Loading...
HomeMy WebLinkAbout3501 Bldg J W 18th St (5)Application Number Appf icaEion pin nunrber Property Address ASSESSOR PARCEL NI]MBER: Application t),?e descripEion Subdivision Name . ProperEy Use Propertsy zoning Appllcation vafuatsion 19- 00000844 Datse 8/2'7 /19 661a40 3501 BLDG .f W 18TH S? 07 -30 - 01-2 -2 - 0000- 0000 - ELECIRICAI, ONI,Y ELECTRICAL PERMIT CITY OF PORT ANGELES 360-4t7 -4735 PUBLIC BUILDTNGS & PARKS 0 REPORT STATE SATES TAX on your excise tax form to the City of Port Angeles (Location Code 0502) Applica!ion desc Electrical block permit July 1 to Dec 31 CITY OF PORT ANGELES PO BOX 1150 POR? ANGELES OI,,iNER wA 9436202r7 Permit , Additsional desc PermiE Fee fssue Date Expiration DaEe ELECTRICAI ALTER COMMERCIAL EI]ECTRICAI BLOCK PERMIT JULY 1 1154.50 Plan Check I'ee 8/21/t9 va.Luati on 2 /23 /20 00 0 Qtsy Unit Charge Per BASE PEE Extension 1154 .50 Charged Paid Credited Due Pennits Fee Total Plan Check Totaf Grand:lotal 1154 .50 .00 1154 .50 1154 1154 50 o0 50 00 00 o0 00 00 00 PERMIT W1LL EX?IRE SIX (6) MONTHS FROM T-AST INSPEC"TION DATE RESULTS:INSPECTOR:INSPECTION TYPE SERVICE ROUGH-IN #EDFINALzlfi/zo COMMENTS: III T TI Signatule ofowner or Electrical Contractor X Date: Contractor DITCH f)onr ANcSLESL-t WASHINGTON, U.S.A Public Works & Utilities Department June 10, 20 t9 JeffYoung City of Port Angeles, Water Treatment Plant 35o l w 18d' street Port Angeles, Washington 98363 Re: Annual Electrical Block Permits. PAMC 14.05.140.B Dear Jeff. Nippon's annual electrical block permit, issued bythe City of Port Angeles, expires June 30,2018. The Pot Angeles Municipal Code (PAMC) addressing electrical block permits states that: A firm, corporation, or other enti[ which has a regularly employed electrical maintenance staft which is exempted from the requirement to have an electriciar ceftificate ofcompetency by RCW.l9.28.091, may choose to purchase a $ l 154.50 biannual electrical work permit for work done by in-house electrical personnel rather than a work permit fbr each installation, or alteration in accordance with the section. Work done by contractors shall not be included in this block permit. The inspector will track work requested under the block permit until $1 154.50 worth offees is reached, after which additional fees will be charged. Additional fees will be based on the published fee schedule in Port Angeles Municipal Code 13. 12.100. On October I 8, 201 l, the City Council adopted the new electrical permit fees with an effective date of January 1,2012. These new fees, which are less than those ofthe Depadment of Labor and lndustries, provide for full cost recovery ofservice. Billing cycles are as follows: 1" billing cycle: January I through June 30 2'd billing cycle: July 1 through December 31 Please send remittance to: City ofPort Angeles fi, ;ffi, J;rrard, Electrical rnspector Port Angeles, WA 98362 Please include a copv ofthe enclosed payments due receipt with your remittance, along with the far number where you wish to have a copy ofthe permit sent. The scheduling of inspections and/or questions may be answered by calling 360-417-4735. I look forward to working with you in this matter. Sincerely, cc: Shailesh Shere, Deputy Director ofPower Systems Phone: 360-417-4800 / Fax: 360-417-4542 Website: www.cityofpa.us / Email: publicworks@cityofpa.us 321 East Fifth Street / Port Angeles, WA 98362-0217 CITY OF Trent Peppard Senior Electrical Inspector