INTERLOCAL AGREEMENT BETWEEN
THE CITY OF PORT ANGELES
AND
PUBLIC UTILITY DISTRICT #1 OF CLALLAM COUNTY
FOR CONSTRUCTION OF DISTRIBUTION FACILITIES RELATED TO THE
EL WHA RIVER RESTORATION PROJECT
This Interlocal Agreement (Agreement) is entered into between the City of Port Angeles,
a code city in the State of Washington, hereinafter referred to as "City," and Public Utility
District No.1 of Clallam County, a Washington Public Utility District, hereinafter referred to as
"District," both of which are sometimes collectively referred to as the "Parties."
In mutual consideration of the promises contained herein, the Parties represent and agree
as follows:
1. REPRESENTATIONS
1. Pursuant to the authority extended in Title 35A RCW, City owns and operates an
electric distribution system.
2. Pursuant to the authority extended in Title 54 RCW, the District owns and operates
an electric distribution system.
3. The Federal Government has implemented a plan to remove two (2) dams from the
Elwha River. This project is commonly known as the Elwha Restoration Project.
4. Each Party owns and maintains electrical distribution facilities that will be impacted
by the proposed Elwha Restoration Project.
5. As a result of the dam removal it will be necessary to replace those electric
distribution facilities.
6. The City and the District recognize the benefit in working cooperatively in the
design and construction of the distribution systems that will require replacement as a result of the
Elwha Restoration Project.
7. This agreement is entered into pursuant to the Washington State Interlocal
Cooperation Act, Chapter 39.34 RCW. Each party has the necessary authority to enter into this
agreement.
- 1 -
II. AGREEMENTS
1. Intent and Pumose. The intent and purpose of this agreement is to set forth the
responsibilities and relationship between the parties with the selection of a single agency to act
on behalf of both in negotiating contracts and documents under a task agreement with the
National Park Service for design and construction of electric distribution facilities impacted by
the Elwha Restoration Project.
2. Lead Agency. The City shall be the lead agency to act on behalf of both the City
and the District in negotiating contracts and documents under a Task Agreement to be
administered and paid for by the National Park Service.
3. Separate Responsibilities. The District shall be responsible for costs in excess of
the amounts paid by the National Park Service for work performed on its facilities. The City
shall be responsible for costs in excess of amounts paid by the National Park Service for work
performed on its facilities.
4. Cooperation. The District will work cooperatively with the City to negotiate a Task
Agreement between the City and the National Park Service.
5. Duration. This agreement shall commence on the date of signature by both parties
and continue until the work below is completed.
III. CITY RESPONSIBILITIES
1. The City will contract for construction of all new distribution facilities to be
constructed to replace facilities impacted by the Elwha Restoration Project.
2. The City will prepare the documents and issue contracts under a Task Agreement
administered and paid for by the National Park Service.
3. City will be responsible for inspecting and accepting construction relating to City
facilities.
4. Any additional City project costs due to post-bid City design changes will be borne
by the City.
IV. DISTRICT RESPONSIBILITIES
1. District will provide City with design of those facilities that are exclusively for
District's use. The design shall be supplied in a timely fashion for inclusion in the construction
contract documents.
2. District will be responsible for inspecting and accepting construction relating to its
facilities.
- 2 -
3. Any additional District project costs due to post-bid District design changes will be
borne by the District.
V. OWNERSHIP OF FACILITIES
City:
1. City will own and maintain electrical facilities which are exclusively for its use.
2. City will continue to own and maintain electrical utility poles that are jointly used
by both District and City.
District:
1. District will own and maintain electrical facilities which are exclusively for its use.
2. District will own and maintain its pole attachments according to the existing joint
use agreement between the City and District.
VI. ASSIGNMENT
This agreement cannot be assigned, transferred, or any portions subcontracted hereunder
without the written agreement of both Parties.
VII. DISPUTE RESOLUTION
Both Parties agree that any dispute that arises out of the interpretation, performance,
enforcement, or other aspects of this agreement, shall be resolved by submitting the same to
binding arbitration which shall proceed according to the rules and regulations of the American
Arbitration Association; provided, however that each Party shall select a nominating person
within ten (10) days of notice of the dispute from either Party to the other. The District shall
elect one nominating person and the City shall elect one nominating person. The two nominating
persons shall then meet to promptly select the arbitrator from the Seattle office of the Judicial
Arbitration and Mediation Service List. If the nominating persons do not select a person who
agrees to serve as arbitrator within thirty (30) days of the first notice, the arbitrator shall be
selected by a Superior Court Judge of Clallam County.
- 3 -
,
VIII. NOTICES
Any notices shall be effective personally served on the other Party or if mailed by
registered or certified mail, return receipt requested, to the following addresses or such other
addresses as a Party may designate in writing and shall be deemed given on the date of mailing:
City of Port Angeles
c/o Mark Madsen, City Manager
P.O. Box 1150
321 E. 5th Street
Port Angeles, W A 98362
Clallam County Public Utility District #1
c/o Doug Nass, General Manager
P.O. Box 1090
2431 E. Highway 101
Port Angeles, W A 98362
IN WITNESS WHEREOF, the Parties have caused this agreement to be executed by the
undersigned duly authorized officials:
CITY OF PORT ANGELES
Date: 2c rct3 ZL::t::::e
ATTEST:
APPROVED AS TO~_
A ~, t ..
~
William E. Bloor, City Attorney
Doug N ass, General Manager
Date:
~~ 3dM~ ~IJ~%
ATTEST:
"~
Carol Biss, Executive Assistant
G:\Legal_B,,,~kup\AGREEr~ENTS&CONTRACTS\2007 Agrmts & Contracts\City-PUD Interlocal.Elwha Restoration 10-23-07.doc
2/15'1008 "
- 4 -
~
~~