HomeMy WebLinkAbout4.526 Original Contract
L-
.
.
</. 5~u
PUBLIC WORKS
CONTRACT
This Contract is made and entered into in duplicate this ~ay of ~ ~ 0 ~ A/' ,
~ by and between the City of Port AngeleS~on-charte~code city ~f
Washington, hereinafter referred to as "the City", and /I.()Jt _ f)~ 1 linn A ,
a , hereinafter referred to as "the Contractor".
WITNESSETH:
Whereas, the City desires to have certain public work performed as hereinafter set forth,
requiring specialized skills and other supportive capabilities; and
Whereas, the Contractor represents that it is qualified and possesses sufficient skills and the
necessary capabilities to perform the services set forth in this Contract.
NOW, THEREFORE, in consideration of the terms, conditions, and agreements contained
herein, the parties hereto agree as follows:
1. Scope of Work.
The Contractor shall do all work and furnish all tools, matenals, and equipment in order to
accomplish the following project:
Erickson Park Restroom, Project 06-26
in accordance with and as described in
A. this Contract, and
B. the Project Manual, which include the attached plans, Specifications, Special
Provisions, submittal requirements, attachments, addenda (if any), Bid Form,
Performance and Payment Bond, and
C. the Standard Specifications for Road, Bridge, and Municipal Construction prepared
by the Washington State Department of Transportation, as may be specifically
modified in the attached Specifications and/or Special Provisions, hereinafter
referred to as "the standard specifications",
and shall perform any alterations in or additions to the work provided under this Contract and every
part thereof.
The Contractor shall provide and bear the expense of all equipment, work, and labor of any
sort whatsoever that may be required for the transfer of materials and for constructing and
completing the work provided for in this Contract, except as may otherwise be provided in the
Project Manual.
PW-407_10 [rev. 4/20/06]
rll~c -4 at 11
Small Works Roster Project Manual
~ -- ...
2. Time for Performance and Liquidated Damages.
A. Time is ofthe essence in the performance ofthis Contract and in adhering to the time
frames specified herein. The Contractor shall commence work within ten (10)
calendar days after notice to proceed from the City, and said work shall be physically
completed within 15 working days after said notice to proceed, unless a different
time frame is expressly provided in writing by the City.
B. If said work is not completed within the time for physical completion, the Contractor
may be required at the City's sole discretion to pay to the City liquidated damages as
set forth in the Project Manual, for each and every day said work remains
uncompleted after the expiration of the specified time.
3. Compensation and Method of Payment.
A. The City shall pay the Contractor for work performed under this Contract as detailed
in the bid, as incorporated in the Project Manual.
B. Payments for work provided hereunder shall be made following the performance of
such work, unless otherwise permitted by law and approved in writing by the City.
No payment shall be made for any work rendered by the Contractor except as
identified and set forth in this Contract.
C. Progress payments shall be based on the timely submittal by the Contractor of the
City's standard payment request form.
D. Payments for any alterations in or additions to the work provided under this Contract
shall be in accordance with the Request For Information (RFI) and/or Construction
Change Order (CCO) process as set forth in the Project Manual. Following approval
of the RFI and/or CCO, the Contractor shall submit the standard payment request
formes).
E. The Contractor shall submit payment requests with a completed Application for
Payment form, an example of which is included in the Attachments to this Contract.
This form includes a lien waiver certification and shall be notarized before
submission. Applications for payment not signed or notarized shall be considered
incomplete and ineligible for payment consideration. The City shall initiate
authorization for payment after receipt of a satisfactorily completed payment request
form and shall make payment to the Contractor within approximately thirty (30) days
thereafter.
4. Independent Contractor Relationship.
The relationship created by this Contract is that of independent contracting entities. No
agent, employee, servant, or representative of the Contractor shall be deemed to be an employee,
agent, servant, or representative of the City, and the employees of the Contractor are not entitled to
any of the benefits the City provides for its employees. The Contractor shall be solely and entirely
responsible for its acts and the acts of its agents, employees, servants, subcontractors, or
representatives during the performance of this Contract. The Contractor shall assume full
PW-407 _10 [rev. 4/20/06]
Small Works Roster Project Manual
~i:l'" S vF 11'
" -,- \,
responsibility for payment of all wages and salaries and all federal, state, and local taxes or
contributions imposed or required, including, but not limited to, unemployment insurance, workers
compensation insurance, social security, and income tax withholding.
5. Prevailing Wage Requirements.
The Contractor shall comply with applicable prevailing wage requirements of the
Washington State Department of Labor & Industries, as set forth in Chapter 39.12 RCW and
Chapter 296-127 WAC. The Contractor shall document compliance with said requirements and
shall file with the City appropriate affidavits, certificates, and/or statements of compliance with the
State prevailing wage requirements. The Washington State Prevailing Wage Rates For Public
Works Contracts, Clallam County, incorporated in this Contract have been established by the
Department of Labor & Industries and are included as an Attachment to this Contract. The
Contractor shall also ensure that any subcontractors or agents of the Contractor shall comply with
the prevailing wage and documentation requirements as set forth herein.
6. Indemnification and Hold Harmless.
A. The Contractor shall defend, indemnify, and hold harmless the City, its officers,
officials, employees, and volunteers against and from any and all claims, injuries,
damages, losses, or suits, including attorney fees, arising out of or in connection with
the performance of this Contract, except for injuries and damages caused by the sole
negligence of the City.
B. Should a court of competent jurisdiction determine that this Contract is subject to
RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury
to persons or damages to property caused by or resulting from the concurrent
negligence of the Contractor and the City, its officers, officials, employees, and
volunteers, the Contractor's liability hereunder shall be only to the extent of the
Contractor's negligence. It is further specifically and expressly understood that the
indemnification provided herein constitutes the Contractor's waiver of immunity
under Industrial Insurance, Title 51 RCW, solely for the purposes of this
indemnification. This waiver has been mutually negotiated by the parties. The
provisions ofthis section shall survive the expiration or termination ofthis Contract.
7. Insurance.
The Contractor shall procure, and maintain for the duration of the Contract, insurance
against claims for injuries to persons or damage to property which may arise from or in connection
with the performance of the work hereunder by the Contractor, their agents, representatives,
employees or subcontractors. Failure by the Contractor to maintain the insurance as required shall
constitute a material breach of contract upon which the City may, after giving five working days
notice to the Contractor to correct the breach, immediately terminate the Contract or at its
discretion, procure or renew such insurance and pay any and all premiums in connection therewith,
with any sums so expended to be repaid to the City on demand, or at the sole discretion of the City,
off set against funds due the Contractor from the City.
A. Minimum Scope of Insurance
PW-407 _10 [rev. 4/20/06]
Small Works Roster Project Manual
P6l:Je e ur II>-
.' -~ ...
The Contractor shall obtain insurance of the types described below:
1. Automobile Liability insurance covering all owned, non-owned, hired and
leased vehicles. Coverage shall be written on Insurance Services Office
(ISO) form CA 00 01 or a substitute form providing equivalent liability
coverage. If necessary, the policy shall be endorsed to provide contractual
liability coverage.
11. Commercial General Liability insurance shall be written on ISO occurrence
form CG 00 Oland shall cover liability arising from premises, operations,
stop gap liability, independent contractors, products-completed operations,
personal injury and advertising injury, and liability assumed under an insured
contract. The Commercial General Liability insurance shall be endorsed to
provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85.
There shall be no endorsement or modification of the Commercial General
Liability insurance for liability arising from explosion, collapse or
underground property damage. The City shall be named as an insured under
the Contractor's Commercial General Liability insurance policy with respect
to the work performed for the City using ISO Additional Insured
endorsement CG 20 10 10 01 and Additional Insured- Completed Operations
endorsement CG 20 37 10 01 or substitute endorsements providing
equivalent coverage.
111. Workers' Compensation coverage as required by the Industrial Insurance
laws ofthe State of Washington.
IV. Builders Risk insurance covering interests of the City, the Contractor,
Subcontractors, and Sub-contractors in the work. Builders Risk insurance
shall be on a all-risk policy form and shall insure against the perils of fire and
extended coverage and physical loss or damage including flood and
earthquake, theft, vandalism, malicious mischief, collapse, temporary
buildings and debris removal. This Builders Risk insurance covering the
work will have a deductible of $5,000 for each occurrence, which will be the
responsibility of the Contractor. Higher deductibles for floor and earthquake
perils may be accepted by the City upon written request by the Contractor
and written acceptance by the City. Any increased deductibles accepted by
the City will remain the responsibility of the Contractor. The Builders Risk
insurance shall be maintained until final acceptance ofthe work by the City.
B. Minimum Amounts of Insurance
The Contractor shall maintain the following insurance limits:
1. Automobile Liability insurance with a minimum combined single limit for
bodily injury and property damage of$I,OOO,OOO per accident.
11. Commercial General Liability insurance shall be written with limits no less
than $3,000,000 each occurrence, $3,000,000 general aggregate and a
$3,000,000 products-completed operations aggregate limit.
PW-407 _10 [rev. 4/20/06]
Small Works Roster Project Manual
Pe~~ 7 of 14
.: -- ..
111. Builders Risk insurance shall be written in the amount of the completed value
ofthe project with no coinsurance provisions.
C. Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions for
Automobile Liability and Commercial General Liability insurance.
1. The Contractor's insurance coverage shall be primary insurance with respect
to the City. Any insurance, self-insurance, or insurance pool coverage
maintained by the City shall be in excess of the Contractor's insurance and
shall not contribute with it.
11. The Contractor's insurance shall be endorsed to state that coverage shall not
be cancelled or reduced as to coverage by either party, except after forty-five
(45) days prior written notice by certified mail, return receipt requested, has
been given to the City.
D. Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best rating of not less than
A:VII.
E. Verification of Coverage
The Contractor shall furnish the City with original certificates and a copy of the amendatory
endorsements, including but not necessarily limited to the additional insured endorsement,
evidencing the Automobile Liability and Commercial General Liability insurance of the
Contractor before commencement of the work. Before any exposure to loss may occur, the
Contractor shall file with the City a copy of the Builders Risk insurance policy that includes
all applicable conditions, exclusions, definitions, terms and endorsements related to this
proj ect.
F. Contractor's Insurance For Other Losses
The Contractor shall assume full responsibility for all loss or damage from any cause
whatsoever to any tools, Contractor's employee owned tools, machinery, equipment, or
motor vehicles owned or rented by the Contractor, or the Contractor's agents, suppliers or
contractors as well as to any temporary structures, scaffolding and protective fences.
G. Waiver of Subrogation
The Contractor and the City waive all rights against each other, any of their Subcontractors,
Subcontractors, agents and employees, each of the other, for damages caused by fire or other
perils to the extent covered by Builders Risk insurance or other property insurance obtain
pursuant to the Insurance Requirements Section of this Contract or other property insurance
applicable to the work. The policies shall provide such waivers by endorsement or
otherwise.
PW -407_10 [rev. 4/20106]
Small Works Roster Project Manual
-Ptoyt:: ~ l.Jr tt
..1..,-.....- ....
8. Compliance with Laws.
A. The Contractor shall comply with all applicable federal, state, and local laws,
including regulations for licensing, certification, and operation of facilities and
programs, and accreditation and licensing of individuals, and any other standards or
criteria as set forth in the Project Manual.
B. The Contractor shall pay any applicable business and permit fees and taxes which
may be required for the performance of the work.
C. The Contractor shall comply with all legal and permitting requirements as set forth in
the Project Manual.
9. Non-discrimination.
The parties shall conduct their business in a manner which assures fair, equal and
nondiscriminatory treatment of all persons, without respect to race, creed, color, sex, Vietnam era
veteran status, disabled veteran condition, physical or mental handicap, or national origin, and, in
particular:
A. The parties will maintain open hiring and employment practices and will welcome
applications for employment in all positions from qualified individuals who are
members of the above-stated minorities.
B. The parties will comply strictly with all requirements of applicable federal, state or
local laws or regulations issued pursuant thereto, relating to the establishment of
nondiscriminatory requirements in hiring and employment practices and assuring the
service of all patrons and customers without discrimination with respect to the
above-stated minority status.
10. Assignment and Subcontractors.
A. The Contractor shall not assign this Contract or any interest herein, nor any money
due to or to become due hereunder, without first obtaining the written consent of the
City.
B. The Contractor shall not subcontract any part of the services to be performed
hereunder without first obtaining the consent of the City and complying with the
provisions of this section.
C. In the event the Contractor does assign this contract or employ any subcontractor, the
Contractor agrees to bind in writing every assignee and subcontractor to the
applicable terms and conditions ofthe contract documents.
D. The Contractor shall, before commencing any work, notify the Owner in writing of
the names of any proposed subcontractors. The Contractor shall not employ any
subcontractor or other person or organization (including those who are to furnish the
principal items or materials or equipment), whether initially or as a substitute,
against whom the Owner may have reasonable objection. Each subcontractor or
PW -407 _10 [rev 4/20/06]
Small Works Roster Project Manual
Pe~c- 8 ef 11.
,'~~ '\0
other person or organization shall be identified in writing to the Owner by the
Contractor prior to the date this Contract is signed by the Contractor. Acceptance of
any subcontractor or assignee by the Owner shall not constitute a waiver of any right
of the Owner to reject defective work or work not in conformance with the contract
documents. If the Owner, at any time, has reasonable objection to a subcontractor or
assignee, the Contractor shall submit an acceptable substitute.
E. The Contractor shall be fully responsible for all acts and omissions of its assignees,
subcontractors and of persons and organization directly or indirectly employed by it
and of persons and organizations for whose acts any of them may be liable to the
same extent that it is responsible for the acts and omissions of person directly
employed by it.
F. The divisions and sections of the specifications and the identifications of any
drawings shall not control the Contractor in dividing the work among subcontractors
or delineating the work to be performed by any specific trade.
G. Nothing contained in the contract documents shall create or be construed to create
any relationship, contractual or otherwise, between the Owner and any subcontractor
or assignee. Nothing in the contract documents shall create any obligation on the
part of the Owner to payor to assure payment of any monies due any subcontractor
or aSSIgnee.
H. The Contractor hereby assigns to the City any and all claims for overcharges
resulting from antitrust violations as to goods and materials purchased in connection
with this Contract, except as to overcharges resulting from antitrust violations
commencing after the date of the bid or other event establishing the price of this
Contract. In addition, the Contractor warrants and represents that each of its
suppliers and subcontractors shall assign any and all such claims for overcharges to
the City in accordance with the terms of this provision. The Contractor further
agrees to give the City immediate notice of the existence of any such claim.
1. In addition to all other obligations of the contractor, if the contractor does employ
any approved subcontractor, the contractor shall supply to every approved
subcontractor a copy of the form, provided in the project manual, to establish written
proof that each subcontract and lower-tier subcontract is a written document and
contains, as a part, the current prevailing wage rates. The contractor, each approved
subcontractor and each approved lower-tier subcontractor shall complete and deliver
the form directly to the City.
11. Contract Administration.
This Contract shall be administered by G,t<. c= 'I LA 11/ 6Er'D on behalf of the Contractor
and by Terri Partch, Assistant Civil Engineer on behalf of the City. Any written notices required by
the terms ofthis Contract shall be served or mailed to the following addresses:
PW-407 _10 [rev. 4/20/06]
Small Works Roster Project Manual
J2.a~ Q 1 9 ef 11
.'~- ..
Contractor:
~ E\reCC:('" COC\s\ruL\\On I U.L
~3l:\ Du\-\eY"G1N ~. Se:.
0\'1\"'\\\>\0 , \tJQ)h\~~00 tj 558
12. Interpretation and Venue.
City:
City of Port Angeles
P.O. Box 1150
321 East Fifth Street
Port Angeles, W A 98362-0217
This Contract shall be interpreted and construed in accordance with the laws of the State of
Washington. The venue of any litigation between the parties regarding this Contract shall be
Clallam County, Washington.
IN WITNESS WHEREOF, the parties hereto have caused this Contract to be executed the
day and year first set forth above.
CONTRACTOR:
"-
GR ECoR. CoII/5TIlVC7ID~
'BY:~u..
Title: ((\~mb6R....
."
CITY OF PORT ANGELES:
By:
~F~
City Attorney
Attest:
&~. ..uptcJ^-
City erk
G \Legal_Backup\AGREEMENTS&CONTRACTS\PUB WORKS\0407_02 Part02 051206 DOC
PW-407 _10 [rev. 4/20/06]
Small Works Roster Project Manual
PS!ile 11 ef 11