PROJECT MANUAL
for
2004 WATER MAIN IMPROVEMENTS
PROJECT NO. 04-01
CITY OF PORT ANGELES
WASHINGTON
FEBRUARY 2004
GLENN A. CUTLER, P.E., DIRECTOR OF PUBLIC WORKS & UTILITIES
GARY W. KENWORTHY, P.E., DEPUTY DIRECTOR OF ENGINEERING SERVICES
For information regarding this project, contact:
Jeremy Andrews, City of Port Angeles
360-417-4812
PW-407 _01 [rev. 10/29/03]
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CITY OF PORT ANGELES
NOTICE OF AWARD
Apn18,2004
TO: Jeffrey Konopaski
Jordan Excavating, Inc.
1826 Golf Course Rd
Port Angeles, WA 98362
PROJECT Description. 2004 Water Main Improvements, Project No. 04-01
The Owner has considered the bid submitted by you for the above described work in response to ItS
Advertisement for Bids dated March 30 . 2004.
You are hereby notified that your bid has been accepted for Items In the amount of $176.295.07 .
includinq tax.
You are required, as stated In the Information for Bidders, to execute the contract and furnish the required
Contractor's Performance and Payment Bond and certificates of insurance within ten (10) calendar days from the
date of thiS notice to you.
If you fail to execute said contract and to furnish said bonds within ten (10) days from the date of thiS
Notice, said Owner will be entitled to consider all of your nghts arising out of the Owner's acceptance of your bid
as abandoned and as a forfeiture of your bid bond. The Owner will be entitled to such other nghts as may be
granted by law.
You are required to return an acknowledged copy of thiS Notice of Award to the Owner.
Dated thiS 8th day of April. 2004.
CITY OF PORT ANGELES
By
Title
ACCEPTANCE OF NOTICE
Receipt of the above Notice of Award is hereby acknowledged this d day of Al:JtZ/J
,
fI ~---1~~-
o 7 SIGNATURE
~nt Name .::r; t1u1 tJ /~lVcJ//-H' ~,
/~/d~-j-
20~.
Title
Please return signed original to the City of Port Angeles Public Works & Utilities Department, attn: Jeremy Andrews
cc City Clerk
PW-407 _17 [rev. 09/18/02]
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PROJECT MANUAL
for
2004 WATER MAIN IMPROVEMENTS
PROJECT NO. 04-01
CITY OF PORT ANGELES
WASHINGTON
EXPIRES: 02/02/05 J
MARCH 2004
GLENN A. CUTLER, P.E., DIRECTOR OF PUBLIC WORKS & UTILITIES
GARY W. KENWORTHY, P.E., DEPUTY DIRECTOR OF ENGINEERING SERVICES
A::L-.
Deputy Diredlor ~
Re~ed by: .r-/ /
W~ ~ ;() 1Vt11:;~ -
City Attorn'ey
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE OF CONTENTS
2004 WATER MAIN IMPROVEMENTS
PROJECT NO. 04-01
PART I
BIDDING REQUIREMENTS:
Page No(s).
Advertisements for Bids .................................................. 1-2
Information for Bidders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 1-3
Bidder's Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 1-4
Non-Collusion Affidavit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 1-5
Bidder's Construction Experience. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 1-6
List of Proposed Subcontractors ........................................... 1-7
Bid Form . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 1-8-10
Bid Bond . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 1-11
PART II
CONTRACT FORMS SUBMITTED FOllOWING AWARD OF CONTRACT
Contract ............................................................ 11-1-7
Performance and Payment Bond ......................................... 11- 8
Escrow Agreement for Retained Percentage .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 11- 9
Certificate of Insurance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. [provided by bidder]
PART III
SPECIFICATIONS, SPECIAL PROVISIONS AND SUBMITTALS. . . . . 111-1-10
ATTACHMENTS
PART IV
A. Washington State Prevailing Wage Rates for Clallam County
B. Request For Information (RFI) and Construction Change Order (CCO) Forms
C. Contractor's Application for Payment Form
D. Project Plans (6 pages)
PW-407 _01 [rev. 10/29/03]
1- 1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PART I
BIDDING REQUIREMENTS
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
ADVERTISEMENT FOR BIDS
2004 WATER MAIN IMPROVEMENTS
PROJECT 04-01
City of Port Angeles
Sealed bids will be received by the Director of Public Works & Utilities at 321 East Fifth Street, P. O. Box 1150,
Port Angeles, Washington 98362, until 1 :30pm, Tuesday, March 30th, 2004, and not later, and will then and there
be opened and publicly read at that time in the Public Works Conference Room in City Hall for the construction of
the following improvements:
Installation of approximately 1575 linear feet of 8 inch ductile iron water main, including related
appurtenances.
The City Engineer's estimate for this project is between $200,000 and $300,000. The time of completion
(performance period) for this Project is 30 working days. To view detailed plans and specifications (Project
Manual), go to www.bxwa.com on the internet, or contact the Builders Exchange of Washington at 425-258-1303.
Detailed plans and specifications (Project Manual) may be obtained from the office of the City Engineer, City of
Port Angeles, upon payment of a non-refundable fee of $25.00. Informational copies of maps, plans and
specifications are on file for inspection in the office of the City Engineer [Phone 360-417-4700]. Bidders shall be
qualified for the type of work proposed. A Bidder's Construction Experience Form is included in the Project
Manual.
All bids shall be submitted on the prescribed Bid Forms and in the manner as stated in this advertisement and in
the Project Manual and said bids shall be accompanied by a bid deposit in the form of a cashier's check, postal
money order, or surety bond to the City of Port Angeles in the amount of five percent (5%) of the total amount of
the bid. If a surety bond is used, said bond shall be issued by a surety authorized and registered to issue said
bonds in the State of Washington. The bond shall specify the surety's name, address, contact and phone number,
and shall include a power of attorney appointing the signatory of the bond as the person authorized to execute it.
Should the successful bidder fail to enter into the Contract and furnish satisfactory performance bond within the
time stated in the Information for Bidders, the bid deposit shall be forfeited to the City of Port Angeles. Faxed bids
and/or surety bonds will not be accepted.
Minority and women owned businesses shall be afforded full opportunity to submit bids in response to this
invitation, shall not be discriminated against on the grounds of gender, race, color, age, national origin or handicap
in consideration of an award of any contract or subcontract, and shall be actively solicited for participation in this
project by direct mailing of the invitation to bid to such businesses as have contacted the City for such notification.
Further, all bidders are directed to solicit and consider minority and women owned businesses as potential
subcontractors and material suppliers for this project.
The bid will be awarded to the lowest responsible bidder. The City of Port Angeles reserves the right to accept
bids and award the Contract to responsible bidders which are in the best interest of the City, to postpone the
acceptance of bids and the award of the Contract for a period not to exceed sixty (60) days, or to reject any and all
bids received and further advertise for bids. When awarded the Contract, the successful bidder shall promptly
execute the Contract and shall furnish a bond of faithful performance of the Contract in the full amount of the
Contract price.
Bids must be submitted in a sealed envelope with the outside clearly marked with the bid opening date and time,
the project name and number as it appears in this advertisement and the name and address of the bidder. Bids
shall be addressed to the Director of Public Works & Utilities, City of Port Angeles, 321 East Fifth Street, P. O. Box
1150, Port Angeles, Washington 98362.
Glenn A. Cutler, P .E.
Director of Public Works & Utilities
Publish: Peninsula Daily News [March 7, March 14], Daily Journal of Commerce [March 8]
PW-407 _01 [rev. 10/29/03]
1-2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
INFORMATION FOR BIDDERS
Sealed bids will be received by the City of Port Angeles (herein called "Owner"), at 321 East Fifth Street, Port
Angeles, Washington 98362, until the time and date as stated in the ADVERTISEMENT FOR BIDS or as
amended through addendum, and then at said office publicly opened and read aloud.
Each bid shall be received by the Owner in the manner set forth in the ADVERTISEMENT FOR BIDS. Each bid
must be submitted in a sealed envelope, so marked as to indicate its contents without being opened, and
addressed in conformance with the instructions of the ADVERTISEMENT FOR BIDS.
Each bid shall be submitted on the required bid form contained in Part I of the Project Manual. All blank spaces
for bid prices must be filled in, in ink or typewritten, and the Bid Form must be fully completed and executed when
submitted. Only one copy of the Bid Form is required. In addition, all other forms included in Part I shall be filled
out and completed, including any addendum(s), and enclosed in a sealed envelope endorsed with the name of the
work. Each bid shall be accompanied by a bid deposit in the form of a cashier's check, postal money order, or
surety bond to the City of Port Angeles for a sum of not less than 5% of the amount of the bid, and no bid will be
considered unless accompanied by such bid deposit.
The Owner may waive any informalities or minor defects or reject any and all bids. Any bid may be withdrawn
prior to the scheduled time for the opening of bids or authorized postponement thereof. Any bid received after the
time and date specified shall not be considered. No bidder will be permitted to withdraw its bid between the
closing time for receipt of bids and execution of the Contract, unless the award is delayed for a period exceeding
sixty (60) calendar days. A conditional or qualified bid will not be accepted. The bid award will be made to the
lowest responsible bidder.
The work will begin within ten (10) calendar days after notice to proceed from the Director of Public Works &
Utilities and shall be completed within the time as stated in the Advertisement for bids.
The Owner may make such investigations as it deems necessary to determine the ability of the bidder to perform
the work, and the bidder shall furnish to the Owner all such information and data for this purpose as the Owner
may request. The Owner reserves the right to reject any bid, if the evidence submitted by, or investigation of, such
bidder fails to satisfy the Owner that such bidder is properly qualified to carry out the obligations of the Contract
and to complete the work contemplated therein.
The party to whom the Contract is awarded will be required to execute the Contract and obtain the Performance
and Payment Bond within ten (10) calendar days from the date the notice of award is delivered to the bidder.
Such bond(s) shall be on the form provided by the Owner, specify the name, contact phone, and address of the
surety, and shall include a power of attorney appointing the signatory of the bond(s) as the person authorized to
execute it (them). .
The notice of award will be accompanied by the necessary Contract and bond forms. In case of failure of the
bidder to execute the Contract, the Owner may, at its option, consider the bidder in default, in which case the bid
deposit accompanying the bid shall become the property of the Owner.
The Owner, within ten (10) calendar days of receipt of the acceptable Performance and Payment Bond and the
Contract signed by the party to whom the Contract was awarded, will sign the Contract and return to such party an
executed duplicate of the Contract. Should the Owner not execute the Contract within such period, the bidder
may, by written notice, withdraw its signed Contract. Such notice of withdrawal will be effective upon receipt of the
notice by the Owner.
The notice to proceed will be issued within ten (10) calendar days of the execution of the Contract by the Owner.
Should there be reasons why the notice to proceed cannot be issued within such period, the time may be
extended by mutual agreement between the Owner and Contractor. If the notice to proceed has not been issued
within the ten (10) calendar day period or within the period mutually agreed upon, the Contractor may terminate
the Contract without further liability on the part of either party. All applicable laws, ordinances, and the rules and
regulations of all authorities having jurisdiction over construction of the project shall apply to the Contract
throughout.
PW-407_01 [rev. 10/29/03]
1-3
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
BIDDER'S CHECKLIST
1. Has a bid deposit in the form of a surety bond in the proper form, postal money order, or cashier's check
been enclosed with your bid?
2. Is the amount of the bid deposit at least five percent (5%) of the total amount of the bid?
3. Have the bid forms been properly signed?
4. Do the written amounts of the bid forms agree with the amounts shown in figures?
5. Have you bid on all items?
6. Has the non-collusion affidavit been properly executed?
7. Have you shown your contractor's state license number on the bid form?
8. Have you listed all Subcontractors that you will use for the project?
9. Have you filled out the bidder's construction experience form?
The following forms are to be executed after the Contract is awarded:
A. Contract - To be executed by the successful bidder and the City.
B. Performance bond - To be executed on the form provided by Owner, by the successful bidder and
its surety company. To include name. contact and phone number. and address of suretv and
power of attorney of sianatorv.
C. Insurance certificate(s).
PW-407 _01 [rev. 10/29/03]
1-4
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
NON-COLLUSION AFFIDAVIT
STATE OF WASHINGTON
COUNTY OF CIt1/~
)
)
)
The undersigned, being first duly sworn on oath, says that the bid herewith submitted is
a genuine and not a sham or collusive bid, or made in the interest or on behalf of any person
not therein named; and (s)he further says that the said bidder has not directly or indirectly
induced or solicited any bidder on the above work or supplies to put in a sham bid, or any
other person or corporation to refrain from bidding, and that said bidder has not in any manner
sought by collusion to secure to him/her self an advantage over any other bidder or bidders.
Si9~~
Subscribed and sworn to before me this i~~day of :::1Y"r~
,2<ci-
PW-407_01 [rev. 10/29/03]
1-5
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
9.
10.
11.
12.
13.
BIDDER'S CONSTRUCTION EXPERIENCE
1.
Answer all questions and provide clear and comprehensive information.
Name of bidder: S'tPlk1w;.) E;CC/ll/ftl/;Y ..LAIc.
Registration No. -;Sat]) It- f!..f 1Cl36 r
Permanent main office address: /?Z6 (};elF C bVl?5 e.. I'd.
~e1- lJfl4Jdu (AlII.
When organized: 5'/'11
I t
Where incorporated: 5'/Ht-e.- ~I- W/}JJ/~h-rJ
How many years have you been engaged in the contracting business under your present firm name?
2.
3.
4.
5.
6.
~
7.
8.
* Have you ev r failed
If so, where and why?
work awarded to you?
o
* Add separate sheets if necessary.
The undersigned hereby authorizes and requests any person, firm or corporation to furnish any information
requested by the City of Port Angeles.
Date: .J/;Jq /()-<j
, "
Bidde~
Print Name: -.::Ie t1~ tJ /t::vJ~ ~/ '
Title: J!l~/je-A-
,
PW-407 _01 [rev. 10/29/03]
1-6
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
LISTING OF PROPOSED SUBCONTRACTORS
Bidder shall list all subcontractors proposed to be used on the project. FAILURE TO LIST
SUBCONTRACTORS SHALL BE CONSIDERED TO BE A NON-RESPONSIVE BID. If there are no
subcontractors, write "NO SUBCONTRACTORS WILL BE USED".
ARks /)-0 Xt</d(/)fp~s
h /J ;tL- 55 ?if;>" 7 r:Jlj)
fT/~~ 1;Ur,
SIGNATU E and TITLE
PW-407 _01 [rev. 10/29/03]
1-7
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
BID FORM
Honorable Mayor and City Council
Port Angeles City Hall
321 East Fifth Street
Port Angeles, W A 98362
BIDDER: ~6~ E}tXA(//JI/~ ..:;Ivc. REGISTRATION NO. --:Soej)I1,e:J9~Jor
DATE: J j;.1 It) Y UBI NUMBER b3 L - 19/-- 7"'e>S-:- ()
The undersigned, hereinafter called the bidder, declares that the only person(s) interested in this bid
are those named herein; that the bid is in all respects fair and without fraud; and that it is made without
any connection or collusion with any other person making a bid on this project.
The bidder further declares that it has carefully examined the plan, specifications, and contract
documents, hereinafter referred to as the Project Manual, for the construction of the proposed project
improvement(s); that it has personally inspected the site(s); that it has satisfied itself as to the types
and quantities of materials, the types of equipment, the conditions of the work involved, including the
fact that the description of and the quantities of work and materials, the types of equipment, the
conditions of and the work involved as included herein, are brief and are intended only to indicate the
general nature of the work and to identify the said quantities with the corresponding requirements of
the Project Manual; and that this bid is made in accordance with the provisions and the terms of the
Contract included in the Project Manual.
The bidder further agrees that it has exercised its own judgment regarding the interpretation of surface
information and has utilized all data which it believes is pertinent from the City Engineer, hereinafter
also referred to as the City or Owner, and such other source of information as it determined necessary
in arriving at its conclusion.
The bidder further certifies that the subcontracting firms or businesses submitted on the LISTING OF
PROPOSED SUBCONTRACTORS will be awarded subcontracts for the described portions of the
work:
If the bidder is awarded a construction contract on this bid, the name and address of the surety who
will provide the performance bond is:
flJe>f&thJ ~~ to
Surety
60J .,E ~4- 51- /bel IJ"'l'k
Surety address
;11 r ~11ert- ~ $;,,,.a
Agent
C163 fi;~~ b;.
Agent Address
-r07n r~~ t(J7-//'/~'
Surety Contact a d Phone Number
'f6r rl!f o/l-
Agent Contact and Phone Number
PW-407 _01 [rev. 10/29/03]
1-8
03/23/2004 TUE 14:57 FAX
~002
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
BID FORM
Item Standard Estimated ITEMS WITH UNIT PRICE BID (unit prices to be UNIT PRICE AMOUNT
No. Specification quantittes for written in words)
SecliOIl comparing bids Dollars Cents DoD~ Cents
only
1 1-04 lump Sum Protection, Restoration and Clean-up
1:~ -fACiAS/ltV'J Jo/liJU 5"CV6 00 S'OOo oD
2 1-07 lump Sum Maintenance & Protection of Traffic
'111u.e- f hOI.l$/JAlJ ~//1Ja 3a:o ao '3 OOD 0-0
3 1-09 lump Sum Mobilization -f ~ j d/~
e: ~ 'A. / dct5^#/'/ 704-0 0-(/ 7 to 0 tit)
4 1.10 150 Hours Traffic Conlrol Labor Ljo
./'- A.h. Jo/1trtM 00 (po <to ()O
5 2-09 380 CY Co~~sitY Fill 1'0
~ JO//1tt-5 00 15UD O-t;
6 2-09 6440 SF Shonng ot Extra Ex~tio~ )..r
fw~tJk, n(/<C) IfR/O 00
7 2-09 694 CY Structure Exbavation Class B. incl. Haul
Si, L_ d~/~ fro ot) V/lo'l 00
8 7-04 62 LF ~d ~AC Storm Sewer Pipe 6' OIA.
I~ f/~ Uk<< ~S- 00 /5S-0 tJO
9 7.05 3EA Type I Catch'Basin W/Curb Ik~me & Grate .
€:We. ~J dPe- #k.J- J.I ~ 1/00 (XI 33 ()O ~
10 7-05 2EA ~st Inlet, Inslall Solid Cover
/~ IuAJvdJd daj/;rt8 5"'00 (Jt) / (:XJO ao
11 7-09 1575lF ~pe ,! Water Main, 8-11l~ Dia. (Class 52)
;". r... Wo -' II. 3.2- ()O 9> <(aD ot>
12 7-12 1 EA ~:ftJtTapWfB"V;We L L L Ji/lJtl
., kf#/l~hr ).r(Ov 00 .;l8tkl DO
13 7-12 3EA ~ 8" Cross w~~ Valve du/J
IA~ "h rA5~ 1/JU ~ 00 qooo l>()
14 7-14 1 EA ~~ace Hydrant A~bIY wi 6' Feed line
w~ ?iy. ~j k/(J1U Y...{11J ero uao (Jt)
~
15 7-14 2EA Hydrant Assem~y ,.;j 3000 Gtxro
l-11tte<::. fJ 6"'5J't, oV 00
16 8-14 58SY Cement Cone. Sidewalk, Curb/Gutter & Ramps 1D
tJi!JeA dollltU aO )'220 0-0
17 7-15 16EA Ncll1h Side ~C&G. A6phalt palch) 1.lnd1 1 (}lJT)
ave. ~ 1 MItru av l~o{J1J (i)
18 7-15 16EA SOu1h Side SeIVi~COllneetiDf1(WIC&G, AspIiaIl palch) 1.1ncIl / (j(}t) l#o I 6 ()(j() ()i)
OP~ 11 ~J tkltru
BID FORM
'PW-407 _01 (rev. 10/29103)
1-9A
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Bid Subtotal $ /~2., 7fiC1" 00
Sales Tax (8.2%) $ /3, 3 f/? " ;;1. f!
Total Bid $ /1~ , 152-. 2-'1
,
ADDENDA ACKNOWLEDGMENT
The bidder hereby acknowledges that it has received Addenda No(s). I to this
Project Manual. The name of the bidder submitting this bid and its business phone number and
address, to which address all communications concerned with this bid and with the Contract shall be
sent, are listed below.
,
Bidder's firm name 7crtd~ "C'f('w1/#J 'j:p/'c.
Complete address tl:~I~ss) atl/./- Cocd5e t!d-
'~ffj}"1~ (J~
(State)
'loJ f"l-
(Zip)
Telephone No. C"? &~ r'5tJ-. - 3~7() (:J~) flJf' -Ifro(j
SignedbY~~ Ti~e j/~.
Printed Name: Je!k.c; (/J /~/JS,t:.1
Notes: (1) If the bidder is a partnership, so state, giving firm name under which business is transacted.
(2) If the bidder is a corporation, this bid must be executed by its duly authorized officials.
PW-407 _01 [rev" 10/29/03]
1-10
I
I A--. '--- rs: ~I
GLENN A.'cUTLER, P.E.
Director of Public Works & Utilities
I There is no change to the Bid Opening Date, Performance Period, or Engineer's Estimate as a result of this
Addendum.
I
I
I
~\
I
I
I
I
I
I
I
I
I 2.
I 3.
I
I 4.
I
~~
ADDENDUM NO. i
TO THE
PROJECT MANUAL FOR
2004 WATER MAIN IMPROVEMENTS,
PROJECT NO. 04-01
NOTICE TO PROSPECTIVE BIDDERS
(March 23, 2004)
NOTICE IS HEREBY GIVEN that the instructions and requirements of the subject bid are amended as follows:
1.
Replace Page 1-9 with the attached Page~-9A. For Bid Item 11 in the Bid Form on Page I - 9, the Standard
Specification number has been changed to 7-09. Also, under the ITEMS WITH UNIT PRlCE BID column,
"Class 52" has been added to the end of"DI Pipe for Water Min, 8-inch Dia." For Bid Item 17 in the Bid
Form on Page I - 9, the estimated quantities has been changed to 16 EA. Under the ITEMS WITH UNIT
PRlCE BID the entry will read "North Side Service Connection (W/C&G, Asphalt patch) I-inch". An
additional bid item, number 18, has been added to the Bid Form, "South Side Service Connection (W/C&G,
Asphalt patch) I-inch"
,
Delete the third paragraph under "Progress Schedule" on Page III - 8, that required the schedule to be
submitted usmg SureTrak software.
Delete the paragraphs labeled "2." and "4." under the TRAFFIC CONTROL PLANS list of special
traffic control requirements on Page III - 9 and replace paragraph "2." with the following:
2. Contractor to maintain access to all driveways during construction. Steel plates can be used by
contractor to accomplish this requirement.
Replace Sheets 3 and 4 of the Drawin2 with the attached Sheets 3A and 4A. The label "SEE DETAIL
"WATER SERVICE" SHEET 6" has been deleted and replaced with: "ADD SOUTH SIDE SERVICE
CONNECTION (TYPICAL)" and" ADD NORTH SIDE SERVICE CONNECTION (TYPICAL)". Work
associated with replacing all service lines serving customer on the south side of 2nd street, from service tap to
existing meter, has been added to the scope of work.
This addendum must be acknowledged in the space provided on the Bid Form in the Project Manual when it is
submitted to the City with your bid (See Page 1-12). Failure to do so may result in the bid being rejected as
being non-responsive.
Addendum No.1
March 23, 2004
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
BID FORM
Item Standard Estimated ITEMS WITH UNIT PRICE BID (unit prices to be UNIT PRICE AMOUNT
No. Specification quantities for written in words)
Section comparing bids Dollars Cents Dollars Cents
only
1 1-04 Lump Sum Protection, Restoration and Clean-Up
2 1-07 Lump Sum Maintenance & Protection of Traffic
3 1-09 Lump Sum Mobilization
4 1-10 150 Hours Traffic Control Labor
5 2-09 380 CY Control Density Fill
6 2-09 6440 SF Shoring or Extra Excavation
7 2-09 694 CY Structure Excavation Class B, incl. Haul
8 7-04 62 LF Solid Wall PVC Storm Sewer Pipe 6' DIA.
9 7.05 3EA Type I Catch Basin W/Curb Inlet Frame & Grate
10 7-05 2EA Adjust Inlet, Install Solid Cover
11 7-09 1575 LF DI Pipe for Water Main, 8-lnch Dia. (Class 52)
12 7-12 1 EA 10' x 8' Hot Tap W/8' Valve
13 7-12 3EA 8' x 8' Cross W/2-8' Valve
14 7-14 1 EA Replace Hydrant Assembly w/6' Feed line
15 7-14 2EA Hydrant Assembly
16 8-14 58 SY Cement Cone. Sidewalk, Curb/Gutter & Ramps
17 7-15 16 EA North Side Service Connection(W/C&G, Asphalt patch) 1-lnch
18 7-15 16 EA South Side Service Conneclion(W/C&G, Asphalt patch) 1-lnch
BID FORM
'PW-407 _01 [rev. 10/29/03]
1- 9A
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PART II
CONTRACT FORMS SUBMITTED FOLLOWING AWARD
OF CONTRACT
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PUBLIC WORKS
CONTRACT
This Contract is made and entered into in duplicate thiS~Y of April, 2004 by and between
the City of Port Angeles, a non-charter code city of the State of Washington, hereinafter referred
to as "the City", and Jordan Excavating Inc, a Washington State Corporation, hereinafter
referred to as "the Contractor".
WITNESSETH:
Whereas, the City desires to have certain public work performed as hereinafter set forth,
requiring specialized skills and other supportive capabilities; and
Whereas, the Contractor represents that it is qualified and possesses sufficient skills and
the necessary capabilities to perform the services set forth in this Contract.
NOW, THEREFORE, in consideration of the terms, conditions, and agreements
contained herein, the parties hereto agree as follows:
1. Scope of Work.
The Contractor shall do all work and furnish all tools, materials, and equipment in order
to accomplish the following project:
2004 WATER MAIN IMPROVEMENTS, Project 04-01
in accordance with and as described in this Contract and the Project Manual, which include the
attached plans, Specifications, Special Provisions, submittal requirements, attachments, addenda
(if any), Bid Form, Performance and Payment Bond, and the Standard Specifications for Road,
Bridge, and Municipal Construction prepared by the Washington State Department of
Transportation, as may be specifically modified in the attached Specifications and/or Special
Provisions, hereinafter referred to as "the standard specifications", and shall perform any
alterations in or additions to the work provided under this Contract and every part thereof. The
Contractor shall provide and bear the expense of all equipment, work, and labor of any sort
whatsoever that may be required for the transfer of materials and for constructing and completing
the work provided for in this Contract, except as may otherwise be provided in the Project
Manual.
2. Time for Performance and Liquidated Damages.
A. Time is of the essence in the performance of this Contract and in adhering to the
time frames speCIfied herein. The Contractor shall commence work within ten
PW-407_02 [rev 04/14/03]
II - 1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
(10) calendar days after notice to proceed from the City, and said work shall be
physically completed within 30 working days after said notice to proceed, unless a
different time frame is expressly provided in writing by the City.
B. If said work is not completed within the time for physical completion, the
Contractor may be required at the City's sole discretion to pay to the City
liquidated damages as set forth in the Project Manual, for each and every day said
work remams uncompleted after the expiration of the specified time.
3. Compensation and Method of Payment.
A. The City shall pay the Contractor for work performed under this Contract as
detailed in the bid, as incorporated in the Project Manual.
B. Payments for work provided hereunder shall be made following the performance
of such work, unless otherwise permitted by law and approved in writing by the
City. No payment shall be made for any work rendered by the Contractor except
as identified and set forth in this Contract.
C. Progress payments shall be based on the timely submittal by the Contractor of the
City's standard payment request form.
D. Payments for any alterations in or additions to the work provided under this
Contract shall be in accordance with the Request For Information (RFI) and/or
Construction Change Order (CCO) process as set forth in the Project Manual.
Following approval of the RFI and/or CCO, the Contractor shall submit the
standard payment request formes).
E. The Contractor shall submit payment requests with a completed Application for
Payment form, an example of which is included in the Attachments to this
Contract. This form includes a lien waiver certification and shall be notarized
before submission. Applications for payment not signed or notarized shall be
considered incomplete and ineligible for payment consideration. The City shall
initIate authorization for payment after receipt of a satisfactorily completed
payment request form and shall make payment to the Contractor within
approximately thirty (30) days thereafter.
4. Independent Contractor Relationship.
The relationship created by this Contract is that of independent contracting entities. No
agent, employee, servant, or representative of the Contractor shall be deemed to be an employee,
agent, servant, or representative of the City, and the employees of the Contractor are not entitled
to any of the benefits the City provides for its employees. The Contractor shall be solely and
entirely responsible for its acts and the acts of its agents, employees, servants, subcontractors, or
PW-407 _02 [rev 04/14/03]
II - 2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
representatIves during the performance of thIS Contract. The Contractor shall assume full
responsibility for payment of all wages and salaries and all federal, state, and local taxes or
contributions Imposed or required, including, but not limited to, unemployment Illsurance,
workers compensatIon insurance, social security, and income tax withholding.
5. Prevailing Wage Requirements.
The Contractor shall comply with applicable prevailing wage requirements of the
Washington State Department of Labor & Industries, as set forth in Chapter 39.12 RCW and
Chapter 296-127 WAC. The Contractor shall document compliance with said requirements and
shall file with the City appropriate affidavits, certificates, and/or statements of compliance with
the State prevailing wage requirements. The Washington State Prevailing Wage Rates For
Public Works Contracts, Clallam County, incorporated III this Contract have been established by
the Department of Labor & Industries and are included as an Attachment to this Contract. The
Contractor shall also ensure that any subcontractors or agents of the Contractor shall comply with
the prevailing wage and documentation requirements as set forth herein.
6. Indemnification and Hold Harmless.
A. The Contractor shall defend, indemnify, and hold harmless the City, its officers,
officials, employees, and volunteers against and from any and all claims, injuries,
damages, losses, or lawsuits, including attorney fees, arising out of or in
connection with the performance ofthis Contract, except for injuries and damages
caused by the sole negligence of the City. It is further provided that no liability
shall attach to the CIty by reason of entering into this Contract, except as
expressly provided herein.
B. Should a court of competent jurisdiction determine that this Contract is subject to
RCW 4.24.115, then, in the event of liability for damages arising out of bodily
injury to persons or damages to property caused by or resulting from the
concurrent neglIgence of the Contractor and the City, its officers, officials,
employees, and volunteers, the Contractor's liability hereunder shall be only to the
extent of the Contractor's negligence. It is further specifically and expressly
understood that the indemnification provided herein constitutes the Contractor's
waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the
purposes of this indemnification. This waiver has been mutually negotiated by the
parties. The provisions of this section shall survive the expiration or termination
of this Contract.
7. Insurance.
The Contractor shall procure, and maintain for the duration of the Contract, insurance
against claims for injuries to persons or damage to property which may arise from or in
connection with the performance of the work hereunder by the Contractor, their agents,
PW-407_02 [rev 04/]4/03]
II - 3
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
representatives, employees or subcontractors. Failure by the Contractor to mamtain the msurance
as required shall constitute a material breach of contract upon which the City may, after gIving
five working days notice to the Contractor to correct the breach, immediately terminate the
Contract or at its discretion, procure or renew such insurance and pay any and all premiums in
connection therewith, with any sums so expended to be repaid to the City on demand, or at the
sole discretion of the City, off set against funds due the Contractor from the City.
A. Minimum Scope of Insurance
The Contractor shall obtain insurance of the types described below:
1. Automobile Liability insurance covering all owned, non-owned, hired and
leased vehicles. Coverage shall be written on Insurance Services Office
(ISO) form CA 00 01 or a substItute form providing equivalent liability
coverage. If necessary, the policy shall be endorsed to provide contractual
liability coverage.
11. Commercial General Liabilitv insurance shall be written on ISO
occurrence form CG 00 01 and shall cover liability arising from premises,
operations, stop gap liability, independent contractors, products-completed
operations, personal injury and advertising injury, and liability assumed
under an insured Contract. The Commercial General Liability insurance
shall be endorsed to provide the Aggregate Per Project Endorsement ISO
form CG 25 03 11 85. There shall be no endorsement or modification of
the Commercial General Liability insurance for liability arising from
explosion, collapse or underground property damage. The City shall be
named as an insured under the Contractor's Commercial General Liability
insurance policy with respect to the work performed for the City using ISO
Additional Insured endorsement CG 20 10 10 01 and Additional Insured-
Completed Operations endorsement CG 20 37 10 01 or substitute
endorsements providing equivalent coverage.
111. Workers' Compensation coverage as required by the Industrial Insurance
laws of the State of Washington.
B. Minimum Amounts of Insurance
The Contractor shall maintain the followmg insurance limits:
1. Automobile Liability insurance with a minimum combined single limit for
bodily injury and property damage of $1 ,000,000 per accident.
11. Commercial General Liability insurance shall be written with limits no
less than $1,000,000 each occurrence, $2,000,000 general aggregate and a
PW-407_02 [rev 04/14/03] II - 4
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
$2,000,000 products-completed operations aggregate limit.
C. Other Insurance Provisions
The Insurance policies are to contaIn, or be endorsed to contaIn, the following provisions
for Automobile LIability and Commercial General Liability insurance.
1. The Contractor's insurance coverage shall be primary Insurance with
respect to the City. Any insurance, self-insurance, or insurance pool
coverage maintained by the City shall be in excess of the Contractor's
insurance and shall not contribute with it.
11. The Contractor's insurance shall not be cancelled or reduced as to
coverage by either party, except after forty-five (45) days prior written
notice by certified mail, return receipt requested, has been given to the
City.
D. Acceptability of Insurers
Insurance is to be placed with insurers with a current A.M. Best rating of not less than
A:VII.
E. Verification ,of Coverage
The Contractor shall furnish the City with original certificates and a copy of the
amendatory endorsements, including but not necessarily limited to the additional insured
endorsement, evidencing the insurance requirements of the Contractor before
commencement of the work.
F. Subcontractors
The Contractor shall include all subcontractors as insureds under its policies or shall
furnish separate certificates and endorsements for each subcontractor. All coverages for
subcontractors shall be subject to all of the same insurance requirements as stated herein
for the Contractor.
8. Compliance with Laws.
A. The Contractor shall comply with all applicable federal, state, and local laws,
Including regulations for licenSIng, certification, and operation of facilities and
programs, and accreditation and licensing of individuals, and any other standards
or criteria as set forth in the Project Manual.
B. The Contractor shall pay any applicable business and permit fees and taxes which
PW-407_02 [rev 04/14/03]
II - 5
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
may be required for the performance of the work.
C. The Contractor shall comply with all legal and permitting requirements as set
forth in the Project Manual.
9. Non-discrimination. The parties shall conduct their business in a manner which assures
fair, equal and nondiscriminatory treatment of all persons, without respect to race, creed, color,
sex, Vietnam era veteran status, disabled veteran conditIon, physical or mental handicap, or
national origin, and, in particular:
A. The parties will maintain open hiring and employment practices and will welcome
applications for employment III all positions from qualified individuals who are
members of the above-stated minoritIes.
B. The parties will comply strictly with all requirements of applicable federal, state
or local laws or regulations issued pursuant thereto, relating to the establishment
of nondiscriminatory requirements in hiring and employment practices and
assuring the service of all patrons and customers without discrimination with
respect to the above-stated minority status.
10. Assignment.
A. The Contractor shall not assign this Contract or any interest herein, nor any money
due to or to become due hereunder, without first obtaining the written consent of
the City, nor shall the Contractor subcontract any part of the services to be
performed hereunder without first obtaining the consent of the City.
B. The Contractor hereby assigns to the City any and all claims for overcharges
resulting from antitrust violations as to goods and materials purchased in
connection with this Contract, except as to overcharges resulting from antitrust
violations commencing after the date of the bid or other event establishing the
price of this Contract. In addition, the Contractor warrants and represents that
each of its suppliers and subcontractors shall assign any and all such claims for
overcharges to the City in accordance with the terms of this provision. The
Contractor further agrees to give the City immediate notice of the existence of any
such claim.
11. Contract Administration.
This Contract shall be administered by Jeffrey Konopaski on behalf of the
Contractor and by Jeremy Andrews on behalf of the City. Any written notices required by
the terms of this Contract shall be served or mailed to the following addresses:
PW-407_02 [rev 04114/03]
II-6
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Contractor:
Jordan Excavating, Inc
1826 Golf Course Rd
Port Angeles, W A 98362
City:
City of Port Angeles
P.O. Box 1150
321 East Fifth Street
Port Angeles, W A 98362-0217
12. Interpretation and Venue.
ThIS Contract shall be interpreted and construed in accordance with the laws of the State
of Washington. The venue of any litigation between the parties regarding this Contract shall be
Clallam County, Washington.
IN WITNESS WHEREOF, the parties hereto have caused this Contract to be executed
the day and year first set forth above.
CONTRACTOR:
~~;J ~~gvr;f ~ J;,~
Name of Contractor
CITY OF PORT ANGELES:
BY:~ ~~
Title: /~//e-/j-
.
Approved as to Form:
~&I~
City Attorney
Attest:
~&>~"4" · ,Upa
City C k
PW-407 _02 [rev 04/14/03]
II - 7
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
r
PERFORMANCE and PAYMENT BOND
Bond to the City of Port Angeles
Bond # 22485297
KNOW ALL MEN BY THESE PRESENTS:
That we, the undersigned, Jordan Excava ting, In~S Principal, and Wes tern Surety
Company a corporation, organized and eXisting under the laws of the State
of Washington, as a surety corporation, and qualified under the laws of the State of Washington to
become surety upon bonds of contractors with municipal corporations as surety, are jointly and
severally held and firmly bound to the City of Port Angeles In the penal sum of $176.295.07
for the payment of which sum on demand we bind ourselves and our successors, heirs, administrators
or personal representatives, as the case may be.
This obligation IS entered into pursuant to the statutes of the State of Washington and the ordinances
of the City of Port Angeles.
Dated at Port Anqeles ,Washington, this _ day of
The conditions of the above obligation are such that:
WHEREAS, the City of Port Angeles has let or is about to let to the said Jordan Excavating. Inc.
_ the above bounded Principal, a certain contract, the said contract being numbered 04-01 ,and
providing for 2004 WATER MAIN IMPROVEMENTS (which contract is referred to herein and is
made a part hereof as though attached hereto), and
WHEREAS, the said Principal has accepted, or is about to accept, the said contract, and undertake to
perform the work therein provided for in the manner and within the time set forth; now, therefore,
If the said Principal, Jordan Excava tioq, IJ;lshall faithfully perform all of the provisions of said
contract in the manner and within the time therein set forth, or within such extensions of time as may
be granted under said contract, and shall pay all laborers, mechanics, subcontractors and
materialmen, and all persons who shall supply said Principal or subcontractors with provisions and
supplies for the carrying on of said work, and shall indemnify and hold the City of Port Angeles
harmless from any damage or expense by reason of failure of performance as specified in said
contract or from defects appearing or developing in the material or workmanship provided or performed
under said contract within a period of one year after its acceptance thereof by the City of Port Angeles,
then and in that event, this obligation shall be void; but otherwise, it shall be and remain in full force
and effect.
Signed this 14 Uday of April
,20 04.
Jordan Excavating, Inc
Principal
By#7o-/~
Title
PO Box 1068,
Surety Address
PO Box 1347,Port Angeles WA 98362
Agent Address
George Hankey 800-262-2110
Surety Contact and Phone Number
Thomas L. Fryer 360-457-1144
Agent Contact and Phone Number
PW-407_02 [rev 04/14/03]
II - 8
I
I
I
I
I
I
I
I
,
I
'I
L
I
I
I
I
I
.
POWER OF ATTORNEY
22485297
. .
That tlus Power of Attorney IS not vahd or In effect unless attached to the bond which It authonzes executed, but may be detached by the approving
officer If demed. That Western Surety Company, a corporatIOn, does hereby make, constitute and appoint the following
: THREE'!; ~. ':1 3': I authonzed IndlVlduals
Know All Men by These Presents:
(Irrevocable)
BOND No. SP-
AUTHORIZED INDIVIDUALS
'DANrEl.;;;..rf7~YEB. ,.>>'
TL 'FRYER 0 '.', ,
~~,:'~~
,,',
~<
AUTHORIZED INDIVIDUALS
P,Aut~ M -,R'EEO: , ~/
= "/', < ~
<:~
, ,> ~
, "
, ::;'
,'" ,~<
-<:." ~:<:
0' ,
.H
<,'" ,
. :',.,f:.
1'1
I
/~~,..' ~ '<,"\
"
, "";:~
< :',~ <
^,
, < <<~
\,'<
'~~ ",
Y, :,'"
'<, ,
, /'^
^ >}' ,.
~ oJ,
" ::;\
/>2 ~
;-<7 ,v-t
, '....,
"
."
~/ \ ,''<~) t ::^ ~
, >
.' ,
, \.....
<~
<"::'
. 0
d
...^~:.' <
In the City of paR TANG El E S ,State of WA SH I NGTON with hmlled authonty, ItS true and
lawful Attorney(s) In fact with full power and authonty hereby conferred, to sign, execute, acknowledge and dehver for and on ItS behalf as Surety, the
following descnbed bond
ONE BlOt PERFORMANCE~ AND/OR PAYMENT BOND PROVIDING THE BONO PENALTY
DOES NO EXCEED SEVEN HUNDRED FIFTY THOUSAND AND NO/IOO DOLLARS
<***750 000.00).
*******~**************************************************************
**********************************************************************
**********************************************************************
The acknowledgment and execution of such bond by the said Attorney in Fact shall be as bindmg upon thIS
Company as if such bond had been executed and acknowledged by the regularly elected offIcers of this Company.
All authority hereby conferred shall expire and terminate, without notice, unless used before midnight of
FEBRUARY
28 , 2006 ,but until such time shall be irrevocable and in full force and effect.
WESTE~~~O~MPANY further cerllfles Ihat the follOWIng IS a true and exact copy of SectIOn 7 of the By-Laws of Western Surety Company, duly adopted and now
In f~~' 1!l~I\i !s.;rtVfn~~ll bonds, poltcles, undertakIngs, Powers of Attorney or other obltgalions of the corporatIOn shall be executed In the corporate name of the Company
b",~th;,~re'ildoAt..&<;[et, AsSIStant Secretary, Treasurer, or any Vice PreSIdent, or by such other officers as the Board of DIrectors may authonze The PreSident, any V,ce
~", " A"':A..~
<1;', eIlI; Se~t@y~ny,,,,,,,~:.':t! Secretary, or the Treasurer may appomt Attorneys m Fact or Agents who shall have authonty to Issue bonds, poltcles, or undertakmgs m the
~e:b~~ CompaDl9' T~ ~ate seal IS not necessary for the valtdllY of any bonds, poltcles, undertakIngs, Powers of Attorney or other obltgallons of the corporatIOn The
;;: 6I&11~ture"df any such of~er'!a~~ corporate seal may be pnnted by facsimile"
:5:> : (.) m ': ~
8:>]he penal amount of the: bOli~erem descnbed may be mcreased If there IS attached to thIS Power, wntten authonty so authonzmg In the form of an endorsement, letter or
~ ~~am Signed by the SenIQr ~IliCrWC1t1ng Officer, Underwntmg Officer, PreSident, Vice PreSident, AsSistant Vice PreSident. Treasurer. Secretary or AsSIstant Secretary of Western
~ e~, ComQ\'n~ speCifICally flu ~mg sald mcrease 8th .
~ ~.,yrrrN$SIW)rEJ!.I!~, ,$estern Surety Company has caused these presents to be executed by ItS PreSident With ItS corporate seal affixed thIS
~ii/~rh.A~rirOY , 1997 , WE S T ERN SUR E T Y COM PAN Y
010. '-:\'"
'flQ(loon ..s,~,"\,,\ /J
STATE 6'O~UUTH DAKOTA} ss By ~i'. . _ ~ ~
COUNTY OF MINNEHAHA -------~~ President
8th April 1997
On thiS day of , In the year , before me, a Notary Publtc, personally
appeared Stephen T Pate, who bemg by me duly sworn, acknowledged that he Signed the above Power of Attorney as the aforesatd officer of WESTERN SURETY COMPANY and
acknowledged said Instrument to be the voluntary act and deed of sald corporatIOn
n~;r;;~N~1
My ~l'l};mIsslOn Expires 6-2.~
I, the underSIgned offIcer of Western Surety Company, a stock corporallon of the State of South Dakota, do hereby cerlify that the attached Power of Attorney IS tn full force
and effect and is irrevocable, and furthermore, that Seclion 7 of the By-Laws of the company as set forth In the Power of Attorney, IS now In force.
'R~
Notary Public, South Dakota
Form 749-4-97
In teslimony whereof, I have hereunto set my hand and the seal of Western Surety Company this. 14 t h day of AD r i 1 2 0 0 4
WESTERN SURETY COMPANY
~p,~::4
.IMPORTANT: This date must be filled m before it is attached
to the bond and it must be the same date as the bond.
By
NOTICE: ThiS border must be BLUE If It IS not BLUE, this Is not a certified copy
.
ACORD,.
CERTIFICATE OF LIABILITY INSURANCE
OP ID T DATE (MM/DDIYYYYI
JORDA 1 04/14/04
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
PRODUCER
,
Fryer & Sons Ins. Inc.
Box 1347
Port Angeles WA 98362
Phone:360-457-1144 Fax:360-457-9440
INSURERS AFFORDING COVERAGE
INSURED
INSURER A
INSURER B
INSURER C
INSURER D
INSURER E
North Pacific Insurance Co.
NAIC#
23892
Jordan Excavating, Inc
1826 South Golf Course Road
Port Angels WA 98362
COVERAGES
I THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS
LTR NSR[ TYPE OF INSURANCE POLICY NUMBER PD~~~1ri~rtf8,w)E P8k!fEY(~~h'1f,yy)'" LIMITS
I GENERAL LIABILITY EACH OCCURRENCE $ 1000000
- PREMISES (E~~~~~nce)
A X X COMMERCIAL GENERAL LIABILITY C06147141 03/19/04 03/19/05 $ 10000
I CLAIMS MADE [!] OCCUR MED EXP (Anyone person) $ 5000
I PERSONAL & ADV INJURY $ 1000000
-
GENERAL AGGREGATE $2000000
-
GEN'L AGGREGATE LIMIT APPLIES PER PRODUCTS - COMP/OP AGG $ 1000000
I h POLICY !Xl j~8;: n LOC
AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT
I----- $ 1000000
X ANY AUTO (Ea accident)
I-----
ALL OWNED AUTOS BODILY INJURY
II I-- $
A ~ SCHEDULED AUTOS C06147141 03/19/04 03/19/05 (Per person)
~ HIRED AUTOS BODILY INJURY
$
,- X NON-OWNED AUTOS (Per accident)
I--
I I----- PROPERTY DAMAGE $
(Per accident)
GARAGE LIABILITY AUTO ONLY - EA ACCIDENT $
(I R ANY AUTO OTHER THAN EA ACC $
AUTO ONLY AGG $
EXCESS/UMBRELLA LIABILITY EACH OCCURRENCE $
tJ OCCUR D CLAIMS MADE AGGREGATE $
I $
R DEDUCTIBLE $
RETENTION $ $
I WORKERS COMPENSATION AND I TORY LIMITS I IOJ~-
EMPLOYERS' LIABILITY
ANY PROPRIETOR/PARTNER/EXECUTIVE E L EACH ACCIDENT $
OFFICER/MEMBER EXCLUDED? E L DISEASE - EA EMPLOYEE $
If yes, descnbe under E L DISEASE - POLICY LIMIT
SPECIAL PROVISIONS below $
I OTHER
I DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES / EXCLUSIONS ADDED BY ENDORSEMENT / SPECIAL PROVISIONS
Operations of the 1nsured for 2004 Water Ma1n Improvements, Project
No.04-01, naming the City of Port Angeles as additional insured.
I
CERTIFICA TE HOLDER
CANCELLATION
City of Port Angeles
Pub11c Works & Ut1l1t1es Dept
321 East Fifth
Port Angeles WA 98362
CITYOFP SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION
DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL 45 DAYS WRITTEN
NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO DO SO SHALL
IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER, ITS AGENTS OR
REPRESENTATIVES
AUTHORIZED REPRESENTA
I ACORD 25 (2001/08)
I
I
I
I
I
I
I
I
-
I
'I
'--
I
I
I
I
I
I
I
I
F'OLlCY NUMBER Jordan Excava ting, lnc COMMERCIAL GENERAL LIABILITY
C06147141 CG20101001
4/14/2004
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
ADDITIONAL INSURED - OWNERS, lESSEES OR
CONTRACTORS - SCHEDULED PERSON OR
ORGANIZATION
This endorsement modifies Insurance provided under the following
COMMERCIAL GENERAL LIABILITY COVERAGE PART
SCHEDULE
Name of Person or Organization:
City of Port Angeles
Public Works & utilities Department
321 East Fifth
(If no entry appears above, Information required to complete this endorsement will be shown in the Declarations as
applicable to thiS endorsement.)
A. Section II - Who Is An Insured is amended to
include as an insured the person or organization
shown In the Schedule, but only with respect to
lIabllityansing out of your ongoing operations per-
formed for that insured.
B. With respect to the insurance afforded to these
additional insureds, the following exclusion IS
added:
2. Exclusions
This insurance does not apply to "bodily in-
jury" or "property damage" occurring after:
(1) All work, including materials, parts or
equipment furnished in connection with
such work, on the project (other than
service, maintenance or repairs) to be
performed by or on behalf of the addi-
tIOnal insured(s) at the site of the cov-
ered operations has been completed;
or
(2) That portion of "your work" out of which
the injury or damage arises has been
put to its Intended use by any person or
organization other than another con-
tractor or subcontractor engaged In
performing operations for a principal as
a part of the same project.
CG 20 10 10 01
105703
@ ISO Properties, Inc., 2000
Page 1 of 1
[
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PART III
SPECIFICATIONS, SPECIAL PROVISIONS
AND SUBMITTALS
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
INTRODUCTION/ORDER OF PRECEDENCE
See Section 1-04.2 of the Standard Specifications for the general order of precedence
for inconsistency in the parts of the Contract. In addition, the order of precedence in the
case of conflicting specifications, special provisions, submittal requirements, plans,
drawings, or other technical requirements of this Project Manual is as follows:
1. Special Provisions as set forth on pages ill - 1 through ill - 12
2. Submittal requirements, as listed on pages ill - 12 through ill - 14
3. Project Plans, as set forth in Attachment ~.
4. Amendments to the Standard Plans and Specifications issued prior to September
1, 2004, as set forth in Attachment ~.
5. Washington State Department of Transportation's 2004 Standard Specifications
for Road, Bridge, and Municipal Construction (English Units), referred to herein
as the Standard Specifications. This includes Section 1-99, APWA
SUPPLEMENT.
6. Washington State Department of Transportation's Standard Plans, as referenced
on page ill-12 .
7. Attachments (exclusive of the above-mentioned) as listed in the Table of
Contents of the Project Manual.
STANDARD SPECIFICATIONS
This Contract incorporates the Washington State Department of Transportation's 2004
Standard Specifications for Road, Bridge, and Municipal Construction (English Units),
referred to herein as the Standard Specifications. Unless otherwise superseded as
detailed above, the Standard Specifications describe the general requirements,
description, materials, construction requirements, measurement and payment of work to
be completed under this Contract.
Section 1-99, APWA SUPPLEMENT, of the 2004 Standard Specifications for Road,
Bridge, and Municipal Construction, shall be included and made a part of the contract
specifications.
SPECIAL PROVISIONS
The following Special Provisions supersede any conflicting provisions of the Standard
Specifications and are made a part of this contract. The Sections referenced in these
Special Provisions refer to Sections of the Standard Specifications.
1-01.3 DEFINITIONS
The term "Contract Bond" is understood to be equal to "Performance and Payment
Bond" for this project.
PW-407_03 [rev 11/18/02]
ill-I
I
I
I
I
I
I
I
.1
I
I
I
I
I
I
I
I
I
I
I
The term "State" is redefined to mean the City of Port Angeles for this project.
The term "Commission" is redefined for this project to mean the City Council of the City
of Port Angeles.
The term "Secretary" is redefined for this project to mean the Director of Public Works
for the City of Port Angeles.
The term "Department" is redefined to mean the City of Port Angeles Department of
Public Works & Utilities for this project.
The terms "Engineer" and "Project Engineer" are redefined for this project to mean the
City Engineer for the City of Port Angeles.
The terms "Contract" and "Project Manual" are interchangeable.
1-02.2 PLANS AND SPECIFICATIONS
Section 1-02.2 of the Standard Specifications is deleted and replaced with the following:
Information as to where plans and specifications can be obtained or reviewed will be
found in the advertisement for the work placed in the Owner's official newspaper.
1-02.5 PROPOSAL FORMS
The term "prequalified" is deleted from Section 1-02.5 of the Standard Specifications for
this project.
1-02.9 DELIVERY OF PROPOSAL
Section 1-02.9 of the Standard Specifications is modified in its entirety for this project to
now read as follows:
Each proposal shall be submitted in accordance with the instructions outlined in the
ADVERTISEMENT FOR BIDS and the INFORMATION FOR BIDDERS AND BIDDER'S
CHECK LIST.
1-03.4 PERFORMANCE AND BOND
In accordance with Section 1-03.4 of the Standard Specifications the Contractor shall
execute a Performance and Payment Bond as provided in the Contract. The bond shall
specify the surety's name and address and shall include a power-of-attorney appointing
the signatory of the bond as the person authorized to execute it.
DESCRIPTION OF WORK
Section 1-04.3 of the Standard Specification is supplemented by the following:
PW-407_03 [rev. 11/18/02]
III-2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
See Advertisement for bid opening instructions.
Port Angeles Landfill dumping fees will be paid by City, not the Contractor, for material
approved for disposal at that site under this contract. To receive compensation for
disposal of material for which there is a bid item under this contract, e.g. "Unsuitable
Material for Backfill Base", the Contractor must submit weight ticket receipts.
1-04.4 CHANGES IN WORK
Section 1-04.4, Changes, of the Standard Specifications shall be amended to add the
following:
All revisions, clarifications, field requests and field authorizations for construction
contracts shall be documented using the "REQUEST FOR INFORMATION" form. A
construction contract change order may be initiated by the Contractor, City inspector, or
Architect/Engineer by using the RFI form, PW-404_02.
Definitions:
a. RFI: Request for Information (City of Port Angeles' Document PW 404_02)
b. CCO: Construction Change Order (City of Port Angeles' Document PW 404_04)
PROTECTION, RESTORATION AND CLEAN-UP
Section 1-04.11, Final Cleanup, and Section 1-07.16, Protection and Restoration of
Property, of the Standard Specifications shall be supplemented with the following:
The work done under this item consists of restoring, cleaning and repairing private
property impacted by the work, and restoration of other existing features of the
landscape which are deemed necessary by the Engineer.
The Contractor shall follow its trenching operation as soon as possible with its
restoration work. The Contractor will not be permitted to leave any particular area
unrestored for more than two weeks except in the case where he may be doing repair
work on a line which has failed to meet test specifications. Such restoration shall follow
immediately.
The lump sum bid item for this work, "Protection, Restoration and Cleanup", shall be full
compensation for all labor, materials, tools, and equipment necessary to complete this
item as specified or as directed by the Engineer.
PLANS AND WORKING DRAWINGS
Unless otherwise required by the Submittal Requirements, Section 1-05.3 of the
Standard Specifications shall apply.
PW407_03 [rev. 11/18/02]
III-3
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1-05.5 AS-BUILT DRAWINGS
Section 1-05.5 is supplemented with the following:
As-built drawings are required to be maintained by the Contractor. The as-built
drawings shall be a record of the construction as installed and completed by the
Contractor. They shall include all the information shown on the contract set of drawings
and a record of all construction deviations, modifications or changes from those
drawings which were incorporated in the work; all additional work not appearing on the
contract drawings; all design submittals, including electrical schematics; and all changes
which are made after final inspection of the contract work.
The Contractor shall mark up a set of full size plans using red ink to show the as-built
conditions. These as-built marked prints shall be kept current and available on the job
site at all times, and be made available to the City Engineer upon request. The
changes from the contract plans which are made in the work or additional information
which might be uncovered in the course of construction shall be accurately and neatly
recorded as they occur by means of details and notes. No construction work shall be
concealed until it has been inspected, approved, and recorded. The drawings shall
show at least the following:
a. The location and description of any utilities or other installations known to
exist and or encountered within the construction area. The location of
these utilities shall include an accurate description, dimensions, and at
least 2 ties to permanent features for all utilities encountered.
b. The location and description of all facilities and appurtenances installed by
the Contractor. The location of facilities and appurtenances shall include
accurate dimensions and at least 2 ties to permanent features for all major
components, including gate valves.
The City of Port Angeles has the right to deny progress payments for
completed work if as-built records, as required by this section, are not
available on the job site for the work that has been completed by the date
of the payment request.
Final as-builts shall be delivered to the City Engineer at the time of final
inspection for review and approval. As-built drawings must be approved by the
City Engineer before final payment will be made. See Submittal Requirements
for additional information.
1-05.10 GUARANTEES
Section 1-05 is supplemented with the following:
The Contractor shall guarantee all materials and equipment furnished and work
performed for a period of one (1) year from the date of substantial completion.
PW-407_03 [rev. 11/18/02]
ill-4
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
The Contractor shall warrant and guarantee for a period of one (1) year from the
date of substantial completion of the system that the completed system is free
from all defects due to faulty materials or workmanship, and the Contractor shall
promptly make such corrections as may be necessary by reason of such defects
including the repairs of any damage to other parts of the system resulting from
such defects. The City will give notice of observed defects with reasonable
promptness. In the event that the Contractor should fail to make such repairs,
adjustments, or other work that may be made necessary by such defects, the
City may do so and charge the Contractor the cost thereby incurred. The
Performance and Payment Bond shall remain in full force and effect through the
guarantee period.
Measurement and Payment
All costs associated with this item shall be incidental to the contract prices for the
various bid items.
STATE SALES TAX
The work on this Contract is to be performed upon lands whose ownership
obligates the Contractor to collect State sales tax from the Contracting Agency.
The provisions of Section 1-07.2(2) apply.
1-07.6 PERMITS AND LICENSES
All permits will be provided to the contractor at the City's expense
1-07.17 UTILITIES AND SIMILAR FACILITIES
Section 1-07.17 is supplemented by the following:
Locations and dimensions shown in the plans for existing facilities are in
accordance with available information obtained without uncovering, measuring,
or other verification.
Public and private utilities, or their contractors, will furnish all work necessary to
adjust, relocate, replace, or construct their facilities unless otherwise provided for
in the Plans or these Special Provisions. Such adjustment, relocation,
replacement, or construction will be done during the prosecution of the work for
this project.
The Contractor shall call the Utility Location Request Center (One Call Center),
for field location not less than two nor more than ten business days before the
scheduled date for commencement of excavation which may affect underground
utility facilities, unless otherwise agreed upon by the parties involved. A business
day is defined as any day other than Saturday, Sunday, or a legal local, state or
federal holiday. The telephone number for the One Call Center for this project is
1-800-424-5555.
PW-407_03 [rev. 11/18/02]
ID-5
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
The Contractor is alerted to the existence of Chapter 19.22 RCW, a law relating
to underground utilities. Any cost to the Contractor incurred as a result of this
law shall be at the Contractor's expense.
No excavation shall begin until all known facilities in the vicinity of the excavation
area have been located and marked.
PUBLIC LIABILITY AND PROPERTY DAMAGE INSURANCE
Section 1-07.18 of the Standard Specifications is deleted in its entirety and
replaced with Sections 6 and 7 of the City's standard Public Works Contract in
Part II of the Project Manual.
1-07.23 PUBLIC CONVENIENCE AND SAFETY
Section 1-07.23 is supplemented with the following:
The construction safety zone for this project is 10 feet from the outside edge of
the traveled way.
During nonworking hours equipment or materials shall not be within the safety
zones unless it is protected by permanent guard rail or temporary concrete
barrier. The use of temporary concrete barrier shall be permitted only if the
Engineer approves the installation and location, however the construction safety
zone of 10 feet must be adhered to as stated above.
During the actual hours of work, unless protected as described above, only
materials absolutely necessary to construction shall be within the safety zone
and only construction vehicles absolutely necessary to construction shall be
allowed within the safety zone or allowed to stop or park on the shoulder of the
roadway.
The Contractor's nonessential vehicles and employees private vehicles shall not
be permitted to park within the safety zone at any time unless protected as
described above.
Adjacent roadways and sidewalks shall be cleaned of construction debris at the
end of each work day, or sooner if there is an unanticipated adverse impact on
the safety of the traveling public.
Deviation from the above requirements shall not occur unless the Contractor has
requested the deviation in writing and the Engineer has provided written
approval.
In addition to the requirements of Section 1-07.23(1) of the Standard
Specifications, the following provisions shall apply:
PW-407_03 [rev. 11/18/02]
ill-6
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1. There shall be no delay to medical, fire, police, or other emergency
vehicles with flashing lights or sirens. The Contractor shall alert all
f1aggers and personnel of this requirement.
2. The Contractor shall notify the Engineer at least one work day in
advance of the need to restrict parking within the project limits. The
Engineer will notify the Police Department of the required restricted
parking.
3. Prior to cutting across driveways and business or parking
accesses, the Contractor MUST NOTIFY ALL OWNERS AT
LEAST 24 HOURS IN ADVANCE.
4. Every effort shall be made to limit restrictions to access of
businesses to short periods of time. The Contractor may be
required to address business access concerns on short notice.
Modification(s) to the contract to compensate the Contractor for
changes due to access concerns shall only be made if such change
results in an impact on the delivery schedule of more than one day
and/or a significant change in labor or equipment requirements.
Measurement and Payment
The contract lump sum price for "Maintenance and Protection of Traffic" shall be
full compensation for all costs and expense necessary or incidental to furnishing
all labor, equipment, tools, and materials in connection with maintaining and
protecting traffic, including installing and removing Class B signs.
The Contractor shall remove and relocate the existing traffic signs as shown on
the Plans or directed by the Engineer. The voids left due to the removal of the
signs shall be filled with suitable material to the satisfaction of the Engineer. All
existing signs damaged by the Contractor during the removal operation shall be
replaced at his own cost.
All costs for furnishing all labor, equipment, tools, and materials required to
remove and relocate existing traffic signs shall be included in the contract lump
sum price for "Maintenance and Protection of Traffic". All costs for sweeping,
washing, or otherwise cleaning roadways and sidewalks of construction debris,
including dirt, dust, mud, etc., shall be included in the contract lump sum price for
"Maintenance and Protection of Traffic".
HOURS OF WORK
See Section 1-08.0 of the APWA Supplement (Section 1-99) to the Standard
Specifications for hours of work allowed under this contract. This section is
further supplemented by the following:
The hours for delivery to the Port Angeles Landfill of approved material under this
PW-407_03 [rev. 11/18/02]
ill -7
I
I
I
I
I
I
I ~
},
I
I
I
I
I
I
I
I
I
I
I
I
contract is limited to Monday through Saturday, 9:00 am to 3:30 pm, excluding
holidays. Material delivered and/or disposed of at other hours will not be
compensated for under this contract.
PROGRESS SCHEDULE
Section 1-08.3 is supplemented with the following:
The Contractor shall prepare and submit to the Engineer a Critical Path Method
(CPM) schedule, in both electronic and hard copy format. The CPM shall include
all aspects of the contract, including procurement of materials, construction,
testing, submittals, and inspection.
The Contractor shall develop the CPM using the most current version of
SureTrak software by Primavera Systems, Inc. which shall be capable of
operating in a Windows NT environment.
The Contractor shall submit, within 21 calender days of award of the contract, 3
sets of complete CPM time-scaled logic diagram on 22" x 34" sheets with
accompanying schedule reports. An electronic copy shall also be submitted.
The schedule diagrams shall show activity numbers, descriptions, early-start
dates, float, and all relationships. The diagrams shall also show the sequence,
order, and interdependence of activities in which the work is to be accomplished.
The Contractor shall submit to the Engineer updates to the CPM schedule every
two weeks. At the same time, the Contractor shall also provide a written
narrative report describing current status and identifying potential delays. This
report shall, at a minimum, state whether the contract is on schedule, note any
milestones that will not be met, and comment on the project's current critical path
as it relates to previously submitted critical path.
The CPM deliverables shall be incidental to the contract, and the City will provide
no additional payment for work related to developing and maintaining the CPM
schedule as required in this contract.
PROSECUTION OF WORK
Section 1-08.4 is supplemented with the following:
Only one block at a time shall be open for construction activities unless otherwise
approved by the Engineer. No work shall commence in areas to receive pavers
until sufficient amount of pavers and materials are onsite to complete the work.
TIME FOR COMPLETION
Section 1-08.5 is supplemented with the following:
PW-407_03 [rev. 11/18/02]
ill-8
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Time is of the essence in the performance of this Contract and in adhering to the
time frames specified herein. The Contractor shall commence work within ten
(10) calendar days after notice to proceed from the City, and said work shall be
physically completed within ~ working days after said notice to proceed,
unless a different time frame is expressly provided in writing by the City.
If said work is not completed within the time for physical completion, the
Contractor may be required at the City's sole discretion to pay to the City
liquidated damages as set forth in the Project Manual, for each and every day
said work remains uncompleted after the expiration of the specified time.
PAYMENTS
Section 1-09.9 is supplemented with the following:
The Contractor shall submit payment requests with a completed Application for
Payment form, an example of which is included as Attachment~ to this
Contract. This form includes a lien waiver certification, and shall be notarized
before submission. Applications for payment not signed or notarized shall be
considered incomplete and ineligible for payment consideration.
TRAFFIC CONTROL MANAGEMENT
The third sentence of the first paragraph of Section 1-10.2(1) is revised to read:
The Contractor may designate the project superintendent as the TCS.
TRAFFIC CONTROL PLANS
The first sentence of Section 1-10.2(2) is to be replaced with the following:
The Contractor shall develop a traffic control plan necessary for their method of
performing the work, and submit it to the Engineer for approval before any work
involving the plan begins. No work shall occur that alters existing traffic control
before approval of the plan. The plan shall be in accordance with this section,
the Standard Plans, and the Manual on Uniform Traffic Control Devices
(MUTCD). The following is a list of special traffic control requirements that shall
be incorporated into the traffic control plan:
1. If it is necessary to close a lane of traffic along 2nd Street, only one
block shall be closed at a time.
2. The traffic control plan shall incorporate temporary chain link fence
barriers, or other barrier approved by the Engineer, to be used for
pedestrian barriers adjacent to roadways.
3. The use of existing parking lanes (i.e., indicate if parking lanes will
PW-407_03 [rev 11/18/02]
ID-9
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
be used as pedestrian walkways, traffic lanes, closed to all
pedestrian and traffic travel, or a combination of uses).
4. Standard Plan K-2 shall be used for this project for the traffic
control plan. The minimum lane width shall be eleven (11) feet.
The Contractor shall provide alternate traffic control Plans for
approval by the Engineer, as necessary to accommodate any
changes.
The last sentence of Section 1-10.2(2) is revised to read:
The Contractor's letter designating and adopting the specific traffic control plan(s)
or any proposed modified plan(s) shall be submitted to the Engineer for approval
at least ten calendar days in advance of the time the new plan will be
implemented.
Costs associated with the development of the traffic control plan(s) shall be
incidental to contract prices.
CONSTRUCTION SIGNS
Section 1-10.3(3) is revised to read:
All signs required by the approved traffic control plan(s) as well as any other
appropriate signs prescribed by the Engineer shall be furnished by the
Contractor. The Contractor shall provide the posts or supports and erect and
maintain the signs in a clean, neat, and presentable condition until the necessity
for them has ceased. All nonapplicable signs shall be removed or completely
covered with metal, plywood, or an Engineer approved product specifically
manufactured for sign covering during periods when they are not needed. When
the need for these signs has ceased, the Contractor, upon approval of the
Engineer, shall remove all signs, posts, and supports from the project and they
shall remain the property of the Contractor.
All signs lost, stolen, damaged, or destroyed shall be replaced at the Contractor's
expense. All signs shall utilize materials, and be fabricated in accordance with,
Section 9-28. All signs shall be constructed of Type I or II reflective background
sheeting unless otherwise noted in the Plans.
Construction signs will be divided into two classes. Class A construction signs
are those signs that remain in service throughout the construction or during a
major phase of the work. They are mounted on posts, existing fixed structures,
or substantial supports of a semi-permanent nature. Sign and support
installation for Class A signs shall be in accordance with the Contract Plans or
the Standard Plans. No Class A construction signs are required for this Contract.
Class 8 construction signs are those signs that are placed and removed daily, or
are used for short durations which may extend for one or more days. They are
PW-407_03 [rev 11/18/02]
III-lO
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
mounted on portable or temporary mountings. In the event of disputes, the
Engineer will determine if a construction sign is considered as a Class A or B
construction sign.
If it is necessary to add weight to signs for stability, only a bag of sand that will
rupture on impact shall be used. The bag of sand shall: (1) be furnished by the
Contractor, (2) have a maximum weight of 40 pounds, and (3) be suspended no
more than 1 foot from the ground.
Furnishing Class B signs will be in accordance with Section 1-10.3(3). Payment
for setup and take down of Class B signs will be paid for under the lump sum bid
item "Maintenance and Protection of Traffic", Section 1-07.23.
The condition of the signs shall be new or "Acceptable" as defined in the book,
Quality Standards For Work Zone Traffic Control Devices. The Engineer's
decision on the condition of a sign shall be final.
The book, Quality Standards For Work Zone Traffic Control Devices, is available
by writing to the American Traffic Safety Service Association, 5440 Jefferson
Davis Hwy., Fredericksburg, VA 22407, telephone: (703) 898-5400, FAX: (703)
898-5510.
Signs, posts, or supports that are lost, stolen, damaged, destroyed, or which the
Engineer deems to be unacceptable while their use is required on the project,
shall be replaced by the Contractor without additional compensation.
STANDARD PLANS
The Washington State Department of Transportation's Standard Plans for Road,
Bridge and Municipal Construction, up to and including any official changes to
these Plans issued through February 1, 2004 are hereby made a part of this
contract. Any conflicts between the Standard Plans and other parts of this
contract will be resolved as stated in the Order of Precedence at the beginning of
Part III.
SUBMITTAL REQUIREMENTS
The following is an index of the section contained under Submittal Requirements:
SR-01 Material Submittals
SR-02 Progress Schedule
SR-03 As-Built Drawings
SR-04 Other Post-Construction Submittals
SR-05 Itemized List Of Submittals
SR-01 MATERIAL SUBMITTALS
PW-407_03 [rev. 11/18/02]
III-ll
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
The Contractor shall furnish to the City Engineer 3 copies of all material
submittals listed in SR-06, "Itemized List Of Submittals". All material submittals
or resubmittals shall be accompanied by SR-07, "Submittals Review Form". The
location of the specification for each of these items in the Standard Specifications
or Special Provisions is indicated in SR-06. If the item description for the
material submittal is not the exact brand or model specified in the Contract, then
3 copies of the manufacturer's descriptive literature, catalog cut-sheets, etc.,
must also be included with the submittal package.
The Contractor shall clearly indicate on all material submittals and copies, the
submittal review package number (starting with "1" for the first submittal review
package), submittal item number (from SR-06) and the exact item selected. In all
cases, the Contractor shall enter the exact brand and model on the "Submittal
Review Form" for that particular item.
All material submittals shall be submitted within 28 days after award of the
Contract. The Contractor should allow 14 calender days from receipt by the City
Engineer for review and approval or rejection. For each material resubmittal
required, the Contractor should allow an additional 7 calender days from date of
receipt by the City Engineer for review and approval or rejection. Except as
provided herein, all requirements of Section 1-05.3, "Plans and Working
Drawings", of the Standard Specifications shall apply.
NOTE: NO CONSTRUCTION SHALL BE PERFORMED ON ANY
PORTION OF THE CONTRACT THAT DOES NOT HAVE
APPROVED SUBMITTALS. NO PAYMENT WILL BE MADE FOR
DESIGNS INSTALLED WITHOUT APPROVAL AS REQUIRED
BY THIS SECTION.
SR~2 PROGRESS SCHEDULE
See Section 1-08.3, as modified in the Special Provisions, for the submittal
requirements for a Progress Schedule and regular updates.
SR-03 AS-BUILT DRAWINGS
Requirements for maintaining As-Builts for the work completed under this
Contract are specified in Section 1-05.5 of the Special Provisions above. Final
As-Builts shall be submitted to the City Engineer at or before the final inspection
for review and approval. As-built drawings must be approved by the City
Engineer before final payment will be made.
SR-04 OTHER POST-CONSTRUCTION SUBMITTALS
The Contractor shall furnish the City Engineer with all other post-construction
submittals required by the specifications, whether or not listed on the submittal
review form. All results of tests the Contractor performs as required by the
Contract for quality assurance such as compaction tests, pressure tests, or
bacteriological analyses shall be submitted to the Project Engineer whether or
not the test meets the performance standards as required by the specifications.
PW-407_03 [rev. 11/18/02]
ill - 12
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SR-05 ITEMIZED LIST OF SUBMITTALS
Below is a summarized list of the submittals required under this contract.
ITEM DESCRIPTION APPLICABLE
NO. SECTION
Material Submittals
1 Bedding and Backfill Materials various
2 Progress Schedule 1-08.3
Post-Construction Submittals
3 Landfill Weight Tickets 1-04.3
4 Final As-Builts 1-05.5
5 Compaction Test Results 6-11 .5
6 Disinfection Results 7-11
PW-407 _03 [rev. 11118/02]
ill-13
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
PART IV
ATTACHMENTS
PW-407 _04 [rev. 02114/03]
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
State of Washington
DEPARTMENT OF LABOR AND INDUSTRIES
Prevailing Wage Section - Telephone (360) 902-5335
PO Box 44540, Olympia, WA 98504-4540
Washington State Prevailing Wage Rates For Public Works Contracts
The PREVAILING WAGES listed here Include both the hourly wage rate and the hourly rate of fringe benefits.
On public works projects, workers' wage and benefit rates must add to not less than this total. A brief
description of overtime calculation requirements is provided on the Benefit Code Key.
CLALLAM COUNTY
Effective 03-03-04
*****************************************************************************************************************
Classification
ASBESTOS ABATEMENT WORKERS
JOURNEY LEVEL
BOILERMAKERS
JOURNEY LEVEL
BRICK AND MARBLE MASONS
JOURNEY LEVEL
CABINET MAKERS (IN SHOP)
JOURNEY LEVEL
CARPENTERS
ACOUSTICAL WORKER
BRIDGE, DOCK AND WARF CARPENTERS
CARPENTER
CREOSOTED MATERIAL
DRYWALL APPLICATOR
FLOOR FINISHER
FLOOR LAYER
FLOOR SANDER
MILLWRIGHT AND MACHINE ERECTORS
PILEDRIVERS, DRIVING. PULLING. PLACING COLLARS AND WELDING
SAWFILER
SHINGLER
STATIONARY POWER SAW OPERATOR
STATIONARY WOODWORKING TOOLS
CEMENT MASONS
JOURNEY LEVEL
DIVERS & TENDERS
DIVER
DIVER TENDER
DREDGE WORKERS
ASSISTANT ENGINEER
ASSISTANT MATE (DECKHAND)
BOATMEN
ENGINEER WELDER
LEVERMAN. HYDRAULIC
MAINTENANCE
MATES
OILER
DRYWALL TAPERS
JOURNEY LEVEL
ELECTRICAL FIXTURE MAINTENANCE WORKERS
JOURNEY LEVEL
Page 1
PREVAILING
WAGE
$31.86
$43.47
$38.37
$14.67
$38.06
$37 90
$37.90
$38.00
$38.74
$38 03
$38 03
$38.03
$38.90
$38.10
$38.03
$38.03
$38.03
$38 03
$31.86
$79.57
$40.67
$38.37
$37.91
$38 37
$38.42
$39.85
$37.91
$38.37
$38.02
$38.59
$9.37
(See Benefit Code Key)
Over
Time Holiday Note
Code Code Code
1N 5D
1B 5N
1M 5A
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1M 5D
1N 5D
1M 5D 8A
1M 5D
1B 5D 8L
1B 5D 8L
1B 5D 8L
1B 5D 8L
1B 5D 8L
1B 5D 8L
1B 5D 8L
1B 5D 8L
1J 5B
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CLALLAM COUNTY
Effective 03-03-04
*****************************************************************************************************************
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
ELECTRICIANS - INSIDE
CABLE SPLICER $48 51 10 6H
CABLE SPLICER (TUNNEL) $52.31 10 6H
CERTIFIED WELDER $46.79 10 6H
CERTIFIED WELDER (TUNNEL) $5041 10 6H
CONSTRUCTION STOCK PERSON $24.33 10 6H
JOURNEY LEVEL $45.06 10 6H
JOURNEY LEVEL (TUNNEL) $48.51 10 6H
ELECTRICIANS - MOTOR SHOP
CRAFTSMAN $15.37 2A 6C
JOURNEY LEVEL $14.69 2A 6C
ELECTRICIANS - POWERLlNE CONSTRUCTION
CABLE SPLICER $48.96 4A 5A
CERTIFIED LINE WELDER $44 65 4A 5A
GROUNDPERSON $32.13 4A 5A
HEAD GROUNDPERSON $33 93 4A 5A
HEAVY LINE EQUIPMENT OPERATOR $44.65 4A 5A
JACKHAMMER OPERATOR $33 93 4A 5A
JOURNEY LEVEL L1NEPERSON $44 65 4A 5A
LINE EQUIPMENT OPERATOR $37 87 4A 5A
POLE SPRAYER $44.65 4A 5A
POWDERPERSON $33.93 4A 5A
ELECTRONIC & TELECOMMUNICATION TECHNICIANS
JOURNEY LEVEL $12.07
ELEVATOR CONSTRUCTORS
MECHANIC $49 28 4A 6Q
MECHANIC IN CHARGE $54.18 4A 6Q
FABRICATED PRECAST CONCRETE PRODUCTS
ALL CLASSIFICATIONS $13.50
FENCE ERECTORS
FENCE ERECTOR $13.80
FENCE LABORER $11.60
FLAGGERS
JOURNEY LEVEL $27.18 1N 50
GLAZIERS
JOURNEY LEVEL $38.96 2E 5G
HEAT & FROST INSULATORS AND ASBESTOS WORKERS
MECHANIC $39.93 1F 5E
HEATING EQUIPMENT MECHANICS
MECHANIC $16.00
HOD CARRIERS & MASON TENDERS
JOURNEY LEVEL $32.34 1N 50
INDUSTRIAL ENGINE AND MACHINE MECHANICS
MECHANIC $1565
INDUSTRIAL POWER VACUUM CLEANER
JOURNEY LEVEL $907
INLAND BOATMEN
CAPTAIN $33.50 1K 5B
COOK $28.96 1K 5B
DECKHAND $28.16 1K 58
ENGINEER/DECKHAND $30.61 1K 58
MATE, LAUNCH OPERATOR $32.05 1K 58
Page 2
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CLALLAM COUNTY
Effective 03-03-04
*****************************************************************************************************************
Classification
INSPECTION/CLEANING/SEALING OF SEWER & WATER
SYSTEMS BY REMOTE CONTROL
CLEANER OPERATOR, FOAMER OPERATOR
GROUT TRUCK OPERATOR
HEAD OPERATOR
TECHNICIAN
TV TRUCK OPERATOR
INSULATION APPLICATORS
JOURNEY LEVEL
IRONWORKERS
JOURNEY LEVEL
LABORERS
ASPHALT RAKER
BALLAST REGULATOR MACHINE
BATCH WEIGHMAN
BRUSH CUTTER
BRUSH HOG FEEDER
BURNERS
CARPENTER TENDER
CASSION WORKER
CEMENT DUMPER/PAVING
CEMENT FINISHER TENDER
CHANGE-HOUSE MAN OR DRY SHACKMAN
CHIPPING GUN (OVER 30 LBS)
CHIPPING GUN (UNDER 30 LBS)
CHOKER SETTER
CHUCK TENDER
CLEAN-UP LABORER
CONCRETE DUMPER/CHUTE OPERATOR
CONCRETE FORM STRIPPER
CONCRETE SAW OPERATOR
CRUSHER FEEDER
CURING LABORER
DEMOLITION, WRECKING & MOVING (INCLUDING CHARRED
DITCH DIGGER
DIVER
DRILL OPERATOR (HYDRAULIC, DIAMOND)
DRILL OPERATOR, AIRTRAC
DUMPMAN
EPOXY TECHNICIAN
EROSION CONTROL WORKER
FALLER/BUCKER, CHAIN SAW
FINAL DETAIL CLEANUP (Le , dusting, vacuuming, window cleaning; NOT
construction debris cleanup)
FINE GRADERS
FIRE WATCH
FORM SETTER
GABION BASKET BUILDER
GENERAL LABORER
GRADE CHECKER & TRANSIT PERSON
GRINDERS
GROUT MACHINE TENDER
Page 3
PREVAILING
WAGE
$9.73
$11 48
$12.78
$7.16
$10.53
$20.50
$41.02
$32.34
$31.86
$27.18
$31.86
$31.86
$31.86
$31.86
$32.70
$32.34
$31.86
$31.86
$32.34
$31.86
$31 86
$31.86
$31.86
$32.34
$31.86
$32.34
$27.18
$31.86
$31.86
$31.86
$32 70
$32.34
$32.70
$31.86
$31.86
$31.86
$32.34
$24.86
$31.86
$27.18
$31 86
$31.86
$31.86
$32.34
$31.86
$31 86
(See Benefit Code Key)
Over
Time Holiday Note
Code Code Code
1B 5A
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
I
I
CLALLAM COUNTY
Effective 03-03-04
*****************************************************************************************************************
I
Classification
GUARDRAIL ERECTOR
HAZARDOUS WASTE WORKER LEVEL A
HAZARDOUS WASTE WORKER LEVEL B
HAZARDOUS WASTE WORKER LEVEL C
HIGH SCALER
HOD CARRIER/MORT ARMAN
JACKHAMMER
LASER BEAM OPERATOR
MANHOLE BUILDER-MUDMAN
MATERIAL YARDMAN
MINER
NOZZLEMAN, CONCRETE PUMP, GREEN CUTTER WHEN USING HIGH
PRESSURE AIR & WATER ON CONCRETE & ROCK, SANDBLAST,
GUNITE, SHOTCRETE, WATER BLASTER
PAVEMENT BREAKER
PILOT CAR
PIPE POT TENDER
PIPE RELlNER (NOT INSERT TYPE)
PIPELAYER & CAULKER
PIPELAYER & CAULKER (LEAD)
PIPEWRAPPER
POT TENDER
POWDERMAN
POWDERMAN HELPER
POWERJACKS
RAILROAD SPIKE PULLER (POWER)
RE-TIMBERMAN
RIPRAP MAN
RODDER
SCAFFOLD ERECTOR
SCALE PERSON
SIGNALMAN
SLOPER (OVER 20')
SLOPER SPRA YMAN
SPREADER (CLARY POWER OR SIMILAR TYPES)
SPREADER (CONCRETE)
STAKE HOPPER
STOCKPILER
TAMPER & SIMILAR ELECTRIC, AIR & GAS
TAMPER (MULTIPLE & SELF PROPELLED)
TOOLROOM MAN (AT JOB SITE)
TOPPER-TAILER
TRACK LABORER
TRACK LINER (POWER)
TRUCK SPOTTER
TUGGER OPERATOR
VIBRATING SCREED (AIR, GAS, OR ELECTRIC)
VIBRATOR
VINYL SEAMER
WELOER
WELL-POINT LABORER
I
I
I
I
I
I
I
I
I
I
I
I
I
Page 4
I
I
I
PREVAILING
WAGE
$31.86
$32.70
$32.34
$31.86
$32 70
$32.34
$32.34
$32.34
$32.34
$31.86
$32.70
$32 34
$32.34
$27.18
$32.34
$32.34
$32.34
$32.70
$32.34
$31.86
$32.70
$31.86
$32 34
$32.34
$32.70
$31.86
$32.34
$31.86
$31.86
$31.86
$32.34
$31.86
$32.34
$32.34
$31.86
$31.86
$32 34
$32 34
$31.86
$31.86
$31.86
$32.34
$31.86
$32 34
$31.86
$32.34
$31.86
$31.86
$32.34
(See Benefit Code Key)
Over
TIme Holiday Note
Code Code Code
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
1N 50
I
CLALLAM COUNTY
I Effective 03-03-04
*****************************************************************************************************************
(See Benefit Code Key)
Over
I PREVAILING Time Holiday Note
Classification WAGE Code Code Code
LABORERS - UNDERGROUND SEWER & WATER
GENERAL LABORER $31 86 1N 50
I PIPE LAYER $32.34 1N 50
LANDSCAPE CONSTRUCTION
IRRIGATION OR LAWN SPRINKLER INSTALLERS $11 42
LANDSCAPE EQUIPMENT OPERATORS OR TRUCK DRIVERS $781
I LANDSCAPING OR PLANTING LABORERS $7.93
LATHERS
JOURNEY LEVEL $38.74 1M 50
MACHINISTS (HYDROELECTRIC SITE WORK)
I MACHINIST $16.84
METAL FABRICATION (IN SHOP)
FITTER/WELDER $15.16 1
LABORER $11.13 1
MACHINE OPERATOR $1066 1
I PAINTER $11.41 1
PAINTERS
JOURNEY LEVEL $30 77 2B 5A
PLASTERERS
I JOURNEY LEVEL $25.83
PLAYGROUND & PARK EQUIPMENT INSTALLERS
JOURNEY LEVEL $7.93
PLUMBERS & PIPEFITTERS
JOURNEY LEVEL $48.71 1G 5A
I POWER EQUIPMENT OPERATORS
ASSISTANT ENGINEERS $3641 1T 50 8L
BACKHOE, EXCAVATOR, SHOVEL (3 YO & UNDER) $39.03 1T 50 8L
BACKHOE, EXCAVATOR, SHOVEL (OVER 3 YO & UNDER 6 YO) $39 49 1T 50 8L
I BACKHOE, EXCAVATOR, SHOVEL (6 YO AND OVER WITH $40.01 1T 50 8L
BACKHOES, (75 HP & UNDER) $38 64 1T 50 8L
BACKHOES, (OVER 75 HP) $39.03 1T 50 8L
BARRIER MACHINE (ZIPPER) $39.03 1T 50 8L
I BATCH PLANT OPERATOR, CONCRETE $39.03 1T 50 8L
BELT LOADERS (ELEVATING TYPE) $38.64 1T 50 8L
BOBCAT $36.41 1T 50 8L
BROOMS $3641 1T 50 8L
I BUMP CUTTER $39.03 1T 50 8L
CABLEWA YS $39.49 1T 50 8L
CHIPPER $39.03 1T 50 8L
COMPRESSORS $36.41 1T 50 8L
I CONCRETE FINISH MACHINE - LASER SCREED $36.41 1T 50 8L
CONCRETE PUMPS $38 64 1T 50 8L
CONCRETE PUMP-TRUCK MOUNT WITH BOOM ATTACHMENT $39.03 1T 50 8L
CONVEYORS $38.64 1T 50 8L
CRANES, THRU 19 TONS, WITH ATTACHMENTS $38.64 1T 50 8L
I CRANES, 20 - 44 TONS, WITH ATTACHMENTS $39.03 1T 50 8L
CRANES, 45 TONS - 99 TONS, UNDER 150 FT OF BOOM (INCLUDING $39.49 1T 50 8L
JIB WITH ATACHMENTS)
CRANES, 100 TONS -199 TONS, OR 150 FT OF BOOM (INCLUDING JIB $40.01 1T 50 8L
I WITH ATTACHMENTS)
CRANES, 200 TONS TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB $40.55 1T 50 8L
WITH ATTACHMENTS)
CRANES, A-FRAME, 10 TON AND UNDER $36.41 1T 50 8L
I Page 5
I
I
I
I
CLALLAM COUNTY
I Effective 03-03-04
*****************************************************************************************************************
(See Benefit Code Key)
Over
I PREVAILING Time Holiday Note
Classification WAGE Code Code Code
CRANES,A-FRAME,OVER10TON $38.64 1T 50 8L
CRANES, OVER 300 TONS, OR 300' OF BOOM INCLUDING JIB WITH $41.07 1T 50 8L
I ATTACHMENTS
CRANES, OVERHEAD, BRIDGE TYPE ( 20 - 44 TONS) $39.03 1T 50 8L
CRANES, OVERHEAD, BRIDGE TYPE ( 45 - 99 TONS) $39.49 1T 50 8L
CRANES, OVERHEAD, BRIDGE TYPE (100 TONS & OVER) $40 01 1T 50 8L
I CRANES, TOWER CRANE UP TO 175' IN HEIGHT, BASE TO BOOM $40.01 1T 50 8L
CRANES, TOWER CRANE OVER 175' IN HEIGHT, BASE TO BOOM $40.55 1T 50 8L
CRUSHERS $39.03 1T 50 8L
DECK ENGINEER/DECK WINCHES (POWER) $39 03 1T 50 8L
I DERRICK, BUILDING $39.49 1T 50 8L
DOZERS, 0-9 & UNDER $38.64 1T 50 8L
DRILL OILERS - AUGER TYPE, TRUCK OR CRANE MOUNT $38 64 1T 50 8L
DRILLING MACHINE $39.03 1T 50 8L
I ELEVATOR AND MANLlFT, PERMANENT AND SHAFT-TYPE $36.41 1T 50 8L
EQUIPMENT SERVICE ENGINEER (OILER) $38 64 1T 50 8L
FINISHING MACHINE/BIDWELL GAMACO AND SIMILAR EQUIP $39 03 1T 50 8L
FORK LIFTS, (3000 LBS AND OVER) $38.64 1T 50 8L
I FORK LIFTS, (UNDER 3000 LBS) $36.41 1T 50 8L
GRADE ENGINEER $38 64 1T 50 8L
GRADECHECKERANDSTAKEMAN $3641 1T 50 8L
GUARDRAIL PUNCH $39.03 1T 50 8L
HOISTS, OUTSIDE (ELEVATORS AND MANLlFTS), AIR TUGGERS $38.64 1T 50 8L
I HORIZONTAUDIRECTIONAL DRILL LOCATOR $38.64 1T 50 8L
HORIZONTAUDIRECTIONAL DRILL OPERATOR $39.03 1T 50 8L
HYDRALlFTS/BOOM TRUCKS (10 TON & UNDER) $36.41 1T 50 8L
HYDRALlFTS/BOOM TRUCKS (OVER 10 TON) $38 64 1T 50 8L
I LOADERS, OVERHEAD (6 YO UP TO 8 YO) $39.49 1T 50 8L
LOADERS, OVERHEAD (8 YO & OVER) $40.01 1T 50 8L
LOADERS, OVERHEAD (UNDER 6 YO), PLANT FEED $39.03 1T 50 8L
LOCOMOTIVES, ALL $39.03 1T 50 8L
I MECHANICS, ALL $39 49 1T 50 8L
MIXERS, ASPHALT PLANT $39.03 1T 50 8L
MOTOR PATROL GRADER (FINISHING) $39.03 1T 50 8L
MOTOR PATROL GRADER (NON-FINISHING) $38.64 1T 50 8L
I MUCKING MACHINE, MOLE, TUNNEL DRILL AND/OR SHIELD $39.49 1T 50 8L
OIL DISTRIBUTORS, BLOWER DISTRIBUTION AND MULCH SEEDING $3641 1T 50 8L
OPERATOR
PAVEMENT BREAKER $36.41 1T 50 8L
I PILEDRIVER (OTHER THAN CRANE MOUNT) $39.03 1T 50 8L
PLANT OILER (ASPHALT, CRUSHER) $38.64 1T 50 8L
POSTHOLE DIGGER, MECHANICAL $3641 1T 50 8L
POWER PLANT $36.41 1T 50 8L
I PUMPS, WATER $36.41 1T 50 8L
QUAD 9,0-10, AND HD-41 $39 49 1T 50 8L
REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING $39.49 1T 50 8L
EQUIP
RIGGER AND BELLMAN $36.41 1T 50 8L
I ROLLAGON $39.49 1T 50 8L
ROLLER, OTHER THAN PLANT ROAD MIX $36.41 1T 50 8L
ROLLERS, PLANTMIX OR MUL TILlFT MATERIALS $38 64 1T 50 8L
ROTO-MILL, ROTO-GRINDER $39.03 1T 50 8L
I SAWS, CONCRETE $38.64 1T 50 8L
Page 6
I
I
I
I
I
CLALLAM COUNTY
Effective 03-03-04
*****************************************************************************************************************
I
Classification
SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING
OFF-ROAD EQUIPMENT ( UNDER 45 YD)
SCRAPERS - SELF PROPELLED, HARD TAIL END DUMP, ARTICULATING
OFF-ROAD EQUIPMENT (45 YD AND OVER)
SCRAPERS, CONCRETE AND CARRY ALL
SCREED MAN
SHOTCRETE GUNITE
SLlPFORM PAVERS
SPREADER, TOPSIDE OPERATOR - BLAW KNOX
SUBGRADE TRIMMER
TOWER BUCKET ELEVATORS
TRACTORS, (75 HP & UNDER)
TRACTORS, (OVER 75 HP)
TRANSFER MATERIAL SERVICE MACHINE
TRANSPORTERS, ALL TRACK OR TRUCK TYPE
TRENCHING MACHINES
TRUCK CRANE OILER/DRIVER ( UNDER 100 TON)
TRUCK CRANE OILER/DRIVER (100 TON & OVER)
TRUCK MOUNT PORTABLE CONVEYER
WHEEL TRACTORS,FARMALL TYPE
YO YO PAY DOZER
POWER EQUIPMENT OPERATORS- UNDERGROUND SEWER &
(SEE POWER EQUIPMENT OPERATORS)
POWER LINE CLEARANCE TREE TRIMMERS
JOURNEY LEVEL IN CHARGE
SPRAY PERSON
TREE EQUIPMENT OPERATOR
TREE TRIMMER
TREE TRIMMER GROUNDPERSON
REFRIGERATION & AIR CONDITIONING MECHANICS
MECHANIC
RESIDENTIAL BRICK & MARBLE MASONS
JOURNEY LEVEL
RESIDENTIAL CARPENTERS
JOURNEY LEVEL
RESIDENTIAL CEMENT MASONS
JOURNEY LEVEL
RESIDENTIAL DRYWALL TAPERS
JOURNEY LEVEL
RESIDENTIAL ELECTRICIANS
JOURNEY LEVEL
RESIDENTIAL GLAZIERS
JOURNEY LEVEL
RESIDENTIAL INSULATION APPLICATORS
JOURNEY LEVEL
RESIDENTIAL LABORERS
JOURNEY LEVEL
RESIDENTIAL PAINTERS
JOURNEY LEVEL
RESIDENTIAL PLUMBERS & PIPEFITTERS
JOURNEY LEVEL
I
I
I
I
I
I
I
I
I
I
I
I
I
Page 7
I
I
I
PREVAILING
WAGE
$39.03
$39 49
$38.64
$39.03
$36.41
$39 49
$39 03
$39.03
$38.64
$38.64
$39.03
$39.03
$39.49
$38.64
$38.64
$39 03
$39 03
$36.41
$39.03
$32.01
$29.79
$30.71
$28.43
$20.89
$27.68
$38.37
$17.85
$25 63
$1800
$27.78
$16.84
$9.86
$18.08
$15.97
$14.60
(See Benefit Code Key)
Over
Time Holiday Note
Code Code Code
1T 5D 8L
1T 5D 8L
1T 5D 8L
1T 5D 8L
1T 5D 8L
1T 5D 8L
1T 5D 8L
1T 5D 8L
1T 5D 8L
1T 5D 8L
1T 5D 8L
1T 5D 8L
1T 5D 8L
1T 5D 8L
1T 5D 8L
1T 5D 8L
1T 5D 8L
1T 5D 8L
1T 5D 8L
4A 5A
4A 5A
4A 5A
4A 5A
4A 5A
1M
5A
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CLALLAM COUNTY
Effective 03-03-04
*****************************************************************************************************************
(See Benefit Code Key)
Over
PREVAILING Time Holiday Note
Classification WAGE Code Code Code
RESIDENTIAL REFRIGERATION & AIR CONDITIONING
JOURNEY LEVEL $46 46 1G 5A
RESIDENTIAL SHEET METAL WORKERS
JOURNEY LEVEL (FIELD OR SHOP) $30.75 1J 6L
RESIDENTIAL SOFT FLOOR LAYERS
JOURNEY LEVEL $10.88
RESIDENTIAL SPRINKLER FITTERS (FIRE PROTECTION)
JOURNEY LEVEL $19.67
ROOFERS
JOURNEY LEVEL $34 53 1R 5A
USING IRRITABLE BITUMINOUS MATERIALS $37.53 1R 5A
SHEET METAL WORKERS
JOURNEY LEVEL (FIELD OR SHOP) $45.43 1J 6L
SIGN MAKERS & INSTALLERS (ELECTRICAL)
JOURNEY LEVEL $1929
SIGN MAKERS & INSTALLERS (NON-ELECTRICAL)
JOURNEY LEVEL $12.15
SOFT FLOOR LAYERS
JOURNEY LEVEL $31.52 1B 5A
SOLAR CONTROLS FOR WINDOWS
JOURNEY LEVEL $10.31 1B 50
SPRINKLER FITTERS (FIRE PROTECTION)
JOURNEY LEVEL $19.67
STAGE RIGGING MECHANICS (NON STRUCTURAL)
JOURNEY LEVEL $13.23
SURVEYORS
CHAIN PERSON $9.35
INSTRUMENT PERSON $11.40
PARTY CHIEF $13.40
TELEPHONE LINE CONSTRUCTION - OUTSIDE
CABLE SPLICER $27.84 2B 5A
HOLE DIGGER/GROUND PERSON $15.69 2B 5A
INSTALLER (REPAIRER) $26 70 2B 5A
JOURNEY LEVEL TELEPHONE L1NEPERSON $25.91 2B 5A
SPECIAL APPARATUS INSTALLER I $27.84 2B 5A
SPECIAL APPARATUS INSTALLER II $27 28 2B 5A
TELEPHONE EQUIPMENT OPERATOR (HEAVY) $27.84 2B 5A
TELEPHONE EQUIPMENT OPERATOR (LIGHT) $25.91 2B 5A
TELEVISION GROUND PERSON $14.89 2B 5A
TELEVISION L1NEPERSON/INSTALLER $19.81 2B 5A
TELEVISION SYSTEM TECHNICIAN $23.43 2B 5A
TELEVISION TECHNICIAN $21.11 2B 5A
TREE TRIMMER $25.91 2B 5A
TERRAZZO WORKERS & TILE SETTERS
JOURNEY LEVEL $35.63 1H 5A
TILE, MARBLE & TERRAZZO FINISHERS
FINISHER $29.46 1H 5A
TRAFFIC CONTROL STRIPERS
JOURNEY LEVEL $30.40 1K 5A
TRUCK DRIVERS
ASPHALT MIX (TO 16 YARDS) $35.91 1T 50 8L
ASPHALT MIX (OVER 16 YARDS) $36.49 1T 50 8L
Page 8
I
I
CLALLAM COUNTY
Effective 03-03-04
*****************************************************************************************************************
I
Classification
DUMP TRUCK
DUMP TRUCK & TRAILER
OTHER TRUCKS
TRANSIT MIXER
WELL DRILLERS & IRRIGATION PUMP INSTALLERS
IRRIGATION PUMP INSTALLER
OILER
WELL DRILLER
PREVAILING
WAGE
$20.23
$20 23
$36 49
$23 73
$11 60
$945
$11.60
(See Benefit Code Key)
Over
Time
Code
Holiday
Code
Note
Code
I
1
1
1T
1
50
8L
I
I
I
I
I
I
I
I
I
I
I
I
I
Page 9
I
I
I
I CLALLAM County -- Apprentices -- Effective 3/3/2004 -
I Benefit Code Key
I Stage of Progression & Hour Prevailing Overtime Holiday Note
Range Wage Code Code Code
I ASBESTOS ABATEMENT WORKERS
I ENVIRONMENTAL CONTROL PAINTERS
1: 0 - 1000 Hours - 50.00% $17.11 IN SD
I 2: 1001 - 2000 Hours - 60.00% $19.58 IN SD
3: 2001 - 3000 Hours - 75.00% $25.08 IN SD
4: 3001 - 4000 Hours - 90.00% $29.15 IN SD
I LABORERS
1: 0 - 1000 Hours - 60.00% $21.98 IN SD
I 2: 1001 - 2000 Hours -70.00% $24.45 IN SD
3: 2001 - 3000 Hours - 80.00% $26.92 IN SD
I 4: 3001 - 4000 Hours - 90.00% $29.39 IN SD
BOILERMAKERS
I 1: 0 - 1000 Hours - 70.00% $35.04 IB SN
2: 1001 - 2000 Hours -75.00% $36.45 IB SN
I 3: 2001 - 3000 Hours - 80.00% $37.85 IB SN
4: 3001 - 4000 Hours - 85.00% $39.26 IB SN
I 5: 4001 - 5000 Hours - 90.00% $40.66 1B SN
6: 5001 - 6000 Hours - 95.00% $42.07 IB SN
I BRICK AND MARBLE MASONS
1: 0 - 750 Hours - 50.00% $22.40 1M SA
I 2: 751 - 2250 Hours - 55.00% $23.90 1M SA
3: 2251 - 3000 Hours - 60.00% $25.36 1M SA
4: 3001 - 3750 Hours - 70.00% $28.27 1M SA
I 5: 3751 - 4500 Hours - 80.00% $31.19 1M SA
6: 4501 - 5250 Hours - 90.00% $34.10 1M SA
I 7: 5251 - 6000 Hours - 95.00% $35.56 1M SA
CARPENTERS
I
I
I
I ACOUSTICAL WORKER
I 1: 0 - 1000 Hours - 50.00% $19.91 1M 5D
2: 1001 - 2000 Hours - 60.00% $26.64 1M 5D
I 3: 2001 - 3000 Hours - 68.00% $28.92 1M 5D
4: 3001 - 4000 Hours - 76.00% $31.21 1M 5D
I 5: 4001 - 5000 Hours - 84.00% $33.49 1M 5D
6: 5001 - 6000 Hours - 92.00% $35.78 1M 5D
I BRIDGE, DOCK AND W ARF CARPENTERS
1: pI Period - 60.00% $22.67 1M 5D
2: 2nd Period - 65.00% $27.96 1M 5D
I 3: 3rd Period - 70.00% $29.38 1M 5D
4: 4th Period - 75.00% $30.80 1M 5D
I 5: 5th Period - 80.00% $32.22 11\1 5D
6: 6th Period - 85.00% $33.64 1M 5D
I 7: 7th Period - 90.00% $35.06 1M 5D
8: 8th Period - 95.00% $36.48 1M 5D
I CARPENTER
1: 1 sl Period - 60.00% $22.67 1M 5D
I 2: 2nd Period - 65.00% $27.96 1M 5D
3: 3rd Period - 70.00% $29.38 1M 5D
I 4: 4th Period - 75.00% $30.80 1M 5D
5: 5th Period - 80.00% $32.22 1M 5D
I 6: 6th Period - 85.00% $33.64 1M 5D
7: 7th Period - 90.00% $35.06 1M 5D
8: 8th Period - 95.00% $36.48 1M 5D
I DRYWALL APPLICATOR
DRYWALL. METAL STUD. AND CEILING APPLICATORS
I 1: 0 - 700 Hours - 50.00% $20.33 1M 5D
2: 701 - 1400 Hours - 60.00% $27.11 1M 5D
I 3: 1401 - 2100 Hours - 68.00% $29.43 1M 5D
4: 2101 - 2800 Hours - 76.00% $31.76 1M 5D
I 5: 2801 - 3500 Hours - 84.00% $34.09 1M 5D
6: 3501 - 4200 Hours - 92.00% $36.41 1M 5D
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
MILLWRIGHT AND MACHINE ERECTORS
1: pt Period - 60.00% $23.27 1M 5D
2: 2nd Period - 65.00% $28.61 1M 5D
3: 3rd Period -70.00% $30.08 1M 5D
4: 4th Period - 75.00% $31.55 1M 5D
5: 5th Period - 80.00% $33.02 1M 5D
6: 6th Period - 85.00% $34.49 1M 5D
7: 7th Period - 90.00% $35.96 1M 5D
8: 8th Period - 95.00% $37.43 1M 5D
PILEDRIVERS, DRIVING, PULLING, PLACING COLLARS AND WELDING
1: pt Period - 60.00% $22.79 1M 5D
2: 2nd Period - 65.00% $28.09 1M 5D
3: 3rd Period -70.00% $29.52 1M 5D
4: 4th Period - 75.00% $30.95 1M 5D
5: 5th Period - 80.00% $32.38 1M 5D
6: 6th Period - 85.00% $33.81 1M 5D
7: 7th Period - 90.00% $35.24 1M 50
8: 8th Period - 95.00% $36.67 1M 5D
CEMENT MASONS
1: 0 - 1000 Hours - 50.00% $12.36 IN 5D
2: 1001 - 2000 Hours - 60.00% $14.83 IN 5D
3: 2001 - 3000 Hours - 70.00% $17.30 IN 5D
4: 3001 - 4000 Hours - 80.00% $19.77 IN 5D
5: 4001 - 5000 Hours - 90.00% $22.24 IN 5D
6: 5001 - 6000 Hours - 95.00% $23.47 IN 5D
DRYWALL TAPERS
1: 0 - 1000 Hours - 50.00% $24.98 1J 58
2: 1001 - 2000 Hours - 55.00% $26.34 IJ 58
3: 2001 - 3000 Hours - 65.00% $29.06 IJ 58
4: 3001 - 4000 Hours - 75.00% $31. 79 IJ 58
5: 4001 - 5000 Hours - 85.00% $34.51 1J 58
6: 5001 - 6000 Hours - 90.00% $35.87 lJ 58
I
I ELECTRICIANS - INSIDE
I 1: 0 - 1000 Hours - 40.00% $18.55 ID 6H
2: 1001 - 2000 Hours - 50.00% $22.00 ID 6H
I 3: 2001 - 3500 Hours - 55.00% $26.92 ID 6H
4: 3501 - 5000 Hours - 65.00% $30.95 ID 6H
I 5: 5001 - 6500 Hours - 75.00% $34.98 ID 6H
6: 6501 - 8000 Hours - 85.00% $39.01 ID 6H
I ELECTRICIANS - POWERLINE CONSTRUCTION
JOURNEY LEVEL LINEPERSON
1: 0 - 1000 Hours - 60.00% $28.54 4A 5A
I 2: 1001 - 2000 Hours - 65.00% $30.33 4A 5A
3: 2001 - 3000 Hours - 71.00% $32.49 4A 5A
I 4: 3001 - 4000 Hours - 81.00% $36.07 4A 5A
5: 4001 - 5000 Hours - 85.00% $37.52 4A 5A
I 6: 5001 - 6000 Hours - 89.00% $38.95 4A 5A
7: 6001 - 7000 Hours - 93.00% $40.38 4A 5A
I POLE SPRAYER
1: 0 - 1000 Hours - 85.70% $37.78 4A 5A
I 2: 1001 - 2000 Hours - 89.80% $39.23 4A 5A
3: 2001 - 3000 Hours - 92.80% $40.31 4A 5A
I ELECTRONIC & TELECOMMUNICATION TECHNICIANS
I 1: 0 - 1000 Hours - 55.00% $7.16 1
2: 1001 - 2000 Hours - 60.00% $7.24 1
I 3: 2001 - 3000 Hours - 65.00% $7.85 1
4: 3001 - 4000 Hours - 70.00% $8.45 1
5: 4001 - 5000 Hours - 75.00% $9.05 1
I 6: 5001 - 6000 Hours - 80.00% $9.66 1
7: 6001 - 7000 Hours - 85.00% $10.26 1
I 8: 7001 - 8000 Hours - 95.00% $11.47 1
ELEVATOR CONSTRUCTORS
I MECHANIC
1: 151 Period - 50.00% $17.67 4A !iQ
I
I
I
I 2: 2nd Period - 55.00% $32.66 4A .@
I 3: 3rd Period - 65.00% $36.20 4A .@
4: 4th Period - 70.00% $37.96 4A .@
I 5: 5th Period - 80.00% $41.50 4A .@
FLAGGERS
I 1: 0 - 1000 Hours - 60.00% $21.98 IN 5D
I 2: 1001 - 2000 Hours - 70.00% $24.45 IN 5D
3: 2001 - 3000 Hours - 80.00% $26.92 IN 5D
4: 3001 - 4000 Hours - 90.00% $27.18 IN 5D
I GLAZIERS
1: 0 - 1000 Hours - 45.00% $21.09 2E 5G
I 2: 1001 - 2000 Hours - 50.00% $22.71 2E 5G
3: 2001 - 3000 Hours - 55.00% $24.34 2E 5G
I 4: 3001 - 4000 Hours - 60.00% $25.96 2E 5G
5: 4001 - 5000 Hours - 65.00% $27.59 2E 5G
I 6: 5001 - 6000 Hours - 70.00% $29.21 2E 5G
7: 6001 - 7000 Hours - 80.00% $32.46 2E 5G
I 8: 7001 - 8000 Hours - 90.00% $35.71 2E 5G
HEAT & FROST INSULATORS AND ASBESTOS WORKERS
I MECHANIC
1: 0 - 1000 Hours - 50.00% $24.85 IF 5E
I 2: 1001 - 2000 Hours - 55.00% $26.36 IF 5E
3: 2001 - 4000 Hours - 65.00% $29.37 IF 5E
I 4: 4001 - 6000 Hours - 75.00% $32.39 IF 5E
5: 6001 - 8000 Hours - 85.00% $35.41 IF 5E
HOD CARRIERS & MASON TENDERS
I
1: 0 - 1000 Hours - 60.00% $21.98 IN 5D
I 2: 1001 - 2000 Hours - 70.00% $24.45 IN 5D
3: 2001 - 3000 Hours - 80.00% $26.92 IN 5D
I 4: 3001 - 4000 Hours - 90.00% $29.39 IN 5D
INSULATION APPLICATORS
I
I
I
I 1: 0 - 1000 Hours - 50.00% $10.25 1
I 2: 1001 - 2000 Hours - 60.00% $12.30 1
3: 2001 - 3000 Hours - 75.00% $15.38 1
I 4: 3001 - 4000 Hours - 90.00% $18.45 1
IRONWORKERS
I 1: 1st Period - 65.00% $24.02 IB 5A
2: 2nd Period - 70.00% $25.45 IB 5A
I 3: 3rd Period - 75.00% $33.88 IB 5A
4: 4th Period - 80.00% $35.31 IB 5A
5: 5th Period - 90.00% $38.16 IB 5A
I 6: 6th Period - 90.00% $38.16 IB 5A
7: 7th Period - 95.00% $39.59 IB 5A
I 8: 8th Period - 95.00% $39.59 IB 5A
LABORERS
I 1: 0 - 1000 Hours - 60.00% $21.98 IN 5D
2: 1001 - 2000 Hours - 70.00% $24.45 IN 5D
I 3: 2001 - 3000 Hours - 80.00% $26.92 IN 5D
4: 3001 - 4000 Hours - 90.00% $29.39 IN 5D
I LABORERS - UNDERGROUND SEWER & WATER
1: 0 - 1000 Hours - 60.00% $21.98 IN 5D
I 2: 1001 - 2000 Hours - 70.00% $24.45 IN 5D
3: 2001 - 3000 Hours - 80.00% $26.92 IN 5D
I 4: 3001 - 4000 Hours - 90.00% $29.39 IN 5D
LATHERS
I 1: 0 - 700 Hours - 50.00% $20.33 1M 5D
2: 701 - 1400 Hours - 60.00% $27.11 1M 5D
3: 1401 - 2100 Hours - 68.00% $29.43 1M 5D
I 4: 2101 - 2800 Hours - 76.00% $31.76 1M 5D
5: 2801 - 3500 Hours - 84.00% $34.09 1M 5D
I 6: 3501 - 4200 Hours - 92.00% $36.41 1M 5D
PAINTERS
I 1: 0 - 750 Hours - 55.00% $15.97 2B 5A
2: 751 - 1500 Hours - 65.00% $17.02 2B 5A
I
I
I
I 3: 1501 - 2250 Hours - 75.00% $18.90 28 SA
I 4: 2251 - 3000 Hours - 80.00% $20.61 2B SA
5: 3001 - 3750 Hours - 85.00% $21.60 2B SA
I 6: 3751 - 4500 Hours - 95.00% $23.57 2B SA
PLASTERERS
I 1: 0 - 500 Hours - 40.00% $10.33 1
2: 501 - 1000 Hours - 45.00% $11.62 1
3: 1001 - 1500 Hours - 45.00% $11.62 1
I 4: 1501 - 2000 Hours - 50.00% $12.92 1
5: 2001 - 2500 Hours - 55.00% $14.21 1
I 6: 2501 - 3000 Hours - 60.00% $15.50 1
7: 3001 - 3500 Hours - 65.00% $16.79 1
I 8: 3501 - 4000 Hours - 70.00% $18.08 1
9: 4001 - 4500 Hours - 75.00% $19.37 1
I 10: 4501 - 5000 Hours - 80.00% $20.66 1
11: 5001 - 5500 Hours - 85.00% $21.96 1
I 12: 5501 - 6000 Hours - 90.00% $23.25 1
13: 6001 - 6500 Hours - 95.00% $24.54 1
I 14: 6501 - 7000 Hours - 95.00% $24.54 1
PLUMBERS & PIPEFITTERS
I 1: 0 - 2000 Hours - 50.00% $25.85 IG SA
2: 2001 - 4000 Hours - 62.50% $35.81 IG SA
I 3: 4001 - 6000 Hours - 70.00% $38.39 IG SA
4: 6001 - 8000 Hours - 75.00% $40.10 IG SA
5: 8001 - 10000 Hours - 85.00% $43.55 IG SA
I POWER EQUIPMENT OPERATORS
ALL EQUIPMENT
I 1: 0 - 1000 Hours - 65.00% $28.41 IT SD 8L
2: 1001 - 2000 Hours - 70.00% $29.87 IT SD 8L
I 3: 2001 - 3000 Hours - 75.00% $31.33 IT SD 8L
4: 3001 - 4000 Hours - 80.00% $32.79 IT SD 8L
I 5: 4001 - 5000 Hours - 90.00% $35.72 IT SD 8L
6: 5001 - 6000 Hours - 95.00% $37.18 IT SD 8L
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
POWER EQUIPMENT OPERATORS- UNDERGROUND SEWER & WATER
(SEE POWER EQUIPMENT OPERATORS)
1: 0 - 1000 Hours - 65.00% $28.22
2: 1001 - 2000 Hours - 70.00% $29.67
3: 2001 - 3000 Hours - 75.00% $31.12
4: 3001 - 4000 Hours - 80.00% $32.57
5: 4001 - 5000 Hours - 90.00% $35.46
6: 5001 - 6000 Hours - 95.00% $36.91
POWER LINE CLEARANCE TREE TRIMMERS
TREE TRIMMER
1: 0 - 1000 Hours - 65.00% $19.74 4A 5A
2: 1001 - 2000 Hours - 75.00% $21.99 4A 5A
3: 2001 - 3000 Hours - 80.00% $23.10 4A 5A
4: 3001 - 4000 Hours - 90.00% $25.36 4A SA
REFRIGERATION & AIR CONDITIONING MECHANICS
MECHANIC
1: 0 - 2000 Hours - 50.00% $13.84 1
2: 2001 - 4000 Hours - 55.00% $15.22 1
3: 4001 - 6000 Hours - 60.00% $16.61 1
4: 6001 - 8000 Hours - 70.00% $19.38 1
5: 8001 - 10000 Hours - 85.00% $23.53 1
RESIDENTIAL CARPENTERS
1: pI Period - 60.00% $10.71 1
2: 2nd Period - 65.00% $11.60 1
3: 3rd Period - 70.00% $12.50 1
4: 4th Period - 75.00% $13.39 1
5: 5th Period - 80.00% $14.28 1
6: 6th Period - 85.00% $15.17 1
7: 7th Period - 90.00% $16.07 1
8: 8th Period - 95.00% $16.96 1
RESIDENTIAL ELECTRICIANS
1: 0 - 900 Hours - 50.00% $13.89 1
I
I 2: 901 - 1800 Hours - 55.00% $15.28 1
I 3: 1801 - 2700 Hours - 75.00% $20.84 1
4: 2701 - 4000 Hours - 85.00% $23.61 1
I RESIDENTIAL PLUMBERS & PIPEFITTERS
1: 0 - 1000 Hours - 55.00% $8.03 1
I 2: 1001 - 2000 Hours - 65.00% $9.49 1
3: 2001 - 4000 Hours - 75.00% $10.95 1
4: 4001 - 6000 Hours - 85.00% $12.41 1
I RESIDENTIAL SHEET METAL WORKERS
JOURNEY LEVEL (FIELD OR SHOP)
I 1: 1 - 1000 Hours - 50.00% $15.66 IJ 6L
2: 1001 - 2000 Hours - 60.00% $17.84 IJ 6L
I 3: 2001 - 3000 Hours - 65.00% $22.10 IJ 6L
4: 3001 - 4000 Hours - 70.00% $23.20 IJ 6L
I 5: 4001 - 5000 Hours - 80.00% $25.39 IJ 6L
6: 5001 - 6000 Hours - 85.00% $26.48 1J 6L
I ROOFERS
I 1: 0 - 820 Hours - 60.00% $21.93 lR SA
2: 821 - 1630 Hours - 67.00% $23.78 lR SA
I 3: 1631 - 2450 Hours - 74.00% $25.58 lR SA
4: 2451 - 3270 Hours - 81.00% $29.66 lR SA
I 5: 3271 - 4080 Hours - 88.00% $31.46 lR SA
6: 4081 - 4899 Hours - 95.00% $33.25 lR SA
I SHEET METAL WORKERS
JOURNEY LEVEL (FIELD OR SHOP)
1: 0 - 2000 Hours - 45.00% $19.17 IJ 6L
I 2: 2001 - 3000 Hours - 50.00% $26.89 IJ 6L
3: 3001 - 4000 Hours - 55.00% $28.63 IJ 6L
I 4: 4001 - 5000 Hours - 60.00% $30.38 IJ 6L
5: 5001 - 6000 Hours - 65.00% $32.14 IJ 6L
I 6: 6001 - 7000 Hours - 70.00% $33.89 1J 6L
7: 7001 - 8000 Hours - 75.00% $35.64 1J 6L
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
'I
I
I
I
I
I
8: 8001 - 9000 Hours - 80.00%
9: 9001 - 10000 Hours - 85.00%
SOFT FLOOR LAYERS
$37.39 1J
$39.15 1J
6L
6L
APPRENTICES INDENTURED ON OR AFTER JUNE 1. 2003
1: 0 -750 Hours - 45.00% $15.19 IB SA
2:751-1500Hours-50.00% $17.31 18 SA
3: 1501 - 2250 Hours - 60.00% $20.95 18 SA
4: 2251 - 3000 Hours - 70.00% $23.59 18 SA
5: 3001 - 3750 Hours - 80.00% $26.24 18 SA
6: 3751 - 4500 Hours - 90.00% $28.88 18 SA
APPRENTICES INDENTURED PRIOR TO JUNE 1. 2003
1: 0 -750 Hours - 45.00% $16.99 18 SA
2: 751 - 1500 Hours - 50.00% $18.31 18 SA
3: 1501 - 2250 Hours - 60.00% $20.95 18 SA
4: 2251 - 3000 Hours - 70.00% $23.59 18 SA
5: 3001 - 3750 Hours - 80.00% $26.24 18 SA
6: 3751 - 4500 Hours - 90.00% $28.88 IB SA
SPRINKLER FITTERS (FIRE PROTECTION)
GRADE 1 (INDENTURED AFTER APRIL 1. 2000)
1: 0 - 1000 Hours - 45.00% $8.85 1
2: 1001 - 2000 Hours - 50.00% $9.84 1
3: 2001 - 3000 Hours - 55.00% $10.82 1
4: 3001 - 4000 Hours - 60.00% $11.80 1
GRADE 1 (INDENTURED BEFORE APRIL 1. 2000)
1: 0 - 1000 Hours - 40.00% $7.87 1
2: 1001 - 2000 Hours - 45.00% $8.85 1
3: 2001 - 3000 Hours - 50.00% $9.84 1
4: 3001 - 4000 Hours - 55.00% $10.82 1
GRADE 2 (INDENTURED AFTER APRIL 1.2000)
1: 0 - 1000 Hours - 65.00% $12.79 1
2: 1001 - 2000 Hours - 70.00% $13.77 1
3: 2001 - 3000 Hours - 75.00% $14.75 1
I
I 4: 3001 - 4000 Hours - 80.00% $15.74 1
I 5: 4001 - 5000 Hours - 85.00% $16.72 1
6: 5001 - 6000 Hours - 90.00% $17.70 1
I GRADE 2 (INDENTURED BEFORE APRIL 1. 2000)
1: 0 - 1000 Hours - 60.00% $11.80 1
I 2: 1001 - 2000 Hours - 65.00% $12.79 1
3: 2001 - 3000 Hours - 70.00% $13.77 1
I 4: 3001 - 4000 Hours - 75.00% $14.75 1
5: 4001 - 5000 Hours - 80.00% $15.74 1
6: 5001 - 6000 Hours - 85.00% $16.72 1
I TERRAZZO WORKERS & TILE SETTERS
1: 0 - 1000 Hours - 50.00% $20.69 IH SA
I 2: 1001 - 2500 Hours - 55.00% $22.02 IH SA
3: 2501 - 3500 Hours - 60.00% $23.35 IH SA
I 4: 3501 - 4500 Hours - 70.00% $26.01 IH SA
5: 4501 - 5500 Hours - 80.00% $28.66 IH SA
I 6: 5501 - 6250 Hours - 90.00% $31.32 IH SA
7: 6251 -7000 Hours - 95.00% $32.65 IH SA
I TILE, MARBLE & TERRAZZO FINISHERS
FINISHER
I 1: 0 - 1000 Hours - 50.00% $20.07 IH SA
2: 1001 - 2500 Hours - 55.00% $21.35 IH SA
I 3: 2501 - 3500 Hours - 60.00% $22.61 IH SA
4: 3501 - 4500 Hours - 70.00% $25.15 IH SA
I TRAFFIC CONTROL STRIPERS
1: 0 - 500 Hours - 60.00% $12.96 lK SA
I 2: 501 - 1000 Hours - 60.00% $17.82 lK SA
3: 1001 - 2333 Hours - 60.00% $20.22 lK SA
I 4: 2334 - 4666 Hours - 73.00% $23.53 lK SA
5: 4667 -7000 Hours - 88.00% $27.35 lK SA
I TRUCK DRIVERS
ALL TRUCKS
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1: 0 - 700 Hours - 70.00%
2: 701 - 1400 Hours - 80.00%
3: 1401 - 2100 Hours - 90.00%
$14.16 1
$16.18 1
$18.21 1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
BENEFIT CODE KEY - EFFECTIVE 03-03-04
************************************************************************************************************************
OVERTIME CODES
OVERTIME CALCULATIONS ARE BASED ON THE HOURLY RATE ACTUALLY PAID TO THE WORKER. ON PUBLIC
WORKS PROJECTS, THE HOURLY RATE MUST BE NOT LESS THAN THE PREVAILING RATE OF WAGE MINUS THE
HOURLY RATE OF THE COST OF FRINGE BENEFITS ACTUALLY PROVIDED FOR THE WORKER.
1.
ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID ATONE
AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.
A. ALL HOURS WORKED ON SA TURDA YS, SUNDAYS AND HOLIDAYS SHALL ALSO BE PAID ATONE AND ONE-HALF
TIMES THE HOURLY RATE OF WAGE.
B. ALL HOURS WORKED ON SATURDAYS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.
ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE.
C.
ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE.
D.
THE FIRST EIGHT (8) HOURS ON SA TURDA YS OF A FIVE - EIGHT HOUR WORK WEEK AND THE FIRST EIGHT (8)
HOURS WORKED ON A FIFTH CALENDAR DAY, EXCLUDING SUNDAY, IN A FOUR - TEN HOUR SCHEDULE, SHALL BE
PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF EIGHT (8)
HOURS PER DAY ON SA TURDA Y; ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS IN A FIFTH CALENDAR
WEEKDAY OF A FOUR - TEN HOUR SCHEDULE; ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DAY
MONDAY THROUGH FRIDAY, AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE
THE HOURLY RATE OF WAGE.
E.
ALL HOURS WORKED IN EXCESS OF 10 PER DAY SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. THE
FIRST EIGHT (8) HOURS ON SA TURDA Y SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS AND SA TURDA Y, AND ALL HOURS WORKED ON
SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE.
F.
THE FIRST EIGHT (8) HOURS ON SA TURDA Y SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON SA TURDA Y, AND ALL HOURS WORKED ON
SUNDAYS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE. ALL
HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES THE HOURLY RATE OF WAGE.
G.
THE FIRST TEN (10) HOURS WORKED ON SA TURDA YS AND THE FIRST TEN (10) HOURS WORKED ON A FIFTH
CALENDAR WEEKDAY IN A FOUR - TEN HOUR SCHEDULE, SHALL BE PAID ATONE AND ONE-HALF TIMES THE
HOURLY RATE OF WAGE. ALL HOURS WORKED IN EXCESS OF TEN (10) HOURS PER DA Y MONDAY THROUGH
SA TURDA Y, AND ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY
RATE OF WAGE.
H.
ALL HOURS WORKED ON SA TURDA YS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER
CONDITIONS OR EQUIPMENT BREAKDOWN) SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF
WAGE.
I.
ALL HOURS WORKED ON SATURDAY SHALL BE PAID ATONE AND ONE-HALF THE HOURLY RATE OF WAGE. WORK
PERFORMED ON SUNDAYS SHALL BE PAID AND DOUBLE THE HOURLY RATE OF WAGE. WORK PERFORMED ON A
HOLIDAY SHALL BE PAID ONE AND ONE-HALF TIMES THEIR HOURLY RATE FOR ACTUAL HOURS WORKED PLUS
EIGHT (8) HOURS OF STRAIGHT TIME FOR THE HOLIDAY.
THE FIRST EIGHT (8) HOURS ON SA TURDA Y SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON SA TURDA Y, AND ALL HOURS WORKED ON
SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE.
J.
K.
ALL HOURS WORKED ON SATURDAYS AND SUNDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY
RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE.
L.
ALL HOURS WORKED ON SATURDAYS, SUNDAYS AND HOLIDAYS (EXCEPT THANKSGIVING DAY AND CHRISTMAS
DAY) SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON
THANKSGIVING DAY AND CHRISTMAS DAY SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE.
M.
ALL HOURS WORKED ON SA TURDA YS (EXCEPT MAKEUP DAYS IF WORK IS LOST DUE TO INCLEMENT WEATHER
CONDITIONS) SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED
ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE.
N.
ALL HOURS WORKED ON SATURDAYS (EXCEPT MAKEUP DAYS) SHALL BE PAID ATONE AND ONE-HALF TIMES THE
HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE
HOURLY RATE OF WAGE.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
BENEFIT CODE KEY - EFFECTIVE 03-03-04
-2 -
P.
ALL HOURS WORKED ON SA TURDA YS (EXCEPT MAKEUP DAYS) AND SUNDAYS SHALL BE PAID ATONE AND ONE-
HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT DOUBLE THE
HOURLY RATE OF WAGE.
Q
ALL HOURS WORKED ON SA TURDA YS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.
ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT CHRISTMAS DAY) SHALL BE PAID AT DOUBLE THE
HOURLY RATE OF WAGE. ALL HOURS WORKED ON CHRISTMAS DAY SHALL BE PAID AT TWO AND ONE-HALF
TIMES THE HOURLY RATE OF WAGE
R.
ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE.
1.
T.
ALL HOURS WORKED ON SA TURDA YS, EXCEPT MAKE-UP DAYS, SHALL BE PAID ATONE AND ONE-HALF TIMES THE
HOURLY RATE OF WAGE. ALL HOURS WORKED AFTER 6:00PM SA TURDA Y TO 6:00AM MONDAY AND ON HOLIDAYS
SHALL BE PAID AT DOUBLE THE HOURLY RATE OF WAGE.
u.
ALL HOURS WORKED ON SA TURDA YS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.
ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT TWO TIMES THE
HOURLY RATE OF WAGE. ALL HOURS WORKED ON LABOR DAY SHALL BE PAID AT THREE TIMES THE HOURLY
RATE OF WAGE.
W. ALL HOURS WORKED ON SA TURDA YS AND SUNDAYS (EXCEPT MAKE-UP DAYS) SHALL BE PAID AT ONE AND ONE-
HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT TWO TIMES
THE HOURLY RATE OF WAGE.
2.
ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID ATONE
AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.
A. THE FIRST SIX (6) HOURS ON SA TURDA Y SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF
WAGE. ALL HOURS WORKED IN EXCESS OF SIX (6) HOURS ON SA TURDA Y AND ALL HOURS WORKED ON SUNDAYS
AND HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE.
B. ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.
C.
ALL HOURS WORKED ON SUNDAYS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.
ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE.
D.
ALL HOURS WORKED ON SATURDAYS AND SUNDAYS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY
RATE OF WAGE. THE FIRST EIGHT (8) HOURS WORKED ON HOLIDAYS SHALL BE PAID AT STRAIGHT TIME IN
ADDITION TO THE HOLIDAY PAY. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON HOLIDAYS SHALL BE
PAID AT ONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.
E.
ALL HOURS WORKED ON SA TURDA YS OR HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID AT ONE AND ONE-HALF
TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS OR ON LABOR DAY SHALL BE PAID AT
TWO TIMES THE HOURLY RATE OF WAGE.
F.
THE FIRST EIGHT (8) HOURS WORKED ON HOLIDAYS SHALL BE PAID AT THE STRAIGHT HOURLY RATE OF WAGE IN
ADDITION TO THE HOLIDAY PAY. ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS ON HOLIDAYS SHALL BE
PAID AT DOUBLE THE HOURLY RATE OF WAGE.
G.
ALL HOURS WORKED ON SUNDAY SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. ALL HOURS
WORKED ON PAID HOLIDAYS SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURLY RATE OF WAGE
INCLUDING HOLIDAY PAY.
H.
ALL HOURS WORKED ON SA TURDA YS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE.
ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. ALL HOURS
WORKED ON HOLIDAYS SHALL BE PAID ATONE AND ONE-HALF TIMES THE HOURLY RATE OF WAGE IN ADDITION
TO THE HOLIDAY PAY.
I.
ALL HOURS WORKED ON SA TURDA YS AND HOLIDAYS (EXCEPT LABOR DAY) SHALL BE PAID ATONE AND ONE-
HALF TIMES THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SUNDAYS AND ON LABOR DAY SHALL BE
PAID AT TWO TIMES THE HOURLY RATE OF WAGE.
J.
ALL HOURS WORKED ON SUNDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE. ALL HOURS
WORKED ON PAID HOLIDAYS SHALL BE PAID AT TWO AND ONE-HALF TIMES THE HOURLY RATE OF WAGE,
INCLUDING THE HOLIDAY PAY. ALL HOURS WORKED ON UNPAID HOLIDAYS SHALL BE PAID AT TWO TIMES THE
HOURLY RATE OF WAGE.
K.
ALL HOURS WORKED ON HOLIDAYS SHALL BE PAID AT TWO TIMES THE HOURLY RATE OF WAGE IN ADDITION TO
THE HOLIDAY PAY.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
4.
5.
BENEFIT CODE KEY - EFFECTIVE 03-03-04
-3-
M.
ALL HOURS WORKED ON SA TURDA YS, SUNDAYS AND HOLIDAYS SHALL BE PAID AT DOUBLE THE HOURL Y RATE
OF WAGE.
O.
ALL HOURS WORKED ON SUNDAYS AND HOLIDAYS SHALL BE PAID AT ONE AND ONE-HALF TIMES THE HOURLY
RATE OF WAGE.
A.
ALL HOURS WORKED IN EXCESS OF EIGHT (8) HOURS PER DAY OR FORTY (40) HOURS PER WEEK SHALL BE PAID AT
DOUBLE THE HOURLY RATE OF WAGE. ALL HOURS WORKED ON SATURDAYS, SUNDAYS AND HOLIDAYS SHALL
BE PAID AT DOUBLE THE HOURLY RATE OF WAGE.
HOLIDAY CODES
A.
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY
AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (7).
B.
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY
AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS, AND CHRISTMAS DAY (8).
C.
HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8).
D.
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE
FRIDAY AND SA TURDA Y AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8).
E.
HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
PRESIDENTIAL ELECTION DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS
DAY (9).
G.
HOLIDAYS NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE
LAST WORK DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY (7).
H.
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, THANKSGIVING DAY, THE DAY AFTER
THANKSGIVING DAY, AND CHRISTMAS (6).
I.
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND
CHRISTMAS DAY (6).
N.
HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS'
DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (9).
O.
PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, AND CHRISTMAS DAY (6).
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, FRIDAY
AND SA TURDA Y AFTER THANKSGIVING DAY, THE DAY BEFORE CHRISTMAS, AND CHRISTMAS DAY (9).
P.
Q.
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
AND CHRISTMAS DAY (6).
R.
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
DAY AFTER THANKSGIVING DAY, ONE-HALF DAY BEFORE CHRISTMAS DAY, AND CHRISTMAS DAY. (7 1/2).
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, AND CHRISTMAS DAY (7).
P AID HOLIDAYS: SEVEN (7) PAID HOLIDAYS.
PAID HOLIDAYS: SIX (6) PAID HOLIDAYS.
PAID HOLIDAYS: NINE (9) P AID HOLIDAYS.
S.
T.
v.
W.
X.
HOLIDAYS: AFTER 520 HOURS - NEW YEAR'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY. AFTER 2080 HOURS
_ NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, CHRISTMAS DAY AND A FLOATING HOLIDAY (8).
Y.
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY,
THANKSGIVING DAY, THE FRIDAY FOLLOWING THANKSGIVING DAY, AND CHRISTMAS DAY (8).
I
z.
I
6. A.
I B.
I c.
I D.
I 6. H.
I I.
L.
I
Q.
I
S.
I T.
I u.
I V.
I W
I x.
I
I 8. A.
I
I c.
I
BENEFIT CODE KEY - EFFECTIVE 03-03-04
-4-
HOLIDAYS. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY,
THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8).
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8).
PAID HOLIDAYS: NEW YEAR'S EVE DAY, NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS EVE DAY, CHRISTMAS DAY. (9)
HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY, THE LAST WORK DAY BEFORE CHRISTMAS DAY, AND
CHRISTMAS DAY (9).
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, THE DAY BEFORE OR THE DAY
AFTER CHRISTMAS DAY (9).
HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING JR. DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (8).
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING
DAY, FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY (7).
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY,
THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE CHRISTMAS DAY, AND
CHRISTMAS DAY. (8)
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY
THANKSGIVING DAY, THE DAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY. UNPAID HOLIDA Y2
PRESIDENTS' DAY.
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING
DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS EVE DAY, AND CHRISTMAS DAY (8).
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE LAST WORKING DAY BEFORE
CHRISTMAS DAY, AND CHRISTMAS DAY (9).
HOLIDAYS: NEW YEAR'S DAY, DAY BEFORE NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY,
LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, THE DAY BEFORE
CHRISTMAS DAY, CHRISTMAS DAY (9).
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING
DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS EVE DAY, CHRISTMAS DAY, EMPLOYEE'S BIRTHDAY,
AND ONE DAY OF THE EMPLOYEE'S CHOICE (10).
PAID HOLIDAYS: NEW YEAR'S DA Y, DAY BEFORE NEW YEAR'S DAY, PRESIDENTS DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING DAY, CHRISTMAS
DAY, DAY BEFORE CHRISTMAS DAY (10).
PAID HOLIDAYS: NEW YEAR'S DAY, DAY BEFORE OR AFTER NEW YEAR'S DAY, PRESIDENTS DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING
DAY, CHRISTMAS DA Y, DAY BEFORE OR AFTER CHRISTMAS DAY, EMPLOYEE'S BIRTHDAY (11).
NOTE CODES
THE STANDBY RATE OF PAY FOR DIVERS SHALL BE ONE-HALF TIMES THE DIVERS RATE OF PAY. IN ADDmON TO
THE HOURLY WAGE AND FRINGE BENEFITS, THE FOLLOWING DEPTH PREMIUMS APPLY TO DEPTHS OF FIFTY FEET
OR MORE:
OVER 50' TO 100' - $1.00 PER FOOT FOR EACH FOOT OVER 50 FEET
OVER 100' TO 175' - $2 25 PER FOOT FOR EACH FOOT OVER 100 FEET
OVER 175' TO 250' - $5.50 PER FOOT FOR EACH FOOT OVER 175 FEET
OVER 250' - DIVERS MAY NAME THEIR OWN PRICE, PROVIDED IT IS NO LESS THAN THE SCALE LISTED
FOR 250 FEET
THE STANDBY RATE OF PAY FOR DIVERS SHALL BE ONE-HALF TIMES THE DIVERS RATE OF PAY. IN ADDmON TO
THE HOURLY WAGE AND FRINGE BENEFITS, THE FOLLOWING DEPTH PREMIUMS APPLY TO DEPTHS OF FIFTY FEET
OR MORE:
OVER 50' TO 100' - $1.00 PER FOOT FOR EACH FOOT OVER 50 FEET
OVER 100' TO 150' - $1.50 PER FOOT FOR EACH FOOT OVER 100 FEET
OVER 150' TO 200' - $2.00 PER FOOT FOR EACH FOOT OVER 150 FEET
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
BENEFIT CODE KEY - EFFECTIVE 03-03-04
-5-
OVER 200' - DIVERS MAY NAME THEIR OWN PRICE
D.
WORKERS WORKING WITH SUPPLIED AIR ON HAZMA T PROJECTS RECEIVE AN ADDITIONAL $1.00 PER HOUR.
L.
WORKERS ON HAZMA T PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS - LEVEL A: $0.75, LEVEL
B: $0.50, AND LEVEL C: $0.25.
M.
WORKERS ON HAZMA T PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS: LEVELS A & B: $1.00,
LEVELS C & D: $0.50.
N.
WORKERS ON HAZMA T PROJECTS RECEIVE ADDITIONAL HOURLY PREMIUMS AS FOLLOWS - LEVEL A: $1.00, LEVEL
B: $0.75, LEVEL C: $0.50, AND LEVEL D: $0.25.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
REQUEST FOR INFORMATION (RFI) FORM
PROJECT NAME: 2ND Street Water Main Improvements
PROJECT/CONTRACT NUMBER: 04-01
ORIGINATOR:
ITEM:
REFERENCE DRAWING OR SPECIFICATION:
DESCRIPTION OF CLARIFICATION/REQUEST:
o Contractor 0 Inspector
DATE REPLY REQUESTED:
CRITICAL TO SCHEDULE: 0 YES 0 NO
ORIGINATOR SIGNATURE:
DATE:
COMMENTS:
RFINO.
PW-407 _04 [rev. 02114/03]
I
CONTRACT CHANGE ORDER (CCO) NO._
I
I
Proiect Name 2ND Street Water Main Improvements
Date:
Contractor
Proiect No.
04-01
I
DESCRIPTION OF WORK
You are ordered to perform the following described work upon receipt of an approved copy of this Change Order:
I
1. Describe work here
2. Additional work, etc....
I
Such work will be compensated by: check one or more of the following as applicable [ ] Increase or [ ] Decrease in bid
items; [ ] Force Account; [ ] Negotiated Price: The described work affects the existing contract items and/or adds and/or
deletes bid items as follows:
I
I
Item Description
No.
RFI # Qty.
Unit
*$ Cost Per Unit
*$ Cost
1
Orig.
I
Rev.
2
Orig.
I
Rev.
I
* ORIGINAL * CURRENT * EST. NET CHANGE TOTAL CHANGE ORDERS, *EST. CONTRACT AFTER
CONTRACT CONTRACT THIS CHANGE ORDER INCLUDING THIS ONE THIS CHANGE ORDER
I DAYS: XX I DAYS:YY I DAYS: ZZ I DAYS: XX+ZZ.yy I DAYS: YY+ZZ I
I
* Sales Tax not included
I
All work, materials and measurements to be in accordance with the provisions of the original contract and/or the standard specifications and special
provIsions for the type of construction involved. The payments and/or additional time specified and agreed to in this order include every claim by the
Contractor for any extra payment or extension of time with respect to the work described herein, including delays to the overall project.
I
I
PROJECT ENGINEER
CITY ENGINEER
CONTRACTOR
I PUBLIC WORKS & UTILITIES DIRECTOR
I
CITY MANAGER
CITY COUNCIL APPROVAL DATE
I
I
PW-407 _04 [rev. 02114/03]
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CONTRACTOR'S APPLICATION FOR PAYMENT
2004 WATER MAIN IMPROVEMENTS, PROJECT NO. 04-01
Page 1 of 2
TO: City of Port Angeles
Public Works & Utilities Department
P.O. Box 1150
Port Angeles, W A 98362
DATE:
FROM: Contractor name & Address
PAYMENT REQUEST NO.
PERIOD From:
to [end of period]:
STATEMENT OF CONTRACT ACCOUNT
Original Contract Amount [Excluding Sales Tax] $
2 Approved Change Order No(s). $
3 Adjusted Contract Amount (1+2) $
4 Value of Work Completed to Date [per attached breakdown] $
5 Material Stored on Site [per attached breakdown] $
6 Subtotal (4+5) $
7 8.2% Sales Tax [at 8.2% of subtotal] $
8 Less Amount Retained [at 5% of subtotal] $
9 Subtotal (6+7-8) $
10 Total Previously Paid [Deduction] $
11 AMOUNT DUE THIS REQUEST (9-10) $
WAIVER OF CLAIMS FOR EXTRA COST OR TIME: The undersigned Applicant waives and releases, up
through the date hereof, any and all claims for costs or item extensions arising out of or relating to extra or
changed work or delays or acceleration not specifically identified and reserved in the amounts identified
below or previously acknowledged in writing by the City of Port Angeles.
CERTIFICATE OF THE CONTRACTOR: I hereby certify that the work performed and the materials
supplied through the ending period date noted above represent the actual value of accomplishment under
the terms of the contract (and all authorized changes) between the Applicant and the City of Port Angeles,
relating to the above referenced project, and that the remaining contract balance is sufficient to cover all
costs of completing the work in accordance with the contract documents.
Continued on Page 2
PW-407_04 [rev. 02114/03]
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CONTRACTOR'S APPLICATION FOR PAYMENT
Page 2 of 2
I also certify that all lower-tier payments, less applicable retention, have been made by the Applicant for the
periods covered by previous payment(s) received by the Applicant to (1) all lower-tier subcontractors/
suppliers, and (2) for all materials, equipment and labor used or in connection with the performance of this
contract. I further certify that I have complied with all federal, state and local tax laws, including Social
Security laws and Unemployment Compensation laws and Workmen's Compensation laws, insofar as
applicable to the performance of this work, and have paid all such taxes, premiums and/or assessments
arising out of the performance of the work.
I further certify that, to the best of my knowledge, information and belief, all work for which previous
payment(s) have been received shall be free and clear of liens, claims, security interests and
encumbrances in favor of the Contractor, subcontractors, material suppliers, or other persons or entities
making a claim by reason of having provided labor, materials and equipment relating to the work.
Within seven (7) days of receipt of the payment requested herein, all payments, less applicable retention,
will be made through the period covered by this pay request to all my lower-tier subcontractors/suppliers
and for all materials, equipment, labor, taxes and assessments arising out of the performance of all said
lower-tire work.
DATED:
CONTRACTOR:
SIGNATURE:
PRINTED NAME AND TITLE:
SUBSCRIBED AND SWORN to before me this
day of
.20~
Notary Public in and for the State of
residing at
My appointment expires
APPROVAL:
Project Manager
Date
City Engineer
Date
PW-407 _04 [rev. 02114/03]
.~fO"7+'_
-
-
~""Oo_
-
-
-
~-o
>@
r--I
[T1>
';(Z
",0
o[T1
or-
Q[T]
en
r----,-___j ! "<../ ;r"',/ / ......./ /"<)
\ I J..., I~ "<, ..' I SJ,/ ..) / :)~Y/ l
r- -r+-i ,''';''''' ,~.:t-'" ", ,,<.:..../,, 'f.' ,/....,: /"7'
\ I' Ii,;'......, /",,(... /""'/ ,..... , )<,/ I'y/ a
- J II" "''',,' ,,/ ....../ / ')' 't,' /......( ,7
I L-L.. ,,~.... / .:;t/......." / " ,~'l " "1
t -"~ 1'..' lJ "'I'..,' 1" ,,...'(', "<.. I
l~\... / ...../' ,l..j.. ..';/ )<"''lo( /""'~ " "Jl:./' " ,,,...-.:::.........
4 "--.,.. ,....t,' 'f.. '~', ~,' <(...' " : .,'
1-" ......( ,'''v,' /"'/ ,'..{ /)0 l'l ~"
. "'fr' '-'I \ / "",,' l....., '~"l,,' ';<, $ :,.. ,
f"" ........ \....... ,'~...l:""/ :';':,' /"'..,<: ,.~',.,../',':/... /'
j '.......... " /',l 1 '-< ' I',/C' ''''1' / '1-, "
b .........""' \ ........" "":"1/ ,>'..< ......Jl~,./ ,,"...././ '
, I - ~'< " ,,' >,','
.-\. " '1,' " ' l... / 'I.... / .~
~~~..../ i''-;<:,. ~~t... ,'''''f~ ,'>-. Ii
I-L::\- \' '<,/ :',:, ", ~,/ ;- ~
;:r r-"J Fr]J-q 1,( , . ~/~)~/(, ,'/,/ \
f ---'--ifJ-" t" -(J/;-i-;~ ~ ;"/(1).~>"1
-- I I B l~"./ / "1(', " ~~tJ''''' )'... I ,':"
I ) I r - ::z/ "'.' ",), , ,~'~v;',<,
- - ' ,e,' ,../ , >(, ....
._7 1 ,( - "-" '" _{ " ,"< I y: , )",. ,,_ ,J
J'--"","i/' :- -r' -'"I'+f~,/~~/)<ll.)ll~/>:';7{:A
_. __ 'll J I ,,<.... / 'J..../ /2~/ )(': ,'J...,;<'... /..)
y- :. J t/......' ,<,/ / ..<. 7cq.< /)<. , , -.l '
f ~~, .. 7~ / :':,:' )<.,:.. ....:s;/ )'1: I >"
., f I j,.." 'J-..>, , '-e.. ,)( /' '... ,<..,
_~. ~ '7 j--l..;. )'..:: :'''':'7{"r%.~ ~ ..(.~(~/~>'
''', 1-l.j<./<'f..v~~:/:,/:;C . ,..t~ ,/~ /" .."
! '",- ~..fI ", (~, I~'ft /').< }"f'
r--L_t -/.....- ~ 1 -,' '\ .~l..;I '...J. ,. ),'Y/..... , ;< / A
\.'fi. ,1 ~ 1~ ' ..,,/ , J. ' ')0.... "<,' '/
3?~"f'" I I ~, ~<.. I "/'1' ';(...;....' l"','/ ,........,:
~ ~,;,' - ! I !pJ,: ;<,!. , "-<:./ ..~ " ~.,.'..,' .,
)i. I , (5" " , '.t.,. '/" Y" ,",'
. ~-,--l 1 1.' ''''~<'f2..'rl ;:...../ ......../ '>"1: ,'-<
_. -1 I .', ~~), ' ,,<....t 7'
1/ /,..,.;f......//~,'
f-r0..... /..-{,,' f.':"'l >l"
fir .(:-1'../ /.. , ,>' ,")'
( / i~,')< :...../,
....r...;:::{ /:~ .I.:,........ ''',,'
'<.. , ,~'>>", /'" ,
" ,', /,' ,'~~-/";:"..../J'o.~
/ ';">,' ,', ,',~ '<'1( l..::....~ 1
.. :~f~' ,/./ :'1'''/: /,' // "'" M ;
- ~ 'j, ~ I L;''/ ,""---
r""-- i cOt, <auRst-.D --1), " 'J:" f'
''---, ,--I J '," Jl
r ,.J /& \ IliJ
') _____ :: ,j l'/ [I'I 1
I !"I _J ,[:1.,.- ~,"l ..l-.' - I
-I__~___ i 1 1 / J
"--- -""-, --II, -rr ,.-."-
- ,,~
1// LL
:r -- '~Jfstf----'" - /. I
I II I - - I
-T -rill "-- f-
I I II II I
\",.
I
I
I
j
~
~
g
Ei
~
'il
en-o
-~
-10
['T']c...
[T']
()
-I
~
.~ - j
I
I
I
-
-
<
~
n
~
Z
~
~
~
~
>
~
0 0 en '"0 en '"0 Z ...., ~
tT:I tT:I ....,l" ....,l" 0 - ~
...., ...., ~~ ~~ ...., ...., ~
~ ~ _Z oZ tT:I l" ~
tT:I
- - oen +en en tIj
l" l" +:r: o:r: en
en en dtT:I otT:I :r:
~ ::x> tT:I
....,tT:I ....,tT:I tT:I
Z Z 0"'" 0...., ....,
0 0 en
Z Z U'J ....,
0 0 ...., ::x>
...., ...., ::x> - if)
tT:I tT:I - 0 ::r:
en en CJ1 +
+ ~ tT:1
~ 0
0 tTj
~
~
Z
0
tTj
><
if)
::c:
tIj
m (Jl ~ (N N -->. tIj
~
-
-
-
-
- ...-
-
~
>
~ f
Z
SECOND AI VENUE WA TER MAliN IMPROVMENTS - TITLE SHEET
REVISION
BY
PUBLIC WORKS
~CIrY OF PORT ANGELES
CARY KENWORTlN C1N ENL1NEER P E
J21 E 5TH STREET POBOX' 150
PORT ANCELES, WA<;H1NCTON, 98J62
PHONE (360) 457-0411
CALL 48 HOURS
BEFORE YOU DIG
1-800-424-5555
DESIGNED BY JSI\ SS
DRAWN BY JSA
PROJECT NO 04-01
OWC f'llENAUE T 1 owe
DCA PROJ NAME NA
suRVtY nlENAME NA
DATE JANUARY 2004 CONTOUR INTERVAL NA
DATE JANUARY 2004 V SCALE 1-.. NA
H SCALE 1-.. AS NOTED
o
L.... ,........--.I
DATE
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
GENERAL NOTES:
1. ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH THE CITY OF PORT ANGELES STANDARDS, THE CURRENT EDITION OF THE WASHINGTON
STATE DEPARTMENT OF SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION, AND TRANSPORTATION'S ANY PROJECT SPECIFIC SPECIAL
PROVISIONS OR CONDITIONS AND REQUIREMENTS.
2 TEMPORARY EROSION/WATER POLLUTION MEASURES ARE REQUIRED AND SHALL COMPLY WITH THE CITY CLEARING AND GRADING ORDINANCE ANDWSDOT/APWA
SPECIFICATION 1-07.15 AS FOLLOWS.
A SOIL EROSION AND WATER POLLUTION/FLOOD CONTROL PLANS SHALL BE SUBMITTED TO THE CITY, APPROVED BY THE CITY, AND
IMPLEMENTED BY THE CONTRACTOR PRIOR TOSOIL ON THE SITE. SUBMITTAL AND APPROVAL OF DISTURBING ANY THESE PLANS SHALL
PRECLUDE ANY CONSTRUCTION ACTIVITY ON THE SITE. :
B. NO PERMANENT INFILTRATION GALLERIES SHALL BE UTILIZED AS PART OF THE CONSTRUCTION OF TEMPORARY EROSION CONTROL AND WATER
POLLUTION/FLOOD ACTIVITIES.
C. ALL PERMANENT STORAGE AND RETENTION/DETENTION AREAS USED AS PART OF THE TEMPORARY EROSION CONTROL AND WATER POLLUTION/FLOOD
ACTIVITIES AND CONVEYANCE INCLUDING PERMANENT SYSTEMS SHALL BE CLEANED OF ALL SILTS. SAND AND OTHER MATERIALS FOLLOWING
COMPLETION OF CONSTRUCTION AND THE PERMANENT FACILITIES SHALL THEN BE COMPLETED INFILTRATION AREAS.
3 A PRECONSTRUCTION MEETING SHALL BE HELD WITH THE CITY PRIOR TO THE START OF CONSTRUCTION.
4. HORIZONTAL AND VERTICAL CONTROLS/DATUM AS ADOPTED BY THE CITY SHALL BE USED, UNLESS APPROVED OTHERWISE.
5. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES. THE CONTRACTOR SHALL VERIFYALL
UTILITY LOCATIONS PRIOR TO CONSTRUCTION BY CALLING UNDERGROUND LOCATE AT 1-800-424-5555 A MINIMUM OF 48 HOURS PRIOR TO ANY
EXCAVATION WORK.
6. ALL NON-FERROUS PIPE AND SERVICES SHALL BE INSTALLED WITH CONTINUOUS TRACER TAPE INSTALLED 12" TO 18" UNDER THE FINAL GROUND
SURFACE. THE MARKER TAPE BY A STANDARD METAL SHALL BE 4" OR WIDER NON-BIODEGRADABLE, PLASTIC WITH METAL CORE OR BACKING MARKED
AND COLOR CODED CORRESPONDING TO THE UTILITY TO BE MARKED AND DETECTABLE DETECTOR. TAPE SHALL BE TERRA TAPE "D"
APPROVED EQUAL. IN ADDITION. TO TRACER TAPE, FORCE MAINS AND CURVED MAINS SHALL ALSO WIRE SHALL BE FURNISHED AND INSTALLED BY
THE CONTRACTOR. HAVE A 14 GAUGE COATED COPPER WIRE. WRAPPED AROUND THE PIPE, BROUGHT UP. COATING STRIPPED. AND TIED OFF AT
THE VALVE STEM OR MANHOLE RING THE TAPE AND WIRE SHALL BE FURNISHED BY THE CONTRACTOR.
7. TEMPORARY STREET PATCHING MAY BE ALLOWED WITH THE APPROVAL OF THE CITY ENGINEER.
8. THE CONTRACTOR SHALL HAVE A COPY OF THE APPROVED TRAFFIC CONTROL PLANS AT THE CONSTRUCTION SITE AT ALL TIMES.
9. SPECIAL STRUCTURES SHALL BE INSTALLED PER PLANS AND MANUFACTURERS' RECOMMENDATIONS.
10. ALL DISTURBED AREAS SHALL RECEIVE TEMPORARY AND PERMANENT EROSION CONTROL IN THE FORM OF VEGETATION ESTABLISHMENT SUCH AS GRASS
SEEDING. A MEANS SHALL BE ESTABLISHED TO PROTECT THE PERMANENT STORM DRAIN SYSTEM PRIOR TO ESTABLISHMENT OF THE PERMANENT
EROSION CONTROL MEASURES THESE METHODS SHALL BE INCLUDED IN THE EROSION AND SEDIMENT CONTROL PLANS IN ACCORDANCE WITH
CHAPTER 6 OF THESE STANDARDS.
11. CONSTRUCTION WORK HOURS SHALL BE RESTRICTED TO 7 A.M TO 7 P.M., UNLESS OTHERWISE APPROVED IN WRITING.
12. THE CITY CONSTRUCTION INSPECTOR SHALL BE NOTIFIED A MINIMUM OF 48 HOURS IN ADVANCE OF THE NEED FOR AN INSPECTION, UNLESS
OTHERWISE INFORMED.
13. TEMPORARY STREET PATCHING
A TEMPORARY RESTORATION OF TRENCHES SHALL BE ACCOMPLISHED BY USING 2" MINIMUM DEPTH CLASS B ASPHALT CONCRETE PAVEMENT WHEN
AVAILABLE, MEDIUM-CURING (MC-250) LIQUID ASPHALT (COLD MIX), ASPHALT TREATED BASE (ATB). OR TRAFFIC BEARING THICKNESS STEEL
PLATES.
B. ATB USED FOR TEMPORARY RESTORATION MAY BE DUMPED DIRECTLY INTO THE TRENCH OR PATCH AREA, BLADED AND ROLLED. AFTER ROLLING,
THE TRENCH MUST BE FILLED FLUSH WITH THE EXISTING PAVEMENT TO PROVIDE A SMOOTH RIDING SURFACE.
C. ALL TEMPORARY PATCHES SHALL BE MAINTAINED BY THE CONTRACTOR UNTIL SUCH TIME AS THE PERMANENT PATCH IS IN PLACE. IF THE
CONTRACTOR IS UNABLE TO MAINTAIN A PATCH FOR WHATEVER REASON, THE CITY WILL PATCH THE AREA AT THE EXPENSE OF THE
CONTRACTOR OR PERMIT APPLICANT.
D. TRAFFIC SHALL NOT BE ALLOWED TO CROSS GRAVEL OR CDF BACKFILL FOR MORE THAN 24 HOURS WITHOUT UTILIZATION OF TEMPORARY
PATCHING MEASURES STATED ABOVE
14. THE CONTRACTOR SHALL GIVE THE CITY A MINIMUM OF 72 HOURS NOTICE PRIOR TO SCHEDULING A PLANNED CUT-IN, LIVE TAP OR OTHER
CONNECTION TO THE EXISTING SYSTEM. THE CONTRACTOR SHALL NOTIFY ALL CUSTOMERS INVOLVED OR AFFECTED BY ANY WATER SERVICE
INTERRUPTION 24 HOURS PRIOR TO INTERRUPTING SERVICE. THE CONTRACTOR SHALL MAKE EVERY EFFORT TO SCHEDULE WATER MAIN CONSTRUCTION
WITH A MINIMUM INTERRUPTION OF WATER SERVICE. IN CERTAIN SITUATIONS, THE CITY MAY NEED TO RESTRICT THE SCHEDULING OF WATER MAIN
SHUTDOWNS, SO AS NOT TO IMPOSE UNNECESSARY SHUTDOWNS DURING SPECIFIC PERIODS TO EXISTING CUSTOMERS.
15. CITY CREW TO ASSIST IN ISOLATING SECTIONS OF EXISTING WATERMAIN TO ALLOW FOR WATER MAIN CONNECTIONS.
16. THE CITY SHALL BE GIVEN 72 HOURS NOTICE PRIOR TO SCHEDULING A SHUTDOWN OF THE WATER SYSTEM. THE EXISTING VALVE MUST BE PRESSURE
TESTED TO CITY STANDARDS PRIOR TO CONNECTION. IF AN EXISTING VALVE FAILS TO PASS THE TEST, THE CONTRACTOR SHALL MAKE THE
NECESSARY PROVISIONS TO TEST THE NEW LINE PRIOR TO CONNECTION TO THE EXISTING SYSTEM OR INSTALL A NEW VALVE.
17. THE EXISTINGVALVES SHALL BE OPERATED ONLY BY CITY EMPLOYEES, UNLESS OTHERWISE INFORMED. 18. DURING THE CONSTRUCTION OF MAINS AND
SERVICES, THE CONTRACTOR SHALL CAP, PLUG, OR SECURE THE ENDS OF SUCH LINES WHENEVER THE PROJECT IS SHUT DOWN AT THE END OF
THE DAY SO THAT CONTAMINATES WILL NOT ENTER THE LINES. 19. ALL LINES SHALL BE CHLORINATED. TESTED, AND DECHLORINATED BY THE
CONTRACTOR, WITH A REPRESENTATIVE OF THE CITY PRESENT, IN CONFORMANCE WITH THE STANDARD SPECIFICATIONS. 20. THE CONTRACTOR SHALL
GIVE THE CITY LIGHT UTILITY 48 HOURS NOTICE FOR EVALUATING AND/OR SECURING POLES PRIOIR TO WATERMAIN WORK WITHIN 8 FEET OF SUCH POLES.
LEGEND:_
ROADWA Y CENTERLINE
PROPERTY LINE
EDGE OF PAVEMENT
EDGE OF GRAVEL
EXISTING SANATARY SEWER
EXISTING STORM DRAIN
EXISTING WATER
EXISTING VALVE
EXISTING FIRE HYDRANT
EXISTING WATER METER
EXISTING SANATARY SEWER MANHOLE
PROPOSED WATER
PROPOSED VALVE
PROPOSED FIRE HYDRANT
PROPOSED REDUCER
EX STORM DRAIN MANHOLE
EX CATCH BASIN
EX LUMINAIRE
EX UTILITY POLE
EX FUEL TANK LID
EXPIRES 02/02/ Cl S I
1D
- -5S-
--~
~~
~~
~
:s;
<:)
If:
~
~
~!i
~c
fti
10;;;
~ ~ ~I
.... ~ ~ ~
... ~ I
~~:.. c
e: n~
Cl)S>::t
--w-
M
b'
m
q
H
....
~
@
o
~
~
~ ::
cc
-0-
co
.
~~
~ !C
cc
~
K' ~
V) C; ~z
<li I
, ~
I'D
C',)S:!IC)
~~~
O~IC)
:t:~~
c-. ~
't~1
~"l;)
~~l;)
~iii'
UCl:l~
~
~
<!:I~L
~a. _ ~
l:liiiii;. Ir X II)
V-WOGl_
~~mz;
l. Co) 000
...... ~ a. t; ,!.
~~ ~ ~
<:)u ~8'
tt.~8:~
I. ~ ~ d ~
~!I:r <> c
"~liiiK
\.. > '"' ~
.... '" c
.... ~ ~..
~
~
I - ",/ _"~~ .
:" I MAINTAIN SERVICE LINE TO' i
:,1_ I (RESIDENCE WHEN DISCONNECTING
IJ' I I WATER MAIN '
'" l IK I
'r I"" '
> I, )/,.,. ,
~ I '.- :...., -
~ _ _.~~~~; -. . _ ,INST~LL W~ERUNE 3 FE~
I ,< ",J< '-.j '-.. -.' OFF-ClJR8.)TYP
/ '
iV" J: .... ~'I--'
'-~ '. ~/
JS Q
-" - '~;,
'\(;\1 - - ''--.-. "
.- vV'f" ,- Iv - . "
c~r~:l;- ~,- '--
~ If~f -.-. '\ -
Ii'\
I Ii I'
l III ----I \
EXJST. ~: I Iii \ \
10 CI I ' \ \ I
I, I
:> \_. I '
f, ).
{,
i
,",
o
o
~
$,
~ ~~~~~\
'\', v h _'..
-7~ -~~_.
'....../.....-"........: '~^
~
"
/
t:: I~.
\
{-.:
r-"
'I -:~R TOI P~TECT
OVERHEAD TREE LIMBS DURING
J ~: ,INST~"O~ ~f :IPE
; --:-E
<" /' J '<-Z
__~__~_ \__,__ .-L _ _ _f/',!~ 'Q
'\........... ~
_--.. I
", ',7 "
/'1"" ,\
c:(
w
z.
~ I!.I"
5 r I(J:
~ ::?L
< j''''''',--
::i ' 0'7,.,
o
_ __ l..^
I'
~~-I"*>.I~~
-.:...::.
m
o
o
;fI""',:;:'
uJ v"
~ /~ 00
A s:-.::-~-'--'----
-'"
-
,
'-.
I'
,/
)>
,-..
"
". I
" '
"
"
<i -
/
-_:~--
"
)
\
/
\,
>
l
I
I I ..s--' / I, I.
:f -:--~;" ..(~D ~ORT~~I~~'. SER\{ICE/ / '."
~j -- " '. ,CONNECTION (lYPICAL)
,-+--;
"d _~~l
v ~~..;~ ~~~ ^'~~ _u J~
EXIST. 3- AC 7
N
o
o
=' """""I~\\
IN
o
o
',.or'".... ,
~:.>'
\r?
"
2'\
r :h
,_)1
--I
I
I
'ADD C~~~~~~~E(~~6~L~~
, I r /~'
I ,-__,-' I L_JI
1_..: I "
ADD NORTH SIDE SERVICE
I ,
CONNECTION (lYP I CAL) \ ;' --
J' ....... /
);r:,,, INSTALLrwAitRtlNE 3 FEET
~ r-.{ /'" '"
O~F ,CUIRB. lYP '/", . -", "-
"\
'-l
o
o
,
~,I /
'-'I
'-, / -"'-
_~_?- N_
J
A
.A Ex~. 3~A AC Y
, f<,
-1- - - -
I
I
/', I
','
d \-'
8" X 8" 01 CROSS W/0 " G
2-8" GA TE VAL LIES. FL~/ , / ~
,(-0~ ~ ./''/
FJ
h8"0/~~
~"--:";i>J '
THRUST BLOCK ~'
0:
REMOLIE E;/~'T-~ I K':L'~~:NOON 3" AC
8" X 3" CROSS '" i IN PLACE
, 8" SLEEVE. AC X 01
,..) rY?
,-, F
/ '" y"~
"''), .
Y"'\~
I
r ' \.
i~
I '
I ,(
, _'" I
,/" ~7
!
i'VT
<.
'"
1O
o
o
'--;:;y--r~;-'--'+;;;-'
i " ~..... '/ ,<~,J "" "\ l- ,,7
"'S'~ '. ';.:. ( ',,~ >/, '."
;'.":;- ~~"" '-----,"-'l \-r-:j
(
f"- "-
,/ ",
. '"
"j 13:
~
(")
:::I:
C
Z
rrJ
)>
\ EXIST. 8" AC 1 '
\ ----'-1 ---.
" - :~ ---------- ,
<>
'"
~~
INSTALL FH
ASSEMBl. Y
'" IL
L:
tY
,-
Ij
J
~
\'>"'/1
/'~"_"""__H_
\,
,"\,
~\
l ,..... L"l
"," ) /'
" -t1Y/>
. ," L..-
~ ~/ -1'-...,
.'" 0<"
o
<i
-i'>
o
o
-f!;
; ;L"~"f
--- - ~ I" ~
/', I'
'- EXIST.
~ 8- AC
"
2'
( ~
,,-c./ v
I ,\ I
- I j
~
/
{ t)
S<lALE
1l"~20'
~
')'p
I EXPIRES 02/02/ I
I
\,
I~ST~H
ASSEMBLY
[
\/ ,,,",
, N~ '" 3:
" f~~' >
,_ _',' ": _~I\ __" /' \ I "X/, ~
~ i ----iF ~, :" ~i"J ()
o / / :::I:
L-C:.~v-.: ~ ../ r
r-~k I -
o ',- '1'-., / Z
o ' ,.__ ' "" rrJ
r ><S, ~
" llJ
"
'"
c-f
y--~~
1\ ~"
l
~~--
I
I;
'I
)
I
I
"f'---' -
\ :
\ '
1 ./~-
l (
, ; ~
I I /
, ,
, I
I:)
<' I \
SCALE - 1 "=20'
.~~~_ ~ ~ ____ _""","""",_, VN ~~.
ADD,; SOUTH SIDE SERVICE
CON,NECTlON (lYPICAL)
)-
t
,/
'-" _/" - /' \",--,/\. \", _/, -/\, .'
-.:.......':j..
/
~,
10
z
o
YlI~
h.:
CS
~
:s:
CJ
it
~
<I~
"-' 0
~
es
f-::::
CJ
~RI~
.. ..
00
....,
00
1"11"
~C3
"
;0
o
VJ wC;
Bi _ ~ ~u~
'" 0 I 0
Vl I x
:~~~~
lD 0<
El fu~ ~ a
z zO i:i: Ct:
Q 3=~ CL
~ ~~ ~ g
~
It)C,:)lr)
ct----lr)
::::>(::)1
CJ:::J'I:I-
:t:32~
Cl;) 1
'l:l-lwCJ
Q::CJ
:::JG::Cl;)
G~..!.
~
~ ~ @ fd
Cj a:: x :ri
""::> WOOl .....
<..... W aJ ...
'C~o~9
~ ~ CL ~ ~
ctG ~o
r-- W;o<D
~?iwvi::?
"-l.. ~ ~ d ~
~ 3= I <.:;I 0
a~:r;: if
,.. w <r
>... ~ ... ~
J......... <.:;I ~
G
~
I
I
i'
I
"
"
,
'>
,
,j'
I
IT)
I
w
Z
---l
I
(.)
I-- "
~ 1/ ~ EXIST. 810
~'V
:)/-1 I /__'_
(--- ~--
L._, 'r= _.
, 'I
l__
I
o
o
AC
,/-- ,.,r
I
I
:>
I
I
I
'j ~
I
. ,,' i' 1 "",
"''%y~ lR:?":~<
Ail v:
;q 1,1 ~
UNBALANCED CROSS
I
1/4" STEeL
BEARING
PLA TE
I
PLUGGED TEE
^'';''~~'' ''K\4:,,<..-<-:~t,,:'0.
," '~"~,"
I
I
I
I
I
\,
'I
,
j
-:::::-7'--;-t'.;-;-~ .
..,,, -""...-... /\
/1'
//,
~~ n
. ,
Y,
/
"
'\'
"
-<
)
,_I
,- -
\
'}
1\ .
N
dNSTALL WATERLINE 31 FEET
o OFF CURB, lYP
".,,~/ "'Oz' '",r
>: ~ "t>... ~~,,-,, 1 .t/l,~
;: \ -~
"
" "
'""
1,~",
, '
-----, ~-- --
i
"
),........ ~ ~A~I , - ~O~^-~~:TI~~~-^ ~v~
~DD SOUTH SIDE i [SERVICE
./ CONNECTION (P'PICAL)
I
I!
,
"
,/ ^ ""v
!7~,;-- -,
~ ('
~f2 / ;~ ~
l' ,\ ..,
'~i ) 1/4" STEeL
"",', "'.", ;$'{yr BEARING PLA TE
';Z;:<>"^"
CROSS II1TH SHACKLED PLUG
HORIZONTAL BENDS
WYE" BRANCH
w V I
;I
,/ I
,/ 4
/
"'....../
" ,
_ 30 y- lbo/
"' .......IJ
l&... ~ {I
~ ..::!/
.>, /
~ v"~// 1
0:::: 25---- ~......--/!.--j-- ~ _ --?-. ---- --- ~
~ "c} / i i I
~ '" i '
0: // I I ^' / /'l
w '1 <.."" /
CO 20. / I ,,~\y // j
5 / l ~fP-.1 ///
C) / I 1.,/, /'
i5 ,C;,,..~~/ /'/ I ~/
h. // /'" ,"',"
!J') 15> /--1 ~'\+\/ .o;,'l") ...--""...
~ // i ,-",1/' ,-",I~
~ ,,// l"'~";~'/ l1.~~/
~ ,,/" <1~~'t..:-,/: ,}. c\..!:::"""'"
::; / ~'~ ,.1'''/
;:" '0' - . ,f), (." ~/- -'
,..., // ~1;) '" ",t.t\.'_.. I
~.... .~........ ~~\.I~;:"'-"" ~ Jf.,'lt..-..-'
..................... ~Q .~~...1" I l40<l9- ~~.-. --'
~_- s~,""""""': I s,..t-l~9~~----
5 "'~~~" ;,l.'-~'.t~. l~r-" !'~'~~r-- . ' -
I '
6 - ----7--- --- B - -- 9 10
PIPE DIAMETER (INCHES)
35
11
NOTES
1 BASED ON 300 PSI TEST PRESSURE AND BEARING VALUES OF DRY SOILS
2 VALUES FROM CURVES ARE FOR TEES, CROSS AND DEADENDS.
I E. STRAIGHT LINE THRUST
FOR 90 BEND USE 1 4X VALUE FROM CURVE
FOR 45 BEND USE O'8X VALUE FROM CURVE
FOR 22 1/2' BEND USE 04X VALUE FROM CURVE
FOR DTHER ANGLES (0) USE/25m 0/2) X VALUE FROM CURVE
3 FDR CONDITIONS NOT COVERED B CURvtS, SPECIAL
THRUST BLOCKS MUST BE COMPUTED AND APPROVED
THRUST BLOCK DETAILS AND
BEARING AREAS
GJ
o
o
'2
I
l,
!
I
"
..r
J
\ I
\ 'j
\ [
, \
\/ /'
'\
\ ~ '
\;----- l '" l-~'<
, i
-'''--'1
,ADD NORTH SIDE SERVICE
CONNECTION (lYPICAL)
. .. __ _ _ _ L..~ ~ _ ~
v v' "
^~.~~~
\,
"
EXIST: 3- AC J -J'.
,
8" X 8" DI CROSS
W/2-8" GA TE VAL VES, FL
~x:,-?
~ ~~ <:-.
REMOVE EXIST PIPING / ::;
i' ,
l :.
T '
4 ~o/ ! !..{ (
o
[
)
~ ~ -~~~
,\', '\...... ,/^,
~
/,-",
_ .:::.N_-:::::__~~~_.,.,_,?~~_ ,..-::~ ~~':...-- - - v~-"'\/'I
.+.--
/,..., ,/, ,j'."
{- EXIST. 610 AC;
I
~T -EXIST ;1 G
~~~A~
/'/ ~ J
\' ~, " # j / ~ I
"'_;/ CJl
I I
/ 0 I
. 0
? ~ ~\~ ~~= - ~<..,
"
J'~, 'J-- _ ",
:-
~
II"'.
(Jl
~'lC:/
. ,.;,j
~:
o
o
,
/"- ,
/' /;::>, )..'
7"~/ ~,
~"
!
8" X 6" REDUCER, FL
" ~ 8" X 2" REDUCER, FL
, I', C
" ~ REMOVE EXIST PIPING AS
:'S/''//y ( NECESSARY AND CONNECT
~" . 2" DI TD EXIST 2" VAL VE
;--;--''' (,
REMDVE EXIST 8" AC PIPE
AND REPLACE II1TH 8" DI
L ~BANDON 2" G
IN PLACE
8" SLEEVE. AC X DI TYP
I [)(PIRES 02/02/ I
I
I ',' , K.::::9
/1 ,/ /;, Tx6"'STORM J5
/ '
1/ '
.
/>: t '
REMOVE EXIST. GRATE AND /, '"
, PRoVIDE SCUD cOvER "., ,~ ---
I ~
/y
/ '
~ )
~/
"
/
\
[
IS>>';
j~
NOTES TEE
1 ALL BLOCKING TO BE CONCRETE CLASS 3000
2 LOCA TE THRUST BLOCKING A TALL LOCA TIONS NOTED ABOVE
AND AS REOUlRED BY THE CITY ENGINEER
3 ALL BLOCKING TO BEAR AGAINST UNDISTURBED NA llVE SOIL
4 PLACE 15# FEL T ROOFING MA TERIAL OR 6MIL PVC
SHEETING BETWEEN FITTING AND CONCRETE
5 SEE SHEET 2 FOR BEARING AREA
..-"
MATCH EXIST.
CURB AND GlITTER
?,
; REPLACE AND RElOCATE
. FIRE HYDRANT
I NOTE: INSTALL RETAINING
,r- WALL (APPROXIMATE
DIMENSIONS SHOWN)
,- MATCWW/EXIST.
,
~
~
~
/AA,
/ .
,~~-... /
/J(~
---.-; \..
, '" ,<\,
.... ""
OJ
: ~
o
,0
/ , I
, {?," MATCH EXIST
REMOVE 7EXIST.GRArE' AND ,..,},: CURB AND GlITTER
/ PROVIDE SOUD covER ~ : ~ " "
::"("/'
>,/ ,;86'x6" STORM DR
i 11'v~",~'~
.>
j
CATCH BASIN ,
W/CURB" INLET >
MATCH RAMPS WITH
EXIST. SIDEWALKS
J
1
J
..1
i
" i)
,"\
MATCH EXIST. CURB
SCALE 1- 1"=10'1 AND GUTTER
irCH BASIN wi CURB INLET
>-
m
z
o
YlI~
f-:
~
~
::s:
Cl
2:
~
<I~
-...; 0
~
~
f.::::
CJ
~RI~
~ ~
00
1"11"
~~
"
~iJ~I;:
0,0
i1i I x w
: ~c; ~ ~
m 0<
~ fu~ ~ a
~ ~~ G: g:
f:J ~~ ~ t5
o 0...00
lC)
lC)
If)~lC)
"'--lC)
:::sCJ1
Cl::J"l-
::t:~~
CQ " I
"l-'<Jc::J
Q::c::J
--JClCQ
~t:J1
10G:)
t8 0
~ ~ ~ ~
Cj Ct: X ~
<: W 0'"
wm
;;: Z
"'( t..? 0 0
3 0.. t5
I-- it ~
Cl:::: <3 ~
a ~ ~:
Q ~ In d
It.. ~ ~ ~
C) ~ If) :
>- w '"
>-... ~ ~ ~
I-- l;l ~
G
e
I
I
I
I
I
I
I
I
I
I
I
:1
4
I
ADJUSTING RING
AS NECESSARY
EXPANSION
JOINT
I
NO TES:
I
OIL SE:PARA TOR "f'
REOUIRE:O A T OU TLE:T
UNLESS OTHERWISE:
APPROVE:D BY CITY
ENGINEER
I
2. CONCRETt CLASS .1000
.1 CA TCH BASIN BASE:
TO BE SE:T LEVE:L
GRA Tt FRAUE TO BE
SHIMMED TO UA TCH
LONClTUOINAL SLOPE
4 USE: WSDO T ORA WING
B-2A AT SAGS AND
WSOOT ORA WING B-2B
FOR AU OTHER LOCATIONS
I
I
I
I
OfTfCTABLE WARNING PA TTfRN AREA
SHALL 8E YELLOW. IN COMPLIANCE
IlfTH SPEc. PROV 8-/. J(J)
~ RAIIP
1- _I \
20' RAG
--~---
IIAX.
2 J/8"
/1/2"
J/4"
1 7/J6"
II/N
A 15/8"
8 5/8"
C 7/16"
D 7/8"
.' TYP
"
~I~
lo ~
VI
~-1F- _ _
I -l I-E-
fLEVA T1~
T/lUNCATfD DONES (SEE NOTf I)
DfTfCTABLf WARNING
PA TTfRN Of TAIl.
CALL FOR FORM INSPECTION
BY CITY .EBJQB TO
POURING CONCRETE
NOTES
/ DETtCTABLE WARNING PATTtRN SrsTtM SHALL BE ARMOR TILE ARMOR TILE PANELS TO BE PROVIDED BY
THE CITY AND INSTALLED BY THE CONTRACTOR
2 CURB RAMP CEMENT CONCRETt SHALL BE CLASS .1000. .I 1/2" THICK MINIMUM
.J. HERBICIDE TO BE PLACED UNDER PAVING, CURB AND ADJACENT SIDEWALK PRIOR TO PLACING OF MATtRIAL5.
4. EXPANSION JOINTS SHALL BE 1/4" THICK. FULL DEPTH, ASPHALT IMPREClVA TtD JOINT MATeRIAL
5 STEEP STREE:T GRADES AND/OR CURVE: RETURN RADII OF LE5.S THAN 15 FEET OR GREA TtR THAN 20 FEET. REOUIRE
SPECIAL DESIGN CURB RAMPS TO BE APPROVE:D BY CITY ENGINEER
6 SIDEWALK CROSS SLOPES NOT TO EXCEED 2Jf. CLIRB RAMP SLOPE TO BE 1 12 OR FLATTtR
CURB
RAMPS
B
A--l
-<1
I CALL FOR INSPeCTION BY art I
PR1CR TO BACKI'4L
~
EXPANSION
JOINT
SEE NOTE NO 4
.1'-0"
USE CATCH BASIN TYPE
BASE FOR 6" PIPE
o 02'/FT
SLOPE
SECTION B-B
\ MA TCH EXISTING PA VE:MENT ELEVA TION
6" OL Yl./PIC FOUNDRY FRAME
SM 52-A WITH .1//6" NON-SKID
GRATt H / DIAJ./OND PATTeRN ON TOP SURFAce
SLOPE ~
-'
I
CALL FOR FORM INSPCCTION BY aTY
PRIOR TO POURING CONCReTe
ADJUST HOOD TO MATCH CURB
HeiGHT (.1" MIN OpeNiNG)
ALL WORK AND MATERIALS TO BE IN ACCORDANCe WITH CURRENT "STANIJARD SPeCIFICATIONS
FOR ROAD. BRIDGE AND MUNICIPAL CONSTRIJCT1ON: WASliINGTON STATe DEPNlTIIENT OF
TRANSPORT A TION, AMERICAN PUBUC WORKS ASSOClA TlON
'"
SECTION A-A
NOT TO SCALE
CATCH BASIN /CURB INLET
INSTALLATION
NOT TO SCALE
NO rES:
ACP PATCH SHALL BE ROLLED AND NOT VIBRATED
8
2 TO BE USED fOR ALL PAVED STREETS AND ALLEYS
BACKfiLL LOCATION TO 1'-0" BEHIND CURB OR EDGE
Of PAVING UNLESS OTHERWISE APPROVED IN ADVANCE
BY CITY ENGINEER
3. WHERE CONCRETE PAVEMENT JOINT IS LESS THAN 4'-0"
fROM SAWCUT, THE PAVEMENT SHALL BE REMOVED
TO THAT JOINT.
. TEMPORARY PATCHING WITH ASPHALT OR PLACEMENT or
STEEL PLATES IS REOUIRED WHEN TRAfrlC WILL CROSS
cor fOR MORE THAN 24 HOURS WITHOUT PERMANENT
RESTORATION. STEEL PLATES SHALL HAVE COLD PATCH
WEDGES ON TRAffiC EDGES
5.CONTROLLED DENSITY BACKfiLL (Cor) TO BE USED IN
ALL TRENCHES WITHIN THE ROADWAY cor CONSISTS or
THE fOLLOWING'
2600 LBS OF aJ75 IN AGGREGA Tt
800 LB5. OF STANDARD CONCRETt SAND
94 LBS. OF PORTLAND CEMENT
APPROX 14 GAL OF WA TtR#
'THE AMOUNT OF WA TtR IS A CRITICAL FACTOR
TO SET-UP TIME AND SHOULD BE ADDEO A T THE SlTt
8
EXPANSION
JOINT
.]'-0"
\MATCH GUTTfR LIP
OR EXISTING PAVEMENT
ELfVATlON /'0" MIN.
FROM FACE OF CURB
(TYP.)
MATCH EXISTING
PAVE:MENT ELfVATlONS
AT GRATt EDGE
1- 2-
TWO INCHES AT FUll SCALE
IF NOT SCAI1: ACCOROINGI.Y
t EXPIRES' 02/02/0:' I
ASPHALT CONCRETE
ROAOWAY PATCH~
fINNISHED. JOINT PIPE UNDE.R
AT SAWCUT ~ ROI\OWAY
EXISTING AC
ROADWAY 1
---""--t--- -
I
1
PIPE UNDER LAWN
SOD
_ ' '___ _ _.L.. 3" MIN. TOPSOIL
~t..: :~ .r=..~..::.~3f:--:---~-
--j 10'
fiNAL
BACKfiLL z
"
2
e;
i
'"
Ii!
l!5z
~i
~'"
"'~
0'"
z ;~
5i 2"
...~
00
CALL FOR INSPECTION PRIOR TO
PLACING CDF BACKFILL
BACKFILL DETAILS
W (see note 4)
NOTES:
ProVIde Uniform support under barrel
2 Hond tamp under haunches.
3 Compoct beddIng motenol to 95" MAX
denSity except directly over pipe.
4 See -TRENCH EXCAVATION" In Secloon 7-10
of the Standard Specifications for trench
width .w" and trenching optIons The pipe
zone will be the actuol trench Width, except
for Ctess A bedding The minimum concrete
Width sholl be 1 1/2" 10 + 18"
BACKFILL MA TtRIAL
(Site not~ 5)
(Closs A)
BACKFILL MA TtRIAL
(Site not~ 5)
5. Trench backfill sholl conform to -Backfilling
Trenches. In Section 7-10 of the Standard
Specifications, except thot rocks or lumps
larger thon ,. per foot of pIpe dlometer
sholl not be used in the backfill matenal
6 See .Beddlng Material for Rigid Pipe- In
the Aggregates section of the Standard
Specifications for the matenal specifications.
7. See "Bedding Matenal for FleXible Pipe- In
the Aggregates section of the Standard
SpeCifications for the matenal speCifications
(Clos. a. c, 0)
BEDDING FOR RIGID PIPE
8. Pipe must be anchored In such 0 manner
os to ensure flow hne IS mOlntalned
NOTE Also see City Standard drawing for
Controlled DenSIty Bockfill (CDf)
for street crossings
BEDDING CLASS TABLE
O.lLENSlON I Cl.ASS A Cl.ASS a ClASS C I l'IASS 0 I Cl.ASS r
." WIN
1/. 10 . . I Zero
12- MAX
x
I'tSP<<T1ON 1tC0UtRCD uPON COIII'fL11ON
OF ROUCH CRAlJINC AND DtJRINC
AAaMCN7 or S7RtJCTURAJ. seCTION.
Y
1/400 I 1/20.0 I 1/800, 2.",
00
c.w FOR f"ORIIlNSPCCTION .., orr
PRfOIf 70 PQJR/NG C'QICIlC1C AND
'Aiiiii mPA"":'
z
3/400 I 1/200 17/8 00
00
. X - .- WIN, 27" 10 and under
6- "IN, over 27" I 0
PIPE BEDDING
FOR WA TERMAINS
10
~
~
~
<:)
It
~
~
~I~
~I~
~
i ~ ~
o~~z
IO.....l..i
<O[~wl~
o~ i5
zz :
wa~
~~elf ~I
"'''' \l~:>
o.oocn
C1\)C!3
~;::::lQ
::s.....lQ
C)~:g
:t~~
~~~
~~~
;!~~
u:g~
~.
ld
(!J~~N
~ 0. _ ~
~ ~g il_
z . -
~......~o~~
cc t;l: W 0.. ~ ,!.
\l,....1: :i' ~
u"u ~-
iiiQ,,~l:;~iil
~ ~l!ej:!
~OUl~W
<:)!~~~
:.:'" oC 0..
)..~w!r
.... ~;; ~
- ..,
u
e
I
ASPHALT CON~1C PA~MCNT OR
aASS B Pee PA VOlENT (HIGH CARL Y)
MATCH CX1SnNC PAIlCUENr T1PC
AND OCPTH sec NOTC ,.
" M/N
I
I
I
NOT TO SCALE
NOTES:
I
1 ACP PA TCH SHALL Be ROLl.CD AND ~ HBRA rED
2 TO 8C /JSCO FOR ALJ. PA If'l) STRCCTS AND ALLEYS. BACKFIll LOCA nON TO 1'-0' BCNIND CIJR8 OR COCC
OF PAVING lJNLESS OTHERWISE APPRO~ IN ADVANC!" Br aTY ENCINCCR
.1 WHERE Ct:1NCR€1E PA..ntoiT JOINT 15 LCSS THAN ,,0-0. FROM SANCtIl, THE PAYCI/ENT SHALL BE RCJtOa.f"D
m THAT .laNT
I
;f TEMPORARY PA TODNG ""TN ASPHAL T OR Pt.ACDlENT OF' srca Pl.A res 1$ RCOIJIRED ItIEN TRAFFIC tfIU CROSS
CDF' FOR MORe THAN 24 HOURS .,THOUT PCRIIANENT RCS1Dl?ATION. STEEL PLATES SHAll HAa.f" COLD PATCH
IfCDGCS ON TRAmC coccs.
C.D. BACKFILL SPECIFICATIONS
2600 LDS OF 4.J75 IN. AGGREGATe
800 LB5. OF STANDARD CONCRETE SAND
94 LBS. OF PORTLAND CCl/ENT
APPROX 14 CAL or WA TER
THE AMOUNT OF WA TCR IS A CRITICAL FACTOR
TO SET uP TAlC AND SHOUW sr ADDCD AT
THC SITC
I __-.c__m I
~aJFaotOl7'.l.L
I
CONTROLLED DENSITY BACKFILL
( CDF)
I
,NOTEO rACE OF HYDRANT SHALl. BE
nUSH ., TH BACK CDCC or SlD€WAI.K
ttHCRC SlDCWAI.J( IS NEXT TO CURB.
.-:--.'
I
I
I
I
1/2 CV '"
Qi'A..a BACKfiLL
FOR DRAINS
I
I
TYPE A <(PREFERRED)
<(VALVE IN STREET)
NO rES:
I
I
I
QL=~
I orr STANDARD i
, ..Jp-- vAL.c Bar
I '
+--4
I
L
~ ~,
[]]' 0..--..",,,
( I( '-"')loi
I \.. '11
'-" ,~'
\~
6' FLANGC x FLANGe
GAlC VAla.f"
S' I/CCH. OR FLANGe .KJ/NT
x 6" FLANGe TCC
TYPE B <(ALTERNATE)
<(VALVE BEHIND CURB)
AU tfI/ORI( ANO MATERIALS TO BE IN ACCORDANCE WTH C1..flRCNT STANDARD SPCCIFlCATlONS
TRANSPORTA11ON, AI/CRfCAN PfJBJ.1C IKWKS ASSOClAntW
FOR RCMO. BRJDGC AND IJUN1C1PAl CONSTRtJCl1ON: WASHlNCTON STATe DCPARTllCNT or
I
FIRE
HYDRANT
TYPE A
ASSEMBLY
& B
I
~ AN"'cP - ~fiT' O/A.
.~--
n-r't !irf'~
. ,~.. I )
. II \..,,, I ,I ' CROSS HATCHCO AI/CA FOIl
{ II :_ \\ 0 III I@BRlCKSUNDER
---;u~.,... _ '.'1~ f----J HIJ8 ON! y
'.~v-t:::i17.~" 'L_~
~~, ~'.~
, , ,
t... J ..,#- ..I
BCARING ARCA PeR
THRUST BLOCKINC
STANDARD DETAILS.
!:!QE.
I CONCRCTC SHALL 8C ClASS 3000
2 VAl. ~ THRUST BLOCKS TO BE INSTAlLED WHEN SHOtw ON PLAN.
VALVE
AND
METER, MCTCR BOX AND
SCTTCR SCC NOTC '3
~
}.
'; ~ i
r.r.:t~"',,"D II il~\
~/ i I U\~~~
~ ! )' /(
~"'" .,. I I ~ =' \'.
~;=
I" SCRVICE LINCS
SADDLC CORPORA TlON STOP AND
PAC JOINTS. SfC NOTC iI1
NO TES'
2- SOUARC/2- HIGH -----''-",
f-'l)-I~
~..y <t / ;&
~ ~~ //
,\ ~~i
~
~ .\
._'';0,' ~
"-1/"- DlAMCTER ____ Y;' /:
IfiT' - THlCKNCSS / l-'
/;/
, .
/ / ~ ,. salO METAL STOCK
I,~ LCNCTH AS ReoolRED
1/8' MIN. TH1C1fNCSS~ //
/ I
; /
.//
(;.V .1/8' SIT SCREw
"'Y~
, 2-1/4' fNS1DC OIMCNSION
~ 2-1/4' DCPTH
~.--;---===:;-:~
Jt-.:; I:,.:
I I ALICN VAL Io'C BOX
6- tttOC X 6- DeEP I I '10 TARS"
CONCRETE: COLLAR . PARALLEL TO MAIN
ReoolRED IN PA..co AREAS I I
l/.W, ,
CAST IRON VAl.lf" BOX use 'I~/-': i
1/1'" MAN/JI'ACTlJl/fNG P40A/P4oe ~ I
OR Ot. YMPIC FOIJN/JRy >fJZ8/>,9ZC I
AND BAse l' \1
Tl/CNCH C'
BOTTOM ~I '-1'--)
"'" r hr:.~~J @
"'---- ~ ,.,.-\
-"9;};yAr/.V.I~.I1onY~ . . . ' \- ~""~-
-~/...~lv~
:. . . '\
I . .
~_!i'
(VAL.c STCM CXTCNS10N
I/COIJIRCO ItHCN DCPTH CXCCCOS ~7
BOX, SUPPORT BLOCK
THRUST BLOCK
! l I~
, Cl:
W SCRVICE LINC TO i
'~~CH OLD ALIGNMCNT " ~. I
- ~ ~~"
~l Ii "CONNCCT SCRVICC LINC
~. I TO <XISTING MCTCR
(i\ i ASSCMBL Y
~)
8" DI/
==-
NORTH SERVICE LINE
I FIRC HYDRANTS SHALL BC PLACCD AT STRCCT INTCRSCCTiONS I+HCRCVE:R POSSlBLC AND LOCATCD TO MINIMIZC THC HAZARD
OF DAMAG< BY TRAmc UNLCSS OTHCRIlfSC RfOUIRCD, THf FOLLOIlfNG SHALL APPLY FOR HYDRANT NUMBCR AND LOCATiON
o RRC HYDRANTS SHALL BC LOCATCD AS PCR THC UNIFORM RRC CODC MOST RCCCNT CDmON ADOPTCD BY THC CITY
OF PORT ANGeLCS
b SlNGLC FAMILY HOMCS PROVIDeD IIfTH RCSlDCNTIAL SPRINKLCRS MAY BC 50D rcCT AWAY FROU A HYDRANT
2 THC LCAD FROU THC SCRVlCC MAIN TO THC RRC HYDRANT SHALL BC DUCTiLC IRON CEMCNT MORTAR LINeD CLASS 52
NO LCSS THAN 6 INCHCS IN DIAMCTCR
J RRC HYDRANTS SHALL COUPLY IIfTH AWWA STANDARD C502 STANDARD FOR DRY-BARRH RRC HYDRANTS IIfTH 5-T/~
INCH MAIN VALVE: OPCNING, TWO 2-1/2 INCH HOSf NOZZLES (NATiONAL STANDARD THRfAD), ONC ~-INCH PUMPCR
NOZZLC (PAClRC COAST THRCAD - ,3). 6-INCH MfCHANICAL JOINT SHOE CONNCCTiON. HYDRANT BURY ~2 INCHCS
HYDRANTS SHALL BC MUHLeR CCNTURION A-~23. CLOW F-2500; WATCROUS; OR APPROVE:D COUAL,
~ HYDRANTS SHALL BC BAGG<D UNTiL THC SYSTCM IS ACCEPTCD AND APPROVE:D
5 ALL HYDRANTS TO BC PAINTCD CHROMC YELLOW LOW FLOW HYDRANTS TO BC INDfNTiReD BY PAINTiNG BONNa RCD
6 FIRC HYDRANTS MUST BC INSTALLED. TCSTCD AND ACCCPTCD PCR APWA 7-/~ PRIOR TO THC ISSUANCE OF A BUILDING
PeRMIT THE FLOW TCSTiNG OF THC HYDRANT SHALL BC IIfTNCSSCD BY THC fiRC OEPARTl.fCNT
7 RRC SYSTCMS SHALL BC SCPARATC OR SCPARATCD FROM DOUCSTiC SYSTCMS IN SUCH A WAY THAT BOTH SYSTCMS CAN
BE OPCRATCD AND TCSTCD AT THOR RCSPCCTiVE: PRCSSURCS
CONNCCT SCRVICE LINC
/TO EXIST. SCRVICE LINC
== 'ij;\~r-' ~
: \ ~
\ I ~)
/. / ~"="'"
CXIST PIPC - - " 8" DI
SOUTH SERVICE LINE
I SCRVlCC SADDUS SHALL BC PAINTCD DUCTlLf IRON OR NYLON COA TCD DUCTiLC IRON IIfTH STAINLCSS STCH STRAPS AND SHALL
BC ROUAC STYLC 10lS ON I" TAP. 202S ON 1-1/2' OR LARGCR TAPS. ROUAC 202N, ROCKI'ELL 3T3 OR APPROVE:D CQUALS ARC
RCOUIRCD FOR HOT OR CORROSIVE: SDlLS. ALL CLAMPS SHALL HAVE: RUBBCR GASKCT AND IRON PIPC THRCADeD OUnCTs.
CORPORATiON STOP SHALL BC ALL BRONZ< AND SHALL BC FORD TYPC F-5OD OR APPROVE:D COUAL IIfTH IRON PIPC THRCADS
CONFORMING TO AWWA C8DD STAINLCSS STCfL INSCRTS SHALL BC USCD IIfTH PACK JOINTS AND POLYETHHCNf PIPC
2 SCRVlCC LINCS SHALL BC ONC (I) INCH HIGH DCNSlTY POL Y-CTHHCNC PiPE. COPPCR TUBC SlZC MINIMUM PRCSSURC CLASS
20D PDI PHILLIPS DRISCO 5TDD ULTRA-LlNC NO GLUfD JOINTS IIfLL BC ACCCPTCD ON ,. SCRVlCE LlNCS T-I/2" AND 2" PVC
SCRVlCES MA Y BC GLUCD. SCRVlCC LINCS SHALL BC INSTALLCD ~5 DCGRCCS OFF THC MAIN
WA TER
SERVICE
I EXPIRES, 02/021 o..t- j
Iii
~
~
~
:s:
o
~
~
~
~I~
~
tli
u.;:
~~
t... ~ ~
I.. ~ .
~ %'-
~ ~~~
~ ~U)bl
CI) 8:>:J:
1
fI;)(!)
~QI()
:::i ~
0::::'1()
:X:~.q.
~ ~
't1,lJ't
....a~Q
....a"Q
oq;~~
UQ:j~
f3
itl
(!3w~
~Q,= :;::
~~g~-
:z . -
...... ~ q ~ ~
Q: W Go ~ ,!.
,,~ 'i: ~
"'U ~~
a...~8:!
I. a= ~ w
~~;g:i~
'" w .... :z:
"on 0-
),. 1;; ~ l<
"'~N~
..... ..,
(j
~
CITY COUNCIL MEETING
April 6, 2004
LATE ITEMS TO BE
PLACED ON THIS OR
FUTURE AGENDAS:
(Cont'd)
FINANCE:
Water UtIhty MaterIals
"F" Street Substation
RebUIld
2004 Water Malll
Improvements
Equipment Purchase -
Vehicle Replacements
CONSENT AGENDA:
<I. ~ 58'
and Chambers, Mr. Haarstad expressed concern with current development and
expanSIOn plans of the hospital specifically related to lack of tree plantlllg III the
parkmg lot, as well as the Implllgement of lightlllg on area residences. He also
expressed concern on the matter of required storm dralllage, and hIS concerns were
heightened when the hospital purchased the lot adjacent to hIs property. Mr. Haarstad
expressed the hope that errors made on the other parklllg lot would be corrected III the
future, and he suggested that the City and Clallam TranSIt should address the hospItal's
transportation needs so that employees don't need to rely on personal cars. He felt tms
especially Important in VIew of off-street parking requirements, as well as the fuel
shortage. BrIef discussion followed, and Mayor Headrick advised Mr Haarstad that
the CIty Council has representatives servlllg on the Transit Board, so perhaps the matter
could be addressed at the TranSIt meetlllgs.
1.
Water UtlZzty Materzals, Project 04-05
Deputy Director of Pubhc Works & UtIhtIes Kenworthy summarIzed lllforrnatIon
relative to the purchase of Water UtIhty materIals, and Councilmember PIttIS suggested
that, III keeplllg WIth past practice, the Mayor should receIve the authOrIZatIOn to SIgn
the assocIated contracts. Therefore, Councilmember Pittis moved to authorize the
Mayor to sign the contract for Schedule A items from Hersey Meter in the
amount of $33,935.81, including sales tax, and Schedule B items from H. D.
Fowler in the amount of$50,136.12, including sales tax. The motion was seconded
by Council member Braun and carried unanimously.
2.
"P" Street Substation RebUIld, Project 01-28
Deputy DIrector Kenworthy revIewed the bids relative to the "F" Street SubstatIOn
Rebuild, and Councilmember Williams moved to award the bid and authorize the
Mayor to sign the contract with Tice Electric Company of Portland, Oregon, in
the amount of$106,892.10, including sales tax. Councilmember Rogers seconded
the motion, which carried unanimously.
3
2004 Water Mam Improvements, Project 04-01:
The scheduled 2004 Water Main Improvements along the north side of 2nd Street
between Chambers and Ennis Streets were summarIzed by Deputy DIrector Kenworthy
Councilmember Rogers moved to award the bid for the 2004 Water Main
Improvements, Project 04-01, to Jordan Excavating of Port Angeles, Washington,
and authorize the Mayor to sign the contract in the amount of $176,295.07,
including sales tax. Brief dIscussIOn ensued concerning the accuracy of the Engineer's
Estimate, as well as the lack of opportumty and appropriateness for co-locatIng other
utIlities in the same VIClllIty. A vote was taken on the motion, which carried
unanimously.
4
Equipment Purchase - VehIcle Replacements, Project 04-02:
Deputy DIrector KenworthyrevIewed bIds receIved on the vehicle replacements, noting
this constitutes the annual equipment replacement asset forth in the budget. Ruddell
Auto Mall bId below the State bId. Councilmember Braun moved to authorize the
City Manager to sign contracts and purchase orders with Ruddell Auto Mall for
the 8 new pickups and 2 new vans in the amount of $161,032.12, including sales
tax. The motion was seconded by Councilmember Pittis and carried unanimously.
Councilmember Rogers expressed pleasure with the effort to lllclude local dealers III
the bidding process.
Council member Erickson moved to accept the Consent Agenda, to include: I)
CIty CouncIl Mlllutes of March 15,2004 speCial meeting and March 16, 2004 regular
meetlllg; 2.) ExpendIture Approval LISt - March 26,2004 - $1,101,00106; 3 )
- 4 -