 921.56 FERRELLGAS INC FUEL,OIL,GREASE, & LUBES 501-7630-548.32-12 115.90 HERMANN BROS LOGGING & CONST AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 207.75 LES SCHWAB TIRE CENTER EXTERNAL LABOR SERVICES 501-7630-548.34-02 173.56 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 1,404.50 EXTERNAL LABOR SERVICES 501-7630-548.34-02 104.47 EXTERNAL LABOR SERVICES 501-7630-548.34-02 130.55 LINCOLN INDUSTRIAL CORP AUTO & TRUCK MAINT. ITEMS 501-7630-548.35-01 816.00 AUTO & TRUCK MAINT. ITEMS 501-7630-548.35-01 816.00 MATT'S TOOLS USA, LLC AUTO & TRUCK MAINT. ITEMS 501-7630-548.35-01 16.40 AUTO & TRUCK MAINT. ITEMS 501-7630-548.35-01 27.38 Page 22 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 30 City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount N C MACHINERY CO AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 6.01 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 153.90 ROAD/HWY EQUIP EARTH,GRD 501-7630-548.34-02 (8,526.66) ROAD/HWY EQUIP EARTH,GRD 501-7630-548.34-02 7,246.78 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 489.88 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 340.54 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 1,855.04 NAPA AUTO PARTS AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 96.11 OWEN EQUIPMENT AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 2,334.82 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 3,022.25 PAPE-KENWORTH NORTHWEST, INC AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 73.96 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 387.93 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 444.48 SIX ROBBLEES' INC AUTO & TRUCK ACCESSORIES 501-7630-594.64-10 654.84 SNAP-ON TOOLS - SARGENT TOOLS LLC AUTO & TRUCK MAINT. ITEMS 501-7630-548.35-01 85.90 US BANK CORPORATE PAYMENT SYSTEM Generator parts-veh #5601 501-7630-548.45-21 606.86 WESTERN EQUIPMENT DISTRIB INC AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 1,406.48 WESTERN PETERBILT INC AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 11,969.46 AUTO & TRUCK MAINT. ITEMS 501-7630-548.34-02 340.20 EXTERNAL LABOR SERVICES 501-7630-548.34-02 1,701.02 Equipment Services Division Total:$31,712.73 Public Works Department Total:$31,712.73 Equipment Services Fund Total:$110,797.24 PORT53 RENTAL/LEASE EQUIPMENT 502-2081-518.41-50 24,716.70 SHI INTERNATIONAL CORP COMPUTER HARDWARE&PERIPHE 502-2081-518.48-02 4,246.32 DATA PROC SERV &SOFTWARE 502-2081-518.48-02 19,228.97 US BANK CORPORATE PAYMENT SYSTEM LTO7 worm media cartridge 502-2081-518.31-60 289.20 Wall mount phone w/ringer 502-2081-518.31-80 143.32 LTO7 tape data cartridges 502-2081-518.31-60 522.20 Ceiling adapter/preamp 502-2081-518.31-80 132.37 Dell QLogic HBA adapter c 502-2081-518.48-10 548.85 LCD TVs/monitors/mounts 502-2081-518.48-02 5,831.55 WebEx subscription 502-2081-518.48-02 418.88 Page 23 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 31 City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount US BANK CORPORATE PAYMENT SYSTEM AV Credenza-Jack Pittis c 502-2081-518.48-02 1,936.10 Wall plate/50ft ext monit 502-2081-518.31-80 80.39 eSignature subscription-I 502-2081-518.41-50 239.57 Fiber optic SFP SM-Scada 502-2081-518.48-10 487.50 HDMI 30ft cable 502-2081-518.31-80 32.63 IT hand tools/supplies fo 502-2081-518.35-01 101.75 IT hand tools/supplies fo 502-2081-518.35-01 387.42 IT hand tools/field suppo 502-2081-518.35-01 332.81 Ext cord/projector-laptop 502-2081-518.31-80 61.97 Business prime renewal 502-2081-518.49-01 194.75 HDMI cables/adapters 502-2081-518.31-80 69.17 Digital security cert ren 502-2081-518.48-02 822.75 WebEx subscription 502-2081-518.48-02 418.88 VERIZON WIRELESS COMMUNICATIONS/MEDIA SERV 502-2081-518.42-10 172.32 06-05 A/C 542276284-00001 502-2081-518.42-10 92.82 06-15 A/C 842160242-00001 502-2081-518.42-10 178.57 06-15 A/C 842160242-00003 502-2081-518.42-10 1,183.49 06-15 A/C 842160242-00004 502-2081-518.42-10 4,609.52 Information Technologies Division Total:$67,480.77 Finance Department Total:$67,480.77 Information Technology Fund Total:$67,480.77 AWC EMPLOYEE BENEFITS TRUST L1 MED/DEN/VIS PREMIUMS 503-1631-517.46-34 8,040.92 LIFE INSURANCE 503-1631-517.46-32 1,751.70 LTD 503-1631-517.46-31 5,510.68 MED/DEN/VIS PREMIUMS 503-1631-517.46-30 204,011.12 HSA BANK Service Fee 503-1631-517.46-30 31.50 Service Fee 503-1631-517.46-30 302.50 REDACTED Disability Board-June 503-1631-517.46-35 20.00 Disability Board-June 503-1631-517.46-35 124.32 Disability Board-June 503-1631-517.46-35 264.10 REIMBURSE MEDICARE-JUNE 503-1631-517.46-35 108.00 REIMBURSE MEDICARE-JUNE 503-1631-517.46-35 108.00 REIMBURSE MEDICARE-JUNE 503-1631-517.46-35 108.00 REIMBURSE MEDICARE-JUNE 503-1631-517.46-35 124.50 REIMBURSE MEDICARE-JUNE 503-1631-517.46-35 136.50 Page 24 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 32 City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount REDACTED REIMBURSE MEDICARE-JUNE 503-1631-517.46-35 145.10 REIMBURSE MEDICARE-JUNE 503-1631-517.46-35 148.50 REIMBURSE MEDICARE-JUNE 503-1631-517.46-35 148.50 REIMBURSE MEDICARE-JUNE 503-1631-517.46-35 148.50 REIMBURSE MEDICARE-JUNE 503-1631-517.46-35 148.50 REIMBURSE MEDICARE-JUNE 503-1631-517.46-35 148.50 REIMBURSE MEDICARE-JUNE 503-1631-517.46-35 154.10 REIMBURSE MEDICARE-JUNE 503-1631-517.46-35 169.10 REIMBURSE MEDICARE-JUNE 503-1631-517.46-35 170.10 REIMBURSE MEDICARE-JUNE 503-1631-517.46-35 170.10 REIMBURSE MEDICARE-JUNE 503-1631-517.46-35 170.10 REIMBURSE MEDICARE-JUNE 503-1631-517.46-35 170.10 REIMBURSE MEDICARE-JUNE 503-1631-517.46-35 444.10 REIMBURSE MEDICARE-JUNE 503-1631-517.46-35 669.10 REDQUOTE, INC. HRA REIMBURSEMENTS 503-1631-517.46-30 3,767.95 HRA REIMBURSEMENTS 503-1631-517.46-30 718.09 HRA REIMBURSEMENTS 503-1631-517.46-30 1,337.15 Other Insurance Programs Division Total:$229,469.43 WASHINGTON HOSPITAL SVCS FEBRUARY 2022 FEE CONTRAC 503-1661-517.41-40 750.00 APRIL 2022 FEE CONTRACT 503-1661-517.41-40 750.00 MAY 2022 FEE CONTRACT 503-1661-517.41-40 750.00 JUNE 2022 FEE CONTRACT 503-1661-517.41-40 750.00 JULY 2022 FEE CONTRACT 503-1661-517.41-40 750.00 Worker's Compensation Division Total:$3,750.00 A WORKSAFE SERVICE, INC PROFESSIONAL SERVICES 503-1671-517.41-50 970.00 MISC CLAIM SETTLEMENTS IN HOUSE LIABILITY CLAIM 503-1671-517.49-98 54.13 Comp Liability Division Total:$1,024.13 Self Insurance Department Total:$234,243.56 Self-Insurance Fund Total:$234,243.56 AFLAC AFLAC SUPP INS JULY PREMI 920-0000-231.53-10 807.38 AFSCME LOCAL 1619 PAYROLL SUMMARY 920-0000-231.54-40 555.00 AWC EMPLOYEE BENEFITS TRUST SUPPLEMENTAL LIFE 920-0000-231.53-30 574.70 BROWN & BROWN OF WASHINGTON PAYROLL SUMMARY 920-0000-231.53-40 1,878.79 CHAPTER 13 TRUSTEE Case #21-10696 920-0000-231.56-90 358.00 Page 25 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 33 City of Port Angeles City Council Expenditure Report Between Jun 25, 2022 and Jul 8, 2022 Vendor Description Account Number Amount EMPOWER-P/R WIRE PAYROLL SUMMARY 920-0000-231.52-20 25,360.63 FEDERAL PAYROLL TAX PAYROLL SUMMARY 920-0000-231.50-10 104,456.15 FICA/MEDICARE PAYROLL TAX PAYROLL SUMMARY 920-0000-231.50-20 105,171.48 FIREFIGHTER'S LOCAL 656 PAYROLL SUMMARY 920-0000-231.54-30 2,650.80 HSA BANK Employee Contributions 920-0000-231.52-40 3,616.54 PAYROLL SUMMARY 920-0000-231.53-11 100.00 PAYROLL SUMMARY 920-0000-231.53-12 301.54 IBEW LOCAL 997 PAYROLL SUMMARY 920-0000-231.54-20 1,362.44 JOHN HANCOCK LIFE INSURANCE CO PAYROLL SUMMARY 920-0000-231.52-25 1,997.91 LEOFF PAYROLL SUMMARY 920-0000-231.51-21 36,583.21 MISSION SQUARE-P/R WIRES PAYROLL SUMMARY 920-0000-231.52-10 26,737.92 PAYROLL SUMMARY 920-0000-231.52-30 11,920.05 OFFICE OF SUPPORT ENFORCEMENT PAYROLL SUMMARY 920-0000-231.56-20 810.76 PERS PAYROLL SUMMARY 920-0000-231.51-10 834.22 PAYROLL SUMMARY 920-0000-231.51-11 15,338.17 PAYROLL SUMMARY 920-0000-231.51-12 81,375.79 POLICE ASSOCIATION PAYROLL SUMMARY 920-0000-231.55-10 367.00 UNITED WAY (PAYROLL) PAYROLL SUMMARY 920-0000-231.56-10 200.00 WSCCCE AFSCME AFL-CIO PAYROLL SUMMARY 920-0000-231.54-40 6,181.79 Division Total:$429,540.27 Department Total:$429,540.27 Payroll Clearing Fund Total:$429,540.27 Total for Checks Dated Between Jun 25, 2022 and Jul 8, 2022 $2,097,874.99 Page 26 of 26 Jul 12, 2022 3:26:42 PMJuly 19, 2022 E - 34 Date: July 19, 2022 To: City Council From: Thomas Hunter, Director of Public Works & Utilities Subject: 2022 Landfill Beach Nourishment Project CON-2022-39 Background / Analysis: As part of a recurring condition of the landfill seawall construction, the Shoreline Conditional Use Permit, and the Hydraulic Project Approval (HPA), the City is required to place beach nourishment material in front of the 454-foot-long seawall fronting the Landfill bluff face. This project will use beach nourishment material from the Landfill Stabilization Project and imported beach nourishment material. Transport trucks and bulldozers, operating on the existing seawall toe armor, will place 2600 cubic yards of clean beach nourishment materials waterward of the seawall. This work will follow all conditions required of the HPA and Army Corp of Engineer permits, including ensuring that all work waterward of the seawall will take place during low tide. Due to staff capacity constraints no progress has been made with stakeholders to revise beach nourishment placement permit conditions. Notice of the bid opportunity was advertised through the Municipal Research and Services Center (MRSC) Rosters on June 21, 2022 and posted to the City’s website. Bids were opened on July 7, 2022, and 4 bids were received. 2 Grade LLC, of Port Angeles, WA is the lowest responsible bidder with a bid amount of $34,752.35. Contractor Bid Amount 2 Grade LLC, Port Angeles, WA $34,752.35 C & J Excavating Inc., Carlsborg, WA $55,270.40 DH Environmental Inc., Seattle, WA $58,157.94 Raptor Excavating and Contracting LLC, Yacolt, WA $85,270.91 Engineer’s Estimate $52,387.20 Funding Overview: Funds are available in the approved 2022 Solid Waste Post-closure Utility Repairs and Maintenance budget account 404-7585-537-4810 in the amount of $34,752.35 Summary: The purpose of this memo is to receive City Council approval for the 2022 Landfill Beach Nourishment project. This project will place 2600 cubic yards of clean beach nourishment material which serves as mitigation of the seawall to prevent natural erosion along the Landfill bluff face. Funding: Funds are available in the approved 2022 Solid Waste Post-closure Utility Repairs and Maintenance budget account 404-7585-537-4810 in the amount of $34,752.35. Recommendation: Award a construction contract with 2 Grade LLC of Port Angeles, WA, for the 2022 Landfill Beach Nourishment Project, CON-2022-39, in an amount not to exceed $34,752.35; and authorize the City Manager to sign all documents necessary to execute the construction contract for the project and to make minor modifications to the contract, as necessary. July 19, 2022 E - 35 Date: July 19, 2022 To: City Council From: Thomas Hunter, Director of Public Works & Utilities Subject: Electric Utility 2022 Resource Plan Background / Analysis: The electric utility is required, by Chapter 19.280 RCW, to prepare an updated Resource Plan (Plan) and submit it to the Washington Department of Commerce by September 1, 2022. While the Plan does not need to be an elaborate document, at a minimum the Plan is required to include: • Current City electric power usage • Future City electric power usage projections for five- and ten-year usage • Plans for providing customers with power for the next ten years • Where the power is purchased or generated • Explain how the City will comply with the Clean Energy Transformation Act (CETA). This Plan must be updated every two years and has been approved by the City Council in 2008, 2010, 2012, 2014, 2016, 2018, and 2020. It is intended to ensure that electric utilities have arranged for adequate resources to meet the needs of their customer base. The City will amend this plan as needed when future needs change. For example if alternative power resource opportunities are identified or if the City changes the source of power generation (provided the change is within the scope of Port Angeles' power agreement with BPA). The City is a contractually bound full-requirements customer of the Bonneville Power Administration (BPA); the Plan was generated by BPA using typical growth rates and the City’s current and anticipated future resource mix. The 2021 version shows all power can be provided by BPA. As reported in the Plan: • The City of Port Angeles used an average of 50.57 aMW, with BPA providing 50.18 aMW, .30 aMW in conservation and a small amount provided through an interlocal agreement with Clallam County PUD (0.09 aMW). • The 5-year forecast is relatively flat 50.53 aMW: o with conservation providing 0.30 aMW, Summary: The City’s electric utility is required by statute to provide a biennial update to its Power Resource Plan. Updates to the Plan were submitted to, and approved by, Council biennially beginning in 2008. The process to update the plan requires public notice and hearing prior to approval of the 2022 Plan. Funding: N/A Recommendation: Pass the attached resolution to set a public hearing on the City’s proposed biennial update to its Power Resource Plan for the regular Council meeting on August 16, 2022 and give notice of that hearing. July 19, 2022 E - 36 o Clallam County PUD providing 0.09 aMW, and o BPA providing the majority with 50.14 aMW. • The 10-year forecast shows Port Angeles remaining flat at 50.48 aMW, with conservation providing 0.30 aMW, Clallam County PUD providing 0.09 aMW, and BPA providing 50.09 aMW. The Plan will be available to the public from the City’s website. It is recommended that the City Council set a public hearing on the plan for the August 16 regular Council meeting. Funding Overview: N/A July 19, 2022 E - 37 RESOLUTION NO. A RESOLUTION of the City Council of the City of Port Angeles, Washington, setting a hearing date for a proposal t o approve the 2022 Electric Utility Resource Plan. WHEREAS, the City strives to ensure that its citizens have reliable access to electricity resources adequate to meet their projected loads; and WHEREAS, the City must submit an Electric Utility Resource Plan to the Washington Department of Commerce by September 1, 2022 as required by Chapter 19.280 RCW; and WHEREAS, the City Council of the City of Port Angeles Washington, being the governing body of the consumer-owned electric utility, will conduct a public hearing on the August 16, 2022 to provide the public the opportunity to comment on the 2022 Electric Utility Resource Plan. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Port Angeles, Washington, that at the regular City Council meeting on August 16, 2022, at 6:30 P.M., or as soon thereafter as possible, the Council will conduct a public hearing regarding the 2022 Electric Utility Resource Plan as prepared by the Director of Public Works and Utilities and attached hereto as Exhibit A. PASSED by the City Council of the City of Port Angeles at a regular meeting of said Council held on July 19, 2022. Kate Dexter, Mayor ATTEST: By: Kari Martinez-Bailey, City Clerk APPROVED AS TO FORM: By: William E. Bloor, City Attorney -1- July 19, 2022 E - 38 City of Port Angeles << Utility Name Washington State Utility Resource Plan Year 2022 Prepared by:Gregg King Base Year 5 Yr. Est.10 Yr Est. Estimate Year 2021 2026 2031 Period Annual Annual Annual Units (MWa)(MWa)(MWa) Loads 30.61 50.45 50.47 Resources: Future Conservation/Efficiency 0.30 0.30 Demand Response BPA Tier 1 (include BPA PF)30.52 50.06 50.08 BPA Tier 2 Non BPA: Co-generation Hydro (critical water) Wind Other Renewables Thermal-Natural Gas Thermal-Coal Market Purchase (non BPA)0.09 0.09 0.09 Other Distributed Generation Undecided Total Resources 30.61 50.45 50.47 Load Resource Balance 0.00 0.00 0.00 Date of Board/Commission Approval (mm/yy) Notes: Explain resource choices other than conservation / Use of renewable energy credits in p RESOURCES: BPA Tier 1 (includes BPA PF) - The City of Port Angeles is a full resource customer of the Bonneville Power Administration. The current BPA contract ends in 2028. This forecast for 2031 assumes the City continues it's power purchase contract with BPA due to low cost and support of the City's energy efficiency. CARBON: The City is complying with all state and federal requirements to decrease carbon in the the City's power supply. As of 2020 (last year available) BPA's power is 94.61% carbon free. In addition, BPA estimates it will maintain a 91% or better carbon-free power over the next ten years. The City is participating in BPA's new contract-period talks and is pushing for a carbon-free energy product. In the event such a product is not available in the next contract period the City does have the option of meeting the 2030 goal of having a carbon-neutral power by utilizing up to 10% of its load with carbon offsets it can purchase on the open market. July 19, 2022 E - 39 This row will be zeros if loads and resourc lanning / Distributed Generation One way of commenting is to enter the line number of the resource title and type the comment following the number. For example: "Line 24: Our Distributed Generation sources are landfill gas and solar. To review your Utility's 2012 Cover Sheet click here to download; they are in alpha order. July 19, 2022 E - 40 Date: July 19, 2022 To: City Council From: Nathan A. West, City Manager Subject: Letter of Support and Partnership for National Endowment for the Arts (NEA) Grant Background / Analysis: Over the last six months, the Port Angeles Fine Arts Center (PAFAC) has been building a mission, vision, and workplan for improved collaboration and shared placemaking in the community. As part of this process, the PAFAC is applying for an Our Town grant through the National Endowment of the Arts (NEA) to help fund the strategic planning and branding work that would be required to form a community arts district. The group consists of partners from Peninsula College, the Community Playhouse, JFFA, NOLS, PA School District, ONP, Field Arts & Events Hall, and the Chamber of Commerce. The initial intent to apply is due August 4, 2022 and the final grant application is due August 14, 2022. In In order to apply for the grant, PAFAC must have a stated partnership between the local government and at least one non-profit organization with an arts/culture designation. The PAFAC has requested a formal letter of support stating the partnership that exists between the City and their organization. The proposed two-year project will formalize a new arts district in Port Angeles. The mission of the Uptown Arts District is to generate inclusive, vibrant arts and culture experiences and education along the Lauridsen Boulevard corridor. The District includes multiple partner organizations committed to collaboration and resource sharing to deliver events and programs for community members and area visitors of all ages. Funding: N/A Summary: The Fine Arts Center is requesting a letter of support to seek National Endowment of the Arts (NEA) grant funding to formalize a new arts district in Port Angeles. Funding: N/A Recommendation: Approve the letter of support of the Port Angeles Fine Arts Center seeking an Our Town grant through the National Endowment of the Arts to formalize a new arts district in Port Angeles. July 19, 2022 E - 41 Date: July 19, 2022 To: City Council From: Nathan A. West City Manager William E. Bloor, City Attorney Subject: Harbor Cleanup Process –Authorizing Payment of City Deposit to Port in the Amount of $14,000 Background / Analysis: In 2012, the Department of Ecology (DOE) asserted the City, together with several other entities– the Port, Nippon, Merrill & Ring, and Georgia Pacific – are potentially liable for some portion of the contaminants in the harbor. In response to that action, in 2013 the City and the other entities, collectively the potentially liable parties (PLPs), joined together in a Participation Agreement to share costs and jointly commence a process to clean up the harbor in accord with state law. The PLPs then negotiated an Agreed Order (AO), which legally obligated the PLPs to complete a Remedial Investigation/Feasibility Study (RI/FS). The group also entered into an Environmental Services Agreement (ESA), which secured the services of technical consultants. In the ESA, the PLPs employed the scientific and technical experts who would perform most of the work needed to prepare a RI/FS. On November 4, 2020 Council authorized the City Manager to execute on behalf of the City an amendment to the PLP Participation Agreement and an Amendment to the Agreed Order with DOE that obligates the City, and other PLPs, to prepare a draft Cleanup Action Plan (dCAP), which is the next step in the cleanup process. The RI /FS is final, and it has been approved by DOE. The PLP group has submitted a dCAP to DOE, but a final CAP has not yet been issued by DOE. Summary: In 2013, the City with other Potentially Liable Parties (PLPs) entered into a Participation Agreement to begin the harbor cleanup process. They also entered into an Environmental Services Agreement (ESA), which secured the services of consultants who would do the technical and scientific work to prepare a Remedial Investigation/Feasibility Study (RI/FS) as the first step in a cleanup of the harbor. Subsequently, in December 2020, and November 2021, Council approved amendments that expanded the scope and budget for both Agreements to direct the technical consultants to do additional work necessary to produce a draft Cleanup Action Plan (dCAP). That work is almost, but not entirely, complete. The Port, as the banker for the PLP group, has estimated the costs likely to be incurred through the end of 2022 and, based on that estimate, the Port is requesting an additional contribution to the PLP group account in the amount of $14,000. Funding: The City’s share of the estimated cost of completing Work Order No. 4 is $14,000 plus future invoices from the Department of Ecology through the end of 2022. The 2022 budget provides sufficient funds for this payment. As has been true in the past, a large portion of the City’s share will be reimbursed by insurance coverage. Recommendation: Authorize payment of $14,000 to the PLPs group account. July 19, 2022 E - 42 The Port serves as the banker for the PLP group. The amount remaining in the group account is approximately $26,904. The Port estimates that an additional $58,104 will be required to complete all necessary work under the ESA and that there will be future Ecology Invoices of $36,000 through the 4th Quarter of 2022. Based on those estimates, the Port’s proposal is that each party contribute $14,000 more to the group account. Funding: The City’s share of the estimated cost of completing Work Order No. 4 is $14,000 plus future invoices from the Department of Ecology through the end of 2022. The 2022 budget provides sufficient funds for this payment. As has been true in the past, a large portion of the City’s share will be reimbursed by insurance coverage. July 19, 2022 E - 43 Date: July 19, 2022 To: City Council From: Nathan A. West, City Manager Subject: Sub-recipient Agreement with OlyCAP for Federal CARES Act CDBG-CV Funding for Clallam County (including Cities of Forks, Port Angeles and Sequim) Background / Analysis: On June 2nd 2020, City Council conducted a public hearing and took action to approve Port Angeles to serve as the grant fund administrator for Clallam County wide CARES Act CDBG funding. The City will be working directly with OlyCAP to provide COVID related subsistence support for the Clallam County Community. As the City has historically done with CDBG grants we plan to execute a subrecipient agreement administration. OlyCAP currently administers the same grant for Jefferson County and has agreed to assist with this Clallam County grant opportunity. The State Department of Commerce provides a standard subrecipient agreement that will be modified to reflect the administrative roles and relationship between the City of Port Angeles and OlyCAP. Funding Overview: The Clallam County region is allocated to receive $605,624 of CARES Act CDBG funding. As the grant fund administrator, the funding would be provided to the City of Port Angeles on a reimbursement basis and operated through a sub-recipient agreement with OlyCAP. Summary: At the City Council meeting on June 2, 2020, City Council conducted a public hearing regarding a Coronavirus Aid, Relief, and Economic Security (CARES) Act Community Development Block Grant (CDBG) which provided support throughout Clallam County for individuals in need due to COVID impacts. At that meeting Council authorized City Staff to enter an agreement with Department of Commerce for the CDBG-CV funds. The Washington State Department of Commerce has awarded a total grant amount of $605,624 with the City of Port Angeles as the lead grant recipient. To ensure the grant is efficiently administered and passed along to individuals in need Staff recommends the City enters a sub-recipient agreement with Olympic Community Action Program (OlyCAP). Funding: The Clallam County region is allocated to receive $605,624 of CARES Act CDBG funding. As the grant fund administrator, the funding would be provided to the City of Port Angeles on a reimbursement basis and operated through a sub-recipient agreement with OlyCAP. Recommendation: Approve and authorize the City’s Community Development Block Grant responsible official to sign and execute a standard sub-recipient agreement with OlyCAP and make minor modifications as necessary. July 19, 2022 E - 44 Date: July 19, 2022 To: City Council From: Thomas Hunter, Director, Public Works & Utilities Subject: Ordinance Amendments – Accessory Dwelling Unit Utility Connections Background / Analysis: Following City Council direction, staff was asked to target and identify the most costly elements of accessory dwelling unit (ADU) utility connection requirements and operation and identify what revisions could be made to Code while still maintaining quality of service and the integrity of the utility. Work in the public-right-of-way associated with the installation of separate water and wastewater connections was identified and evaluated. Based on the motion and Port Angeles Municipal Code (PAMC) amendments from the May 31, 2022 Utility Advisory Committee (UAC), staff then prepared draft revisions to Title 13 regarding water and wastewater connections for ADU’s to present to the Council. A condensed summary of these proposed revisions is as follows: • Remove the current requirement for a separate connection to the main for a water service where a single connection can provide adequate service to both the primary and accessory dwellings. • Remove the current requirement for a monthly base fee for the meter serving the accessory dwelling. • Remove the current requirement for a separate connection to the main for wastewater service for a detached accessory dwelling where a single existing connection can provide adequate service to both the primary and accessory dwellings. • Allow the use of existing 4-inch sewer laterals for ADUs. • Remove the current requirement for a monthly base fee for the wastewater service for the detached accessory dwelling. At the May 31, 2022 UAC meeting, changes to the Code regarding water and wastewater connection requirements and elimination of monthly base charges for ADU’s were considered. The UAC reviewed the proposed revisions and voted in favor of forwarding a favorable recommendation to City Council to approve the revisions. Considering the prior discussion at UAC and the critical need to see more housing stock staff is recommending that Council waive the second reading. Summary: The attached revisions to the Port Angeles Municipal Code Title 13 reduces fees for water and wastewater connections for new and existing accessory dwelling units within the City while maintaining the integrity and operations of City utilities. Funding: Any costs not recovered for services provided will be subsidized by other users through the cost of service analysis. This amount, if any, is not fully known at this time as it is difficult to predict the number of new accessory dwelling units that will occur as a result of these changes. However, staff estimates this impact will be minimal at this time. Recommendation: 1.) Conduct the first reading of the proposed amendments to Ordinance Sections 13.32.025, 13.44.020(C), 13.62.015 and 13.65.010(C) related to revising current requirements for accessory dwelling unit water and wastewater connections and elimination of monthly base charges and; 2.) Waive the second reading and adopt the ordinance. G - 1July 19, 2022 Funding: Any costs not recovered for services provided will be subsidized by other users through the cost of service analysis. This amount, if any, is not fully known at this time as it is difficult to predict the number of new accessory dwelling units that will occur as a result of these changes. However, staff estimates this impact will be minimal at this time. G - 2July 19, 2022 1 ORDINANCE NO. __________ AN ORDINANCE of the City of Port Angeles, Washington amending Chapters 13.32, 13.44, 13.62 and 13.65 of the Port Angeles Municipal Code relating to Accessory Dwelling Units. THE CITY COUNCIL OF THE CITY OF PORT ANGELES DO HEREBY ORDAIN AS FOLLOWS: Section 1. Ordinance 2181 as amended, and Chapter 13.32 of the Port Angeles Municipal Code relating to water service connection charges are hereby amended by adding a new section 13.32.025 to Chapter 13.32 as follows: 13.32.025 – Exception to Conditions applicable to all water service connections – Accessory Dwelling Unit. Subject to the conditions set out in subparagraphs A through D below, water service to a single attached or detached accessory dwelling unit (ADU) may be supplied from a supply line connected to an existing or new service line that supplies water from a City main to the primary dwelling unit on the property: A. The service line must provide water to the ADU with a flow of at least 2 GPM @ 30 PSI. B. New ADU water meter shall be installed to City Standards. C. The owner of the primary dwelling unit shall assume all risks and shall hold the City harmless from all losses and damages arising from any such connection. D. No separate water system development fee shall be charged for the ADU water connection. Section 2. Ordinance 2181 as amended, and Chapter 13.44.020 of the Port Angeles Municipal Code relating to water service connection charges are hereby amended as follows: 13.44.020 Monthly non-discounted residential metered rate—Within City. A. The following monthly customer charges are applicable to water service to single-family residences within the corporate limits of the City of Port Angeles. For the purposes of this section, "single-family residences" are defined as structures designed for occupancy by a single family only, containing a complete kitchen unit. Structures which are not "single- family residences" include, but are not limited to, duplexes, fourplexes, apartments, and rooming houses. The base rate charge is specified below: G - 3July 19, 2022 2 Service Size Effective January 1, 2020 with 5/8-inch meter $38.50 with 3/4-inch meter $38.50 1-inch meter $38.50 1-1/2-inch meter $38.50 2-inch meter $38.50 B. No base rate will be charged for a new or existing lawful single attached or detached accessory dwelling unit (ADU) service where the primary residence pays a base rate charge. BC. Metered consumption for up to 1,000 cubic feet shall be 1.976 for 2020 for each 100 cubic feet consumed. CD. Additional consumption up to 1,500 cubic feet shall be 2.498 for 2020 for each 100 cubic feet consumed. DE. Additional consumption beyond 1,500 cubic feet shall be 3.012 for 2020 for each 100 cubic feet consumed. EF. The monthly residential rate for those qualifying for discounts per section 13.20 PAMC, regardless of meter sizes, shall be: Discount amount Effective January 1, 2020 25% Discount $28.88 35% Discount $25.03 FG. 25% discount metered consumption per cubic feet shall be 1.522 for 2020 for each 100 cubic feet consumed. GH. 35% discount metered consumption per cubic feet shall be 1.319 for 2020 for each 100 cubic feet consumed. Section 3. Ordinance 2394 as amended, and Chapter 13.62 of the Port Angeles Municipal Code relating to connections-extensions are hereby amended by adding a new section 13.62.015 to Chapter 13.62 as follows: 13.62.015 - Separate connection required exception – Accessory Dwelling Unit Subject to the conditions set out in subparagraphs A through E below, sewer service to a single attached or detached accessory dwelling unit (ADU) may be provided by a connection from the ADU to the primary dwelling unit on the property: A. The connection of the ADU to the primary dwelling shall be 4” diameter or greater. G - 4July 19, 2022 3 B. Prior to a connection being made, the line servicing the primary dwelling shall be video inspected at the sole expense of the developer to verify sewer line integrity. Record of video inspection shall be provided to the Director for approval or denial of the connection. C. The developer must demonstrate that both the line serving the primary dwelling and the line serving the ADU are, or will be, constructed to City Standards. D. The owner of the primary dwelling unit shall assume all risks and shall hold the City harmless from all losses and damages arising from any such connection. E. No separate wastewater system development fee shall be charged for the ADU wastewater connection. Section 4. Ordinance 2394 as amended, and Chapter 13.65 Section 010 of the Port Angeles Municipal Code relating to wastewater service rates are hereby amended as follows: 13.65.010 - Single residential unit monthly rate. A. Each residential unit and each living unit connected to the City wastewater collection, treatment and disposal system shall be charged a monthly customer charge during months in which water is consumed, except when exempt by 13.61.090 PAMC. This section shall not apply to a residential connection to the City water system for agricultural and irrigation purposes in accordance with 13.44.050 PAMC. B. The monthly rate is based upon the size of the meter as specified below, for non - discounted residential users and shall be: Effective Date—January 1, 2020 Base Rate CSO Rate Total With 5/8-inch meter $33.34 $13.92 $47.26 With 3/4-inch meter $41.76 $13.92 $55.68 With 1-inch meter $58.60 $13.92 $72.52 With 1-1/2-inch meter $100.71 $13.92 $114.63 C. No base rate will be charged for a new or existing lawful single attached or detached accessory dwelling unit (ADU) service where the primary residence pays a base rate charge. CD. The monthly residential rate for those qualifying for discounts per section 13.20 PAMC, for all meter sizes, shall be: Effective Date—January 1, 2020 Base Rate CSO Rate Total 25% Discount $25.00 $10.26 $35.26 35% Discount $21.67 $8.89 $30.56 G - 5July 19, 2022 4 DE. Metered consumption for all residential customers shall be based on the water consumption and shall be per each 100 cubic foot, regardless of meter size: Effective Date—January 1, 2020 Wastewater usage CSO usage Total usage Residential non- discount $4.243 $1.543 $5.786 Residential 25% discount $3.183 $1.137 $4.320 Residential 35% discount $2.759 $0.985 $3.744 Section 5. - Corrections. The City Clerk and the codifiers of this ordinance are authorized to make necessary corrections to this ordinance including, but not limited to, the correction of the scrivener’s/clerical errors, references to other local, state, or federal laws, codes, rules or regulations, or ordinance numbering, section/subsection numbers and any references thereto. Section 6. - Severability. If any provisions of this Ordinance, or its application to any person or circumstances, are held invalid, the remainder of the Ordinance, or application of the provisions of the Ordinance to other persons or circumstances, is not affected. Section 7. - Effective Date. This Ordinance, being an exercise of a power specifically delegated to the City legislative body, is not subject to referendum. This ordinance shall take effect five (5) days after passage and publication of an approved summary thereof consisting of the title. PASSED by the City Council of the City of Port Angeles at a regular meeting of said Council held on the _____ day of ___________, 2022. _______________________ Kate Dexter, Mayor APPROVED AS TO FORM: _____________________________ William E. Bloor, City Attorney ATTEST: _____________________________ Kari Martinez-Bailey, City Clerk G - 6July 19, 2022 Date: July 19, 2022 To: City Council From: Nathan A. West, City Manager Holden Fleming, Housing Coordinator Subject: Ordinance to Suspend Select Permit Fees until September 1, 2023 Background / Analysis: At the June 7, 2022, City Council meeting, council members received recommendations from the Planning Commission to address a lack of affordable housing. Three recommendations specified for immediate action, including: 1. Reform of sewer and water development charges to incentivize ADU, duplex and multifamily. Including the choice of a single owner's water meter for multiple units under a single ownership. 2. Suspension of building permit fees for all ADU, multifamily and duplex projects. 3. Allow up to four units per parcel in the entire R7 zoning. After discussion, Council passed a motion directing Staff to “prepare an ordinance to suspend permit fees until September 1, 2023, for ADUs, duplexes, triplexes, townhouses, cottage developments, and multifamily developments that are used for residential housing available for families at or below 80% AMI.” Staff has created a draft ordinance to accomplish the goals of the language used in the motion. A brief description of the draft follows: Draft Ordinance: • Includes a fee waiver rather than a fee suspension • Uses the phrasing “reserved for families” • Maintains the AMI requirement for 5 years after the fee suspension expires • Clarifies developments must be used for “long-term” residential use • Requires owner/developer to demonstrate construction is eligible for the waiver Summary: At its June 7th, 2022, meeting, the City Council directed staff to prepare an ordinance to suspend permit fees until September 1, 2023, for ADUs, duplexes, triplexes, townhouses, cottage developments, and multifamily developments of residential housing available for families at or below 80% AMI. Staff has prepared an ordinance in line with this direction. Funding: This proposal is expected to reduce the Community and Economic Development department’s revenue collection by approximately $23,800 over the remainder of the 2022 budget year and the first nine months of 2023. Staff Recommendation: 1) Conduct the first reading of the attached ordinance, 2) Waive the second reading of the ordinance, and adopt the ordinance. G - 7July 19, 2022 • Authorizes CED to create process, procedures, and forms necessary to administer this fee waiver This draft is staff’s attempt to fulfill the goals of the motion but does depart from the specific language of the motion in two places. Specifically, this ordinance calls for a fee waiver rather than a fee suspension and uses stronger language of “reserved for” rather than “available to” to help ensure that projects receiving this fee waiver would be utilized by families at or below 80% AMI. This draft also clarifies that this restriction would be lifted 5 years after this ordinance was no longer in effect. Additionally, this draft clarifies that the residential use must be long-term, and that state mandated development fees could not be waived through this process. This draft ordinance contains language that requires the owner/developer to demonstrate that the construction is eligible for this waiver and authorizes the Department of Community and Economic Development to adopt procedures to implement the waiver program. Staff anticipates utilizing a “self- certification” style application to administer this fee waiver to encourage owners/developers to take advantage of this fee waiver while avoiding burdensome reporting that may dissuade utilization of this waiver. Finally, it is important to note that this item has been discussed extensively at both Planning Commission and City Council meetings that have included multiple public presentations. Considering this and because of the urgent nature surrounding the need for affordable housing, Staff feels that it would be appropriate for Council to waive the second reading of the ordinance to expediate the adoption process. To help in Council’s deliberation of this topic, staff has attached AMI information for Clallam County, what “affordable housing” costs would be at that income level, and additional information on rental costs in Port Angeles. Attachments: Fee Waiver Draft Ordinance, Fee Waiver Supplemental Information G - 8July 19, 2022 1 ORDINANCE NO. __________ AN ORDINANCE of the City of Port Angeles, Washington amending portions of Chapter 3.70 of the Port Angeles Municipal Code relating to permit fees. THE CITY COUNCI L OF THE CITY OF PORT ANGELES DO HEREBY ORDAIN AS FOLLOWS: Section 1. Ordinance 2932 as amended, and Chapter 3.70 of the Port Angeles Municipal Code are hereby amended by amending a section of Chapter 3.70 as follows: Chapter 3.70 Fees . . . . 3.70.080 Building, mechanical, plumbing, and sign permit fees . . . . E. Temporary waiver of permit fees 1. All fees, not mandated by the state, are hereby suspended until September 1, 2023 for all construction that meets the following criteria: a. Accessory dwelling units (ADUs), duplexes, triplexes, townhouses, cottage developments, and multifamily developments; b. Used for long-term residential housing; and c. Reserved for families at or below 80% area median income (AMI) until September 2028. d. The owner or developer has submitted an application that demonstrates the construction is eligible for the waiver. 2. The Department of Community and Economic Development is authorized and directed to administer this program and to design and make available to applicants the process, procedures, and forms that will be used to determine the applicant’s eligibility for this waiver no later than August 1, 2022. G - 9July 19, 2022 2 Section 2. - Corrections. The City Clerk and the codifiers of this ordinance are authorized to make necessary corrections to this ordinance including, but not limited to, the correction of the scrivener’s/clerical errors, references to other local, state, or federal laws, codes, rules or regulations, or ordinance numbering, section/subsection numbers and any references thereto. Section 3. - Severability. If any provisions of this Ordinance, or its application to any person or circumstances, are held invalid, the remainder of the Ordinance, or application of the provisions of the Ordinance to other persons or circumstances, is not affected. Section 4. - Effective Date. This Ordinance, being an exercise of a power specifically delegated to the City legislative body, is not subject to referendum. This ordinance shall take effect five (5) days after passage and publication of an approved summary thereof consisting of the title. This ordinance shall expire and its effectiveness shall terminate as of September 1, 2023. PASSED by the City Council of the City of Port Angeles at a regular meeting of said Council held on the _____ day of ___________, 2022. _______________________ Kate Dexter, Mayor APPROVED AS TO FORM: _____________________________ William E. Bloor, City Attorney ATTEST: _____________________________ Kari Martinez-Bailey, City Clerk G - 10July 19, 2022 TEMPORARY BUILDING FEE WAIVER SUPPLEMENTAL INFORMATION Holden A. Fleming, AICP Housing Coordinator G - 11July 19, 2022 PORT ANGELES 80% AMI G - 12July 19, 2022 AFFORDABLE HOUSING Affordable housing is generally defined as housing on which the occupant is paying no more than 30 percent of gross income for housing costs, including utilities. G - 13July 19, 2022 ADDITIONAL PORT ANGELES HOUSING INFO G - 14July 19, 2022 Date: July 19, 2022 To: City Council From: Nathan West, City Manager Sarina Carrizosa, Finance Director Subject: Second Amendment to the 2022 Budget Background / Analysis: The 2022 Budget is being amended for the second time, primarily to bring the budget into alignment with the recently adopted 2023-2028 Capital Facilities Plan (CFP), as well as, adjust revenues and expenditures that have been approved by Council at previous meetings in the first half of the year, or that require minor accounting corrections. Attached is a detailed list of proposed budget changes, the budget amendment ordinance, including the Exhibit A which lists total revenues and expenditures by fund for the 2022 Budget Amendment #1 and proposed Amendment #2 for comparison. Since many of the individual actions require funding to come from reserves (money unspent at the end of the fiscal year automatically rolls into reserves/fund balance), approval of the ordinance will require a super majority of the entire Council, or five (5) affirmative votes. Tonight’s meeting will include the first reading of the budget amendment ordinance. Funding Overview: Please see the “Detailed list of proposed budget changes” attachment to this memo for a full listing of all funding changes. Summary: The 2022 Budget is being amended for the second time to reflect changes in revenues and expenditures that have occurred during the second quarter of 2022. This budget amendment primarily includes capital adjustments resulting from the adoption of the 2023-2028 Capital Facilities Plan to ensure consistency with the Budget. This is the first reading of the ordinance. As this budget amendment includes new revenues as well as an authorization to use funds from reserves, the ordinance must be approved by a super-majority of the entire Council, or at least five (5) affirmative votes. Funding: Please see the detailed summary attached to this memo. Recommendation: The requested action for this issue is as follows: 1. Conduct the first reading of the 2022 Budget Amendment #2 ordinance; and 2. Continue to the August 16th Council meeting. G - 15July 19, 2022 Attached: Detailed list of proposed budget changes 2022 Budget Ordinance – Amendment #2 Exhibit A G - 16July 19, 2022 BUDGET AMENDMENT ITEM Revenues Expenditure Account Notes WASPC MHFR Grant; Revenue 65,000 - 001-5010-334-06-90 Council Approved 7/5/22 WASPC MHFR Grant; Expense - 65,000 001-5010-521-41-50 Council Approved 7/5/22 PD0120 - Police Taser Replacements - 1,100 001-5012-597-59-91 Reprioritized in CFP Transfer Parks Security to General Fund (27,300) 001-5012-597.59-94 Transfer Parks Security to General Fund Overtime for Parks Security - 27,300 001-5022-521.10-11 Transfer Parks Security to General Fund WASPC Grant; Traffic Safety 7,000 - 001-5022-333-20-60 Grant Revenue Traffic Safety Equipment - 7,000 001-5022-521-35-01 Grant Expense WA Attorney General Grant - Evidence Refigerator 1,400 - 001-5029-333-16-83 Grant Revenue Evidence Refrigerator - 1,400 001-5029-521-31-01 Grant Expense Housing Action Plan & Implementation Grant 100,000 - 001-4060-334-04-20 Council Approved 4/19/22 Housing Action Plan & Implementation Grant - 100,000 001-4060-558-41-50 Council Approved 4/19/22 FIIRE Pilot Program Grant 10,000 - 001-6020-334-06-90 Grant Revenue FIIRE Pilot Program - 10,000 001-6020-522.31-11 Grant Expense FD0415 - Fire Department Turnout Gear - 2,800 001-6012-597-59-91 Reprioritized in CFP Fire Personnel Training Seminar; Fees from Neighboring Districts 2,000 001-6045-342-20-17 Reimbursed Training TR0616 - Francis Street ADA - 1,200 001-7012-597-59-91 Reprioritized in CFP TR0821 - Facility Assessment - 1,000 001-7012-597-59-91 Reprioritized in CFP PK0519 - City Pier Erosion Stabilization and Sidewalk Repair - 55,000 001-8080-597-59-91 Reprioritized in CFP PK0418 - Civic Field - 11,000 001-8080-597-59-91 Reprioritized in CFP TOTAL GENERAL FUND 185,400 255,500 Hurricane Ridge Transit Event Grant Increase - 13,800 101-1430-557-41-50 Council Approved 6/21/22 PK0418 - Civic Field - (11,000) 101-1430-597-59-91 Reprioritized in CFP TR0909 - Wayfinding - (100,000) 101-1430-597-59-91 Reprioritized in CFP TOTAL LODGING TAX FUND - (97,200) TR0101 - Laurel Street Stairs Replacement - (415,000) 105-7840-597-59-91 Reprioritized in CFP TR0621 - Waterfront Trail Repairs - (100,000) 105-7840-597-59-91 Move to REET II Fund PK0819 - City Pier Railings Replacment - (200,000) 105-7840-597-59-91 Move to REET II Fund PK0220 - Synthetic Turf at Volunteer Field - 50,000 105-7840-597-59-91 Reprioritized in CFP TOTAL REET I FUND - (665,000) PD0121 - EOC/911 Dispatch Center - 1,000,000 107-5160-597-59-91 Reprioritized in CFP PD0119 - Computer Aided Dispatch - (38,100) 107-5160-597-59-91 Reprioritized in CFP TOTAL PENCOM FUND - 961,900 TR0918 - Downtown Tree/Sidewalk Replacement - Phase II - (300,000) 160-7841-597-59-91 Reprioritized in CFP TR0618 - Stevens Middle School Walking Routes - (15,000) 160-7841-597-59-91 Reprioritized in CFP TR0621 - Waterfront Trail Repairs - 100,000 160-7841-597-59-91 Reprioritized in CFP PK0819 - City Pier Railing Replacement - 202,000 160-7841-597-59-91 Reprioritized in CFP TOTAL REET II FUND - (13,000) Transfer Parks Security to General Fund (27,300) - 175-5620-397.10-94 Transfer Parks Security to General Fund Transfer Parks Security to General Fund - 27,300 175-5620-524.10-XX Transfer Parks Security to General Fund TOTAL CODE COMPLIANCE FUND (27,300) 27,300 PD0120 - Taser Replacements 1,100 - 310-5950-397-10-91 Reprioritized in CFP PD0121 - PENCOM 911/EOC Center 1,000,000 - 310-5950-397-10-91 Reprioritized in CFP PD0119 - Computer Aided Dispatch (38,100) - 310-5950-397-10-91 Reprioritized in CFP FD0415 - Fire Department Turnout Gear 2,800 - 310-5950-397-10-91 Reprioritized in CFP PK0819 - City Pier Railing Replacement 2,000 - 310-8985-397-10-91 Reprioritized in CFP PK0220 - Synthetic Turf at Volunteer Field 50,000 - 310-8985-397-10-91 Reprioritized in CFP PK0519 - City Pier Erosion 55,000 - 310-8985-397-10-91 Reprioritized in CFP PD0119 - Computer Aided Dispatch - 88,100 310-5950-594-65-10 Reprioritized in CFP PD0121 - EOC/911 Dispatch Center - (1,093,000) 310-5950-594-65-10 Reprioritized in CFP PD0222 - PenCom Radio/Phone Traffic Recording - 31,500 310-5950-594-65-10 Reprioritized in CFP PD0322 - PenCom 911 Phone Equipment - 153,000 310-5950-594-65-10 Reprioritized in CFP GG0119 - Ennis Creek Fish Barrier Removal - (199,700) 310-7910-594-65-10 Reprioritized in CFP PK0519 - City Pier Erosion Stabilization and Sidewalk Repair - 110,000 310-8985-594-65-10 Reprioritized in CFP PK0719 - Parks Maintenance Building - (532,100) 310-8985-594-65-10 Reprioritized in CFP TOTAL GOVERNMENTAL CAPITAL FUND 1,072,800 (1,442,200) Detailed List of Proposed Budget Changes - 2022 Budget Amendment #2 G - 17July 19, 2022 BUDGET AMENDMENT ITEM Revenues Expenditure Account Notes TR00209 - Race Street Design; FHA Grant 1,756,300 - 312-7930-331-20-20 Grant Revenue TR0918 - Downtown Tree/Sidewalk Replacement - Phase II (300,000) - 312-7930-397-10-91 Reprioritized in CFP TR0618 - Stevens Middle School Walking Routes (15,000) - 312-7930-397-10-91 Reprioritized in CFP TR0101 - Laurel Street Stairs Replacement (415,000) - 312-7930-397-10-91 Reprioritized in CFP TR0616 - Francis Street ADA 1,200 - 312-7930-397-10-91 Reprioritized in CFP TR0821 - Facility Assessment 1,000 - 312-7930-397-10-91 Reprioritized in CFP TR0909 - Wayfinding Signage - (250,000) 312-4160-595-65-10 Reprioritized in CFP TR0114 - Hill Street Olympic Trail - 6,900 312-4160-595-65-10 Reprioritized in CFP TR0115 - N Street Chip Seal (5th-8th Streets)- 100,000 312-7930-595-65-10 Reprioritized in CFP TR0120 - Signal Controller Upgrades (1st and Front)- 12,500 312-7930-595-65-10 Reprioritized in CFP TR0518 - I Street Chip Seal (5th to 16th Streets)- 100,000 312-7930-595-65-10 Reprioritized in CFP TR0616 - Francis Street ADA - 1,200 312-7930-595-65-10 Reprioritized in CFP TR0618 - Stevens Middle School Walking Routes - (15,000) 312-7930-595-65-10 Reprioritized in CFP TR0821 - Facility Assessment - 1,000 312-7930-595-65-10 Reprioritized in CFP TR0919 - Traffic Safety Camera Program - (35,000) 312-7930-595-65-10 Reprioritized in CFP TR0119 - 8th Street Paving (Lincoln to A Streets)- (30,000) 312-7930-595-65-10 Reprioritized in CFP TR0320 - 2021 Pavement Preservation - 60,900 312-7930-595-65-10 Budget Correction TOTAL TRANSPORTATION BENEFIT CAPITAL FUND 1,028,500 (47,500) CL0320 - F Street LTC Replacement - (200,000) 451-7188-594-65-10 Reprioritized in CFP CL0414 - Light Operations Building - (4,469,800) 451-7188-594-65-10 Reprioritized in CFP CL0420 - College Street Load Tap Changer Replacement - (200,000) 451-7188-594-65-10 Reprioritized in CFP TOTAL ELECTRIC CAPITAL FUND - (4,869,800) WT0121 - White Creek and 3rd Street Crossing Main - 120,000 452-7388-594-65-10 Reprioritized in CFP WT0218 - Reservoir Repairs - 25,400 452-7388-594-65-10 Reprioritized in CFP WT0221 - Race Street Water Mnain Replacment South - 57,800 452-7388-594-65-10 Reprioritized in CFP WT0321 - Facility Assessment - 1,000 452-7388-594-65-10 Reprioritized in CFP WT0419 - Decant Facility at the Transfer Station - (777,400) 452-7388-594-65-10 Reprioritized in CFP WT0420 - Ennis Creek Water Main Relocate - 20,000 452-7388-594-65-10 Reprioritized in CFP WT0421 - Race Street Water Main Replacment North - (125,000) 452-7388-594-65-10 Reprioritized in CFP WT0519 - Water Treatment Plant Repairs - 78,000 452-7388-594-65-10 Reprioritized in CFP WT0521 - Water Main Replacement Village Lindberg - (120,000) 452-7388-594-65-10 Reprioritized in CFP WT0619 - Peabody Reservoir Inlet Pipe Replacement - (266,000) 452-7388-594-65-10 Reprioritized in CFP WT0122 - Elwha - Fish Screen Facility Improvements - 200,000 452-7388-594-65-10 Reprioritized in CFP WT0222 - Elwha - Effluent Distribution Structure Bypass - 15,000 452-7388-594-65-10 Reprioritized in CFP TOTAL WATER CAPITAL FUND - (771,200) WW0120 - Pump Station 3 Force Main Replacment - (250,000) 453-7488-594-65-10 Reprioritized in CFP WW0121 - Facility Replacement - 1,000 453-7488-594-65-10 Reprioritized in CFP WW0220 - West 4th Street Capacity Improvement - (400,000) 453-7488-594-65-10 Reprioritized in CFP WW0319 - Watewater Comprehensive Plan - 66,600 453-7488-594-65-10 Reprioritized in CFP WW0320 - WWTP Septic Truck Pad Repair - (20,000) 453-7488-594-65-10 Reprioritized in CFP WW0420 - WWTP Potable Water Air-Gap - 15,000 453-7488-594-65-10 Reprioritized in CFP WW0508 - Digester Mixing Improvement WWTP - (50,000) 453-7488-594-65-10 Reprioritized in CFP WW0519 - Decant Facility at Transfer Station - (577,400) 453-7488-594-65-10 Reprioritized in CFP WW0520 - Sanitary Force Main Replacement (Lees Creek)- 20,000 453-7488-594-65-10 Reprioritized in CFP WW0618 - Neighborhood Sewer Rehabilitation - (250,000) 453-7488-594-65-10 Reprioritized in CFP WW0918 - 2025 Neighborhood Sewer Rehabilitation - (6,500) 453-7488-594-65-10 Reprioritized in CFP WW0122 - Anaerobic Digester Roof Improvements - 138,400 453-7488-594-65-10 Reprioritized in CFP WW0419 - WWTP HVAC Replacement - 20,000 453-7488-594-65-10 Reprioritized in CFP TOTAL WASTEWATER CAPITAL FUND - (1,292,900) SW0112 - Decant Facility at Transfer Station - (707,900) 454-7688-594-65-10 Reprioritized in CFP SW0117 - Landfill Scale Software - 3,800 454-7688-594-65-10 Reprioritized in CFP SW0120 - Landfill Pump Station 17 Replacement - (250,000) 454-7688-594-65-10 Reprioritized in CFP SW0121 - Landfill Access Road Repair - (515,000) 454-7688-594-65-10 Reprioritized in CFP SW0221 - Facility Assessment - 1,000 454-7688-594-65-10 Reprioritized in CFP TOTAL SOLID WASTE CAPITAL FUND - (1,468,100) DR0120 - Decant Facility at the Transfer Station - (977,400) 456-7688-594-65-10 Reprioritized in CFP DR0121 - Facility Assessment - 1,000 456-7688-594-65-10 Reprioritized in CFP DR0213 - H Street Outfall Improvements - 12,000 456-7688-594-65-10 Reprioritized in CFP DR0804 - Lincoln Park/Big Boy Pond Study - (19,200) 456-7688-594-65-10 Reprioritized in CFP DR0322 - Park Ave Outfall to Peabody Creek - 450,000 456-7688-594-65-10 Reprioritized in CFP DR0215 - Francis Street Outfall Repair - 40,000 456-7688-594-65-10 Reprioritized in CFP TOTAL STORMWATER CAPITAL FUND - (493,600) G - 18July 19, 2022 BUDGET AMENDMENT ITEM Revenues Expenditure Account Notes WW0120 - Pump Station #3 Force Main Replacement - 335,000 463-7489-594-65-10 Reprioritized in CFP WW1122 - 2022 Neighborhood Sewer Rehab - 389,000 463-7489-594-65-10 Reprioritized in CFP TOTAL CSO CAPITAL FUND - 724,000 Trench Shoring - 10,000 402-7380-534-35-01 Carried from 2021 TOTAL WATER FUND - 10,000 Trench Shoring - 10,000 403-7480-535-35-01 Carried from 2021 Wastewater Collection Push Camera - 9,000 403-7480-535-35-01 TOTAL WASTEWATER FUND - 19,000 #1411 - 2005 Ford Crown Vic - (22,300) 501-7630-594-64-10 Reprioritized in CFP #4103 - 2004 Ford Crown Vic - (22,300) 501-7630-594-64-10 Reprioritized in CFP #5107 - 2005 Ford Crown Vic - (22,300) 501-7630-594-64-10 Reprioritized in CFP #2290 - Ford F550 Service Truck - 176,700 501-7630-594-64-10 Reprioritized in CFP #2291 - QT Lube Skid - 20,100 501-7630-594-64-10 Reprioritized in CFP #1246 - 1999 Dodge 3500 Service Truck - (87,600) 501-7630-594-64-10 Reprioritized in CFP #1569 - 1988 CAT 926E Wheel Loader - (153,900) 501-7630-594-64-10 Reprioritized in CFP #1782 - 1993 GMC 5-8CY Dump Truck - (89,100) 501-7630-594-64-10 Reprioritized in CFP #1756 - 1991 John Deere Backhoe Loader - 131,400 501-7630-594-64-10 Reprioritized in CFP #1240 - 2012 Freightliner/Elgin Air Sweeper - 138,700 501-7630-594-64-10 Reprioritized in CFP #1887 - 2001 Dodge 4X4 Flatbed Truck with Snow Plow - (79,300) 501-7630-594-64-10 Reprioritized in CFP #7321- 2007 Toro Aerator (Tractor Attachment)- (29,300) 501-7630-594-64-10 Reprioritized in CFP #2184 - Ecostack 5032W Conveyor - 100 501-7630-594-64-10 Reprioritized in CFP Terminal Tractor parts - (30,000) 501-7630-594-64-10 Reprioritized in CFP #2281 - Ford F250 4X4 Pickup - 65,000 501-7630-594-64-10 Reprioritized in CFP #6503 - Replacement Addco Message Board 11,900 501-7630-594-64-10 TOTAL EQUIPMENT SERVICES FUND - 7,800 IT0716 - ERP Road Map and Replacement - 133,900 502-2082-594-65-10 Reprioritized in CFP TOTAL IT FUND - 133,900 G - 19July 19, 2022 -1- ORDINANCE NO._____ AN ORDINANCE of the City of Port Angeles, Washington, amending the City’s 2022 budget. WHEREAS, the Annual Budget of the City of Port Angeles for the year 2022, was adopted, approved and confirmed on December 7, 2021, in Ordinance No. 3686; and WHEREAS on April 19, 2022, the first 2022 budget amendment was adopted, approved and confirmed by Ordinance No. 3690; and WHEREAS, now there exists an emergency that could not reasonably have been foreseen when the 2022 budget or the first amendment to it were adopted. NOW, THEREFORE, the City Council of the City of Port Angeles, Washington, do ordain as follows: Section 1. The Council finds and declares: A. There exists an emergency that could not reasonably have been foreseen when the 2022 budget or the first amendment to it were adopted. The facts constituting the emergency include, but are not limited to: 1. Unanticipated additional revenue; and 2. Unanticipated reduced revenue; and. 3. Unanticipated additional and reduced expenditures primarily for changes in planned capital expenditures as previously authorized by Council. B. These facts require amendments to the adopted budget in order to meet the expenses of government of the City for the fiscal year ending December 31, 2022. Section 2. On the basis of the foregoing findings, pursuant to RCW 35A.33.090, the City Council declares that an emergency exists. G - 20July 19, 2022 -2- Section 3. To respond to the budget emergency, the 2022 budget appropriation for each separate fund as set forth in Ordinance No.3686, is amended as shown in the attached Exhibit A. Section 4. The City Clerk and the codifiers of this ordinance are authorized to correct scrivener’s errors, references, ordinance numbering, section and subsection numbers and any references thereto. Section 5. This Ordinance exercises authority granted exclusively to the City Council and is not subject to referendum. It shall be in force and take effect 5 (five) days after publication according to law. PASSED by the City Council of the City of Port Angeles by a vote of one more than the majority of all members of the legislative body at a regular meeting of said Council on the ____ day of ________, 2022. _______________________________ Kate Dexter, Mayor ATTEST: APPROVED AS TO FORM: _______________________________ _______________________________ Kari Martinez-Bailey, City Clerk William E. Bloor, City Attorney PUBLISHED: ___________________ By Summary G - 21July 19, 2022 CITY of PORT ANGELES 2022 Budget Ordinance - Amendment #2 Exhibit A Fund Div.Name / Description Beginning Revenue Expenditures Ending Beginning Revenue Expenditures Ending Balance - Est.Balance - Est. Balance Balance GENERAL FUND (Note: Divisional totals for reference only) Fund Balance:9,827,510 7,836,910 7,738,465 5,677,765 001. 1160 City Council 24,200 71,900 24,200 71,900 001. 1210 City Manager 359,800 496,600 359,800 496,600 001. 1211 Customer Commitment 0 2,500 0 2,500 001. 1220 Human Resources 97,100 276,800 97,100 276,800 001. 1230 City Clerk 63,700 256,000 63,700 256,000 001. 2001 Finance - Revenue 14,324,200 0 14,324,200 0 001. 2020 Finance Administration 159,900 941,800 159,900 941,800 001. 2023 Accounting 679,600 981,500 679,600 981,500 001. 2025 Customer Service 1,199,000 1,187,400 1,199,000 1,187,400 001. 2070 Reprographics 37,900 46,600 37,900 46,600 001. 3030 City Attorney 172,500 555,600 172,500 555,600 001. 3012 Jail Contributions 0 950,800 0 950,800 001. 4060 Planning 431,400 762,700 531,400 862,700 001. 4050 Building 548,000 251,700 548,000 251,700 001. 4071 Economic Development 50,000 101,900 50,000 101,900 001. 5010 Police Administration 0 674,500 65,000 739,500 001. 5012 PenCom/Capital Transfers 356,600 537,900 356,600 511,700 001. 5021 Police Investigation 2,700 1,095,800 2,700 1,095,800 001. 5022 Police Patrol 553,100 3,715,700 560,100 3,750,000 001. 5026 Police Reserves & Volunteers 0 11,300 0 11,300 001. 5029 Police Records 13,600 465,000 15,000 466,400 001. 5050 Police Facilities Maintenance 16,300 8,100 16,300 8,100 001. 6010 Fire Administration 76,900 241,400 76,900 241,400 001. 6012 PenCom/Medic I Support 0 348,500 0 351,300 001. 6020 Fire Suppression 0 1,415,200 10,000 1,425,200 001. 6030 Fire Prevention 7,800 108,400 7,800 108,400 001. 6045 Fire Training 3,000 127,000 5,000 127,000 001. 6050 Fire Facilities Maintenance 0 59,400 0 59,400 001. 7010 Public Works Administration 1,247,700 2,189,800 1,247,700 2,189,800 001. 7012 Public Works CIP 0 68,800 0 71,000 001. 7032 Public Works Telecommunications 32,800 32,800 32,800 32,800 001. 8010 Parks Administration 0 276,200 0 276,200 001. 8012 Senior Center 33,200 165,900 33,200 165,900 001. 8050 Ocean View Cemetery 115,000 185,000 115,000 185,000 001. 8080 Park Facilities 0 2,204,100 0 2,270,100 001. 8112 Senior Center Facilities 0 57,900 0 57,900 001. 8131 Central Services Facilities 463,200 510,200 463,200 510,200 001. 8155 Facility Rentals 56,000 118,100 56,000 118,100 001. 8221 Sports Programs 0 114,000 0 114,000 001. 9029 General Unspecified 0 1,501,000 0 1,501,000 001 TOTAL General Fund 9,827,510 21,125,200 23,115,800 7,836,910 7,738,465 21,310,600 23,371,300 5,677,765 SPECIAL REVENUE FUNDS 101 Lodging Excise Tax Fund 824,440 701,400 666,400 859,440 824,439 701,400 569,200 956,639 102 Street Fund 677,348 1,609,000 1,802,600 483,748 677,348 1,609,000 1,802,600 483,748 105 Real Estate Excise Tax-1 (REET-1) Fund 1,048,251 306,000 1,020,200 334,051 1,048,251 306,000 355,200 999,051 107 PenCom Fund 1,986,822 4,637,500 4,996,800 1,627,522 1,986,822 4,637,500 5,958,700 665,622 160 Real Estate Excise Tax-2 (REET-2) Fund 883,928 307,600 525,000 666,528 883,927 307,600 512,000 679,527 165 Business Improvement Area 41,055 35,300 0 76,355 41,055 35,300 0 76,355 172 Port Angeles Housing Rehab. Fund 1,123,640 1,039,300 662,700 1,500,240 1,123,640 1,039,300 662,700 1,500,240 175 Code Compliance Fund 39,421 161,100 161,100 39,421 39,421 133,800 133,800 39,421 TOTAL Special Revenue Funds 6,624,905 8,797,200 9,834,800 5,587,305 6,624,903 8,769,900 9,994,200 5,400,603 2022 Budget Amendment #2Funds2022 Budget Amendment #1 G - 22July 19, 2022 CITY of PORT ANGELES 2022 Budget Ordinance - Amendment #2 Exhibit A Fund Div.Name / Description Beginning Revenue Expenditures Ending Beginning Revenue Expenditures Ending Balance - Est.Balance - Est. Balance Balance DEBT SERVICE FUNDS 216 2014 LTGO Bond (Landfill Bluff Stabilization) Fund 178,462 601,700 597,200 182,962 178,463 601,700 597,200 182,963 217 2015 LTGO Bond - Refunding (W.U.G.A.)14,353 232,500 231,700 15,153 14,353 232,500 231,700 15,153 TOTAL Debt Service Funds 192,815 834,200 828,900 198,115 192,816 834,200 828,900 198,116 ENTERPRISE / UTILITY FUNDS 401 Electric Utility Fund 11,443,657 25,390,300 25,442,900 11,391,057 11,443,657 25,390,300 25,442,900 11,391,057 402 Water Utility Fund 16,907,671 6,847,100 9,602,200 14,152,571 16,907,671 6,847,100 9,612,200 14,142,571 403 Wastewater Utility Fund 3,380,413 7,161,300 7,397,700 3,144,013 3,380,413 7,161,300 7,416,700 3,125,013 404 Solid Waste Utility Fund 2,797,879 14,334,000 15,556,200 1,575,679 2,800,872 14,334,000 15,556,200 1,578,672 406 Stormwater Utility Fund 2,211,487 2,783,000 2,812,800 2,181,687 2,211,487 2,783,000 2,812,800 2,181,687 409 Medic 1 Utility Fund 1,407,454 3,006,700 3,460,200 953,954 1,407,454 3,006,700 3,460,200 953,954 413 Harbor Clean-up Fund (152,367)2,047,600 2,047,600 (152,367)(152,367)2,047,600 2,047,600 (152,367) 421 Conservation Fund 575,352 305,000 296,500 583,852 575,352 305,000 296,500 583,852 TOTAL Enterprise / Utility Funds 38,571,546 61,875,000 66,616,100 33,830,446 38,574,539 61,875,000 66,645,100 33,804,439 ENTERPRISE / INTERNAL SERVICE FUNDS 501 Equipment Services 13,503,274 1,944,000 6,841,000 8,606,274 7,717,902 1,944,000 6,848,800 2,813,102 502 Information Technology 4,184,878 2,731,000 4,690,000 2,225,878 2,576,358 2,731,000 4,823,900 483,458 503 Self-Insurance 565,140 6,157,100 6,136,200 586,040 685,878 6,157,100 6,136,200 706,778 TOTAL Internal Service Funds 18,253,292 10,832,100 17,667,200 11,418,192 10,980,138 10,832,100 17,808,900 4,003,338 FIDUCIARY FUNDS 602 Firemen's Pension Fund 214,162 19,200 92,600 140,762 327,175 19,200 92,600 253,775 TOTAL Fiduciary Funds 214,162 19,200 92,600 140,762 327,175 19,200 92,600 253,775 PERMANENT FUNDS 601 Cemetery Endowment Fund 418,607 6,000 0 424,607 418,606 6,000 0 424,606 TOTAL Permanent Funds 418,607 6,000 0 424,607 418,606 6,000 0 424,606 CAPITAL FUNDS 310 Governmental Capital Improvement Fund 3,477,644 5,099,100 8,400,900 175,844 3,477,644 6,171,900 6,958,700 2,690,844 312 Transportation Capital 4,375,651 5,212,500 9,363,900 224,251 4,375,652 6,241,000 9,316,400 1,300,252 316 Governmental Park Improvement Fund 307,928 9,200 0 317,128 307,928 9,200 0 317,128 451 Electric Capital Fund 12,430,778 800,000 8,267,800 4,962,978 12,430,778 800,000 3,398,000 9,832,778 452 Water Capital Fund 4,769,111 725,000 3,115,400 2,378,711 4,769,111 725,000 2,344,200 3,149,911 453 Wastewater Capital Fund 3,618,852 950,000 2,047,300 2,521,552 3,618,852 950,000 754,400 3,814,452 454 Solid Waste Capital Fund 2,270,260 1,855,600 3,793,900 331,960 2,270,260 1,855,600 2,325,800 1,800,060 456 Stormwater Capital Fund 2,860,342 434,000 1,236,500 2,057,842 2,860,342 434,000 742,900 2,551,442 463 Combined Sewer Overflow Capital Fund 1,569,258 2,321,900 2,510,200 1,380,958 1,569,258 2,321,900 3,234,200 656,958 TOTAL Capital Funds 35,679,824 17,407,300 38,735,900 14,351,224 35,679,825 19,508,600 29,074,600 26,113,825 SUB-TOTAL ALL FUNDS 109,782,661 120,896,200 156,891,300 73,787,561 100,536,467 123,155,600 147,815,600 75,876,467 Reserves - Designated 498,500 791,300 Reserves Used 36,493,600 25,451,300 TOTAL CITYWIDE ALL FUNDS 109,782,661 157,389,800 157,389,800 73,787,561 100,536,467 148,606,900 148,606,900 75,876,467 2022 Budget Amendment #2Funds2022 Budget Amendment #1 G - 23July 19, 2022 Date: July 19, 2022 To: City Council From: Nathan A. West, City Manager Subject: American Rescue Plan Act Funding Approval and Subrecipient Agreement with the Olympic Peninsula YMCA Background / Analysis: The pandemic created shortages in childcare programs and exacerbated an already limited service in our community. Many families rely on childcare to help them remain in and enter the workplace. The Olympic Peninsula YMCA has provided the City with options for solutions in this area, and necessary funding amounts to provide this important support. The organization is planning to build an Early Learning Center that would serve up to 92 children between the ages of 6 weeks and 5 years. Studies have shown that early childhood learning provides children with essential foundations for their future and has a return on investment rate of 7 times the investment. Additionally, the new facility will:  Serve more families: An estimated 50 families and up to 92 children ages 0 to 5 will be served at the YMCA’s Early Learning Facility.  Improve workforce recruitment and retention: Employees will be able to work knowing that they have access to safe, quality, affordable child care.  Create jobs: The YMCA will employ an additional 15 early learning and child care professionals. Summary: One of the many lasting impacts from the pandemic has been the ability of families in Port Angeles to obtain and afford childcare. The funding requirements from the American Rescue Plan Act (ARPA) allow certain childcare reimbursements as eligible expenses of this funding. The City has been approached by the Olympic Peninsula YMCA, a local non-profit, with a request for assistance in building a new facility that will provide childcare services in our community specific to children aged 0-5. The specific request was in the amount of $500,000 to build an Early Learning Center adjacent to the Port Angeles YMCA. Based on the request Staff is recommending Council approve $250,000 in ARPA funding for this project in support of this new childcare facility. Staff is presenting the YMCA’s request for funds as well as the subrecipient agreement for such a contribution for Council consideration. Funding: This is a subrecipient agreement for ARPA funds received by the Federal government. While City resources will be provided to assist with the subrecipient agreement and project, no City funds are committed as part of the agreement. The total award amount recommended through this subrecipient agreement is $250,000. Recommendation: Staff is requesting City Council: 1. Pass the Resolution approving funding for the Olympic Peninsula YMCA in the amount of $250,000. 2. Approve and authorize the City Manager to sign the ARPA Subrecipient Agreement and complete final negotiations on Attachment D with the Olympic Peninsula YMCA and to make minor modifications to the agreement as necessary. H - 1July 19, 2022  For our region: Establish Clallam County as a community of choice with high quality, accessible child care. The total project cost is estimated at $4,520,800 with the YMCA allocating $1.025 million of their own funds. They have also received $1.0 million from the Washington State Department of Commerce – Early Learning Facilities Program and are actively pursuing additional funding streams. The request from the YMCA has been attached to this memo for Council reference. Staff recommends Council support funding this new facility in the amount of $250,000. This amount will allow closer consistency with amounts provided previously to other license exempt childcare providers. The City’s allocation is expected to leverage additional ARPA funding from Clallam County. The YMCA’s estimated budget for this project is included below: Similar to the Boys & Girls Clubs of the Olympic Peninsula and the Shore Metro Park District’s SPARK program the Olympic Peninsula YMCA is unique in that they are a non-profit that is not eligible for the grants that are available for private businesses operating similar programs and State resources have been limited to licensed providers. As a result Staff recommends that license exempt childcare facilities be prioritized to receive ARPA funding from the City. The YMCA is the only license exempt childcare provider that has not yet been provided ARPA funding from the City. Further, the Final Rule regarding ARPA funding allows for “Promoting Healthy Childhood Environments” by supporting “New or expanded high quality childcare to provide safe and supportive care for children.” The allocation for support in this area would meet Councils Strategic Plan Issue of Critical Importance #3 – Capacity and #4 – High Performing Relationships. Staff will continue to explore other funding opportunities in support of this critical local need. Staff recommends Council pass the resolution obligating $250,000 to the Olympic Peninsula YMCA for childcare needs in the Port Angeles community. Staff further requests that Council authorize the City Manager to sign the ARPA Subrecipient Agreement and complete final negotiations on the Scope of Work identified as Attachment D with the Olympic Peninsula YMCA and to make minor modifications to the agreement as necessary. Funding Overview: This is a subrecipient agreement for funds received by the Federal government through ARPA. City resources will be provided to assist with the subrecipient agreement; however, no City funds are committed as part of the agreement. The total award amount recommended is $250,000. H - 2July 19, 2022 Attachments:  Resolution approving funding for the Olympic Peninsula YMCA in the amount of $250,000  Sub-recipient Agreement with the Olympic Peninsula YMCA  Request for funding and presentation from the Olympic Peninsula YMCA for a new Early Learning Facility H - 3July 19, 2022 1 RESOLUTION NO. A RESOLUTION of the City Council of the City of Port Angeles, Washington, approving funding from the American Rescue Plan Act (ARPA) for reimbursement to the City for pandemic related expenses incurred in responding to COVID. WHEREAS, the Office of Financial Management (OFM) notified the City that it will be receiving $5,646,884 from in American Rescue Plan Act (ARPA) funding; and WHEREAS, Staff compiled eligible ARPA funding options and presented recommendations in a July 6th, 2021 Memorandum to Council; and WHEREAS, during the July 6, 2021, July 20, 2021 and August 17, 2021 City Council meetings a discussion was held on the utilization of ARPA funding; and WHEREAS, during the September 7, 2021 and October 19, 2021 City Council meetings, Council discussed in detail several other items recommended by Staff for this funding; and WHEREAS, during the July 19, 2022 meeting, Council agreed that the Olympic Peninsula YMCA qualified for ARPA funding and that they should be approved for funding in the amount of $250,000.00; and WHEREAS, Council agreed that other funding authorization could be considered and approved at later meetings, NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Port Angeles, Washington: That funding for reimbursement to the Olympic Peninsula YMCA for pandemic related expenses incurred in responding to COVID in amount not to exceed $250,000 hereby is approved and authorized; AND, IT IS FURTHER RESOLVED that the City Manager is authorized to negotiate such details, conditions, contract amendments, subrecipient agreements, and other terms as appropriate to carry out the funding authorized above. H - 4July 19, 2022 2 PASSED by the City Council of the City of Port Angeles at a regular meeting of said Council held on the 19th day of July, 2022. _______________________________ Kate Dexter, Mayor ATTEST: _______________________________ Kari Martinez-Bailey, City Clerk APPROVED AS TO FORM: _______________________________ William E. Bloor, City Attorney H - 5July 19, 2022 ARPA Subrecipient Agreement 1 ARPA SUBRECIPIENT AGREEMENT This Agreement (“Agreement”) is dated as of the _____ day of July, 2022, by and between the City of Port Angeles, a non-charter code city and municipal corporation of the State of Washington, and the Olympic Peninsula YMCA, a Washington non-profit corporation ("Subrecipient"). WHEREAS, the U.S. Department of the Treasury (“Treasury”) has allocated to the City $5,646,884 of federal stimulus funding from the Coronavirus State Fiscal Recovery Fund and the Coronavirus Local Fiscal Recovery Funds, CFDA Reference number 21.027 (“ARPA Funds”) under Section 603(b) of the Social Security Act, as amended by Section 9901 of the American Rescue Plan Act (“ARPA Act”) for the limited purposes identified in the OFM Letter agreement dated June 7, 2021 (OFM Letter), identified as Attachment A, the Coronavirus State and Local Fiscal Recovery Funds Final Rule (“Final Rule”), identified as Attachment B, and the Compliance and Reporting Guidance for State and Local Fiscal Recovery Funds (“Compliance & Reporting Guidelines”), identified as Attachment C and the Scope of Work and ARPA Eligibility (“Scope of Work”), identified as Attachment D. Attachments A, B, C and D are attached hereto and incorporated herein by this reference. WHEREAS, the ARPA Act authorizes the City to expend ARPA Funds awarded to the City for the following eligible purposes as outlined in the Final Rule as follows: (1) To respond to the COVID-19 public health emergency or its negative economic impacts, including assistance to households, small businesses, and nonprofits, or aid to impacted industries such as tourism, travel, and hospitality; (2) To respond to workers performing essential work during the COVID-19 public health emergency by providing premium pay to eligible workers; (3) For the provision of government services to the extent of the reduction in revenue due to the COVID-19 public health emergency relative to revenues collected in the most recent full fiscal year prior to the emergency; and (4) To make necessary investments in water, sewer, or broadband infrastructure (collectively “Eligible Uses”). The American Rescue Plan Act, Treasury’s Final Rule, and guidance from Treasury explicitly mention assistance to the following: 1. Expand services by creating more affordable options to families; including increased hours of operation and additional programs; and 2. Provide safe and supportive care for children. WHEREAS, the City and Subrecipient desire to enter into this Agreement so that the City may provide City’s ARPA Funds for appropriate and qualifying expenditures of grant funds advanced to the Subrecipient by the City for new or expanded childcare that will provide safety and promote healthy childhood environments. H - 6July 19, 2022 ARPA Subrecipient Agreement 2 NOW, THEREFORE, in consideration of the foregoing recitals which are incorporated herein by reference, and the terms and conditions set forth below, the parties agree as follows: 1. Effective Date and Term. This Agreement shall commence when last executed by all parties and remain in effect until December 31, 2024, unless terminated by the City in writing for cause as specified in the Termination section of this agreement. 2. ARPA Funds. The City agrees to provide the Subrecipient a total sum not to exceed $250,000.00 to be used for the new or expanded childcare that will provide safety and promote healthy childhood environments conditioned on the requirement that such funds will be disbursed no later than December 31, 2024, and based on the details described in Attachment D. 3. Subrecipient’s Use of ARPA Funds. The Subrecipient shall ensure that the ARPA Funds requests are necessary Eligible Uses under one of the following cost categories: a) To respond to the COVID-19 public health emergency or its negative economic impacts, including assistance to households, small businesses, and nonprofits, or aid to impacted industries such as tourism, travel, and hospitality, b) To respond to workers performing essential work during the COVID-19 public health emergency by providing premium pay to eligible workers, c) For the provision of government services to the extent of the reduction in revenue due to the COVID-19 public health emergency relative to revenues collected in the most recent full fiscal year prior to the emergency; and d) To make necessary investments in water, sewer, or broadband infrastructure. 4. Ineligible Uses. Non-allowable uses of ARPA Funds include, without limitation, the following: a) usage of funds to either directly or indirectly offset a reduction in net tax revenue resulting from a change in law, regulation or administrative interpretation during the covered period that reduces any tax or delays the imposition of any tax or tax increase; b) damages covered by insurance; c) usage of funds as a deposit into any pension fund; d) expenses that have been or will be reimbursed under any federal program; e) debt service costs; f) contributions to a “rainy day” fund; and d) legal settlements. 5. Reimbursement Request & Reporting Requirements. To facilitate the release of ARPA Funds by the City to the Subrecipient and the City’s compliance with reporting requirements for usage of ARPA funding under the Agreement and Attachment D, the City may disperse funds as requested through an A19 form, to the Subrecipient with an attestation by the Subrecipient that such grants are eligible in accordance with the eligibility requirements outlined in Attachment D. The Subrecipient shall then utilize this funding to fund the childcare needs. Such schedule may be modified with the prior approval of the City. Failure to provide any of the required documentation may result in the withholding and/or nonpayment of all or a portion of the request, and termination of the Agreement. 6. Termination. The City may terminate this Agreement for cause, which shall include the violation of any terms of this agreement. H - 7July 19, 2022 ARPA Subrecipient Agreement 3 7. Independent Contractor. Each party under the Agreement shall be for all purposes an independent Contractor. Nothing contained herein will be deemed to create an association, a partnership, a joint venture, or a relationship of principal and agent, or employer and employee between the parties. The Subrecipient shall not be, or be deemed to be, or act or purport to act, as an employee, agent, or representative of the City for any purpose. 8. Indemnification. The Subrecipient agrees to defend, indemnify and hold the City, its officers, officials, employees, agents and volunteers harmless from and against any and all claims, injuries, damages, losses or expenses including without limitation personal injury, bodily injury, sickness, disease, or death, or damage to or destruction of property, which are alleged or proven to be caused in whole or in part by an act or omission of the Subrecipient, its officers, directors, employees, and/or agents relating to the Subrecipients’ performance or failure to perform under this Agreement. The section shall survive the expiration or termination of this Agreement. 9. Compliance with Laws, Guidelines. The Subrecipient shall comply with all federal, state, and local laws and all requirements (including certifications, audits and suspension and debarment) of the IGA, Final Rule, and Compliance & Reporting Guidelines to the extent applicable, when disbursing ARPA Funds to recipients or when seeking Reimbursement from the City. 10. Maintenance and Audit of Records. The Subrecipient shall maintain records, books, documents, and other materials relevant to its performance under this Agreement. These records shall be subject to inspection, review and audit by the City or its designee, the Washington State Auditor’s Office and as required by the IGA, Final Rule and Compliance & Reporting Guidelines for five (5) years following termination of this Agreement. If it is determined during the course of the audit that the Subrecipient was reimbursed for unallowable costs under this Agreement or any other program or agreement, the Subrecipient agrees to promptly reimburse the City for such payments upon request. 11. Notices. Any notice desired or required to be given hereunder shall be in writing, and shall be deemed received three (3) days after deposit with the U.S. Postal Service, postage fully prepaid, certified mail, return receipt requested, and addressed to the party to which it is intended at its last known address, or to such other person or address as either party shall designate to the other from time to time in writing forwarded in like manner: Subrecipient Olympic Peninsula YMCA 675 N. 5th Avenue; STE 3A Sequim, WA 98382 H - 8July 19, 2022 ARPA Subrecipient Agreement 4 City of Port Angeles Attn: Nathan West, City Manager 321 East 5th Street Port Angeles, WA 98362 12. Improper Influence. Each party warrants that it did not and will not employ, retain, or contract with any person or entity on a contingent compensation basis for the purpose of seeking, obtaining, maintaining, or extending this Agreement. Each party agrees, warrants, and represents that no gratuity whatsoever has been or will offered or conferred with a view towards obtaining, maintaining, or extending this Agreement. 13. Conflict of Interest. The elected and appointed officials and employees of the parties shall not have any personal interest, direct or indirect, which gives rise to a conflict of interest. 14. Time. Time is of the essence in this Agreement. 15. Survival. The provisions of this Agreement that by their sense and purpose should survive expiration or termination of the Agreement shall so survive. Those provisions include without limitation Indemnification and Maintenance and Audit of Records. 16. Amendment. No amendment or modification to the Agreement will be effective without the prior written consent of the authorized representatives of the parties. 17. Governing Law; Venue. The Agreement will be governed in all respects by the laws of the Washington State, both as to interpretation and performance, without regard to conflicts of law or choice of law provisions. Any action arising out of or in connection with the Agreement may be instituted and maintained only in a court of competent jurisdiction in Clallam County, Washington or as provided by RCW 36.01.050. 17. Non-Waiver. No failure on the part of the City to exercise, and no delay in exercising, any right hereunder shall operate as a wavier thereof; nor shall any single or partial exercise by the City of any right hereunder preclude any other or further exercise thereof or the exercise of any other right. The remedies herein provided are cumulative and not exclusive of any remedy available to the City at law or in equity. 18. Binding Effect. This Agreement shall be binding upon and inure to the benefit of the parties hereto and their respective successors. 19. Assignment. The Subrecipient shall not assign or transfer any of its interests in or obligations under this Agreement without the prior written consent of the City. 20. Entire Agreement. This Agreement constitutes the entire agreement between the City and the Subrecipient for the use of funds received under this Agreement and it supersedes all prior or contemporaneous communications and proposals, whether electronic, oral, or written between the parties with respect to this Agreement. H - 9July 19, 2022 ARPA Subrecipient Agreement 5 21. No Third-Party Beneficiaries. Nothing herein shall or be deemed to create or confer any right, action, or benefit in, to, or on the part of any person or entity that is not a party to this Agreement. This provision shall not limit any obligation which either Party has to Treasury in connection with the use of ARPA Funds, including the obligations to provide access to records and cooperate with audits as provided in this Agreement. 22. Severability. In the event that one or more provisions of this Agreement shall be determined to be invalid by any court of competent jurisdiction or agency having jurisdiction thereof, the remainder of the Agreement shall remain in full force and effect and the invalid provisions shall be deemed deleted. 23. Counterparts. This Agreement may be executed in one or more counterparts, any of which shall be deemed an original but all of which together shall constitute one and the same instrument. 24. Authorization. Each party signing below warrants to the other party, that they have the full power and authority to execute this Agreement on behalf of the party for whom they sign. IN WITNESS WHEREOF, this Agreement is executed and shall become effective as of the last date signed below. DATED this _____ day of ___________________, 2022. SUBRECIPIENT By: _________________________________________ Print Name: Wendy Bart Its: _______Chief Executive Director DATED this _____ day of _______________, 2022. CITY OF PORT ANGELES By: _________________________________________ Print Name: Nathan A. West Its: ___ City Manager H - 10July 19, 2022 ARPA Subrecipient Agreement 6 ATTACHMENT A Letter agreement H - 11July 19, 2022 ARPA Subrecipient Agreement 7 ATTACHMENT B U.S. DEPARTMENT OF TREASURY CORONAVIRUS STATE AND LOCAL FISCAL RECOVERY FUNDS FINAL RULE DATED 5-17-2021 H - 12July 19, 2022 ARPA Subrecipient Agreement 8 ATTACHMENT C U.S. DEPARTMENT OF TREASURY COMPLIANCE AND REPORTING GUIDANCE FOR CORONAVIRUS STATE AND LOCAL FISCAL RECOVERY FUNDS DATED 6-17-2021 H - 13July 19, 2022 ARPA Subrecipient Agreement 9 ATTACHMENT D SCOPE OF WORK H - 14July 19, 2022 OLYMPIC PENINSULA YMCA │ 675 N 5TH AVE, STE 3A | SEQUIM, WA 98382 | 360.452.9244 │WWW.OLYMPICPENINSULAYMCA.ORG May 6, 2022 City of Port Angeles City Council 321 E. 5th Street Port Angeles, WA 98362 Re: Funding Request for Olympic Peninsula YMCA – Early Learning Facility Dear City Council Members: Based on the lack of available child care in our region, the Olympic Peninsula YMCA is proposing to build an 8,000+ sq ft Early Learning Facility that will serve up to 92 children between the ages of 6 weeks to five years. According to a survey completed by the Clallam County Economic Development Council in June of 2021, 78% of parents currently not in the workforce would return to the workforce if they could find and access “affordable, reliable child care for their child(ren).” Parents rely on child care to help them enter, re-enter, or remain in the workforce; the lack of available child care has disproportionately impacted women’s ability to return and/or stay in the workforce. Current availability of licensed child care meets the need of less than 30% of children under six whose parents are in the workforce and need care. In addition to supporting the workforce, early childhood education benefits children: it increases kindergarten preparedness so children start school ready to learn; and participation in a quality early learning program lowers risk factors and improves health outcomes in adulthood. Every dollar spent on early childhood development can yield up to a $16 return. The Early Learning Facility will be built on property that the YMCA already owns, adjacent to the Port Angeles YMCA, and within 5 minutes of the largest employers in Port Angeles and Clallam County. In addition to improving workforce recruitment and retention for Clallam County employers, the Y’s Early Learning Facility will create a minimum of 15 jobs for early learning professionals. We are estimating the total project cost to be $4,520,800. The YMCA has allocated $1.025M of its own funds, including the value of the property to be used for the project. In addition, we have received $1M from the Washington State Department of Commerce – Early Learning Facilities Program and we are actively pursuing additional funding streams. We are respectfully requesting $500,000 from the City of Port Angeles to be applied to the cost of this project. For your review, I have included a fact sheet with additional information about our Early Learning Facility. If you have any questions or would like to speak with me about this project, I can be reached at 360-504-0526 or by email at wendy@olympicpeninsulaymca.org. Thank you for your consideration, Wendy Bart Chief Executive Officer H - 15July 19, 2022 OLYMPIC PENINSULA YMCA • 675 N. 5TH AVENUE, STE 3A, SEQUIM, WA 98382 • 360.452.9244 • www.olympicpeninsulaymca.org OLYMPIC PENINSULA YMCA EARLY LEARNING FACILITY OLYMPIC PENINSULA YMCA The Olympic Peninsula YMCA, founded in 1948, is a 501(c)(3) not-for-profit charitable organization. We are an inclusive organization of men, women and children with a shared commitment to nurture the potential of youth, promote healthy living and foster social responsibility. OUR CAUSE & COMMUNITY PRESENCE  The Olympic Peninsula YMCA has three branches located in Sequim, Port Angeles, and Jefferson County.  The Y offers a variety of programs including childcare for working families, swimming and fitness for all ages, various youth and adult enrichment classes, school-based mentoring, summer camps, family camps, afterschool clubs, and chronic disease prevention and management programs.  In 2021, the Olympic Peninsula YMCA served more than 9,500 different individuals. The Y provides a safe place where all sections of the community gather. No one is denied the opportunity to participate due to an inability to pay. VISION FOR CHILD CARE  The Olympic Peninsula YMCA’s vision for child care is to establish a robust network of allies and partners across diverse sectors of the community that work to ensure that all families have an abundance of safe, quality, affordable child care options. Child care is vital to a community’s thriving ecosystem and is integral to the healthy development of children and families. OUR MISSION To put Christian principles into practice through programs that build healthy spirit, mind, and body for all. We live our mission daily, one person and relationship at a time. EVERYONE IS WELCOME The Y is a membership organization open to all people. We welcome women, men, girls and boys of all ages, races, ethnicities, religions, abilities, sexual orientations and financial circumstances. Our programs and branches embrace diversity, reflecting the people and needs of our communities. H - 16July 19, 2022 OLYMPIC PENINSULA YMCA – EARLY LEARNING FACILITY BACKGROUND Even before the pandemic, the lack of available child care was at a crisis level in Clallam County. According to ChildCare Aware of Washington 24% of licensed child care sites have closed since 2020. As of March, 2021 the Washington State Department of Children Youth & Families (DCYF) estimated that of the 1,118 children eligible* in Clallam County, only 476 were enrolled in licensed child care 1. Based on this significant need, the Olympic Peninsula YMCA Board of Directors adopted a child care growth strategy with an emphasis on early childhood. THE CASE FOR EARLY LEARNING FACILITIES  For Children: 90% of brain development happens in the first five years; early childhood education increases kindergarten preparedness so children start school ready to learn; and participation in a quality early learning program lowers risk factors and improves health outcomes in adulthood. Every dollar spent on early childhood development can yield up to a $16 return.  For The Workforce: Parents rely on childcare to help them enter, re-enter, or remain in the workforce. Current licensed availability meets the need of less than 30% of children under six whose parents are in the workforce and need care. Based on estimates provided by Washington State Department of Commerce: • Employers in our region incur almost $94 million per year in compensation and turnover costs for workers arriving late or leaving early as a result of child care issues and for workers who leave employment because of a lack of child care • 2,900 employees with children under six years of age quit a job due to challenges related to child care • 1,400 employees with children under the age of six were fired from work due to challenges related to child care THE OPPORTUNITY The Y’s goal is to ensure that children enter kindergarten ready to learn, grow, and thrive. In order to accomplish this, we are planning to build an early learning center on property we own adjacent to the Port Angeles YMCA. The property is centrally located and within 5 minutes of the largest employers in Port Angeles and Clallam County. The site will accommodate an 8,000+ square foot facility, serving up to 92 children. PROJECT OUTCOMES AND BENEFITS  Serve more families: An estimated 50 families and up to 92 children ages 0 to 5 will be served at the Y’s Early Learning Facility.  Improve workforce recruitment and retention: Employees will be able to work knowing that they have access to safe, quality, affordable child care.  Create jobs: The Y will employ an additional 15 early learning and child care professionals. CONTACT For more information about the Olympic Peninsula YMCA’s Early Learning Facility project, please contact Wendy Bart, Chief Executive Officer, at wendy@olympicpeninsulaymca.org or by phone at 360-504-0526. * All caregivers in the workforce 1 https://www.dcyf.wa.gov/practice/oiaa/reports/early-learning-dashboards/child-care-need-supply-data EARLY LEARNING FACILITY – CAPITAL PROJECT BUDGET Land .................................................................. $840,000.00 Architecture & Engineering................................. $80,000.00 Construction .................................................. $3,300,800.00 Capitalized Equipment ...................................... $250,000.00 Project Management .......................................... $50,000.00 TOTAL .................................................................. $4,520,800.00 H - 17July 19, 2022 1 OLYMPIC PENINSULA YMCAEARLY LEARNING FACILITY H - 18July 19, 2022 BUILDING AN EARLY LEARNING FACILITY IS ALIGNED WITH OUR CHILD CARE GROWTH STRATEGY 2 H - 19July 19, 2022 90% OF BRAIN DEVELOPMENT HAPPENS IN THE FIRST FIVE YEARS Sensory Pathways (Vision, Hearing) Language Higher Cognitive Function Center on the Developing Child, Harvard University. Source: C.A. Nelson (2000) H - 20July 19, 2022 PARTICIPATION IN A QUALITY EARLY LEARNING PROGRAM LOWERS RISK FACTORS AND IMPROVES HEALTH OUTCOMES IN ADULTHOOD 4 H - 21July 19, 2022 THE ROI IS SIGNIFICANT –FOR THE CHILD: Washington STEM -State Of The Children: Early Learning And Care American Community Survey 5-Year Estimates, Age Of Own Children Under 18 Years In Families And Subfamilies By Living Arrangements By Employment Status Of Parents. https://data.census.gov/cedsci/table?q=B23008&g=0400000US53,53.050000&tid=ACSDT5Y2018.B23008&hidePreview=true *Investment and gain figures are based on an estimate of year-round, full-day, quality care for low-income children, derived from the average cost ($1,960 per month) of programs currently providing this care. H - 22July 19, 2022 Washington STEM -State Of The Children: Early Learning And Care The Mounting Costs of Child Care: Impacts of child care affordability and access to Washington’s employers and economy, 2018,Retrieved from: http://www.commerce.wa.gov/wp-content/uploads/2019/09/MountingCostsReport_FINAL.pdf AND FOR THE WORKFORCE IN OUR COMMUNITY* Employers incur almost $94M per year in compensation and turnover costs for workers arriving late or leaving early as a result of child care issues and for workers who leave employment because of a lack of child care. 2,900 employees with children under six years of age quit a job due to challenges related to child care. 1,400 employees with children under the age of six were fired from work due to challenges related to child care. *Estimates for the North Olympic Peninsula based on state-wide percentages H - 23July 19, 2022 CURRENT LICENSED AVAILABILITY MEETS THE NEEDS OF APPROXIMATELY 28% OF CHILDREN UNDER SIX WHOSE PARENTS ARE IN THE WORKFORCE AND NEED CARE. **Based on the assumption that 63 percent of children with all caregivers in the workforce would use child care if it were to be available Washington STEM -State Of The Children: Early Learning And Care Data provided directly to Washington STEM via data sharing agreement with Department of Children, Youth and Families. American Community Survey 5-Year Estimates, Age Of Own Children Under 18 Years In Families And Subfamilies By Living Arrangements By Employment Status Of Parents. https://data.census.gov/cedsci/table?q=B23008&g=0400000US53,53.050000&tid=ACSDT5Y2018.B23008&hidePreview=true H - 24July 19, 2022 WE HAVE THE LAND AVAILABLE –WITHIN 5 MINUTES OF THE LARGEST EMPLOYERS IN PORT ANGELES 8 H - 25July 19, 2022 PROJECT OUTCOMES & BENEFITS 9 Serve more families:An estimated 50 families and up to 92 children ages 0 to 5 will be served at the Y’s Early Learning Facility. Improve workforce recruitment and retention:Employees will be able to work knowing that they have access to safe, quality, affordable child care. Create jobs:The Y will employ an additional 15 early learning and child care professionals. For our region: Establish Clallam County as a community of choice with high quality, accessible child care. H - 26July 19, 2022 ESTIMATED PROJECT COST 10 H - 27July 19, 2022 QUESTIONS? H - 28July 19, 2022 THANK YOU Wendy Bart, CEO Olympic Peninsula YMCA wendy@olympicpeninsulaymca.org 360-504-0526 H - 29July 19, 2022 N N V N C O on N Q V I� L 4-J cc� a V G O V t t O r J O s -- N V W W J LL ', ^ N u M N a-J ro E a-J N W W u � N a-J �--� c: �--� C: a) O o N Q cV cr Z o a) O 4-J a) � O N N N E N N > N a-J N U O 4-J Zan u L a-J L O > N N O �- OV V l0^J p 4-JN O N N u L = 4-J N c i u � UA Q N cn Q Ln -� (n " -0 N �> + to �+ u 4-J N O 0 N ca j N L^ E u N . "T *.O CV4 M *.O (V M M O� Diu'III i.. �� �i�llll iiullllll ,1 N O N L W � Q 0 3 W 3 0 0 �- E o .v o W Ln N o 0 0 a CA m 0- 0 4-, j u U i Q O N U U N >, > V LLI IAU V cn �; G� a� U o W to U N 'a i ate--+ O � N vi � N � O � N V Q a) N 3 Ln N 4-, O N U N vi p O N O c Q = N L U U O O N i O O U O L a� > U ` - � ou C w N � an Ln CO on � J = a) > cn Q N a) Q ♦ ♦ ♦ • s O E o 0 0 0 0 0 0 0 0 o o LA LA LA I� O M M LA 0� Ln Ln Ln "t OM 10 N M M on 7 m N y m 0 10 O Ln 00 O 00 I" 0% 10 10 �;.� c% Ln _ 0 U N ONO M 0% N 0% On O �p N f6 �0 Lr O CO C M M M � M N N N I� J NLn Ln Ln Ln N _ EE E t E 0 r E t E r CO M rn N 't Co 0' M Ln 0 CO O^ 00 N M O, 0) Lr!10 00 _ CD0 0^O O LLn ^ Ln W N W Q CDa a 't a CDa N E E N Z N Z Z Z N Z O Q uo w V W 3 V U- Ln N 't N Q Q Q O Q Q L Z Z Z Z Z On W DC E ° W 0 _ ; ° o w d d Y /\ W Ln x co •� u u u v y L � 0 - v O V� V ° ° ° o . r o ° L O O N v v v E: c O� a = V ~ N O0 o o° o° o° �` o L a N 0 L L L U Cl. LL O _ LL N 0. LL Cl. WO/ Jw/ L L = a o O O O V p Y DOt1 .V U NV V V J N V f6 D coN > > Y a x o E o ^� OO O O C4 on N N U U U Ln 0 onU N M N N N o v v v u rn LL_ E u o LnO O N U LL- N LL_ 0 O O O 00 00 O 0� O� o_ NO N O O O cq N C � V � V V V N to f6 �' fL6 V f6 f6 L O D_ D_ D_ W O N E f6 LL_ O O a E WU J � a o Mo 10 ° rn °° v c v Ln W �y kx'J � ti Oyu "cY. 1 der � 21 tt7Lnsv Ln , 4 h . , +y 4 fi 4 N M W W V CD W V CLCD _ Ln 0 V on o L M co N a� t/f N a� L U Q N It N N O E Ln ateJ O 4-J f� 'a J 0 O u on on N L L N U Q N N r. � o a' a' 1 a 1 � - R. r Z � W m W � V Lit 0 � '"".... � _ U. 6Y" V L 3 0 rim \W x O / d N p N x V � No V) o o c N u °' N w o iCD 4-J N ,� E yfl: 0 a-J w _� III II II II II II II II II II II II II II II II II II II II II[ ii as Wto N � V 0 � 3 A� Vr f0 r 'oc k � L V _. 00(14 V�/ 1 C) O N p ( �} N °� N r4 W Q N - u a) -J Mo a� O �� ..� LLIN N U a-+ f�l 1 00 N Lu N ^ 0 U 4-J L f0 Q _ _ T � v I � I k 1 � 00 ` W CD H 'p ; l W DC V 0 � I VCdl P CO \W N U U / I N O ) M N v o -.a U v1 LL. }+ N o u - o +I Z Ln O � p U + N � } F � "O � N N > L C o E p l� fa N N #4 a' M � U t- O f� N N Ln a w o u � O f7,as O co W , z . . W CD < W m *, W O � DC V 07, Ice iv V � o N M N 4-J o (14 .o N 0 O — U Q- N Q (U on on L E aU cv 3 C p m o E(14 a) N M :(14 a-+ W N J U Lon L 0 a� to 2 - co f I ' z 'I ob IpIry +I�eS Y H � Z . . LLI to • ��� � M i'i 1fl1 M N A � V O � 3 V � _ oC J � m ,r3 O Lr o o N J L 1 Ln o Z O LL V 4j)- LL N L.�_N u N f6 U p > c p0 V p Q S +� L t/1 � N N . 1 O NO V N N a u 00 0 w %O 0 on 0 J 2> J 00 aP 1 O � O as 9�4 as M p Z W Lu w, Q W � VY � o ., w PA f Q M ja- r,4 LL ti O U V'r N "' v ``' ' N O U -a o a. .. ra O U O - Z c°n � Li a-J N '" = � u N v H o cv v oo w Ln �- u v Ln O v CD CD 00 CDr � V � u 'V on M � � o N , o u � M L N a--+ U t , Z a-J N N cv � > � � � u W p ON a-+ U Ln C: / W 0 Q O COa ) U i on O 0 N = cn � 2J � m V 4=. 00 O E 4—; 0 N E 'tooa u_ o > 41 X En O o tt� N u N . . N � � N O o Z � you N (Z O c 4-1 � ' N � } � O E _ N� N C u r W NO CO d Q co 4-J u N CO on J - N Q -o ON > 5 m a ` _ a r° O V r IYp i 4-J a-J 00 CV u f � O O f� I� CV can N M u Rj N CV 9Hs"psi " CV NO N p �'p :ZEEV a-+ E � N O u N a; .0 }' on N E � 3 ° o E � � ° Z on u -a J N N N •c L 'v N p O u N N on O V) O V Q o -p N � u N u •N 4-1 O O E '� •an L u O V 30 0 V) M O `+ N '- " = O O N u 3 � 0 W N i M N N Q O N �; O O N � CO N � N O O ,� Q Q O V a..i > -gyp O N •V �' an � -a O an Q O O O N Q a-J a-J N `� 'V 4-J N N u Un 4, N • N CO O >, •� L O on � r O O Q O Z3 a-J •� •N L � N L E N O N -a >, � N N �; u O N �cn 4-+ •N m Z3 � O UOn E O >, L u O N N N O - N J V u m D c Q 4—+ Q ~ Q 4—+ 3 � N •� O N � N 4-J Z N N O O M N a-J N O- : a--J u L L N Q N >` 04-J N N O N L x N e u 0 � N L u -0 0- N Q cn cn a-J N a-J L O O O O � Z3 3 nn M f� -J N N UA a-J _ a--J U1� Z •N o - •E N N Q Q Q Q) N •� O' O � N O a-J cr ro O O N U -' ro 4-, 4-J DC o 5 4-0 ~ •N N � = E N N N > O N +, 4 N +-+ . . 4-J 4-J an O N aa) N L N N V) to " •Z3 O Q) N O � -0 � N 0 ro O N L _ Q N_ � J UA L' > Q >' L O _ a--' roO O Q M a..i N p O � O +-+ +-+ O- N V V c N O M L N N > O -0 E 4j OI O ,� 'p •� N � N N V L N 4--J +J N O •^ . f� Q Q Q 0 � N Q N 0 Q N LL Lu O d- ro O � ° •3 can 0- L O O O O � Z3 3 nn M f� -J N N UA a-J _ a--J U1� Z •N o - •E N N Q Q Q Q) N •� O' O � N O a-J cr ro O O N U -' ro 4-, 4-J DC o 5 4-0 ~ •N N � = E N N N > O N +, 4 N +-+ . . 4-J 4-J an O N aa) N L N N V) to " •Z3 O Q) N O � -0 � N 0 ro O N L _ Q N_ � J UA L' > Q >' L O _ a--' roO O Q M a..i N p O � O +-+ +-+ O- N V V c N O M L N N > O -0 E 4j OI O ,� 'p •� N � N N V L N 4--J +J N O •^ . f� Q Q Q 0 � N Q N 0 Q N LL Lu O d- ro O � ° •3 can 0- � M N _ 3 o M a-J M O N O N 4' V E `j L- :>-- 'o C 0 N = i o E O o aJ U U Q V O V .N •� O Z3 N 'v L 'i c�.� 00, O .> 3 V 3 NL N O O � 3 N ^ Z) O 'N N c;l� N Eon N 'N -w V O � N � O O CD_ Q O O 'C: V V im-J 0 0 O O O 'V) ^ V .CL a-J N V V N N N U N _ V U Q E N u O Q V Q Q r�4 Y ' IF, l- 4 Y�-• 7�•..1F A s 3. J at L 1' Ln O I = � o 0 A r Al_ �u ti' Date: July 19, 2022 To: City Council From: Nathan A. West, City Manager Subject: Bird Rides, LLC. Discussion Background / Analysis: The Cities of Port Angeles and Sequim have both been approached by Bird Rides, LLC., an electric power scooter rental company. Recently, the Sequim City Council agreed by a motion to pursue a trial period operating agreement with the company. The City of Port Angeles has also been approached by the company with interest in establishing the same transportation program in Port Angeles that would deploy motorized stand-up foot scooters. These “e-scooters” utilize a smart phone app riders use to connect and pay for usage of the scooters. A Bird Rides, LLC overview states: “Bird uses electric-powered scooters, two-wheeled stand-up vehicles designed to safely and sustainably get you around your city. Through the Bird smartphone app, riders can see the closest Bird on a map, unlock it, complete the safety tutorial, and ride directly to their destination. It costs $1 to start, then a per minute fee. Our mission is to get people out of cars and: Solve the last-mile problem and connect more residents to transit options.” Excerpts from a Bird Rides, LLC. state that the Stand-up electric scooters are to be ridden on streets, and where available, in bike lanes and bike paths. Stand-up electric scooters are to stay to the right of street lanes and to offer the right of way to bicycles in bike lanes and on bike paths. Users of Stand-up electric scooters shall be 18 or older. A representative of Bird Rides LLC is planning on being available during the Council meeting. At this time most City Departments have not had an opportunity to review Bird’s proposal or implementation plan. Review of current code and communication with Port Angeles area stakeholders has not occurred as of the drafting of this memo. Council discussion this evening will provide insights on Council’s policy desires regarding this program and more details can be brought back to a future meeting. In light of the recent Sequim decision and the seasonal importance of capturing summer months including August and September staff understands that there may be desire for a decision to be made at this Council meeting. In a July 12th email a Bird representative shared that a July decision would be best for them. If Summary: Bird Rides, LLC., an electric power scooter rental company, has proposed establishing e- scooter rental systems in both Port Angeles and Sequim. Recently, the Sequim City Council took action to explore operation of the “e-scooters” within their City limits. Now, the City of Port Angeles has the opportunity to consider a similar system within our own City limits. Funding: N/A Recommendation: Staff recommend Council: 1.) Discuss Bird’s proposal – pros and cons; 2.) If Council chooses to pursue a pilot program with Bird Rides, LLC, prior to the August 16th Council meeting: Authorize the City Manager to negotiate, execute, and administer an operating agreement with Bird similar to the one recently approved by the City of Sequim. July 19, 2022 I - 1 that is Council’s desire staff recommends that action be taken to authorize the City Manager to negotiate, execute, and administer an operating agreement similar to the one recently approved by the City of Sequim. Funding Overview: N/A July 19, 2022 I - 2 What is Bird? Bird is a last-mile electric vehicle company dedicated to bringing affordable, environmentally- friendly transportation solutions to cities everywhere. Today, Bird serves over 300 communities worldwide, ranging from metropolises like Los Angeles, CA (pop. 4 million), to smaller cities like Fort Scott, KS (pop, 7,700). How it works. Bird uses electric-powered scooters, two- wheeled stand-up vehicles designed to safely and sustainably get you around your city. Through the Bird smartphone app, riders can see the closest Bird on a map, unlock it, complete the safety tutorial, and ride directly to their destination. It costs $1 to start, then a per minute fee. Our mission is to get people out of cars and: Solve the last-mile problem and connect more residents to transit options Find Birds on the map Scan QR to begin ride Watch safety tutorial Enjoy the ride! Reduce congestion and over-reliance on cars Improve air quality and reduce GHG emissions Improve the overall quality of life in cities 1 2 3 4 July 19, 2022 I - 3 Bird’s impact on the communities we serve Prioritizing safety, first. Bird partners with cities across the globe to develop programs that maximize the positive impact of micro-mobility. Connectivity Bird supplements car use by providing a new, affordable transportation option. In fact, Bird provides up to a 9x increase in the reach of transit stations, driving tourism and bringing the community together. Bird leads the industry in safety. Safety is deeply embedded across all components of our business- from our policy and operations; to our community education and engagement; to our industry leading vehicle design. of Bird rides ending at local businesses helping connect shops and restaurants with riders in their community. a recent study showed that e-scooters directly contributed to spending at local food and beverage businesses averaging $921/scooter over six months. $0 investment from the city. One sustainable ride at a time. Bird’s custom vehicles are the most durable micro-mobility options on the road today. Each Bird Scooter on the road today represents: Bolstering the local economy. 18 months + OF SUSTAINABLE RIDES 58%$921 / scooter Free 1,500 pounds OF CO2 AVOIDED July 19, 2022 I - 4 Leading the way on Bird is committed to working with cities to manage and maximize the positive impact of our partnerships. That’s why we’ve developed industry-leading technology to measure, innovate, and improve both our fleet and our reporting. Here’s just a small sample of our offering for cities: Custom in-app education Bird riders are each shown a comprehensive education program that can be customized to address your city’s chief concerns. Community-based reporting Every member of your community can access community mode in the Bird app to submit complaints directly to our team for fast resolution. Localized policy zones Bird’s geo-fencing technology allows us to implement no-ride zones, no-parking zones, and reduced-speed zones with custom messaging to increase safe riding. innovative solutions for cities Account Manager Bird’s account managers partner with cities to provide a custom experience dedicated to servicing each specific community’s needs. Industry-leading vehicles Bird’s best-in-class teams create innovative new vehicles from the ground-up. From self- reporting damage sensors and tip detection to an industrial-grade anti-tipping kickstand, Bird offers the most advanced shared e- scooter on the road today. Programs for equitable access Our city dashboards provide customized information about how our partnership is helping to complement the city’s mobility menu. Bird provides cities with easy-to-read dashboards and in-depth APIs to help cities understand how riders move about the city. Parking management Bird offers a comprehensive suite of parking tools that bridges the gap between technology and infrastructure by both directing and incentivizing riders to park in city- designated areas and reduce the communities concerns of 'clutter'. Want to learn more about if Bird would be a good partner to meet your city’s goals? Just reach out to to be connected to your regional representative partnerships@bird.co NExt Park with care Do not block the public right-of-way. Park by bike racks when available. Hyper-local operations Bird partners with local small businesses, or "Fleet Managers," creating additional jobs and using hometown know-how to maximize operational efficiency. July 19, 2022 I - 5 Bird Fleet Manager Program Bird’s Fleet Manager program is a global program for logistics providers and small businesses interested in making their neighborhoods cleaner, safer, and less congested by managing fleets of Bird e-scooters. Start your own business If you’re a self-motivated individual and are eager to dive into the micro-mobility industry, become a Fleet Manager and provide affordable transportation options in your community! This program allows pioneering business owners to explore their city while managing a fleet of Bird scooters. We give you the autonomy to build your team as you see fit in order to provide fleet management services seven days/week, 365 days/year - the more you put into the program, the more you get out and we’ll always be here along the way. July 19, 2022 I - 6 Core Market [US] (Metropolitan market ex. Los Angeles, San Diego, San Francisco) Longtail Market [US] (Cities with the population size of 10,000 -25,000 and located 2-3 hours from metro city) Start up costs as low as $01 Start up costs as low as $01 Earning potential up to $130K2 Earning potential up to $70K2 1 If you already have a legal entity set up. 2 Figures are projections for owners operating with a fleet of 50-100+ vehicles. What it takes to start your business Once you have successfully completed all stages of the onboarding process, here are some of the steps you’ll need to take to get your business up and running: ●Create your business entity and officially become a business owner. Existing businesses may use their existing entity. ●Obtain Insurance for your business. ●Build and hire any help you may need to fix and maange scooters. ●Access to storage space. You will need room to store and care for your fleet. ●Purchase recommended repair tools. July 19, 2022 I - 7 What Bird takes care of Once you have successfully completed all stages of the onboarding process, here are some of the steps you’ll need to take to get your business up and running: ●Onboarding Once you join the Fleet Manager program, we will provide you in-depth onboarding resources to ensure you’re set up for success when utilizing the Bird app, working with the vehicles, operating in your market, following health and safety protocols, and more! We also host repair classes periodically to ensure all your pressing repair concerns are addressed and vehicle updates are shared. ●Vehicles The team at Bird has been building the industry’s most trusted shared scooter service by engineering custom vehicles that raise the bar for safety, sustainability, and durability. ●Tech Our tech helps you to find opportunities to maximize revenue and monitor your fleet’s activity. Kickstarting Your Success: Launch & Onboarding Period During your first 30 days operating as a fleet manager partner, we want you to be set up for success. Bird provides a risk free, 30-day ramp up period to ensure this partnership is a strong mutual fit for the long-term. You will be partnering with an Engagement Manager from the Bird regional team, and they will be your main contact to ensure a smooth launch of your fleet manager operation. Our qualified and dedicated Engagement Managers help our partners strategize for deployments, optimize day-to-day operations, and share learned lessons to help maximize your revenue. Even beyond the first 30 days, you will be looped in on market compliance and regulations, have access to formalized repair training for the Bird vehicles (prior mechanical experience is highly recommended), and hundreds of Help Center articles to address all of your concerns and needs as you get started. You and the Bird team will work closely together to drive forward the mission of cleaner and more accessible cities. July 19, 2022 I - 8 A Day in the Life of an FM To provide a taste of what the daily operations for a fleet manager partner may entail, below is an overview of what a fleet manager operations may look like: Disclaimer:The schedule is merely a rough outline, every fleet manager decides on their own operations schedule. IN THE AM / PM Deploy & Pickup Vehicles Vehicles are picked up regularly to ensure they are charged and assessed for any repairs. Once vehicles are determined to be in proper condition, they are placed back on the street and ready to be ridden. Moving Vehicles It is important that the vehicles are placed in optimal locations to receive rides. The app will flag vehicles that should be moved in an effort to increase your earning potential. DURING THE DAY Repair Vehicles You may come across vehicle damages that will require repair before being ridden again. There is repair documentation available that will assist you in facilitating any repair and a Shopify store with all the spare parts you may need to purchase. Team Duties You may choose to hire subcontractors or employees to help with your operations on a rotating schedule or for peak season holidays. Fleet managers also hire for overnight shifts to pick up low battery scooters so they do not go missing. GENERAL Ongoing Compliance In order to maintain a positive relationship with your community, you may be asked to pick up improperly parked vehicles that may be in violation of city regulations. Your local team will work with you to make sure compliance concerns are resolved in a timely manner. Communication Keeping in contact with your Engagement Manager and local team gives you the chance to learn from their operational experience. July 19, 2022 I - 9 Testimonials My partner and I love being fleet managers. We love to see the joy and fun that not only us as managers experience but seeing the public have a lot of fun and entertainment with the scooters. When you can stop your trailer and unload practically your whole thing in one spot due to people wanting to ride them. It is a fun and rewarding opportunity. - Robert Lumley (Duluth, MN) [LONGTAIL] Bird is truly an unique opportunity to interact with the local community in a way I never knew existed to be honest. I was working two jobs that were extremely boring, and not very rewarding. I needed a change. Bird can definitely bring about its own set of challenges, but at the end of the day, there are a lot of rewards beyond just the monetary payout. I strongly believe in a “work hard, play hard” mentality, and I can say Bird has supported that. - Kristopher Vaught (KC) [CORE] My advice to anyone joining is very simple: you are going to be placed into a program where to be successful takes a whole host of skills and attributes that you probably never really sat down and thought about. Are you actually willing to understand that the micro mobility game is forever changing, will never be static, and will require you to adapt on the fly, become a jack of trades you never knew existed? If so, hold on, cause it's about to get bumpy, but don't forget to open your eyes for one hell of an adventure! - Anonymous July 19, 2022 I - 10 We’ll provide you with the tools and support you need to succeed ●Training Videos We have recorded video walkthroughs that show you how to take apart your vehicles, handle various repairs, and infield strategy. Our training videos cover all Bird Model vehicles. ●Help Center Our Help Center provides you with detailed written content to help navigate around the Fleet Manager program. ●Reporting Within our provided reporting dashboard, you’ll be able to understand the entirety of your operations and be able to identify areas of improvement. ●Global FM Support Team We have the best in class support team working around the clock to help support your requests and resolve your most challenging issues. ●Engagement Manager You’ll have a dedicated Engagement Manager to help you better your business and achieve daily KPI goals. ●Local Team In addition to your Engagement Manager, you’ll also have the support of market experts who will assist with strategy optimization, provide you with tips and tricks on how to excel in your assigned territory and guide you on proper Bird care and maintenance. July 19, 2022 I - 11 Costs and Revenue Costs [US] Start up ●Legal Entity ●Insurance (General Liability, Commercial Auto, Workers’ Compensation*) ●Tools Ongoing ●Fuel For picking up and deploying your Birds. You can also invest in a smaller device like an electric trolley to reduce these costs further. ●Electricity To charge your vehicles. ●Spare Parts Wear and tear is common - you may need to purchase spare parts from our Shopify store to keep your Birds on the road. ●Employees If you need some additional support managing your fleet, you may want to consider hiring employees, but this is by no means required. ●Storage Space To charge, repair, and store your vehicles. * If you will employ any workers or helpers to assist with your business operations. Costs [EMEA] Start up ●Legal Entity ●Tools Ongoing ●Fuel For picking up and deploying your Birds. You can also invest in a smaller device like an electric trolley to reduce these costs further. ●Electricity To charge your vehicles. ●Spare Parts Wear and tear is common - you may need to purchase spare parts from our Shopify store to keep your Birds on the road. ●Employees If you need some additional support managing your fleet, you may want to consider hiring employees, but this is by no means required. ●Storage Space To charge, repair, and store your vehicles. Revenue Fleet Managers make money off of each ride - which means you’ll want to make sure you have as many vehicles on the road as possible and that you’re placing them in prime locations throughout the day. The harder you work, the more you’ll make! July 19, 2022 I - 12 FAQs When did the fleet manager partner program launch? The fleet manager partner program launched early 2020. Bird has been providing partnership opportunities in all size markets to our local operators who are entrepreneurial, enjoy running their business being hands-on, and have a passion bringing micro-mobility into their community. Where do I sign up? We are excited you are interested in signing up for the fleet manager program. Please click here to submit your information for review. If our team feels you are a good fit, we will reach out to you with next steps. Why is Bird deciding on coming here to my city? We have done extensive research and analysis that led us to reaching out to your city based on its characteristics and layout. We are excited to partner with the city to bring alternative clean transportation to your town. How might seasonality affect my business? If you are in a market that faces challenging/extreme weather (hot or cold), your Bird partner team will help navigate and prepare for those seasonality changes as they come. Birds are stored and off the road when it is required by the city, or when the weather warrants them to be removed. With this in mind, our fleet managers in affected markets maximize revenue during peak seasons to counteract this. How much mechanical experience do I need? Although we provide the content to teach you how to repair the vehicles, it is highly recommended that you come in with previous mechanical experience. Keeping the vehicles well-maintained and on the street are key to your success. July 19, 2022 I - 13 What are examples of common repairs? Common repairs include brake lever replacements, kickstand replacements, front fork replacements, bell and button replacements, and QR code replacements. Can I hire employees & set up a team? Yes, this is your business! You can set up your team and add employees to your payroll as you see fit. The official contract will be listed under your LLC, and access for your employees will be added accordingly (speak to your Bird partner team). How much storage do I ideally need for storage/charging/repair space? We recommend having no less than 500 square feet of space to store Bird scooters. This can be a residential or commercial space as long as it is enclosed and has ample electricity. July 19, 2022 I - 14 Bird Scooter FAQs Bird + City Partnership Why is Bird choosing to expand now? Bird's mission is to make cities more livable by reducing car usage, traffic, and carbon emissions. Bird was the first scooter company in the space, and is excited to be in a position where we can meet our company mission and bring microboliity to as many cities in the country as possible. Our newest Fleet Manager operating model allows us to provide high touch and focused service to all communities regardless of the size. Will it cost the city anything to bring Birds to town? Bird can launch & operate at no cost to the city. Who is the city’s main point of contact and who do we contact in the event of an emergency? Each city we work to launch Bird with will have a dedicated Account Manager who will be their main point of contact at Bird. The Account Manager will work with the city throughout the pre-launch and launch process to ensure a successful scooter program in each city. Bird Scooter FAQs 1 July 19, 2022 I - 15 Riders & Safety How old do you have to be to ride? We set the age to 18+. How does Bird prevent underage riding? During account set up users are asked to verify their age. As needed we can add a feature to scan their ID or driver's license. How do you address riding these on the sidewalk? Riders are reminded of safe riding & parking expectations through banner & in-app notifications in the Bird app How does Bird address Safety? Safety has been Bird’s top priority since day one. Bird has built several features in app to address safety, including Helmet Selfie, Warm-Up Mode, as well as in-app safety tutorials, and a safety video available on our blog and website. Additionally, each city will also have an Account Manager who can work closely with your team to address any safety concerns if they arise. Your dedicated account manager will also be able to walk you through all new safety features, and update you as we release new ones as well Bird Scooter FAQs 2 July 19, 2022 I - 16 Vehicles & Operations How much does it cost Renting a Bird will cost the rider a $1 unlock fee+ a per minute fee. Billing is all done through the Bird app with a credit or debit card. Bird has discounted pricing programs available for frontline workers, active duty and retired military personnel, low-income, veterans, senior citizens and select community and non-profit groups. Learn more about eligibility requirements: https://www.bird.co/bird-access/ https://help.bird.co/hc/en-us/articles/360051003951-Community-Pricing- What is the speed of the Bird scooters? Our scooters go up to 15mph, which aligns with the speed of the casual biker.We have the ability to create slow speed zones and adjust the speed. “Warm-up mode” is available for all riders which will automatically soften a Bird scooter’s acceleration, allowing riders to slowly work their way up to full speed. Where will Birds be able to operate? When Bird launches in a new city, we create an operating zone on the backend, which will correspond to an area on a map. We will work with the city to align on the operating area that will align with the city’s goals of ridership & access to alternative transportation. Birds will only operate in this area and will slow to a stop outside of it. The city can also highlight any specific areas with parking rules, slow speeds or no riding. Where will the scooters need to be parked? Bird follows a dockless model, which means riders can park wherever they would like within the operating area. We educate riders where and how to park: at a bike rack when available, and Bird Scooter FAQs 3 July 19, 2022 I - 17 not blocking the right-of-way, sidewalks, ADA ramps, or driveways. At the end of each Bird ride, riders will be promoted to take a picture of the parked scooter as proof. Our Fleet Manager will be notified if a vehicle that is not in a ride is being moved- this will help to keep the fleet organized in case someone moves a parked vehicle out of place How does Bird manage “clutter” or vehicles being left everywhere? Our local fleet managers are responsible for rebalancing and moving vehicles throughout the city during operating hours. They pay attention to areas of scooter congestion as well as demand throughout the day, and rebalance vehicles accordingly. On the rider side, riders are required to take a photo of their appropriately parked Bird after each ride, which adds a layer of accountability. Bird can also display any bike racks or designated scooter parking infrastructure that a city may have in place, in the Bird app for riders to see as they end their ride. How many scooters will Bird be operating in town? As we work with cities to plan our Bird launch, we calculate the ideal scooter fleet size generally based on population size of the city as well as other factors such as tourism, commuter traffic, university presence, and more. Generally after launching an initial fleet in town, the Bird team monitors utilization after launch and works with city administrators to get approval to add more to the fleet as demand & usage increases. How does Bird source their local fleet managers? Bird works with local businesses, entrepreneurs, or community organizations to help manage our fleets locally and address the unique needs of each community. These individuals are selected based on a number of criteria to help best ensure the success of the fleet and a strong partnership with the city. Where are the Birds washed, charged and repaired/stored? Our local Fleet Managers charge, maintain, and store Birds in their own facilities. Bird Scooter FAQs 4 July 19, 2022 I - 18 Atty Rev 2022 Page 1 of 11 _______________________________________________________ TEMPORARY OPERATING AGREEMENT BETWEEN CITY OF SEQUIM AND BIRD RIDES, INC. _______________________________________________________ The Parties to this Temporary Operating Agreement (“Agreement”) are the City of Sequim (“City”), a municipal corporation of the State of Washington, and Bird Rides, Inc., a California company licensed to do business in the State of Washington (“Bird”), collectively the “Parties”. RECITALS WHEREAS, Bird desires to administer a micromobility transportation program within the city limits of Sequim by making motorized stand-up foot scooters (“e-scooters”) available to riders via a smart phone application (“app”); and WHEREAS, the City finds that entering into a Temporary Operating Agreement with Bird to make Bird’s e-scooter share program available for a defined and limited time period will allow the City and its residents and visitors to evaluate the following factors: ● Whether shared e-scooters have a positive effect on the environment by reducing motorized vehicle trips; ● Whether shared e-scooters are a viable alternative for commuters and visitors; ● Whether shared e-scooters have a positive effect on the health, safety, and welfare of the general public; and ● Whether the general public, including residents and visitors, support an ongoing shared e- scooter program in Sequim; and WHEREAS, the Parties are agreeing to enter into a temporary pilot program as set forth herein, and reserve the right to renegotiate the terms of any ongoing shared e-scooter program, including without limitation provisions for payment by Bird for use of the City’s rights-of-way and other public property on a per trip and/or flat fee basis; and WHEREAS, Bird acknowledges that this Agreement is for a temporary pilot program, and that they have no expectation of the City agreeing to any continued permit allowing their operations within the city limits after expiration of the pilot program; NOW, THEREFORE, for good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the City and Bird agree as follows: AGREEMENT 1. TERM OF AGREEMENT; SCOPE OF PILOT PROGRAM; LICENSE FOR RIGHT- OF-WAY USE; PERMIT REQUIRED; NO CONFLICT OF INTEREST The term of this Agreement begins on the Effective Date below and ends no later than September 30, 2022 unless renewed or extended by mutual written agreement (see ¶3). July 19, 2022 I - 19 Atty Rev 2022 Page 2 of 11 This Agreement authorizes Bird to operate a shared e-scooter pilot program as more specifically outlined in Attachment A, incorporated by reference herein, and in compliance with all applicable laws and regulations in local, state, and federal law, including without limitation chapter 10.23 (Motorized Foot Scooters) of the Sequim Municipal Code, permit requirements, and the terms of this Agreement. For the duration of this Agreement, the City grants Bird a non-exclusive authorization to disseminate, pursuant to the terms of this Agreement, a maximum of ____ shared scooters at any one time upon the City streets, and to operate a shared e-scooter program based on a smart phone app. The City in its sole discretion and upon written notice to Bird may authorize a different number of shared e-scooters after due consideration. The City will not unreasonably deny such increases and will provide a basis for its decisions. This Agreement is intended to convey limited rights and interests only as to those rights-of-way in which the City has an actual interest. It is not a warranty of title or interest in any right-of- way, and does not provide Bird with any interest in any particular location within the right-of- way. Further, it does not confer any rights to Bird other than as expressly provided in this Agreement. Bird must apply for and obtain a right-of-way use permit issued by the City’s Public Works Department and approved by the Community Development Department before beginning the pilot program and comply with the permit’s terms in addition to all other conditions required under this Agreement. Bird further certifies that no City officer or employee has, or will have, a direct or indirect financial or personal interest in this Agreement, and that no City officer or employee, or member of such officer’s or employee’s immediate family, has negotiated, or has or will have an arrangement, concerning employment to perform services on behalf of Bird or its contractors under this Agreement. If any language in this Agreement conflicts with the right-of-way permit, the language of this Agreement prevails. 2. DEFAULT AND TERMINATION OF AGREEMENT a. If Bird defaults in or violates any of the covenants, agreements, commitments, or conditions in this Agreement, and any such default or violation continues unremedied for a period of 7 business days after written notice thereof to Bird, the City may, at its option and in addition to all other rights and remedies which it may have at law or in equity against Bird, expressly including the specific enforcement hereof, have the cumulative right to immediately suspend or terminate this Agreement and all Bird’s rights under this Agreement. b. Termination without cause. This Agreement may be terminated by either Party at any time with 30 calendar days’ prior written notice to the other Party. c. The rights and remedies of the City provided in this subsection are not exclusive and are in addition to any other rights and remedies provided by law or under this Agreement. d. Bird must remove all its e-scooters and equipment from the City’s right-of-way within 24 hours of being notified in the case of default or at the end of the 30 calendar days’ notice, as applicable. If Bird does not remove the same upon due notice, any remaining e- scooters and equipment will be removed by the City at Bird’s expense. Bird is not entitled to any damages for City removing its e-scooters or other equipment. July 19, 2022 I - 20 Atty Rev 2022 Page 3 of 11 e. Bird’s obligations with regards to indemnification as provided herein survive the expiration or termination of this Agreement with regards to any claims arising during such time as this Agreement was in effect. 3. RENEWAL; EXTENSION This Agreement will not automatically renew or extend. If the City desires to renew or extend, the City will provide written notice to Bird of its desire to renew this Agreement at least 15 business days before the scheduled termination date. 4. MERGER AND MODIFICATION This Agreement constitutes the entire agreement between the Parties. There are no understandings, agreements, or representations, oral or written, not specified within this Agreement. This Agreement may not be modified, supplemented or amended, in any manner, except by written agreement signed by both Parties. 5. SEVERABILITY If any term of this Agreement is declared by a court having jurisdiction to be illegal or unenforceable, the validity of the remaining terms is unaffected, and, if possible, the rights and obligations of the Parties are to be construed and enforced as if the Agreement did not contain that term. If a court having jurisdiction or the Parties determine that the illegal or unenforceable provisions frustrate the purpose of this Agreement, the Parties may mutually agree to terminate this Agreement. In such instance Bird is solely responsible for all direct and indirect costs, fees, and charges associated with demobilization of its e-scooters from the City rights-of-ways. 6. ASSIGNMENT AND SUBCONTRACTS; AUTHORITY; WHOLLY OWNED SUBSIDIARIES; BINDING UPON AGENTS AND SUCCESSORS Bird may not assign or otherwise transfer or delegate any right or duty without the City’s express written consent. Bird is solely responsible for the performance of the services covered by this Agreement. Bird does not have authority to contract for or incur obligations on behalf of the City. The Parties acknowledge that Bird may utilize independent business logistics providers to facilitate local operations. Bird may perform any or all of the services contemplated hereunder, including the owning and/or operation of e-scooters in the City, through one or more of its wholly owned subsidiaries. Bird’s use of these logistics providers or performance through its wholly owned subsidiaries does not constitute a transfer or assignment of this Agreement, and Bird remains responsible for all obligations and requirements under this Agreement. All contracts with Bird’s subcontractors must contain the following written disclosure: WHILE YOU ARE LOCATING AND RETURNING SCOOTERS, PROVIDING TRANSPORT, BATTERY CHARGE, OR REPAIR SERVICES, YOU MAY BE ENGAGED IN COMMERCIAL ACTIVITY. YOUR PRIVATE PASSENGER AUTOMOBILE, HOMEOWNERS, CONDOMINIUM, OR RENTERS INSURANCE POLICIES MIGHT NOT PROVIDE COVERAGE FOR YOU, DEPENDING ON THE TERMS OF YOUR POLICY. July 19, 2022 I - 21 Atty Rev 2022 Page 4 of 11 This Agreement is binding upon Bird’s agents, employees, contractors, and successors in interest. 7. NOTICE; POINT OF CONTACT All formal notices or other communications required under this Agreement must be given by certified mail and are complete on the date mailed when addressed to the Parties at the following addresses, or alternate addresses as may be specified in writing: CITY: Clerk’s Office City of Sequim 152 West Cedar Street Sequim WA 98382 (360) 681-3428 With a separate copy addressed to the City Attorney. BIRD RIDES, INC.: Bird Rides, Inc 8605 Santa Monica, Blvd. #20388 West Hollywood, CA 90069 and to 711 Capitol Way S., Suite 204 Olympia WA 98501-1267 Attn: Austin Marshburn (213) 282-4685 amarshburn@bird.co This provision is not intended to apply to informal communications, which are commonly conducted by email. Bird will designate a point of contact with authority to act on Bird’s behalf with regard to this pilot program and this Agreement for the duration of the program (see Attachment A). Any change in point of contact must be made in writing and promptly provided to the City. 8. APPLICABLE LAW AND VENUE This Agreement is governed by and construed in accordance with the laws of the State of Washington without regard to conflict of law provisions. Any action to enforce this Agreement must be adjudicated exclusively in the County of Clallam or the Western District of Washington federal court, as applicable. Bird explicitly agrees and submits to such jurisdiction, waiving all objections to jurisdiction and venue. 9. SPOLIATION; NOTICE OF POTENTIAL CLAIMS Bird must promptly notify the City of all potential claims that arise or result from this Agreement. Bird must also take all reasonable steps to preserve all physical and electronic evidence and information that may be relevant to the circumstances surrounding a potential claim, while maintaining public safety, and grants to the City the opportunity to review and inspect the evidence, including, without limitation, the scene of an accident. 10. INDEMNITY AND HOLD HARMLESS; RCW TITLE 51 PROVISIONS Bird must defend, indemnify, and hold the City, its officers, officials, employees and volunteers harmless from and against any claim, injury, damage, loss or suit including attorney fees, arising out of or in connection with the performance of this Agreement, except for injuries and damages July 19, 2022 I - 22 Atty Rev 2022 Page 5 of 11 caused by the City’s sole negligence. If claims, losses, damages, or expenses are caused by the joint or concurrent negligence of Bird and City, each Party is responsible and liable in proportion to its own negligence. Bird must promptly pay any judgment rendered against the City or any City personnel for any claims or liabilities. It is specifically and expressly understood that this indemnification constitutes Bird’s waiver of immunity under Industrial Insurance, Title 51 RCW, as to the City only, for the purposes of this indemnification. Waiver of Title 51 immunity allows Bird’s employees to sue Bird, along with any other potentially liable parties, for injuries they incur on the City’s premises during performance of this Agreement. This waiver has been mutually negotiated and agreed to by both Parties as signified by their initials here: _______ Bird _____ Authorized City Official. 11. INSURANCE Bird must obtain and maintain without interruption insurance of the types required below and must name the City as an additional insured in a form acceptable to the City Attorney. The insurance, its scope of coverage, and limits must not be construed to limit Bird’s liability to the coverage provided by such insurance, or otherwise limit the City’s recourse to any remedy available at law or in equity. ☒ Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage must be at least as broad as Insurance Services Office (ISO) form CA 00 01. If necessary, the policy will be endorsed to provide contractual liability coverage. The minimum combined single limit for bodily injury and property damage must be $1,000,000 per accident. ☒ Commercial General Liability insurance must be written on a form at least as broad as ISO occurrence form CG 00 01 and cover liability arising from premises, operations, independent contractors, products-completed operations, stop gap liability, personal injury and advertising injury, and liability assumed under an insured contract. The City must be named as an insured under Bird’s Commercial General Liability insurance policy with respect to the work performed for City using ISO additional endorsement CG 20 10 01 and CG 20 37 10 01 or substitute endorsements providing equivalent coverage. The minimum limits must be no less than $1,000,000 for each occurrence, $5,000,000 general aggregate, and a $2,000,000 products- completed operations aggregate limit. ☒ Workers’ Compensation coverage as required by the Industrial Insurance laws of the State of Washington. Original, signed insurance certificates and endorsements must be sent via email from Bird’s insurance broker/agent to the City. Additional Insured Endorsements must be provided along with the Certificate of Insurance. Additional Insured Endorsements must not (i) exclude “Contractual liability”; (ii) restrict coverage to the “sole” liability of Bird; (iii) exclude “third-party-over-actions”; or (iv) contain any other exclusions contrary to this Agreement. Bird’s Automobile Liability and Commercial General Liability insurance policies must contain or be endorsed to contain that they are primary insurance as respect the City. Any insurance, self-insurance, or self-insured pool coverage maintained by the City is excess of the Bird’s insurance and does not contribute with it. If Bird maintains higher insurance limits than the minimums shown above, the City must be July 19, 2022 I - 23 Atty Rev 2022 Page 6 of 11 insured for the full available limits of Commercial General and Excess or Umbrella liability maintained by Bird, regardless of whether such limits are greater than those required by this Agreement or whether any certificate of insurance furnished to the City evidences limits of liability lower than those maintained by Bird. Upon written request by the City, the insurer or insurer’s agent will furnish, prior to or during the operation of Bird’s e-scooter program, a copy of any policy cited above, certified to be a true and complete copy of the original. Bird must provide the City with written notice of any policy cancellation within two business days of receipt of such notice. Bird’s failure to maintain the required insurance constitutes a material breach of this Agreement. 12. ALTERNATIVE DISPUTE RESOLUTION; JURY TRIAL The City does not agree to any form of binding arbitration, mediation, or other forms of mandatory alternative dispute resolution. The Parties have the right to enforce their rights and remedies in judicial proceedings. The City does not waive any right to a jury trial. However, the Parties agree to attempt to mediate in good faith before any litigation is commenced. 13. CONFIDENTIALITY; PROPRIETARY MATERIAL Bird will not use or disclose any information it receives from the City under this Agreement that the City has previously identified as confidential or exempt from mandatory public disclosure except as necessary to carry out the purposes of this Agreement or as authorized in advance by the City. The City will not disclose any information it receives from Bird that Bird has previously identified as confidential and that the City determines in its sole discretion is protected from mandatory public disclosure under a specific exception to the Washington State Public Records Act, RCW 42.56. In such situations the City will provide Bird with third-party notification during which time Bird may choose to seek an injunction from a court with jurisdiction that would prevent the City from releasing the information. Bird bears the burden of proving that the data sought to be deemed as proprietary or confidential meets the standards required under Washington law and that an injunction is appropriate. Immediately upon receiving the court’s ruling, Bird will promptly provide the City with a conformed copy of the injunction ruling, regardless of the outcome. Bird agrees to identify and clearly highlight or segregate any material Bird believes is proprietary before sharing it with the City or using it in performance of the services under this Agreement. If Bird believes certain material is proprietary and exempt from disclosure, Bird must provide two copies of the material to the City, one copy with the purportedly proprietary information redacted, the other without redaction, and include a cover letter explaining the purpose of the submittal and including Bird’s legal basis for identifying the material as proprietary. Any material that has not been so identified by Bird as potentially proprietary will be released to the public to the extent it does not contain other exempt material. The duties of the Parties under this section to maintain confidentiality of information and protect proprietary material from disclosure continue beyond the term of this Agreement. Bird has read, acknowledged, and specifically agrees to this paragraph: ____ [initials] 14. COMPLIANCE WITH RECORDS LAWS July 19, 2022 I - 24 Atty Rev 2022 Page 7 of 11 Bird understands that the City must disclose any non-exempt public record related to this Agreement when required to do so pursuant to the Public Records Act or other lawful disclosure request, without regard to the location of the record or which Party possesses it. Records that Bird has identified as confidential or proprietary (see ¶13) may be exempt from disclosure; however, the City’s Public Records Officer (Clerk) makes the final decision on exempt status and will release all non-exempt records unless Bird obtains a court order to the contrary within 30 calendar days of receiving notice from the City of the request for disclosure. Bird agrees to contact the City immediately upon receiving a direct request for documents related to this Agreement and to comply with the City’s instructions on how to respond to the request. If the City receives a request for records that Bird has previously specifically identified as confidential or proprietary, the Clerk will provide Bird with notice of the request so that Bird can seek a court order preventing disclosure. The Clerk’s notice to Bird will be issued in compliance with the City’s adopted public disclosure guidelines on third-party notice and not the Notice provisions in this Agreement. Bird further agrees to retain all records related to this Agreement for the required Washington State Archivist retention period (RCW 40.14), which can be obtained from the City Clerk, and which is no shorter than six years following completion or termination of this Agreement. City and Bird can, by mutual written agreement, transfer possession of all records to the City at any time within the retention period. Bird must not delete or destroy any potential public record without first consulting with the City Clerk and documenting the destruction as required by the Clerk. Bird agrees to fully cooperate with City instructions and deadlines when responding to a records request. City agrees to reimburse Bird up to $200 for Bird’s time spent in collecting and reviewing records if Bird expends more than four hours on the task and provides a detailed invoice of time and activity to City. 15. INDEPENDENT ENTITY/NO JOINT VENTURE Bird is an independent entity under this Agreement and is not a City employee for any purpose, including the application of the Social Security Act, the Fair Labor Standards Act, the Federal Insurance Contribution Act, the Washington Unemployment Compensation Law, any State Retirement Program and the Washington Labor and Industries law. Bird retains sole and absolute discretion in the manner and means of carrying out Bird’s activities and responsibilities under this Agreement, except to the extent specified in this Agreement. As such, it is expressly understood that the Parties are not now, nor will they be, engaged in a joint venture, partnership, or any other form of business relationship except as expressly set forth in this Agreement, and that no Party will be responsible for the conduct, warranties, guarantees, acts, errors, omissions, debts, obligations, or undertakings of any kind or nature of the other in performance of this Agreement. 16. NONDISCRIMINATION AND COMPLIANCE WITH LAWS Bird agrees to comply with all laws, rules, and policies, including those relating to nondiscrimination, accessibility, civil rights, protection of personal information, including without limitation those laws regarding storing, sharing, use, or disclosure of the personal information for individuals or entities. Bird agrees to timely file all required reports, make required payroll deductions, and timely pay all taxes and premiums owed, including sales and July 19, 2022 I - 25 Atty Rev 2022 Page 8 of 11 use taxes and unemployment compensation and workers' compensation premiums. Bird must have and keep current at all times during the term of this Agreement all licenses and permits required by law. All data provided by the City to Bird in the process of providing services under this Agreement must not be sold. 17. SURVIVAL OF CERTAIN PROVISIONS The terms of this Agreement and any exhibits and attachments that by reasonable implication contemplate continued performance, rights, or compliance beyond expiration or termination of the Agreement, survive the Agreement and will continue to be enforceable. Without limiting the generality of this provision, Bird’s obligations to provide insurance and to indemnify the City will survive for a period equal to any and all relevant statutes of limitation, plus the time necessary to fully resolve any claims, matters or actions begun within that period. 18. BUSINESS LICENSE City requires Bird to have a current Washington state business license with a City of Sequim endorsement before execution of this Agreement or, by mutual agreement when time is of the essence, after execution but before any compensation is paid. The City will verify Bird’s business license status before execution of this Agreement. Allowing a business license to be suspended or to lapse during the Agreement term will be considered a breach. Business licenses are obtained and renewed through the State of Washington Department of Revenue: https://dor.wa.gov/manage-business/city-license-endorsements/sequim. 19. TAXPAYER ID AND TAX COMPLIANCE Bird’s federal employer ID number is: ________________ and Washington State UBI# is 604 298 781. City will require a completed and signed W-9 form prior to payment. Bird must be in compliance with the City’s tax ordinances. Bird must, upon request, furnish to the City proof that it is in compliance with the City’s tax ordinances and not delinquent on any payment or other obligation imposed by such ordinances. 20. EFFECTIVENESS OF AGREEMENT This Agreement is not effective until fully executed by both Parties. [City Use Only] The Effective Date of this Agreement is ___ day of ____________, 20___. BIRD RIDES, INC. ___________________________________ Austin Marshburn, Director of City Partnerships Date of Signature: ____________________ CITY OF SEQUIM __________________________________ Matthew Huish, City Manager Date of Signature: ___________________ APPROVED AS TO FORM: __________________________________ Kristina Nelson-Gross, City Attorney Date of Signature: ___________________ July 19, 2022 I - 26 Atty Rev 2022 Page 9 of 11 ATTACHMENT A SCOPE OF SHARED E-SCOOTER PILOT PROGRAM AND OPERATING TERMS Designated Point of Contact: BIRD RIDES, INC. CITY OF SEQUIM Name: Title: Address: Phone Number: Email Address: Taylor Kenney Account Manager 8605 Santa Monica, Blvd. #20388, West Hollywood, CA 90069 taylor.kenney@bird.co 866-205-2442 Bird Rides, Inc. will provide a smart phone application-based micromobility transportation service using stand-up motorized foot scooters (“e-scooters”) on a pilot program basis within the jurisdictional limits of the City of Sequim. The terms and conditions for the pilot program are set forth in the attached Temporary Operating Agreement, with this Scope incorporated by reference with its detailed obligations and deliverables. COMPLIANCE WITH CITY CODE/STATE LAW Throughout the duration of the pilot program, and during any ongoing agreement the Parties may elect to execute, Bird Rides, Inc. will remain in compliance with the Sequim Municipal Code, the right-of-way permit granted by the City to Bird, and any other applicable local, state, and federal laws and regulations, and the terms of the applicable Agreement. Bird will not deploy an e-scooter sharing system in the City of Sequim in violation of this Agreement. Riders of e-scooters must be ____ years of age or older. Riders of e-scooters who violate any provision of the Sequim Municipal Code may be fined by the City consistent with the Sequim Municipal Code. E-scooters must be limited to a maximum speed of 20 MPH (RCW 46.04.336). RIDER EDUCATION AND RULES OF THE ROAD Bird will provide education to e-scooter riders on the City’s rules and regulations, safe and courteous riding, and proper parking of the vehicles. July 19, 2022 I - 27 Atty Rev 2022 Page 10 of 11 Bird will provide easily visible contact information, including toll-free phone number and/or email address, on each e-scooter for members of the public to make relocation requests or to report other issues with the devices. Bird must institute geofencing regarding speed, parking, and restricted areas as requested by City. E-scooters must be ridden on streets, and where available, in bike lanes and bike paths. E-scooters must stay to the right of street lanes and offer the right of way to bicycles in bike lanes and on bike paths. Bird must inform its riders of applicable legal requirements governing use of the e-scooters, including without limitation helmet requirements, prohibitions on traveling on sidewalks, and parking or leaving e-scooters in a manner that impedes pedestrian or vehicular traffic. Bird may make e-scooters available to rent 24 hours per day. However, the City may choose to limit operation hours and require that any e-scooter operated during hours of darkness be equipped with headlamps and taillights of the same visibility as those required for bicycles. City- regulated hours of operation must be provided to Bird in writing as part of the rights-of-way permit and will not be unreasonably restrictive. PARKING/DOCKING, AND STORAGE Bird agrees to respond within 4 hours to any complaint related to safety or improperly parked e- scooters whether they originate from riders, property owners, or members of the public. Upon request of the City due to emergency, severe weather, construction, parade, public gathering, or other situation affecting the normal use of the right-of-way, Bird must collect and remove from the rights-of-way all or, at the City’s sole discretion, a portion of Bird’s e-scooters until such time as the City authorizes the e-scooters to return to the rights-of-way. If Bird does not remove the e-scooters within the time period prescribed by the City, the City is authorized but not required to remove the e-scooters to a location of its choosing. In this event, Bird may retrieve the e-scooters from the City at any time during normal business hours. Bird will pay the City for any and all costs incurred by the City to move the e-scooters. Payment must occur within 30 calendar days of the City issuing Bird a written invoice. In addition, on days where inclement weather (rain, ice, or snow) is anticipated, Bird will monitor the weather conditions and disable and remove vehicles if necessary. On days where ice or snow is anticipated, Bird must remove its e-scooters from the City’s right-of-way. Bird may not hold the City liable for damage to e-scooters or other equipment caused by the City’s ice/snow removal operations. The City is not liable for any direct or indirect losses Bird may suffer due to requested or mandatory removal of its e-scooters and equipment from City rights-of-ways. E-scooters may be parked in or upon the areas the Parties have designated in writing in the approved permit, which may include portions of sidewalks or scooter “corrals” that have been officially marked with signs by the City and/or a private owner of the property. July 19, 2022 I - 28 Atty Rev 2022 Page 11 of 11 E-scooters are prohibited from parking in or on the following: ● street pavements or alleys ● doorways or building entrances ● driveways and alley entrances ● curb ramps and pedestrian access routes Improperly parked e-scooters are Bird’s responsibility to move or remove as soon as practicable, and no later than 2 hours after receiving notice from City staff or a complaint from a member of the public of the improper parking. The City reserves the right to move and potentially store e- scooters that are parked in violation of this Agreement to an authorized e-scooter area and will bill Bird for that activity. Bird is responsible for taking corrective action within 4 hours of any report of a damaged, misplaced, or abandoned e-scooter. Corrective action includes without limitation relocating the e-scooter to a location compliant with this Agreement. Bird is responsible for deploying e-scooters geographically and numerically according to ridership demand data and the terms of this Agreement. Each e-scooter must be clearly branded with color, company logo, phone number, email address, and website to contact with questions, complaints, or problems. It is Bird’s sole responsibility to track and monitor each e-scooter deployed onto City rights-of-ways. Bird is solely responsible for maintaining all of its e-scooters deployed in the City in fully functioning and good working order. Bird is solely responsible for any and all damage to or loss of an e-scooter and associated equipment and for any and all costs associated therewith. Bird must make every reasonable effort to recover a lost or stolen e-scooter before contacting City law enforcement. DATA COLLECTION AND REPORTING TO CITY Bird will provide data to the City as necessary to assist with monitoring program usage, including e-scooter availability, trip starts, trip destinations, and routes traveled. Bird will maintain an online request logging system with a portal provided for the City to review. The system must log the time a request or complaint was received, its nature, the time of Bird’s response, and the nature of the resolution. Bird will provide data to the City as necessary to assist with monitoring program usage, including e-scooter availability, trip starts, trip destinations, and routes traveled. Such data is provided via an application programming interface, subject to Bird’s license agreement for such interface, in compliance with a national data format specification such as the Mobility Data Specification. July 19, 2022 I - 29 Date: July 19, 2022 To: City Council From: Thomas Hunter, Director of Public Works & Utilities Subject: Signal Controller Upgrades – Professional Services Agreement (PSA-2022-24) Background / Analysis: On December 21, 2021 City Council accepted a grant from Washington State Department of Transportation (WSDOT) Highway Safety Improvement Program for the Signal Controller Upgrades Project on 1st and Front Streets. The grant program is focused on funding cost-effective collision-reducing projects. Project elements will be designed to reduce potential collisions by improving traffic flow and increasing pedestrian safety at traffic signal-controlled intersections within the project area. The work in this agreement includes funding for preliminary engineering, design documentation, and assistance with environmental compliance and community and stakeholder outreach. A future amendment will be required to authorize funds for final design. Depending on project costs, the project will include, in order of priority: Implementation of operational safety upgrades, to include: o Lead Pedestrian Interval (LPI) timing, corridor level signal coordination and vehicle detection to reduce the number of collisions, o improved corridor flow and efficiency, and o LPI protection at all project signals. Installation of countdown pedestrian signal heads and ADA compliant audible pedestrian signal actuators required for implementation of LPI, where not already provided, and Improved corridor level vehicle detection, including emergency vehicle detection and signal pre- emption to improve emergency vehicle response time and multimodal safety. The City advertised for engineering support on April 4, 2022. Two firms responded to the City’s Request for Qualifications. After rating the submittals and holding interviews with both firms, Parametrix of Bremerton, WA was selected as the most qualified to perform the work. Staff negotiated a scope and budget for the work. The Summary: Two projects included in the approved 2023-2028 CFP are the Signal Controller Upgrades 1st/Front (TR0120) and Traffic Signal Interconnect/Preemption (TR1399) projects. Parametrix, Inc., has been selected as the best firm to perform preliminary engineering work for these projects. The City has funding and is ready to begin work on these projects. Funding: Funds for this effort are available in the 2022 Capital Transportation budget (312-7930-595- 6510) in the amount of (TR0120) $221,980.02 and (TR1399) $41,277.16. On December 21, 2021 City Council accepted a grant from WSDOT City Safety Program in the amount of $1,562,500 of which $215,000 is authorized for design. Recommendation: Award the Signal Controller Upgrades Professional Services Agreement to Parametrix, Inc. in the not to exceed amount of $263,257.18 and approve and authorize the City Manager to sign and make minor modifications as necessary. July 19, 2022 J - 1 agreement with Parametrix will include support services through December 31, 2023 and Parametrix will work with City staff to:  Prepare an alternatives analysis,  Complete a topographic survey,  Prepare environmental documentation,  Perform traffic analysis, and  Prepare design documentation and 30% design documents. A future amendment will be required to authorize final design and construction support. City staff will work with WSDOT to secure additional funding for final design and anticipated construction cost increases due to inflation. This agreement also includes a scope of work and budget for a planning level analysis of a second City project TR1399 Traffic Signal Interconnect/Preemption. The goal of the signal interconnect project is to look at the City traffic signal system as a whole and determine operational and functional upgrade needs to implement this project in future years. Construction of the Signal Controller Upgrades Project is planned for 2023. WSDOT will waive the 10% match requirement for the Construction phase if the project is authorized for construction on, or before, April 23, 2023. These projects support the City’s Comprehensive Plan as follows:  Goal (G-4A) “To develop a coordinated, multimodal system, which services all of the city and all types of users in a safe, economical, and efficient manner”  Goal (G-4B) “To improve circulation patterns across and within the community, and to achieve the desired urban design of the City” Professional Services Rationale: The City does not have the capacity to accomplish the design of this project in-house. Furthermore, the project design requires personnel with specialized traffic signal design experience, as well as several other unique skill sets the City does not currently retain in-house. For this reason, the City is seeking outside support. Funding Overview: Funds for this effort are available in the Capital Transportation budget (account (312-7930-595-6510). The table below identifies the tasks and the negotiated amount for the proposed scope of work. Signal Controller Upgrades Task Scope of Work Cost Estimate 1 Project Management $30,146.78 2 Preliminary Design $213.790.40 3 Direct Expenses $9,320.00 4 Directed Services $10,000.00 Agreement Total $263,257.18 5 Final Design (not authorized at this time) $83,158.71 Design Project Total $346,415.89 July 19, 2022 J - 2 Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Agreement Number: Firm/Organization Legal Name (do not use dba’s): Address Federal Aid Number UBI Number Federal TIN or SSN Number Execution Date Completion Date 1099 Form Required Yes No Federal Participation Yes No Project Title Description of Work Yes No DBE Participation Yes No MBE Participation Yes No WBE Participation Yes No SBE Participation Total Amount Authorized: Management Reserve Fund: Maximum Amount Payable: Index of Exhibits Exhibit A Exhibit B Exhibit C Exhibit D Exhibit E Exhibit F Exhibit G Exhibit H Exhibit I Exhibit J Scope of Work DBE Participation Preparation and Delivery of Electronic Engineering and Other Data Prime Consultant Cost Computations Sub-consultant Cost Computations Title VI Assurances Certification Documents Liability Insurance Increase Alleged Consultant Design Error Procedures Consultant Claim Procedures Agreement Number: Page 1 of 14 Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 July 19, 2022 J - 3 THIS AGREEMENT, made and entered into as shown in the “Execution Date” box on page one (1) of this AGREEMENT, between the , hereinafter called the “AGENCY,” and the “Firm / Organization Name” referenced on page one (1) of this AGREEMENT, hereinafter called the “CONSULTANT.” WHEREAS, the AGENCY desires to accomplish the work referenced in “Description of Work” on page one (1) of this AGREEMENT and hereafter called the “SERVICES;” and does not have sufficient staff to meet the required commitment and therefore deems it advisable and desirable to engage the assistance of a CONSULTANT to provide the necessary SERVICES; and WHEREAS, the CONSULTANT represents that they comply with the Washington State Statutes relating to professional registration, if applicable, and has signified a willingness to furnish consulting services to the AGENCY. NOW, THEREFORE, in consideration of the terms, conditions, covenants, and performance contained herein, or attached and incorporated and made a part hereof, the parties hereto agree as follows: I.General Description of Work The work under this AGREEMENT shall consist of the above-described SERVICES as herein defined, and necessary to accomplish the completed work for this project. The CONSULTANT shall furnish all services, labor, and related equipment and, if applicable, sub-consultants and subcontractors necessary to conduct and complete the SERVICES as designated elsewhere in this AGREEMENT. II.General Scope of Work The Scope of Work and projected level of effort required for these SERVICES is described in Exhibit “A” attached hereto and by this reference made a part of this AGREEMENT. The General Scope of Work was developed utilizing performance based contracting methodologies. III.General Requirements All aspects of coordination of the work of this AGREEMENT with outside agencies, groups, or individuals shall receive advance approval by the AGENCY. Necessary contacts and meetings with agencies, groups, and/or individuals shall be coordinated through the AGENCY. The CONSULTANT shall attend coordination, progress, and presentation meetings with the AGENCY and/or such State, Federal, Community, City, or County officials, groups or individuals as may be requested by the AGENCY. The AGENCY will provide the CONSULTANT sufficient notice prior to meetings requiring CONSULTANT participation. The minimum required hours or days’ notice shall be agreed to between the AGENCY and the CONSULTANT and shown in Exhibit “A.” The CONSULTANT shall prepare a monthly progress report, in a form approved by the AGENCY, which will outline in written and graphical form the various phases and the order of performance of the SERVICES in sufficient detail so that the progress of the SERVICES can easily be evaluated. The CONSULTANT, any sub-consultants, and the AGENCY shall comply with all Federal, State, and local laws, rules, codes, regulations, and all AGENCY policies and directives, applicable to the work to be performed under this AGREEMENT. This AGREEMENT shall be interpreted and construed in accordance with the laws of the State of Washington. Agreement Number: Page 2 of 14 Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 July 19, 2022 J - 4 Participation for Disadvantaged Business Enterprises (DBE) or Small Business Enterprises (SBE), if required, per 49 CFR Part 26, shall be shown on the heading of this AGREEMENT. If DBE firms are utilized at the commencement of this AGREEMENT, the amounts authorized to each firm and their certification number will be shown on Exhibit “B” attached hereto and by this reference made part of this AGREEMENT. If the Prime CONSULTANT is a DBE certified firm they must comply with the Commercial Useful Function (CUF) regulation outlined in the AGENCY’s “DBE Program Participation Plan” and perform a minimum of 30% of the total amount of this AGREEMENT. It is recommended, but not required, that non-DBE Prime CONSULTANTS perform a minimum of 30% of the total amount of this AGREEMENT. In the absents of a mandatory DBE goal, a voluntary SBE goal amount of ten percent of the Consultant Agreement is established. The Consultant shall develop a SBE Participation Plan prior to commencing work. Although the goal is voluntary, the outreach efforts to provide SBE maximum practicable opportunities are not. The CONSULTANT, on a monthly basis, shall enter the amounts paid to all firms (including Prime) involved with this AGREEMENT into the wsdot.diversitycompliance.com program. Payment information shall identify any DBE Participation. All Reports, PS&E materials, and other data furnished to the CONSULTANT by the AGENCY shall be returned. All electronic files, prepared by the CONSULTANT, must meet the requirements as outlined in Exhibit “C – Preparation and Delivery of Electronic Engineering and other Data.” All designs, drawings, specifications, documents, and other work products, including all electronic files, prepared by the CONSULTANT prior to completion or termination of this AGREEMENT are instruments of service for these SERVICES, and are the property of the AGENCY. Reuse by the AGENCY or by others, acting through or on behalf of the AGENCY of any such instruments of service, not occurring as a part of this SERVICE, shall be without liability or legal exposure to the CONSULTANT. Any and all notices or requests required under this AGREEMENT shall be made in writing and sent to the other party by (i) certified mail, return receipt requested, or (ii) by email or facsimile, to the address set forth below: If to AGENCY: If to CONSULTANT: Name: Name: Agency: Agency: Address: Address: City: State: Zip: City: State: Zip: Email: Email: Phone: Phone: Facsimile: Facsimile: IV.Time for Beginning and Completion The CONSULTANT shall not begin any work under the terms of this AGREEMENT until authorized in writing by the AGENCY. All work under this AGREEMENT shall be completed by the date shown in the heading of this AGREEMENT titled “Completion Date.” The established completion time shall not be extended because of any delays attributable to the CONSULTANT, but may be extended by the AGENCY in the event of a delay attributable to the AGENCY, or because of unavoidable delays caused by an act of GOD, governmental actions, or other conditions beyond the control of the CONSULTANT. A prior supplemental AGREEMENT issued by the AGENCY is required to extend the established completion time. Agreement Number: Page 3 of 14 Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 July 19, 2022 J - 5 V.Payment Provisions The CONSULTANT shall be paid by the AGENCY for completed SERVICES rendered under this AGREEMENT as provided hereinafter. Such payment shall be full compensation for SERVICES performed or SERVICES rendered and for all labor, materials, supplies, equipment, and incidentals necessary to complete SERVICES, specified in Section II, “Scope of Work”. The CONSULTANT shall conform to all applicable portions of 48 CFR Part 31 (www.ecfr.gov). The estimate in support of the Cost Plus Fixed Fee amount is attached hereto as Exhibits “D” and “E” and by this reference made part of this AGREEMENT. A.Actual Costs: Payment for all consulting services for this PROJECT shall be on the basis of the CONSULTANT’S actual cost plus a fixed fee. The actual cost shall include direct salary cost, indirect cost rate, and direct non-salary costs. 1.Direct (RAW) Labor Costs: The Direct (RAW) Labor Cost is the direct salary paid to principals, professional, technical, and clerical personnel for the time they are productively engaged in work necessary to fulfill the terms of this AGREEMENT. The CONSULTANT shall maintain support data to verify the direct salary costs billed to the AGENCY. 2.Indirect Cost Rate (ICR) Costs: ICR Costs are those costs, other than direct costs, which are included as such on the books of the CONSULTANT in the normal everyday keeping of its books. Progress payments shall be made at the ICR rates shown in attached Exhibits “D” and “E” of this AGREEMENT. Total ICR payment shall be based on Actual Costs. The AGENCY agrees to reimburse the CONSULTANT the actual ICR costs verified by audit, up to the Maximum Total Amount Payable, authorized under this AGREEMENT, when accumulated with all other Actual Costs. A summary of the CONSULTANT’S cost estimate and the ICR percentage is shown in Exhibits “D” and “E”, attached hereto and by this reference made part of this AGREEMENT. The CONSULTANT (prime and all A&E sub-consultants) will submit to the AGENCY within six (6) months after the end of each firm’s fiscal year, an ICR schedule in the format required by the AGENCY (cost category, dollar expenditures, etc.) for the purpose of adjusting the ICR rate for billings received and paid during the fiscal year represented by the ICR schedule. It shall also be used for the computation of progress payments during the following year and for retroactively adjusting the previous year’s ICR cost to reflect the actual rate. The ICR schedule will be sent to Email: ConsultantRates@wsdot.wa.gov. Failure to supply this information by either the prime CONSULTANT or any of their A&E sub-consultants shall cause the AGENCY to withhold payment of the billed ICR costs until such time as the required information is received and an overhead rate for billing purposes is approved. The AGENCY’s Project Manager and/or the Federal Government may perform an audit of the CONSULTANT’S books and records at any time during regular business hours to determine the actual ICR rate, if they so desire. 3.Direct Non-Salary Costs: Direct Non-Salary Costs will be reimbursed at the Actual Cost to the CONSULTANT. (excluding Meals, which are reimbursed at the per diem rates identified in this section) These charges may include, but are not limited to, the following items: travel, printing, long distance telephone, supplies, computer charges and fees of sub-consultants. Air or train travel will be reimbursed only to economy class levels unless otherwise approved by the AGENCY. The CONSULTANT shall comply with the rules and regulations regarding travel costs (excluding air, train, and rental car costs) in accordance with WSDOT’s Accounting Manual M 13-82, Chapter 10 – Travel Rules and Procedures, and revisions thereto. Air, train, and rental car costs shall be reimbursed in accordance with 48 Code of Federal Regulations (CFR) Part 31.205-46 “Travel Costs.” The billing for Direct Non-Salary Costs shall include an itemized listing of the charges directly identifiable with the PROJECT. The CONSULTANT shall maintain the original supporting documents in their office. Copies of the original supporting documents shall be supplied to the AGENCY upon request. All above charges must be necessary for the services provided under this AGREEMENT.Agreement Number: Page 4 of 14 Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 July 19, 2022 J - 6 4.Fixed Fee: The Fixed Fee, which represents the CONSULTANT’S profit, is shown in attached Exhibits “D” and “E” of this AGREEMENT. This fee is based on the Scope of Work defined in this AGREEMENT and the estimated person-hours required to perform the stated Scope of Work. In the event the CONSULTANT enters into a supplemental AGREEMENT for additional work, the supplemental AGREEMENT may include provisions for the added costs and an appropriate additional fee. The Fixed Fee will be prorated and paid monthly in proportion to the percentage of work completed by the CONSULTANT and reported in the Monthly Progress Reports accompanying the billings. Any portion of the Fixed Fee earned but not previously paid in the progress payments will be covered in the final payment, subject to the provisions of Section IX entitled “Termination of Agreement.” 5.Management Reserve Fund (MRF): The AGENCY may desire to establish MRF to provide the Agreement Administrator with the flexibility to authorize additional funds to the AGREEMENT for allowable unforeseen costs, or reimbursing the CONSULTANT for additional work beyond that already defined in this AGREEMENT. Such authorization(s) shall be in writing and shall not exceed the lesser of $100,000 or 10% of the Total Amount Authorized as shown in the heading of this AGREEMENT. The amount included for the MRF is shown in the heading of this AGREEMENT. This fund may not be replenished. Any changes requiring additional costs in excess of the MRF shall be made in accordance with Section XIII, “Extra Work.” 6.Maximum Total Amount Payable: The Maximum Total Amount Payable by the AGENCY to the CONSULTANT under this AGREEMENT shall not exceed the amount shown in the heading of this AGREEMENT. The Maximum Total Amount Payable is comprised of the Total Amount Authorized, and the MRF. The Maximum Total Amount Payable does not include payment for Extra Work as stipulated in Section XIII, “Extra Work.” No minimum amount payable is guaranteed under this AGREEMENT. B. Monthly Progress Payments: The CONSULTANT may submit billings to the AGENCY for reimbursement of Actual Costs plus the ICR and calculated fee on a monthly basis during the progress of the work. Such billings shall be in a format approved by the AGENCY and accompanied by the monthly progress reports required under Section III, “General Requirements” of this AGREEMENT. The billings will be supported by an itemized listing for each item including Direct (RAW) Labor, Direct Non-Salary, and allowable ICR Costs to which will be added the prorated Fixed Fee. To provide a means of verifying the billed Direct (RAW) Labor costs for CONSULTANT employees, the AGENCY may conduct employee interviews. These interviews may consist of recording the names, titles, Direct (RAW) Labor rates, and present duties of those employees performing work on the PROJECT at the time of the interview. C.Final Payment: Final Payment of any balance due the CONSULTANT of the gross amount earned will be made promptly upon its verification by the AGENCY after the completion of the work under this AGREEMENT, contingent, if applicable, upon receipt of all PS&E, plans, maps, notes, reports, electronic data and other related documents which are required to be furnished under this AGREEMENT. Acceptance of such Final Payment by the CONSULTANT shall constitute a release of all claims for payment, which the CONSULTANT may have against the AGENCY unless such claims are specifically reserved in writing and transmitted to the AGENCY by the CONSULTANT prior to its acceptance. Said Final Payment shall not, however, be a bar to any claims that the AGENCY may have against the CONSULTANT or to any remedies the AGENCY may pursue with respect to such claims. The payment of any billing will not constitute agreement as to the appropriateness of any item and at the time of final audit; all required adjustments will be made and reflected in a final payment. In the event that such final audit reveals an overpayment to the CONSULTANT, the CONSULTANT will refund such overpayment to the AGENCY within thirty (30) calendar days of notice of the overpayment. Such refund shall not constitute a waiver by the CONSULTANT for any claims relating to the validity of a finding by the AGENCY of overpayment. The CONSULTANT has twenty (20) working days after receipt of the final POST AUDIT to begin the appeal process to the AGENCY for audit findings. Agreement Number: Page 5 of 14 Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 July 19, 2022 J - 7          D.Inspection of Cost Records: The CONSULTANT and their sub-consultants shall keep available for inspection by representatives of the AGENCY and the United States, for a period of six (6) years after receipt of final payment, the cost records and accounts pertaining to this AGREEMENT and all items related to or bearing upon these records with the following exception: if any litigation, claim or audit arising out of, in connection with, or related to this AGREEMENT is initiated before the expiration of the six (6) year period, the cost records and accounts shall be retained until such litigation, claim, or audit involving the records is completed. An interim or post audit may be performed on this AGREEMENT. The audit, if any, will be performed by the State Auditor, WSDOT’s Internal Audit Office and/or at the request of the AGENCY’s Project Manager. VI.Sub-Contracting The AGENCY permits subcontracts for those items of SERVICES as shown in Exhibit “A” attached hereto and by this reference made part of this AGREEMENT. The CONSULTANT shall not subcontract for the performance of any SERVICE under this AGREEMENT without prior written permission of the AGENCY. No permission for subcontracting shall create, between the AGENCY and sub-consultant, any contract or any other relationship. Compensation for this sub-consultant SERVICES shall be based on the cost factors shown on Exhibit “E” attached hereto and by this reference made part of this AGREEMENT. The SERVICES of the sub-consultant shall not exceed its maximum amount payable identified in each sub- consultant cost estimate unless a prior written approval has been issued by the AGENCY. All reimbursable direct labor, indirect cost rate, direct non-salary costs and fixed fee costs for the sub-consultant shall be negotiated and substantiated in accordance with section V “Payment Provisions” herein and shall be memorialized in a final written acknowledgement between the parties. All subcontracts shall contain all applicable provisions of this AGREEMENT, and the CONSULTANT shall require each sub-consultant or subcontractor, of any tier, to abide by the terms and conditions of this AGREEMENT. With respect to sub-consultant payment, the CONSULTANT shall comply with all applicable sections of the STATE’s Prompt Payment laws as set forth in RCW 39.04.250 and RCW 39.76.011. The CONSULTANT, sub-recipient, or sub-consultant shall not discriminate on the basis of race, color, national origin, or sex in the performance of this AGREEMENT. The CONSULTANT shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT-assisted contracts. Failure by the CONSULTANT to carry out these requirements is a material breach of this AGREEMENT, which may result in the termination of this AGREEMENT or such other remedy as the recipient deems appropriate. VII.Employment and Organizational Conflict of Interest The CONSULTANT warrants that they have not employed or retained any company or person, other than a bona fide employee working solely for the CONSULTANT, to solicit or secure this contract, and that it has not paid or agreed to pay any company or person, other than a bona fide employee working solely for the CONSULTANT, any fee, commission, percentage, brokerage fee, gift, or any other consideration, contingent upon or resulting from the award or making of this contract. For breach or violation of this warrant, the AGENCY shall have the right to annul this AGREEMENT without liability or, in its discretion, to deduct from this AGREEMENT price or consideration or otherwise recover the full amount of such fee, commission, percentage, brokerage fee, gift, or contingent fee. Any and all employees of the CONSULTANT or other persons while engaged in the performance of any work or services required of the CONSULTANT under this AGREEMENT, shall be considered employees of the CONSULTANT only and not of the AGENCY, and any and all claims that may arise under any Workmen’s Agreement Number: Page 6 of 14 Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 July 19, 2022 J - 8 Compensation Act on behalf of said employees or other persons while so engaged, and any and all claims made by a third party as a consequence of any act or omission on the part of the CONSULTANT’s employees or other persons while so engaged on any of the work or services provided to be rendered herein, shall be the sole obligation and responsibility of the CONSULTANT. The CONSULTANT shall not engage, on a full- or part-time basis, or other basis, during the period of this AGREEMENT, any professional or technical personnel who are, or have been, at any time during the period of this AGREEMENT, in the employ of the United States Department of Transportation or the AGENCY, except regularly retired employees, without written consent of the public employer of such person if he/she will be working on this AGREEMENT for the CONSULTANT. VIII.Nondiscrimination During the performance of this AGREEMENT, the CONSULTANT, for itself, its assignees, sub-consultants, subcontractors and successors in interest, agrees to comply with the following laws and regulations:  Title VI of the Civil Rights Act of 1964 • Civil Rights Restoration Act of 1987 (42 U.S.C. Chapter 21 Subchapter V § 2000d (Public Law 100-259) through 2000d-4a) • American with Disabilities Act of 1990 •Federal-aid Highway Act of 1973 (42 U.S.C. Chapter 126 § 12101 et. seq.) (23 U.S.C. Chapter 3 § 324)• 23 CFR Part 200 •Rehabilitation Act of 1973  49 CFR Part 21(29 U.S.C. Chapter 16 Subchapter V § 794) 49 CFR Part 26•Age Discrimination Act of 1975 •RCW 49.60.180(42 U.S.C. Chapter 76 § 6101 et. seq.) In relation to Title VI of the Civil Rights Act of 1964, the CONSULTANT is bound by the provisions of Exhibit “F” attached hereto and by this reference made part of this AGREEMENT, and shall include the attached Exhibit “F” in every sub-contract, including procurement of materials and leases of equipment, unless exempt by the Regulations or directives issued pursuant thereto. IX.Termination of Agreement The right is reserved by the AGENCY to terminate this AGREEMENT at any time with or without cause upon ten (10)days written notice to the CONSULTANT. In the event this AGREEMENT is terminated by the AGENCY, other than for default on the part of the CONSULTANT, a final payment shall be made to the CONSULTANT for actual hours charged and any appropriate fixed fee percentage at the time of termination of this AGREEMENT, plus any direct non-salary costs incurred up to the time of termination of this AGREEMENT. No payment shall be made for any SERVICES completed after ten (10) days following receipt by the CONSULTANT of the notice to terminate. If the accumulated payment made to the CONSULTANT prior to Notice of Termination exceeds the total amount that would be due when computed as set forth in paragraph two (2) of this section, then no final payment shall be due and the CONSULTANT shall immediately reimburse the AGENCY for any excess paid. If the services of the CONSULTANT are terminated by the AGENCY for default on the part of the CONSULTANT, the above formula for payment shall not apply. In the event of a termination for default, the amount to be paid to the CONSULTANT shall be determined by the AGENCY with consideration given to the actual costs incurred by the CONSULTANT in performing SERVICES to the date of termination, the amount of SERVICES originally required which was satisfactorily completed to Agreement Number: Page 7 of 14 Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 July 19, 2022 J - 9 date of termination, whether that SERVICE is in a form or a type which is usable to the AGENCY at the time of termination, the cost to the AGENCY of employing another firm to complete the SERVICES required and the time which may be required to do so, and other factors which affect the value to the AGENCY of the SERVICES performed at the time of termination. Under no circumstances shall payment made under this subsection exceed the amount, which would have been made using the formula set forth in paragraph two (2) of this section. If it is determined for any reason that the CONSULTANT was not in default or that the CONSULTANT’s failure to perform is without the CONSULTANT’s or its employee’s fault or negligence, the termination shall be deemed to be a termination for the convenience of the AGENCY. In such an event, the CONSULTANT would be reimbursed for actual costs and appropriate fixed fee percentage in accordance with the termination for other than default clauses listed previously. The CONSULTANT shall, within 15 days, notify the AGENCY in writing, in the event of the death of any member, partner, or officer of the CONSULTANT or the death or change of any of the CONSULTANT’s supervisory and/or other key personnel assigned to the project or disaffiliation of any principally involved CONSULTANT employee. The CONSULTANT shall also notify the AGENCY, in writing, in the event of the sale or transfer of 50% or more of the beneficial ownership of the CONSULTANT within 15 days of such sale or transfer occurring. The CONSULTANT shall continue to be obligated to complete the SERVICES under the terms of this AGREEMENT unless the AGENCY chooses to terminate this AGREEMENT for convenience or chooses to renegotiate any term(s) of this AGREEMENT. If termination for convenience occurs, final payment will be made to the CONSULTANT as set forth in the second and third paragraphs of this section. Payment for any part of the SERVICES by the AGENCY shall not constitute a waiver by the AGENCY of any remedies of any type it may have against the CONSULTANT for any breach of this AGREEMENT by the CONSULTANT, or for failure of the CONSULTANT to perform SERVICES required of it by the AGENCY. Forbearance of any rights under the AGREEMENT will not constitute waiver of entitlement to exercise those rights with respect to any future act or omission by the CONSULTANT. X.Changes of Work The CONSULTANT shall make such changes and revisions in the completed work of this AGREEMENT as necessary to correct errors appearing therein, without additional compensation thereof. Should the AGENCY find it desirable for its own purposes to have previously satisfactorily completed SERVICES or parts thereof changed or revised, the CONSULTANT shall make such revisions as directed by the AGENCY. This work shall be considered as Extra Work and will be paid for as herein provided under section XIII “Extra Work.” XI.Disputes Any disputed issue not resolved pursuant to the terms of this AGREEMENT shall be submitted in writing within 10 days to the Director of Public Works or AGENCY Engineer, whose decision in the matter shall be final and binding on the parties of this AGREEMENT; provided however, that if an action is brought challenging the Director of Public Works or AGENCY Engineer’s decision, that decision shall be subject to judicial review. If the parties to this AGREEMENT mutually agree, disputes concerning alleged design errors will be conducted under the procedures found in Exhibit “J”. In the event that either party deem it necessary to institute legal action or proceeding to enforce any right or obligation under this AGREEMENT, this action shall be initiated in the Superior Court of the State of Washington, situated in the county in which the AGENCY is located. The parties hereto agree that all questions shall be resolved by application of Washington law and that the parties have the right of appeal from such decisions of the Superior Court in accordance with the laws of the State of Washington. The CONSULTANT hereby consents to the personal jurisdiction of the Superior Court of the State of Washington, situated in the county in which the AGENCY is located. Agreement Number: Page 8 of 14 Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 July 19, 2022 J - 10 XII.Legal Relations The CONSULTANT, any sub-consultants, and the AGENCY shall comply with all Federal, State, and local laws, rules, codes, regulations and all AGENCY policies and directives, applicable to the work to be performed under this AGREEMENT. This AGREEMENT shall be interpreted and construed in accordance with the laws of the State of Washington. The CONSULTANT shall defend, indemnify, and hold The State of Washington (STATE) and the AGENCY and their officers and employees harmless from all claims, demands, or suits at law or equity arising in whole or in part from the negligence of, or the breach of any obligation under this AGREEMENT by, the CONSULTANT or the CONSULTANT’s agents, employees, sub consultants, subcontractors or vendors, of any tier, or any other persons for whom the CONSULTANT may be legally liable; provided that nothing herein shall require a CONSULTANT to defend or indemnify the STATE and the AGENCY and their officers and employees against and hold harmless the STATE and the AGENCY and their officers and employees from claims, demands or suits based solely upon the negligence of, or breach of any obligation under this AGREEMENT by the STATE and the AGENCY, their agents, officers, employees, sub-consultants, subcontractors or vendors, of any tier, or any other persons for whom the STATE and/or the AGENCY may be legally liable; and provided further that if the claims or suits are caused by or result from the concurrent negligence of (a) the CONSULTANT or the CONSULTANT’s agents, employees, sub-consultants, subcontractors or vendors, of any tier, or any other persons for whom the CONSULTANT is legally liable, and (b) the STATE and/or AGENCY, their agents, officers, employees, sub-consultants, subcontractors and or vendors, of any tier, or any other persons for whom the STATE and or AGENCY may be legally liable, the defense and indemnity obligation shall be valid and enforceable only to the extent of the CONSULTANT’s negligence or the negligence of the CONSULTANT’s agents, employees, sub-consultants, subcontractors or vendors, of any tier, or any other persons for whom the CONSULTANT may be legally liable. This provision shall be included in any AGREEMENT between CONSULTANT and any sub-consultant, subcontractor and vendor, of any tier. The CONSULTANT shall also defend, indemnify, and hold the STATE and the AGENCY and their officers and employees harmless from all claims, demands, or suits at law or equity arising in whole or in part from the alleged patent or copyright infringement or other allegedly improper appropriation or use of trade secrets, patents, proprietary information, know-how, copyright rights or inventions by the CONSULTANT or the CONSULTANT’s agents, employees, sub-consultants, subcontractors or vendors, of any tier, or any other persons for whom the CONSULTANT may be legally liable, in performance of the Work under this AGREEMENT or arising out of any use in connection with the AGREEMENT of methods, processes, designs, information or other items furnished or communicated to STATE and/or the AGENCY, their agents, officers and employees pursuant to the AGREEMENT; provided that this indemnity shall not apply to any alleged patent or copyright infringement or other allegedly improper appropriation or use of trade secrets, patents, proprietary information, know-how, copyright rights or inventions resulting from STATE and/or AGENCY’s, their agents’, officers’ and employees’ failure to comply with specific written instructions regarding use provided to STATE and/or AGENCY, their agents, officers and employees by the CONSULTANT, its agents, employees, sub-consultants, subcontractors or vendors, of any tier, or any other persons for whom the CONSULTANT may be legally liable. The CONSULTANT’s relation to the AGENCY shall be at all times as an independent contractor. Notwithstanding any determination by the Executive Ethics Board or other tribunal, the AGENCY may, in its sole discretion, by written notice to the CONSULTANT terminate this AGREEMENT if it is found after due notice and examination by the AGENCY that there is a violation of the Ethics in Public Service Act, Chapter 42.52 RCW; or any similar statute involving the CONSULTANT in the procurement of, or performance under, this AGREEMENT. The CONSULTANT specifically assumes potential liability for actions brought by the CONSULTANT’s own employees or its agents against the STATE and /or the AGENCY and, solely for the purpose of this indemnification and defense, the CONSULTANT specifically waives any immunity under the state industrial insurance law, Title 51 RCW. This waiver has been mutually negotiated between the Parties. Agreement Number: Page 9 of 14 Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 July 19, 2022 J - 11 Unless otherwise specified in this AGREEMENT, the AGENCY shall be responsible for administration of construction contracts, if any, on the project. Subject to the processing of a new sole source, or an acceptable supplemental AGREEMENT, the CONSULTANT shall provide On-Call assistance to the AGENCY during contract administration. By providing such assistance, the CONSULTANT shall assume no responsibility for: proper construction techniques, job site safety, or any construction contractor’s failure to perform its work in accordance with the contract documents. The CONSULTANT shall obtain and keep in force during the terms of this AGREEMENT, or as otherwise required, the following insurance with companies or through sources approved by the State Insurance Commissioner pursuant to Title 48 RCW. Insurance Coverage A.Worker’s compensation and employer’s liability insurance as required by the STATE. B.Commercial general liability insurance written under ISO Form CG 00 01 12 04 or its equivalent with minimum limits of one million dollars ($1,000,000.00) per occurrence and two million dollars ($2,000,000.00) in the aggregate for each policy period. C.Business auto liability insurance written under ISO Form CG 00 01 10 01 or equivalent providing coverage for any “Auto” (Symbol 1) used in an amount not less than a one million dollar ($1,000,000.00) combined single limit for each occurrence. Excepting the Worker’s Compensation Insurance and any Professional Liability Insurance, the STATE and AGENCY, their officers, employees, and agents will be named on all policies of CONSULTANT and any sub- consultant and/or subcontractor as an additional insured (the “AIs”), with no restrictions or limitations concerning products and completed operations coverage. This coverage shall be primary coverage and non-contributory and any coverage maintained by the AIs shall be excess over, and shall not contribute with, the additional insured coverage required hereunder. The CONSULTANT’s and the sub-consultant’s and/or subcontractor’s insurer shall waive any and all rights of subrogation against the AIs. The CONSULTANT shall furnish the AGENCY with verification of insurance and endorsements required by this AGREEMENT. The AGENCY reserves the right to require complete, certified copies of all required insurance policies at any time. All insurance shall be obtained from an insurance company authorized to do business in the State of Washington. The CONSULTANT shall submit a verification of insurance as outlined above within fourteen (14) days of the execution of this AGREEMENT to: Name: Agency: Address: City: State: Zip: Email: Phone: Facsimile: No cancellation of the foregoing policies shall be effective without thirty (30) days prior notice to the AGENCY. The CONSULTANT’s professional liability to the AGENCY, including that which may arise in reference to section IX “Termination of Agreement” of this AGREEMENT, shall be limited to the accumulative amount of the authorized AGREEMENT amount or one million dollars ($1,000,000.00), whichever is greater, unless the limit of liability is increased by the AGENCY pursuant to Exhibit H. In no case shall the CONSULTANT’s professional liability to third parties be limited in any way. Agreement Number: Page 10 of 14 Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 July 19, 2022 J - 12            The parties enter into this AGREEMENT for the sole benefit of the parties, and to the exclusion of any third party, and no third party beneficiary is intended or created by the execution of this AGREEMENT. The AGENCY will pay no progress payments under section V “Payment Provisions” until the CONSULTANT has fully complied with this section. This remedy is not exclusive; and the AGENCY may take such other action as is available to it under other provisions of this AGREEMENT, or otherwise in law. XIII.Extra Work A.The AGENCY may at any time, by written order, make changes within the general scope of this AGREEMENT in the SERVICES to be performed. B.If any such change causes an increase or decrease in the estimated cost of, or the time required for, performance of any part of the SERVICES under this AGREEMENT, whether or not changed by the order, or otherwise affects any other terms and conditions of this AGREEMENT, the AGENCY shall make an equitable adjustment in the: (1) maximum amount payable; (2) delivery or completion schedule, or both; and (3) other affected terms and shall modify this AGREEMENT accordingly. C.The CONSULTANT must submit any “request for equitable adjustment,” hereafter referred to as “CLAIM,” under this clause within thirty (30) days from the date of receipt of the written order. However, if the AGENCY decides that the facts justify it, the AGENCY may receive and act upon a CLAIM submitted before final payment of this AGREEMENT. D.Failure to agree to any adjustment shall be a dispute under the section XI “Disputes” clause. However, nothing in this clause shall excuse the CONSULTANT from proceeding with the AGREEMENT as changed. E.Notwithstanding the terms and conditions of paragraphs (A.) and (B.) above, the maximum amount payable for this AGREEMENT, shall not be increased or considered to be increased except by specific written supplement to this AGREEMENT. XIV.Endorsement of Plans If applicable, the CONSULTANT shall place their endorsement on all plans, estimates, or any other engineering data furnished by them. XV.Federal Review The Federal Highway Administration shall have the right to participate in the review or examination of the SERVICES in progress. XVI.Certification of the Consultant and the Agency Attached hereto as Exhibit “G-1(a and b)” are the Certifications of the CONSULTANT and the AGENCY, Exhibit “G-2” Certification Regarding Debarment, Suspension and Other Responsibility Matters - Primary Covered Transactions, Exhibit “G-3” Certification Regarding the Restrictions of the Use of Federal Funds for Lobbying and Exhibit “G-4” Certificate of Current Cost or Pricing Data. Exhibit “G-3” is required only in AGREEMENT’s over one hundred thousand dollars ($100,000.00) and Exhibit “G-4” is required only in AGREEMENT’s over five hundred thousand dollars ($500,000.00.) These Exhibits must be executed by the CONSULTANT, and submitted with the master AGREEMENT, and returned to the AGENCY at the address listed in section III “General Requirements” prior to its performance of any SERVICES under this AGREEMENT. Agreement Number: Page 11 of 14 Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 July 19, 2022 J - 13      XVII.Complete Agreement This document and referenced attachments contain all covenants, stipulations, and provisions agreed upon by the parties. No agent, or representative of either party has authority to make, and the parties shall not be bound by or be liable for, any statement, representation, promise or agreement not set forth herein. No changes, amendments, or modifications of the terms hereof shall be valid unless reduced to writing and signed by the parties as a supplement to this AGREEMENT. XVIII.Execution and Acceptance This AGREEMENT may be simultaneously executed in several counterparts, each of which shall be deemed to be an original having identical legal effect. The CONSULTANT does hereby ratify and adopt all statements, representations, warranties, covenants, and AGREEMENT’s contained in the proposal, and the supporting material submitted by the CONSULTANT, and does hereby accept this AGREEMENT and agrees to all of the terms and conditions thereof. XIX.Protection of Confidential Information The CONSULTANT acknowledges that some of the material and information that may come into its possession or knowledge in connection with this AGREEMENT or its performance may consist of information that is exempt from disclosure to the public or other unauthorized persons under either chapter 42.56 RCW or other local, state or federal statutes (“State’s Confidential Information”). The “State’s Confidential Information” includes, but is not limited to, names, addresses, Social Security numbers, e-mail addresses, telephone numbers, financial profiles, credit card information, driver’s license numbers, medical data, law enforcement records (or any other information identifiable to an individual), STATE and AGENCY source code or object code, STATE and AGENCY security data, non-public Specifications, STATE and AGENCY non-publicly available data, proprietary software, State security data, or information which may jeopardize any part of the project that relates to any of these types of information. The CONSULTANT agrees to hold the State’s Confidential Information in strictest confidence and not to make use of the State’s Confidential Information for any purpose other than the performance of this AGREEMENT, to release it only to authorized employees, sub-consultants or subcontractors requiring such information for the purposes of carrying out this AGREEMENT, and not to release, divulge, publish, transfer, sell, disclose, or otherwise make it known to any other party without the AGENCY’s express written consent or as provided by law. The CONSULTANT agrees to release such information or material only to employees, sub-consultants or subcontractors who have signed a nondisclosure AGREEMENT, the terms of which have been previously approved by the AGENCY. The CONSULTANT agrees to implement physical, electronic, and managerial safeguards to prevent unauthorized access to the State’s Confidential Information. Immediately upon expiration or termination of this AGREEMENT, the CONSULTANT shall, at the AGENCY’s option: (i) certify to the AGENCY that the CONSULTANT has destroyed all of the State’s Confidential Information; or (ii) returned all of the State’s Confidential Information to the AGENCY; or (iii) take whatever other steps the AGENCY requires of the CONSULTANT to protect the State’s Confidential Information. As required under Executive Order 00-03, the CONSULTANT shall maintain a log documenting the following: the State’s Confidential Information received in the performance of this AGREEMENT; the purpose(s) for which the State’s Confidential Information was received; who received, maintained and used the State’s Confidential Information; and the final disposition of the State’s Confidential Information. The CONSULTANT’s records shall be subject to inspection, review, or audit upon reasonable notice from the AGENCY. The AGENCY reserves the right to monitor, audit, or investigate the use of the State’s Confidential Information collected, used, or acquired by the CONSULTANT through this AGREEMENT. The monitoring, auditing, or investigating may include, but is not limited to, salting databases. Agreement Number: Page 12 of 14 Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 July 19, 2022 J - 14 Violation of this section by the CONSULTANT or its sub-consultants or subcontractors may result in termination of this AGREEMENT and demand for return of all State’s Confidential Information, monetary damages, or penalties. It is understood and acknowledged that the CONSULTANT may provide the AGENCY with information which is proprietary and/or confidential during the term of this AGREEMENT. The parties agree to maintain the confidentiality of such information during the term of this AGREEMENT and afterwards. All materials containing such proprietary and/or confidential information shall be clearly identified and marked as “Confidential” and shall be returned to the disclosing party at the conclusion of the SERVICES under this AGREEMENT. The CONSULTANT shall provide the AGENCY with a list of all information and materials it considers confidential and/or proprietary in nature: (a) at the commencement of the term of this AGREEMENT; or (b) as soon as such confidential or proprietary material is developed. “Proprietary and/or confidential information” is not meant to include any information which, at the time of its disclosure: (i) is already known to the other party; (ii) is rightfully disclosed to one of the parties by a third party that is not acting as an agent or representative for the other party; (iii)is independently developed by or for the other party; (iv) is publicly known; or (v) is generally utilized by unaffiliated third parties engaged in the same business or businesses as the CONSULTANT. The parties also acknowledge that the AGENCY is subject to Washington State and federal public disclosure laws. As such, the AGENCY shall maintain the confidentiality of all such information marked proprietary and/ or confidential or otherwise exempt, unless such disclosure is required under applicable state or federal law. If a public disclosure request is made to view materials identified as “Proprietary and/or confidential information” or otherwise exempt information, the AGENCY will notify the CONSULTANT of the request and of the date that such records will be released to the requester unless the CONSULTANT obtains a court order from a court of competent jurisdiction enjoining that disclosure. If the CONSULTANT fails to obtain the court order enjoining disclosure, the AGENCY will release the requested information on the date specified. The CONSULTANT agrees to notify the sub-consultant of any AGENCY communication regarding disclosure that may include a sub-consultant’s proprietary and/or confidential information. The CONSULTANT notification to the sub-consultant will include the date that such records will be released by the AGENCY to the requester and state that unless the sub-consultant obtains a court order from a court of competent jurisdiction enjoining that disclosure the AGENCY will release the requested information. If the CONSULTANT and/or sub-consultant fail to obtain a court order or other judicial relief enjoining the AGENCY by the release date, the CONSULTANT shall waive and release and shall hold harmless and indemnify the AGENCY from all claims of actual or alleged damages, liabilities, or costs associated with the AGENCY’s said disclosure of sub-consultants’ information. XX.Records Maintenance During the progress of the Work and SERVICES provided hereunder and for a period of not less than six (6) years from the date of final payment to the CONSULTANT, the CONSULTANT shall keep, retain and maintain all “documents” pertaining to the SERVICES provided pursuant to this AGREEMENT. Copies of all “documents” pertaining to the SERVICES provided hereunder shall be made available for review at the CONSULTANT’s place of business during normal working hours. If any litigation, claim or audit is commenced, the CONSULTANT shall cooperate with AGENCY and assist in the production of all such documents. “Documents” shall be retained until all litigation, claims or audit findings have been resolved even though such litigation, claim or audit continues past the six (6) year retention period. For purposes of this AGREEMENT, “documents” means every writing or record of every type and description, including electronically stored information (“ESI”), that is in the possession, control, or custody of the CONSULTANT, including, without limitation, any and all correspondences, contracts, AGREEMENT ‘s, appraisals, plans, designs, data, surveys, maps, spreadsheets, memoranda, stenographic or handwritten notes, reports, records, telegrams, schedules, diaries, notebooks, logbooks, invoices, accounting records, work sheets, charts, notes, drafts, scribblings, recordings, visual displays, photographs, minutes of meetings, Agreement Number: Page 13 of 14 Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 July 19, 2022 J - 15 tabulations, computations, summaries, inventories, and writings regarding conferences, conversations or telephone conversations, and any and all other taped, recorded, written, printed or typed matters of any kind or description; every copy of the foregoing whether or not the original is in the possession, custody, or control of the CONSULTANT, and every copy of any of the foregoing, whether or not such copy is a copy identical to an original, or whether or not such copy contains any commentary or notation whatsoever that does not appear on the original. For purposes of this AGREEMENT, “ESI” means any and all computer data or electronic recorded media of any kind, including “Native Files”, that are stored in any medium from which it can be retrieved and examined, either directly or after translation into a reasonably useable form. ESI may include information and/or documentation stored in various software programs such as: Email, Outlook, Word, Excel, Access, Publisher, PowerPoint, Adobe Acrobat, SQL databases, or any other software or electronic communication programs or databases that the CONSULTANT may use in the performance of its operations. ESI may be located on network servers, backup tapes, smart phones, thumb drives, CDs, DVDs, floppy disks, work computers, cell phones, laptops or any other electronic device that CONSULTANT uses in the performance of its Work or SERVICES hereunder, including any personal devices used by the CONSULTANT or any sub-consultant at home. “Native files” are a subset of ESI and refer to the electronic format of the application in which such ESI is normally created, viewed, and /or modified. The CONSULTANT shall include this section XX “Records Maintenance” in every subcontract it enters into in relation to this AGREEMENT and bind the sub-consultant to its terms, unless expressly agreed to otherwise in writing by the AGENCY prior to the execution of such subcontract. In witness whereof, the parties hereto have executed this AGREEMENT as of the day and year shown in the “Execution Date” box on page one (1) of this AGREEMENT. Signature Date Signature Date Any modification, change, or reformation of this AGREEMENT shall require approval as to form by the Office of the Attorney General. Agreement Number: Page 14 of 14 Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 July 19, 2022 J - 16 Exhibit A Scope of Work Project No. Agreement Number: Exhibit A - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 1 of 1July 19, 2022 J - 17 City of Port Angeles 234-2191-XXX Signal Controller Upgrades 1 July 2022 TR0120 SCOPE OF WORK City of Port Angeles Signal Controller Upgrades TR0120 INTRODUCTION The City of Port Angeles (City) received a grant from the Highway Safety Improvement Program’s (HSIP) 2020 City Safety funding to finance the design, environmental documentation, right-of-way, and construction phases of the Signal Controller Upgrades project (Project). The Project consists of upgrading signal control equipment (controllers and cabinets) to implement lead pedestrian interval (LPI) and blank-out no turn on red signs where warranted, corridor-level signal coordination and detection to address crashes and corridor flow and efficiency, and signal preemption. Per the City’s Americans with Disabilities Act (ADA) Transition Plan, pedestrian countdown signal heads and audible pedestrian signal (APS) pushbuttons will be required at each intersection that upgrades signal controllers, replaces signal heads, or replaces pedestrian detectors. Additional work may include curb ramp upgrades, signing, and utility work as needed to coincide with the signal upgrades. Improvements will be assessed at the following intersections: · Grant-eligible intersections (13 total):  W 1st St and Oak St  W 1st St and Laurel St  E 1st St and Lincoln St  E 1st St and Peabody St  E 1st St and Race St  E 1st St and Ennis St  E 1st St and Golf Course Road  W Front St and Oak St  W Front St and Laurel St  E Front St and Lincoln St  E Front St and Race St  E Front St and Ennis St  Hwy 101 and Del Guzzi Dr In addition to the grant-funded work, City local funds will be used to study and provide recommendations for signal upgrade improvements at several additional signals outside of the grant scope of work. The following intersections will be analyzed during the alternatives analysis phase which will result in a preferred design alternative with recommended improvements at these intersections. However, work to complete final design and construct any improvements at these intersections is outside the scope of this Project. Improvements using local funds will be assessed at the following intersections: · Locally funded intersections (12 total):  Lincoln St and 3rd St  Lincoln St and 5th St  Lincoln St and 8th St  Lincoln St and Lauridsen Blvd July 19, 2022 J - 18 SCOPE OF WORK (continued) City of Port Angeles 234-2191-XXX Signal Controller Upgrades 2 July 2022 TR0120  Peabody St and 5th St  Peabody St and 8th St  Race St and 5th St  Race St and 8th St  Race St and Lauridsen Blvd  Cherry St and 8th St  Pine St and 8th St  Marine Drive and S Tumwater Truck Route A map of the signal locations included in the Project is shown in Figure 1. Figure 1. Signal Locations in scope The Project is federally funded and has a Design Disadvantaged Business Enterprise (DBE) goal of 13%. Lincoln Street, 1st Street, Front Street, and Marine Drive are within Washington State Department of Transportation (WSDOT) State Routes (SR) 101 (US 101) and SR 117. Work within these corridors will require WSDOT Olympic Region input and design documentation. Because of the Project’s federal funding, all other design, environmental and right-of-way acquisitions will require WSDOT Local Programs oversight and approvals. Parametrix (Consultant) will lead coordination with WSDOT, with input and support provided by the City. July 19, 2022 J - 19 SCOPE OF WORK (continued) City of Port Angeles 234-2191-XXX Signal Controller Upgrades 3 July 2022 TR0120 Detailed scope-of-service information, including a description of services, assumptions, and deliverables for each work element and subtask, is provided below. This scope of services describes the scope of work anticipated to be required through final design, however, only work described in Task 01 (Project Management) and Task 02 (Preliminary Design) are included in the Agreement at this time. Work described under Task 03 (Final Design) is anticipated to be added by supplement to the Agreement at a future date. Optional services beyond those stated in this scope of services may include: · Final Design as described under Task 03 of this Scope of Work. · Right-of-way acquisition services as noted. It is anticipated that should these services be required, Consultant will subcontract with RES Group NW, a DBE. · Bid support and construction management. · Other services to support the Project if requested by the City. Budget for these optional services is not included in the Agreement at this time, but may be added, if necessary, through the management reserves or by a supplement to the Agreement. General Project Assumptions · Stormwater upgrades will be minor and include replacement of portions of the stormwater infrastructure and addition to new inlets and catch basins, as needed. The Project will be exempt from all minimum requirements per the 2019 Department of Ecology Stormwater Management Manual’s definition of pavement maintenance practices and, therefore, no Best Management Practice (BMP) design is included within this scope of work. · Relocation of franchise utilities (power and communications) by others. · No geotechnical investigation is required for this Project or is included in this scope of work. Should geotechnical investigation be required, a supplement may be necessary. · No channelization revisions are required for this Project. Should channelization improvements be required, a supplement may be necessary. · The Plans, Specifications, and Estimate (PS&E) will require review and approval from the WSDOT Highways and Local Programs (Local Programs) prior to soliciting bids. The Consultant will be responsible for leading coordination with Local Programs. · The City will be responsible for advertisement and distribution of final documents for bidding. · The schedule for this Project includes agency review durations based on past project experience. However, neither the City nor the Consultant can control these review durations. · A 10-month total Project schedule is assumed – July 2022 through April 2023. Design Standards and References The following design standards and references are to be followed during the development of the Project: · 2023 WSDOT Standard Specifications and General Special Provisions. · City’s Engineering Design and Construction Standards. July 19, 2022 J - 20 SCOPE OF WORK (continued) City of Port Angeles 234-2191-XXX Signal Controller Upgrades 4 July 2022 TR0120 · American Association of State Highway and Transportation Officials (AASHTO) 7th Edition (2018) of “Policy on Geometric Design of Highways and Streets” (Green Book). · 2009 Manual on Uniform Traffic Control Devices with Revisions 1 and 2 (MUTCD). · 2019 Department of Ecology Stormwater Management Manual for Western Washington (SWMMWW). · WSDOT Local Agency Guidelines (LAG) Manual. · City’s Standard Special Provisions (Specifications). · WSDOT Standard Plans as required. (WSDOT standard plans, if used, need to be cross referenced with City standards to determine any discrepancies and provide design if not congruent.) · WSDOT Design Manual (Design Manual). The Consultant will conduct services under the Agreement based on the versions of the above-stated design standards that are current at the time of signing the Agreement. If updated versions of the standards become available and/or effective during the term of the Agreement, the Consultant and City will discuss potential implications to the Project. This will include the Consultant’s estimate of the cost of additional services, if any, to update Project designs and deliverables. The City will determine if updated standards shall be used. Additional cost of Consultant services, if any, will be compensated through the management reserve or as a supplement to the Agreement. The Consultant will prepare all drawings using AutoCAD Civil3D 2022. Spreadsheets will be prepared using Microsoft (MS) Excel (version 2016 compatible) and text documents in Microsoft Word (version 2016 compatible). Unless specifically noted otherwise, all plans will be completed at a 1 inch = 20 feet scale on a sheet size of 22 inches by 34 inches. The City will provide the Consultant with the City’s AutoCAD template for use in preparing plan sheets. All deliverables will be electronic. TASK 01 – PROJECT MANAGEMENT Subtask 01 – Project Management Objectives The objective of this subtask is to provide overall Project management of the Consultant contract with the City. This subtask includes general management functions as follows: · Schedule and coordinate the work of Consultant team members and ensure that work is completed accurately and within scope and budget. · Coordinate with City staff including:  Prepare and submit monthly progress billings to the City.  Provide additional identification of issues and proposed solutions if unforeseen issues arise.  Provide a design schedule. · Meet with the City virtually on up to four occasions as follows:  Kickoff Workshop with City staff and the Project team to confirm design objectives, issues, and schedule. July 19, 2022 J - 21 SCOPE OF WORK (continued) City of Port Angeles 234-2191-XXX Signal Controller Upgrades 5 July 2022 TR0120  Review Alternative Analysis.  Review preliminary design (30%).  Review 90% design. · Meet with the City for regular coordination virtually on up to ten occasions as follows:  Once monthly coordination meetings outside of the formal design review meetings noted above. Deliverables Deliverables for this subtask include: · Monthly progress reports and invoices (10). · Meeting agendas and notes for the four (4) City design review meetings noted above. · Project design schedule (1). Assumptions Assumptions for this subtask include: · Delays due to unforeseen circumstances (i.e., additional meetings or extended review periods) may result in additional effort necessary for project management and administration which may require a supplement. · Virtual design review meetings (kickoff, alternatives analysis, 30% and 90%) will be attended by up to two (2) Consultant staff and one subconsultant staff and will require a total of 2 hours each. · Monthly video conference calls with City staff will be attended by up to two (2) Consultant staff and will require a total of 1/2 hour each. Subtask 02 – Community Outreach and Stakeholder Coordination Goal To provide engineering and project management support for community outreach and property owner coordination efforts. Approach Consultant will support City staff with community outreach efforts by preparing a presentation graphic for use at outreach meetings and in the City s community outreach letter, preparing the community outreach letter, and providing public response survey questions for City use. Deliverables The deliverables for Subtask 01.2 will be determined prior to Consultant initiating work under this subtask. Assumptions The following are assumptions for this subtask include: · Services to be completed under this subtask include: July 19, 2022 J - 22 SCOPE OF WORK (continued) City of Port Angeles 234-2191-XXX Signal Controller Upgrades 6 July 2022 TR0120  Prepare one (1) presentation graphics to be included in a community outreach letter (in electronic PDF).  Prepare a community outreach letter using the City-provided form.  Providing up to one round of survey questions for City use in surveying public input regarding the Project. · No consultant time to attend community outreach or stakeholder coordination meetings is included in this scope of work. · The community outreach letter will be mailed and distributed by the City. · The survey will be prepared and distributed by the City. · Meeting minutes, agendas, meeting invitations, and all other materials and coordination as required to set up and complete community outreach meetings will be completed by City staff. · All graphics are assumed to be transmitted to the City electronically. · Additional community outreach or stakeholder coordination subtasks beyond those described in this subtask may require a supplement. Subtask 03 – Quality Control and Quality Assurance Goal To prepare a quality management plan for the Project and to complete internal quality reviews of each deliverable as noted below. Approach Consultant will perform quality control and quality assurance reviews of each deliverable including: · Alternatives Analysis Memorandum · Traffic Analysis Memorandum · WSDOT Design Documentation Submittals including – Summary of Design, Maximum Extent Feasible (MEF) Report, and Full Package Submittals · 30% Plans and Estimate Package · 90% PS&E Package · Final Bidding Documents Deliverables · Independent quality reviews of each deliverable listed on Consultant internal standard comment response sheets (electronic PDF format) · Quality Management Plan (PDF format) Subtask 04 – Transportation Engineering Support Services as Requested Goal The purpose of this subtask is to facilitate timely response by Consultant to needs that are anticipated on the City’s historic use of engineering services for evaluation of transportation projects and studies. July 19, 2022 J - 23 SCOPE OF WORK (continued) City of Port Angeles 234-2191-XXX Signal Controller Upgrades 7 July 2022 TR0120 Approach Consultant and its subconsultants shall provide professional traffic and transportation engineering, and right-of- way acquisition services to the City at the specific direction of authorized City staff. No such assistance or services shall be provided unless specifically directed by the City. The budget for this subtask is a contingency allowance that includes labor and expenses. TASK 02 – PRELIMINARY DESIGN Subtask 01 – Alternatives Analysis Goal To evaluate existing conditions at all grant-funded intersections included in the scope of work, recommend design solutions at each intersection, evaluate the recommended designs at each intersection, and then select a preferred design alternative to be carried forth into preliminary design. Approach Following the Kickoff Workshop meeting with the City as noted in Subtask 01.01, the Consultant will complete a field visit to observe the existing conditions and deficiencies at each intersection in the scope of work. The Consultant will also complete field measurements on existing ADA compliance upgrade locations. After completing the field visit, Consultant will evaluate potential design solutions for each intersection. The design solutions will be shown schematically on a plan view figure. Design solutions will be evaluated for their performance or how well they address the deficiency noted at each intersection during the field visit. They will be evaluated for their impacts to right-of-way and environmental impacts. Finally, a conceptual-level cost estimate (including design, permitting, acquisition, and construction costs) will be prepared for each solution proposed at each of the 13 grant-funded intersections. This evaluation will be summarized in a memorandum that will include the conceptual layouts at each intersection and evaluation matrix. Following City review of the memorandum and Project matrix, the Consultant will attend an Alternatives Analysis design review meeting (included in Subtask 01.01). Together at this meeting, the City and Consultant will select a preferred design alternative for each intersection to carry forward to final design. The preferred design alternative will then be presented to WSDOT Olympic Region Traffic for concurrence as noted in Subtask 02.05. Following the meeting with WSDOT Olympic Region Traffic, the preferred design solution will be adjusted as necessary to arrive at a final alternative to carry forward to final design. This design alternative will be documented via an amendment to the Alternatives Analysis Memorandum which will document the design decisions resulting from feedback from both the City and WSDOT before moving forward with Preliminary Design. Work during the Alternatives Analysis process will be completed in conjunction with the initial Traffic Analysis work included in Subtask 02.04 and preliminary environmental review included in Subtask 02.03. Deliverables The following deliverables are associated with this subtask: · Existing conditions field observation sheets (13) · Draft Alternatives Analysis Memorandum, including figures and solution matrix (in electronic PDF) July 19, 2022 J - 24 SCOPE OF WORK (continued) City of Port Angeles 234-2191-XXX Signal Controller Upgrades 8 July 2022 TR0120 · Final Alternatives Analysis Memorandum, including figures and solution matrix (in electronic PDF) Assumptions The following assumptions are associated with this subtask: · The field visit will take up to three 8-hour days, plus travel and hotel expenses. This field visit will be attended by up to one (1) Consultant staff and one subconsultant staff (time included in Subtask 02.04) for 2 days, and two (2) Consultant staff for 1 day. · Up to two (2) submittals of the Alternatives Analysis Memorandum will be necessary to arrive at a preferred design alternative. If additional submittals are required, a supplement may be necessary. · Meeting time with City and WSDOT is included in other subtasks in this Scope. Subtask 01C – Alternatives Analysis (Locally Funded Intersections) Goal To evaluate all locally funded intersections included in the scope of work, recommend design solutions at each intersection, evaluate the recommended designs at each intersection, and then select a preferred design alternative to be carried forth into preliminary design in a future project (outside of this scope of work). Work in this subtask includes the same approach, deliverables, and assumptions as Subtask 02.01 but will be prepared and submitted separately. Subtask 02 – Survey and Mapping Goal To provide AutoCAD base maps as necessary to confirm limits of existing right-of-way and support design/preparation of plans for bid documents. To determine right-of-way at each of the thirteen grant-funded intersections. Approach Topographic Mapping Consultant will provide topographic mapping of intersection corners only as shown in Table 1. The mapping limits will be limited to the outside corners of each intersection and will not include full intersection topography. Contours will be at 1-foot intervals. In addition, Consultant will include creating 811 tickets from the Call Before You Dig website to place markings down for subsurface utilities. The field survey for each intersection corner will be situationally based depending on the ADA Improvements to be constructed at each corner as identified in the preferred design alternative and as defined in the Alternatives Analysis process. While the exact survey needs for the Project will be determined in Subtask 02.01, for purposes of scoping the work, the complexity of the field survey will be based on the survey needs code shown in Table 1. The field survey will locate visible evidence of various improvements depending on the survey needs code shown in Table 1 but may include the following improvements: · Curbs July 19, 2022 J - 25 SCOPE OF WORK (continued) City of Port Angeles 234-2191-XXX Signal Controller Upgrades 9 July 2022 TR0120 · Corners of each electrical panel/junction box · Top of water nut on water valves · Sidewalks/Paths · Buildings · Driveways/curb cuts · Storm drainage and storm drain structures · Sanitary sewer manholes · Electrical power vaults and associated surface features · Telephone pedestals · Natural gas · Cable or fiber optic pedestals · Street lighting · Fire Hydrants · Signage · Meters or utility connects to existing buildings Note: Our survey crews are not allowed to enter subsurface vaults. Our work will be conducted from the surface using measure-down techniques. Crews will also not open any structure covers in excess of 80 pounds. · Underground utility location paint marks set by others if visible at time of the field survey · Significant trees with drip lines (6 inches or larger as measured 4-1/2 feet above the ground) Right-of-Way Determination Consultant will determine right-of-way at each of the 13 grant-funded intersections. Consultant will perform records research for evidence of previous surveys, perform control measurements, and locate evidence of occupation near each intersection. Deliverables · An electronic drawing file of the right-of-way boundary and topographic survey in AutoCAD Civil3D 2022 format Assumptions · If necessary, Consultant will be provided a current title report including all referenced documents for the subject property prior to commencement of work. · There will be no lateral parcel lines determined, only the right-of-way lines of each corresponding street at the grant-funded intersections. · If traffic control for survey and mapping purposes is needed, it will be provided by others. Any right of entry or general permits required to complete the survey will be provided by others. · The City will provide white paint in the intersection areas (listed above) to delineate the areas for which the 811 Call Before You Dig locators need as parameters to locate the subsurface utilities. · Consultant will be provided reasonable access to all areas requiring surveys. · For safety reasons Consultant personnel are not permitted to enter enclosed utility structures. These structures will be detailed and inventoried only to the extent feasible from the surface. July 19, 2022 J - 26 SCOPE OF WORK (continued) City of Port Angeles 234-2191-XXX Signal Controller Upgrades 10 July 2022 TR0120 · All electronic mapping standards will be based on Consultant drafting standards unless specified otherwise. · Consultant field crews may need to perform minor brushing with machetes to conduct this survey, and we have the City’s permission to do so. · We have not accounted for the cost of an independent utility locating service to identify the location of existing underground utilities. · We have not accounted for the cost of an arborist in this scope of work. · The setting of any survey monuments at any of the right-of-way boundary points of the subject property intersections has not been included in this scope of work. The right-of-way lines will be merged into the topographic mapping, as appropriate, and shown for graphical purposes only. This service can be provided, if required, at a later date; however, any setting of property corners and filing of a Record of Survey (if required) will be considered additional services and billed separately as described below. · Unless otherwise specified by the client, Horizontal Datum shall be North American Datum of 1983 (NAD 83/91) Washington Coordinate System, North Zone, and Vertical datum shall be North American Vertical Datum of 1988 (NAVD88). Subtask 03 – Environmental Documentation Goal To complete an environmental review during the Alternatives Analysis phase for each of the 13 grant-funded signal locations resulting in a permit matrix. To meet with WSDOT Local Programs to confirm environmental documentation approach and assumptions. To prepare a National Environmental Policy Act (NEPA) Categorical Exclusion Documentation Form pursuant to WSDOT requirements. Approach During the Alternatives Analysis phase, Consultant will complete a concurrent environmental review of each of the 13 grant-funded signal locations included in the scope of work. The results will be documented in tabular format. Once the initial review is complete, Consultant will attend a meeting with WSDOT Local Programs environmental staff to confirm results of environmental review and documentation requirements for the signal locations selected to carry forward to final design. During the 30% design phase, Consultant will prepare a Permit Matrix for the selected Project alternative. Consultant will prepare a WSDOT NEPA Categorical Exclusion Documentation Form during the 90% design phase based on the final selected signal locations. Deliverables · Permit Matrix (in electronic PDF format) · Draft and Final NEPA Categorical Exclusion Documentation Form (in electronic PDF format) Assumptions · No critical areas, critical areas buffers, or other resources regulated under Chapter 15.20 City of Port Angeles Code will be impacted by the Project. If potential impacts to critical areas are identified during the course of the Project that trigger additional environmental documentation or permitting, a supplement may be required. July 19, 2022 J - 27 SCOPE OF WORK (continued) City of Port Angeles 234-2191-XXX Signal Controller Upgrades 11 July 2022 TR0120 · Because the Project includes federal funding administered by WSDOT, the Project is required to comply with NEPA and associate crosscutting authorities. The Project is presumed to be able to be designed and implemented to qualify as a Categorical Exclusion (CE). Documentation of compliance with NEPA will be via WSDOT standard form WSDOT Form 140-100. No additional documentation, discipline reports, or studies will be required. If WSDOT requires additional documentation to demonstrate compliance with NEPA or other crosscutting authorities, a supplement may be required. · Because the Project includes federal funding administered by WSDOT, the Project is required to comply with Section 106 of the National Historic Preservation Act. The Project is presumed to be able to be designed and implemented to have minimal potential to cause effects as defined in the Statewide Programmatic Agreement (PA). Documentation of No Cultural Resources Services or review will be required for the Project. An Area of Potential Effects is not required for the Project. If cultural resources services are required, a supplement will be necessary. · Because the Project includes federal funding administered by WSDOT, the Project is required to comply with Section 7 of the Endangered Species Act (ESA) and the Magnuson-Stevens Act. The Project is presumed to be able to be designed and implemented to have no effect on ESA-listed species or critical habitat or Essential Fish Habitat (EFH). Documentation of compliance with Section 7 of the ESA and the Magnuson-Stevens Act can be accomplished via Parts 5 and 6, respectively, of WSDOT Form 140-100. If WSDOT requires a Biological Assessment or No Effect Letter, a supplement will be necessary. · Per City direction, it is assumed that the nature of the work on this project is categorically exempt from State Environmental Policy Act (SEPA). The scope of services and budget estimate do not include preparation of a SEPA Checklist. If documentation or assessments are required by the City pursuant to SEPA, a supplement may be necessary. · Any right-of-way, street use, land use, construction, or other permits required to complete this work will be completed by the City or others. The preparation and submittal of permit applications is not included in this scope of work. Should Consultant be requested to prepare additional permit applications or submittals, a supplement may be required. · No shoreline related permits will be required to complete this work. Subtask 04 – Traffic Analysis and Signal Timing (PH Consulting) Goal To complete data collection, site reconnaissance, existing conditions analysis, operational analysis, and traffic signal timing of the grant-funded intersections. Approach Consultant will contract with PH Consulting to complete traffic analysis and signal timing. A copy of the scope and fee for PH Consulting is enclosed with this proposal (see Exhibit E). PH Consulting will complete an existing conditions review, including collecting and reviewing data and completing a field review of signal operations to document safety deficiencies. After completing a field review, PH Consulting will develop an existing conditions Synchro model, recommend safety improvements, and prepare an Existing Conditions Memorandum. July 19, 2022 J - 28 SCOPE OF WORK (continued) City of Port Angeles 234-2191-XXX Signal Controller Upgrades 12 July 2022 TR0120 After the preferred design alternative is selected, PH Consulting will then prepare signal timing plans for the grant-funded signals. Deliverables · Draft and Final Existing Conditions Memorandum (in electronic PDF) · Draft and Final Safety Operations Memorandum (in electronic PDF) · 90% Corridor Timing Plan and Technical Memorandum · Final Corridor Timing Plan and Technical Memorandum · Synchro models with proposed signal timing/coordination plans · Timing/coordination cards as applicable with the final corridor timing plans Assumptions For assumptions for this subtask, see the PH Consulting scope and fee enclosed with this proposal. Subtask 04C – Traffic Analysis and Signal Timing (Locally Funded Intersections) (PH Consulting) Goal To complete data collection, site reconnaissance, existing conditions analysis, operational analysis, and traffic signal timing of the locally funded intersections. Work in this subtask includes the same approach, deliverables, and assumptions as Subtask 02.04 but will be prepared and submitted separately. Consultant will contract with PH Consulting to complete traffic analysis and signal timing. A copy of the scope and fee for PH Consulting is enclosed with this proposal. Subtask 05 – WSDOT Design Documentation Goal Prepare all required WSDOT Design Documentation for the Development Services and Local Programs offices for this project including: a Traffic Analysis Memorandum (prepared under Subtask 02.04), Summary of Design (SOD), Maximum Extent Feasible (MEF) Report, Full Package Submittal (FPS), and “Patented/Proprietary Item Certification.” WSDOT Design Documentation will meet WSDOT Olympic Region Development Services and Local Programs requirements. To attend an Alternatives Analysis review meeting with WSDOT to confirm approach and assumptions for preferred design alternative prior to moving forward with preliminary and final design, and to then meet with WSDOT monthly to coordinate design documentation submittals. Approach WSDOT Coordination Meetings Attend an Alternatives Analysis review meeting with WSDOT at the conclusion of the Alternatives Analysis phase. This meeting will be attended by WSDOT Local Programs, WSDOT Development Services, Region Traffic, and the environmental reviewer and right-of-way staff. July 19, 2022 J - 29 SCOPE OF WORK (continued) City of Port Angeles 234-2191-XXX Signal Controller Upgrades 13 July 2022 TR0120 Additional coordination meetings will be held monthly with WSDOT through the Project life cycle to coordinate design and submittals. Traffic Analysis Memorandum (Prepared under Subtask 02.04) At the conclusion of the Alternatives Analysis phase, the Consultant will prepare a Traffic Analysis Memorandum to reflect this preferred alternative design. A draft Traffic Analysis Memorandum will be prepared along with the 30% (or first) Full Package Submittal for review by City and WSDOT staff. The Consultant will respond to and incorporate comments from WSDOT and City into the final Traffic Analysis document. The Traffic Analysis Memorandum will be prepared and submitted at the same time as the 90% (or second) Full Package Submittal. Summary of Design Consultant will prepare a Summary of Design (SOD) meeting WSDOT Development Services requirements. A draft SOD will be prepared along with the 30% (or First) Full Package Submittal for review by City and WSDOT staff. Consultant will respond to and incorporate comments from WSDOT and City into the final SOD document. The final SOD will be prepared and submitted at the same time as the 90% (or Second) Full Package Submittal. Maximum Extent Feasible At the 90% design level, along with the Second Full Package Submittal, Consultant will prepare a Draft MEF report for the elements on the Project where the nature of the existing facilities makes it virtually impossible to comply with applicable accessibility standards through a planned alteration. The document will be prepared in accordance with Chapter 29 of the LAG Manual and Chapter 1510 of WSDOT’s Design Manual. Once comments are received on the Second Full Package Submittal, Consultant will prepare and submit a Final MEF report to be submitted along with the Final Full Package Submittal for WSDOT approval. Full Package Submittal At the conclusion of the 30% design phase, Consultant will prepare a preliminary Full Package submittal in accordance with the WSDOT Olympic Region Development Services Developer Agreement Full Package Submittal Checklist. Upon receipt of comments from WSDOT on the first Full Package Submittal, and upon completion of the 90% design phase, Consultant will prepare comment responses and will resubmit a Second Full Package Submittal for final WSDOT approval. Once comments are received on the Second Full Package Submittal and prior to preparing final bidding documents, Consultant will prepare and submit a Final Full Package Submittal for WSDOT approval. Patented/Proprietary Item Certification At the 90% design phase, along with the Second Full Package Submittal, Consultant will prepare a Patented/Proprietary Item Certification form in accordance with WSDOT Form 140-051 for all proprietary items to be specified on the Project. No review comments are expected on this form. The intent is to keep this form with the City’s project files. Deliverables · Draft Traffic Analysis Memorandum (electronic PDF format) – prepared under Subtask 02.04 · Final Traffic Analysis Memorandum and Draft Traffic Analysis comment responses (electronic PDF format) – prepared under Subtask 02.04 July 19, 2022 J - 30 SCOPE OF WORK (continued) City of Port Angeles 234-2191-XXX Signal Controller Upgrades 14 July 2022 TR0120 · Draft Maximum Extent Feasible Report (electronic PDF format) · Final Maximum Extent Feasible Report and Draft MEF comment responses (electronic PDF format) · Draft Summary of Design (electronic PDF format) · Final Summary of Design and Draft SOD comment responses (electronic PDF format) · First Full Package Submittal and Full Package Submittal checklist (11x17 electronic PDF format) · First Full Package Submittal comment responses and Second Full Package Submittal (11 x17 electronic PDF format) · Second Full Package Submittal comment responses and Final Full Package Submittal (11 x17 electronic PDF format) · Patented/Proprietary Item Form (in electronic PDF format) Assumptions · Up to two (2) submittals of the Traffic Analysis Memorandum, Maximum Extent Feasible Report and Summary of Design, and up to three (3) submittals of the Full Package Submittal will be necessary for WSDOT approval. If additional submittals are required, a supplement may be necessary. · The Alternatives Analysis design review meeting with WSDOT will be held virtually. This meeting will be attended by up to three (3) Consultant staff and one subconsultant staff and will be require a total of 2 hours. · Up to nine coordination meetings with WSDOT will be required. It is assumed that these meetings will be held virtually. WSDOT coordination meetings will be attended by up to two (2) Consultant staff and one subconsultant staff and will require a total of 1 hour each. Additional meetings with WSDOT may require a supplement. · Preparation of an Intersection Control Evaluation report, Plans for Approval or Design Analyses will not be required. Should additional WSDOT Design Documentation not noted in this scope be required, a supplement may be needed. · Any development services review fees associated with this subtask will be paid the City. Subtask 06 – 30% Design Goal To prepare preliminary (30%) plans and an opinion of cost to the City for review prior to moving towards final design. Approach The budget estimate for this project includes the design of signal and ADA improvements as shown in Table 1. July 19, 2022 J - 31 SCOPE OF WORK (continued) City of Port Angeles 234-2191-XXX Signal Controller Upgrades 15 July 2022 TR0120 Table 1 Intersection Signal Owner Quadrant New Controller Add new PPB and new Post Add new PPB Extension on Existing Pole Add APS Clear Space ONLY Replacement/ Design Pedestrian Circulation Panel Replacement Full Ramp Replacement Survey Needs* 1st and Oak City Y NW 2 0 2 1 Y 0 2 NE 0 0 2 0 N 0 4 SE 0 0 2 0 N 0 4 SW 1 1 2 1 Y 0 2 1st and Laurel City Y NW 0 0 2 0 N 0 4 NE 2 0 2 0 Y 0 2 SE 0 1 1 0 N 0 3 SW 0 0 1 0 N 0 4 1st and Lincoln WSDOT Y NW 2 0 2 0 Y 2 1 NE 0 0 2 0 N 0 3 SE 0 2 2 2 Y 0 2 SW 0 1 2 0 N 0 3 1st and Peabody WSDOT Y NW 0 2 2 1 Y 0 2 NE 0 2 2 0 N 0 3 SE 0 2 2 0 N 0 3 SW 0 2 2 0 N 0 3 1st and Race WSDOT Y NW 0 2 2 1 Y 0 2 NE 0 2 2 0 Y 0 1 SE 0 2 2 2 Y 0 2 SW 0 2 2 0 0 0 2 1st and Ennis WSDOT N 1st and Golf Course WSDOT Y NE 1 0 1 0 N 0 3 Island E-E 1 0 1 1 N 0 3 Island E-W 0 1 1 0 N 0 3 Island W 2 0 2 0 N 0 3 SE 1 0 1 0 N 0 3 SW 2 0 2 1 N 0 2 Front and Oak City Y NW 0 0 2 0 N 0 4 NE 0 2 2 0 N 0 4 SE 1 0 2 0 Y 0 2 SW 2 0 2 0 Y 1 flare 2 Front and Laurel City Y NW 1 1 2 0 Y 0 2 NE 1 1 2 0 Y 0 2 SE 1 1 2 0 Y 0 1 SW 2 2 2 0 Y 0 2 Front and Lincoln WSDOT Y NW 2 0 2 0 Y 0 2 NE 2 0 2 0 Y 1 1 SE 0 2 2 0 N 0 2 SW 1 1 2 0 Y 1 1 Front and Race WSDOT Y NW 2 0 2 0 Y 0 2 NE 2 0 2 0 Y 0 1 SE 1 0 2 0 N 0 3 SW 0 1 2 0 N 0 1 Front and Ennis WSDOT N Hwy 101 and Del Guzzi WSDOT Y NW 0 1 1 0 N 0 3 SE 0 1 1 1 N 1 2 SW 1 0 2 1 N 1 2 Anticipated Signal and ADA Improvements By Intersection 1 2 3 4 Survey only curb, ex ramp, sidewalk w/ joints, ex poles and lids, one hour of survey time Flowline survey only supplemented by in field measurements, 30 minutes survey time Assume OK per GIS, no survey time required Survey Needs Code Full Corner Survey, including buried utilities marked by locates, two hours of survey time July 19, 2022 J - 32 SCOPE OF WORK (continued) City of Port Angeles 234-2191-XXX Signal Controller Upgrades 16 July 2022 TR0120 Consultant will complete Preliminary Plans as shown in the sheet list shown in Table 2 below: Deliverables The deliverables for this subtask include: · Preliminary Plans (11-inch by 17-inch, half-size in electronic PDF format) · Preliminary Opinion of Cost (in MS Excel and electronic PDF format) Assumptions Following are the assumptions for this subtask: · Documents and figures will be prepared utilizing AutoCAD 2022 and using Consultant internal design standards with the exception that plans will be prepared using the City’s Title Block. · The City will provide the Consultant their latest plan sheet title block prior to the beginning of work on Subtask 02.06. · Demolition plans will not be separate but instead included on the curb ramp grading sheets. · Any stormwater work will be included on the curb ramp grading sheets. · Signal controller cabinets mounted to poles will be replaced in kind, and all other signal controller cabinets will be replaced adjacent to existing cabinets. · Existing conduit will not exceed fill limits with added wiring necessary for improvements. · Existing conduit will be used except where new poles are required for APS compliance. · Existing junction boxes will not exceed fill limits with added conduit necessary for improvements. · Clear space replacement locations assumed based off of the City-provided geographic information system data from the ADA Transition Plan. · Full signal re-wiring will not be required at any intersection. No new Type II or Type III signal poles will be relocated for this project. · Preliminary plans will be based on the preferred design alternative developed in Subtask 02.01. · Utility improvements are limited to minor drainage improvements required to replace curb ramps, including placement of new inlets at low points and storm lateral connections to a trunk line. Design of stormwater treatment or flow control or improvements beyond those necessary to drain the roadway due to re-graded curb ramps is not included in this scope. Design services for utilities that are not included in this scope of services may require a supplement. Sheet Title Included # of Sheets Included # of Sheets Included # of Sheets Cover Sheet, Index, Vicinity Map X 1 X 1 X 1 General Notes and Abbreviations X 1 X 1 X 1 Key Map, Survey Control Plan X 3 X 3 X 3 Curb Ramp, Demolition and TESC Intersection Details X 10 X 10 X 10 Electrical Plan X 13 X 13 X 13 Electrical Details 4 4 Traffic Control Plan (PH Constulting)X 3 X 3 TOTAL PLANS 28 35 35 Table 2 Signal Controller Upgrades Project - Sheet List 90% Submittal Final Submittal30% Submittal Assumptions: 19 ADA compliance upgrades (clear space and full ramp replacement) at locations shown in Table 2, 2 ADA compliance upgrades per grading sheet, Signal upgrades at 13 intersections, one intersection per electrical plan sheet. July 19, 2022 J - 33 SCOPE OF WORK (continued) City of Port Angeles 234-2191-XXX Signal Controller Upgrades 17 July 2022 TR0120 · No structural engineering is required for this project. No wall design or construction is included in this project. Should walls be determined necessary to complete these improvements, a supplement may be necessary. · Property restoration will be limited to restoring to match existing conditions. Landscape design and the use of a landscape architect’s services will not be required for this project. If additional landscape design services become necessary, a supplement may be required. · No utility relocations or coordination will be required for this work. Should any utility relocations be required, a supplement may be needed. Any existing utilities located within ADA improvements will be documented in the MEF report included in Subtask 02.05. · Comments received on the preliminary design will be incorporated into the 90% PS&E. TASK 03 – FINAL DESIGN (NOT IN CONTRACT - FUTURE PHASE OF WORK) Subtask 01 – 90% Plans, Project Manual and Estimate Goal To prepare 90% plans, Project Manual, and an opinion of cost to the City for review prior to final design. Approach Consultant will prepare 90% plans, opinion of cost, and Project Manual to include the sheets as listed above in Table 2. Additional work within this subtask includes: · Responding to 30% City review comments. Deliverables The deliverables for this subtask include: · 30% City comment response documentation sheet (in electronic PDF format) · 90% plans (11-inch by 17-inch, half-size in electronic PDF format) · 90% Opinion of Cost (in MS Excel format) · Draft Project Manual (Contract Documents, Specifications Divisions 1 through 9) (in MS Word format) Assumptions Following are the assumptions for this subtask: · Comments received on the 90% design will be incorporated into the Final Design plans, specifications, and opinion of cost included in Subtask 03.02. · The City will provide the Consultant their latest Project Manual template prior to the beginning of work on Subtask 03.01. July 19, 2022 J - 34 SCOPE OF WORK (continued) City of Port Angeles 234-2191-XXX Signal Controller Upgrades 18 July 2022 TR0120 Subtask 02 – Final Bid Documents Goal To assist City in preparation of final (Ad-ready) bidding documents. Approach Consultant will prepare final stamped plans, Project Manual, and opinion of cost to the Final Design level of completion. The final design plans are anticipated to include the plan sheets as noted in Table 2. Deliverables The deliverables for this subtask include: · Final stamped plans (in electronic PDF format) · Final Opinion of Cost (in MS Excel and PDF format) · Final Project Manual (in MS Word and PDF format) End of Scope of Work July 19, 2022 J - 35 Exhibit B DBE Participation Agreement Number: Exhibit B - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 1 of 1 July 19, 2022 J - 36     City of Port Angeles  234‐2191‐XXX Signal Controller Upgrades 1 June 2022 Project No. TR0120   Disadvantaged Business Enterprise Inclusion Plan       City of Port Angeles  Signal Controller Upgrades  TR0120  Disadvantaged Business Enterprise Inclusion Plan  Founded as an MBE firm in 1969, Parametrix understands the challenges that Disadvantaged Business Enterprises  (DBEs) face as they seek opportunities to expand their business. This plan outlines Parametrix’s commitment to  meet the DBE requirement of 13 percent established for this project.  SECTION 1 – SUBCONTRACTING The table below lists the values as a percentage of the contract amount that Parametrix anticipates for  participation by DBE firms.  Table 1. DBE Participation Percentages  Certification of Business Participation Anticipated Percentage   Disadvantaged Business Enterprise 22.7%  SECTION 2 – DIVERSE BUSINESS SUBCONTRACTORS Subconsultants anticipated to be used on this project are listed below, along with descriptions of tasks to be  performed.  Table 2. Subconsultant Task Descriptions  Name of DBE  DBE  Certifications Task Description  Anticipated DBE  Subcontract Value  PH Consulting D5M0024799 Traffic Analysis, Signal Timing, Traffic Control Plans        $78,576.50  * It is the intent of Parametrix to also use RES Group NW, DBE Certification Number D4F0023741, for ROW  Acquisition Services should those services become necessary through the course of the project.   SECTION 3 – DESIGNATED DBE LIAISON The DBE Liaison for this project will be Mallory Wilde, the Project Manager. Her contact information is:  Mallory Wilde, P.E.  Parametrix  Email: MWilde@parametrix.com   Phone number: (360) 850‐5325  $59,832.50 July 2022 July 19, 2022 J - 37   SCOPE OF WORK (continued)    City of Port Angeles  234‐2191‐XXX Signal Controller Upgrades 2 June 2022 Project No. TR0120   Disadvantaged Business Enterprise Inclusion Plan     Mallory’s responsibilities as the DBE Liaison include:   Providing monthly updates to the City’s Project Manager that include utilization of DBE subconsultants,  progress to date, and projections for future work.   Ensuring success of the DBE firms on the team by supporting them in learning the processes and  procedures of the City’s contracting.  SECTION 4 – DBE GOAL ATTAINMENT STRATEGY Achieving the DBE requirement of 13 percent for this project will be accomplished by assigning Right‐of‐Way  Planning to RES Group NW; and Traffic Analysis, Signal Timing, and Traffic Control Plan preparation to PH  Consulting. Their participation will be monitored frequently and reported on monthly invoices. Parametrix has  successfully teamed with these firms on previous projects.  SECTION 5 – PROMPT PAYMENT AND DISPUTE RESOLUTION The Parametrix process for monitoring and ensuring prompt payment to subconsultants starts with establishing  the calendar by which our billing cycle operates so the subconsultant’s invoice is timed with the Parametrix  invoice submittal to the client. A calendar is provided to the subconsultant identifying the cutoff date for each  monthly invoice. Parametrix’s policy is to pay subconsultants no longer than 15 days after receiving payment from the  client. In the event that any portion of an invoice is disputed, payment will be made for the non‐disputed amounts.  For resolution of disputes, first a good faith negotiation between representatives of the subconsultant and  Parametrix would take place. This would start with the subconsultant and Parametrix project managers and  escalate to the principals of each firm if needed. The next step is nonbinding mediation under the Commercial  Mediation Arbitration Rules and Mediation Procedures of the American Arbitration Association using a neutral  mediator mutually acceptable to the parties, with the costs, therefore, shared equally. If the nonbinding  mediation is not successful, final remedy would be through Superior Court in Pierce County, Washington.  SECTION 6 – MONITORING AND REPORTING REQUIRED DBE PARTICIPATION Our accounting system, BST10, allows us to track the monthly effort of the subconsultants and compare the  results against the planned level of effort. Our Project Manager will meet regularly with the subconsultant (in  person or via telephone), check progress, and address any questions or challenges they may have with either  their technical work or their share of the work in order to monitor and attain the required goal. A report  summarizing the status and progress toward goal attainment will be included with each monthly invoice and  progress report. We will submit this information via the Diversity Management and Compliance System reporting  system.  July 2022 July 19, 2022 J - 38 Exhibit C Preparation and Delivery of Electronic Engineering and Other Data In this Exhibit the agency, as applicable, is to provide a description of the format and standards the consultant is to use in preparing electronic files for transmission to the agency. The format and standards to be provided may include, but are not limited to, the following: I.Surveying, Roadway Design & Plans Preparation Section A.Survey Data B.Roadway Design Files C.Computer Aided Drafting Files Agreement Number: Exhibit C - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 1 of 4 July 19, 2022 J - 39 D.Specify the Agency’s Right to Review Product with the Consultant E.Specify the Electronic Deliverables to Be Provided to the Agency F.Specify What Agency Furnished Services and Information Is to Be Provided Agreement Number: Exhibit C - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 2 of 4 July 19, 2022 J - 40 II.Any Other Electronic Files to Be Provided III.Methods to Electronically Exchange Data Exhibit C - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 3 of 4 July 19, 2022 J - 41 A.Agency Software Suite B.Electronic Messaging System C.File Transfers Format Exhibit C - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 4 of 4 July 19, 2022 J - 42 Exhibit D Prime Consultant Cost Computations Agreement Number: Exhibit D - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 1 of 1 July 19, 2022 J - 43 Project: Port Angeles Signal Controller Upgrades - Preliminary Engineering Direct Salary Cost (DSC): Classification Man Hours =Rate =Cost Senior Engineer 119 $72.12 $8,582.28 Senior Engineer 34 $80.68 $2,743.12 Senior Engineer 316 $63.40 $20,034.40 Engineer III 288 $46.67 $13,440.96 Scientist / Biologist IV 4 $54.91 $219.64 Planner III 14 $40.29 $564.06 Scientist / Biologist II 64 $31.17 $1,994.88 Survey Supervisor 21 $72.80 $1,528.80 Sr Surveyor 61 X $50.82 $3,100.02 Technical Lead 65 X $43.47 $2,825.55 Surveyor II 10 X $33.54 $335.40 Surveyor III 95 X $39.66 $3,767.70 Surveyor II 26 X $28.05 $729.30 Sr Project Control Specialist 14 X $47.98 $671.72 Project Accountant 5 X $36.63 $183.15 Publications Supervisor 39 X $40.56 $1,581.84 X Total DSC =$62,302.82 Overhead (OH Cost -- including Salary Additives): OH Rate x DSC of 172.55 % x $$62,302.82 $107,503.52 Fixed Fee (FF): FF Rate x DSC of 30 % x $$62,302.82 $18,690.85 Reimbursables: Survey Mileage - 1000 miles @ $0.585/mile $585.00 Survey Equipment (10 days $160/Use)$1,600.00 Per Diem Full Day Standard $74, 5 days $370.00 Per Diem Travel Day Standard $55.5, 9 days $499.50 Per Diem Lodging Standard $161, 8 days $1,288.00 Design Mileage - 1000 miles @ $0.585/mile $585.00 Other Direct Expenses Total:$4,927.50 Subconsultants: (See Exhibit E) PH Consulting (DBE)$59,832.50 Subconsultants Total: $59,832.50 Management Reserve: $10,000.00 Grand Total $263,257.18 Mallory Wilde, P.E.Date:7/8/2022 WSDOT Form 140-089 EF Exhibit D Page 1 of 1 Exhibit D-1 Prime Consultant Cost Computations Agreement Number: July 19, 2022 J - 44 Mallory K. WildeChuck SchottMarc KendallKallyse CrawfordAdam MerrillAlyssa WorshamAmanda WeissLucas MillerKristy L. AllinsonSteven N SharpeJade L AustinMichael D'AgostinoBridget R. MacchioneChristy PopeSarah A. CrackenbergerAmanda B. LucasSr EngineerSr EngineerSr EngineerEngineer IIIScientist/Biologist IVPlanner IIIScientist/Biologist IISurvey SupervisorSr SurveyorTechnical LeadSurveyor IISurveyor IIISurveyor IISr Project Control SpecialistProject AccountantPublications SupervisorBurdened Rates (includes DL, OH, FF):$218.20 $244.10 $191.82 $141.20 $166.13 $121.90 $94.30 $220.26 $153.76 $131.52 $101.48 $119.99 $84.87 $145.16 $110.82 $122.71 Task SubTask Description Direct Cost Dollars OH Dollars (172.55%)FF Dollars (30%)Cost+OH+FF Lbr Hrs 01 Project Management $9,964.23 $17,193.28 $2,989.27 $30,146.78 152 47 34 35 16 0 0 0 0 0 0 0 0 0 10 5 5 01 Project Management $5,678.71 $9,798.61 $1,703.61 $17,180.94 90 43 0 27 0 0 0 0 0 0 0 0 0 0 10 5 5 Design Review Meetings (4)$1,337.76 $2,308.30 $401.33 $4,047.39 20 8 12 Monthly coordination calls with City (10 mos)$677.60 $1,169.20 $203.28 $2,050.08 10 5 5 Progress Reports (10 mos)$1,347.05 $2,324.33 $404.12 $4,075.50 25 10 5 5 5 Project Management - General (10 mos)$2,316.30 $3,996.78 $694.89 $7,007.97 35 20 10 5 02 Community Outreach and Stakeholder Coordination $1,144.56 $1,974.94 $343.37 $3,462.87 22 2 0 4 16 0 0 0 0 0 0 0 0 0 0 0 0 Presentation Graphics and Form Letter Preparation $1,144.56 $1,974.94 $343.37 $3,462.87 22 2 4 16 03 Quality Control and Quality Assurance $3,140.96 $5,419.73 $942.29 $9,502.97 40 2 34 4 0 0 0 0 0 0 0 0 0 0 0 0 0 Alternatives Analysis memorandum $466.96 $805.74 $140.09 $1,412.79 6 2 4 Traffic Analysis memo $253.60 $437.59 $76.08 $767.27 4 4 Summary of Design $161.36 $278.43 $48.41 $488.19 2 2 MEF Report $322.72 $556.85 $96.82 $976.39 4 4 Full Package Submittal $322.72 $556.85 $96.82 $976.39 4 4 30% Plans and Estimate $645.44 $1,113.71 $193.63 $1,952.78 8 8 90% PS&E $645.44 $1,113.71 $193.63 $1,952.78 8 8 Final Bidding Documents $322.72 $556.85 $96.82 $976.39 4 4 04 Transportation Engineering Support Services as Requested 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Transportation Engineering Support Services as Requested 02 Preliminary Design $52,338.59 $90,310.24 $15,701.58 $158,350.40 1023 72 0 281 272 4 14 64 21 61 65 10 95 26 4 0 34 01 Alternatives Analysis $10,341.79 $17,844.76 $3,102.54 $31,289.09 184 12 0 91 69 0 0 0 0 0 0 0 0 0 0 0 12 Prepare existing conditions intersection observation form $313.48 $540.91 $94.04 $948.43 6 2 4 Field visit including travel time $2,415.37 $4,167.72 $724.61 $7,307.70 41 30 11 Evaluate design solutions (13 intersections)$2,543.59 $4,388.96 $763.08 $7,695.63 43 4 26 13 Prepare alternative analysis figure (13 intersections)$1,542.40 $2,661.41 $462.72 $4,666.53 28 4 8 16 Conceptual cost estimates (13 intersections)$1,719.39 $2,966.81 $515.82 $5,202.01 30 4 13 13 Prepare draft alternative analysis memorandum $1,205.04 $2,079.30 $361.51 $3,645.85 24 8 8 8 Prepare final alternative analysis memorandum $602.52 $1,039.65 $180.76 $1,822.92 12 4 4 4 01C Alternatives Analysis (Locally Funded Intersections)$7,329.40 $12,646.88 $2,198.82 $22,175.10 132 12 0 56 52 0 0 0 0 0 0 0 0 0 0 0 12 Evaluate design solutions (12 intersections)$2,370.12 $4,089.64 $711.04 $7,170.80 40 4 24 12 Prepare alternative analysis figure (12 intersections)$1,542.40 $2,661.41 $462.72 $4,666.53 28 4 8 16 Conceptual cost estimates (12 intersections)$1,609.32 $2,776.88 $482.80 $4,869.00 28 4 12 12 Prepare draft alternative analysis memorandum $1,205.04 $2,079.30 $361.51 $3,645.85 24 8 8 8 Prepare final alternative analysis memorandum $602.52 $1,039.65 $180.76 $1,822.92 12 4 4 4 02 Survey and Mapping $12,286.77 $21,200.82 $3,686.03 $37,173.62 278 0 0 0 0 0 0 0 21 61 65 10 95 26 0 0 0 1st and Oak $456.14 $787.07 $136.84 $1,380.05 10 1 1 4 4 1st and Laurel $456.14 $787.07 $136.84 $1,380.05 10 1 1 4 4 1st and Lincoln $622.40 $1,073.95 $186.72 $1,883.07 14 1 1 6 6 1st and Pebody $539.27 $930.51 $161.78 $1,631.56 12 1 1 5 5 1st and Race $749.00 $1,292.40 $224.70 $2,266.10 17 1 1 8 7 1st and Ennis (no survey, field measurements)$0.00 $0.00 $0.00 $0.00 0 1st and Golf Course $622.40 $1,073.95 $186.72 $1,883.07 14 1 1 6 6 Front and Oak $456.14 $787.07 $136.84 $1,380.05 10 1 1 4 4 Front and Laurel $749.00 $1,292.40 $224.70 $2,266.10 17 1 1 8 7 Front and Lincoln $788.66 $1,360.83 $236.60 $2,386.09 18 1 1 8 8 Front and Race $788.66 $1,360.83 $236.60 $2,386.09 18 1 1 8 8 Front and Ennis (no survey, field measurements)$0.00 $0.00 $0.00 $0.00 0 Hwy 101 and Del Guzzi $456.14 $787.07 $136.84 $1,380.05 10 1 1 4 4 Travel Time $644.22 $1,111.60 $193.27 $1,949.09 18 12 6 811 tickets (13)$335.40 $578.73 $100.62 $1,014.75 10 10 Research $406.56 $701.52 $121.97 $1,230.05 8 8 Field work (13 Intersections)$1,455.84 $2,512.05 $436.75 $4,404.64 42 2 20 20 ROW Determination $2,760.80 $4,763.76 $828.24 $8,352.80 50 10 40 03 Environmental Documentation $3,465.42 $5,979.58 $1,039.63 $10,484.63 96 0 0 2 12 4 14 64 0 0 0 0 0 0 0 0 0 Coordination $161.16 $278.08 $48.35 $487.59 4 4 Background Review and Draft Permit Matrix $938.48 $1,619.35 $281.54 $2,839.37 28 2 2 24 Final Permit Matrix $164.97 $284.66 $49.49 $499.12 5 1 4 WSDOT Meeting $120.87 $208.56 $36.26 $365.69 3 3 Draft CE Form $1,461.03 $2,521.01 $438.31 $4,420.35 41 2 4 2 1 32 Final CE Form and Comment Responses $164.97 $284.66 $49.49 $499.12 5 1 4 Section 106 Review $453.94 $783.27 $136.18 $1,373.40 10 8 2 04 Traffic Analysis and Signal Timing $747.40 $1,289.64 $224.22 $2,261.26 12 2 0 8 0 0 0 0 0 0 0 0 0 0 2 0 0 Subconsultant Coordination $747.40 $1,289.64 $224.22 $2,261.26 12 2 8 2 04PH Traffic Analysis and Signal Timing (PH Consulting)0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 04C Traffic Analysis and Signal Timing (Locally Funded Intersections)$747.40 $1,289.64 $224.22 $2,261.26 12 2 0 8 0 0 0 0 0 0 0 0 0 0 2 0 0 Subconsultant Coordination $747.40 $1,289.64 $224.22 $2,261.26 12 2 8 2 04CPH Traffic Analysis and Signal Timing (Locallly Funded Intersections) (PH Consulting)0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Exhibit D-2 - PRELIMINARY ENGINEERING Client: City of Port Angeles Project: Signal Controller Upgrades $10,000.00 (See below) (See below) 7/8/2022July 19, 2022 J - 45 Mallory K. WildeChuck SchottMarc KendallKallyse CrawfordAdam MerrillAlyssa WorshamAmanda WeissLucas MillerKristy L. AllinsonSteven N SharpeJade L AustinMichael D'AgostinoBridget R. MacchioneChristy PopeSarah A. CrackenbergerAmanda B. LucasSr EngineerSr EngineerSr EngineerEngineer IIIScientist/Biologist IVPlanner IIIScientist/Biologist IISurvey SupervisorSr SurveyorTechnical LeadSurveyor IISurveyor IIISurveyor IISr Project Control SpecialistProject AccountantPublications SupervisorBurdened Rates (includes DL, OH, FF):$218.20 $244.10 $191.82 $141.20 $166.13 $121.90 $94.30 $220.26 $153.76 $131.52 $101.48 $119.99 $84.87 $145.16 $110.82 $122.71 Task SubTask Description Direct Cost Dollars OH Dollars (172.55%)FF Dollars (30%)Cost+OH+FF Lbr Hrs Exhibit D-2 - PRELIMINARY ENGINEERING Client: City of Port Angeles Project: Signal Controller Upgrades 05 WSDOT Design Documentation $8,713.58 $15,035.28 $2,614.07 $26,362.94 153 32 0 49 62 0 0 0 0 0 0 0 0 0 0 0 10 Alternatives Analysis Design Review meeting $508.62 $877.62 $152.59 $1,538.83 8 4 2 2 Monthly coordination calls with WSDOT (9)$1,724.52 $2,975.66 $517.36 $5,217.54 25 16 9 Draft Summary of Design $500.16 $863.03 $150.05 $1,513.23 10 2 8 Final Summary of Design $313.48 $540.91 $94.04 $948.43 6 2 4 Draft MEF Report $1,412.40 $2,437.10 $423.72 $4,273.22 26 4 8 8 6 Final MEF Report $1,042.80 $1,799.35 $312.84 $3,154.99 20 8 8 4 First FPS and FPS Checklist $1,355.72 $2,339.29 $406.72 $4,101.73 24 4 8 12 Second FPS, FPS Checklist and Comment Response Package $771.20 $1,330.71 $231.36 $2,333.27 14 2 4 8 Final FPS, FPS Checklist and Comment Response Package $771.20 $1,330.71 $231.36 $2,333.27 14 2 4 8 Patented/Proprietary Item Form $313.48 $540.91 $94.04 $948.43 6 2 4 06 30% Design $8,706.83 $15,023.64 $2,612.05 $26,342.51 156 12 0 67 77 0 0 0 0 0 0 0 0 0 0 0 0 Cover sheet, index, vicinity map (1)$313.48 $540.91 $94.04 $948.43 6 2 4 General Notes and Abbreviations (1)$406.82 $701.97 $122.05 $1,230.83 8 2 6 Key map, survey control (3)$626.96 $1,081.82 $188.09 $1,896.87 12 4 8 Curb ramp, demolition and TESC intersection details (13)$3,920.79 $6,765.32 $1,176.24 $11,862.35 70 4 33 33 Electical Plan (13)$1,719.39 $2,966.81 $515.82 $5,202.01 30 4 13 13 Opinion of Cost $1,719.39 $2,966.81 $515.82 $5,202.01 30 4 13 13 03 Final Design (Not in Contract)$0.00 $0.00 $0.00 $0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 01 90% Plans, Project Manual and Estimate (Not in Contract)$0.00 $0.00 $0.00 $0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02 Final Bid Documents (Not in Contract)$0.00 $0.00 $0.00 $0.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,175 119 34 316 288 4 14 64 21 61 65 10 95 26 14 5 39 Direct Labor Totals:$62,302.82 $8,582.28 $2,743.12 $20,034.40 $13,440.96 $219.64 $564.06 $1,994.88 $1,528.80 $3,100.02 $2,825.55 $335.40 $3,767.70 $729.30 $671.72 $183.15 $1,581.84 Direct Labor + OH Totals:$107,503.52 Overhead $14,808.72 $4,733.25 $34,569.36 $23,192.38 $378.99 $973.29 $3,442.17 $2,637.94 $5,349.08 $4,875.49 $578.73 $6,501.17 $1,258.41 $1,159.05 $316.03 $2,729.46 Fixed Fee (30%)$18,690.85 Fixed Fee $2,574.68 $822.94 $6,010.32 $4,032.29 $65.89 $169.22 $598.46 $458.64 $930.01 $847.67 $100.62 $1,130.31 $218.79 $201.52 $54.95 $474.55 Total DL+OH+FF $198,497.18 Total $25,965.69 $8,299.31 $60,614.08 $40,665.62 $664.52 $1,706.56 $6,035.51 $4,625.38 $9,379.11 $8,548.70 $1,014.75 $11,399.18 $2,206.50 $2,032.29 $554.12 $4,785.86 Check $188,497.18 Check Plus Management Reserve 198,497.18$ Subconsultants Subtask 02.04PH Traffic Analysis/Signal Timing (Grant Funded) (PH Consulting)$38,599.20 Subtask 02.04CPH Traffic Analysis/Signal Timing (Locally Funded) (PH Consulting)$16,840.80 Subtask 03.01PH 90% Design (PH Consulting - Not in Contract)$0.00 Subtask 03.02 Final Bid Documents (PH Consulting - Not in Contract)$0.00 PH Consulting Direct Expenses $4,392.50 Subconsultants Total:$59,832.50 Other Direct Expenses Survey Mileage - 1000 miles @ $0.585/mile $585.00 Survey Equipment (10 days $160/Use)$1,600.00 Per Diem Full Day Standard $74, 5 days $370.00 Per Diem Travel Day Standard $55.5, 9 days $499.50 Per Diem Lodging Standard $161, 8 days $1,288.00 Design Mileage - 1000 miles @$0.585/mile $585.00 Other Direct Expenses Total:$4,927.50 Project Total (Preliminary Engineering)$263,257.18 $188,497.18 TOTAL PLUS MANAGEMENT RESERVE 7/8/2022July 19, 2022 J - 46 May 12, 2022 Parametrix, Inc. 1019 39th Avenue SE, Suite 100 Puyallup, WA 98374-2215 Subject: Acceptance FYE 2021 ICR Cognizant Review Dear Janice Walden: We have accepted your firms FYE 2021 Indirect Cost Rate (ICR) of 172.55% of Combined/Corporate (rate includes 0.11% Facilities Capital Cost of Money) based on WSDOT Audit Office. This rate will be applicable for WSDOT Agreements and Local Agency Contracts in Washington only. This rate may be subject to additional review if considered necessary by WSDOT. Your ICR must be updated on an annual basis. Costs billed to agreements/contracts will still be subject to audit of actual costs, based on the terms and conditions of the respective agreement/contract. Any other entity contracting with your firm is responsible for determining the acceptability of the ICR. If you have any questions, feel free to contact our office at (360) 705-7019 or via email consultantrates@wsdot.wa.gov. Regards; ERIK K. JONSON Contract Services Manager EKJ:ah July 19, 2022 J - 47 O/H Certification; Nov 2010 Certification of Final Indirect Costs Firm Name: Parametrix, Inc. Indirect Cost Rate Proposal: 172.55 Date of Proposal Preparation (mm/dd/yyyy): 4/11/22 Fiscal Period Covered (mm/dd/yyyy to mm/dd/yyyy): 1/2/2021 - 12/31/2021 I, the undersigned, certify that I have reviewed the proposal to establish final indirect cost rates for the fiscal period as specified above and to the best of my knowledge and belief: 1.) All costs included in this proposal to establish final indirect cost rates are allowable in accordance with the cost principles of the Federal Acquisition Regulations (FAR) of title 48, Code of Federal Regulations (CFR), part 31. 2.) This proposal does not include any costs which are expressly unallowable under the cost principles of the FAR of 48 CFR 31. All known material transactions or events that have occurred affecting the firm’s ownership, organization and indirect cost rates have been disclosed. Signature: ________________________________________________________________ Name of Certifying Official* (Print): Jeff Peacock Title: President, CEO Date of Certification (mm/dd/yyyy): 04/19/2022 *The “Certifying Official” must be an individual executive or financial officer of the firm at a level no lower than a Vice President or Chief Financial Officer, or equivalent, who has the authority to represent the financial information utilized to establish the indirect cost rate for use under Agency contracts. Ref. FHWA Directive 4470.1A available on line at: http://www.fhwa.dot.gov/legsregs/directives/orders/44701a.htm July 19, 2022 J - 48 PARAMETRIX, INC.    Statement of Direct Labor, Fringe Benefits and General Overhead  For the Fiscal Year Ended December 31, 2021      See accompanying notes. CNFSDONOTEMAIL  ‐ 4 ‐  General Ledger   Balance for the Fiscal Year Ended December 31, Unallowable Proposed 2021 Expenses Ref. Amount Percent Direct Labor  $     34,409,131  $                        ‐   $     34,409,131 100.00% Fringe Benefits: Vacation, sick leave, holidays           7,353,992                          ‐             7,353,992 21.37% Payroll taxes           5,223,649                (33,028) E           5,190,621 15.09% Medical insurance           4,707,654                          ‐             4,707,654 13.68% ESOP retirement plan         11,495,150                          ‐           11,495,150 33.41% Total Fringe Benefits         28,780,445                (33,028)        28,747,417 83.55% General Overhead: Administrative salaries         11,246,602                (71,054) A          11,175,548 32.48% Training salaries               758,401                          ‐                 758,401 2.20% Bonuses/misc. salaries           9,287,479           (1,767,064) B            7,520,415 21.86% Direct selling salaries           1,377,124                          ‐             1,377,124 4.00% Bid and proposal salaries           3,514,619                          ‐             3,514,619 10.21% Advertising expense               128,034              (128,034) C                            ‐ 0.00% Direct selling expenses                 61,160                (20,375) D                  40,785 0.12% Business taxes           2,047,195                          ‐             2,047,195 5.95% Insurance               865,256                          ‐                 865,256 2.51% Office rent           4,180,663                          ‐             4,180,663 12.15% Office expenses, supplies, remodeling and business meals               146,530                (56,038) F                  90,492 0.26% Staff appreciation/awards                 70,137                (58,146) G                  11,991 0.03% Printing, copier/printer supplies                 46,940                          ‐                   46,940 0.14% Telephone               187,302                          ‐                 187,302 0.54% Depreciation (including gain/loss on disposal)          1,652,585                          ‐             1,652,585 4.80% Amortization                 14,583                (14,583) H                            ‐ 0.00% Auto expense               204,382                (11,938) I                192,444 0.56% Billed in‐house autos             (185,993)                         ‐               (185,993)‐0.54% Office travel               161,663                (34,987) J                126,676 0.37% Subscriptions, library material and dues               238,380                (26,232) K                212,148 0.62% Donations                 60,802                (60,802) L                            ‐ 0.00% Professional licenses                 30,559                          ‐                   30,559 0.09% Postage, couriers, freight                 29,116                          ‐                   29,116 0.08% Training/education               208,380                          ‐                 208,380 0.61% Field equipment/supplies               120,008                          ‐                 120,008 0.35% Health and safety equipment/supplies                 25,368                          ‐                   25,368 0.07% Billed in‐house equipment             (382,220)                         ‐               (382,220)‐1.11% Office equipment 178,810                        (33) M                178,777 0.52% Computer supplies, circuits               490,719                      (779) M                489,940 1.42% Software/maintenance           2,455,923                          ‐             2,455,923 7.14% Recruiting costs               101,004                          ‐                 101,004 0.29% Payroll, legal and audit                 24,080                187,962  N                212,042 0.62% Temporary labor                 17,438                 17,438 0.05% Consulting services               817,053              (114,000) O                703,053 2.04% Bad debts               102,300              (102,300) P                            ‐ 0.00% Utilities/building maintenance                 72,689                          ‐                   72,689 0.21% Finance, bank charges               (58,908)                66,578  Q                    7,670 0.02% Paycheck Protection Program credit          (7,494,883) R           (7,494,883)‐21.78% Total General Overhead 40,296,163       (9,706,708)        30,589,455       88.90% Total Indirect Costs 69,076,608$     (9,739,736)$      59,336,872$     172.45% Percentage of Direct Labor (Less FCC)200.75%172.45% Facilities cost of capital (FCC)37,736 S 37,736 0.11% 59,374,608$      Percentage of Direct Labor (Includes FCC)172.55% Description   July 19, 2022 J - 49 PARAMETRIX, INC.    Statement of Direct Labor, Fringe Benefits and General Overhead (Continued)  For the Fiscal Year Ended December 31, 2021        See accompanying notes. CNFSDONOTEMAIL  ‐ 5 ‐  References    A. Labor costs incurred in defense of contract performance issues per 48 CFR 31.205‐47(f)(5)(A); Collection costs  unallowable per 48 CFR 31.205‐3; Organizational Cost pertaining to acquisitions per 31.205‐27.   B. Share value‐based bonuses unallowable per 48 CFR 31.205‐6(i); Limitation on allowability of senior executive  compensation per 31.205‐6(p); Personal vehicle use unallowable per 48 CFR 31.205‐6(m)(2). Gifts unallowable per 48  CFR 31.205‐13(b).  C. Nonallowable public relations and advertising costs per 31.205‐1; Promotional materials unallowable per 48 CFR  31.205‐1(f)(5).  D. Entertainment unallowable per 48 CFR 31.205‐14; Alcohol unallowable per 48 CFR 31.205‐51; Excess lodging and per  diem unallowable per 48 CFR 31.205‐46.  E. Fringe benefits associated with labor deemed unallowable per 48 CFR 31.201‐6(a).  F. Gift unallowable per 48 CFR 31.205‐13(b); Entertainment unallowable per 48 CFR 31.205‐14; Alcohol unallowable per  48 CFR 31.205‐51.  G. Entertainment unallowable per 48 CFR 31.205‐14; Gifts unallowable per 48 CFR 31.205‐13(b); Alcohol unallowable per  48 CFR 31.205‐51.  H. Amortization unallowable per 48 CFR 31.205.49.  I. Personal vehicle use unallowable per 48 CFR 31.205‐6(m)(2).  J. Entertainment unallowable per 48 CFR 31.205‐14; Alcohol unallowable per 48 CFR 31.205‐51; Excess lodging and per  diem unallowable per 48 CFR 31.205‐46.  K. Dues to social clubs unallowable per 48 CFR 31.205‐1(f)(7), 31.205‐14; Lobbying unallowable per 48 CFR 31.205‐22(c).  L. Donations unallowable per 48 CFR 31.205‐8.  M. Prior period cost unallowable per 31.203 (g).  N. Legal costs incurred in defense of contract performance issues per 48 CFR 31.205‐47(f)(5)(A); Organizational Cost  pertaining to acquisition per 31.205‐27. Recovery of prior year disallowed legal costs.  O. Nonallowable public relations and advertising costs per 48 CFR 31.205‐1.  P. Bad debt unallowable per 48 CFR 31.205‐3.  Q. Interest, late fees unallowable per 48 CFR 31.205‐20. Forgiveness of previously disallowed PPP interest expense.  R. Credit for Paycheck Protection Program (PPP) loan forgiveness per 48 CFR 31.201‐5.  S. Cost of money adjustments per 48 CFR 31.205‐10(a).    July 19, 2022 J - 50 Exhibit E Sub-consultant Cost Computations If no sub-consultant participation at this time. The CONSULTANT shall not sub-contract for the performance of any work under this AGREEMENT without prior written permission of the AGENCY. Refer to section VI “Sub-Contracting” of this AGREEMENT. Agreement Number: Exhibit E - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 1 of 1 July 19, 2022 J - 51 6/23/2022 22-016 EXHIBIT E SCOPE OF WORK PAGE 1 OF 8 6/24/2022 Scope of Services Introduction During the term of this AGREEMENT, PH Consulting LLC (PHC) shall perform professional services for Parametrix, Inc. (PMX) in support of the following City of Port Angeles (CITY) project: City of Port Angeles Signal Controller Upgrades TR0120 This Scope of Work is for the Signal Controller Upgrades Project (Project). This scope includes data collection, site reconnaissance, existing conditions analysis, operational analysis, traffic signal timing/coordination development, and traffic control plan development (including plans, specifications, and estimates). The following Design Standards and References (as of execution of the agreement) are to be followed during the development of the project. If changes to the Design Standards and References occur after project work starts, except as noted in the list below where updated standards are currently in process, resulting in needed revisions to any deliverable, PHC may seek additional compensation to bring deliverables in-line with updated Design Standards and References.  City of Port Angeles Standards and Guidelines (latest editions)  WSDOT Olympic Region Traffic Design Practices  2022 Washington State Department of Transportation (WSDOT) Standard Specifications for Road, Bridge, and Municipal Construction.  WSDOT Local Agency Guidelines (LAG).  Manual on Uniform Traffic Control Devices for Streets and Highways (latest edition).  A Policy on Geometric Design of Highways and Streets (i.e. AASHTO ‘Green Book’) (latest edition).  WSDOT Standard Plans as required (latest edition).  PROWAG, 2011  Current edition of ITE Standards  Federal ITS Architecture, latest edition  NEC, Latest Edition The plans shall be prepared in accordance with the CITY’s standards. July 19, 2022 J - 52 6/23/2022 22-016 EXHIBIT E SCOPE OF WORK PAGE 2 OF 8 6/24/2022 Assumptions The following general assumptions have been made in developing the Scope of Work and Budget for the Project. Additional detail has been included in the task descriptions contained in the remainder of the Scope of Work. General Assumptions 1. The AGREEMENT has an anticipated start date of July 5, 2022 and is anticipated to have a duration of nine months. PHC’S ability to meet the completion date is contingent upon timely receipt of information from the PMX, CITY, and others and provided the scope proceeds as outlined and within the timeframe above. 2. Staff-hour estimates assume the number of intersections and sheets as shown in the task descriptions, based on PHC’s current knowledge of the project scope and that one contract bid package will be prepared representing design work items associated with the project. 3. While at the project site, PHC is not responsible for the health and safety of others, other than PHC’S own personnel and is not responsible for those duties that belong to the CITY and/or other entities, and do not relieve the CITY and / or other entity of their obligations, duties, and responsibilities. 4. The CITY will provide to PHC all data in the CITY's possession relating to PHC's services on the Project. PHC will reasonably rely upon the accuracy, timeliness, and completeness of the information provided by the CITY only to the extent directed by the CITY. 5. The standard of care applicable to PHC's Services will be the degree of skill and diligence normally employed by professional engineers or PHCs performing the same or similar Services at the time said services are performed. PHC will re-perform any services not meeting this standard without additional compensation. TASK 1 1. Traffic Analysis/Signal Timing The Traffic Analysis/Signal Timing task covers project management, data collection and review, existing conditions documentation, alternative development and analysis, and traffic signal timing. It includes the following tasks, described in more depth below. In the following sections tasks are further separated out by work associated with grant-funded intersections and local-funded intersections. 1. Project Management 2. Existing Conditions a. Complete field review of signal operations b. Share field review notes 3. Assess safety and operations modifications a. Assist PMX in creating the Alternatives Analysis Menu b. Build Synchro Model c. Assess operations modifications 4. Prepare signal timing plans July 19, 2022 J - 53 6/23/2022 22-016 EXHIBIT E SCOPE OF WORK PAGE 3 OF 8 6/24/2022 1.1. A. Project Management – Grant Funded Intersections Project Management This task will be continuous throughout the Project duration. It will include the work necessary to set up and plan the Project and establish project-specific procedures, including communication, quality control (QC), overall Project coordination with PMX and Project team, and Project closeout. Components of this work include planning the Project, executing the Project, managing change, and closing the Project. This task consolidates agency and stakeholder consultation and coordination required for the design process. Work to be performed under this task also includes general administrative coordination with the key project review staff and affected agencies/companies (such as the Black Ball Ferry Line). This work is for coordination on the Traffic Analysis and Signal Timing components of the project. Assumptions:  Project duration is assumed to be nine (9) months.  PMX will perform all WSDOT/FHWA, property owner, and private utility coordination necessary for the project.  PMX will be responsible for preparing meeting agendas, documentation, and confirming action items. Project Coordination PHC will coordinate with PMX on a regular basis to keep PMX's project manager informed about project issues and schedule. Communication shall occur on a weekly basis at a frequency consistent with the overall progress of the project. Project Monitoring, Progress Reporting, and Invoicing Project monitoring shall include project resource scheduling, preparation of a monthly progress report and a monthly billing statement. Regular e-mail correspondence is anticipated between the project team members to ensure timely response to issues and maintenance of the overall schedule. Assumptions:  Meetings to include: - One (1) Project Kick-off Meeting (virtual, 0.5 hour) - One (1) Alternatives Analysis Summary Meeting (virtual, 1 hour) - One (1) Signal Timing Review Meeting with City (virtual, 1 hour) - One (1) 30% Design Review meeting with City (virtual, 1 hour) - One (1) 90% Design Review meeting with City (virtual, 1 hour) - Up to four (4) WSDOT coordination meetings (virtual, 1 hour each) - One (1) 30% Design Review Meeting with WSDOT (virtual, 1 hour) - One (1) 90% Design Review Meeting with WSDOT (virtual, 1 hour) - Up to four (4) consultant coordination meetings (virtual, 30 minutes each) - Two (2) meetings with the Black Ball Ferry Line (virtual , 1 hour each) - One (1) meeting with the appropriate parties regarding tsunami evacuation routes and priorities (virtual, 1 hour) July 19, 2022 J - 54 6/23/2022 22-016 EXHIBIT E SCOPE OF WORK PAGE 4 OF 8 6/24/2022 1.1 B. Project Management – Local Funded Intersections This task will have the same scope as task 1.1.A. It will cover project management work on the local-funded intersections. Assumptions:  Meetings to include: - One (1) Project Kick-off Meeting (virtual, 0.5 hour) - One (1) Alternatives Analysis Summary Meeting (virtual, 1 hour) - Up to two (2) consultant coordination meetings (virtual, 30 minutes each) 1.2. A. Existing Conditions – Grant Funded Intersections PHC will visit the project site and familiarize themselves with the site conditions and data collected for the project. PHC will complete a review of signal operations with PMX/CITY to observe operations and obtain photographs for reference. After review of the above data, PHC will notify PMX of any additional information or clarification required. PHC will collect traffic signal as-builts, traffic signal timing sheets, and topographic data from the CITY along with any existing traffic volume data that is available. PHC will document the field review notes and will share with the PMX/City, including observed safety deficiencies and potential safety improvements based on these observed safety deficiencies. Assumption(s):  13 grant funded intersections included  One 8-hour day is assumed for two (2) staff for the field review plus travel and expenses.  CITY will provide as-builts at intersections, existing traffic signal timing sheets, and topographic data.  Collision data collection and review is not included in this project. Deliverables(s):  Field Notes 1.2 B. Existing Conditions – Local Funded Intersections The scope for this task is the same as for 1.2.A. with the assumptions and deliverables listed below. Assumption(s):  12 local funded intersections included  One 8-hour day is assumed for two (2) staff for the field review plus travel and expenses  CITY will provide as-builts at intersections, existing traffic signal timing sheets, and topographic data Deliverables(s):  Field Notes July 19, 2022 J - 55 6/23/2022 22-016 EXHIBIT E SCOPE OF WORK PAGE 5 OF 8 6/24/2022 1.3. A. Assess Safety and Operations – Grant Funded Intersections Alternatives Analysis Menu PHC will assist PMX in developing the Alternatives Analysis Menu. This is assumed to be up to 10 hours of effort from PHC to consult with PMX, with all documentation done by PMX. Model Development PHC will build the operations model in Synchro 11. PHC will obtain summer PM Peak traffic volume data, using as much existing data as possible. Safety and Operations Assessment PHC will complete an assessment of safety and operations modifications using Synchro 11. This assessment will be completed for the Summer PM Peak traffic condition for up to two alternatives per intersection. Alternatives will include items such as a Leading Pedestrian Intervals (LPIs). For this stage, PHC will assume basic cycle length and offset optimization for the Plus Project condition. PHC will document findings in a simple Operations Memorandum, which will also document signal timing assumptions. Safety improvements that are not modeled will be discussed generically and qualitatively. Assumption(s):  Summer PM Peak period for Opening Year 2023  13 Grant Funded Intersections included  Up to two (2) operations alternatives per intersection  Option to add additional traffic volume or operational scenarios If deemed appropriate for additional fee Deliverables(s):  Draft and Final Operations Memorandum – Grant Funded Intersections 1.3. B. Assess Safety and Operations – Local Funded Intersections The scope for this task is the same as for 1.3.A. with the assumptions and deliverables listed below. Assumption(s):  Summer PM Peak period for Opening Year 2023  12 Local Funded Intersections included  Up to two (2) operations alternatives per intersection  Option to add additional traffic volume or operational scenarios If deemed appropriate for additional fee Deliverables(s):  Draft and Final Operations Memorandum – Local Funded Intersections July 19, 2022 J - 56 6/23/2022 22-016 EXHIBIT E SCOPE OF WORK PAGE 6 OF 8 6/24/2022 1.4. A. Prepare Signal Timing Plans – Grant Funded Intersections PHC will complete the following tasks: 1. Develop basic signal timing parameters at all project intersections to include recommendations for pedestrian walk time, pedestrian clearance time, minimum green, yellow change interval and all red clearance interval per MUTCD and approved City Policy. 2. Develop “free” operations parameters and TOD plan. 3. Prepare draft and final technical memorandum to include documentation on approach, recommendations, signal timing cards, synchro worksheets, and reference data. Assumption(s):  Signal Timing completed for the 13 grant funded intersections.  The City will provide: - electronic controller database/configuration (if applicable) - City standards for signal timing (if applicable)  The City is responsible for ensuring all traffic signals are interconnected to local master or central system for clock synchronization.  One (1) TOD plan is included for the Summer PM Peak (2023 projected traffic volumes).  One (1) Ferry surge plan included.  One (1) tsunami/emergency evacuation plan included.  As described in the Project Management section above, PH will attend meetings with the appropriate parties regarding the Ferry flush plan and the Tsunami evacuation plan. It is assumed that the City will coordinate these meetings.  Option: At the option of the City, the Consultant can prepare additional signal timing plans, which could include plans such as other TOD, seasonal, or event plans for an additional fee. Deliverables(s):  90% Corridor Timing Plan and Technical Memorandum  Final Corridor Timing Plan and Technical Memorandum  Synchro models with proposed signal timing/coordination plans  Timing/coordination cards as applicable with the final corridor timing plans TASK 2 2. 90% Traffic Control Plans – Grant Funded Intersections At the 90% plan level, PHC will prepare Traffic Control Plans. PHC will provide generic/scenario based traffic control plans that can be applied to multiple work locations. PHC will prepare Division 1 Traffic Control Special Provisions and Traffic Control Estimate to PMX. Assumptions:  Work for the 13 grant funded intersection included in this effort  PMX will provide electronic base mapping (Not in Contract) July 19, 2022 J - 57 6/23/2022 22-016 EXHIBIT E SCOPE OF WORK PAGE 7 OF 8 6/24/2022  PMX will provide construction staging information  The level of effort and fee estimate for this task assumes preparation of the following sheets: o General Notes sheet o Three (3) generic/scenario based traffic control plan sheets (shoulder closure, lane closure, plus one (1) other scenario) o Two (2) typical pedestrian detour plan sheets.  PMX will compile the submittal and complete coordination with City and/or other agencies.  Option: The City may add additional traffic control plans for an additional fee. Deliverable(s):  90% Traffic Control Plans  Revised 90% Traffic Control plans after receiving City and WSDOT 90% comments TASK 3 3. Final Bidding Documents Traffic Control Plans – Grant Funded Intersections PHC will prepare Traffic Control Plans for the final bidding documents. PHC will provide typical/scenario based traffic control plans that can be applied to multiple work locations. Assumptions:  It is assumed that at this point modifications will be editorial in nature and that the City will not direct PH to modify plans significantly. Deliverable(s):  Final Traffic Control Plans, Specifications, and Estimates. TASK 4 (FUTURE) 4. Construction Phase Services Timing / Coordination Plan Implementation As part of Construction Phase Supplement to this agreement, PHC will provide traffic signal timing implementation support services. After traffic signal improvements have been completed PHC will coordinate in the field with CITY traffic operations staff observing, testing, and adjusting timings to optimize coordination plans. Fee and detailed scope for this task will be determined as part of supplement to base contract. (Not in Contract) (Not in Contract) July 19, 2022 J - 58 6/23/2022 22-016 EXHIBIT E SCOPE OF WORK PAGE 8 OF 8 6/24/2022 TASK 5 (OPTIONAL) 5. Optional Engineering Services Prepare Additional or Special Signal Timing Plans At the option of the City, PHC will prepare time of day signal timing plans for the City funded project intersections and/or additional time of day signal timing plans for grant funded project intersections as a supplemental task. Fees for this task will be estimated as part of supplement to base contract as applicable. Prepare Additional Temporary Traffic Control Plans At the option of the City, PHC will prepare temporary traffic plans for the City funded project intersections and/or additional temporary traffic control plans for grant funded project intersections as a supplemental task. Scope and fees for this task will be estimated as part of supplement to base contract as applicable. (Not in Contract) July 19, 2022 J - 59 Project: Port Angeles Signal Controller Upgrades - Preliminary Engineering Direct Salary Cost (DSC): Classification Man Hours =Rate =Cost Principal 10 X $90.00 $900.00 Senior Traffic Engineer 236 X $65.00 $15,340.00 Project Engineer 4 X $55.00 $220.00 Associate Engineer 184 X $34.00 $6,256.00 CAD Designer II 0 X $44.00 $0.00 Office Administrator 12 X $32.00 $384.00 X $0.00 X $0.00 X $0.00 X $0.00 Total DSC =$23,100.00 Overhead (OH Cost -- including Salary Additives): OH Rate x DSC of 110.00 % x $$23,100 $25,410.00 Fixed Fee (FF): FF Rate x DSC of 30 % x $$23,100 $6,930.00 Reimbursables: Traffic Count Data $3,810 Mileage/Travel $582.50 Total Reimbursables $4,392.50 Grand Total $59,832.50 Date:7/8/2022 WSDOT Form 140-089 EF Exhibit E Page 1 of 1 Exhibit E-1 Subconsultant Cost Computations Agreement Number: July 19, 2022 J - 60 City of Port Angeles Signal Controller Upgrades Fee Estimate Summary Project No. 22-016 PH Consulting Staff Category Hours Rate Cost Principal 15 $ 90.00 $ 1,350.00 Senior Traffic Engineer 268 $ 65.00 $ 17,420.00 Project Engineer 84 $ 55.00 $ 4,620.00 CAD Designer II 20 $ 44.00 $ 880.00 Associate Engineer 184 $ 34.00 $ 6,256.00 Office Administrator 12 $ 32.00 $ 384.00 Total Hours 583 $ 30,910.00 Direct Labor Cost $ 30,910.00 Overhead Rate @ 110% of Direct Labor $ 34,001.00 Fee @30% of Direct Labor $ 9,273.00 Direct Labor Sub-Total City 16,840.80$ Direct Labor Sub-Total Grant 57,343.20$ Direct Salary Cost $ 74,184.00 Direct Expenses Unit Cost Total Traffic Data/Counts - City 1 2,080.00$ 2,080.00$ Traffic Data/Counts - Grant 1 1,730.00$ 1,730.00$ Reproduction Costs Full Sized Copies (Bond)1 -$ -$ Reprographics 1 -$ -$ Travel (Hotel) - City 1 135.00$ 135.00$ Travel (Hotel) - Grant 1 135.00$ 135.00$ Other Expenses 1 -$ -$ 2022 Mileage Rates - City 250 $0.625/Mi 156.25$ 2022 Mileage Rates - Grant 250 $0.625/Mi 156.25$ Sub-Total Direct Expenses - City $ 2,371.25 Sub-Total Direct Expenses - Grant $ 2,021.25 Sub-Total Project Fee Estimate - City $ 19,212.05 Sub-Total Project Fee Estimate - Grant $ 59,364.45 Total Fee $ 78,576.50 6/23/2022 1 900.00 15,340.00 220.00 0.00 6,256.00 384.00 10 236 4 0 184 12 23,100.00446 23,100.00 25,410.00 6,930.00 38,599.20 55,440.00 40,620.45 59,832.50 7/08/2022July 19, 2022 J - 61 City of Port Angeles Signal Controller Upgrades Task Hour Breakdown Project No. 22-016 Task No.Task Description Principal Senior Traffic Engineer Project Engineer CAD Designer II Associate Engineer Office Administrator Total Direct Rate $ 90.00 $ 65.00 $ 55.00 $ 44.00 $ 34.00 $ 32.00 Hourly Rate $ 216.00 $ 156.00 $ 132.00 $ 105.60 $ 81.60 $ 76.80 1A-Grant Traffic Analysis / Signal Timing Project Management 4 28 4 2 12 50 Existing Conditions 23 23 46 Assess Safety and Operations 40 50 90 Traffic Signal Timing Plans 90%2 52 32 86 Traffic Signal Timing Plans Final 2 26 4 32 Task 1A - Grant Total Hours 8 169 4 0 111 12 304 Subtotal Task 1-Grant $ 1,728.00 $ 26,364.00 $ 528.00 $ - $ 9,057.60 $ 921.60 $ 38,599.20 1B-City Traffic Analysis / Signal Timing Project Management 2 4 6 Existing Conditions 23 23 46 Assess Safety and Operations 40 50 90 Task 1B - City Total Hours 2 67 0 0 73 0 142 Subtotal Task 1-City $ 432.00 $ 10,452.00 $ - $ - $ 5,956.80 $ - $ 16,840.80 2-Grant 90% Traffic Control Plans 90% TCP 2 12 40 8 62 90% Revised TCP 1 12 24 8 45 Task 2 Total Hours 3 24 64 16 0 0 107 Subtotal Task 2-Grant $ 648.00 $ 3,744.00 $ 8,448.00 $ 1,689.60 $ - $ - $ 14,529.60 3-Grant Final Bid Documents - Traffic Control Plans Final TCP 2 8 16 4 30 Task 3 Total Hours 2 8 16 4 0 0 30 Subtotal Task 3-Grant $ 432.00 $ 1,248.00 $ 2,112.00 $ 422.40 $ - $ - $ 4,214.40 4-Grant Construction Phase Services (Future) Timing Implementation Support 0 Task 4-Grant Total Hours 0 0 0 0 0 0 0 Subtotal Task 4-Grant $ - $ - $ - $ - $ - $ - $ - 5-(TBD) Optional Engineering Services Special Timing Plans, TOD Timing Plans 0 Traffic Control Plans 0 Task 6.0 Total Hours 0 0 0 0 0 0 0 Subtotal Task 6.0 $ - $ - $ - $ - $ - $ - $ - PH TOTAL HOURS 15 268 84 20 184 12 583 TOTAL ALL TASKS $ 3,240.00 $ 41,808.00 $ 11,088.00 $ 2,112.00 $ 15,014.40 $ 921.60 $ 74,184.00 6/23/2022 2 (Not in Contract) $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (Not in Contract) 10 236 4 0 184 44612 36,816.002,160.00 528.00 0.00 15,014.40 921.60 55,440.00 7/08/2022July 19, 2022 J - 62 City of Port Angeles Signal Controller Upgrades ANTE Rate Schedule Project No. 22-016 Job Classifications Quality Manager 95.00$ 104.50$ 28.50$ 228.00$ Principal 90.00$ 99.00$ 27.00$ 216.00$ Sr Project Manager 85.00$ 93.50$ 25.50$ 204.00$ Project Manager 80.00$ 88.00$ 24.00$ 192.00$ Senior Traffic Engineer 75.00$ 82.50$ 22.50$ 180.00$ Project Engineer 70.00$ 77.00$ 21.00$ 168.00$ Associate Engineer 55.00$ 60.50$ 16.50$ 132.00$ Assistant Transportation Engineer 50.00$ 55.00$ 15.00$ 120.00$ Senior Construction Manager 65.00$ 71.50$ 19.50$ 156.00$ Construction Manager 55.00$ 60.50$ 16.50$ 132.00$ Construction Inspector 50.00$ 55.00$ 15.00$ 120.00$ Engineering Intern II 27.50$ 30.25$ 8.25$ 66.00$ Engineering Intern I 22.50$ 24.75$ 6.75$ 54.00$ CAD Designer III 55.00$ 60.50$ 16.50$ 132.00$ CAD Designer II 50.00$ 55.00$ 15.00$ 120.00$ CAD Designer I 45.00$ 49.50$ 13.50$ 108.00$ CAD Technician II 40.00$ 44.00$ 12.00$ 96.00$ CAD Technician I 35.00$ 38.50$ 10.50$ 84.00$ Marketing Lead 40.00$ 44.00$ 12.00$ 96.00$ Office Administrator 45.00$ 49.50$ 13.50$ 108.00$ Office Assistant 35.00$ 38.50$ 10.50$ 84.00$ Direct non-salary costs will be billed at actual costs. Direct Mileage will be billed at current approved IRS mileage rate. PH Consulting LLC Summary of Direct Labor Costs Effective January 1, 2022-December 31, 2022 Maximum Direct Labor Rate Safe Harbor Overhead 110% Fixed Fee 30% Maximum Billing Rate 6/23/2022 3July 19, 2022 J - 63 June 29, 2022 Pablo Para PH Consulting, LLC 913 Martin Luther King Jr. Way, Ste A Tacoma, WA 98405-4149 Re: PH Consulting, LLC Safe Harbor Indirect Cost Rate Extension Dear Pablo: Washington State has received approval from our local Federal Highway Administration (FHWA) Division to continue administering the “safe harbor” indirect cost rate program on engineering and design related service contracts, as well as for Local Public Agency projects. We completed our risk assessment for PH Consulting, LLC in January 2017. Our assessment was conducted based on the documentation provided by the firm. The reviewed data included, but was not limited to, a description of the company, basis of accounting, accounting system and the basis of indirect costs. Based on our review, we found the firm eligible to use the Safe Harbor rate. PH Consulting opted to use the Safe Harbor rate, rather than provide a FAR-compliant rate. Based on further review and discussion with the firm, we are issuing an extension of the Safe Harbor Indirect Cost Rate of 110% of direct labor with a field rate, where applicable, of 80% of direct labor for PH Consulting. PH Consulting agreed to improve Internal Controls and timekeeping processes to be able to develop an Indirect Cost Rate Schedule in the future in accordance with the Federal Acquisition Regulations (FAR), Subpart 31. The WSDOT Internal Audit Office has provided guidance and information related to FARs and the AASHTO Audit Guide. You may use the Safe Harbor Rate of 110%, or 80% for field office situations, for agreements entered prior to June 30, 2023. For agreements entered after this date, please contact the WSDOT Consultant Services Office (CSO) or our office for guidance. The Safe Harbor Rate will not be subject to audit. Please coordinate with CSO or your Local Programs contact if you have questions about when to apply the Safe Harbor rate to your agreement. If you have any questions, please contact Steve McKerney or me at (360)705-7003. Sincerely, Schatzie Harvey, CPA Agreement Compliance Audit Manager cc: Steve McKerney, Director of Internal Audit Larry Schofield, MS 47323 File July 19, 2022 J - 64 Agreement Number ____________ Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Exhibit F - Title VI Assurances Appendix A & E APPENDIX A During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the "contractor") agrees as follows: 1.Compliance with Regulations: The contractor (hereinafter includes consultants) will comply with the Acts and the Regulations relative to Non-discrimination in Federally-assisted programs of the U.S. Department of Transportation, (Title of Modal Operating Administration), as they may be amended from time to time, which are herein incorporated by reference and made a part of this contract. 2.Non-discrimination: The contractor, with regard to the work performed by it during the contract, will not discriminate on the grounds of race, color, or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The contractor will not participate directly or indirectly in the discrimination prohibited by the Acts and the Regulations, including employment practices when the contract covers any activity, project, or program set forth in Appendix B of 49 CFR Part 21. [Include Modal Operating Administration specific program requirements.] 3.Solicitations for Subcontracts, Including Procurements of Materials and Equipment: In all solicitations, either by competitive bidding, or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials, or leases of equipment, each potential subcontractor or supplier will be notified by the contractor of the contractor's obligations under this contract and the Acts and the Regulations relative to Non-discrimination on the grounds of race, color, or national origin. [Include Modal Operating Administration specific program requirements.] 4.Information and Reports: The contractor will provide all information and reports required by the Acts, the Regulations, and directives issued pursuant thereto and will permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the Recipient or the (Title of Modal Operating Administration) to be pertinent to ascertain compliance with such Acts, Regulations, and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish the information, the contractor will so certify to the Recipient or the (Title of Modal Operating Administration), as appropriate, and will set forth what efforts it has made to obtain the information. 5.Sanctions for Noncompliance: In the event of a contractor's noncompliance with the Non- discrimination provisions of this contract, the Recipient will impose such contract sanctions as it or the (Title of Modal Operating Administration) may determine to be appropriate, including, but not limited to: a.withholding payments to the contractor under the contract until the contractor complies; and/or b.cancelling, terminating, or suspending a contract, in whole or in part. 6.Incorporation of Provisions: The contractor will include the provisions of paragraphs one through six in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Acts, the Regulations and directives issued pursuant thereto. The contractor will take action with respect to any subcontract or procurement as the Recipient or the (Title of Modal Operating Administration) may direct as a means of enforcing such provisions including sanctions for noncompliance. Provided, that if the contractor becomes involved in, or is threatened with litigation by a subcontractor, or supplier because of such direction, the contractor may request the Recipient to enter into any litigation to protect the interests of the Recipient. In addition, the contractor may request the United States to enter into the litigation to protect the interests of the United States. July 19, 2022 J - 65 Local Agency A&E Professional Services Agreement Number ____________ Negotiated Hourly Rate Consultant Agreement Revised 02/01/2021 Exhibit F - Title VI Assurances Appendix A & E APPENDIX E During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the "contractor") agrees to comply with the following non-discrimination statutes and authorities; including but not limited to: Pertinent Non-Discrimination Authorities: •Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), (prohibits discrimination on the basis of race, color, national origin); and 49 CFR Part 21. •The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. § 4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects); •Federal-Aid Highway Act of 1973, (23 U.S.C. § 324 et seq.), (prohibits discrimination on the basis of sex); •Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended, (prohibits discrimination on the basis of disability); and 49 CFR Part 27; •The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), (prohibits discrimination on the basis of age); •Airport and Airway Improvement Act of 1982, (49 USC § 471, Section 47123), as amended, (prohibits discrimination based on race, creed, color, national origin, or sex); •The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms "programs or activities" to include all of the programs or activities of the Federal-aid recipients, sub-recipients and contractors, whether such programs or activities are Federally funded or not); •Titles II and III of the Americans with Disabilities Act, which prohibit discrimination on the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities (42 U.S.C. §§ 12131-12189) as implemented by Department of Transportation regulations at 49 C.F.R. parts 37 and 38; •The Federal Aviation Administration's Non-discrimination statute (49 U.S.C. § 47123) (prohibits discrimination on the basis of race, color, national origin, and sex); •Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations, which ensures discrimination against minority populations by discouraging programs, policies, and activities with disproportionately high and adverse human health or environmental effects on minority and low-income populations; •Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, and resulting agency guidance, national origin discrimination includes discrimination because of limited English proficiency (LEP). To ensure compliance with Title VI, you must take reasonable steps to ensure that LEP persons have meaningful access to your programs (70 Fed. Reg. at 74087 to 74100); •Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating because of sex in education programs or activities (20 U.S.C. 1681 et seq). July 19, 2022 J - 66 Exhibit G Certification Documents Exhibit G-1(a) Certification of Consultant Exhibit G-1(b) Certification of _Agency______________________________ Exhibit G-2 Certification Regarding Debarment, Suspension and Other Responsibility Matters - Primary Covered Transactions Exhibit G-3 Certification Regarding the Restrictions of the Use of Federal Funds for Lobbying Exhibit G-4 Certificate of Current Cost or Pricing Data Agreement Number: Exhibit G - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 1 of 1 July 19, 2022 J - 67      Exhibit G-1(a)  Certification of Consultant I hereby certify that I am the and duly authorized representative of the firm of whose address is and that neither the above firm nor I have: a) Employed or retained for a commission, percentage, brokerage, contingent fee, or other consideration, any firm or person (other than a bona fide employee working solely for me or the above CONSULTANT) to solicit or secure this AGREEMENT; b) Agreed, as an express or implied condition for obtaining this contract, to employ or retain the services of any firm or person in connection with carrying out this AGREEMENT; or c) Paid, or agreed to pay, to any firm, organization or person (other than a bona fide employee working solely for me or the above CONSULTANT) any fee, contribution, donation, or consideration of any kind for, or in connection with, procuring or carrying out this AGREEMENT; except as hereby expressly stated (if any); I acknowledge that this certificate is to be furnished to the and the Federal Highway Administration, U.S. Department of Transportation in connection with this AGREEMENT involving participation of Federal-aid highway funds, and is subject to applicable State and Federal laws, both criminal and civil. Consultant (Firm Name) Signature (Authorized Official of Consultant) Date Agreement Number: Exhibit G - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 July 19, 2022 J - 68      Exhibit G-1(b)  Certification of I hereby certify that I am the: Other of the , and or its representative has not been required, directly or indirectly as an express or implied condition in connection with obtaining or carrying out this AGREEMENT to: a) Employ or retain, or agree to employ to retain, any firm or person; or b) Pay, or agree to pay, to any firm, person, or organization, any fee, contribution, donation, or consideration of any kind; except as hereby expressly stated (if any): I acknowledge that this certificate is to be furnished to the and the Federal Highway Administration, U.S. Department of Transportation, in connection with this AGREEMENT involving participation of Federal-aid highway funds, and is subject to applicable State and Federal laws, both criminal and civil. Signature Date Agreement Number: Exhibit G - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 July 19, 2022 J - 69               Exhibit G-2 Certification Regarding Debarment, Suspension and Other Responsibility Matters - Primary Covered Transactions I.The prospective primary participant certifies to the best of its knowledge and belief, that it and its principals: A.Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency; B.Have not within a three (3) year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State, or local) transaction or contract under a public transaction; violation of Federal or State anti-trust statues or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property; C.Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State, or local) with commission of any of the offenses enumerated in paragraph (1)(b) of this certification; and D.Have not within a three (3) year period preceding this application / proposal had one or more public transactions (Federal, State and local) terminated for cause or default. II.Where the prospective primary participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. Consultant (Firm Name) Signature (Authorized Official of Consultant) Date Agreement Number: Exhibit G - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 July 19, 2022 J - 70                     Exhibit G-3  Certification Regarding the Restrictions of the Use of Federal Funds for Lobbying The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that: 1.No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or any employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative AGREEMENT, and the extension, continuation, renewal, amendment, or modification of Federal contract, grant, loan or cooperative AGREEMENT. 2.If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan or cooperative AGREEMENT, the undersigned shall complete and submit Standard Form - LLL, “Disclosure Form to Report Lobbying,” in accordance with its instructions. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000.00, and not more than $100,000.00, for each such failure. The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier sub-contracts, which exceed $100,000, and that all such sub-recipients shall certify and disclose accordingly. Consultant (Firm Name) Signature (Authorized Official of Consultant) Date Agreement Number: Exhibit G - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 July 19, 2022 J - 71              Exhibit G-4  Certificate of Current Cost or Pricing Data This is to certify that, to the best of my knowledge and belief, the cost or pricing data (as defined in section 2.101 of the Federal Acquisition Regulation (FAR) and required under FAR subsection 15.403-4) submitted, either actually or by specific identification in writing, to the Contracting Officer or to the Contracting Officer ’s representative in support of * are accurate, complete, and current **as of . This certification includes the cost or pricing data supporting any advance AGREEMENT’s and forward pricing rate AGREEMENT’s between the offer or and the Government that are part of the proposal. Firm: Signature Title Date of Execution***: *Identify the proposal, quotation, request for pricing adjustment, or other submission involved, giving the appropriate identifying number (e.g. project title.) **Insert the day, month, and year, when price negotiations were concluded and price AGREEMENT was reached. ***Insert the day, month, and year, of signing, which should be as close as practicable to the date when the price negotiations were concluded and the contract price was agreed to. Agreement Number: Exhibit G - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 July 19, 2022 J - 72 Exhibit H Liability Insurance Increase To Be Used Only If Insurance Requirements Are Increased The professional liability limit of the CONSULTANT to the AGENCY identified in Section XII, Legal Relations and Insurance of this Agreement is amended to $ . The CONSULTANT shall provide Professional Liability insurance with minimum per occurrence limits in the amount of $ . Such insurance coverage shall be evidenced by one of the following methods: •Certificate of Insurance. •Self-insurance through an irrevocable Letter of Credit from a qualified financial institution. Self-insurance through documentation of a separate fund established exclusively for the payment of professional liability claims, including claim amounts already reserved against the fund, safeguards established for payment from the fund, a copy of the latest annual financial statements, and disclosure of the investment portfolio for those funds. Should the minimum Professional Liability insurance limit required by the AGENCY as specified above exceed $1 million per occurrence or the value of the contract, whichever is greater, then justification shall be submitted to the Federal Highway Administration (FHWA) for approval to increase the minimum insurance limit. If FHWA approval is obtained, the AGENCY may, at its own cost, reimburse the CONSULTANT for the additional professional liability insurance required. Notes: Cost of added insurance requirements: $ .  Include all costs, fee increase, premiums.  This cost shall not be billed against an FHWA funded project. •For final contracts, include this exhibit. Agreement Number: Exhibit H - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 1 of 1 July 19, 2022 J - 73 Exhibit I Alleged Consultant Design Error Procedures The purpose of this exhibit is to establish a procedure to determine if a consultant’s alleged design error is of a nature that exceeds the accepted standard of care. In addition, it will establish a uniform method for the resolution and/or cost recovery procedures in those instances where the agency believes it has suffered some material damage due to the alleged error by the consultant. Step 1 Potential Consultant Design Error(s) is Identified by Agency’s Project Manager At the first indication of potential consultant design error(s), the first step in the process is for the Agency’s project manager to notify the Director of Public Works or Agency Engineer regarding the potential design error(s). For federally funded projects, the Region Local Programs Engineer should be informed and involved in these procedures. (Note: The Director of Public Works or Agency Engineer may appoint an agency staff person other than the project manager, who has not been as directly involved in the project, to be responsible for the remaining steps in these procedures.) Step 2 Project Manager Documents the Alleged Consultant Design Error(s) After discussion of the alleged design error(s) and the magnitude of the alleged error(s), and with the Director of Public Works or Agency Engineer’s concurrence, the project manager obtains more detailed documentation than is normally required on the project. Examples include: all decisions and descriptions of work; photographs, records of labor, materials and equipment. Step 3 Contact the Consultant Regarding the Alleged Design Error(s) If it is determined that there is a need to proceed further, the next step in the process is for the project manager to contact the consultant regarding the alleged design error(s) and the magnitude of the alleged error(s). The project manager and other appropriate agency staff should represent the agency and the consultant should be represented by their project manager and any personnel (including sub-consultants) deemed appropriate for the alleged design error(s) issue. Step 4 Attempt to Resolve Alleged Design Error with Consultant After the meeting(s) with the consultant have been completed regarding the consultant’s alleged design error(s), there are three possible scenarios:  It is determined via mutual agreement that there is not a consultant design error(s). If this is the case, then the process will not proceed beyond this point.  It is determined via mutual agreement that a consultant design error(s) occurred. If this is the case, then the Director of Public Works or Agency Engineer, or their representatives, negotiate a settlement with the consultant. The settlement would be paid to the agency or the amount would be reduced from the consultant’s agreement with the agency for the services on the project in which the design error took place. The agency is to provide LP, through the Region Local Programs Engineer, a summary of the settlement for review and to make adjustments, if any, as to how the settlement affects federal reimbursements. No further action is required.  There is not a mutual agreement regarding the alleged consultant design error(s). The consultant may request that the alleged design error(s) issue be forwarded to the Director of Public Works or Agency Engineer for review. If the Director of Public Works or Agency Engineer, after review with their legal counsel, is not able to reach mutual agreement with the consultant, proceed to Step 5. Agreement Number: Exhibit I - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 1 of 2 July 19, 2022 J - 74 Step 5 Forward Documents to Local Programs For federally funded projects all available information, including costs, should be forwarded through the Region Local Programs Engineer to LP for their review and consultation with the FHWA. LP will meet with representatives of the agency and the consultant to review the alleged design error(s), and attempt to find a resolution to the issue. If necessary, LP will request assistance from the Attorney General’s Office for legal interpretation. LP will also identify how the alleged error(s) affects eligibility of project costs for federal reimbursement.  If mutual agreement is reached, the agency and consultant adjust the scope of work and costs to reflect the agreed upon resolution. LP, in consultation with FHWA, will identify the amount of federal participation in the agreed upon resolution of the issue.  If mutual agreement is not reached, the agency and consultant may seek settlement by arbitration or by litigation. Agreement Number: Exhibit I - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 2 of 2 July 19, 2022 J - 75 Exhibit J Consultant Claim Procedures The purpose of this exhibit is to describe a procedure regarding claim(s) on a consultant agreement. The following procedures should only be utilized on consultant claims greater than $1,000. If the consultant’s claim(s) are a total of $1,000 or less, it would not be cost effective to proceed through the outlined steps. It is suggested that the Director of Public Works or Agency Engineer negotiate a fair and reasonable price for the consultant’s claim(s) that total $1,000 or less. This exhibit will outline the procedures to be followed by the consultant and the agency to consider a potential claim by the consultant. Step 1 Consultant Files a Claim with the Agency Project Manager If the consultant determines that they were requested to perform additional services that were outside of the agreement’s scope of work, they may be entitled to a claim. The first step that must be completed is the request for consideration of the claim to the Agency’s project manager. The consultant’s claim must outline the following: •Summation of hours by classification for each firm that is included in the claim;  Any correspondence that directed the consultant to perform the additional work;  Timeframe of the additional work that was outside of the project scope; •Summary of direct labor dollars, overhead costs, profit and reimbursable costs associated with the additional work; and  Explanation as to why the consultant believes the additional work was outside of the agreement scope of work. Step 2 Review by Agency Personnel Regarding the Consultant’s Claim for Additional Compensation After the consultant has completed step 1, the next step in the process is to forward the request to the Agency’s project manager. The project manager will review the consultant’s claim and will met with the Director of Public Works or Agency Engineer to determine if the Agency agrees with the claim. If the FHWA is participating in the project’s funding, forward a copy of the consultant’s claim and the Agency’s recommendation for federal participation in the claim to the WSDOT Local Programs through the Region Local Programs Engineer. If the claim is not eligible for federal participation, payment will need to be from agency funds. If the Agency project manager, Director of Public Works or Agency Engineer, WSDOT Local Programs (if applicable), and FHWA (if applicable) agree with the consultant’s claim, send a request memo, including backup documentation to the consultant to either supplement the agreement, or create a new agreement for the claim. After the request has been approved, the Agency shall write the supplement and/or new agreement and pay the consultant the amount of the claim. Inform the consultant that the final payment for the agreement is subject to audit. No further action in needed regarding the claim procedures. If the Agency does not agree with the consultant’s claim, proceed to step 3 of the procedures. Agreement Number: Exhibit J - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 1 of 2 July 19, 2022 J - 76 Step 3 Preparation of Support Documentation Regarding Consultant’s Claim(s) If the Agency does not agree with the consultant’s claim, the project manager shall prepare a summary for the Director of Public Works or Agency Engineer that included the following:  Copy of information supplied by the consultant regarding the claim; •Agency’s summation of hours by classification for each firm that should be included in the claim;  Any correspondence that directed the consultant to perform the additional work; •Agency’s summary of direct labor dollars, overhead costs, profit and reimbursable costs associated with the additional work; •Explanation regarding those areas in which the Agency does/does not agree with the consultant’s claim(s);  Explanation to describe what has been instituted to preclude future consultant claim(s); and  Recommendations to resolve the claim. Step 4 Director of Public Works or Agency Engineer Reviews Consultant Claim and Agency Documentation The Director of Public Works or Agency Engineer shall review and administratively approve or disapprove the claim, or portions thereof, which may include getting Agency Council or Commission approval (as appropriate to agency dispute resolution procedures). If the project involves federal participation, obtain concurrence from WSDOT Local Programs and FHWA regarding final settlement of the claim. If the claim is not eligible for federal participation, payment will need to be from agency funds. Step 5 Informing Consultant of Decision Regarding the Claim The Director of Public Works or Agency Engineer shall notify (in writing) the consultant of their final decision regarding the consultant’s claim(s). Include the final dollar amount of the accepted claim(s) and rationale utilized for the decision. Step 6 Preparation of Supplement or New Agreement for the Consultant’s Claim(s) The agency shall write the supplement and/or new agreement and pay the consultant the amount of the claim. Inform the consultant that the final payment for the agreement is subject to audit. Agreement Number: Exhibit J - Local Agency A&E Professional Services Cost Plus Fixed Fee Consultant Agreement Revised 02/01/2021 Page 2 of 2 July 19, 2022 J - 77 Date: July 19, 2022 To: City Council From: Nathan A. West, City Manager William Bloor, City Attorney Thomas Hunter, Director of Public Works & Utilities Subject: Amendment to Water Contract between City of Port Angeles and McKinley Paper Company Background / Analysis: The City of Port Angeles is party to a 30-year water agreement now held by McKinley Paper Company (McKinley). The original agreement expired on January 1, 2020. McKinley and Port Angeles have extended the agreement in 2020 and 2021 due to the pandemic and McKinley’s work in updating the plant. The continuing effects of the pandemic and continued needed analysis have again prevented the parties from completing negotiations, and another extension is needed. Substantial changes have occurred to the City’s industrial water system and the costs associated with purveying industrial water supply. Both parties now agree that an additional extension is necessary and appropriate. This twelve-month extension will provide time to adequately re-negotiate the agreement to meet the needs of both McKinley and the City Water Utility. Additionally, the extension provides: Adequate time for both parties to recover from the impact of the pandemic; Flexibility for the City and McKinley to finalize negotiations with Bonneville Power Association for a long-term power agreement; and The opportunity for the City to continue studying the costs and obligations associated with operating and maintaining the Elwha Industrial Water Facility inherited by the City in August of 2018. The attached amendment to the water contract will allow for a twelve-month extension of the existing agreement. Funding Overview: The twelve-month extension of this agreement is consistent with 2022 Budget revenues. Summary: The current water contract between the City of Port Angeles and the McKinley Paper Company expires July 31, 2022. The parties have been negotiating terms for a new contract, but they will not be able to complete those negotiations before the current contract expires. The parties mutually propose a twelve-month extension to provide additional time to negotiate a new water contract. Funding: The twelve-month extension of this Contract is consistent with 2022 Budget revenues. Recommendation: Approve an amendment to the McKinley Paper Company Water contract for a twelve-month extension and authorize the City Manager to execute and to make minor modifications to the agreement, as necessary. July 19, 2022 J - 78 1 2022 AMENDMENT TO WATER CONTRACT between CITY OF PORT ANGELES and McKINLEY PAPER COMPANY This Amendment is entered into on this ____ day of July, 2022, by and between the City of Port Angeles, a non-charter code city and municipal corporation of the State of Washington (hereinafter referred to as City), and McKinley Paper Company, a New Mexico corporation licensed to conduct business in the state of Washington (McKinley). In consideration of the covenants and promises set forth herein, the parties hereto agree as follows: 1.On December 5, 1989 the City, Daishowa America, and ITT Rayonier entered into a 30-year agreement (the Water Supply Contract) by which the City sold untreated water to the Daishowa America and ITT Rayonier. 2.The Water Supply Contract has been amended. As amended, and all rights and duties of Daishowa America and ITT Rayonier have been assigned and delegated to McKinley and the Water Supply Contract expires on July 31, 2022. 3.The parties intend to negotiate a new agreement to replace the Water Supply Contract. However, the parties acknowledge that significant changes have occurred since the Water Supply Contract was negotiated in 1989. In addition, their negotiations have been impeded by the COVID-19 pandemic. As a result, they will not have sufficient time prior to the expiration of the Water Supply Contract to negotiate a new agreement. 4.Therefore, to allow additional time to negotiate a new agreement, the City and McKinley Paper Company agree to, and do hereby, extend the term of the Water Supply Contract; and by this agreement the parties do amend the Water Supply Contract to extend its term through July 31, 2023. 5.All other terms of the original Water Supply Contract are confirmed, ratified, and remain unchanged. IN WITNESS WHEREOF, the parties hereto have executed this contract to be effective as of the date and year indicated below. CITY OF PORT ANGELES MCKINLEY PAPER COMPANY, a New Mexico Corporation By__________________________________ By:__________________________________ Nathan West, City Manager Print Name: __________________________ Dated: ______________________________ Dated: _______________________________ ATTEST: APPROVED AS TO FORM: ____________________________________ ____________________________________ Kari Martinez-Bailey, City Clerk William E. Bloor, City Attorney July 19, 2022 J - 79 Date: July 19, 2022 To: City Council From: Thomas Hunter, Director of Public Works and Utilities Brian Smith, Chief of Police Subject: Equipment Purchase – Replacement of Police Vehicles Background / Analysis: The purchase of the Police patrol vehicles continues the City practice in establishing a standardized fleet to meet the working conditions and safety needs of the Police patrol unit. It is necessary to replace Police vehicles 911, 1210, and 1411 in 2022 to ensure the Police fleet remains reliable, safe and efficient. These new Police patrol vehicles will replace two 2005 Ford Crown Victoria Police vehicles with a combined mileage of 264,400 miles and a 2004 Ford Crown Victoria vehicle with 88,390 miles. Funding Overview: The 2022 budget includes $157,500.00 for the purchase of three new Police patrol vehicles, including applicable tax and accessories. Summary: The 2022 budget includes funds to procure three marked patrol cars for the Police Department. Through the City’s membership with the Washington State Purchasing Cooperative (WSPC), Northsound Dwayne Lane’s Auto Dealership was selected from the cooperative vendor list, Contract No. 05916. Funding: These vehicle purchases and replacements are identified in the 2022 budget and are included in the 2022 Capital Facilities Plan. Pricing from the Washington State Purchasing Cooperative (WSPC) contract is summarized below: WSPC Bid Purchase Contract (WSPC Bid Prices Include Sales Tax) New Vehicle Type Vehicle Budget State Bid Accessories Replacing Vehicle 2022 Dodge Charger $52,500 $32,326.07 $20,173.93 911, 2005 Ford Crown Victoria 2022 Dodge Charger $52,500 $32,326.07 $20,173.93 1210, 2010 Ford Crown Victoria 2022 Dodge Charger $52,500 $32,326.07 $20,173.93 1411, 2005 Ford Crown Victoria Total Cost $157,500 Recommendation: 1.Approve and authorize the City Manager to sign a contract for the purchase and outfitting of three police patrol vehicles. 2.Approve and authorize the City Manager to make minor modifications to the purchase contract if necessary. 3.Approve and authorize the city Manager to surplus vehicles 911, 1210 and 1411, once the new police vehicles are placed into service. July 19, 2022 J - 80 Date: July 19, 2022 To: Mayor Dexter, Deputy Mayor Meyer, Councilmember Carr, Councilmember French, Councilmember McCaughan, Councilmember Schromen-Wawrin, Councilmember Suggs From: Sarina Carrizosa, Finance Director Subject: Monthly Update on Past Due Utility Accounts - June APRIL 2022 MAY 2022 JUNE 2022 AMOUNT CHANGE % CHANGE MAY - JUNE Number of Customers Past Due 1,649 1,479 1,474 (5) -0.34% Number of Disconnections for Non-payment - - - - N/A 60 days past due amount 333,740.80 215,751.00 206,017.10 (9,733.90) -4.51% 90 days past due amount 206,087.72 172,365.00 131,723.33 (40,641.67) -23.58% 120 days past due amount 1,324,266.46 1,333,068.00 1,307,352.41 (25,715.59) -1.93% Total amount past due 1,864,094.98 1,721,184.00 1,645,092.84 (76,091.16) -4.42% Total Additional Payment Plan Agreements 113 87 39 (48) -55.17% CITY OF PORT ANGELES MONTHLY REPORT ON PAST DUE ACCOUNTS MAY 2022 - JUNE 2022 -25.0% -20.0% -15.0% -10.0% -5.0% 0.0% - 200,000 400,000 600,000 800,000 1,000,000 1,200,000 1,400,000 1,600,000 1,800,000 2,000,000 60 days past due amount 90 days past due amount 120 days past due amount Total amount past due MAY 2022 -JUNE 2022 PAST DUE AMOUNTS MAY 2022 JUNE 2022 % CHANGE MAY - JUNE L - 1July 19, 2022 Date: July 19, 2022 To: Mayor Dexter, Deputy Mayor Meyer, Councilmember Carr, Councilmember French, Councilmember McCaughan, Councilmember Schromen-Wawrin, Councilmember Suggs Cc: City Manager West, Attorney Bloor, Chief Smith, Interim Chief Sanders, Director Hunter, Director Delikat From: Sarina Carrizosa, Finance Director Subject: 2021 Year-End Financial Report (unaudited) This report provides an overview of the year-to-date financial information for 2021, along with comparatives to previous years’ data. High level information will be included in this report, with specific financial reports provided as a supplemental attachment for your reference when reviewing this report. Please note the City’s audit is not complete and therefore there is potential for the reports to change. Additionally, specific information on spending and revenue information can also be found on the Open Budget portal of the City’s website here: http://openbudget.cityofpa.us/#!/year/default, or by clicking on the “Open Data and Public Records” icon on the City’s website and following the link for “Open Budget.” For easy reference the “Budget at a Glance” chart demonstrates the percent change for each major fund at year-end compared to the amended 2021 Budget. Revenue changes highlighted in green indicate the year-end surpassed, budget expectations. Expenditure items in green were at or below budget at the end of 2021. Items highlighted in red exceeded budgeted expenses or did not meet revenue expectations. When reviewing year- end amounts attention to overall revenues less expenditures is the best way to determine fund stability. For example, if revenues are greater than, or equal to expenditures the fund balance will increase, or remain the same. However, if expenditures exceed revenues the fund balance will be impacted negatively. Citywide Funds: While the 2021 year demonstrated many promises of the return to historical trends and the ability to re-prioritize projects and services that had been delayed or on-hold due COVID pandemic restrictions many challenges remained. City staff continued to prioritize the needs of our community in any way possible, including continuing fee waivers and financial relief while balancing internal needs relative to capacity. Sound policies and financial 2.88% 9.11% LODGING TAX FUND -109.06% 2.07% STREET FUND -0.62% 6.22% REET I & II COMBINED -107.84% 1.38% PENCOM FUND -23.50% 6.64% PORT ANGELES HOUSING FUND 48.93% 63.03% 1.49% 0.09% ELECTRIC UTILITY FUND -2.42% 2.57% WATER UTILITY FUND 4.35% 10.01% WASTEWATER UTILITY FUND -0.81% 4.55% SOLID WASTE UTILITY FUND -2.12% 3.22% STORMWATER UTILITY FUND 4.19% 7.81% MEDIC 1 UTILITY FUND 1.56% 6.89% HARBOR CLEAN-UP FUND 59.26% 56.03% CONSERVATION FUND 22.62% -0.91% EQUIPMENT SERVICES 1.52% 71.09% INFORMATION TECHNOLOGY 2.76% 13.90% 11.40% 10.04% GOVERNMENTAL CAPITAL FUNDS 29.84% 66.12% TRANSPORTATION BENEFIT DISTRICT 49.10% 34.81% UTILITY CAPITAL PROJECTS 8.82% 31.11% TOTAL CITYWIDE ALL FUNDS 10.44% 17.72% % CHANGE 2021 ACTUAL TO BUDGET BUDGET AT A GLANCE REVENUE EXPENSES GENERAL FUND DEBT SERVICE FUNDS - COMBINED SELF-INSURANCE L - 2July 19, 2022 2021 Year- E nd Financial Report Page | 2 decisions eased this process and assured staff and our community that the City would remain available to provide assistance as the difficulties and lasting impacts of the pandemic remained. These impacts can directly be seen in the year-end report and it is through the hard efforts of City Council and Staff that the 2021 Budget completed the year in firm financial footing. Though overall revenue collection was less than anticipated this was largely due to grants for capital projects that were not realized and investment interest earned falling significantly below budget expectations due to market conditions that were unfavorable by year end. However, there were many areas to celebrate in the budget including the return to tax revenue to above historical levels. This was particularly true in the Lodging Tax fund that saw the highest level of collection of any year on record and more than double the revenue budget expectations. Commercial usage and consumption also saw typical patterns for collection after more than a year of revenue shortfalls in this area. The careful planning that went into the 2021 Budget process considered conservative revenue projections and stringent expenditure budgets that continued to meet the needs of the Port Angeles community allowed operating funds to remain balanced without depleting City reserves. Revenue trends are discussed in more detail throughout this report and a major revenue chart is included at the bottom of this section for easy comparison of budget to actual amounts for these revenue sources. Expenditures Citywide saw similar patterns of savings in personnel costs, as well as less spending in travel and training, utilities expenses, repairs and maintenance and project spending. Funds that were primarily capital in nature saw many projects carry into 2022, with corresponding grant revenue reimbursement delayed as a result. Though the City’s budget is fiscally sound many factors are still at the forefront of any decision making process including any long-terms effects from the pandemic, inflation and present economic conditions. All of which will require continual monitoring to ensure sustainability and growth of services. At this time it is crucial that the City approaches new spending and any financial changes in a thoughtful manner to keep the foundation that years of commitment and dedication built in place. $4,786,700 $3,363,600 $4,391,500 $303,100 $473,200 $263,500 $762,100 $349,100 $932,400 $534,700 $395,600 $26,739,100 $6,055,900 $6,761,300 $4,627,400 $7,646,900 $2,504,000 $2,072,400 $10,526,000 $1,565,300 $4,833,873 $4,549,363 $4,672,981 $435,711 $405,000 $241,986 $1,024,268 $509,338 $1,587,307 $1,111,342 $359,395 $27,862,596 $6,155,375 $6,908,659 $4,681,110 $8,159,967 $2,491,512 $2,193,449 $4,993,365 $(846,202)2021 MAJOR REVENUE -BUDGET VS. ACTUAL 2021 Budget 2021 Actual - Estimate L - 3July 19, 2022 2021 Year- E nd Financial Report Page | 3 General Fund: Revenues – General Fund revenues fell short of projections in all major categories except for taxes. Resulting in an overall decrease as compared to the budget by 2.9% at the end of the year. The revenue shortfall in the General Fund was relative to funds received from the American Rescue Plan Act (ARPA). The City received $2.8 million in ARPA funding in 2021. At the end of the year approximately $1.9 million of this funding had been unexpended and was moved to a liability account until expenditures occur. This resulted in lower-than-expected revenue collection in the General Fund at the end of the year. Additionally, interest earned on investments also saw lower revenue than anticipated due to unfavorable market conditions in 2021. This trend is expected to continue into 2022. However, expenditures at year-end did not exceed revenues despite the lower- than-expected revenue collection, allowing this fund to remain stable in 2021. Each major revenue source in the General Fund is discussed further below. Property taxes – Property tax collections were slightly higher than anticipated for the year. The City received $47,173 more tax in this area than expected due to revenues from new construction. Sales Taxes – City sales taxes for a 12-month basis are well over revenue expectations at year-end. Regular City sales taxes are 35.3%, or $1,185,763, over budget for the year. An increase of 17.5% from the 12-month period prior. Increases to tax revenue were mainly in the retail sales, including online sales, accommodation and food services and technology services categories. Retail sales and accommodation services were significantly impacted by the pandemic in 2020; however, these categories have returned to historical levels in 2021. Online spending has remained high despite the increase to the overall retail sales category. This area increased 63.5% as compared to 2020. Sales tax trend changes by category in 2021 as compared to 2020 are indicated below:  Retail Trade increased 9.1%  Construction decreased 2.0%  Accommodation and Food Services increased 37.8%  Wholesale Trade increased 16.3%  Manufacturing increased 167.7%  Other services increased 10.9%  Information increased 12.2% Utility Taxes –  Utility taxes collected in the electric, water, solid waste transfer station and stormwater utilities all finished the year above budget expectations, a total of $290,056, or 9.4% over budget collectively. This was related to overall usage from residential and commercial customers returning to pre-pandemic levels.  The Solid Waste collections and Wastewater utility tax fell below budget projections slightly, $8,575 (0.7%); however, this is not concerning at this time when compared to total budget estimates. Telephone Tax –This tax has seen unsteady changes in the last several years due to the effects of households switching from landlines to cell phones, making the tax collection highly unpredictable. Collection in 2021 once again saw a decrease as compared to the budget. This revenue fell short of budget expectations by $112,367, or 23.6% lower as compared to 2020. Since 2011 this revenue source has declined 63.3% ($323,900), or an average yearly revenue loss of $154,900 as compared to 10 years ago. Charges for Goods and Services – In the General Fund allocations make up the majority of charges for goods and services. Lower staffing levels from vacancies as well as decreased spending resulted in $151,129, or 3.3%, less being allocated to utilities at the end of the year than was projected in the budget. L - 4July 19, 2022 2021 Year- E nd Financial Report Page | 4 Building Permits and Fees – In 2021, revenue collection from permits slightly exceeded budget by 0.05%. This is a good indicator that impacts from the pandemic relative to development have dissipated. Parks and Recreation Fees and Rental Income – Revenue collection for event fees and facility rentals in the Parks and Recreation department was one of the most significantly impacted areas of the City’s budget in 2020, this carried into the first quarter of 2021, but as the year progressed activity increased and this area of the budget met expectations with the exception of sporting event fees, which fell below anticipated collection amounts. In total the year ended 27.3% lower than budget expectations. It is expected that in 2022 this revenue will return to historical levels. Expenditures  Total expenditures for the General Fund were $1,807,321, or 7.3%, below budget. This was due primarily to continued staffing vacancies in multiple departments as well as corresponding decreases to services for sporting events and facilities as well as decreases in expected spending associated with the ARPA funding.  The General Fund revenues less expenditures ended the year with an estimated net decrease in fund balance of $453,949 as a result of planned spending of excess fund balance on one- time projects. This brought the fund balance to an estimated 42.7% at year end. (Please note that approximately $2.0 million from General Fund reserves is planned for use on one- time projects in the 2022 Budget, this includes carry over of grant and project spending from 2022 Budget and will reduce the total percentage of the General Fund reserve in the amended 2022 to an estimated 33.9%.) Additionally, any further excess fund balance spending should be carefully considered until more about the long-term effects of the pandemic and current world events are known. The chart below shows the change in expenditures comparing the 2021 Budget to actual amounts for each department in the General Fund. $71,500 $928,300 $2,992,400 $1,446,400 $1,561,200 $6,930,300 $2,325,000 $2,180,000 $3,679,100 $2,695,300 $57,490 $880,034 $2,899,108 $1,426,588 $1,484,800 $6,357,626 $2,344,900 $2,041,287 $3,343,837 $2,166,509 GENERAL FUND EXPENDITURES BY DEPARTMENT BUDGET VS. ACTUAL 2021 Budget 2021 Actual L - 5July 19, 2022 2021 Year- E nd Financial Report Page | 5 Special Revenue Funds: Lodging Tax Fund #101 – The COVID-19 pandemic heavily impacted this fund in 2020. Early in 2021 indicators showed the tax collection would be higher than budget expectations; however, these indicators were far exceeded with lodging tax collection ending the year 109.1% over budget with total tax collection of $1,009,843. This is the highest collection year on record for this revenue source. Expenditures were slightly lower than estimates primarily due to events that were cancelled. Street Fund #102 - Revenues in the Street fund came in $10,599 higher than anticipated in the budget due to unexpected interdepartmental charges to other funds for services performed by the Street Department. However, motor vehicle fuel tax, a significant revenue source in this fund, fell 9.2% below the budget. This has occurred for several years and is concerning because the General Fund subsidizes the street fund to maintain a 25% fund balance. Expenses ended the year $109,813 under budget due to savings in personnel costs and repairs and maintenance. The net of the revenues and expenditures is estimated at $64,414. This means the Street fund balance will not be negatively impacted and the 25% fund balance requirement will remain in place keeping this fund stable. Real Estate Excise Tax #1 & #2 (REET#1 & REET#2) – Revenues in both REET funds combined completed the year $576,642 over budget. This is the seventh year this collection has remained higher than budget. Expenditures consist of transfers approved for debt and capital and as a result are fully expended for the year. PenCom #107 – Revenue in the PenCom fund at year-end was well above the budget projections with $669,993 collected over budget expectations largely due to the county wide sales tax collection for 911 services finishing the year 70.2% over budget. PenCom revenues for capital reimbursement were also above budget due to reimbursement from Jefferson County for shared projects in 2021. Expenditures continue to be under budget largely due to extremely low staffing levels in PenCom. Year-end expenses were $226,771, or 6.6% under budget at year end. Business Improvement Fund #165 – This fund is used to collect revenues for parking and downtown improvements. The number of businesses downtown and the amount of the recurring charges varies very little, however, in 2021 Council approved a waiver of business fees for the first two quarters of the year to alleviate financial burden caused by pandemic impacts and as a result this revenue did not meet budget expectations. There was no spending in this fund in 2021. Port Angeles Housing Fund #172 – This fund is used to finance housing rehabilitation and building for low-income residents in the City limits. Additionally, the tax collected, and expenses associated with affordable housing are also tracked in this fund. While under budget in revenues and expenditures, these amounts are related to contracts and resulting CDBG grants that will carry into the 2022 Budget for funding to support our community with COVID related assistance. The affordable housing sales tax collection exceeded expectations by 45.9% with a total collection amount of $509,337. Code Compliance Enforcement Fund #175 – This fund accounts for actions taken by the City regarding blighted properties. A $50,000 transfer from the General Fund was used as a start-up for the fund. In 2021, there was little activity associated with this fund and as a result this fund was within the budget projections at the end of the year. L - 6July 19, 2022 2021 Year- E nd Financial Report Page | 6 Debt Service Funds: 2016 LTGO Fund #215 – Property acquisition for the parking structure (Niichel property) carried a $1 million balloon payment due in 2021. In 2020, the General Fund transferred $350,000 in anticipation of this payment. This payment was made in March of 2021 as scheduled and completes the debt associated with this property. This fund was closed as part of the year-end process in 2021. LTGO Bond Fund #216 – This bond provided capital for the Landfill Bluff Stabilization Project. While considered a governmental debt, the debt service is paid with a transfer from the Solid Waste Fund. As a result, this fund ended the year on budget for expenditures with revenues falling below expectations due to investment interest collections coming in below budget. LTGO Bond Fund #217 – This refunding bond provided funding to extend service into the Western Urban Growth Area (WUGA). Approximately 82% of the total debt service is paid by Electric, Water, and Wastewater utilities. With the remaining 18% coming from the General Fund. As revenues consist of transfers in and expenditures only consist of principal and interest payments the year ended on target. General Government Capital Projects Funds: Capital Improvement Fund #310 – Due to changing priorities capital projects do not follow a spending pattern from year to year. This trend was particularly evident in 2020 as the pandemic shifted City priorities and hindered the City’s ability to obtain needed supplies and services for the completion of these projects. Staffing capacity to complete projects is also a critical element in this fund. Though projects began to resume in 2021 there were still lingering pandemic related impacts that prevented projects from moving forward as planned and contributed to a backlog that resulted in carrying projects into the 2022 Budget at the end of the 2021 year. In this fund revenues fell short by 30.9% due to unreceived grant funding that was expected in the budget for the Erickson Pump Track. Spending was also below budget due to unfinished capital projects that will carry into 2022. Funding for each project approved in the 2021 Budget will be held in reserves and carried into 2022 for use on these unfinished projects. Transportation Benefit District #312 – Tax collection in the Transportation Benefit District (TBD) was 50.9% under collected in 2021 largely due to grant revenue that has not yet been received for the Race Street project. This grant will carry into 2022 for project completion. However, the TBD tax collected exceeded budget expectations by 34.4% ($262,138). Spending in this fund was below budget by $1,526,012, or 34.8% due to projects that were delayed due to backlog that was caused by the pandemic. The funding for these unfinished projects remains in this fund for completion and were included in the first budget amendment to the 2022 Budget. Parks Capital Fund #316 – Revenues in this fund exceeded budget expectations by 33.0% due to an increase in facility rental fees collected after more than a year of lower collection in this area that resulted from the pandemic. This change is an indicator that pandemic related impacts are beginning to slowdown. There were no planned expenditures in this fund in 2021. Utilities and Enterprise Funds: Electric Fund #401 – Revenues in the Electric fund ended the year 2.4% over budget as a result of increased consumption by the City’s industrial customer. Consumption by this customer increased 353% as compared to the previous year. Additionally, revenue collection continued to L - 7July 19, 2022 2021 Year- E nd Financial Report Page | 7 follow an untypical trend in this utility fund as seen in 2020 where residential consumption exceeded budget expectations by 3.7% at the end of the year. Commercial collection combined remained in line with the budget projections. Expenditures were 2.6% under budget due to continued personnel vacancies in 2021. Water Fund #402 – Revenues finished the year in the water fund slightly under budget (4.4%) as a result of investment earnings falling below budget expectations due to unfavorable market conditions. As noted in the Electric fund residential usage was higher than budget expectations (2.6%) while commercial met budget expectations in the water fund as well. Expenditures were 10.0% below budget as a result of savings from minor repairs and maintenance, charges from the General Fund for services rendered and professional services in the industrial water division. Wastewater Fund #403 – Revenues were over budget ($58,437) in 2021 due to higher collection for services than expected despite a significant decrease of investment income as compared to expected budget. Similar to 2020 revenue collection for residential usage remained higher than expected with commercial usage falling below budget projections in 2021. Expenditures were under budget by 5.2% ($326,184) due to savings in administrative services charged by the General Fund for services provided, as well as staffing vacancies. Solid Waste Fund #404 – Revenue in the Solid Waste fund ended the year over budget primarily as a result of higher volumes of waste brought into the Transfer Station. Revenue in this fund ended the year $266,181, or 2.1% higher than budget expectations. Expenditures in the Solid Waste Fund were 3.2% below budget largely due to unspent professional services in the Post Closure division. Stormwater Fund #406 –The City received 4.2% ($109,299) less revenue than budgeted in this fund primarily due to investment interest earned falling 73.9% below revenue projections. Expenditures were also under budget by 7.8% ($216,920), due to lower repairs and maintenance and less utility expenses than anticipated. Medic 1 Fund #409 – Revenues were slightly above budget by 1.56% ($47,899) at the end of 2021 due to increased transport services. Expenditures finished the year under budget ($221,669) due to staffing vacancies. Harbor Clean -Up Fund #413 –This fund includes insurance coverage for the majority of costs associated with the Harbor Remedial Investigation/Feasibility Study. Expenses are paid with insurance reimbursement following, resulting in timing differences. Revenues and expenditures were significantly under budget at the end of 2021 indicating both invoices and reimbursements for this project are behind. Conservation Fund #421 – Contract payments from Bonneville Power Association for conservation activities make up nearly 100% of the revenue for this fund. This revenue is tied to the amount of power purchased. At year-end revenues were 22.6% ($80,435) lower than expected and expenses were 0.9% over budget due to higher than anticipated spending for incentives. Utilities Capital Funds: All Capital Utility funds –  Revenues in Electric, Water, Wastewater and Stormwater capital funds are the result of a funding transfers from each of the pertaining utilities. Solid Waste and CSO capital funds also receive a surcharge to pay for debt service in addition to the transfer from the utilities. Transfers are made in each budget year regardless of spending to keep rates stable and L - 8July 19, 2022 2021 Year- E nd Financial Report Page | 8 predictable. It is not uncommon for revenues to stay in reserves until a project is fully funded and ready for implementation. Due to the transfer of funds on a yearly basis revenue in these funds are in line with the budget expectations. The Electric and Solid Waste capital budgets also included expected grant funding in 2021. This funding was for projects that carried at the end of the year and as a result the grants were not received for reimbursement in 2021.  The Solid Waste and CSO surcharges continue to see higher collection then expected which may result in the ability to pay the debt associated with the surcharges off early. This will be closely monitored moving.  All projects included in the budget are approved in the Capital Facilities Plan.  All utility capital funds were well under anticipated spending, indicating unfinished projects will carry into the 2022 Budget. The effects of the pandemic continue to play a role in the City’s ability to complete projects as does staffing capacity. Many supplies and services needed to finish these projects continue to be unavailable or significantly delayed, which resulted in capital projects being unable to move forward as scheduled. Internal Service Funds: Equipment Service Fund #501 – Revenues ended the year slightly below budget due to unfavorable investment earnings resulting from current market conditions that ended the year $45,605 below budget. Expenditures finished the year significantly under budget due to capital vehicle replacements that were carried into 2022 due to delays in manufacturing that have occurred since the start of the pandemic. Information Technology Fund #502 – Revenues and expenditures were both under budget in 2021. The IT fund charges other departments for the expenditures incurred while operating and maintaining the City’s IT infrastructure therefore if expenses did not occur the actual charges to other departments will be adjusted accordingly at year-end. In 2021, savings were realized as compared to the budget due to carrying several IT capital projects into 2022. Self-Insurance Fund #503 – This fund accounts for property/casualty insurance, workers compensation, and health insurance coverage. Revenues and expenditures were both under budget at the end of the 2021 budget year. Similar to the IT Fund, this fund only spends amounts collected by other funds for services and as result the revenues and expenses are linked. The savings in 2021 was the result of unspent budget for employee insurance due to staffing vacancies. Permanent & Trust Funds: Cemetery Endowment Fund #601 – A portion of the purchase price for gravesites is collected and placed in this fund for maintenance of the cemetery after it is at capacity. Capacity is not expected to be reached for many years. Revenues in 2021 primarily consisted of investment interest earned. Due to unfavorable market conditions in the last year interest collected finished the year negatively, or $2,453 below the anticipated budget. Firemen’s Pension Fund #602 – This fund pays for retired pre-LEOFF employee medical and salary costs based on existing agreements. As of December 31, 2021, the fund had two former employees and one surviving spouse covered by this plan. In 2021, the investment earnings in this fund greatly exceeded expectations, by $54,149. Spending was also considerably less than the projected budget due to expected long-term care costs that were included in the budget but were not needed. The result of which moved $35,413 into the fund balance at the end of the year. L - 9July 19, 2022 CITY of PORT ANGELES Q4-2021 Budget Status Report - Data & Graph Attachment 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 Budget Budget CITYWIDE REVENUE Actual YTD Actual YTD Actual YTD Amend #3 Actual YTD Remain. $Remain. % Taxes 16,723,086 16,209,994 16,650,475 15,665,300 18,907,074 (3,241,774)-20.69% Licenses & Permits 632,096 909,553 618,859 731,100 609,047 122,053 16.69% Intergovernmental Rev.6,295,690 6,570,103 7,289,855 14,263,800 7,707,719 6,556,081 45.96% Charges for Goods/Svcs.65,102,190 65,895,164 65,807,840 69,843,100 71,950,423 (2,107,323)-3.02% Fines & Penalties 5,735 1,779 1,590 3,000 695 2,305 76.83% Miscellaneous Revenue 15,630,006 10,827,787 10,844,704 10,951,300 5,522,115 5,429,185 49.58% Prop./Trust Other Income 288,365 147,451 197,055 170,000 108,967 61,033 35.90% Other Financing Sources 8,386,600 10,363,876 10,755,574 12,926,000 12,735,488 190,512 1.47% TOTAL Citywide Revenue $113,063,768 $110,925,707 $112,165,952 $124,553,600 $117,541,528 $7,012,072 5.63% Variance from Prior Yr. - $$9,286,213 ($2,138,061)$1,240,245 $5,375,576 Variance from Prior Yr. - %8.95%-1.89%1.12%4.79% 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 Budget Budget CITYWIDE EXPENDITURES Actual YTD Actual YTD Actual YTD Amend #3 Actual YTD Remain. $Remain. % Salaries & Wages 18,311,845 18,706,967 19,114,903 21,963,300 21,069,698 893,602 4.07% Personnel Benefits 7,625,881 7,702,899 7,417,187 8,672,800 7,750,393 922,407 10.64% Supplies 13,924,046 13,711,952 14,257,709 19,138,100 18,586,655 551,445 2.88% Services 36,191,933 36,304,897 36,289,437 43,031,600 38,403,813 4,627,787 10.75% Intergov'tl. Svcs./Pmts.10,277,464 11,265,506 12,324,589 13,969,200 12,793,257 1,175,943 8.42% Capital Outlay 7,047,180 3,518,409 4,169,458 18,475,800 8,052,013 10,423,787 56.42% Debt Service: Principal 3,872,894 4,480,634 8,134,875 5,144,300 5,144,091 209 0.00% Debt Service: Int./Other 2,485,609 2,244,026 2,130,320 1,841,700 1,958,336 (116,636)-6.33% Other Financing Sources 228,907 210,605 249,541 5,987,700 314,682 5,673,018 94.74% TOTAL Citywide Expenditures $99,965,759 $98,145,895 $104,088,019 $138,224,500 $114,072,938 $24,151,562 17.47% Variance from Prior Yr. - $$1,263,451 ($1,819,864)$5,942,124 $9,984,919 Variance from Prior Yr. - %1.28%-1.82%6.05%9.59% -50% 50% 150% 250% 350% 450% 550% 650% 750% - 2,000,000 4,000,000 6,000,000 8,000,000 10,000,000 12,000,000 14,000,000 16,000,000 18,000,000 MAJOR FUNDS -ESTIMATED YEAR-END FUND BALANCES Unassigned Fund/Cash Balance Fund/Cash Balance required % of 2021 Expenditures Fund Balance Target % 1 of 17 L - 10July 19, 2022 CITY of PORT ANGELES Q4-2021 Budget Status Report - Data & Graph Attachment 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 Budget Budget GENERAL FUND REVENUE Actual YTD Actual YTD Actual YTD Amend #3 Actual YTD Remain. $Remain. % Taxes 14,127,829 13,842,615 14,009,132 13,606,800 15,179,927 (1,573,127)-11.56% Licenses & Permits 501,315 780,406 495,661 599,300 486,789 112,511 18.77% Intergovernmental Rev.654,243 894,962 2,312,499 4,107,000 1,932,181 2,174,819 52.95% Charges for Goods/Svcs.4,782,158 4,906,802 4,649,739 5,006,500 4,817,582 188,918 3.77% Fines & Penalties 5,735 1,779 1,590 3,000 695 2,305 76.83% Miscellaneous Revenue 241,861 444,117 176,628 296,500 67,490 229,010 77.24% Other Financing Sources 230,600 117,000 165,000 65,200 63,566 1,634 2.51% TOTAL General Fund Revenue $20,543,741 $20,987,681 $21,810,249 $23,684,300 $22,548,230 $1,136,070 4.80% Variance from Prior Yr. - $$1,073,678 $443,940 $822,568 $737,981 Variance from Prior Yr. - %5.51%2.16%3.92%3.38% 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 Budget Budget GENERAL FUND REVENUE -- Detail Actual YTD Actual YTD Actual YTD Amend #3 Actual YTD Remain. $Remain. % Property Tax 4,569,617 4,645,944 4,721,982 4,786,700 4,833,873 (47,173)-0.99% Sales Tax--CoPA Regular 4,091,950 3,628,496 3,873,321 3,363,600 4,549,363 (1,185,763)-35.25% Sales Tax-- EUGA Shared 180,966 175,026 189,579 171,100 226,905 (55,805)-32.62% Electric Utility Tax 1,465,656 1,481,799 1,442,939 1,471,100 1,703,362 (232,262)-15.79% Water Utility Tax 641,399 715,435 681,019 680,600 692,562 (11,962)-1.76% Wastewater Utility Tax 966,956 985,115 963,805 985,300 978,083 7,217 0.73% Solid Waste-Collect. Tax 313,765 338,077 324,918 325,600 324,242 1,358 0.42% Solid Waste-Trans. Sta. Tax 684,060 728,983 728,012 720,100 762,785 (42,685)-5.93% Stormwater Utility Tax 175,268 186,767 202,931 208,800 211,947 (3,147)-1.51% Parking Tax 44,776 44,904 5,201 22,900 2,627 20,273 88.53% Telephone Tax 369,286 367,559 335,217 368,500 256,133 112,367 30.49% Leasehold Excise Tax 183,979 157,736 153,953 150,100 154,404 (4,304)-2.87% Cable TV Franchise Fee 170,342 166,204 207,234 170,000 118,917 51,083 30.05% Liquor Excise Tax/Liquor Profits 283,079 266,650 287,500 267,300 296,822 (29,522)-11.04% Other General Fund Revenue 6,402,642 7,098,985 7,692,638 9,992,600 7,436,205 2,556,395 25.58% TOTAL--General Fund $20,543,741 $20,987,681 $21,810,249 $23,684,300 $22,548,230 $1,136,070 4.80% Variance from Prior Yr. - $$1,073,678 $443,940 $822,568 $737,981 Variance from Prior Yr. - %5.51%2.16%3.92%3.38% 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 Budget Budget GENERAL FUND EXPENDITURES Actual YTD Actual YTD Actual YTD Amend #3 Actual YTD Remain. $Remain. % Salaries & Wages 8,844,697 9,051,068 9,198,883 9,936,900 9,616,205 320,695 3.23% Personnel Benefits 3,618,261 3,662,326 3,582,560 4,002,000 3,667,459 334,541 8.36% Supplies 690,439 756,888 624,833 851,100 603,268 247,832 29.12% Services 3,715,344 3,635,682 4,409,986 6,272,500 5,318,598 953,902 15.21% Intergov'tl. Svcs./Pmts.2,843,499 2,829,812 3,532,140 3,747,000 3,746,895 105 0.00% Capital Outlay 17,327 11,375 0 0 0 0 N/A Other Financing Sources 26,956 9,007 13,534 0 49,754 (49,754)N/A TOTAL General Fund Expenditures $19,756,523 $19,956,158 $21,361,936 $24,809,500 $23,002,179 $1,807,321 7.28% Variance from Prior Yr. - $$64,091 $199,635 $1,405,778 $1,640,243 Variance from Prior Yr. - %0.33%1.01%7.04%7.68% 2 of 17 L - 11July 19, 2022 CITY of PORT ANGELES Q4-2021 Budget Status Report - Data & Graph Attachment $0 $200,000 $400,000 $600,000 $800,000 $1,000,000 $1,200,000 $1,400,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2021 Combined Sales Tax --Budget vs. Actual 2021 Budget 2021 Actual $0 $500,000 $1,000,000 $1,500,000 $2,000,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2021 PROPERTY TAX BUDGET vs. ACTUAL 2021 Budget 2021 Actual $0 $100,000 $200,000 $300,000 $400,000 $500,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2021 COMBINED UTILITY TAX BUDGET vs. ACTUAL 2021 Budget 2021 Actual 3 of 17 L - 12July 19, 2022 CITY of PORT ANGELES Q4-2021 Budget Status Report - Data & Graph Attachment $0 $50,000 $100,000 $150,000 $200,000 $250,000 $300,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2021 ELECTRIC UTILITY TAX BUDGET vs. ACTUAL 2021 Budget 2021 Actual - 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2021 WATER UTILITY TAX BUDGET vs. ACTUAL 2021 Budget 2021 Actual - 20,000 40,000 60,000 80,000 100,000 120,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2021 WASTEWATER UTILITY TAX BUDGET vs. ACTUAL 2021 Budget 2021 Actual 4 of 17 L - 13July 19, 2022 CITY of PORT ANGELES Q4-2021 Budget Status Report - Data & Graph Attachment ($20,000) ($10,000) $0 $10,000 $20,000 $30,000 $40,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2021 SOLID WASTE COLLECTIONS UTILITY BUDGET vs. ACTUAL 2021 Budget 2021 Actual $0 $10,000 $20,000 $30,000 $40,000 $50,000 $60,000 $70,000 $80,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2021 SOLID WASTE TRANSFER STATION UTILITY TAX BUDGET vs. ACTUAL 2021 Budget 2021 Actual ($20,000) $0 $20,000 $40,000 $60,000 $80,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2021 TELEPHONE TAX BUDGET vs. ACTUAL 2021 Budget 2021 Actual 5 of 17 L - 14July 19, 2022 CITY of PORT ANGELES Q4-2021 Budget Status Report - Data & Graph Attachment Council & City Manager Dept.12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 554,608 430,608 540,979 568,800 589,009 (20,209)-3.55% Expenditure 904,394 802,196 870,619 999,800 937,524 62,276 6.23% Net--Revenue less Expend.(349,786)(371,588)(329,640)(431,000)(348,515) Variance from Prior Yr. - $$207,099 ($21,802)$41,948 ($18,875) Variance from Prior Yr. - %-37.19%6.23%-11.29%5.73% Finance Department 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 16,533,436 16,373,646 16,515,135 15,908,500 17,158,370 (1,249,870)-7.86% Expenditure 2,895,238 2,715,752 2,787,383 2,992,400 2,899,108 93,292 3.12% Net--Revenue less Expend.13,638,198 13,657,894 13,727,752 12,916,100 14,259,262 Variance from Prior Yr. - $$926,942 $19,696 $69,858 $531,510 Variance from Prior Yr. - %7.29%0.14%0.51%3.87% Legal Department 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 289,397 412,196 346,789 367,300 355,906 11,394 3.10% Expenditure 1,323,381 1,473,495 1,409,490 1,446,400 1,426,588 19,812 1.37% Net--Revenue less Expend.(1,033,984)(1,061,299)(1,062,701)(1,079,100)(1,070,682) Variance from Prior Yr. - $($34,701)($27,315)($1,402)($7,981) Variance from Prior Yr. - %3.47%2.64%0.13%0.75% Community & Economic Devel.12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 657,616 1,005,555 1,143,788 836,000 798,291 37,709 4.51% Expenditure 740,310 895,305 808,799 1,561,200 1,484,800 76,400 4.89% Net--Revenue less Expend.(82,694)110,250 334,989 (725,200)(686,509) Variance from Prior Yr. - $$87,682 $192,944 $224,739 ($1,021,498) Variance from Prior Yr. - %-51.46%-233.32%203.84%-304.93% Police Department 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 749,683 735,093 941,242 1,268,900 1,148,323 120,577 9.50% Expenditure 5,724,673 5,847,432 6,248,317 6,930,300 6,357,626 572,674 8.26% Net--Revenue less Expend.(4,974,990)(5,112,339)(5,307,075)(5,661,400)(5,209,303) Variance from Prior Yr. - $($260,603)($137,349)($194,736)$97,772 Variance from Prior Yr. - %5.53%2.76%3.81%-1.84% Fire Department 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 109,117 178,942 67,429 70,900 71,766 (866)-1.22% Expenditure 2,751,028 2,560,506 2,713,505 2,325,000 2,344,900 (19,900)-0.86% Net--Revenue less Expend.(2,641,911)(2,381,564)(2,646,076)(2,254,100)(2,273,134) Variance from Prior Yr. - $$21,375 $260,347 ($264,512)$372,942 Variance from Prior Yr. - %-0.80%-9.85%11.11%-14.09% GENERAL FUND REVENUES AND EXPENDITURES AT YEAR END 12/31/2020 6 of 17 L - 15July 19, 2022 CITY of PORT ANGELES Q4-2021 Budget Status Report - Data & Graph Attachment Public Works & Utilities 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 854,868 931,130 861,221 1,076,400 949,145 127,255 11.82% Expenditure 1,900,125 2,211,770 2,059,603 2,180,000 2,041,287 138,713 6.36% Net--Revenue less Expend.(1,045,257)(1,280,640)(1,198,382)(1,103,600)(1,092,142) Variance from Prior Yr. - $$64,383 ($235,383)$82,258 $106,240 Variance from Prior Yr. - %-5.80%22.52%-6.42%-8.87% Parks & Recreation 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 794,620 920,511 586,670 734,100 649,808 84,292 11.48% Expenditure 3,355,859 3,360,529 3,126,569 3,679,100 3,343,837 335,263 9.11% Net--Revenue less Expend.(2,561,239)(2,440,018)(2,539,899)(2,945,000)(2,694,029) Variance from Prior Yr. - $$107,554 $121,221 ($99,881)($154,130) Variance from Prior Yr. - %-4.03%-4.73%4.09%6.07% Non-Departmental 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 396 0 806,996 2,853,400 827,612 2,025,788 71.00% Expenditure 161,515 89,173 1,337,651 2,695,300 2,166,509 528,791 19.62% Net--Revenue less Expend.(161,119)(89,173)(530,655)158,100 (1,338,897) Variance from Prior Yr. - $($110,144)$71,946 ($441,482)($808,242) Variance from Prior Yr. - %216.07%-44.65%495.08%152.31% TOTAL -- General Fund 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 20,543,741 20,987,681 21,810,249 23,684,300 22,548,230 1,136,070 4.80% Expenditure 19,756,523 19,956,158 21,361,936 24,809,500 23,002,179 1,807,321 7.28% Net--Revenue less Expend.787,218 1,031,523 448,313 (1,125,200)(453,949) Variance from Prior Yr. - $$1,009,587 $244,305 ($583,210)($902,262) Variance from Prior Yr. - %-454.01%31.03%-56.54%-201.26% $0 $500,000 $1,000,000 $1,500,000 $2,000,000 $2,500,000 $3,000,000 $3,500,000 $4,000,000 $4,500,000 $5,000,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2021 GENERAL FUND REVENUE BUDGET vs. ACTUAL 2021 Budget 2021 Actual 7 of 17 L - 16July 19, 2022 CITY of PORT ANGELES Q4-2021 Budget Status Report - Data & Graph Attachment Lodging Tax Fund #101 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 833,472 818,505 507,239 505,500 1,056,807 (551,307)-109.06% Expenditure 934,200 727,904 759,777 539,400 528,233 11,167 2.07% Net--Revenue less Expend.(100,728)90,601 (252,538)(33,900)528,574 Variance from Prior Yr. - $$20,334 $191,329 ($343,139)$781,112 Variance from Prior Yr. - %-16.80%-189.95%-378.74%-309.30% SPECIAL REVENUE FUNDS $0 $500,000 $1,000,000 $1,500,000 $2,000,000 $2,500,000 $3,000,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2021 GENERAL FUND EXPENDITURES BUDGET vs. ACTUAL 2021 Budget 2021 Actual 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00% 45.00% - 1,000,000 2,000,000 3,000,000 4,000,000 5,000,000 6,000,000 7,000,000 8,000,000 9,000,000 10,000,000 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 - Est GENERAL FUND UNASSIGNED FUND BALANCE AT YEAR END General Fund Unassigned Fund Balance % of General Fund Expenditures 8 of 17 L - 17July 19, 2022 CITY of PORT ANGELES Q4-2021 Budget Status Report - Data & Graph Attachment Street Fund #102 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 1,585,807 1,662,118 1,671,370 1,710,200 1,720,799 (10,599)-0.62% Expenditure 1,741,996 1,571,528 1,474,393 1,766,200 1,656,385 109,815 6.22% Net--Revenue less Expend.(156,189)90,590 196,977 (56,000)64,414 Variance from Prior Yr. - $$175,171 $246,779 $106,387 ($132,563) Variance from Prior Yr. - %-52.86%-158.00%117.44%-67.30% R.E.E.T I Fund #105 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 478,068 386,310 430,742 269,000 555,717 (286,717)-106.59% Expenditure 363,000 93,000 387,900 617,800 617,800 0 0.00% Net--Revenue less Expend.115,068 293,310 42,842 (348,800)(62,083) Variance from Prior Yr. - $$8,311 $178,242 ($250,468)($104,925) Variance from Prior Yr. - %7.78%154.90%-85.39%-244.91% PenCom Fund #107 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 3,091,107 2,961,031 3,192,057 2,851,500 3,521,493 (669,993)-23.50% Expenditure 2,686,155 2,718,526 3,053,005 3,413,300 3,186,529 226,771 6.64% Net--Revenue less Expend.404,952 242,505 139,052 (561,800)334,964 Variance from Prior Yr. - $$170,875 ($162,447)($103,453)$195,912 Variance from Prior Yr. - %73.00%-40.12%-42.66%140.89% R.E.E.T. II Fund #160 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 481,242 388,317 429,099 265,700 555,625 (289,925)-109.12% Expenditure 167,840 317,036 142,531 942,000 920,422 21,578 2.29% Net--Revenue less Expend.313,402 71,281 286,568 (676,300)(364,797) Variance from Prior Yr. - $$55,869 ($242,121)$215,287 ($651,365) Variance from Prior Yr. - %21.69%-77.26%302.03%-227.30% Business Improvement District 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 34,972 34,743 9,312 32,300 16,410 15,890 49.20% Expenditure 46,427 999 38,800 4,000 4,000 0 0.00% Net--Revenue less Expend.(11,455)33,744 (29,488)28,300 12,410 Variance from Prior Yr. - $($47,298)$45,199 ($63,232)$41,898 Variance from Prior Yr. - %-131.96%-394.58%-187.39%-142.08% P.A. Housing Fund #172 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 776,934 52,325 1,125,700 1,369,200 699,212 669,988 48.93% Expenditure 1,190,165 - 809,279 1,386,600 512,641 873,959 63.03% Net--Revenue less Expend.(413,231)52,325 316,421 (17,400)186,571 Variance from Prior Yr. - $($513,479)$465,556 $264,096 ($129,850) Variance from Prior Yr. - %-512.21%-112.66%504.72%-41.04% Code Compliance Fund #175 2018 Actual 2019 Actual 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 50,000 1,794 594 700 (315)1,015 145.00% Expenditure 0 12,000 327 5,300 326 4,974 93.85% Net--Revenue less Expend.50,000 (10,206)267 (4,600)(641) Variance from Prior Yr. - $$50,000 ($60,206)$10,473 ($908) Variance from Prior Yr. - %#DIV/0!-120.41%-102.62%-340.07% 9 of 17 L - 18July 19, 2022 CITY of PORT ANGELES Q4-2021 Budget Status Report - Data & Graph Attachment $0 $50,000 $100,000 $150,000 $200,000 $250,000 1 2 3 4 5 6 7 8 9 10 11 12 2021 LODGING TAX REVENUE BUDGET vs. ACTUAL 2021 Budget 2021 Actual $0 $20,000 $40,000 $60,000 $80,000 $100,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2021 MOTOR VEHICLE FUEL TAX BUDGET vs. ACTUAL 2021 Budget 2021 Actual $0 $200,000 $400,000 $600,000 $800,000 $1,000,000 $1,200,000 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 Budget 2021 Actual REET I & REET II COMBINED ACTUAL REVENUE REET-1 Actual Revenue REET-2 Actual Revenue 10 of 17 L - 19July 19, 2022 CITY of PORT ANGELES Q4-2021 Budget Status Report - Data & Graph Attachment 2006 LTGO - Property Acquistion 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 303,608 39,524 367,928 1,700 20 1,680 98.82% Expenditure 86,890 86,891 86,890 1,059,700 1,058,066 1,634 0.15% Net--Revenue less Expend.216,718 (47,367)281,038 (1,058,000)(1,058,046) Variance from Prior Yr. - $$239,156 ($264,085)$328,405 ($1,339,084) Variance from Prior Yr. - %-1065.85%-121.86%-693.32%-476.48% 2014 LTGO - Solid Waste Landfill 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 347,081 609,528 603,729 604,100 595,671 8,429 1.40% Expenditure 344,000 599,000 598,500 598,200 598,200 0 0.00% Net--Revenue less Expend.3,081 10,528 5,229 5,900 (2,529) Variance from Prior Yr. - $$582 $7,447 ($5,299)($7,758) Variance from Prior Yr. - %23.29%241.71%-50.33%-148.36% 2015 LTGO - Refunding 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 234,071 232,465 234,254 237,500 235,038 2,462 1.04% Expenditure 233,072 231,151 233,152 235,000 234,972 28 0.01% Net--Revenue less Expend.999 1,314 1,102 2,500 66 Variance from Prior Yr. - $$55,972 $315 ($212)($1,036) Variance from Prior Yr. - %-101.82%31.53%-16.13%-94.01% Governmental Capital Fund 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 616,540 718,546 1,822,899 1,648,300 1,149,087 499,213 30.29% Expenditure 1,640,200 241,503 820,194 1,096,000 371,319 724,681 66.12% Net--Revenue less Expend.(1,023,660)477,043 1,002,705 552,300 777,768 Variance from Prior Yr. - $($1,341,734)$1,500,703 $525,662 ($224,937) Variance from Prior Yr. - %-421.83%-146.60%110.19%-22.43% Transportation Benefit District 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 4,258,043 2,719,551 1,772,659 7,853,900 3,997,896 3,856,004 49.10% Expenditure 3,067,225 1,651,711 1,169,853 4,384,400 2,858,388 1,526,012 34.81% Net--Revenue less Expend.1,190,818 1,067,840 602,806 3,469,500 1,139,508 Variance from Prior Yr. - $$1,190,818 ($122,978)($465,034)$536,702 Variance from Prior Yr. - %#DIV/0!-10.33%-43.55%89.03% Parks Capital Fund 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 20,988 26,301 6,881 11,800 15,689 (3,889)-32.96% Expenditure 0 0 9,562 0 0 0 #DIV/0! Net--Revenue less Expend.20,988 26,301 (2,681)11,800 15,689 Variance from Prior Yr. - $($16,634)$5,313 ($28,982)$18,370 Variance from Prior Yr. - %-44.21%25.31%-110.19%-685.19% GOVERNMENTAL CAPITAL PROJECT FUNDS DEBT SERVICE FUNDS 11 of 17 L - 20July 19, 2022 CITY of PORT ANGELES Q4-2021 Budget Status Report - Data & Graph Attachment Electric Utility Fund #401 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 24,428,407 24,999,004 23,814,676 27,557,300 28,224,260 (666,960)-2.42% Expenditure 21,367,989 24,754,748 27,554,791 26,501,900 25,820,286 681,614 2.57% Net--Revenue less Expend.3,060,418 244,256 (3,740,115)1,055,400 2,403,974 Variance from Prior Yr. - $($154,011)($2,816,162)($3,984,371)$6,144,089 Variance from Prior Yr. - %-4.79%-92.02%-1631.23%-164.28% ENTERPRISE FUNDS (UTILITY FUNDS) $0 $1,000,000 $2,000,000 $3,000,000 2021 ELECTRIC FUND TOTAL REVENUE BUDGET vs. ACTUAL Electric Revenue Budget Electric Actual Revenue $0 $500,000 $1,000,000 $1,500,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2021 RESIDENTIAL ELECTRIC REVENUE BUDGET vs. ACTUAL Electric Residential Revenue Budget Electric Residential Actual Revenue $0 $500,000 $1,000,000 1 2 3 4 5 6 7 8 9 10 11 12 2021 INDUSTRIAL TRANSMISSION ELECTRIC REVENUE BUDGET vs. ACTUAL Industrial Transmission Revenue Budget Industrial Transmission Actual Revenue 12 of 17 L - 21July 19, 2022 CITY of PORT ANGELES Q4-2021 Budget Status Report - Data & Graph Attachment Water Utility Fund #402 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 13,105,880 7,219,780 9,383,963 6,871,900 6,572,756 299,144 4.35% Expenditure 6,834,014 6,750,835 6,658,721 7,515,000 6,762,455 752,545 10.01% Net--Revenue less Expend.6,271,866 468,945 2,725,242 (643,100)(189,699) Variance from Prior Yr. - $$6,670,328 ($5,802,921)$2,256,297 ($2,914,941) Variance from Prior Yr. - %-1674.02%-92.52%481.14%-106.96% $0 $500,000 $1,000,000 $1,500,000 $2,000,000 $2,500,000 $3,000,000 $3,500,000 $4,000,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2021 ELECTRIC FUND TOTAL EXPENDITURES BUDGET vs. ACTUAL Electric Budget Electric Actual ($100,000) $900,000 $1,900,000 $2,900,000 $3,900,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2021 BPA PURCHASED POWER BUDGET vs. ACTUAL BPA Purchased Power Budget BPA Purchased Power Actual $0 $200,000 $400,000 $600,000 $800,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2021 WATER FUND TOTAL REVENUE BUDGET vs. ACTUAL Water Budget Water Actual 13 of 17 L - 22July 19, 2022 CITY of PORT ANGELES Q4-2021 Budget Status Report - Data & Graph Attachment Wastewater Utility Fund #403 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 7,296,742 7,488,828 7,247,320 7,190,900 7,249,337 (58,437)-0.81% Expenditure 6,644,727 6,915,125 6,799,511 7,165,600 6,839,416 326,184 4.55% Net--Revenue less Expend.652,015 573,703 447,809 25,300 409,921 Variance from Prior Yr. - $$19,555 ($78,312)($125,894)($37,888) Variance from Prior Yr. - %3.09%-12.01%-21.94%-8.46% - 100,000 200,000 300,000 400,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2021 WATER RESIDENTIAL REVENUE BUDGET vs. ACTUAL Water Budget Water Actual $0 $50,000 $100,000 $150,000 $200,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2021 WATER COMMERCIAL REVENUE BUDGET vs. ACTUAL Water Budget - 200,000 400,000 600,000 800,000 1,000,000 1,200,000 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2021 WATER FUND EXPENDITURES BUDGET vs. ACTUAL Water Budget Water Actual 14 of 17 L - 23July 19, 2022 CITY of PORT ANGELES Q4-2021 Budget Status Report - Data & Graph Attachment Solid Waste Utility Fund #404 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 12,178,334 12,681,908 12,584,274 12,527,700 12,793,881 (266,181)-2.12% Expenditure 11,552,448 12,018,704 12,338,899 16,100,800 15,582,254 518,546 3.22% Net--Revenue less Expend.625,886 663,204 245,375 (3,573,100)(2,788,373) Variance from Prior Yr. - $$660,290 $37,318 ($417,829)($3,033,748) Variance from Prior Yr. - %-1919.22%5.96%-63.00%-1236.37% Stormwater Utility Fund #406 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 2,206,543 2,342,072 2,622,180 2,609,800 2,500,501 109,299 4.19% Expenditure 1,877,801 1,859,110 2,195,577 2,778,800 2,561,880 216,920 7.81% Net--Revenue less Expend.328,742 482,962 426,603 (169,000)(61,379) Variance from Prior Yr. - $$43,164 $154,220 ($56,359)($487,982) Variance from Prior Yr. - %15.11%46.91%-11.67%-114.39% Medic 1 Utility Fund #409 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 2,952,250 3,876,170 3,281,262 3,066,800 3,018,901 47,899 1.56% Expenditure 2,767,404 2,899,996 3,115,992 3,217,100 2,995,431 221,669 6.89% Net--Revenue less Expend.184,846 976,174 165,270 (150,300)23,470 Variance from Prior Yr. - $$108,806 $791,328 ($810,904)($141,800) Variance from Prior Yr. - %143.09%428.10%-83.07%-85.80% Harbor Clean-up Fund #413 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 978,999 908,611 991,047 2,829,100 1,152,676 1,676,424 59.26% Expenditure 1,079,856 1,002,833 964,816 2,847,600 1,251,975 1,595,625 56.03% Net--Revenue less Expend.(100,857)(94,222)26,231 (18,500)(99,299) Variance from Prior Yr. - $($33,272)$6,635 $120,453 ($125,530) Variance from Prior Yr. - %49.23%-6.58%-127.84%-478.56% Conservation Utility Fund #421 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 628,588 338,125 263,060 355,600 275,165 80,435 22.62% Expenditure 871,060 578,652 411,980 358,300 361,573 (3,273)-0.91% Net--Revenue less Expend.(242,472)(240,527)(148,920)(2,700)(86,408) Variance from Prior Yr. - $($189,649)$1,945 $91,607 $62,512 Variance from Prior Yr. - %359.03%-0.80%-38.09%-41.98% Electric Capital Fund #451 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 1,077,700 4,650,000 3,300,000 878,800 800,000 78,800 8.97% Expenditure 434,037 288,458 527,691 2,062,700 975,936 1,086,764 52.69% Net--Revenue less Expend.643,663 4,361,542 2,772,309 (1,183,900)(175,936) Variance from Prior Yr. - $$180,427 $3,717,879 ($1,589,233)($2,948,245) Variance from Prior Yr. - %38.95%577.61%-36.44%-106.35% UTILITY CAPITAL FUNDS (Includes transfers from Utility Funds ) 15 of 17 L - 24July 19, 2022 CITY of PORT ANGELES Q4-2021 Budget Status Report - Data & Graph Attachment Water Capital Fund #452 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 596,000 562,000 719,100 650,000 650,000 0 0.00% Expenditure 1,056,954 21,059 212,209 574,400 206,267 368,133 64.09% Net--Revenue less Expend.(460,954)540,941 506,891 75,600 443,733 Variance from Prior Yr. - $($840,154)$1,001,895 ($34,050)($63,158) Variance from Prior Yr. - %-221.56%-217.35%-6.29%-12.46% Wastewater Capital Fund #453 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 600,000 783,500 850,000 900,000 900,000 0 0.00% Expenditure 354,757 213,450 832,070 1,581,000 981,245 599,755 37.94% Net--Revenue less Expend.245,243 570,050 17,930 (681,000)(81,245) Variance from Prior Yr. - $$1,193,152 $324,807 ($552,120)($99,175) Variance from Prior Yr. - %-125.87%132.44%-96.85%-553.12% Solid Waste Capital Fund #454 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 1,096,848 1,366,294 1,352,290 1,871,300 1,319,771 551,529 29.47% Expenditure 814,617 1,250,837 1,201,091 3,311,600 2,129,521 1,182,079 35.70% Net--Revenue less Expend.282,231 115,457 151,199 (1,440,300)(809,750) Variance from Prior Yr. - $($146,016)($166,774)$35,742 ($960,949) Variance from Prior Yr. - %-34.10%-59.09%30.96%-635.55% Stormwater Capital Fund #456 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 485,000 400,000 400,000 545,000 545,000 0 0.00% Expenditure 349,404 25,408 6,520 511,000 439,726 71,274 13.95% Net--Revenue less Expend.135,596 374,592 393,480 34,000 105,274 Variance from Prior Yr. - $($264,404)$238,996 $18,888 ($288,206) Variance from Prior Yr. - %-66.10%176.26%5.04%-73.25% CSO Capital Fund #463 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 2,372,822 2,407,169 2,371,947 2,362,200 2,356,515 5,685 0.24% Expenditure 2,319,969 2,294,673 2,266,957 2,316,700 2,402,466 (85,766)-3.70% Net--Revenue less Expend.52,853 112,496 104,990 45,500 (45,951) Variance from Prior Yr. - $($196,485)$59,643 ($7,506)($150,941) Variance from Prior Yr. - %-78.80%112.85%-6.67%-143.77% Equipment Services Fund #501 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 1,896,255 1,926,067 1,739,303 4,524,500 4,455,629 68,871 1.52% Expenditure 1,846,942 1,635,170 1,170,105 6,343,900 1,833,836 4,510,064 71.09% Net--Revenue less Expend.49,313 290,897 569,198 (1,819,400)2,621,793 Variance from Prior Yr. - $$100,037 $241,584 $278,301 $2,052,595 Variance from Prior Yr. - %-197.22%489.90%95.67%360.61% INTERNAL SERVICE FUNDS 16 of 17 L - 25July 19, 2022 CITY of PORT ANGELES Q4-2021 Budget Status Report - Data & Graph Attachment Information Technology Fund #502 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 1,998,824 1,761,212 2,118,407 2,824,000 2,746,034 77,966 2.76% Expenditure 1,721,638 1,645,164 1,723,611 2,312,900 1,991,349 606,762 26.23% Net--Revenue less Expend.277,186 116,048 394,796 511,100 754,685 Variance from Prior Yr. - $$218,516 ($161,138)$278,748 $359,889 Variance from Prior Yr. - %372.45%-58.13%240.20%91.16% Self-Insurance Fund #503 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 5,493,860 5,473,634 5,075,424 5,922,000 5,247,027 674,973 11.40% Expenditure 5,673,564 5,687,997 5,125,846 5,952,000 5,354,126 597,874 10.04% Net--Revenue less Expend.(179,704)(214,363)(50,422)(30,000)(107,099) Variance from Prior Yr. - $($246,221)($34,659)$163,941 ($56,677) Variance from Prior Yr. - %-370.16%19.29%-76.48%112.41% Cemetery Endowment Fund #601 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 6,296 12,004 6,355 6,000 (2,453)8,453 140.88% Expenditure - - - - - - N/A Net--Revenue less Expend.6,296 12,004 6,355 6,000 (2,453) Variance from Prior Yr. - $$2,311 $5,708 ($5,649)($8,808) Variance from Prior Yr. - %57.99%90.66%-47.06%-138.60% Firemen's Pension Fund #602 12/31/2018 12/31/2019 12/31/2020 2021 Budget 12/31/2021 $ Remaining % Remaining Revenue 8,746 90,590 60,632 15,000 69,149 (54,149)-360.99% Expenditure 140,885 96,269 35,533 92,600 33,736 58,864 63.57% Net--Revenue less Expend.(132,139)(5,679)25,099 (77,600)35,413 Variance from Prior Yr. - $($105,161)$126,460 $30,778 $10,314 Variance from Prior Yr. - %389.80%-95.70%-541.96%41.09% PERMANENT AND TRUST FUNDS 17 of 17 L - 26July 19, 2022