Loading...
HomeMy WebLinkAbout4.484 Original Contract . .= "e.- -,=,., -<I. </. g-</ - - ~ -11-) or~J'~ , " ' SMALL WORKS PROJECT MANUAL Spot Coating the #2 Floating Cover Digester, Project 04-10A SCOPE OF WORK City of Port Angeles Public Works and Utilities Department will accept bids to sandblast and spot coat the floating cover digester Number 2, at the City wastewater treatment plant. The work will consist of the following major components: A. This specification details the procedures recommended for the application of a Tar-Guard Coal Tar Epoxy protective coating system to the interior of a process and storage vessel. B. If there is a procedure difference between this specification and any other specification or standard referred to, this specification shall control unless the City's representative authorizes a change. C. The coating material manufacturer's current product data sheets are to be used in conjunction with and become a part of this specification. The applicator should adhere to all manufacturer recommendations of product shelf life, pot life, mixing ratios and acceptable thinners. D. The applicator should use industry standard inspection equipment, quality control and inspection policies in regards to the application of this product. E. The Coating Inspection Form included in this contract must be completed during the project at the required project stages. It is the responsibility of the applicator to adhere to industry standard application and inspection procedures for record keeping purposes. F. The coating system is to be applied in one coat, plus a striping coat to a nominal film thickness required for the intended service. The recommended coating dry film thickness will vary between 8 mils (minimum) to 16 mils with acceptable spots at 16 mils. G. It is the applicator's responsibility to compute and supply adequate ventilation to prevent explosion and toxicity hazard conditions as prescribed by standards of good safety practices, local and state regulations, OSHA and other federal regulations. H. The contractor must have a suitable Confined Space Entry Permit system. 1.02 SUBMITTALS A. Product Data: Submit manufacturer's technical data, installation instructions, and chemical resistance data for the lining. Include certification indicating compliance of materials with requirements. B. Preparation and Application Data: Submit technical data on abrasives, cleaners and application equipment. C. Licenses: Submit qualifications for and prior performance of this type of work. Any certifications held in the performance of this type of work. Must display familiarity with the process of preparing, coating and inspecting similar Page I of 13 l (,. ~ . structures by these aforementioned means. PART II PRODUCTS 2.01 COATING MATERIALS Lining material shall be TAR-GUARD COAL TAR EPOXY (Sherwin Williams) or equal. Any coating other than TAR-GUARD COAL TAR EPOXY (Sherwin Williams) must be approved in writing by the City's representative. 2.02 COLOR A. Striping coat: Red. B. Final coat: Black. PART III EXECUTION 3.01 PRELIMINARY INSPECTION Before any coating is begun, the following shall be done: A. All weld splatter, sharp projections, slivers and pits should be removed. B. Weld metal should be used to fill repairs. Putty should not be used. C. Welds that are rough, irregular and not well formed should be corrected by grinding smooth. D. All sharp corners and edges should be rounded to at least a 1/8" radius. E. No other conditions exist which would shorten the expected life of the applied coatings. 3.02 SURFACE PREPARATION A. Oil and grease should be removed from the surfaces to be coated with a suitable safety solvent per SSPC-SP1 prior to abrasive blasting. B. The dome support angle on the entire tank interior should be blasted to expose sharp edges, welds and other areas prone to coating failure. Entryways in the dome lid must also be blasted to a near white metal. C. All sharp edges and welds should be ground smooth to a rounded contour in accordance with NACE Weld Preparation Designation "D". After metal surfaces are subjected to grinding, the areas must be re-blasted to ensure surface profile is correct. D. Non-carbon steel parts that will not be coated should be removed and/or protected prior to blasting, including but not limited to hatch covers, hatch rings, outlet valves and vents. The lining should be terminated on the non-carbon steel approximately 1" past the interface. Ports containing valves which cannot be removed shall have the valve component face protected and the sealing area protected by masking so that surface Page 2 of 13 I f~ ) . preparation does not damage the valve. E. The compressed air used for blasting should be free of water and oil. To determine cleanliness, blast without abrasive into a white cloth. The trap and separators should be blown down until subsequent cloth tests show no oil or water contamination. F. All weld seams should be individually blasted prior to blasting other areas of the vessel. Weld seams are the areas of early coating failure. Removal of contaminants and achieving the proper anchor pattern in the heat-affected zone at the welds is critical to the service life of the lining. G. Dome Support angle surfaces should be blasted to a "near white metal" in accordance with SSPC-SP10. H. The anchor pattern or "tooth" in the metal should be a minimum of 2 mils. Proper abrasive should be a sharp angular natural abrasive, similar to or equal to G40 or other abrasives having a sharp, hard-cutting surface, properly graded, dry, of best quality and of proper size to produce the specified anchor pattern. The first coat must be applied the same day blasting occurs. I. All internal surfaces should be vacuum cleaned to remove all blast media and dust after blasting is completed. External surfaces may be air blown clean using dry, oil-free air. Magnets are suggested to remove steel grit particles not removed by other methods. 1. No visible oxidation should be permitted between the time of blasting and striping the blasted surface. 2. The interior of the vessel should be protected from moisture from the time of blasting to the time that application and curing are complete. 3. The surface preparation must conform to SSPC-VIS 1 standards of steel cleanliness. 4. The adjoining painted area is to be brush blasted in accordance with SSPC-SP7 to a width of at least 4 inches on all sides in order to insure the adherence of the new coating to the old coating. 3.03 COATING APPLICATION A. Before starting coating application, it is recommended that the applicator read all available safety data including, but not limited to, OSHA approved material safety data sheet, product data sheet and backup label. B. TAR-GUARD consists of two parts, which must be mixed prior to using. Mix contents of each component separately and thoroughly using power agitation. Make sure no pigment remains at the bottom of the container. Mix well until obtaining a smooth liquid free of any unmixed particles of pigment. Then combine four (4) parts Part A by volume with one (1) part, Part B by volume. Thoroughly agitate the mixture with a power agitator. Restir prior to use. If reducer solvent is used, add only after both components are mixed. After the coating and curing agent have been combined and mixed, it has a 2-hour pot life at 7rF. It may be necessary Page 3 of 13 , . to thin the coating with Reducer R24K (Sherwin Williams) or equal. Reduction shall not be added at greater than 15% by volume. C. The lining application must not proceed until the substrate temperature is a minimum of 50F above the dew point. Minimum air or surface temperature at the time of application should be 500F and a maximum of 120oF. If necessary due to temperature and humidity at the time of application, appropriate dehumidification and heating equipment must be used. Applicator will document temperature, humidity and dew point at the time of application. D. Coating will be applied in two steps: a. Striping Coat (Red). b. Second spray coat (Black). E. All areas subject to over spray and drips (such as the vessel bottom) should be protected by a suitable covering while spraying other areas in the vessel. F. When airless spray equipment is used, the recommended liquid pressure is 3000 psi with tip size from .017" to .025". Adjust spray tip orifice size and material fluid pressure to obtain a spray pattern with the best possible atomization. G. Air supply should be uncontaminated. H. Apply a mist-bonding pass. I. Apply a crisscross multi-pass moving gun at a fairly rapid rate maintaining a wet appearing film. Use a 50% overlap with each pass of the gun to avoid holidays, bare areas and pinholes. By allowing the solvents to flash off for a few minutes, additional fast multi-passes may be applied until you have a film thickness of approximately 11 to 22 wet mils (measured on a wet film thickness gauge) and approximately 8 to 16 mils dry film. J. Venting from the bottom of the vessel is recommended during the application and initial curing process. K. Overcoat time will vary with the temperature and ventilation and will require >10 hours at 7rF for enclosed spaces. L. Be sure to remove any dust from sanding before applying topcoat. 3.04 CURING A. Normal cure will take place in 7 days at 770F. As ventilation and other factors affect the time/cure of the coating, additional time allowance is recommended if cure time is questioned. B. Curing must be complete before the vessel is closed up or subjected to weather conditions below the 500F minimum curing requirements (time and temperature). This may require force curing. C. Force curing at elevated temperatures does increase resistance to certain exposures; therefore, when exposure is severe, force curing is recommended to obtain maximum resistance. Page 4 of 13 . . 3.05 AREA TO BE COATED A. The support beams (angle steel) welded under the dome of the entire interior of the #2 digester will be coated according to these specifications on all carbon steel surfaces. This includes the hatches and all penetrations where corrosion has occurred. B. The interior of the digester #2 that has been properly coated (that area between the supports) is not included in the scope of this project. Contractor must ensure that the coated product will adhere to the existing coal tar epoxy and that it is properly prepared at the interface of the two coatings to a width of at least four inches. Flanges and piping ports having equipment such as valves attached and not exposed during the project are not included for coating except that these piping ports will be prepared and coated as far as practical within the port. C. Approximate volume of the tank in the coated area is 215,000 gallons. 3.06 INSPECTION A. Determine degree of blast obtained using NACE or SSPC standards. B. Depth of profile should be determined by visual comparison to Clemtex anchor pattern standards or by using Press-O-Film replica tape. C. Total dry film thickness should be determined using non-destructive dry film thickness gauges, which have been properly calibrated. SSPC Volume 1, Chapter 6, shall be used as a guide for the number of readings required per square foot. D. After a minimum 24-hour cure at 70 to gooF, the coating film will be tested for discontinuities with a low voltage holiday detector. All discontinuities shall be marked and repaired. NOTE: Discontinuity tests should be performed with a non-destructive type holiday detector such as the Tinker Rasor Model M1. E. Repair of discontinuities will include grinding the coating in the affected area to bare metal and applying two coats of the coating material in the approved method. All repaired areas will be retested with the holiday detector. F. Inspection by City Representative and authorization to proceed to the next step must occur after the following stages: a. Surface preparation (i.e. sand blast). b. Striping coat. c. Final spray coating. d. Final inspection (holiday detector) G. Scheduling the inspections and coordination is the responsibility of the Contractor. H. Inspections must be recorded on the Coating Inspection Form included with the contract. Page 5 of 13 3.07 SAFETY THE SOLVENT IN THIS COATING IS FLAMMABLE AND CARE AS REQUIRED BY GOOD PRACTICE, OSHA, STATE AND LOCAL SAFETY CODES, ETC. MUST BE FOLLOWED CLOSELY. ADDITIONAL REQUIREMENTS 1. The bid shall be submitted on the attached Bid Form and mailed or delivered to the Director of Public Works & Utilities, City of Port Angeles, 321 East Fifth Street, P. O. Box 1150, Port Angeles, Washington 98362. Questions may be directed to Jeff Young, WWTP Superintendent, at 360-417-4845. Faxed bids will not be accepted. 2. The attached Washington State Prevailing Wage Rates for Clallam County shall apply to this contract. 3. The bid may be awarded to the lowest responsible bidder. The attached Contract will then be signed, requiring the Contractor to meet the requirements in the Contract as well as the entire Project Manual. No bidder will be permitted to withdraw its bid between the closing time for receipt of bids and the execution of a Contract, unless the award is delayed for a period exceeding thirty (30) calendar days. The City of Port Angeles reserves the right to reject all bids. 4. Bids shall be submitted no later than 1 :30 pm Tuesday, November 9, 2004. 5. Because this Contract is for an amount less than $35,000, a bid bond, performance and payment bond, and retainage will not be required for this work. However, the City shall have the right of recovery against the Contractor for any payments made on the Contractor's behalf. 6. The performance period for this work is 45 working days. Contractor is to mobilize and start work within 45 working days. Page 6 of 13 BID FORM Spot Coating the #2 Floating Cover Digester, Project 04-10A The bidder hereby bids the following amounts for all work (including labor, equipment, time and materials) required to Spot Coat the Floating Digester Cover as required in the Scope of Work. Lump Sum $ 2 B, 500" 00 Sales Tax (8.3%) $ 2.. :, ~S.. &0 Total Bid $ "30, <8 ~5p 5<0 The bidder hereby acknowledges that it has received Addenda No(s). _ to this Project Manual. The name of the bidder submitting this bid and its business phone number and address, to which address all communications concerned with this bid and with the contract shall be sent is listed below. " Bidder's firm name _ Complete address _ GJ< ~ w fl... C-o N'S iRtJt:.-710 AI 4-3q 'Du-fE:.R. ROU7 RDSE. .# a () I;j Qb . '<. (Street address) , 1. UJ I tV . 1 'OS I ..J (City) (State) Telephone No. 1 (;.0 - 4:3 /)J1ff " Signed by ~ Title ~ufJrA Printed Name: _ a~&"1 ~&GJ'Yl.O (Zip) '185"'/3 Page 7 of 13 ( f1.....,..,...'"'="~-:-~~OZ-...z:;;;~............."""-~-- ~~=::::;r1.;7;;;;;;5:;~~=;;<.~~~~~~~~:;::=""_~~Z:~:.l:W:,"':;\.:~.."l\.--::;a:147 ~d_~.=Y2.~.19.: d!g~2..t~!!?~!.!!lg~~_~ ~ _ ~~_~_._ ___''_.~~----.--~ _'''___,'_~_==-,,=. PUBLIC WORKS CONTRACT This Co ract is made and entered into in duplicate this da of, 2004 by and between t City of Port Angeles, a non-charter code city of the S te of Washmgton, hereinafter r erred to as the City, and, " a, , ereinafter referred to as the Contractor. \ WITNESSETH. Whereas, the City desl es to have certain public work pertor. ed as hereinafter set forth, requiring specialized ski and other supportive capabilltle ; and Whereas, the Contractor re esents that it is qualifie and possesses sufficient skills and the necessary capabilities perform the services set forth in this Contract. NOW, THEREFORE, in consid ration of the rms, conditions, and agreements contained herein, the parties hereto gree as folio s: 1. General Provisions The Contractor's bid and the Request for i<Zls for this project are hereby incorporated . -,' ~.! and shall be construed as part' of this contra, . . . ... . The co~tra~t~;'shai~ provide all equipme (~~~r~ ':nd labor 'Of any sort whatsoever that may be required to complete the work pr&ided fo 'n this Contract. All work shall be executed in accor~' ~e with the sp ciflcations stated in this contract and with the best practices and stan~~s of the indust ~. . The Contractor guarantees a~';~'. wikmans.9~'1? a~~' m~te~ia ,f~~ :~.:,p~riod of one year following substantial completion f the work. :'-: ' , 2. Time for Performance an Liquidated Damaqes. a. Time is of the essen~ in the-perform'ance of this :con~r'a~t an in adhering to the time frames specifi~d herein. The Contractor shall commen work within 45 working days of Nbtice to Proceed, and said work shall be phys ally completed within 45 working days after commencing work, unless a differen ime frame is expressly provicled in writing by the City. 2. If said wor~s not completed within the time for physical comple' n, the cont/ractor s'hall pay to the City liquidated damages of $100 for each an every day said ark remains uncomPlej)de t~he expiration of the specified lim Page 8 of 13 PUBLIC WORKS CONTRACT This Contract is made and entered into in duplicate this q~ day of '~~l ~ 2005 by and between the City of Port Angeles, a non-charter code city of the State Washington, hereinafter referred to as the City, and, Grecor Construction a Washinqton Corporation , hereinafter referred to as the Contractor. WITNESSETH: Whereas, the City desires to have certain public work performed as hereinafter set forth, requiring specialized skills and other supportive capabilities; and Whereas, the Contractor represents that it is qualified and possesses sufficient skills and the necessary capabilities to perform the services set forth in this Contract. NOW, THEREFORE, in consideration of the terms, conditions, and agreements contained herein, the parties hereto agree as follows: 1 . General Provisions The Contractor's bid and the Request for Bids for this project are hereby incorporated and shall be construed as part of this contract. The Contractor shall provide all equipment, work, and labor of any sort whatsoever that may be required to complete the work provided for in this Contract. All work shall be executed in accordance with the specifications stated in this contract and with the best practices and standards of the industry. The Contractor guarantees all workmanship and materials for a period of one year following substantial completion of the work. 2. Time for Performance and liquidated Damaqes. a. Time is of the essence in the performance of this Contract and in adhering to the time frames specified herein. The Contractor shall commence work within 45 working days of Notice to Proceed, and said work shall be physically completed within 45 working days after commencing work, unless a different time frame is expressly provided in writing by the City. b. If said work is not completed within the time for physical completion, the Contractor shall pay to the City liquidated damages of $100 for each and every day said work remains uncompleted after the expiration of the specified time. Page 8 of 13 3. Compensation and Method of Payment. a. The City shall pay the Contractor for work performed under this Contract the amount detailed in the bid, at the completion of work and submission of a detailed invoice. b. Payments for any alterations in or additions to the work provided under this Contract shall be on a negotiated time and materials basis. 4. Independent Contractor Relationship. The relationship created by this Contract is that of independent contracting entities. No agent, employee, servant, or representative of the Contractor shall be deemed to be an employee, agent, servant, or representative of the City, and the employees of the contractor are not entitled to any of the benefits the City provides for its employees. The Contractor shall be solely and entirely responsible for its acts and the acts of its agents, employees, servants, subcontractors, or representatives during the performance of this Contract. The Contractor shall assume full responsibility for payment of all wages and salaries and all federal, state, and local taxes or contributions imposed or required, including, but not limited to, unemployment insurance, workers compensation insurance, social security, and income tax withholding. The Contractor shall control the method and manner of the work. 5. Prevailinq Waqe Requirements. The Contractor shall comply with applicable prevailing wage requirements of the Washington State Department of Labor & Industries, as set forth in Chapter 39.12 RCW and Chapter 296-127 WAC. The Contractor shall document compliance with said requirements and shall file with the City appropriate affidavits, certificates, and/or statements of compliance with the State prevailing wage requirements. The Washington State Prevailing Wage Rates For Public Works Contracts, Clallam County, incorporated in this Contract have been established by the Department of Labor & Industries and are included as an Attachment to this Contract. The Contractor shall also ensure that any subcontractors or agents of the Contractor shall comply with the prevailing wage and documentation requirements as set forth herein. 6. Indemnification and Hold Harmless. a. The Contractor shall defend, indemnify, and hold harmless the City, its officers, officials, employees, and volunteers against and from any and all claims, injuries, damages, losses, or lawsuits, including attorney fees, arising out of or in connection with the performance of this Contract, except for injuries and damages caused by the sole negligence of the City. It is further provided that no liability shall attach to the City by reason of entering into this Contract, except as expressly provided herein. Page 9 of 13 . . b. Should a court of competent jurisdiction determine that this Contract is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the Contractor and the City, its officers, officials, employees, and volunteers, the Contractor's liability hereunder shall be only to the extent of the Contractors negligence. It is further specifically and expressly understood that the indemnification provided herein constitutes the Contractor's waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes ofthis indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Contract. Contractor Initials 7. Insurance. The Contractor shall procure and maintain for the duration of the Contract, insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, their agents, representatives, employees or subcontractors. Failure by the Contractor to maintain the insurance as required shall constitute a material breach of contract upon which the City may, after giving five working days notice to the Contractor to correct the breach, immediately terminate the Contract or at its discretion, procure or renew such insurance and pay any and all premiums in connection therewith, with any sums so expended to be repaid to the City on demand, or at the sole discretion of the City, off set against funds due the Contractor from the City. 8. Minimum scope of insurance. a. The Contractor shall obtain insurance of the types described below: i. Automobile Liability insurance covering all owned, non-owned, hired and leased vehicles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. ii. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, products-completed operations, personal injury and advertising injury, and liability assumed under an insured Contract. The Commercial General Liability insurance shall be endorsed to provide the Aggregate Per Project Endorsement ISO form CG 25 03 11 85. There shall be no endorsement or modification of the Commercial General Liability insurance for liability arising from explosion, collapse or underground Page 10 of 13 property damage. The City shall be named as an insured under the Contractor's Commercial General Liability insurance policy with respect to the work performed for the City using ISO additional insured endorsement CG 20 10 11 85 or a substitute endorsement providing equivalent coverage. iii. Workers' Compensation coverage as required by the Industrial Insurance laws of the State of Washington. b. Minimum Amounts of Insurance The Contractor shall maintain the following insurance limits: i. Automobile Liabilitv insurance with a minimum combined single limit for bodily injury and property damage of $1 ,000,000 per accident. ii. Commercial General Liabilitv insurance shall be written with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 products-completed operations aggregate limit. c. Other Insurance Provisions The insurance policies are to contain, or be endorsed to contain, the following provisions for Automobile Liability and Commercial General Liability insurance. i. The Contractor's insurance coverage shall be primary insurance as respect the City. Any Insurance, self-insurance, or insurance pool coverage maintained by the City shall be excess of the Contractor's insurance and shall not contribute with it. II. The Contractor's insurance shall be endorsed to state that coverage shall not be cancelled by either party, except after thirty (30) days prior written notice by certified mail, return receipt requested, has been given to the City. d. Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. e. Verification of Coverage The Contractor shall furnish the City with original certificates and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance requirements of the Contractor before commencement of the work. Page 11 of 13 , . 9. Compliance with Laws. a. The Contractor shall comply'with all applicable federal, state, and local laws, including regulations for licensing, certification, and operation of facilities and programs, and accreditation and licensing of individuals, and any other standards or criteria as set forth in the project manual. b. The Contractor shall pay any applicable business and permit fees and taxes, which may be required for the performance of the work. c. The Contractor shall comply with all legal and permitting requirements as set forth in the project manual. 10. Non-discrimination. The parties shall conduct their business in a manner which assures fair, equal and nondiscriminatory treatment of all persons, without respect to race, creed, color, sex, Vietnam era veteran status, disabled veteran condition, physical or mental handicap, or national origin, and, in particular: a. The parties will maintain open hiring and employment practices and will welcome applications for employment in all positions from qualified individuals who are members of the above-stated minorities. b. The parties will comply strictly with all requirements of applicable federal, state or local laws or regulations issued pursuant thereto, relating to the establishment of nondiscriminatory requirements in hiring and employment practices and assuring the service of all patrons and customers without discrimination with respect to the above-stated minority status. 11. Assiqnment. a. The Contractor shall not assign this Contract or any interest herein, nor any money due to or to become due hereunder, without first obtaining the written consent of the City, nor shall the Contractor subcontract any part of the services to be performed hereunder without first obtaining the consent of the City. b. The Contractor hereby assigns to the City any and all claims for overcharges resulting from antitrust violations as to goods and materials purchased in connection with this Contract, except as to overcharges resulting from antitrust violations commencing after the date of the bid or other event establishing the price of this Contract. In addition, the Contractor warrants and represents that each of its suppliers and subcontractors shall assign any and all such claims for overcharges to the City in accordance with the terms of this provision. The Page 12 of! 3 Contractor further agrees to give the City immediate notice of the existence of any such claim. 12. Contract Administration. This Contract shall be administered by Grev Lanqemo on behalf of the Contractor and by Jeff Young on behalf of the City. Any written notices required by the terms of this Contract shall be served or mailed to the following addresses: Grecor Construction 439 Duterrow Road SE, #9 Olympia, WA, WA 98513 City: City of Port Angeles P.O. Box 1150 321 East Fifth Street Port Angeles, WA 98362-0217 Contractor: 13. Interpretation and Venue. This Contract shall be interpreted and construed in accordance with the laws of the State of Washington. The venue of any litigation between the parties regarding this Contract shall be Clallam County, Washington. IN WITNESS WHEREOF, the parties hereto have caused this Contract to be executed the day and year first set forth above. CONTRACTOR: CITY OF PORT ANGELES: (dz~LO/(' LeNsrlWt:..r/O'1. t Name of Contractor Mayor i~st~ City Attorney By: Title: Dw"'~ Attest: \ - ';,' ~~t1.~ j.)rJ.o~ CityCI Page 13 of 13 ,\ . ~ . State of WashirlgtOO DEPARTMENT OF LABOR AND INDUSTRIES Prevailing Wage Section - Telephone (360) 902-5335 PO Box 44540, Olympia, WA 9B504-454O Washington State Prevailing Wage Rates For Public Works Contracts The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fringe' benefits. On public works projects, workers' wage and benefit rates must add to not less than this total. A brief description of overtime calculation requirements is provided on the Benefit Code Key. CLALLAM COUNTY Effective 09-01-04 **********************************************************************..*************....************************ Classification ASBESTOS ABATEMENT WORKERS JOURNEY LEVEL BOILERMAKERS JOURNEY LEVEL BRICK AND MARBLE MASONS JOURNEY LEVEL CABINET MAKERS (IN SHOP) JOURNEY LEVEL CARPENTERS ACOUSTICAl WORKER I BRIDGE, DOCK AND WARF CARPENTERS CARPENTER CREOSOTED MATERIAL DRYWALL APPLICATOR FLOOR FINISHER FLOOR LAYER FLOOR SANDER MILLWRIGHT AND MACHINE ERECTORS PILEDRIVERS, ORNlNG, PUlliNG, PLACING COLLARS AND WELDING SAWFILER SHINGLER STATIONARY POWER SAW OPERATOR STATIONARY WOODWORKING TOOLS CEMENT MASONS JOURNEY LEVEL DIVERS & TENDERS DIVER DIVER TENDER DREDGE WORKERS ASSISTANT ENGINEER ASSISTANT MATE (DECKHAND) BOATMEN ENGINEER WELDER LEVERMAN, HYDRAULIC MAINTENANCE MATES OILER DRYWALl TAPERS JOURNEY LEVEL ELECTRICAl FIXTURE MAINTENANCE WORKERS JOURNEY LEVEL Page 1 (See Benefit Code Key) Over PREVAILING Time Holiday Note WAGE Code Code Code $32.61 1N 50 $43.47 1B 5N $39.87 1M SA $14.67 1 $39.11 1M 50 $38.95 1M 50 $38.95 1M 50 $39.05 1M 50 $39.63 1M 50 $39.08 1M 50 $39.08 1M 50 $39.08 1M 50 $39.95 1M I 5(;) , , $39.15 1M ,SIb $39.08 1M I SID $39.08 1M 50 $39.08 1M 50 $39.08 1M 50 $32.61 1N 50 $80.62 1M 50 BA $41.72 1M 50 $39.52 1B 50 8L $38.76 1B 50 BL $39.52 1B 50 8L $39.57 1B 50 8L $41.04 1B 50 8L $38.76 1B 50 8L $39.52 1B 50 8L $39.16 1B 50 8L $39.44 1J 5B $9.37 1 ClALLAM COUNTY . . I Effective 09-O1~ **************************************.***********************************************************************... (See Benefit Code Key) Over PREVAILING lime Holiday Note Classification WAGE Code Code Code ELECTRICIANS - INSIDE CABLE SPLICER $49.51 1D 6H CABLE SPLICER (TUNNEL) $53.31 1D 6H CERTIFIED WELDER $47.79 1D 6H CERTIFIED WELDER (TUNNEL) $51.41 10 6H . CONSTRUCTION STOCK PERSON $24.33 10 6H JOURNEY LEVEL $46.06 10 6H JOURNEY LEVEL (TUNNEL) $49.51 10 6H ELECTRICIANS - MOTOR SHOP CRAFTSMAN $15.37 2A 6C JOURNEY LEVEL $14.69 2A 6C ELECTRICIANS - POWERLlNE CONSTRUCTION CABLE SPLICER $49.54 4A SA CERTIFIED LINE WELDER $45.15 4A SA GROUNDPERSON $32.63 4A SA HEAD GROUNDPERSON $34.43 4A SA HEAVY LINE EQUIPMENT OPERATOR $45.15 4A SA JACKHAMMER OPERATOR $34.43 4A SA JOURNEY LEVEL L1NEPERSON $45.15 4A SA LINE EQUIPMENT OPERATOR $38.37 4A SA POLE SPRAYER $45.15 4A SA POWDERPERSON $34.43 4A SA ELECTRONIC & TELECOMMUNICATION TECHNICIANS JOURNEY LEVEL $12.07 1 ELEVATOR CONSTRUCTORS MECHANIC $49.28 4A 6Q MECHANIC IN CHARGE $54.18 4A 6Q FABRICATED PRECAST CONCRETE PRODUCTS ALL CLASSIFICATIONS $13.50 1 FENCE ERECTORS ' . FENCE ERECTOR $13.80 1 FENCE LABORER $11.60 1 FLAGGERS JOURNEY LEVEL $27.93 1N 50 GLAZIERS JOURNEY LEVEL $39.96 2E 5G HEAT & FROST INSULATORS AND ASBESTOS WORKERS MECHANIC $41.93 1F 5E HEATING EQUIPMENT MECHANICS MECHANIC $16.00 HOD CARRIERS & MASON TENDERS JOURNEY LEVEL $33.09 1N 50 INDUSTRIAL ENGINE AND MACHINE MECHANICS MECHANIC $15.65 1 INDUSTRIAL POWER VACUUM CLEANER JOURNEY LEVEL $9.07 1 INLAND BOATMEN CAPTAIN $35.14 1K 5B COOK $30.11 1K 5B DECKHAND $29.09 1K 58 ENGINEER/DECKHAND $31.66 1K 58 MATE, LAUNCH OPERATOR $33.24 1K 58 Page 2 '. , .. . . ,,- CLALLAM COUNTY Effective 09-01..()4 I ****..*********************************.********************************************************.***..*********** (See Benefit Code Key) Over PREVAILING Time Holiday Note Classification WAGE Code ~ Code INSPECTION/CLEANING/SEALING OF SEWER & WATER SYSTEMS BY REMOTE CONTROL CLEANER OPERATOR, FOAMER OPERATOR $9.73 1 GROUT TRU~K OPERATOR $11.48 1 HEAD OPERATOR $12.78 1 TECHNICIAN $7.16 1 TV TRUCK OPERATOR $10.53 1 INSULATION APPLICATORS JOURNEY LEVEL $20.50 1 IRONWORKERS JOURNEY LEVEL $43.12 18 SA LABORERS ASPHALT RAKER $33.09 1N 50 BALLAST REGULATOR MACHINE $32.61 1N 50 BATCH'WEIGHMAN $27.93 1N 50 BRUSH CUTTER $32.61 1N 50 BRUSH HOG FEEDER $32.61 1N 50 BURNERS $32.61 1N 50 CARPENTER TENDER $32.61 1N 50 CASS/ON WORKER $33.45 1N 50 CEMENT DUMPERlPAVlNG $33.09 1N 50 CEMENT FINISHER TENDER $32.61 1N 50 CHANGE-HOUSE MAN OR DRY SHACKMAN $32.61 1N 50 CHIPPING GUN (OVER 30 LBS) $33.09 1N 50 CHIPPING GUN (UNDER 30 LBS) $32.61 1N 50 CHOKER SETTER $32.61 1N 50 CHUCK TENDER $32.61 1N 50 CLEAN-UP LABORER $32.61 1N 50 CONCRETE DUMPER/CHUTE OPERATOR $33.09 1N 50 CONCRETE FORM STRIPPER $32.61 1N 50 CONCRETE SAW OPERATOR $33.09 1N 50 CRUSHER FEEDER $27.93 1N 50 CURING LABORER $32.61 1N 50 DEMOLITION, WRECKING & MOVING (INCLUDING CHARRED $32.61 1N 50 DITCH DIGGER $32.61 1N 50 DIVER $33.45 1N 50 DRILL OPERATOR (HYDRAULIC, DIAMOND) $33.09 1N 50 DRILL OPERATOR, AIRTRAC $33.45 1N 50 DUMPMAN $32.61 1N 50 EPOXY TECHNICIAN $32.61 1N 50 EROSION CONTROL WORKER $32.61 1N 50 FALLERlBUCKER, CHAIN SAW $33.09 1N 50 FINAL DETAIL CLEANUP (i.e., dusting, vacuuming, window cleaning; NOT $25.61 1N 50 construction debris cleanup) FINE GRADERS $32.61 1N 50 FIRE WATCH $27.93 1N 50 FORM SETTER $32.61 1N 50 GABION BASKET BUILDER $32.61 1N 50 GENERAL LABORER $32.61 1N 50 GRADE CHECKER & TRANSIT PERSON $33.09 1N 50 GRINDERS $32.61 1N 50 GROUT MACHINE TENDER $32.61 1N 50 Page 3 , . CLALLAM COUNTY Effective 09-01-04 ...************************************************************************************************************** Classification GUARDRAIL ERECTOR HAZARDOUS WASTE WORKER LEVEL A HAZARDOUS WASTE WORKER LEVEL B HAZARDOUS WASTE WORKER LEVEL C HIGH SCALER HOD CARRIERlMORT ARMAN JACKHAMMER LASER BEAM OPERATOR MANHOLE BUILOER-MUOMAN MATERIAL YARDMAN MINER NOZZLEMAN, CONCRETE PUMP, GREEN CurrER WHEN USING HIGH PRESSURE AIR & WATER ON CONCRETE & ROCK, SANDBLAST, GUNITE, SHOTCRETE, WATER BLASTER PAVEMENT BREAKER PILOT CAR PIPE POT TENDER PIPE RELlNER (NOT INSERT TYPE) PIPELAYER & CAULKER PIPELAYER & CAULKER (LEAD) PIPEWRAPPER POT TENDER POWOERMAN POWDERMAN HELPER POWERJACKS RAILROAD SPIKE PULLER (POWER) -RE-TIMBERMAN RIPRAP MAN ROOOER SCAFFOLD ERECTOR SCALE PERSON SIGNALMAN SLOPER (OVER 20j SLOPER SPRAYMAN SPREADER (CLARY POWER OR SIMILAR TYPES) SPREADER (CONCRETE) STAKE HOPPER STOCKPILER TAMPER & SIMILAR ELECTRIC. AIR & GAS TAMPER (MULTIPLE & SELF PROPELLED) TOOLROOM MAN (AT JOB SITE) TOPPER-TAILER TRACK LABORER TRACK LINER (POWER) TRUCK SPOTTER TUGGER OPERATOR VIBRATING SCREED (AIR, GAS, OR ELECTRIC) VIBRATOR VINYL SEAMER WELDER WELL-POINT LABORER Page 4 (See Benefit Code Key) OYer PREVAILING Tme Horlday Note WAGE Code Code Code $32.61 1N 50 $33.45 1N 50 $33.09 1N 50 $32.61 1N 50 $33.45 1N 50 $33.09 1N 50 $33.09 1N 50 $33.09 1N 50 $33.09 1N 50 $32.61 1N 50 $33.45 1N 50 $33.09 1N 50 $33.09 1N 50 $27.93 1N 50 $33.09 1N 50 $33.09 1N 50 $33.09 1N 50 $33.45 1N 50 $33.09 1N 50 $32.61 1N 50 $33.45 1N 50 $32.61 1N 50 $33.09 1N 50 $33.09 1N 50 $33.45 1N 50 , $32.61 1N 513 , . $33.09 1N .50 $32.61 1N 5tP $32.61 1N 50 $32.61 1N 50 $33.09 1N 50 $32.61 1N 50 $33.09 1N 50 $33.09 1N 50 $32.61 1N 50 $32.61 1N 50 $33.09 1N 50 $33.09 1N 50 $32.61 1N 50 $32.61 1N 50 $32.61 1N 50 $33.09 1N 50 $32.61 1N 50 $33.09 1N 50 $32.61 1N 50 $33.09 1N 50 $32.61 1N 50 $32.61 1N 50 $33.09 1N 50 " . . .' . . CLALLAM COUNTY Effective 09-01-04 I , **********************.*******************************.*********************..**************************..******* (See Benefit Code Key) Over PREVAILING lime Ho6day Note Classification WAGE Code Code Code LABORERS. UNDERGROUND SEWER & WATER GENERAL lABORER $32.61 1N 50 PIPE LAYER $33.09 1N 50 LANDSCAPE CONSTRUCTION IRRIGATION OR LAWN SPRINKLER INSTALLERS $11.42 1 LANDSCAPE EQUIPMENT OPERATORS OR TRUCK DRIVERS $7.81 1 LANDSCAPING OR PLANTING LABORERS $7.93 1 LATHERS JOURNEY LEVEL $39.63 1M 50 MACHINISTS (HYDROE~ECTRIC SITE WORK) MACHINIST $16.84 METAL FABRICATION (IN SHOP) FITTER/WELDER $15.16 1 lABORER $11.13 1 MACHINE OPERATOR $10.66 1 PAINTER $11.41 1 PAINTERS , JOURNEY LEVEL $30.76 2B SA PlASTERERS JOURNEY LEVEL $25.83 1 PLAYGROUND & PARK EQUIPMENT INSTALLERS JOURNEY LEVEL $7.93 1 PLUMBERS & PIPEFITTERS JOURNEY LEVEL $48.86 1G SA POWER EQUIPMENT OPERATORS ASSISTANT ENGINEERS $37.26 1T 50 8L BACKHOE, EXCAVATOR, SHOVEL (3 YO & UNDER) $39.88 1T 50 8L BACKHOE, EXCAVATOR, SHOVEL (OVER 3 YO & UNDER 6 YO) '$40.34 1T 50 8L BACKHOE, EXCAVATOR, SHOVEL (6 YO AND OVER WITH $40.86 1T 50 8L BACKHOES, (75 HP & UNDER) $39.49 1T 50 8L BACKHOES, (OVER 75 HP) $39.88 1T 50 8L BARRIER MACHINE (ZIPPER) $39.88 1T 50 8L BATCH PlANT OPERATOR, CONCRETE $39.88 1T 50 8L BELT LOADERS (ELEVATING TYPE) $39.49 1T 50 8L BOBCAT $37.26 1T 50 8L BROOMS $37.26 1T 50 8L BUMP CUTTER $39.88 1T 50 8L CABLEWAYS $40.34 1T 50 8L CHIPPER $39.88 1T 50 8L COMPRESSORS $37.26 1T 50 8L CONCRETE FINISH MACHINE. lASER SCREED $37.26 1T 50 8L CONCRETE PUMPS $39.49 1T 50 8L CONCRETE PUMP-TRUCK MOUNT WITH BOOM ATTACHMENT $39.88 1T 50 8L CONVEYORS $39.49 1T 50 8L CRANES, THRU 19 !TONS, WITH ATTACHMENTS $39.49 1T 50 8L CRANES, 20 - 44 TONS, WITH ATTACHMENTS $39.88 1T 50 8L CRANES, 45 TONS. 99 TONS, UNDER 150 FT OF BOOM (INCLUDING $40.34 1T 50 8L JIB WITH ATACHMENTS) CRANES, 100 TONS .199 TONS, OR 150 FT OF BOOM (INCLUDING JIB $40.86 1T 50 8L WITH ATTACHMENTS) CRANES, 200 TONS TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB $41.40 1T 50 8L WITH ATTACHMENTS) CRANES, A-FRAME, 10 TON AND UNDER $37.26 1T 50 8L Page 5 CLALLAM COUNTY Effective 09-01-04 ***************************************************************************************************************** " (See Benefit Code Key) Over PREVAILING TIme Holiday Note Classification WAGE Code ~ Code , CRANES, A-FRAME, OVER 10 TON $39.49 1T 50 .8L CRANES, OVER 300 TONS, OR 300' OF BOOM INCLUDING JIB WITH $41.92 1T 50 8L ATTACHMENTS CRANES, OVERHEAD, BRIDGE lYPE ( 20 - 44 TONS) $39.88 1T 50 8L CRANES. OVERHEAD. BRIDGE lYPE ( 45 - 99 TONS) $40.34 1T 50 8L CRANES, OVERHEAD. BRIDGE lYPE (100 TONS & OVER) $40.86 1T 50 8L CRANES, TOWER CRANE UP. TO 175' IN HEIGHT, BASE TO BOOM $40.86 1T 50 8L CRANES. TOWER CRANE OVER 175' IN HEIGHT, BASE TO BOOM $41.40 1T 50 8L CRUSHERS $39.88 1T 50 8L OECK ENGINEERlDECK WINCHES (POWER) $39.88 1T 50 8L DERRICK. BUILDING $40.34 1T 50 8L DOZERS. 0-9 & UNOER $39.49 1T 50 8L DRIU OILERS - AUGER TYPE. TRUCK OR CRANE MOUNT $39.49 1T 50 ~ ORIUING MACHINE $39.88 1T 50 8L ELEVATOR AND MANLlFT. PERMANENT AND SHAFT-lYPE $37.26 1T 50 8L EQUIPMENT SERVICE ENGINEER (OILER) $39.49 1T 50 8L FINISHING MACHINElBIDWELL GAMACO AND SIMILAR EQUIP $39.88 1T 50 8L FORK LIFTS, (3000 LBS AND OVER) $39.49 1T 50 .8L . FORK LIFTS. (UNDER 3000 LBS) $37.26 1T 50 8L GRADE ENGINEER , $39.49 1T 50 8l GRADECHECKER AND STAKEMAN $37.26 1T 50 8L GUARDRAIL PUNCH $39.88 1T 50 8L HOISTS, OUTSIDE (ELEVATORS AND MANLlFTS). AIR TUGGERS $39.49 1T 50 8L HORIZONTAUDIRECTIONAL DRIU LOCATOR $39.49 1T 50 8L HORIZONTAUDIRECTIONAL DRIU OPERATOR $39.88 1T 50 8L HYDRALIFTSIBOOM TRUCKS (10 TON & UNDER) $37.26 1T 50 8L HYDRALIFTSIBOOM TRUCKS (OVER 10 TON) $39.49 1T 51? 8L LOADERS. OVERHEAD (6 YO UP TO 8 YO) $40.34 1T SD 8L LOADERS, OVERHEAD (8 YO & OVER) , . $40.86 1T . sib . . 8L LOADERS, OVERHEAD (UNDER 6 YO), PLANT FEED $39.88 1T 5ID 8L LOCOMOTIVES. AU $39.88 1T 50 8L MECHANICS, AU $40.34 1T 50 8L MIXERS, ASPHALT PLANT $39.88 1T 50 8L MOTOR PATROL GRADER (FINISHING) $39.88 1T 50 8L MOTOR PATROL GRADER (NON-FINISHING) $39.49 1T 50 8L MUCKING MACHINE, MOLE. TUNNEL DRILL AND/OR SHIELD $40.34 1T 50 8L OIL DISTRIBUTORS, BLOWER DISTRIBUTION AND MULCH SEEDING $37.26 1T 50 8L OPERATOR PAVEMENT BREAKER $37.26 1T 50 aL PILEDRIVER (OTHER THAN CRANE MOUNT) $39.88 1T 50 8L PtANT-OltER(ASPHAtT, CRUSHER) - -$39.49 u-1T ------50- ----8L- POSTHOLE DIGGER. MECHANICAl. $37.26 1T 50 8L POWER PLANT $37.26 1T 50 8L PUMPS, WATER $37.26 1T 50 8L QUAD 9.0-10, AND HD-41 $40.34 1T 50 8L REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING $40.34 1T 50 8L EQUIP RIGGER AND BELLMAN $37.26 1T 50 8L ROLLAGON $40.34 1T 50 8L ROLLER, OTHER THAN PLANT ROAO MIX $37.26 1T 50 8L ROLLERS. PLANTMIX OR MULTIUFT MATERIALS $39.49 1T 50 8L ROTa-MILL, ROTO-GRINDER $39.88 1T 50 8L SAWS. CONCRETE $39.49 1T 50 8L Page 6 " . '. . , . . CLALLAM COUNTY Effective 09-01..()4 I . ******************.********************************************************************************************** Classification SCRAPERS - SELF PROPELLED. HARD TAIL END DUMP. ARTICULATING OFF-ROAD EQUIPMENT ( UNDER 45 YO) SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP. ARTICULATING OFF-ROAD EQUIPMENT (45 YO AND OVER) SCRAPERS. CONCRETE AND CARRY ALL SCREED MAN SHO'rCRETE GUNITE SLlPFORM PAVERS SPREADER, TOPSIDE OPERATOR - BLAW KNOX SUBGRADE TRIMMER TOWER f3UCKET ELEVATORS TRACTORS, (75 HP & UNDER) TRACTORS, (OVER 75 HP) TRANSFER MATERIAL SERVICE MACHINE TRANSPORTERS. ALL TRACK OR TRUCK TYPE TRENCHING MACHINES TRUCK CRANE OILERlDRIVER ( UNDER 100 TON) TRUCK CRANE OILERlDRIVER (100 TON & OVER) TRUCK MOUNT PORTABLE CONVEYER WHEEL TRACTORS. FARMALL TYPE YO YO PAY DOZER POWER EQUIPMENT OPERATORS- UNDERGROUND SEWER & (SEE POWER EQUIPMENT OPERATORS) POWER LINE CLEARANCE TREE TRIMMERS JOURNEY LEVEL IN CHARGE SPRAY PERSON TREE EQUIPMENT OPERATOR TREE TRIMMER TREE TRIMMER GROUNDPERSON REFRIGERATION & AIR CONDITIONING MECHANICS MECHANIC RESIDENTIAL BRICK & MARBLE MASONS JOURNEY LEVEL RESIDENTIAL CARPENTERS JOURNEY LEVEL RESIDENTIAL CEMENT MASONS JOURNEY LEVEL RESIDENTIAL DRYWALL TAPERS JOURNEY LEVEL RESIDENTIAL ELECTRICIANS JOURNEY LEVEL RESIDENTIAl GLAZIERS JOURNEY LEVEL RESIDENTIAL INSULATION APPLICATORS JOURNEY LEVEL , RESIDENTIAL LABORERS JOURNEY LEVEL RESIDENTIAL PAINTERS JOURNEY LEVEL RESIDENTIAL PLUMBERS & PIPEFITTERS JOURNEY LEVEL Page 7 (See Benefit Code Key) Over PREVAILING Time Holiday Note WAGE Code Code Code $39.88 1T 50 8L $40.34 1T 50 8L $39.49 1T 50 8L $39.88 1T 50 8L $37.26 1T 50 8L $40.34 1T 50 8L $39.88 1T 50 8L $39.88 1T 50 8L $39.49 1T 50 8L $39.49 1T 50 8L $39.88 1T 50 8L $39.88 1T 50 8L $40.34 1T 50 8L $39.49 1T 50 8L $~9.49 1T 50 8L $39.88 1T 50 8L $39.88 1T 50 8L $37.26 1T 50 8L $39.88 1T 50 8L $33.06 4A SA $31.34 4A 5A $31.76 4A SA $29.48 4A SA $21.94 4A SA $27.68 $39.87 1M SA $17.85 1 $25.63 $18.00 $27.78 $16.84 $9.86 $18.08 $15.97 $14.60 CLALLAM COUNTY Effective 09-01-04 I ***************************************.************************************************************************* (See Benefit Code Key) Over PREVAILING Tme Holiday Noll! Classification WAGE Code ~ Code RESIDENTiAl REFRIGERATION & AIR CONDITIONING JOURNEY LEVEL $46.41 1G SA RESIDENTIAl SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) $30.22 1J 6L RESIDENTiAl SOFT FLOOR LAYERS JOURNEY LEVEL $10.88 1 RESIDENTIAL SPRINKLER FITTERS (FIRE PROTECTION) JOURNEY LEVEL $19.67 1 ROOFERS JOURNEY LEVEL $34.53 1R SA USING IRRITABLE BITUMINOUS MATERIAlS $37.53 1R SA SHEET METAl WORKERS JOURNEY LEVEL (FIELD OR SHOP) $46.74 1J 6L SIGN MAKERS & INSTAlLERS (ELECTRICAL) JOURN~ LEVEL $19.29 1 SIGN MAKERS & INSTAlLERS (NON-ELECTRICAL) JOURNEY LEVEL $12.15 1 SOFT FLOOR LAYERS JOURNEY LEVEL $32.24 18 sA SOLAR CONTROLS FOR WINDOWS JOURNEY LEVEL $10.31 18 50 SPRINKLER FITTERS (FIRE PROTECTION) JOURNEY LEVEL $19.67 1 STAGE RIGGING MECHANICS (NON STRUCTURAl) JOURNEY LEVEL $13.23 1 SURVEYORS CHAIN PERSON $9.35 1 INSTRI:JMENT PERSON $11.40 1 PARTY CHIEF $13.40 1 TELEPHONE LINE CONSTRUCTION - OUTSIDE CABLE SPLICER $28.29 28 SA HOLE DIGGER/GROUND PERSON $15.91 28 SA INSTAlLER (REPAIRER) $27.13 28 SA JOURNEY LEVEL TELEPHONE LINE PERSON $26.32 28 SA SPECIAl APPARATUS INSTALLER I $28.29 28 SA SPECIAl APPARATUS INSTALLER II $27.72 28 SA TELEPHONE EQUIPMENT OPERATOR (HEAVY) $28.29 28 SA TELEPHONE EQUIPMENT OPERATOR (LIGHT) $26.32 28 SA TELEVISION GROUND PERSON $15.10 28 SA TELEVISION L1NEPERSONlINSTALLER $20.11 28 SA TELEVISION SYSTEM TECHNICIAN $23.80 28 SA TELEVISION TECHNICIAN $21.43 28 5A TREE TRIMMER $26.32 28 SA TERRAZZO WORKERS & TILE SETTERS JOURNEY LEVEL $37.03 1H SA TILE. MARBLE & TERRAZZO FINISHERS FINISHER $30.86 1H SA TRAFFIC CONTROL STRIPERS JOURNEY LEVEL $31.90 1K 5A TRUCK DRIVERS ASPHALT MIX (TO 16 YARDS) $36.89 1T 50 8L ASPHALT MIX (OVER 16 YARDS) $37.47 1T 50 8L Page 8 It. ,.' o . CLALLAM COUNTY Effective 09-01-04 ***************************************************************************************************************** Classification DUMP TRUCK DUMP TRUCK & TRAILER OTHER TRUCKS TRANSIT MIXER WELL DRILLERS & IRRIGATION PUMP INSTALlERS IRRIGATION PUMP INSTALLER OILER WELL DRILLER PREVAILING WAGE $20.23 $20.23 $37.47 $23.73 $11.60 $9.45 $11.60 (See Benefrt Code Key) Over Time ~ Holiday Code Note Code 1 1 1T 1 5D 8L Page 9 . . CLALLAM County - Apprentices - Effective 9/112004 - Benefit Code Kev . .- Prevailing Overtime Hobday Stage of Progression & Hour Range W C d Cod' age 0 e e ASBESTOS ABATEMENT WORKERS ENVIRONMENTAL CONTROL PAINTERS $17.53 IN 5D $20.03 IN 5D $25.72 IN 5D $29.85 IN 5D LABORERS $22.63 IN $25.12 IN $27.62 IN $30.11 IN BOILERMAKERS $35.04 1B .5N $36.45 1B 5N $37.85 1B 5N $39.26 1B 5N $40.66 1B 5N $42.07 1B 5N BRICK AND MARBLE MASONS $23.96 1M 5A $25.38 1M 5A $26.84 1M 5A $29.76 1M .iA $32.68 1M 5A $35.60 1M 5A $37.06 1M 5A CARPENTERS ACOUSTICAL WORKER 1: 0 - 1000 Homs - 50.00% $20.96 1 M 5D 2: 1001- 2000 Homs - 60.00% $27.69 1M 5D 3: 2001 - 3000 Hours - 68.00% $29.97 1M 5D 4: 3001 - 4000 Hours - 76.00% $32.26 1M 5D 5: 4001 - 5000 Homs - 84.00% $34.54 1M 5D 6: 5001 - 6000 Homs - 92.00% $36.83 1M 5D BRIDGE, DOCK AND W ARF CARPENTERS $23.72 1M 5D $29.01 1M 5D $30.43 1M 5D $31.85 1M 50 $33.27 1M 5D $34.69 1M 50 $36.11 1M 5D $37.53 1M 50 CARPENTER $23.72 1M $29.01 1M $30.43 1M $31.85 1M $33.27 1M $34.69 1M . 1: 0 - 1000 Hours - 50.00% .2: 1001 - 2000 Homs - 60.00% 3: 2001 - 3000 Homs - 75.00% 4: 3001 - 4000 Homs - 90.00% 1: 0 - 1000 Hours - 60.00% 2: 1001 - 2000 Homs - 70.00010 3: 2001 - 3000 Homs - 80.00% 4:' 3001 - 4000 Homs - 90.00% 1: 0 - 1000 Homs - 70.00% 2: 1001- 2000 Homs -75.00% 3: 2001 - 3000 Hams - 80.00010 4: 3001 - 4000 Hams - 85.00% 5: 4001 - 5000 Hams - 90.00% 6: 5001 - 6000 Homs - 95.00% 1: 0 - 750 Hams - 50.00% 2: 751 - 2250 Homs - 55.00% 3: 2251 - 3000 Hams - 60.00% 4: 3001 - 3750 Hours - 70.00% 5: 3751 - 4500 Hours - 80.00% 6: 4501 - 5250 Hours - 90.00% 7: 5251 - 6000 Hours - 95.00% 1: 1 II Period.! 60.00% 2: 2nd Period - 65.00% 3: 3M Period - 70.00% 4: 41b Period - 75.00% 5: 51b Period - 80.00% 6: 61b Period - 85.00% 7: 71b Period - 90.00% 8: 81b Period - 95.00% 1: 1st Period - 60.00% 2: 2nd Period - 65.00% 3: 3M Period - 70.00% 4: 41b Period - 75.00% 5: Sib Period - 80.00% 6: 61b Period - 85.00% 5D 5D 5D 5D 50 5D 5D 5D SD 5D - Note Code $36.11 1M $37.53 1M DRYWALL APPUCATOR DRYWAll. METAL STUD. AND CEILING APPliCATORS 1: 0 -700 Homs - 50.00% $21.22 1M . 5D' 2: 701 - 1400 Homs - 60.(>00/0 $28.00 1M SD 3: 1401 - 2100 Hours - 68.00% $30.32 1M SD 4: 2101 - 2800 Hours - 76.00% $32.65 1M SD 5: 2801 - 3500 Hours - 84.00% $34.98 1M SD 6: 3501 - 4200 Hours - 92.00% $37.30 1M SD. I MILLWRIGHT AND MACHINE ERECTORS 1: 111 Period - 60.00% $24.32 1M SD 2: 2M Period - 65.00% $29.66 1M SD 3: 3n1 Period -70.00% $31.13 1M 5D 4: 41b Period - 75.00% $32.60 1M SD 5: Sib Period - 80.00% $34.07 1M 5D 6: 61b Period - 85.00% $35.54 1M 5D 7: 71b Period - 90.00% $37.01 1M 5D 8: 81b Period - 95.00% $38.48 1M 5D PILEDRIVERS, DRIVING, PULLING, PLACING COLLARS AND WELDING 1: ISlPeriod-60.OO% $23.84 1M 5D 2: 2M Period - 65.00% $29.14 1M 5D 3: 3n1 Period - 70.00% $30.57 1M 5D 4: 41b Period - 75.00% $32.00 1M 5D 5: Sib Period - 80.00% $33.43 1M 5D 6: 61b Period - 85.00% $34.86 1M 5D 7: 71b Period - 90.00% $36.29 1M 5D 8: 81b Period - 95.00% $37.72 1M 5D CEMENT MASONS ' $12.48 IN $14.98 IN $17.47 IN $19.97 IN $22.46 IN $23.71 IN DRYWALL TAPERS $25.78 11 $27.14 1J $29.87 11 $32.61 1J $35.34 1J $36.71 11 ELECTRICIANS - INSIDE 1: 0 -1000 Hours - 40.00% $19.55 10 6H 2: 1001 - 2000 Hours - 50.00% $23.00 10 6H 3: 2001 - 3500 Hours - 55.00% $27.92 10 6H 4: 3501 - 5000 Hours - 65.00% $31.95 10 6H 5: 5001 - 6500 Hours - 75.00% $35.98 10 6H 6: 6501 - 8000 Hours - 85.00% $40.01 10 6H ELECTRICIANS - POWERLINE CONSTRUCTION JOURNEY LEVEL LINEPERSON $29.04 4A 5A $30.11 4A SA . $31.55 4A 5A $33.35 4A SA '. . . . 7: 71b Period - 90.00% 8: 81b Period - 95.00% 1: 0 - 1000 Hours - 50.00% 2: 1001 - 2000 Hours - 60.00% 3: 2001 - 3000 Ho~ - 70.00% 4: 3001 - 4000 Hours - 80.00% 5: 4001 - 5000 Hours - 90.00% 6: 5001 - 6000 Hours - 95.00% 1: 0 -1000 Hours - 50.00% 2: 1001 - 2000 Hours - 55.00% 3: 2001 - 3000 Hours - 65.00% 4: 3001 - 4000 Hours - 75.00% 5: 4001 - 5000 Hours - 85.00% 6: 5001 - 6000 Hours - 90.00% 1: 0 - 1000 Hours - 60.00% 2: 1001 - 2000 Hours - 65.00% 3: 2001 - 3000 Hours -71.00% 4: 3001 - 4000 Hours - 81.00% SD 5D . . SD 5D 5D 5D 5D 5D 5B 5B 5B 5B 5B 5B , . 5: 4001 - 5000 Hours - 85.00% .6: 5001 - 6000 Hours - 89.00% 7: 6001 - 7000 Hours - 93.00% SA SA SA $35.51 4A $38.37 4A $39.80 4A POLE SPRAYER 1: 0 - 1000 Hours - 85.70% $38.27 4A SA 2: 1001 - 2000 Hours - 89.80% $39.73 4A SA 3: 2001 - 3000 Hours - 92.80% $40.81 4A 5A ELECTRONIC & TELECOMMUNICATION TECHNICIANS ,1: 0 - 1000 Hours - 55.00% 2: 1001 - 2000 Hours - 60.00% 3: 2001 - 3000 Hours - 65.00% 4: 3001 - 4000 Hours - 70.00% 5: 4001 - 5000 Hours - 75.00% 6: 5001 - 6000 Hours - 80.00% 7: 6001 - 7000 Hours - 85.00% 8: '7001 - 8000 Hours - 95.00% 1: III Period - 50.000"" 2: 2ad Period - 55.00% 3: 3nl Period - 6S.000"" 4: 4th Period - 70.00% S: Sth Period - 80.00010 $7.16 1 $7.24 1 $7.85 1 $8.45 1 $9.05 1 $9.66 1 $10.26 1 $11.47 1 ELEVATOR CONSTRUCTORS MECHANIC $17.67 4A QQ $32.66 4A QQ $36.20 4A QQ $37.96 4A QQ $41.50 4A QQ GLAZIERS 1: 0 - 1000 Hours - 4S.00% $21.76 2E 5G 2: 1001 - 2000 Hours - 50.00% $23.41 2E 5G 3: 2001 - 3000 Hours - 55.00010 $25.07 2E 5G 4: 3001 - 4000 Hours - 60.00% $26.72 2E SG S: 4001 - 5000 Hours - 6S.0001o $28.38 2E SG 6: SOOI - 6000 Hours - 70.00% $30.03 2E 5G 7: 6001 - 7000 Hours - 80.00% $33.34 2E SG 8: 7001 - 8000 Hours - 90.00% $36.65 2E SG HEAT & FROST INSULATORS AND ASBESTOS WORKERS MECHANIC 1: 0 -1000 Hours - SO.OO% $25.97 IF 5E 2: 1001 - 2000 Hours - 55.00% $27.57 IF SE 3: 2001 - 4000 Hours - 6S.00% $30.76 IF 5E 4: 4001 - 6000 Hours - 7S.00% $33.95 IF 5E 5: 6001 - 8000 Hours - 85.00% $37.14 IF 5E ; HOD CARRIERS & MASON TENDERS 1: 0 - 1000 Hours - 60.00% 2: 1001 - 2000 Hours -70.00% 3: 2001 - 3000 Hours - 80.00% 4: 3001 - 4000 Hours - 90.00% 1: 0 - 1000 Hours - 50.00% 2: 1001 - 2000 Hours - 60.00% 3: 2001 - 3000 Hours - 75.00% 4: 3001 - 4000 Hours - 90.00% 1: 111 Period - 65.00% 2: 2nd Period - 70.00% 3: 3nl Period - 75.00% $22.63 IN 5D $25.12 IN 5D $27.62 IN 5D $30.11 IN 5D INSULATION APFUCATORS $10.25 1 $12.30 1 $15.38 1 $18.45 1 mONWORKERS $25.68 lB 5A $27.17 1B SA $35.67 lB SA ,. I '. ' . . 4: 41b Period - 80.00% $37.16 IE 5A 5: Sib Period - 90.00% $40.14 IE 5A 6: 61b Period - 90.00% $40.14 1B 5A 7: 71b Period - 95.00% $41.63 1B 5A 8: 81b Period - 95.00% $41.63 1B 5A' LABORERS 1: 0 - 1000 Hours - 60.00% $22.63 IN 5D 2: 1001 - 2000 Hours - 70.00% $25.12 IN 50 3: 2001 - 3000 Hours - 80.00% $27.62 IN 50 4: 3001 - 4000 Hours - 90.00% ' $30.11 IN 50 I LABORERS _ UNDERGROUND SEWER & WATER 1: 0 - 1000 Hours - 60.00% $22.63 IN 5D 2: 1001 - 2000 Hours - 70.00% $25.12 IN 50 3: 2001 - 3000 Hours - 80.00% $27.62 IN 5D 4: 3001 - 4000 Hours - 90.00% $30.11 IN 5D LATHERS 1: 0 - 700 Hours - 50.00% $21.22 1M 50 2: 701 - 1400 Hours - 60.00% $28.00 1M 50 3: 1401 - 2100 Hours - 68.00% $30.32 1M 50 4: 2101 - 2800 Hours - 76.00% $32.65 1M 50 5: 2801 - 3500 Hours - 84.00% $34.98 1M 50 6: 3501 - 4200 Hours - 92.@OO/o $37.30 1M 5D P AlNTERS 1: 0 - 750 Hours - 55.00% $16.18 2E SA 2:751-1500Hours-65.oo% $17.23 2E 5A 3: 1501 - 2250 HoUrs - 75.00% $19.11 2B 5A 4: 2251- 3000 Hours - 80.00% $20.82 2B SA 5: 3001 - 3750 Hours - 85.00% $21.81 2B 5A 6: 3751 - 4500 Hours - 95.00% $23.78 2B. SA PLASTERERS 1: 0 - 500 Hours - 40.00% $10.33 1 2: 501 - 1000 Hours - 45.000/0 $11.62 1 3: 1001 - 1500 Hours - 45.000/0 $11.62 1 4: 1501 - 2000 HourS - 50.00% $12.92 1 5: 2001 - 2500 Hours - 55.00% $14.21 1 6: 2501 - 3000 Hours - 60.00% $15.50 1 7: 3001 - 3500 Hours - 65.00% $16.79 1 8: 3501 - 4000 Hours - 70.00010 $18.08 1 9: 4001 - 4500 Hours - 75.00% $19.37 1 10: 4501 - 5000 Hours - 80.00% $20.66 1 11: 5001 - 5500 Hours - 85.00% $21.96 1 12: 5501 - 6000 Hours - 90.00% $23.25 1 13: 6001 - 6500 Hours - 95.00% $24.54 1 14: 6501 - 7000 Hours - 95.00% $24.54 1 PLUMBERS & PIPEFITTERS 1:0-2000Hours-50.00% $27.00 IG SA 2: 2001 - 4000 Hours - 62.50% $36.95 1 G 5A 3: 4001- 6000 Hours - 70.00010 $39.54 IG 5A 4: 6001 - 8000 Hours - 75.00% $41.25 1 G 5A 5: 8001 - 10000 Hours - 85.00% $44.70 1G 5A POWER EQillPMENT OPERATORS AU EOUIPMENT 1:0-1000Hours-65.00% $29.26 IT 50 8L 2: 1001 - 2000 Hours - 70.00% $30.72 1 T 50 8L 3: 2001 - 3000 Hours - 75.00% $32.18 IT 50 8L 4: 3001 - 4000 Hours - 80.00% $33.64 IT SO 8L . . , . '. 1: 0 - 2000 Hours - 50.00% 2: 2001 - 4000 Hours - 55.00% 3: 4001 - 6000 Hours - 60.00% 4: 6001 - 8000 Hours -70.00% 5: 8001 - 10000 Hours - 85.00% 5: 4001 - 5000 Hours - 90.00% $36.57 IT 5D 8L 6: 5001 - 6000 Hours - 95.00% $38.03 IT 5D 8L POWER EQUIPMENT OPERATORS- m"'DERGROUND SEWER & WATER (SEE POWER EQUIPMENT OPERATORS) 1: 0 - 1000 Hours - 65.00% $29.26 " 2: 1001 - 2000 Hours - 70.00010 $30.27 3: 2001 - 3000 Hours -75.00% $32.18 4: 3001 - 4000 Hours - 80.00% $33.64 5: 4001 - 5000 Hours - 90.00% $36.57 6: 5001 - 6000 Hours - 95.00% $38.03 I POWER LINE CLEARANCE TREE TRIMMERS TREE TRIMMER 1: 0 - 1000 Hours - 65.00010 $20.68 4A SA 2: 1001 - 2000 Hours - 75.00% $23.04 4A SA 3: 2001 - 3000 Hours - 80.00% $24.15 4A 5A 4: 3001 - 4000 Hours - 90.00% $26.41 4A 5A REFRIGERATION & AJR CONDITIONING MECHANICS MECHANIC $13.84 1 $15.22 1 $16.61 1 $19.38 1 $23.53 1 RESIDENTIAL CARPENTERS " $10.71 1. $11.60 1 $12.50 1 $13.39 1 . $14.28 1 $15.17 1 $16.07 1 $16.96 1 RESIDENTIAL ELECTRICIANS 1: 0 - 900 Hours - 50.00% $13.89 1 2: 901 - 1800 Hours - 55.00% $15.28 1 3: 1801 - 2700 Hours - 75.00% $20.84 1 4: 2701 - 4000 Hours - 85.00% $23.61 1 RESIDENTIAL PLUMBERS & PIPEFITTERS 1: 0 - 1000 Hours - 55.00% $8.03 1 2: 1001 - 2000 Hours - 65.00% $9.49 1 3: 2001 - 4000 Hours - 75.00% $10.95 1 4: 4001 - 6000 Hours - 85.00% $12.41 1 RESIDENTIAL SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) $14.95 11 6L $15.81 11 6L $17.09 11 6L $17.95 11 6L $19.06 11 6L $19.93 1J 6L ROOFERS 1: 151 Period - 60.00% 2: 2nd Period - 65.00% 3: 3m Period - 70.00% 4: 41b Period - 75.00% 5: 51b Period - 80.00% 6: 61b Period - 85.00% 7: 71b Period - 90.00% 8: glb Period - 95.00% 1: 1 - 1000 Hours - 50.00% 2: 1001 - 2000 Hours - 60.00% 3: 2001 - 3000 Hours - 65.00% 4: 3001 - 4000 Hours - 70.00% 5: 4001 - 5000 Hours - 80.00% 6: 5001 - 6000 Hours - 85.00% 1: 0 - 820 Hours - 60.00% 2: 821 - 1630 Hours - 67.00% 3: 1631 - 2450 Hours - 74.00% $21.93 $23.78 $25.58 lR lR lR 5A SA SA ." .. .\. ~ , 4: 2451 - 3270 Hours - 81.00% ,5: 3271 - 4080 Hours - 88.00% 6: 4081 - 4899 Hours - 95.00% 1: 0 - 2000 Hours - 45.00% 2: 2001 - 3000 Hours - 50.00% 3: 3001 - 4000 Hours - 55.00% 4: 4001 - 5000 Hours - 60.00% ,5: 5001 - 6000 Hours - 65.00% 6: 6001 - 7000 Homs - 70.00% 7: 7001 - 8000 Homs - 75.00% 8: 8001 - 9000 Homs - 80.00% 9: 9001 - 10000 Hours - 85.00% 5A 5A SA $29.66 lR $31.46 1R $33.25 lR SHEET METAL WORKERS JOURNEY LEVEL (FIELD OR SHOP) $20.23 1J 6L $27.96 11 6L $29.72 11 6L $31.50 11 6L $33.28 11 6L $35.05 11 6L $36.83 11 6L $38.61 11 6L $40.39 11 6L SOFT FLOOR LAYERS APPRENTICES INDENTURED ON OR AFTER JUNE 1.2003 1: 0 - 750 Hours - 4S.()OOIo $16.52 1B SA 2: 751 - 1500 Hours - SO.()O% $17.74 1B SA 3: 1501 - 2250 Hours - 60.00% $21.48 1B 5A 4: 2251 - 3000 Homs-70.00% $24.17 1B SA 5: 3001 - 3750 Homs - 80.00% $26.86 1B 5A 6: 3751 - 4500 Hours - 90.00% $29.55 1B 5A APPRENTICES INDENTURED PRlOR TO JUNE 1.2003 1: 0 -750 Hours - 45.00% $17.45 1B 5A 2: 751 - 1500 Hours - 50.00% $18.79 IB SA 3: 1501 - 2250 Hours - 60.00% $21.48 1B SA 4: 2251 - 3000 Hours - 70.00% $24.17 1B SA 5: 3001 - 3750 Hours - 80.00% $26.86 1B 5A 6: 3751 - 4500 Hours - 90.00% $29.55 IB 5A SPRINKLER FITTERS (FIRE PROTECTION) GRADE 1,(JNDENTURED AFTER APRlL 1. 2000) I: 0 - 1000 Homs - 45.00% $8.85 1 2: 1001 - 2000 Hours - 50.00% $9.84 1 3: 2001 - 3000 Hours - 55.00010 $10.82 1 4: 3001 - 4000 Hours - 60.00% $11.80 1 GRADE 1 fINDENTURED BEFORE APRIL 1. 2000) 1: 0 - 1000 Hours - 40.00% $7.87 1 2: 1001 - 2000 Hours - 45.00% $8.85 1 3: 2001 - 3000 Hours - 50.00% $9.84 1 4: 3001 - 4000 Hours - 55.00% $10.82 1 GRADE 2 (JNDENTURED AFTER APRlL 1. 2000) 1: 0 - 1000 Hours - 65.00% $12.79 1 2: 1001 - 2000 Hours - 70.00% $13.77 1 3: 2001 - 3000 Hours -75.00% $14.75 1 4: 3001 - 4000 Hours - 80.00% $15.74 1 5: 4001 - 5000 Hours - 85.00% $16.72 1 6: 5001 - 6000 Hours - 90.00% $17.70 1 GRADE 2 (JNDENTURED BEFORE APRIL 1. 2000) 1: 0 - 1000 Hours - 60.00% $11.80 1 2: 1001 - 2000 Hours - 65.00% $12.79 1 3: 2001 - 3000 Homs - 70.00% $13.77 1 4: 3001 - 4000 Hours - 75.00% $14.75 1 5: 4001 - 5000 Homs - 80.00% $15.74 1 6: 5001 - 6000 Hours - 85.00% $16.72 1 TERRAZZO WORKERS & TILE SETTERS . l .' . . > I: 0 - 1000 Hours - 50.000.4 $22.07 IH 5A 2: 1001 - 2500 Hours - 55.00% $23.40 IH 5A 3: 2501 - 3500 Hours - 60.000.4 $24.73 IH 5A 4: 3501 - 4500 Hours - 70.00% $27.39 IH 5A 5: 4501 - 5500 Hours - 80.00% $30.06 IH 5A' 6: 5501 - 6250 Hours - 90.00% $32.72 IH 5A 7: 6251 - 7000 Hours - 95.00% $34.05 1H 5A TILE, MARBLE & TERRAZZO FINISHERS FINISHER $21.46 IH 5A. $22.74 IH 5A $24.00 IH 5A $26.56 IH 5A TRAFFIC CONTROL STRIPERS 1: 0 - 1000 Hours - 50.00% . I 2: 1001 - 2500 Hours - 55.00% 3: 2501 - 3500 Hours - 60.00% 4: 3501 - 4500 Hours - 70.00% 1: 0 - 500 Hours - 60.00% 2: SOl - 1000 Hours - 60.00% 3: 1001 - 2333 Hours - 60.00% 4: 2334 - 4666 Hours - 73.00% 5: 4667 - 7000 Hours - 88.00% 1: 0 - 700 Hours - 70.00% 2: 701 - 1400 Hours - 80.00% 3: 1401 - 2100 Hours - 90.00% $13.50 IK $18.60 IK $21.22 IK $24.69 lK $28.70 IK TRUCK DRIVERS ALL TRUCKS $14.16 1 $16.18 1 $18.21 1 5A 5A 5A 5A 5A . . ,'. . v BENEFIT CODE KEY - EFFECTIVE 09-01-04 OVERTIME CODES OVERTIME CALCULATIONS ARE BASED ON TIIE HOURLY RATE ACfUALLY PAID TO THE WORKER. ON PUBLIC WORKS PROJECTS, THE HOURLY RATE MUST BE NOT LESS THAN THE PREVAILING RATE OF WAGE MINUS TIlE HOURLY RATE OF THE COST OF FRINGE BENEFlTS ACTUALLY PROVIDED FOR THE WORKER. 1. All. HOURS woRKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. ALL HOURS WORKED ON SATURDAYS, SUNDAYS AND HOLIDAYS SHALL ALSO BE PAID AT ONE AND ONE-HALF 'TIMES THE HOURLY RATE OF WAGE. B. ALL HOURS WORKED ON SATURDAYS SHAll. BE PAID ATONE AND ONE-HALF TIMES TIlE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE TIlE HOURLY RATE OF WAGE. C. ALL HOURS WORKED ON SUNDAYS SHAll BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. D. THE FIRST EIGHT (8) HOURS ON SA TURDA YS OF A FIVE - EIGHT HOUR WORK. WEEK. AND THE FIRST EIGlIT (8) HOURS WORKED ON A FIFTH CALENDAR DA Y, EXCLUDING SUNDA Y,IN A FOUR - TEN HOUR SCHEDULE, SHALL BE PAID ATONE AND ONE-HALF TIMES TIlE HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY ON SA TURDA Y; ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS IN A FIFIH CALENDAR WEEKDAY OF A FOUR - TEN HOUR SCHEDULE; ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH FRIDAY, AND ALL HOURS WORKED ON SUNDAYS AND HOLmA YS SHALL BE PAID AT DOUBLE TIlE HOURLY RATE OF WAGE. . E. ALL HOURS WORKED IN EXCESS OF 10 PER DAY SHALL BE PAID AT DOUBLE TIlE HOURLY RATE OF WAGE. TIlE FIRST EIGJIT (8) HOURS ON SA ruRDA Y SHALL BE PAID ATONE AND ONE-HALF TIMES TIlE HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON SA ruRDA Y, AND ALL HOURS WORKED ON . SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. F. THE FIRST EIGHT (8) HOURS ON SA ruRDA Y SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON SAruRDAY, AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON LABOR DAY SHAll BE PAID AT THREE TIMES THE HOURLY RATE OF WAGE. G. THE FIRST TEN (J 0) HOURS WORKED ON SA ruRDA YS AND THE FIRST TEN (10) HOURS WORKED ON A FIFTH CALENDAR WEEKDAY IN A FOUR - TEN HOUR SCHEDULE, SHALL BE PAID AT ONE AND ONE-HALF TIMES TIlE HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH SATURDAY, AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. H. ALL HOURS WORKED ON SAruRDA YS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER CONDITIONS OR EQUIPMENT BREAKDOWN) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. L ALL HOURS WORKED ON SATURDAY SHALL BE PAID ATONE AND ONE-HALF THE HOURLY RATE OF WAGE. WORK PERFORMED ON SUNDAYS SHAll. BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. WORK PERFORMED ON A HOLIDAY SHALL BE PAID ONE AND ONE-HALF TIMES THEIR HOURLY RATE FOR ACTUAL HOURS WORKED PLUS EIGHT (8) HOURS OF STRAIGHT TIME FOR THE HOLIDAY. J. THE FIRST EIGJIT (8) HOURS ON SA TURDA Y SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON SA TURDA Y, AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. K. ALL HOURS WORKED ON SATURDAYS AND SUNDAYS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. L ALL HOURS WORKED ON SATURDAYS, SUNDAYS AND HOLIDAYS (EXCEPT THANKSGIVING DAY AND CHRISTMAS DAY) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON THANKSGIVING DAY AND CHRISTMAS DAY SHALL BE PAID AT DOUBLE THE HOURI. Y RATE OF WAGE. M. All. HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER CONDITIONS) SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. N. ALL HOURS WORKED ON SA TURDA YS {EXCEPT MAKEUP DAYS) SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE TIlE HOURLY RATE OF WAGE. " 1. BENEFIT CODE KEY - EFFECTIVE 03-03-04 -2- . . '. P. ALL HOURS WORKED ON SA TURDA YS (EXCEPT MAKEUP DAYS) AND SUNDAYS SHALL BE PAID AT ONE AND ONE- HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT OOUBLE THE HOURLY RATE OF WAGE. Q. ALL HOURS WORKED ON SA TURDA YS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT CHRISTMAS DAY) SHALL BE PAID AT OOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON CHRISTMAS DAY SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. R. ALL HOURS WORXED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. T. ALL HOURS WORKED ON SA TURDA YS, EXCEPT MAKE-UP DAYS, SHALi BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED AFfER 6:00PM SATURDAY TO 6:00AM MONDAY AND ON HOLmA YS SHALL BE PAID A T DOUBLE THE HOURLY RATE OF WAGE. U. ALL HOURS WORKED ON SATURDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES TIlE HOURLY RATE OF WAGE. . W. ALL HOURS WORKED ON SATURDAYS AND SUNDAYS (EXCEPT MAKE-UP DAYS) SHALL BE PAID AT ONE AND ONE- HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. 2. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. A. THE FIRST SIX (6) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALFTIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF SIX (6) HOURS ON SATURDAY AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. B. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. I ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT TWO'TIMES THE HOURLY RATE OF WAGE. I ALL HOURS WORKED ON SA TIJRDA YS AND SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. THE FIRST EIGHT (8) HOURS WORKED ON HOLIDAYS SHALL BE PAID AT STRAIGHT TIME IN ADDITION TO THE HOLIDAY PAY. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON HOLIDAYS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. c. D. E. ALL HOURS WORKED ON SA TURDA YS OR HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID ATONE AND ONE- HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS OR ON LABOR DAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. F. THE FIRST EIGHT (8) HOURS WORKED ON HOLIDAYS SHALL BE PAID AT THE STRAIGHT HOURLY RATE OF WAGE IN ADDmON TO THE HOLIDAY PAY. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. G. ALL HOURS WORKED ON SUNDAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON PAID HOLIDAYS SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURLY RATE OF WAGE INCLUDING HOLIDAY PAY. H. ALL HOURS WORKED ON SA TURDA YS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE IN ADDITION TO THE HOLIDA Y PAY. I. ALL HOURS WORKED ON SA TURDA YS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT ONE AND ONE- HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND ON LABOR DAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. J. ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON PAID HOLIDAYS SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURLY RATE OF WAGE, INCLUDING THE HOLIDAY PAY. ALL HOURS WORKED ON UNPAID HOLIDAYS SHALL BE PAID ATTWOT1ME5 THE HOURLY RATE OF WAGE. K. ALL HOURS WORKED ON HOLJDA YS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE IN ADDmON TO THE HOLIDAY PAY. " i. · , . ,; , M. O. 4. A. BENEFIT CODE KEY - EFFECTIVE O~3-04 -3- . AU.. HOURS WORKED ON SATURDAYS. SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ' ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHAll.. BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SATURDA YS. "SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. s. HOUDA Y CODES HOLIDAYS: NEW YEAR'S DAY. MEMORIAL DAY. INDEPENDENCE DAY. LABOR DAY. THANKSGIVING DAY. FRIDAY AFTER THANKSGIVING DAY. AND CHRISTMAS DAY (7). B. HOLIDAYS: NEW YEAR'S DAY. MEMORIAL DAY. INDEPENDENCE DAY. LABOR DAY. THANKSGIVING DAY. FRIDAY AFTER THANKSGIVING DAY. THE DAY BEFORE CHRISTMAS. AND CHRISTMAS DAY (8). A. C. HOLIDAYS: NEW YEAR'S DAY. PRESIDENTS' DAY. MEMORIAL DAY, INDEPENDENCE DAY. LABOR DAY, THANKSGIVlNG DAY. THE FRIDAY AFTER THANKSGIVING DAY. AND CHRISTMAS DAY (8). D. HOLIDAYS: NEW YEAR'S DAY. MEMORIAL DAY. INDEPENDENCE DAY. LABOR DAY. THANKSGIVING DAY, THE FRIDAY AND SA TURDA Y AFTER THANKSGIVING DAY. AND CHRISTMAS DAY (8). . E. HOLIDAYS: NEW YEAR'S DAY. PRESIDENTS' DAY. MEMORIAL DAY, INDEPENDENCE DAY. LABOR DAY, PRESIDENTIAL ELECTION DAY. THANKSGIVING DAY. THE FRIDAY AFTER THANKSGIVING DAY. AND CHRlSTMAS DAY (9). G. HOLIDAYS: NEW YEAR'S DAY. MEMORIAL DAY. INDEPENDENCE DAY. LABOR DAY. THANKSGIVING DAY, THE LAST WORK DAY BEFORE CHRISTMAS DAY. AND CHRISTMAS DAY (7). H. HOLIDAYS: NEWYEAR'SDAY.MEMORIALDAY.INDEPENDENCEDAY. THANKSGIVING DAY. THE DAY AFTER THANKSGIVING DAY, AND CHRISTMAS (6). . I. 'HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY. INDEPENDENCE DAY. LABOR DAY. THANKSGIVING DAY, AND CHRISTMAS DAY (6). N. HOLIDAYS: NEW YEAR'S DAY. PRESIDENTS' DAY, MEMORIAL DAY. INDEPENDENCE DAY. LABOR DAY. VETERANS' DAY. THANKSGIVING DAY. THE FRIDAY AFTER THANKSGIVING DAY. AND CHRISTMAS DAY (9). O. PAID HOLIDAYS: NEWYEAR'S DAY. WASHINGTON'S BIRTHDAY. INDEPENDENCE DAY. LABOR DAY. THANKSGIVING DAY. AND CHRISTMAS DAY (6). P. HOLIDAYS: NEW YEAR'S DAY. MEMORIAL DAY. INDEPENDENCE DAY. LABOR DAY. THANKSGIVING DAY. FRIDAY AND SA TURDA Y AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS, AND CHRISTMAS DAY (9). Q. PAID HOLIDAYS: NEW YEAR'S DAY. MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY. THANKSGIVING DAY, AND CFSTMAS DAY (6). R PAID HOLIDAYS: NEW YEAR'S DAY. MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY. THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, ONE-HALF DAY BEFORE CHRISTMAS DAY. AND CHRISTMAS DAY. (7112). S. PAID HOUDA YS: NEW YEAR'S DAY. PRESIDENTS' DAY. MEMORIAL DAY. INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY (7). T. PAID HOLIDAYS: SEVEN (7) PAID HOLIDAYS. V. PAID HOLIDAYS: SIX (6) PAID HOLIDAYS. W. PAID HOUDAYS: NINE (9) PAID HOLIDAYS. X. HOLIDAYS: AFTER 520 HOURS - NEW YEAR'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY. AFTER 2080 HOURS -NEW YEAR'S DAY. WASHINGTON'S BIRTHDAY, MEMORIAL DAY. INDEPENDENCE DAY. LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND A FLOATING HOLIDAY (8). Y. HOLlDA YS: NEW YEAR'S DAY. MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY. THANKSGIVING DAY, THE FRIDAY FOLLOWING THANKSGIVING DAY, AND CHRISTMAS DAY (8). , .. .. .' BENEFIT CODE KEY - EFFECTIVE 03-03-04 -4- . . Z. HOLIDA YS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY. THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY. AND CHRISTMAS DAY (8). 6. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA Y~ THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8). B. PAID HOLIDAYS: NEW YEAR'S EVE DAY, NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY. LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS EVE DAY, CHRISTMAS DAY. (9) A. C. HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, THE LAST WORK DAY BEFORE CHRISTMAS DAY, AND CHRlSTMAS DAY (9). . D. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, THE DAY BEFORE OR THE DAY AFTER CHRISTMAS DAY (9). 6. HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING JR. DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8). L PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (7). H. L. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY. THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY. (8) Q. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY. UNPAID HOLIDAY~ PRESIDENTS'DAY. S. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DA Y, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS EVE DAY, AND CHRISTMAS DAY (8). T. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY (9). U. HOLIDAYS: NEW YEAR'S DAY, DAY BEFORE NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE DAY BEFORE CHRlSTMAS DAY, CHRISTMAS DAY (9). V. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS EVE DAY, CHRISTMAS DAY, EMPLOYEE'S BIRTHDAY, AND ONE DAY OF THE EMPLOYEE'S CHOICE (10). W. PAID HOLIDAYS: NEW YEAR'S DAY,DAY BEFORE NEW YEAR'S DAY, PRESIDENTS DAY,MEMORlALDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY , DAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, DAY BEFORE CHRISTMAS DAY (10). X. PAID HOLIDAYS: NEW YEAR'S DA Y, DAY BEFORE OR AFTER NEW YEAR'S DAY, PRESIDENTS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, DAY BEFORE OR AFTER CHRISTMAS DAY, EMPLOYEE'S BIRTHDAY (11). NOTE CODES 8. A. THE STANDBY RATE OF PAY FOR DIVERS SHALL BE ONE-HALF TIMES THE DIVERS RATE OF PAY. IN ADDITION TO THE HOURLY WAGE AND FRINGE BENEFITS, THE FOLLOWING DEPTH PREMIUMS APPLY TO DEPTHS OF FIFTY FEET OR MORE: OVER 50' TO 100' - $1.00 PER FOOT FOR EACH FOOT OVER 50 FEET OVER 100' TO 175' - $2.25 PER FOOT FOR EACH FOOT OVER 100 FEET OVER 175' TO 250' - $5.50 PER FOOT FOR EACH FOOT OVER 17S FEET OVER 250' - DIVERS MAY NAME THEIR OWN PRICE, PROVIDED IT IS NO LESS mAN 1HE SCALE LISTED FOR 250 FEET C. THE STANDBY RATE OF PAY FOR DIVERS SHALL BE ONE.HALF TIMES THE DIVERS RATE OF PAY. IN ADDITION TO THE HOURLY WAGE AND FRINGE BENEFITS, THE FOLLOWING DEPTH PREMIUMS APPLY TO DEPTHS OF FIFTY FEET OR MORE: OVER 50'TO 100' - $ 1.00 PER FOOT FOR EACH FOOT OVER 50 FEET OVER 100' TO I SO' - $1.50 PER FOOT FOR EACH FOOT OVER 100 FEET OVER ISO' TO 200' - $2.00 PER FOOT FOR EACH FOOT OVER ]50 FEET ".' -fl. L 1tJ. .' 4 . BEJIo'EFlT CODE KEY - EFFECTIVE 03-03-04 -5- OVER 200' - DIVERS MAY NAME THEIR OWN PRlCE D. WORKERS WORKING wrrn SUPPLIED AIR ON HAZMA T PROJECTS RECEIVE AN ADDITIONAL SI.00 PER HOUR. L. WORKERS ON HAZMA T PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS - LEVEL A: SO.75, LEVEL B: SO.50. AND LEVEL C: SO.25. M. WORKERS ON HAZMA T PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS: LEVELS A & B: $1.00, LEVELS C & D: $0.50. N. WORKERS ON HAZMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS - LEVEL A: SI.oo, LEVEL B: SO.75, LEVEL C: $0.50, AND LEVEL D: $0.25. FINANCE: (Cont'd) CH2M Hill Contract Amendment (Cont'd) Spot Coating #2 Floatmg Cover, Project 04-1 OA Landfill Compactor Engine Replacement Waterfront TraIl Reparrs Break CITY COUNCIL MEETING February 1, 2005 </. </ 8~ UGA. The most slgmficant issue is fire flow for the Mill, and costs also mclude the additional task of an Emergency Response Plan for the Water UtilIty. Director Cutler advised the Council that the City is lookmg to provide utihtIes to that area no later than November I, 2005, and the fire flow would follow. He noted there IS a meetmg scheduled With the property owners this coming Thursday, 7:00 p.m., to diSCUSS the project, associated costs, and projected time frames. Followmg bnef diSCUSSIOn, Councilmember Williams moved to authorize the Mayor to sign Amendment No. 1 to the Consultant Agreement with CH2M Hill in the amount 0($424,059.00, for a total contract amount not to exceed $842,059.10. Councilmember Rogers seconded the motion, which carried unanimously. 2. Spot Coatmg #2 Floatmg Cover, Project 04-10A Director Cutler explained to the Council that the first successful bidder, Square ConstructIOn, could not perform the necessary work, so Pubhc Works returned to the bid documents and inquired of the next bidder if the bid price would be honored. Grecor ConstructIOn agreed to hold the price, and staff is recommending that the contract for the floatmg cover be awarded to Grecor. Responding to an inquiry from Councilmember Pittis, Attorney Bloor clarified that the original contractor would be dropped from the Small Works Roster and considered to be non-responsive If It bids on any City project on or before December 31, 2005. In additIon, Director Cutler mdicated staffis studying the posslblhty of reqUiring a bond for projects over $35,000, acknowledgmg such a requrrement would be more expensive for contractors Councilmember Pittis moved to award and authorize the Mayor to sign a contract with Grecor Construction of Olympia in the amount of $30,865.50, for Spot Coating the #2 Floating Digester Cover, Project 04-10A. The motion was seconded by Councilmember Braun and, following brief discussion, a vote was taken on the motion, which carried unanimously. 3 Landfill Compactor Engine Replacement: Drrector Cutler presented mformatlOn pertment to the need to replace the engme on the Landfill compactor. An engine had to be installed right away and, because of the pnce, Council approval was necessary. Councilmember Rogers moved to authorize the Director of Public Works & Utilities to secure the services of NC Machinery to replace the engine in an amount up to $20,000. Councilmember Braun seconded the motion. Discussion ensued With regard to the future use and/or resale of the compactor m view of the upcommg Landfill closure. A vote was taken on the motion, which carried unanimously. 4. Waterfront Trazl Repazrs. Director Cutler summarized the need to perform immediate reparrs to the Olympic Discovery Trail east of the Rayomer Mill site, reparrs that were necessitated because of high tides and winter storm events that undermined various portions of the Trail. Repairs can commence as of Monday and must be completed by February 15th in order to meet Fish & WIldlife requirements on the fish window. Drrector Cutler mdlcated that appropriate permits have been obtamed from the County and, in response to Councilmember Rogers, he indicated the funding would come out of the unallocated portion of the CFP. Councilmember Williams moved to award the project and authorize the Mayor to sign a contract with Horizon Excavating, Inc., in the amount of$27,473.55 for the Olympic Discovery Trail Emergency Repairs Project 05-05. The motion was seconded by Councilmember Rogers and carried unanimously. Mayor Headrick recessed the meeting for a break at 7 20 p m The meetmg reconvened at 7:35 p.rn. - 7 -