HomeMy WebLinkAbout14-22 i
RESOLUTION NCB. —
RESOLUTION UTTON of the City Council of the City of Port Angeles,
Washington, setting a hearing date for a proposal to
approve the 2022 Electric Utility Resource Plan.
WHEREAS,the City strives to ensure that its citizens have reliable access to electricity
resources adequate to meet their projected loads; and
WHERE AS, the City must submit an Electric Utility Resource flan to the Washington
Department of Commerce by September 1, 21122 as required by Chapter 19.280 RCW; and
f
WHEREAS, the City Council ncil of the City of Fort Angeles Washington, being the
1 governing body of the consumer-owned electric utility, will conduct a public hearing on the
August 16, 2022 to provide the public the opportunity to comment on the 2022 Electric Utility
Resource Flan.
NOW, THEREFORE,, BE IT RESOLVED by the City Council of the City of Port
Angeles, Washington, that at the regular City Council meeting on August 16, 2022, at 6:30
P.M., or as soon thereafter as possible,the Council will conduct a public hearing regarding the
2022 Electric Utility Resource Plan as prepared by the Director of Public Works and Utilities
and attached hereto as Exhibit A,
PASSED by the City Council of the City of Port Angeles at a regular meeting of said
Council held on July 19, 2022.
Kate Dexter, .Mayor
ATTEST:
I asi Martmez-Bailey, City C:"lerlk-
APPROVE A' TO FORM.-
ole
`7
William E. ITloo _....,__
r, City attorney
r
f
C ly of port Angeles M <e Utility Name
Prepaid
blase Year 5 Yr.Est. 10'l'""r Est.
U17J11/IPUl J�����' ��1N1N111111Y0111,�9 Y�I 1 11111 %'J11011I1 2 t� 2031
Period � Annual
Annual
Resources
Future ConservationlEfficiency 030 0 3
Demand Response
BPA Tier 1 (include BPA PP=).. .. 5006 50,08
....
.........
. .... .. ....................
...... ..µ..._.
BPA TPer
!!Noun BPA:
co-generation
Hydro(crwdticaP wvater)
Wind
,.., ,.,.,.,.... .rv,,.,, -.,.,.,.,..,....-
Gther Renewwrables
Thermal-Natural Gas
Therrnal-Coat _...-
MarPreP Purchase non BPA 0 09 0 Ug 009._
Other
.,.... . .. ..w.w. ... ........-�.� . ... .-..._.. .....
ova
stributed Generation
Undecided
r�fot_ai Resources
t.cad �tesrrurce Balance
Date o Board/Commission Approval . . I(rrt m/yy)
Ndotesw Explain resource choices other than conservation f Use of renewable energy credits in p
l P OURCE a BRA Tier t ('includes BPA M PF)- The City of Port Angeles is a full resot�r�ce customer of
�.o r o W. wvv..
MMM t
Bonneville Power Administration, The current BPA contract ends it?20'26 This forecast for 2031 assumes the
City continues its power purchase contract with BPA doe to low cost.and support of the Caty`s energy efficiency.
CARBON: The City is complying with,all state and federal requirements to decrease carbon in the the City's
power supply. As of 2020(fast year available)BPA's power is 94 ht%carbon free. In addition, BRA estimates it
will maintain a t or better carbon-free power over the next ten years
The City is participating in SPA's new contract-period talks and is pushing for a carbon-free energy product In
the event such a product is not available in the nett contract period the City does have the option of meeting the
2030 goal of having a carbon-neutral powwer by utilizing up to 10%of its load with carbon offsets of can purchase
..... .... ....-...A...-._.... _—.—.....-........... ........ �_...�
July 19, 2022 E - 39
0
11. 2 pj L 2 G ove r
,5heei
in.,�ft%td ngder,
'This row will t)e zeros 4 loads,and resourb
Manning/Distributed Generabot
One way of commenting is to enter the
Wine number of the resource title and
type the comment foillowing the number,
For exa,mpte,"'Line 24,Our Dstnbuted
Generation sources are landfill gas and
solar.
Juily 19,E 2022 E - 40