PROJECT MANUAL
'Oak Street Sewer Repair
Project 04-03
SCOPE OF WORK
The project to be bid consist of three elements. The first is for the installation of a
manhole and approximately 12 feet of 12" PVC pipe sanitary sewer main. The second is
two service reconnections. The third element is the realignment of approximately 43 feet
of 8-inch PVC pipe storm sewer line.
All work to complete the installation, including the furnishing of all labor, tools, equipment and matenal
needed in the placing of all necessary pipe, manholes, JOint restraints, fittings, bedding, CDF backfill,
concrete and asphalt roadway and sidewalk resurfacing, pavement markings, restoration and clean up is
included in the bid
In the area of work, existing concrete slab thickness in the road IS expected to be less than or equal to 8".
Concrete IS to be sawcut and replaced with new concrete doweled at the joints with #5 size rebar space
18" OC and with a penetrating length of 6 Inches
Pipeline bedding shall be Imported 3/4" minus sand and/or gravel miX, 6 inches below pipe to 6 inches
above pipe. Control DenSity Fill must be used for backfill above the bedding.
The Contractor is responsible for protecting the sculpture and sculpture pedestal located in the sidewalk
immediately north or the Railroad Street and Oak Street Intersection (See attached plan sheets), during
the realignment of the 8-inch PVC Pipe storm sewer.
All eXisting live sanitary sewers shall be kept In service at all times. Provisions shall be made by the
Contractor for sewer flow bypass while repairs are made to the sanitary sewer main.
All other work shall meet the requirements of the City of Port Angeles' Urban Services Standards and
Guidelines. ThiS Contract incorporates the Washington State Department of Transportation's 2004
Standard Specifications for Road, Bridge, and Municipal Construction (English Units), referred to herein
as the Standard Specifications.
The following Special Provisions supersede any conflicting prOVisions of the Standard SpeCification and
made a part of thiS Contract. The sections referenced In these SpeCial Provisions refer to sections of the
Standard Specifications
1-10 TEMPORARY TRAFFIC CONTROL
1-10.2 Traffic Control Management
1-10.2(1) General
The third sentence of the first paragraph of Section 1-10.2(1) is revised to read:
The Contractor may designate the project superintendent as the TCM.
1-10.2(2) Traffic Control Plans (TCP's)
The first sentence of Section 1-10.2(2) is to be replaced with the following:
The Contractor shall develop a traffic control plan necessary for their method of performing the
Small Works Roster Project Manual
1
4
(.
work, and submit it to the City Engineer for approval at least 10 calendar days before any work
involving the plan begins. No work shall occur that alters existing traffic control before approval of
the plan. The plan shall be in accordance with this section, the Standard Plans, and the Manual on
Uniform Traffic Control Devices (MUTCD). The following is a list of special traffic control
requirements that shall be Incorporated Into the traffic control plan'
1. If It IS necessary to conduct work along Front Street, the contractor must use traffic safety cones
to maintain two open lanes at all times.
2. The traffic control plan shall incorporate temporary chain link fence barriers, or other barrier
approved by the Engineer, to be used for pedestrian barriers adjacent to roadways.
3. The use of existing parking lanes (i.e., indicate if parking lanes will be used as pedestrian
walkways, traffic lanes, closed to all pedestrian and traffic travel, or a combination of uses).
4. Bus service to the Oak Street Bus Station shall be maintained during sewer repair work. The
Contractor shall coordinate with Clallam Transit at 1-800-858-3747.
The last sentence of Section 1-10.2(2) is revised to read:
The Contractor's letter designating and adopting the specific traffic control plan(s) or any proposed
modified plan(s) shall be submitted to the Engineer for approval at least ten calendar days in
advance of the time the new plan will be Implemented.
All costs associated with the development and implementation of the traffic control plan(s), except
Traffic Control Labor shall be incidental to contract prices.
See the attached drawings (5 Sheets) for more information.
ADDITIONAL REQUIREMENTS
1. The bid shall be submitted on the attached Bid Form and mailed or delivered to the
Director of Public Works & Utilities, City of Port Angeles, 321 East Fifth Street, P. O. Box
1150, Port Angeles, Washington 98362. Questions may be directed to Jeremy
Andrews, at 360-417-4812.
2. The most recently issued Washington State Prevailing Wage Rates for Clallam County, a
copy of which IS attached to this Project Manual, shall apply to thiS Contract.
3. The bid will be awarded to the lowest responsible bidder from the group of Small Works
Roster contractors asked to bid on thiS work. The attached Contract will then be signed,
requiring the Contractor to meet the requirements in the Contract as well as the entire
Project Manual. No bidder will be permitted to withdraw its bid between the closing time
for receipt of bids and the execution of a Contract, unless the award is delayed for a
period exceeding sixty (60) calendar days.
4. Bids shall be submitted no later than 1 :30 P.M. September 1, 2004.
5. Because this Contract is for an amount less than $35,000, a bid bond, performance and
payment bond, and retainage will not be required for this work. However, the City shall
have the right of recovery against the Contractor for any payments made on the
Contractor's behalf.
Small Works Roster Project Manual
2
~
(,
6. The performance period for this work is 20 working days. Contractor is to mobilize and
start work within 20 working days of Notice To Proceed.
Small Works Roster Project Manual
3
(.
i.
BID FORM
Oak Street Sewer Repair
Project 04-03
The bidder hereby bids the following amounts for all work (including labor, equipment, time
and materials) required to install the sanitary sewer pipe, sanitary service pipes and storm
sewer pipe as required in the Scope of Work.
-- - .. ~~--~-. -~------- -- - - ~- - - ~
1. Manhole and Sewer Main 1 LS $ 9500 ?O $ 6SDo.O
2. 2 - Service Lines 2 EA $ l/P e b, (XJ $ 3370.
~.
3. Storm Sewer 1 LS $ I L 5qD,OD $ III 5'00 .
I
4. Traffic Control Labor 40 HR $ 3e.OO $ 1570.0
Sales Tax (8.3%) $ 20"'5,6
Quantitv
Units
Unit Price
I~otal E>rice
o
()U
o~
o
7
Total Bid I $ ~ ~/q))-, 97
The bidder hereby acknowledges that it has received Addenda Nos. $- to this Project Manual.
The name of the bidder submitting this bid and its business phone number and address, to which address
all communications concerned with this bid and with the contract shall be sent, are listed below.
Bidder's firm name j( U 6han Lo",,^- s-"iY IJ c\1~ (_0 . -:LrLc .
Complete address 3 6 ~ p6f. /)Ja- ~ q 7J '3 to 2-
(Street address) (State)
Registration Number K LJC:Jt1t4.C-COCO G4
UBI Number 19o.\ - q5 0 - q~ 2-
Telephone No. 3&,0 1-/ S 7 .. '7 141.. o-y L..{ &() -{ O,?- Z-
Signed by ~D1uJ,- /:AJ oL-
Title O\J..MQ/ / ()~
Printed Name: /Oo.J\C\.. k( u( h-CUh
Small Works Roster Project Manual 4
(.
~
PUBLIC WORKS
CONTRACT
ThIS Contract is made and entered into m duplicate trus ~y of .~" ,..I. , 20M by and between
the CIty of Port Angeles, a non-charter code city of the State of Washi~eferred to as "the City",
and Kuchan Construction, Inc., a Washington State Corporation, hereinafter referred to as "the Contractor".
WITNESSETH:
Whereas, the CIty desires to have certam publIc work performed as heremafter set forth, reqUIrmg
specIalIzed sktlls and other SupportIve capabIlItIes; and
Whereas, the Contractor represents that It IS qualIfied and possesses sufficIent skIlls and the necessary
capabIlIties to perform the servIces set forth m thIS Contract.
NOW, THEREFORE, in consIderatIOn of the terms, condItIons, and agreements contamed herem, the
partIes hereto agree as follows:
1. Scope of Work.
The Contractor shall do all work and furnish all tools, matenals, and equipment in order to accomplIsh the
following project:
Oak Street Sewer Repair
Project 04-03
m accordance WIth and as descnbed m this Contract and the Project Manual, wruch include the attached plans and
scope of work, and shall perform any alterations m or addItions to the work provIded under this Contract and every
part thereof. The Contractor shall provIde and bear the expense of all eqUIpment, work, and labor of any sort
whatsoever that may be required for the transfer of matenals and for constructing and completmg the work provIded
for in this Contract, except as may otherwise be provided in the Project Manual.
2. Time for Performance and LIqUIdated Damages.
a. Time IS of the essence m the performance of this Contract and in adhering to the tIme frames
speCIfied herem. The Contractor shall commence work wItrun 20 workmg days of NotIce to
Proceed, and saId work shall be phYSIcally completed withm 20 workmg days after commencing
work, unless a dIfferent tIme frame is expressly prOVIded in writing by the CIty.
b. If saId work is not completed WIthin the tIme for physical completIon, the Contractor may be
required at the City's sole discretIOn to pay to the City liquidated damages of $1000.00 for each
and every day said work remains uncompleted after the expIratIon of the speCIfied time.
3. CompensatIon and Method of Payment.
a. The CIty shall pay the Contractor for work performed under trus Contract as detailed in the bid, at
the completIOn of work and submission of a detailed mvoice.
Small Works Roster Project Manual
5
t
i-
b. Payments for any alteratIons m or addItIons to the work provided under this Contract shall be on a
negotiated time and materials basIs.
4. Independent Contractor Relationship.
The relationshIp created by thIs Contract IS that of independent contractmg entItIes. No agent, employee,
servant, or representatIve of the Contractor shall be deemed to be an employee, agent, servant, or representative of
the City, and the employees of the Contractor are not entitled to any of the benefits the City provides for its
employees. The Contractor shall be solely and entirely responsIble for its acts and the acts of its agents, employees,
servants, subcontractors, or representatIves during the performance of thIs Contract. The Contractor shall assume
full responsibility for payment of all wages and salaries and all federal, state, and local taxes or contnbutions
Imposed or required, mcludmg, but not limited to, unemployment insurance, workers compensation insurance, social
securitY, and mcome tax withholding.
5. PrevaIling Wage Requirements.
The Contractor shall comply with applIcable prevailmg wage requirements of the Washington State
, Department of Labor & Industries, as set forth m Chapter 39.12 RCW and Chapter 296-127 WAC. The Contractor
shall document complIance with said requirements and shall file with the City appropriate affidavits, certificates,
and/or statements of complIance with the State prevailing wage requIrements. The Washington State Prevailing
Wage Rates For Public Works Contracts, Clallam County, incorporated m this Contract have been established by the
Department of Labor & Industnes and are mcluded as an AttachInent to thIS Contract. The Contractor shall also
ensure that any subcontractors or agents of the Contractor shall comply With the prevailmg wage and documentation
requirements as set forth herein.
6. IndemnificatIon and Hold Harmless.
a. The Contractor shall defend, indemnify, and hold harmless the City, its officers, officials,
employees, and volunteers against and from any and all claims, injurIes, damages, losses, or
lawsUIts, mcludmg attorney fees, arising out of or m connectIon With the performance of this
Contract, except for injuries and damages caused by the sole neglIgence of the City. It is further
provided that no liability shall attach to the CIty by reason of entering into this Contract, except as
expressly provided herein.
b. Should a court of competent jurisdiction determine that thIs Contract is subject to RCW 4.24.115,
then, in the event ofliability for damages arising out of bodily mjury to persons or damages to
property caused by or resulting from the concurrent negligence of the Contractor and the City, its
officers, officials, employees, and volunteers, the Contractor's liability hereunder shall be only to
the extent of the Contractor's negligence. It is further specifically and expressly understood that
the indenmification provided herein constitutes the Contractor's waiver of immunity under
'Industna1 Insurance, TItle 51 RCW, solely for the purposes of this indemnification. This waiver
has been mutually negotIated by the parties. The provisIOns of thIs section shall survIve the
expuation or terminatIon of this Contract.
7. Insurance.
The Contractor shall procure and maintam for the duration of the Contract, msurance against claims for
mjuries to persons or damage to property which may anse from or in connectIOn with the performance of the work
hereunder by the Contractor, their agents, representatives, employees or subcontractors. Failure by the Contractor to
mamtam the insurance as required shall constitute a material breach of contract upon whIch the City may, after
giving five working days notice to the Contractor to correct the breach, immediately terminate the Contract or at its
dIscretion, procure or renew such Insurance and pay any and all prerrnums m connection thereWith, with any sums
Small Works Roster Project Manual
6
(
\.
so expended to be repaid to the City on demand, or at the sole dIscretion of the CIty, off set agamst funds due the
Contractor from the CIty.
a. MlDlmum Scope of Insurance
The Contractor shall obtam msurance of the types described below:
1. Automobile Liability msurance covering all owned, non-o'Ylled, hIred and leased
vehIcles. Coverage shall be written on Insurance Services Office (ISO) form CA 00 01
I or a substitute form providing equivalent liabIlIty coverage. If necessary, the policy shall
be endorsed to provide contractual liability coverage.
11. Commercial General Liabilitv msurance shall be written on ISO occurrence form CG 00
01 and shall cover liability ansmg from premises, operations, stop gap lIability,
mdependent contractors, products-completed operatIOns, personal injury and advertising
mJury, and lIability assumed under an insured Contract. The CommercIal General
Liability insurance shall be endorsed to provide the Aggregate Per Project Endorsement
ISO form CG 2503 11 85. There shall be no endorsement or modIfication of the ,
Commercial General Liability insurance for liability arismg from explosion, collapse or '
underground property damage. The City shall be named as an msured under the '
Contractor's Commercial General Liability insurance policy with respect to the work
performed for the City using ISO AddItional Insured endorsement CG 20 10 10 Oland
Additional Insured-Completed Operations endorsement CG 20 37 1001 or substitute
endorsements provIding equivalent coverage.
lll. Workers' Compensation coverage as required by the Industrial Insurance laws of the
State of Washington. i
b. MinImum Amounts of Insurance
The Contractor shall maintain the followmg insurance limits:
1. Automobile Liability msurance with a minimum combined single limit for bodily injury
and property damage of $1 ,000,000 per accident.
11. Commercial General Liabilitv insurance shall be written with limits no less than
$1,000,000 each occurrence, $2,000,000 general aggregate and a $2,000,000 products-
completed operatIons aggregate limit.
c. Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the followmg provisions for Automobile
LiabIlIty and Commercial General LIability insurance.
1. The Contractor's insurance coverage shall be primary insurance as respect to the City.
Any Insurance, self-insurance, or insurance pool coverage maintained by the CIty shall be
m excess of the Contractor's insurance and shall not contribute with it.
11. The Contractor's insurance shall not be cancelled or reduced as to coverage by either
party, except after forty-five (45) days prior written notice by certified mail, return
receipt requested, has been given to the City.
d. Acceptability of Insurers
Small Works Roster Project Manual
7
...
Insurance IS to be placed wIth insurers with a current A.M. Best rating of not less than A:VII.
e. VerificatIOn of Coverage
The Contractor shall furnish the CIty With origmal certIficates and a copy of the amendatory endorsements,
including but not necessarily hrmted to the addItIonal msured endorsement, eVldencmg the msurance
requirements of the Contractor before commencement of the work.
8., Com1Jhance with Laws.
a. The Contractor shall comply With all applicable federal, state, and local laws, including
-regulations for hcensing, certification, and operatIOn of facilities and programs, and accreditation
and licensing of individuals, and any other standards or cntena as set forth in the Project Manual.
b. The Contractor shall pay any apphcable business and perrmt fees and taxes WhICh may be required
for the performance of the work.
c. The Contractor shall comply With all legal and pennittmg requrrements as set forth in the Project
Manual.
9. Non-discnmination. The partIes shall conduct their business in a manner which assures fair, equal and
nondlscnminatory treatment of all persons, Without respect to race, creed, color, sex, VIetnam era veteran status,
dIsabled veteran condition, physical or mental handIcap, or natIOnal ongm, and, in particular:
A. The parties will mamtain open hmng and employment practices and will welcome
apphcations for employment in all pOSItIOns from quahfied mdivlduals who are members of the
above-stated minontIes.
B. The parties will comply strictly with all requirements of applicable federal, state or local
laws or regulations Issued pursuant thereto, relatmg to the estabhshment of nondiscnrninatory
reqmrements in mring and employment practIces and assuring the service of all patrons and
customers without discrimination with respect to the above-stated mmority status.
10. Assignment.
a. The Contractor shall not assign this Contract or any interest herein, nor any money due to or to
become due hereunder, without frrst obtainmg the wntten consent of the City, nor shall the
Contractor subcontract any part of the services to be performed hereunder without frrst obtaining
the consent of the City.
b. ,The Contractor hereby aSSIgns to the City any and all claims for overcharges resulting from
antItrust VIOlatIOns as to goods and materials purchased in connection With tills Contract, except as
to overcharges resultmg from antitrust violations commencmg after the date of the bid or other
event establismng the pnce of this Contract. In addItIon, the Contractor warrants and represents
that each of its supphers and subcontractors shall assign any and all such claims for overcharges to
the City in accordance with the terms of tills provlSlon. The Contractor further agrees to give the
City immediate notIce of the eXIstence of any such claim.
11. Contract AdministratIon.
This Contract shall be adrmmstered by Dana Kuchan on behalf of the Contractor and by Jeremy
Andrews, Assistant Civil Engineer on behalf of the City. Any wntten notices required by the terms of this
Contract shall be served or mailed to the followmg addresses:
Small Works Roster Project Manual
8
,
City:
Contractor:
Kuchan ConstructIon Co. Inc.
3049 E. HICkory Street
Port Angeles, W A 98362
CIty of Port Angeles
P.O. Box 1150
321 East FIfth Street
Port Angeles, W A 98362-0217
1. InterpretatIon and Venue.
ThIs Contract shall be mterpreted and construed in accordance WIth the laws of the State ofWashmgton.
The venue of any lItIgatIOn between the partIes regarding this Contract shall be Clallam County, Washmgton.
IN WITNESS WHEREOF, the partIes hereto have caused this Contract to be executed the day and year
fIrst set forth above.
CONTRACTOR:
fiU'-f1/AiV C~/.
Name of Contractor
By: '0~-,gd~
CITY OF PORT ANGELES:
TItle: ?reJ: IJ~,
By:
li~~~.~~
Ik-
AITr9ved as to Form:
/,,!~ <C
CIty Attorney
Attest:
~:!~~
\ .
" -
Small Works Roster Project Manual
9
...
State of Washrngton
DEPARTMENT OF LABOR AND INDUSTRIES
Prevailing Wage Section - Telephone (360) 902-5335
PO Box 44540, Olympia, WA 98504-4540
Washington State Prevailing Wage Rates For Public Works Contracts
The PREVAILING WAGES listed here include both the hourly wage rate and the hourly rate of fnnge benefits.
On public works projects, workers' wage and benefit rates must add to not less than this total. A brief
description of overtime calculation reqUirements is prOVided on the Benefit Code Key.
CLALLAM COUNTY
Effective 09-01-04
*****************************************************************************************************************
Classification
ASBESTOS ABATEMENT WORKERS
JOURNEY LEVEL
BOILERMAKERS
JOURNEY LEVEL
BRICK AND MARBLE MASONS
JOURNEY LEVEL
CABINET MAKERS (IN SHOP)
JOURNEY LEVEL
CARPENTERS
ACOUSTICAL WORKER
BRIDGE, DOCK AND WARF CARPENTERS
CARPENTER
CREOSOTED MATERIAL
DRYWALL APPLICATOR
FLOOR FINISHER
FLOOR LAYER
FLOOR SANDER
MILLWRIGHT AND MACHINE ERECTORS
PILEDRIVERS, DRIVING, PULLING, PLACING COLLARS AND WELDING
SAWFILER
SHINGLER
STATIONARY POWER SAW OPERATOR
STATIONARY WOODWORKING TOOLS
CEMENT MASONS
JOURNEY LEVEL
DIVERS & TENDERS
DIVER
DIVER TENDER
DREDGE WORKERS
ASSISTANT ENGINEER
ASSISTANT MATE (DECKHAND)
BOATMEN
ENGINEER WELDER
LEVERMAN, HYDRAULIC
MAINTENANCE
MATES
OILER
DRYWALL TAPERS
JOURNEY LEVEL
ELECTRICAL FIXTURE MAINTENANCE WORKERS
JOURNEY LEVEL
Page 1
PREVAILING
WAGE
$32.61
$43.47
$39.87
$14.67
$39.11
$38 95
$38.95
$39 05
$39.63
$39.08
$39 08
$39.08
$39 95
$39.15
$39.08
$39.08
$39.08
$39.08
$32.61
$80.62
$41.72
$39.52
$38.76
$39.52
$39 57
$41.04
$38.76
$39.52
$39.16
$39.44
$9.37
(See Benefit Code Key)
Over
Time Holiday Note
Code Code Code
1N
5D
1B
5N
1M
5A
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1N 5D
1M 5D 8A
1M 5D
1B 5D 8L
1B 5D 8L
18 5D 8L
1B 5D 8L
1B 5D 8L
1B 5D 8L
1B 5D 8L
1B 5D 8L
1J 5B
~
CLALLAM COUNTY
Effective 09-01-04
*****************************************************************************************************************
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
ELECTRICIANS - INSIDE
CABLE SPLICER $49.51 1D 6H
CABLE SPLICER (TUNNEL) $53.31 10 6H
CERTIFIED WELDER $47.79 10 6H
CERTIFIED WELDER (TUNNEL) $51.41 1D 6H
CONSTRUCTION STOCK PERSON $24.33 10 6H
JOURNEY LEVEL $46.06 1D 6H
JOURNEY LEVEL (TUNNEL) $49.51 10 6H
ELECTRICIANS - MOTOR SHOP
CRAFTSMAN $15.37 2A 6C
JOURNEY LEVEL $14.69 2A 6C
ELECTRICIANS - POWERLlNE CONSTRUCTION
CABLE SPLICER $49.54 4A 5A
CERTIFIED LINE WELDER $45.15 4A 5A
GROUNDPERSON $32.63 4A 5A
HEAD GROUNDPERSON $34.43 4A 5A
HEAVY LINE EQUIPMENT OPERATOR $45.15 4A 5A
JACKHAMMER OPERATOR $34.43 4A 5A
JOURNEY LEVEL L1NEPERSON $45.15 4A 5A
LINE EQUIPMENT OPERATOR $38.37 4A 5A
POLE SPRAYER $45.15 4A 5A
POWDERPERSON $34.43 4A 5A
ELECTRONIC & TELECOMMUNICATION TECHNICIANS
JOURNEY LEVEL $12.07
ELEVATOR CONSTRUCTORS
MECHANIC $49.28 4A 6Q
MECHANIC IN CHARGE $54.18 4A 6Q
FABRICATED PRECAST CONCRETE PRODUCTS
ALL CLASSIFICATIONS $13.50
FENCE ERECTORS
FENCE ERECTOR $13.80
FENCE LABORER $11.60
FLAGGERS
JOURNEY LEVEL $27.93 1N 5D
GLAZIERS
JOURNEY LEVEL $39.96 2E 5G
HEAT & FROST INSULATORS AND ASBESTOS WORKERS
MECHANIC $41.93 1F 5E
HEATING EQUIPMENT MECHANICS
MECHANIC $16.00
HOD CARRIERS & MASON TENDERS
JOURNEY LEVEL $33.09 1N 5D
INDUSTRIAL ENGINE AND MACHINE MECHANICS
MECHANIC $15.65
INDUSTRIAL POWER VACUUM CLEANER
JOURNEY LEVEL $9.07
INLAND BOATMEN
CAPTAIN $35.14 1K 5B
COOK $30 11 1K 5B
DECKHAND $29.09 1K 5B
ENGINEER/DECKHAND $31.66 1K 5B
MATE, LAUNCH OPERATOR $33.24 1K 5B
Page 2
..
CLALLAM COUNTY
Effective 09-01-04
*****************************************************************************************************************
ClaSSification
INSPECTION/CLEANING/SEALING OF SEWER & WATER
SYSTEMS BY REMOTE CONTROL
CLEANER OPERATOR, FOAMER OPERATOR
GROUT TRUCK OPERATOR
HEAD OPERATOR
TECHNICIAN
TV TRUCK OPERATOR
INSULATION APPLICATORS
JOURNEY LEVEL
IRONWORKERS
JOURNEY LEVEL
LABORERS
ASPHALT RAKER
BALLAST REGULATOR MACHINE
BATCH WEIGHMAN
BRUSH CUTTER
BRUSH HOG FEEDER
BURNERS
CARPENTER TENDER
CASSION WORKER
CEMENT DUMPER/PAVING
CEMENT FINISHER TENDER
CHANGE-HOUSE MAN OR DRY SHACKMAN
CHIPPING GUN (OVER 30 LBS)
CHIPPING GUN (UNDER 30 LBS)
CHOKER SETTER
CHUCK TENDER
CLEAN-UP LABORER
CONCRETE DUMPER/CHUTE OPERATOR
CONCRETE FORM STRIPPER
CONCRETE SAW OPERATOR
CRUSHER FEEDER
CURING LABORER
DEMOLITION, WRECKING & MOVING (INCLUDING CHARRED
DITCH DIGGER
DIVER
DRILL OPERATOR (HYDRAULIC, DIAMOND)
DRILL OPERATOR, AIRTRAC
DUMPMAN
EPOXY TECHNICIAN
EROSION CONTROL WORKER
FALLER/BUCKER, CHAIN SAW
FINAL DETAIL CLEANUP (i e ,dusling, vacuuming, window cleaning, NOT
construclion debris cleanup)
FINE GRADERS
FIRE WATCH
FORM SETTER
GAB ION BASKET BUILDER
GENERAL LABORER
GRADE CHECKER & TRANSIT PERSON
GRINDERS
GROUT MACHINE TENDER
PREVAILING
WAGE
$9.73
$11.48
$12.78
$7.16
$10.53
$20.50
$43.12
$33.09
$32.61
$27.93
$32.61
$32.61
$32.61
$32.61
$33.45
$33.09
$32.61
$32.61
$33 09
$32.61
$32.61
$32.61
$32.61
$33.09
$32.61
$33.09
$27.93
$32.61
$32.61
$32.61
$33.45
$33.09
$33.45
$32.61
$32.61
$32.61
$33.09
$25.61
$32.61
$27.93
$32.61
$32.61
$32.61
$33.09
$32.61
$32.61
Page 3
(See Benefit Code Key)
Over
Time Holiday
Code Code
Note
Code
1B 5A
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 50
1N 5D
1N 5D
1N 50
1N 5D
1N 5D
1N 5D
1N 50
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 50
1N 5D
CLALLAM COUNTY
Effective 09-01-04
*****************************************************************************************************************
Classification
GUARDRAIL ERECTOR
HAZARDOUS WASTE WORKER LEVEL A
HAZARDOUS WASTE WORKER LEVEL B
HAZARDOUS WASTE WORKER LEVEL C
HIGH SCALER
HOD CARRIERlMORTARMAN
JACKHAMMER
LASER BEAM OPERATOR
MANHOLE BUILDER-MUDMAN
MATERIAL YARDMAN
MINER
NOZZLEMAN, CONCRETE PUMP, GREEN CUTTER WHEN USING HIGH
PRESSURE AIR & WATER ON CONCRETE & ROCK, SANDBLAST,
GUNITE, SHOTCRETE, WATER BLASTER
PAVEMENT BREAKER
PILOT CAR
PIPE POT TENDER
PIPE RELlNER (NOT INSERT TYPE)
PIPELAYER & CAULKER
PIPELAYER & CAULKER (LEAD)
PIPEWRAPPER
POT TENDER
POWDERMAN
POWDERMAN HELPER
POWERJACKS
RAILROAD SPIKE PULLER (POWER)
RE-TIMBERMAN
RIPRAP MAN
RODDER
SCAFFOLD ERECTOR
SCALE PERSON
SIGNALMAN
SLOPER (OVER 20")
SLOPER SPRAYMAN
SPREADER (CLARY POWER OR SIMILAR TYPES)
SPREADER (CONCRETE)
STAKE HOPPER
STOCKPILER
TAMPER & SIMILAR ELECTRIC, AIR & GAS
TAMPER (MULTIPLE & SELF PROPELLED)
TOOLROOM MAN (AT JOB SITE)
TOPPER-TAILER
TRACK LABORER
TRACK LINER (POWER)
TRUCK SPOTTER
TUGGER OPERATOR
VIBRATING SCREED (AIR, GAS, OR ELECTRIC)
VIBRATOR
VINYL SEAMER
WELDER
WELL-POINT LABORER
Page 4
PREVAILING
WAGE
$32.61
$33.45
$33.09
$32.61
$33.45
$33.09
$33.09
$33.09
$33.09
$32.61
$33.45
$33.09
$33.09
$27.93
$33.09
$33.09
$33 09
$33 45
$33 09
$32 61
$33 45
$32.61
$33.09
$33 09
$33 45
$32.61
$33.09
$32.61
$32 61
$32.61
$33.09
$32.61
$33.09
$33.09
$32.61
$32.61
$33.09
$33.09
$32.61
$32.61
$32.61
$33.09
$32.61
$33.09
$32.61
$33.09
$32.61
$32.61
$33.09
(See Benefit Code Key)
Over
Time Holiday Note
Code Code Code
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
1N 5D
CLALLAM COUNTY
Effective 09-01-04
*****************************************************************************************************************
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
ClaSSification WAGE Code Code Code
LABORERS - UNDERGROUND SEWER & WATER
GENERAL LABORER $32.61 1N 5D
PIPE LAYER $33.09 1N 5D
LANDSCAPE CONSTRUCTION
IRRIGATION OR LAWN SPRINKLER INSTALLERS $11.42
LANDSCAPE EQUIPMENT OPERATORS OR TRUCK DRIVERS $7.81
LANDSCAPING OR PLANTING LABORERS $7.93
LATHERS
JOURNEY LEVEL $39.63 1M 5D
MACHINISTS (HYDROELECTRIC SITE WORK)
MACHINIST $16.84
METAL FABRICATION (IN SHOP)
FITTERlWELDER $15.16
LABORER $11.13
MACHINE OPERATOR $10.66
PAINTER $11.41
PAINTERS
JOURNEY LEVEL $30.76 2B 5A
PLASTERERS
JOURNEY LEVEL $25.83
PLAYGROUND & PARK EQUIPMENT INSTALLERS
JOURNEY LEVEL $793
PLUMBERS & PIPEFITTERS
JOURNEY LEVEL $48.86 1G 5A
POWER EQUIPMENT OPERATORS
ASSISTANT ENGINEERS $37 26 1T 5D 8L
BACKHOE, EXCAVATOR, SHOVEL (3 YD & UNDER) $39 88 1T 5D 8L
BACKHOE, EXCAVATOR, SHOVEL (OVER 3 YD & UNDER 6 YD) $40.34 1T 5D 8L
BACKHOE, EXCAVATOR, SHOVEL (6 YD AND OVER WITH $40 86 1T 5D 8L
BACKHOES, (75 HP & UNDER) $39 49 1T 5D 8L
BACKHOES, (OVER 75 HP) $39.88 1T 5D 8L
BARRIER MACHINE (ZIPPER) $39.88 1T 5D 8L
BATCH PLANT OPERATOR, CONCRETE $39.88 1T 5D 8L
BELT LOADERS (ELEVATING TYPE) $39.49 1T 5D 8L
BOBCAT $37.26 1T 5D 8L
BROOMS $37.26 1T 5D 8L
BUMP CUTTER $39.88 1T 5D 8L
CABLEWAYS $40.34 1T 5D 8L
CHIPPER $39.88 1T 5D 8L
COMPRESSORS $37.26 1T 5D 8L
CONCRETE FINISH MACHINE - LASER SCREED $37.26 1T 5D 8L
CONCRETE PUMPS $39.49 1T 5D 8L
CONCRETE PUMP-TRUCK MOUNT WITH BOOM ATTACHMENT $39 88 1T 5D 8L
CONVEYORS $39 49 1T 5D 8L
CRANES, THRU 19 TONS, WITH ATTACHMENTS $39.49 1T 5D 8L
CRANES, 20 - 44 TONS, WITH ATTACHMENTS $39.88 1T 5D 8L
CRANES, 45 TONS - 99 TONS, UNDER 150 FT OF BOOM (INCLUDING $40 34 1T 5D 8L
JIB WITH ATACHMENTS)
CRANES, 100 TONS -199 TONS, OR 150 FT OF BOOM (INCLUDING JIB $40.86 1T 5D 8L
WITH ATTACHMENTS)
CRANES, 200 TONS TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB $41 .40 1T 5D 8L
WITH ATTACHMENTS)
CRANES, A-FRAME, 10 TON AND UNDER $37.26 1T 5D 8L
Page 5
CLALLAM COUNTY
Effective 09-01-04
*****************************************************************************************************************
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
CRANES, A-FRAME, OVER 10 TON $39.49 1T 50 8L
CRANES, OVER 300 TONS, OR 300' OF BOOM INCLUDING JIB WITH $41.92 1T 50 8L
ATTACHMENTS
CRANES, OVERHEAD, BRIDGE TYPE ( 20 - 44 TONS) $39.88 1T 50 8L
CRANES, OVERHEAD, BRIDGE TYPE ( 45 - 99 TONS) $40.34 1T 50 8L
CRANES, OVERHEAD, BRIDGE TYPE (100 TONS & OVER) $40.86 1T 50 8L
CRANES, TOWER CRANE UP TO 175' IN HEIGHT, BASE TO BOOM $40.86 1T 50 8L
CRANES, TOWER CRANE OVER 175' IN HEIGHT, BASE TO BOOM $41 .40 1T 50 8L
CRUSHERS $39.88 1T 50 8L
DECK ENGINEER/DECK WINCHES (POWER) $39.88 1T 50 8L
DERRICK, BUILDING $40.34 1T 50 8L
DOZERS, 0-9 & UNDER $39.49 1T 50 8L
DRILL OILERS - AUGER TYPE, TRUCK OR CRANE MOUNT $39.49 1T 50 8L
DRILLING MACHINE $39.88 1T 50 8L
ELEVATOR AND MANLlFT, PERMANENT AND SHAFT-TYPE $37.26 1T 50 8L
EQUIPMENT SERVICE ENGINEER (OILER) $39.49 1T 50 8L
FINISHING MACHINE/BIDWELL GAMACO AND SIMILAR EQUIP $39.88 1T 50 8L
FORK LIFTS, (3000 LBS AND OVER) $39.49 1T 50 8L
FORK LIFTS, (UNDER 3000 LBS) $37.26 1T 50 8L
GRADE ENGINEER $39.49 1T 50 8L
GRADECHECKER AND STAKE MAN $37.26 1T 50 8L
GUARDRAIL PUNCH $39 88 1T 50 8L
HOISTS, OUTSIDE (ELEVATORS AND MANLlFTS), AIR TUGGERS $39 49 1T 50 8L
HORIZONTAUDIRECTIONAL DRILL LOCATOR $39 49 1T 50 8L
HORIZONTAUDIRECTIONAL DRILL OPERATOR $39 88 1T 50 8L
HYDRALlFTS/BOOM TRUCKS (10 TON & UNDER) $37 26 1T 50 8L
HYDRALlFTS/BOOM TRUCKS (OVER 10 TON) $39.49 1T 50 8L
LOADERS, OVERHEAD (6 YO UP TO 8 YO) $40 34 1T 50 8L
LOADERS, OVERHEAD (8 YO & OVER) $40.86 1T 50 8L
LOADERS, OVERHEAD (UNDER 6 YO), PLANT FEED $39.88 1T 50 8L
LOCOMOTIVES, ALL $39.88 1T 50 8L
MECHANICS, ALL $40.34 1T 50 8L
MIXERS, ASPHALT PLANT $39.88 1T 50 8L
MOTOR PATROL GRADER (FINISHING) $39.88 1T 50 8L
MOTOR PATROL GRADER (NON-FINISHING) $39.49 1T 50 8L
MUCKING MACHINE, MOLE, TUNNEL DRILL AND/OR SHIELD $40.34 1T 50 8L
OIL DISTRIBUTORS, BLOWER DISTRIBUTION AND MULCH SEEDING $37.26 1T 50 8L
OPERATOR
PAVEMENT BREAKER $37 26 1T 50 8L
PILEDRIVER (OTHER THAN CRANE MOUNT) $39.88 1T 50 8L
PLANT OILER (ASPHALT, CRUSHER) $39.49 1T 50 8L
POSTHOLE DIGGER, MECHANICAL $37.26 1T 50 8L
POWER PLANT $37 26 1T 50 8L
PUMPS, WATER $37 26 1T 50 8L
QUAD 9,0-10, AND HD-41 $40 34 1T 50 8L
REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING $40.34 1T 50 8L
EQUIP
RIGGER AND BELLMAN $37.26 1T 50 8L
ROLLAGON $40.34 1T 50 8L
ROLLER, OTHER THAN PLANT ROAD MIX $37.26 1T 50 8L
ROLLERS, PLANTMIX OR MUL TILlFT MATERIALS $39.49 1T 50 8L
ROTO-MILL, ROTO-GRINDER $39.88 1T 50 8L
SAWS, CONCRETE $39.49 1T 50 8L
Page 6
CLALLAM COUNTY
Effective 09-01-04
*****************************************************************************************************************
Classification
SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING
OFF-ROAD EQUIPMENT ( UNDER 45 YD)
SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING
OFF-ROAD EQUIPMENT (45 YD AND OVER)
SCRAPERS, CONCRETE AND CARRY ALL
SCREED MAN
SHOTCRETE GUNITE
SLlPFORM PAVERS
SPREADER, TOPSIDE OPERATOR - BLAW KNOX
SUBGRADE TRIMMER
TOWER BUCKET ELEVATORS
TRACTORS, (75 HP & UNDER)
TRACTORS, (OVER 75 HP)
TRANSFER MATERIAL SERVICE MACHINE
TRANSPORTERS, ALL TRACK OR TRUCK TYPE
TRENCHING MACHINES
TRUCK CRANE OILER/DRIVER ( UNDER 100 TON)
TRUCK CRANE OILER/DRIVER (100 TON & OVER)
TRUCK MOUNT PORTABLE CONVEYER
WHEEL TRACTORS, FARMALL TYPE
YO YO PAY DOZER
POWER EQUIPMENT OPERATORS- UNDERGROUND SEWER &
(SEE POWER EQUIPMENT OPERATORS)
POWER LINE CLEARANCE TREE TRIMMERS
JOURNEY LEVEL IN CHARGE
SPRAY PERSON
TREE EQUIPMENT OPERATOR
TREE TRIMMER
TREE TRIMMER GROUNDPERSON
REFRIGERATION & AIR CONDITIONING MECHANICS
MECHANIC
RESIDENTIAL BRICK & MARBLE MASONS
JOURNEY LEVEL
RESIDENTIAL CARPENTERS
JOURNEY LEVEL
RESIDENTIAL CEMENT MASONS
JOURNEY LEVEL
RESIDENTIAL DRYWALL TAPERS
JOURNEY LEVEL
RESIDENTIAL ELECTRICIANS
JOURNEY LEVEL
RESIDENTIAL GLAZIERS
JOURNEY LEVEL
RESIDENTIAL INSULATION APPLICATORS
JOURNEY LEVEL
RESIDENTIAL LABORERS
JOURNEY LEVEL
RESIDENTIAL PAINTERS
JOURNEY LEVEL
RESIDENTIAL PLUMBERS & PIPEFITTERS
JOURNEY LEVEL
Page 7
PREVAILING
WAGE
$39.88
$40.34
$39.49
$39.88
$37.26
$40.34
$39.88
$39.88
$39.49
$39.49
$39.88
$39.88
$40 34
$39.49
$39.49
$39.88
$39 88
$37.26
$39 88
$33.06
$31.34
$31.76
$29.48
$21.94
$27.68
$39.87
$17.85
$25.63
$18.00
$27.78
$16.84
$9.86
$18.08
$15.97
$14.60
(See Benefit Code Key)
Over
Time Holiday Note
Code Code Code
1T 50 8L
1T 5D 8L
1T 5D 8L
1T 5D 8L
1T 5D 8L
1T 50 8L
1T 50 8L
1T 50 8L
1T 50 8L
1T 50 8L
1T 50 8L
1T 5D 8L
1T 50 8L
1T 5D 8L
1T 50 8L
1T 50 8L
1T 50 8L
1T 5D 8L
1T 50 8L
4A 5A
4A 5A
4A 5A
4A 5A
4A 5A
1M
5A
CLALLAM COUNTY
Effective 09-01-04
*****************************************************************************************************************
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
RESIDENTIAL REFRIGERATION & AIR CONDITIONING
JOURNEY LEVEL $46.41 1G 5A
RESIDENTIAL SHEET METAL WORKERS
JOURNEY LEVEL (FIELD OR SHOP) $30 22 1J 6L
RESIDENTIAL SOFT FLOOR LAYERS
JOURNEY LEVEL $10.88
RESIDENTIAL SPRINKLER FITTERS (FIRE PROTECTION)
JOURNEY LEVEL $19.67
ROOFERS
JOURNEY LEVEL $34.53 1R 5A
USING IRRITABLE BITUMINOUS MATERIALS $37.53 1R 5A
SHEET METAL WORKERS
JOURNEY LEVEL (FIELD OR SHOP) $46.74 1J 6L
SIGN MAKERS & INSTALLERS (ELECTRICAL)
JOURNEY LEVEL $19.29
SIGN MAKERS & INSTALLERS (NON-ELECTRICAL)
JOURNEY LEVEL $12.15
SOFT FLOOR LAYERS
JOURNEY LEVEL $32.24 1B 5A
SOLAR CONTROLS FOR WINDOWS
JOURNEY LEVEL $10.31 1B 50
SPRINKLER FITTERS (FIRE PROTECTION)
JOURNEY LEVEL $19.67
STAGE RIGGING MECHANICS (NON STRUCTURAL)
JOURNEY LEVEL $13.23
SURVEYORS
CHAIN PERSON $9.35
INSTRUMENT PERSON $11.40
PARTY CHIEF $13.40
TELEPHONE LINE CONSTRUCTION - OUTSIDE
CABLE SPLICER $28.29 2B 5A
HOLE DIGGER/GROUND PERSON $15.91 2B 5A
INSTALLER (REPAIRER) $27.13 2B 5A
JOURNEY LEVEL TELEPHONE L1NEPERSON $26.32 2B 5A
SPECIAL APPARATUS INSTALLER I $28.29 2B 5A
SPECIAL APPARATUS INSTALLER II $27.72 2B 5A
TELEPHONE EQUIPMENT OPERATOR (HEAVY) $28.29 2B 5A
TELEPHONE EQUIPMENT OPERATOR (LIGHT) $26.32 28 5A
TELEVISION GROUND PERSON $15.10 2B 5A
TELEVISION L1NEPERSON/INSTALLER $20.11 2B 5A
TELEVISION SYSTEM TECHNICIAN $23 80 2B 5A
TELEVISION TECHNICIAN $21.43 2B 5A
TREE TRIMMER $26.32 28 SA
TERRAZZO WORKERS & TILE SETTERS
JOURNEY LEVEL $37 03 1H SA
TILE, MARBLE & TERRAZZO FINISHERS
FINISHER $30.86 1H SA
TRAFFIC CONTROL STRIPERS
JOURNEY LEVEL $31.90 1K SA
TRUCK DRIVERS
ASPHALT MIX (TO 16 YARDS) $36.89 1T SD 8L
ASPHALT MIX (OVER 16 YARDS) $37.47 1T SD 8L
Page 8
CLALLAM COUNTY
Effective 09-01-04
*****************************************************************************************************************
Classification
DUMP TRUCK
DUMP TRUCK & TRAILER
OTHER TRUCKS
TRANSIT MIXER
WELL DRILLERS & IRRIGATION PUMP INSTALLERS
IRRIGATION PUMP INSTALLER
OILER
WELL DRILLER
PREVAILING
WAGE
$20.23
$20.23
$37.47
$23.73
$11.60
$9.45
$11.60
(See Benefit Code Key)
Over
Time
Code
Holiday
Code
Note
Code
1
1
1T
1
5D
8L
Page 9
.
CLALLAM County -- Apprentices -- Effective 9/1/2004 -- Benefit Code Kev
,---- -~ . -~"--, "-"'" '-"P;e~aIi1ng~ Overtime-~~~iioIMay'---"Note'-'~--'-"%_-,-~~~ -,--~
Stage of ProgressIOn & Hour Range Wage Code Code Code
ASBESTOS ABATEMENT WORKERS
ENVIRONMENTAL CONTROL PAINTERS
$17.53 JJ~. 51.2
$20.03 IN 5D
$25.72 ill. 5D
$29.85 IN 5D
LABORERS
$22.63 IN
$25.12 IN
$27.62 IN
$30.11 IN
BOILERMAKERS
$35.04 In 5K
$36.45 In 5N
$37.85 1B 5N
$39.26 In 5N
$40.66 1B 5K
$42.07 ill 5N
BRICK AND MARBLE MASONS
$23.96 1M 5A
$2538 1M 5A
$26.84 1M 5A
$29.76 1M 5A
$32.68 1 M 5A
$3560 1M ~A
$37.06 1M 5A
CARPENTERS
ACOUSTICAL WORKER
1: 0 - 1000 Hours - 50.00% $20.96 1 M 5 I~
2: 1001 - 2000 Hours - 60.00% $27.69 1M 5D
3: 2001 - 3000 Hours - 68.00% $29.97 1M 5D
4: 3001 - 4000 Hours - 76.00% $32.26 1M 5D
5: 4001 - 5000 Hours - 84.00% $34.54 1M 5D
6: 5001 - 6000 Hours - 92.00% $36 83 1M 5D
BRIDGE, DOCK AND W ARF CARPENTERS
$23.72 1M 5D
$29.01 1M 5D
$30.43 1M 5D
$31 85 1M 5D
$33.27 1M 5D
$34.69 1M 5D
$36.11 1M 5D
$37.53 1M 5D
CARPENTER
$23.72 1M
$29.01 1M
$30.43 1M
$31.85 1M
$33.27 1M
$34.69 1~..1
1: 0 - 1000 Hours - 50.00%
2: 1001 - 2000 Hours - 60.00%
3: 2001 - 3000 Hours - 75.00%
4: 3001 - 4000 Hours - 90.00%
1: 0 - 1000 Hours - 60.00%
2: 1001 - 2000 Hours - 70.00%
3: 2001 - 3000 Hours - 80.00%
4: 3001 - 4000 Hours - 90.00%
1: 0 - 1000 Hours - 70.00%
2: 1001 - 2000 Hours - 75.00%
3: 2001 - 3000 Hours - 80.00%
4: 3001 - 4000 Hours - 85 00%
5: 4001 - 5000 Hours - 90.00%
6: 5001 - 6000 Hours - 95.00%
1: 0 - 750 Hours - 50.00%
2: 751 - 2250 Hours - 55.00%
3.2251 - 3000 Hours - 60.00%
4. 3001 - 3750 Hours - 70.00%
5' 3751 - 4500 Hours - 80.00%
6' 4501 - 5250 Hours - 90.00%
7: 5251 - 6000 Hours - 95.00%
1: 1st PerIod - 60.00%
2: 2nd PerIod - 65.00%
3: 3rd PerIod - 70.00%
4: 4th PerIod - 75.00%
5: 5th PerIod - 80.00%
6: 6th PerIod - 85.00%
7: 7th PerIod - 90.00%
8: 8th PerIod - 95.00%
1. 151 PerIod - 60.00%
2: 2nd PerIod - 65.00%
3: 3rd Period - 70.00%
4: 4th PerIod - 75.00%
5' 5th Period - 80.00%
6: 6th PerIod - 85.00%
5D
5D
5D
5D
5D
5D
5D
.~J2
5Q
5])
7: 7th Period - 90.00%
8: 8th Penod - 95.00%
$36.11 1M
$37.53 1M
DRYWALL APPLICATOR
DRYWALL. METAL STUD. AND CEILING APPLICATORS
1: 0 -700 Hours - 50.00% $21.22 1M 5D
2: 701 - 1400 Hours - 60.00% $28.00 1M 5D
3: 1401 - 2100 Hours - 68.00% $30.32 1M 5D
4: 2101 - 2800 Hours - 76.00% $32.65 1 M 5D
5: 2801 - 3500 Hours - 84.00% $34.98 1M 5D
6: 3501 - 4200 Hours - 92.00% $37.30 1M 5D
MILLWRIGHT AND MACHINE ERECTORS
1:1slpenod-60.00% $24.32 1M 5D
2: 2nd Penod - 65.00% $29.66 1 M 5D
3: 3rd Penod -70.00% $31.13 1M 5D
4: 4th Period - 75.00% $32.60 . 1 M 5D
5: 5th Period - 80.00% $34.07 1M 5D
6: 6th Period - 85.00% $35.54 1 M 5D
7: 7th Period - 90.00% $37.01 1M 5D
8: 8th Period - 95.00% $38.48 1 M 5D
PILEDRIVERS, DRIVING, PULLING, PLACING COLLARS AND WELDING
1: 1st Period - 6000% $23.84 1M 5D
2: 2nd Penod - 65.00% $29 14 1M SD
3' 3rd Penod - 70.00% $3057 1-M 5[)
4: 4th Period - 75.00% $32.00 iM SD
5 5th Penod - 80.00% $33.43 1M sri
6: 6th Penod - 85.00% $34.86 1M 5D
7. 7th Penod - 90.00% $36.29]M SD
8: 8th Peri 0 d-95.00% $37.72]M SD
CEMENT MASONS
$12.48 11\
$14.98 11\
$]7.47 lli
$19.97 ill
$22.46 ill
$23.71 lli
DRYWALL TAPERS
$25.78 11
$27.14 11
$29.87 11
$32.61 1J
$35 34 11
$36.71 11
ELECTRICIANS - INSIDE
1: 0 - 1000 Hours - 40.00% $19.55 11) 6H
2: 1001 - 2000 Hours - 50.00% $23.00 lD fil:l
3: 2001 - 3500 Hours - 55.00% $27.92 1D 6H
4: 3501 - 5000 Hours - 65.00% $31.95 1D 6H
5: 5001 - 6500 Hours - 75.00% $35.98 lQ 6H
6: 6501 - 8000 Hours - 85.00% $40.01 11) 6H
ELECTRICIANS - POWERLINE CONSTRUCTION
JOURNEY LEVEL LINEPERSON
$29.04 4A SA
$30.11 4A SA
$31.55 4A SA
$33.35 4A 5A
1: 0 - 1000 Hours - 50.00%
2: 1001 - 2000 Hours - 60.00%
3: 2001 - 3000 Hours - 70.00%
4: 3001 - 4000 Hours - 80 00%
5: 4001 - 5000 Hours - 90.00%
6: 5001 - 6000 Hours - 95.00%
1: 0 - 1000 Hours - 50.00%
2: 1001 - 2000 Hours - 55.00%
3: 2001 - 3000 Hours - 65.00%
4' 3001 - 4000 Hours - 75.00%
5: 4001 - 5000 Hours - 85.00%
6: 5001 - 6000 Hours - 90.00%
1: 0 - 1000 Hours - 60.00%
2: 1001 - 2000 Hours - 65.00%
3: 2001 - 3000 Hours - 71.00%
4: 3001 - 4000 Hours - 81.00%
5Q
5D
Sf)
Sf)
5D
5f)
5f)
5D
58
5B
5B
5B
513
5B
$35.51 4A
$38.37 4A
$39 80 ~A
POLE SPRAYER
1: 0 - 1000 Hours - 85.70% $38.27 4A 5A
2: 1001 - 2000 Hours - 89.80% $39.73 4A 5A
3: 2001 - 3000 Hours - 92.80% $40.81 4A 5A
ELECTRONIC & TELECOMMUNICATION TECHNICIANS
5: 4001 - 5000 Hours - 85.00%
6: 5001 - 6000 Hours - 89.00%
7: 6001 - 7000 Hours - 93.00%
1: 0 - 1000 Hours - 55.00%
2: 1001 - 2000 Hours - 60.00%
3: 2001 - 3000 Hours - 65.00%
4: 3001 - 4000 Hours - 70.00%
5: 4001 - 5000 Hours - 75.00%
6: 5001 - 6000 Hours - 80.00%
7: 6001 - 7000 Hours - 85.00%
8: 7001 - 8000 Hours - 95.00%
1: 1 st Period - 50.00%
2: 2nd Penod - 55.00%
3: 3rd Penod - 65.00%
4: 4th Penod - 70.00%
5: 5th Penod - 80.00%
5A
5A
2A
$7.16 1
$7.24 1
$7.85 1
$8.45 1
$9.05 1
$9.66 1
$10.26 1
$11.47 1
ELEVATOR CONSTRUCTORS
MECHANIC
$17.67 4A 2.Q
$32.66 4A 2.Q
$36.20 4A .Q.Q
$37.96:!A .Q.Q
$41.50 4A 6Q
GLAZIERS
1:0-1000Hours-45.00% $21.76 2E 50
2: 1001 - 2000 Hours - 50.00% $23.41 2E 50
3: 2001 - 3000 Hours - 55.00% $25.07 2F 50
4: 3001 - 4000 Hours - 60.00% $26.72 2E 50
5: 4001 - 5000 Hours - 65.00% $28.38 2E 5G
6: 5001 - 6000 Hours - 70.00% $3003 2F 50
7: 6001 - 7000 Hours - 80.00% $33.34 2E 5G
8: 7001 - 8000 Hours - 90.00% $36.65 2E 5G
HEAT & FROST INSULATORS AND ASBESTOS WORKERS
MECHANIC
1: 0 - 1000 Hours - 50.00% $2597 IF 5E
2: 1001 - 2000 Hours - 55.00% $27 57 IF 5E
3: 2001 - 4000 Hours - 65.00% $30.76 IF 5E
4: 4001 - 6000 Hours -75.00% $33.95 IF SE
5: 6001 - 8000 Hours - 85.00% $37.14 IF SE
HOD CARRIERS & MASON TENDERS
1: 0 - 1000 Hours - 60.00%
2: 1001 - 2000 Hours - 70.00%
3: 2001 - 3000 Hours - 80.00%
4: 3001 - 4000 Hours - 90.00%
1: 0 - 1000 Hours - 50.00%
2: 1001 - 2000 Hours - 60.00%
3: 2001 - 3000 Hours - 75.00%
4: 3001 - 4000 Hours - 90.00%
1: 1st Penod - 65.00%
2: 2nd Period - 70.00%
3: 3rd Period - 75.00%
$22.63 IN .?P
$25.12 IN SD
$27.62 JJ'{ .~D
$30.11 IN .2Ll
INSULATION APPLICATORS
$10.25 1
$12.30 1
$15.38 1
$18.45 1
IRONWORKERS
$25.68 ill 5A
$27.17 1B SA
$35.67 ill SA
4: 4th Penod - 80.00% $37.16 l~ 5A
5: 5th Period - 90.00% $40.14 J.n 5A
6: 6th Period - 90.00% $40.14 III 5A
7: 7th Penod - 95.00% $41.63 IE 5A
8: 8th Period - 95.00% $41.63 ill 5A
LABORERS
1: 0 - 1000 Hours - 60.00% $22.63 1 ~ 50
2: 1001 - 2000 Hours -70.00% $25.12 IN 50
3: 2001 - 3000 Hours - 80.00% $27.62 IN 50
4: 3001 - 4000 Hours - 90.00% $30.11 1 N 50
LABORERS - UNDERGROUND SEWER & WATER
1: 0 - 1000 Hours - 60.00% $22.63 1 N 5D
2: 1001 - 2000 Hours - 70.00% $25.12 IN 50
3: 2001 - 3000 Hours - 80.00% $27.62 1 N 5D
4: 3001 - 4000 Hours - 90.00% $30.11 1 ~ 50
LATHERS
1: 0 -700 Hours - 50.00% $21.22 1M 5D
2: 701 - 1400 Hours - 60.00% $28.00 1M 5D
3: 1401 - 2100 Hours - 68.00% $30.32 1M 5D
4: 2101 - 2800 Hours - 76.00% $32.65 1M 5D
5: 2801 - 3500 Hours - 84.00% $34.98 1M 5D
6: 3501 - 4200 Hours - 92.00% $37.30 1M 5D
PAINTERS
1: 0 - 750 Hours - 55.00% $16.18 28 5A
2:751-1500Hours-6500% $17.23 ~~ 5A
3: 1501 - 2250 Hours -75.00% $19.11 ~8 ~1,
4: 2251 - 3000 Hours - 80 00% $20.82 28 5A
5: 3001 - 3750 Hours - 85.00% $21.81 213 5A
6: 3751 - 4500 Hours - 95.00% $23.78 213 5A
PLASTERERS
l' 0 - 500 Hours - 40.00% $10.33 1
2: 501 - 1000 Hours - 45.00% $11.62 1
3'1001-1500Hours-45.00% $11.62 1
4: 1501 - 2000 Hours - 50.00% $12.92 1
5: 2001 - 2500 Hours - 55.00% $14.21 1
6: 2501 - 3000 Hours - 60.00% $15.50 1
7: 3001 - 3500 Hours - 65.00% $16.79 1
8: 3501 - 4000 Hours - 70.00% $18.08 1
9: 4001 - 4500 Hours -75.00% $19.37 1
10: 4501 - 5000 Hours - 80.00% $20.66 1
11: 5001 - 5500 Hours - 85.00% $21.96 1
12: 5501 - 6000 Hours - 90.00% $2325 1
13: 6001 - 6500 Hours - 95.00% $24.54 1
14: 6501 - 7000 Hours - 95.00% $24.54 1
PLUMBERS & PIPE FITTERS
1: 0 - 2000 Hours - 50.00% $27.00 lQ 2-A
2: 2001 - 4000 Hours - 62.50% $36.95 1G 5A
3: 4001 - 6000 Hours - 70.00% $39.54 1G 5A
4: 6001 - 8000 Hours - 75.00% $41.25 lQ ~<\
5: 8001 - 10000 Hours - 85.00% $44.70 1G 5A
POWER EQUIPMENT OPERATORS
ALL EOUIPMENT
1: 0 - 1000 Hours - 65.00% $29.26 IT 50 gL
2: 1001 - 2000 Hours - 70.00% $30.72 IT 5D gL
3: 2001 - 3000 Hours - 75.00% $32.18 IT 50 8L
4: 3001 - 4000 Hours - 80.00% $33.64 IT 5D 8L
5: 4001 - 5000 Hours - 90.00% $36.57 1 T 5D 8L
6: 5001 - 6000 Hours - 95.00% $38 03 _U 212 ~1
POWER EQUIPMENT OPERATORS- UNDERGROUND SEWER & WATER
(SEE POWER EQUIPMENT OPERATORS)
1: 0 - 1000 Hours - 65.00% $29.26
2. 1001 - 2000 Hours - 70.00% $30.27
3: 2001 - 3000 Hours - 75.00% $32.18
4: 3001 - 4000 Hours - 80.00% $33.64
5: 4001 - 5000 Hours - 90.00% $36.57
6: 5001 - 6000 Hours - 95.00% $38.03
POWER LINE CLEARANCE TREE TRIMMERS
TREE TRIMMER
1: 0 - 1000 Hours - 65.00% $20.68 4A 5A
2: 1001 - 2000 Hours - 75.00% $23.04 4A 5A
3: 2001 - 3000 Hours - 80.00% $24.15 4A 5A
4: 3001 - 4000 Hours - 90.00% $26.41 4A 5A
REFRIGERATION & AIR CONDITIONING MECHANICS
MECHANIC
$13.84 1
$15.22 1
$16.61 1
$19.38 1
$23.53 J_
RESIDENTIAL CARPENTERS
1: 0 - 2000 Hours - 50.00%
2: 2001 - 4000 Hours - 55.00%
3: 4001 - 6000 Hours - 60.00%
4.6001 - 8000 Hours - 70.00%
5: 8001 - 10000 Hours - 85.00%
1: 151 Period - 60.00%
2: 2nd Penod - 65.00%
3: 3'd Penod - 70.00%
4: 4th Period - 75.00%
5: 5th Penod - 80.00%
6: 61h Penod - 85.00%
7: 7th Penod - 90.00%
8: 8th Penod - 95.00%
$10.71 1.
$11.60 1
$12.50 1
$13 39 1
$14.28 1
$15.17 1
$16.07 1
$16.96 1
RESIDENTIAL ELECTRICIANS
1: 0 - 900 Hours - 50.00% $13.89 1
2: 901 - 1800 Hours - 55.00% $15.28 1
3. 1801 - 2700 Hours - 75.00% $20.84 1
4.2701 - 4000 Hours - 85.00% $23.61 1
RESIDENTIAL PLUMBERS & PIPE FITTERS
1: 0 - 1000 Hours - 55.00% $8.03 1
2: 1001 - 2000 Hours - 65.00% $9.49 1
3: 2001 - 4000 Hours - 75.00% $10.95 1
4: 4001 - 6000 Hours - 85.00% $12.41 1
RESIDENTIAL SHEET METAL WORKERS
JOURNEY LEVEL (FIELD OR SHOP)
$14.95 11 6L
$15.81 11 6L
$17.09 n 6L
$17.95 11 6L
$19.06 11 61.
$19.93 11 6L
ROOFERS
1: 1 - 1000 Hours - 50.00%
2: 1001 - 2000 Hours - 60.00%
3: 2001 - 3000 Hours - 65.00%
4: 3001 - 4000 Hours - 70.00%
5: 4001 - 5000 Hours - 80.00%
6: 5001 - 6000 Hours - 85.00%
1: 0 - 820 Hours - 60.00%
2: 821 - 1630 Hours - 67.00%
3: 1631 - 2450 Hours -74.00%
$21.93
$23.78
$25.58
lR
1R
lR
SA
SA
SA
4: 2451 - 3270 Hours - 81.00%
5: 3271 - 4080 Hours - 88.00%
6: 4081 - 4899 Hours - 95.00%
1: 0 - 2000 Hours - 45.00%
2: 2001 - 3000 Hours - 50.00%
3: 3001 - 4000 Hours - 55.00%
4: 4001 - 5000 Hours - 60.00%
5: 5001 - 6000 Hours - 65.00%
6: 6001 - 7000 Hours - 70.00%
7: 7001 - 8000 Hours - 75.00%
8: 8001 - 9000 Hours - 80.00%
9: 9001 - 10000 Hours - 85.00%
$29.66 1R
$31.46 IR
$33.25 1R
SHEET METAL WORKERS
JOURNEY LEVEL (FIELD OR SHOP)
$20.23 11 6L
$27.96 11 6L
$29.72 11 6L
$31.50 11 6L
$33.28 11 6L
$35.05 11 6L
$36.83 11 6L
$38.61 11 6L
$40.39 11 6L
SOFT FLOOR LAYERS
5A
5A
5A
APPRENTICES INDENTURED ON OR AFTER JUNE I. 2003
1: 0 - 750 Hours - 45.00% $16.52 1B 5A
2:751-1500Hours-50.00% $17.74 1B 5A
3: 1501 - 2250 Hours - 60.00% $21.48 1B 5A
4: 2251 - 3000 Hours -70.00% $24.17 1B 5A
5: 3001 - 3750 Hours - 80.00% $26.86 1~ )1.).
6: 3751 - 4500 Hours - 90.00% $29.55 l~ ~i:\
APPRENTICES INDENTURED PRIOR TO JUNE I. 2003
1. 0 - 750 Hours - 45.00% $17.45 1~ ~A
2.751 - 1500 Hours - 50.00% $18.79 1B SA
3: 1501 - 2250 Hours - 60.00% $21.48 1B 5A
4: 2251 - 3000 Hours - 70.00% $24.17 1 B 5A
5. 3001 - 3750 Hours - 80.00% $26.86 1 B 5A
6.3751 - 4500 Hours - 90.00% $29.55 ill. SA.
SPRINKLER FITTERS (FIRE PROTECTION)
GRADE I (INDENTURED AFTER APRIL 1. 2000)
1: 0 - 1000 Hours - 45.00% $8.85 I
2: 1001 - 2000 Hours - 50.00% $9.84 1
3: 2001 - 3000 Hours - 55.00% $10.82 1
4: 3001 - 4000 Hours - 60.00% $11.80 1
GRADE 1 (INDENTURED BEFORE APRIL 1. 2000)
1: 0 - 1000 Hours - 40.00% $7.87 1
2: 1001 - 2000 Hours - 45.00% $8.85 1
3: 2001 - 3000 Hours - 50.00% $9.84 1
4: 3001 - 4000 Hours - 55.00% $10.82 1
GRADE 2 (INDENTURED AFTER APRIL 1. 2000)
1: 0 - 1000 Hours - 65.00% $12.79 1
2: 1001 - 2000 Hours - 70.00% $13.77 1
3: 2001 - 3000 Hours - 75.00% $14.75 1
4: 3001 - 4000 Hours - 80.00% $15.74 1
5: 4001 - 5000 Hours - 85 00% $16.72 1
6: 5001 - 6000 Hours - 90.00% $17.70 1
GRADE 2 (INDENTURED BEFORE APRIL 1. 2000)
1:0-1000Hours-60.00% $11.80 1
2: 1001 - 2000 Hours - 65.00% $12.79 1
3.2001 - 3000 Hours - 70.00% $13.77 1
4: 3001 - 4000 Hours - 75.00% $14.75 1
5.4001 - 5000 Hours - 80.00% $15.74 1
6: 5001 - 6000 Hours - 85.00% $16.72 1
TERRAZZO WORKERS & TILE SETTERS
1: 0 - 1000 Hours - 50.00% $22.07 1H 5A
2: 1001 - 2500 Hours - 55.00% $23.40 lJ:I SA
3: 2501 - 3500 Hours - 60.00% $24.73 1H SA
4: 3501 - 4500 Hours - 70.00% $27.39 1H SA
5: 4501 - 5500 Hours - 80.00% $30.06 1H SA
6: 5501 - 6250 Hours - 90.00% $32.72 IH SA
7: 6251 - 7000 Hours - 95.00% $34.05 1H 5A
TILE, MARBLE & TERRAZZO FINISHERS
FINISHER
$21.46 HI 5A
$22.74 IH 5A
$24.00 IH 5A
$26.56 1 H 5A
TRAFFIC CONTROL STRIPERS
1: 0 - 1000 Hours - 50.00%
2: 1001 - 2500 Hours - 55.00%
3: 2501 - 3500 Hours - 60.00%
4: 3501 - 4500 Hours - 70.00%
1: 0 - 500 Hours - 60.00%
2. 501 - 1000 Hours - 60.00%
3: 1001 - 2333 Hours - 60.00%
4: 2334 - 4666 Hours - 73.00%
5: 4667 - 7000 Hours - 88.00%
1: 0 - 700 Hours - 70.00%
2: 701 - 1400 Hours - 80.00%
3: 1401 - 2100 Hours - 90.00%
$13.50 1K
$18.60 lK
$21.22 lK
$24.69 1K
$28.70 1K
TRUCK DRIVERS
ALL TRUCKS
$14.16 1
$16.18 1
$18.21 J
5A
SA
SA
SA
SA
BENEFIT CODE KEY - EFFECTIVE 09-01-04
************************************************************************************************************************
OVERTIME CODES
OVERTIME CALCULATIONS ARE BASED ON THE HOURLY RATE ACTUALLY PAID TO THE WORKER. ON PUBLIC
WORKS PROJECTS, THE HOURLY RATE MUST BE NOT LESS THAN THE PREVAILING RATE OF WAGE MINUS THE
HOURL Y RATE OF THE COST OF FRINGE BENEFITS ACTUALLY PROVIDED FOR THE WORKER.
ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE
AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
A ALL HOURS WORKED ON SA TURDA YS, SUNDAYS AND HOLIDAYS SHALL ALSO BE P AID AT ONE AND ONE-HALF
TIMES THE HOURLY RATE OF WAGE
B. ALL HOURS WORKED ON SA TURDA YS SHALL BE P AID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF
WAGE.
C. ALL HOURS WORKED ON SUNDAYS SHALL BE P AID AT DOUBLE THE HOURLY RATE OF WAGE.
D. THE FIRST EIGHT (8) HOURS ON SA TURDA YS OF A FIVE - EIGHT HOUR WORK WEEK AND THE FIRST EIGHT (8)
HOURS WORKED ON A FIFTH CALENDAR DAY, EXCLUDING SUNDAY, IN A FOUR - TEN HOUR SCHEDULE, SHALL BE
PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED IN EXCESS OF EIGHT (8)
HOURS PER DAY ON SA TURDA Y; ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS IN A FIFTH CALENDAR
WEEKDAY OF A FOUR - TEN HOUR SCHEDULE; ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY
MONDAY THROUGH FRIDAY, AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE
THE HOURL Y RATE OF WAGE.
E ALL HOURS WORKED IN EXCESS OF 10 PER DAY SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE THE
FIRST EIGHT (8) HOURS ON SA TURDA Y SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON SA TURDA Y, AND ALL HOURS WORKED ON
SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE
F THE FIRST EIGHT (8) HOURS ON SATURDAY SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON SA TURDA Y, AND ALL HOURS WORKED ON
SUNDAYS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE ALL
HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES THE HOURLY RATE OF WAGE
G THE FIRST TEN (10) HOURS WORKED ON SATURDAYS AND THE FIRST TEN (10) HOURS WORKED ON A FIFTH
CALENDAR WEEKDAY IN A FOUR - TEN HOUR SCHEDULE, SHALL BE P AID AT ONE AND ONE-HALF TIMES THE
HOURLY RATE OF WAGE ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY MONDAY THROUGH
SA TURDA Y, AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY
RATE OF WAGE
H ALL HOURS WORKED ON SA TURDA YS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER
CONDITIONS OR EQUIPMENT BREAKDOWN) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE P AID AT DOUBLE THE HOURLY RATE OF
WAGE
ALL HOURS WORKED ON SA TURDA Y SHALL BE PAID ATONE AND ONE-HALF THE HOURL Y RATE OF WAGE
WORK PERFORMED ON SUNDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE WORK PERFORMED
ON A HOLIDAY SHALL BE PAID ONE AND ONE-HALF TIMES THEIR HOURLY RATE FOR ACTUAL HOURS WORKED
PLUS EIGHT (8) HOURS OF STRAIGHT TIME FOR THE HOLIDAY
THE FIRST EIGHT (8) HOURS ON SA TURDA Y SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURL Y RATE OF
WAGE ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON SATURDAY, AND ALL HOURS WORKED ON
SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE
K ALL HOURS WORKED ON SA TURDA YS AND SUNDAYS SHALL BE P AID AT ONE AND ONE-HALF TIMES THE HOURLY
RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE
L. ALL HOURS WORKED ON SA TURDA YS, SUNDAYS AND HOLIDAYS (EXCEPT THANKSGIVING DAY AND CHRISTMAS
DA Y) SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON
THANKSGIVING DAY AND CHRISTMAS DAY SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE
M ALL HOURS WORKED ON SA TURDA YS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER
CONDITIONS) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED
ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURL Y RATE OF WAGE
N ALL HOURS WORKED ON SA TURDA YS (EXCEPT MAKEUP DAYS) SHALL BE P AID AT ONE AND ONE-HALF TIMES
THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE
THE HOURLY RATE OF WAGE
"
BENEFIT CODE KEY - EFFECTIVE 03-03-04
-2-
P ALL HOURS WORKED ON SA TURDA YS (EXCEPT MAKEUP DAYS) AND SUNDAYS SHALL BE PAID ATONE AND ONE-
HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE
HOURLY RATE OF WAGE
Q ALL HOURS WORKED ON SA TURDA YS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT CHRISTMAS DAY) SHALL BE PAID AT
DOUBLE THE HOURLY RATE OF WAGE ALL HOURS WORKED ON CHRISTMAS DAY SHALL BE PAID AT TWO AND
ONE-HALF TIMES THE HOURLY RATE OF WAGE.
R ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE P AID AT TWO TIMES THE HOURLY RATE OF WAGE
I.
T.
ALL HOURS WORKED ON SA TURDA YS, EXCEPT MAKE-UP DAYS, SHALL BE P AID AT ONE AND ONE-HALF TIMES
THE HOURLY RATE OF WAGE ALL HOURS WORKED AFTER 6 OOPM SA TURDA Y TO 6 OOAM MONDAY AND ON
HOLIDAYS SHALL BE P AID AT DOUBLE THE HOURL Y RATE OF WAGE
U ALL HOURS WORKED ON SA TURDA YS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT TWO TIMES
THE HOURLY RATE OF WAGE ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES THE
HOURLY RATE OF WAGE
W ALL HOURS WORKED ON SA TURDA YS AND SUNDAYS (EXCEPT MAKE-UP DAYS) SHALL BE PAID ATONE AND ONE-
HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON HOLIDAYS SHALL BE P AID AT TWO TIMES
THE HOURLY RATE OF WAGE
2 ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT ONE
AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
A THE FIRST SIX (6) HOURS ON SATURDAY SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE ALL HOURS WORKED IN EXCESS OF SIX (6) HOURS ON SA TURDA Y AND ALL HOURS WORKED ON SUNDAYS
AND HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE
B ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
C ALL HOURS WORKED ON SUNDAYS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE
ALL HOURS WORKED ON HOLIDAYS SHALL BE P AID AT TWO TIMES THE HOURLY RATE OF WAGE
D ALL HOURS WORKED ON SA TURDA YS AND SUNDAYS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY
RATE OF WAGE THE FIRST EIGHT (8) HOURS WORKED ON HOLIDAYS SHALL BE PAID AT STRAIGHT TIME IN
ADDITION TO THE HOLIDAY PAY ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON HOLIDAYS SHALL BE
PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
E ALL HOURS WORKED ON SATURDAYS OR HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID ATONE AND ONE-
HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS OR ON LABOR DAY SHALL BE
PAID AT TWO TIMES THE HOURLY RATE OF WAGE
F THE FIRST EIGHT (8) HOURS WORKED ON HOLIDAYS SHALL BE PAID AT THE STRAIGHT HOURLY RATE OF WAGE
IN ADDITION TO THE HOLIDAY PAY ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON HOLIDAYS SHALL
BE PAID AT DOUBLE THE HOURLY RATE OF WAGE
G ALL HOURS WORKED ON SUNDAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE ALL HOURS
WORKED ON PAID HOLIDAYS SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
INCLUDING HOLIDAY PAY
H ALL HOURS WORKED ON SA TURDA YS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE ALL
HOURS WORKED ON HOLIDAYS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE IN
ADDITION TO THE HOLIDAY PAY
ALL HOURS WORKED ON SA TURDA YS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT ONE AND ONE-
HALF TIMES THE HOURLY RATE OF WAGE ALL HOURS WORKED ON SUNDAYS AND ON LABOR DAY SHALL BE
PAID AT TWO TIMES THE HOURLY RATE OF WAGE
J ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE ALL HOURS
WORKED ON PAID HOLIDAYS SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURL Y RATE OF WAGE,
INCLUDING THE HOLIDAY PAY ALL HOURS WORKED ON UNPAID HOLIDAYS SHALL BE PAID AT TWO TIMES THE
HOURLY RATE OF WAGE
K ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE IN ADDITION TO
THE HOLIDAY PAY
.
BENEFIT CODE KEY - EFFECTIVE 03-03-04
-3-
M. ALL HOURS WORKED ON SA TURDA YS, SUNDAYS AND HOLIDAYS SHALL BE P AID AT DOUBLE THE HOURLY RATE
OF WAGE
o ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY
RATE OF WAGE.
4.
ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID
AT DOUBLE THE HOURL Y RATE OF WAGE. ALL HOURS WORKED ON SA TURDA YS, SUNDAYS AND HOLIDAYS
SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE
A
HOLIDAY CODES
5.
A
HOLIDAYS. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY
AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (7)
B HOLIDAYS. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY
AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS, AND CHRISTMAS DAY (8)
C HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8).
D HOLIDA YS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE
FRIDAY AND SA TURDA Y AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8)
E HOLIDA YS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
PRESIDENTIAL ELECTION DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS
, DAY (9)
G HOLIDA YS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE
LAST WORK DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY (7)
H HOLIDA YS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, THANKSGIVING DAY, THE DAY AFTER
THANKSGIVING DAY, AND CHRISTMAS (6)
I. HOLIDA YS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DA Y, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY (6)
N HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS'
DA Y, THANKSGIVING DAY, THE FRIDA Y AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (9)
o PAID HOLIDAYS NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, AND CHRISTMAS DAY (6)
P. HOLIDA YS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY
AND SA TURDA Y AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS, AND CHRISTMAS DAY (9).
Q PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
AND CHRISTMAS DAY (6)
R PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
DA Y AFTER THANKSGIVING DAY, ONE-HALF DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY (7 II2)
S. PAID HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, AND CHRISTMAS DAY (7)
T PAID HOLIDAYS SEVEN (7) PAID HOLIDAYS
V PAID HOLIDAYS SIX (6) PAID HOLIDAYS
W PAID HOLIDAYS. NINE (9) PAID HOLIDAYS
X HOLIDA YS AFTER 520 HOURS - NEW YEAR'S DAY, THANKSGIVING DA Y AND CHRISTMAS DAY AFTER 2080
HOURS - NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY AND A FLOATING HOLIDAY (8)
Y HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION
DA Y, THANKSGIVING DAY, THE FRIDAY FOLLOWING THANKSGIVING DAY, AND CHRISTMAS DAY (8)
"
BENEFIT CODE KEY - EFFECTIVE 03-03-04
-4-
Z HOLIDA YS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY,
THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8)
6
PAID HOLIDAYS' NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, cAB OR DAY,
THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8)
A.
B. PAID HOLIDAYS NEW YEAR'S EVE DAY, NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS EVE DAY, CHRISTMAS DAY (9)
C HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, THE LAST WORK DAY BEFORE CHRISTMAS DAY, AND
CHRISTMAS DAY (9).
D. PAID HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, THE DA Y BEFORE OR THE DAY
AFTER CHRISTMAS DAY (9)
6.
HOLIDAYS NEW YEAR'S DAY, MARTIN LUTHER KING JR DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8)
H
PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING
DA Y, FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (7)
L HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY, AND
CHRISTMAS DAY (8)
Q PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S
DA Y THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY UNPAID
HOLIDA Y_ PRESIDENTS' DAY
S PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING
DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS EVE DAY, AND CHRISTMAS DAY (8)
T PAID HOLIDAYS NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DA Y, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE
CHRISTMAS DAY, AND CHRISTMAS DAY (9)
U HOLIDAYS NEW YEAR'S DAY, DAY BEFORE NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE DAY BEFORE
CHRISTMAS DAY, CHRISTMAS DAY (9)
V PAID HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING
DA Y, DAY AFTER THANKSGIVING DAY, CHRISTMAS EVE DAY, CHRISTMAS DAY, EMPLOYEE'S BIRTHDAY,
AND ONE DAY OF THE EMPLOYEE'S CHOICE (10)
W PAID HOLIDAYS NEW YEAR'S DAY, DAY BEFORE NEW YEAR'S DAY, PRESIDENTS DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS
DA Y, DAY BEFORE CHRISTMAS DAY (10)
X PAID HOLIDAYS NEW YEAR'S DAY, DAY BEFORE OR AFTER NEW YEAR'S DAY, PRESIDENTS DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING
DA Y, CHRISTMAS DAY, DAY BEFORE OR AFTER CHRISTMAS DAY, EMPLOYEE'S BIRTHDAY (I I)
NOTE CODES
8
THE STANDBY RATE OF PAY FOR DIVERS SHALL BE ONE-HALF TIMES THE DIVERS RATE OF PAY IN ADDITION TO
THE HOURLY WAGE AND FRINGE BENEFITS, THE FOllOWING DEPTH PREMIUMS APPLY TO DEPTHS OF FIFTY FEET
OR MORE
OVER 50' TO 100' - $ I 00 PER FOOT FOR EACH FOOT OVER 50 FEET
OVER 100' TO 175' - $2 25 PER FOOT FOR EACH FOOT OVER 100 FEET
OVER 175' TO 250' - $5 50 PER FOOT FOR EACH FOOT OVER 175 FEET
OVER 250' - DIVERS MAY NAME THEIR OWN PRICE, PROVIDED IT IS NO lESS THAN THE SCALE LISTED
FOR 250 FEET
A
C. THE STANDBY RATE OF PAY FOR DIVERS SHAll BE ONE-HALF TIMES THE DIVERS RATE OF PAY IN ADDITION TO
THE HOURLY WAGE AND FRINGE BENEFITS, THE FOllOWING DEPTH PREMIUMS APPLY TO DEPTHS OF FIFTY FEET
OR MORE
OVER 50' TO 100' - $\ 00 PER FOOT FOR EACH FOOT OVER 50 FEET
OVER \ 00' TO \50' - $\.50 PER FOOT FOR EACH FOOT OVER \ 00 FEET
OVER 150' TO 200' - $2.00 PER FOOT FOR EACH FOOT OVER 150 FEET
.
"
BENEFIT CODE KEY - EFFECTIVE 03-03-04
-5-
OVER 200' - DIVERS MAY NAME THEIR OWN PRICE
D. WORKERS WORKING WITH SUPPLIED AIR ON HAlMA T PROJECTS RECEIVE AN ADDITIONAL $1 00 PER HOUR
L WORKERS ON HAlMA T PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS - LEVEL A: $0 75,
LEVEL B $0 50, AND LEVEL C $0 25
M. WORKERS ON HAlMAT PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS' LEVELS A & B $100,
LEVELS C & D. $0 50
N. WORKERS ON HAlMA T PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS - LEVEL A: $ I .00,
LEVEL B $075, LEVEL C $050, AND LEVEL D $0.25
,
CITY OF PORT ANGELES
OAK STREET SEWER REPAIR
PROJECT NO. 04-03
VICINITY MAP
SHEET INDEX
TITLE
TITLE SHEET
(O~OK ~~
NOTES
PROJECT SITE
PLAN & PROFILE SHEET
SERVICE CONNECTION
SECTION VIEW
PORT ANGELES HARBOR
STORM DRAIN
REALIGNMENT
,.
" .
eARK AVE
I
,.,
"
~....< - ~,
/ "\\
';>
,""
~
.i
PORT ANGELES
SCALE 1"=2000'
fu
I-..
~II
~il'
lM
~
i::::
SHEET
1
~IVIV
~ 8 g
"" N N
Y I I
U U
'" '"
< <
~ ~
WIW
~~
2
3
4
~~lo
:::)Qlo
C)~:g
:J::~~
~ t\i
~llJ~
-.Jlte;)
-.J~~
'O:l;l(j~
~ltl~
~
~
~ W ~
~a.:: ~
~ f5 ~ ~
,~CD":::
Il=:... ~ 0 5 ~
tft~a.~~
",," I V
yU !Q-
rn. >- t;j ~ ~
Il::!.!o.. I W .'"
I- e::: Vl '"-"
~ ~ tn ~ ~
C)~~~~
~ ~ w ~
I}:..,.. ~ NO-
.... '"
~
@)
5
,
.."
GENERAL NOTES
1 ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH THE CITY OF PORT ANGELES URBAN SERVICES STANDARDS AND GUIDELINES, THE
CURRENT EDITION OF THE WASHINGTON STATE DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL
CONSTRUCTION, THE MOST CURRENT AMENDMENTS TO STANDARD SPECIFICATIONS AND ANY PROJECT SPECIFIC SPECIAL PROVISIONS OR CONDITIONS AND
REQUIREMENTS STATED IN THE PROJECT MANUAL
2 A PRECONSTRUCTION MEETING SHALL BE HELD WITH THE CITY PRIOR TO THE START OF CONSTRUCTION
3 HORIZONTAL AND VERTICAL CONTROLS/DATUM AS ADOPTED BY THE CITY SHALL BE USED, UNLESS APPROVED OTHERWISE
4 THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES THE CONTRACTOR SHALL VERIFY ALL
UTILITY LOCATIONS PRIOR TO CONSTRUCTION BY CALLING UNDERGROUND LOCATE AT 1 -800-424-5555 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION WORK SEE SPECIAL PROVISION 1 -07 17 UTILITIES AND SIMILAR FACILITIES IN THE PROJECT MANUAL
5 TEMPORARY STREET PATCHING MAY BE ALLOWED WITH THE APPROVAL OF THE CITY ENGINEER
6 THE CONTRACTOR SHALL HAVE A COPY OF THE APPROVED TRAFFIC CONTROL PLANS AT THE CONSTRUCTION SITE AT ALL TIMES.
7. CONSTRUCTION WORK HOURS SHALL BE RESTRICTED TO 7 A M. TO 7 PM., UNLESS OTHERWISE APPROVED IN WRITING.
8 THE CITY CONSTRUCTION INSPECTOR SHALL BE NOTIFIED A MINIMUM OF 48 HOURS IN ADVANCE OF THE NEED FOR AN INSPECTION, UNLESS
OTHERWISE INFORMED.
9 TEMPORARY STREET PATCHING
A TEMPORARY RESTORATION OF TRENCHES SHALL BE ACCOMPLISHED BY USING 2" MINIMUM DEPTH CLASS B ASPHALT CONCRETE PAVEMENT WHEN
AVAILABLE, MEDIUM-CURING (MC-250) LIQUID ASPHALT (COLD MIX), ASPHALT TREATED BASE (ATB), OR TRAFFIC BEARING THICKNESS STEEL
PLATES
B ATB USED FOR TEMPORARY RESTORATION MAY BE DUMPED DIRECTLY INTO THE TRENCH OR PATCH AREA, BLADED AND ROLLED AFTER ROLLING,
THE TRENCH MUST BE FILLED FLUSH WITH THE EXISTING PAVEMENT TO PROVIDE A SMOOTH RIDING SURFACE
C. ALL TEMPORARY PATCHES SHALL BE MAINTAINED BY THE CONTRACTOR UNTIL SUCH TIME AS THE PERMANENT PATCH IS IN PLACE IF THE
CONTRACTOR IS UNABLE TO MAINTAIN A PATCH FOR WHATEVER REASON, THE CITY WILL PATCH THE AREA AT THE EXPENSE OF THE
CONTRACTOR OR PERMIT APPLICANT.
D TRAFFIC SHALL NOT BE ALLOWED TO CROSS GRAVEL OR CDF BACKFILL FOR MORE THAN 24 HOURS WITHOUT UTILIZATION OF TEMPORARY
PATCHING MEASURES STATED ABOVE.
10 THE CONTRACTOR SHALL GIVE THE CITY A MINIMUM OF 72 HOURS NOTICE PRIOR TO SCHEDULING A PLANNED CUT-IN, LIVE TAP OR OTHER
CONNECTION TO THE EXISTING SANITARY SEWER SYSTEM
LEGEND:
ROADWA Y CENTERLINE --. - -- ----
PROPERTY LINE ~ - - - - - ---
EDGE OF PAVEMENT
EDGE OF GRAVEL - - -- - -- -- -- ..
EXISTING SANATARY SEWER - S$-- - >0-
EXISTING STORM DRAIN SC SG
EXISTING WATER - N-- -- w--
EXISTING VALVE M
EXISTING FIRE HYDRANT tJ
EXISTING WATER METER 83
EXISTING SANA TARY SEWER MANHOLE Os
PROPOSED WATER
PROPOSED VALVE ~
PROPOSED FIRE HYDRANT ....
PROPOSED REDUCER ~
EX STORM DRAIN MANHOLE
@
EX CATCH BASIN
o
EX LUMINAIRE
~
EX UTILITY POLE
-0-
EX FUEL TANK LID
~
1;;
z
o
~
"'
~~
: 0< ~I'"
~.~;
~--o
~~~
~gVl
8 >:1:
'"'
x,",
~H
00
<
.., 0 Z
o 0 <
gi>i~~~~
~ ~~ ~ z ~
~ ~~ ~ (3 G:
t5 i~ Li: g:?J
~ ~~ ~ g ~
~ (!) 1-
!t....iC)
:::)~l()
C>~l()
:t:~",
~ ~
't~1
.....,,1;:)
.....~~
~ll.jl
'"'CQ.....
~
~ 0
~w~ N
"'"'s!:. 0......... ~
ca;;;;. a::: x (0
<oEii" woO) .....
'~CDZ;
L C) 0 0 0
F>too. 3 0.. b ,!.
ft~ ~~
C i3 lQ 0-
ii.~8:c.
II ~ ~ ~ ~
~3::I: C) 0
,=,~tn~I
~ &: w ~
J....... t3 ~ a..
~
@
I -l~-:-a4AS7REd~EWER PRQ liX -- ;.
, 1 I
r -- -----1: 040--c-------- -- ---- -1--- ---- - L-- -- --- -1- - -- --1-----
28 i SJA 0+ 3 i i ! I !
r>> ~ ~ - ----- : ~E~~!~i~} ~--~:~:g - ! - - + - -- 00-,- ----- 1 - - - --I --------- ---- - n ----- ---- ~,- - - - -- -----
1f; "'tJ' I . -I : , I '
--', OLE I : I
2() c------ -- -------- ~;-~~TlbN ----- --r,7:21-t--------~------j------ -------- ----
INVERT IN (E~ = 2.64 !
- ----- --- ------ 1NVERT---etff-ttS)---='-2:64 I
-- - - 1 - j- - t- - .J.__
I I i I I
~ - .--- --- ~--~__: ------ ~- - -1- --- - -- -----~ - -----~-- -- --- -- -----
I " I I
; \
.
'"
~
-'"
- -- -- - -~~-P.~~ -- -
- --' --; r- ~~ o'i ..f\Sii/~~, -',
j I! j. 0 ~ i
", ; It i
I ~:~ [81 ~ :
I I CNAL~ I
I -'}~;;:~~~~~270~
v
i
I Ct:
V> I
wi
~i
/
';; I
L' - - -- .-. --- ---- - -- - -.- --
.__ _J
)
C f\
~~~T.
,=~^^ }\ ~~
.\..
-
,;
w
,
, I
I
, .
I'
32
1/6
T -,- --
- --- - III - ---
II
i
!
I
1/2
i
I I : I!
()8 I
---.----- ..-- --~'i -, -... r -- -.-- . - -------- . ----.-- -; -- ..-~-.., -- i -- - I'
I I I -L . I -LEXIST~HL PIPE~ LOPE~ .08"
L'~-JJ~+ - -- - - - - ~ - ~ -.-~--.=--: ~ -+ e-
{ZQ___.J ___ _ _ _ _. ~__ _.__. __.___ _ . __ ___ ___~_____ ________~-------'-_ ._ . _ j ___ _ _ .L __._ _1_____
()4?()() 1/4?()() 24?()()
i
I
I
I
I
i
~---
()4J
CAll 4J8 HOURS
BEFORE YOU D//G
1/=8 ()() =4J24J =5555
DESIGNED BY JSA
DRAWN BY JSA
H SCALE 20'
DATE 2/02/04
DATE 2/02/04
I
)
l \
\
\
-~~-......,
I '\
( /
I
\
\
,,/
!
I
.
\ 20 0 10 20
, \ ~..I I I
ORIGINAL SCALE
-'.
//
- .--. --.---- --- --- --
I
---- --- --- -1-----
- -.I- -----OI-
l
'/ /( Jf
I
____ __ _ __ . _.___ ___.1 _._ _ _
i
P8/JFII F
- 1---- --.---
-
'r
I
LLOS" I
m ___u_ --;;) II~ -..;J+--'79 .--------- - ------- --- -- -- ---- -INST), L1: MA f..JHOLEi --- ----l 072"- ----
RIM ~I ruA1 ION = 16.41 c:"iT'A srA '='..1. ~g 0 I::. CT
1M ERT 1t'___(<SE>)__.f .__32:g1.11_- RIM ELEV~~~ = _17~~___~~j~~~~~hC?~i\:= H.98 .
uu -=. IN\JERT IN ~E!=r ~.64 1.'ly&;.RT ~UT \HJ = .68
: iNV~i lTVlfltiS-J=r2;64
--- .------ -------------- -----1-- - - ------ ----------1-- ---- ------ '. r f..------ ---------1------ --------
-- -..
--------
-
I
.. Ii I II
I --- ------ ---- -- f-- -- ,--- -, ---- ---. 1--- .--.+------- --- - n____
I I I I
II' I
it ;n:
'-IT- -- --~---- Ir------ .-
L--JI 1!fA.
~ I UY '-I NSTALL 12- pile PIPI
!--
I
I
LEfilGTH = 36S..~6'
I-I ,
I m___J. ____.-1 _.__
34?()()
I
I
-!-
-!-
I
4J.4?()()
()4?58. 1/2
PILAN AND PROF//lE
~
PUBLIC WORKS DEPARTMENT
CITY OF PORT ANGELES
V SCALE 8'
GARY KENWORTHY P.E.
CITY ENGINEER
NO DATE
REVISION
CONTOUR INTERVAL NA
FILE 04 03
BY APPEND PROJ NAME OAK ST SEWER REPAIR
OAK STREET SEWER REPA//R
PROJ/EC T ()4J=()3
321 EAST 5TH STREET POBOX 1150
PORT ANGELES, WA 98362 PHONE (206) 457-0411
40
I
1" ~ 20'
32
28
24J
2()
1/6
1/2
8
1------- - -- -
4J.
()
y:
.
..
CALL 4iJ HOURS
BEFORE YOU DIG
1-800-424-5555
1 6
1 2
8
4 r-~'~""
NO DATE
STA. 2+67
--T'^~ - ,
. , I
I EXISTING OAK STREET
,~ J _~URF. E__ , 1~--~'-
_1::.-1 - - ~ -1_ _ 1- I -;
: I I
,6,M WATER,_~-+_
MAIN '\
I i
~ 48rINBUSTRtAI;;-_l""
: WATER' MAIN I
__~,L" """ ,L,__",
6M EJCTRI~.-/i
; ,U
i
i ,
, I
I I '
"'--r~--"- T'-'-', HJ
21M FORfE MAl'
~~= ~~/~~-= ~---~
j j
I INSTALL 6M'
I SERVICE PIPE:
-40
-20
REVlSION
1 6
1 6
~ -~~~~ 1 2
~/
/
CONNECT 0 8
' ^EXISnNG~ RVlcEi
,
UNE
I
1 2
I
, I I
I i 12- SANITARY SEWER
,- ,,~,~__';'H ,^-PIPE~Fl{>W--{)IRECTlON
NORTH I
I
4
I 12M SAN 'ARY SEwER PIPE
;, ",_ ",~OW D"!CTlON, SO
o
20
DESIGNEO BY JSA
40
STA. 3+13
,,_~~~~~~~ ~ ~~~~~__~~_~~~~_~_VA~~V
;-- -,
---
. EXISTlNP OAK STREET, SURFACE
'r I
~"1' ~ _ _ ~';=:--=-:-"~- = '
1 6
48M INDUSTRIAL
WATE ' MAI~~"
6M stORM D~~ ^J' "
, '_'H_'~'
6M WATERY~"
~N ' /
-<,/
/ 1 2
6M' I
ELECTRICAL J
CONDUIT' ,
8
I
I
-^ -~T~~--r-~
21M FORCE MAIN J
8
//
4
?' CONNECT TO ,
7 EXISTING ~ERVlC~
',^" '~"'-i~""t1N~"--- I """"",J
~__~~_~,~~_"l,,^_
, 12M SANitARY
i I : SEwER PIPE FLOW
""'^~'~~t2"-SAN~ARY'-SEWER~IPE,:l, ~__~~~CTI_~~~~O~_~
FLOW I DIRECTION SOUTH ' ,
, '
4
"'-INSTALL' 6M~,
SERVICE PIPE
-40
-20
o
40
20
NOTE: THE LOCATION AND DEPTH OF ALL
UTILITIES ARE APPROXIMATE AND SHALL BE
FIELD VERIFIED.
~
DRAWN BY JSA
H SCALE 1" 20' V SCALE 1" 4'
CONTOUR INTERVAL CONTINT
FILE DOWNTOWN DWG
GARY KENWORTHY P.E.
CITY ENGINEER
BY APPEND PROJ NAME OAK STREET SEWER REPAIR
PUBLIC WORKS DEPARTMENT
SERV/lCE /L/lNE CROSS SECT/lONS
OAK STREET SEWER REPA/lR
PROJECT 04~03
CITY OF PORT ANGELES
321 EAST 5TH STREET POBOX 1150
PORT ANGELES, WA 98362 PHONE (206) 457-0411
..
~
.
- ~ ~-~---- - ---.,
,
\
,
- s';--- -- ss-- - m SS- - - ss- - ss- - ss--
,
\
\
)r
\
!
I
:;.
I
i
:;.
\
\
/-~'\ !
-~ J-- -"
\"j I
)<
L __J-- - SL --- S;)+-
j'
/
I
/
//
!
I
i
-~---~
--~-
~\
-- SD- ---- ,,1- - -- S1- - SD-
\\
)r
,
/
/
SS -
SS- - SS- --
ss
-ss - ---<;s - -SS - - <<;; - -SS - --ss --- - ss -
~s -
OAK STREET \
__ ss - -- -- SS- - SS--- -- ~ .,-
....-.- SS---
- - \S-'_-
ss -- ..- SS-
J -:J
--- :;
~---- 3
'3
]
\
/,._'" '
--!, i -,-
"J !
-~\- -A-
- ---..- ~-
/
"
/
;1
1__
CALL 48 HOURS
BEFORE YOU DIG
1-800-424-5555
NO DATE
-- A _. _. 1'\
i,<I\..
-- )>'
.. ,'\ -
I .-.--1
I I
.J
\
REVISION
I
~ SS- -- SS-
J ----
\
\/
\
J
/
~<N-~ ~
..- A -
~r
~ PR~TECT CONCRETE lBASE
~-~~-~~ __ ss- tl ss.-- - ssf - t ss--
, , ,
, l ,I
2.6' I ! ) !
INSTALL 8- PVC PIPE
BETWEEN EXISTING MANHOLE
AND CONCRETE BASE
I,
I
DISCONNECT EXISTING STORM
DRAIN AT EXISTING JOINT AND
CONNECT 8- PVC PIPE -
APPROXIMATE DEPTH = 5.5'
" <
i I \
\
,r-\
\_j'
\
,
f')
,
(.I;
V,
n 1.>--: I
V>
v
V>
I
I ~
0
"'I
I~ 0
0
II I
0
o.
M IF '",
-/
RAILROAD l STR~ I
In
GARY KENWORTHY P.E.
CITY ENGINEER
~
,
I
,
\
,
,
DESIGNED BY JSA
ORA WN BY JSA
H SCALE 1" 20' V SCALE ," 4'
CONTOUR INTERVAL CONTINT
FILE DOWNTOWN DWG
BY APPEND PROJ NAME OAK STREET SEWER REPAIR
\
\
,
,
.- --CONNECT 8- PVC PIPE
. - - INTO EXISTING STORM !
DRAIN. APPROXIMATE i
DEPTH TO PIPE = 6' /
FIELD VERIFY DEPTH AND'
LOCATION
< ,
\ ::
\ '
r-:'\:
\,4<1
, ),
I
I ~
I'
I !
PUBLIC WORKS DEPARTMENT
CITY OF PORT ANGELES
321 EAST 5TH STREET POBOX 1150
PORT ANGELES, WA 98362 PHONE (206) 457-0411
,
I
{
,
,
i
I
I
,
,
\
\
\
\
\
\
\
804 8
~
16
I
ORIGINAL SCALE ," = 8 .
-...j l\.,
,\ r, (" ~ 1_, ...)
R~'<
, ..
'"
"'",
"
"\,
\
STORM DRAIN REAlIGNMEN7f
OAK S7fREE7r SEWER REPAIR
PROJEC7f 04-03