HomeMy WebLinkAbout321 W 4th St - Building
.
CITY OF PORT ANGELES LIGHT DEPARTMENT
321 E. Fifth Street
Port Angeles, WA 98362
(206) 457-0411
PERMIT NO.
.$:;;lS7
/2.. /11,/ f!r
, .
DATE
ELECTRICAL PERMIT
Installed By:
o READY FOR
INSPECTION
License Number:
o WILL CALL FOR
INSPECTION
Phone:
Site Address:
Owner/Business:
Phone:
Owner/Business Address:
Sq. Ft.
ELECTRIC HEAT
o BASEBOARD KW _
o FURNACE KW _
o HEAT PUMP KW_
~ FAN/WALL KW ...!l-
o RISER
~ OVERHEAD SERVICE
o UNDERGROZD SERVICE
VOLTAGE:I.zo '.21/0
~1l1S D3l1S
SERVICE SIZEc9&O
o TEMPORARY SERVICE FEEDER SIZE
0"""0=';0;'" ~tJ ~ 11#. ~ ~CM
r7;;!,,- . ~vJ ~
~ RESIDENTIAL
o COMMERCIAL
o NEW CONSTRUCTION
~' REMODEL
M' ADD/ALTER CIRCUITS
"l>r SERVICE UPGRADE/REPAIR
AMPS
AMPS
.
C -?
---
r
W.S. No. SERVICE SIZE
CAPACITY:
o O.K. 0 NOT O.K.
ACTION REQUIRED: 0 CHANGE TRANSFORMER
o INSTALL SERVICE POLE
DATE
ENGR.
o OVERHEAD SERVICE APPROVED
o CHANGE SERVICE WIRE
o OTHER
o Ditch Inspection O.K.
o Rough-in/cover O.K.
~ ~O.K. to connect service
b Final O.K.
Site Address:
$I
Permit/Receipt No.
~S;7
.-'
Installer:
New Meters
.
Notify Port Angele City Light by Street Address and Permit Numberwhen ready for inspection. Work must not be covered
before inspection and O.K. for covering has been given by the electrical inspector in writing on either the Wiring Report
or on the Builgjog Permit. PHONE 457-0411, EXT. 224.
(~ NO OCCUPANCY OA USE ESTABLISHED UNOEA THIS PEAMIT $ #' .s-o
Electrical Inspector Permit Fee
WHITE - File by address
PINK - Top: Eng, Bottom, Customer
GREEN - Top: Meter Dept., Bottom: City Hall
OLYMPIC PRINTERS INC
'1 f--W ~ {:L;r
PORT ANGELES HOUSING REHABILITATION PROGRA~
129 E 1st Street
Port Angeles, WA 98362
rel ephone #452.....2iJ23
August 30, 1995 (revised September 19 and November 6, 1995)
Final worklist specifications for:
Betty J. Fuson (95PA22)
321 W 4th St
Port Angeles, WA 98362
Telephone #1/57...9693
SELECTED CONTRACTOR: Cozi Homes Construction
324 E 9th St
Port Angeles, WA 98362
Telephone #1/52-99'6
PROJECT A (HEALTH ANO SAFETY REPAIRS)
0400 1)Front entry: Install new concrete steps and landing to
replace existing.
2)Rear main floor entry: Remove the existing wood decking
and framing and install a new concrete slab and step to
match the existing configuration.
0500 1)Front entry: Install new hand railing on each side of the
entry steps.
0900 1)Rear entry/hallway: Install new underlayment and sheet
vinyl floor covering.
2)Bathroom: Install new underlayment and sheet vinyl floor
covering.
3)Kitchen: Install new underlayment and sheet vinyl floor
covering.
4)Living and dining areas: Install new pad and carpet.
5)Front entry: Install new underlayment and sheet vinyl
floor covering.
6)Main floor west bedroom: Install new pad and carpet.
1
7)Main floor ne bedroom: Install new pad and carpet.
8)Bathroom: Sheetrock, tape, finish, and make ready for
paint the wall and ceiling areas. Include water resistant
concrete wall board in the tub area. Homeowner to complete
painting.
9)Bathroom: Install a new fiberglass or plastic laminate
tub wrap. Reframe window to be located above tub
wrap/surround.
10)Living room, kitchen and dining room: Sheetrock, tape,
texture, and make ready for paint the ceiling areas. Include
new cove mould ceiling trim. Homeowner 1:0 complet:e paint:ing"
No t:e: Floor coveri /1g allowance is $17 per square ya'rd for
carpet: and pad and $16 per square yard for vinyl..
1500 1) Bathroom: Install a new 24" vanity sink package.
2)Bathroom: Install a new bathtub package with shower faucet
and diverter and trim and fittings. Include a hand-held
shower with a stainless steel flex hose and wall mount
bracket.
3)Bathroom: Install a new toilet package.
1600 l)Basement entry: Install a new exterior motion detector
security light and connect to a new switch inside the entry.
2)Exterior: Disconnect and remove the overhead service to
the storage building on the north side of the house.
3)Basement and crawlspace areas: Properly secure all loose
romex wiring.
4)Front entry: Install a new entry light and connect to
existing switch inside the entry way.
5)Safe up the wiring, outlets, fixtures, connections, and
junction boxes throughout the house. Insure that service
panel is properly labeled, grounded and wired. All switches,
outlets, connections, and fixtures to have proper junction
boxes. All 3-prong outlets to be properly grounded and all
other outlets to have proper polarity.
6)Bathroom: Install a new GFCI outlet near the sink:
7)Bathroom: Install a new wall mount light over the vanity
sink. Connect to existing switch near the doorway~
2
;-' ~:'.''-i.,,,....,.
8)Living room: Install (2) additional outlets. Homeowner to
designate location.
9)Dining room: Install (2) additional outlets. Homeowner to
designate location.
10)Kitchen: Replace (2) existing outlets near the sink with
GFCI protected outlets.
11)Kitchen: Install (1) additional GFCI protected outlet.
12)Kitchen: Install a new 2-foot 2-tube florescent ceiling
light and switch over the kitchen sink.
13)Kitchen: Install a new 4-foot 2-tube florescent ceiling
light to replace existing ceiling light.
14)Kitchen: Install a new separate circuit and outlet for
the microwave oven.
15)Living room: Install a new ceiling light fixture to
replace existing pull chain fixture. Connect to a new switch
to be located near the front entry.
16)Replace three (3) existing wall heaters with (3) new
electric wall heaters with thermostat switches. Include
repair of wall areas. Homeowner 1:0 complet:e pa.int:ing..
F/A
17)Living room, dining room, and kitchen: Install new
electric wall heaters sized and located to adequately
the main living area of the house.
F/A
heat
18)Install a new 200 amp service panel complete.
PROJECT B (OPTIONAL-HEALTH ANO SAFETY)
0200/1700 1)Provide a new EPA approved wood stove package.
Include reframing wall, installing insulation, and finishing
the interior and exterior walls. Install new proper floor
and wall protection. Homeowner to complet:e removal of
exist.ing chimney a'nd st:oveJI new wood st:ove inst:al1i:."'tt:ion and
pain!:inq. (stove allowance $1,000)
3
PROJECT C (ENERGY CONSERVATION)
0800 l)Front entry: Install a new steel insulated prehung door
package with a deadbolt, lock, and window in the upper half.
Trim and finish the interior and exterior. Homeowner to
stain and finish Of' paint the door i:.~nd t:rim.
2)Kitchen: Install a new vinyl framed slideby window with
insulating glass on the north wall. Trim and finish the
interior and exterior. Homeowner 1:0 stain and fini5'h or
paint the trim.
3)Upper NW bedroom: Modify the window opening on the north
wall and install a new vinyl framed slideby window with
insulating glass. Trim and finish the interior and exterior.
Homeowner to stain and finish or paint t:he trim.. No~e: Chis
mLlst be a proper egress window..
4)Upper NE bedroom: Modify the window opening on the north
wall and install a new vinyl framed slideby window with
insulating glass. Trim and finish the interior and exterior.
Homeowner to st:a.in and finish or paint: the trim. No~e: this
mus t be a proper egress window..
5)Basement utility area: Install a new vinyl framed slideby
window with insulating glass. Trim and finish the interior
and exterior. Homeowner to stain and finish or paint the
trim.
6)8asement entry: Install a new steel insulated prehung
door package with a deadbolt and lock. Trim and finish the
exterior. Homeowner to stain and f1n16'/7 or paint: the door
and trim.
7)Rear main floor entry: Install a new steel insulated
prehung door package with a deadbolt, lock, and a window in
the upper half. Trim and finish the interior and exterior.
Homeowner to stain and fin.ish or paint t:he door and t:"im.
Note: all entry doors to be keyed alike.
8)Reglaze the broken window pane in the attic window over
the front entry.
9)Bathroom: Install a new vinyl framed casement or awning
window with insulating tempered glass on the north wall.
Trim and finish the interior and exterior. Homeowner to
stain and finish or pai-nt t:he trim. Interior window
wrap/trim to be an impervious/waterproof surface.
4
Not:e~o all new windowS' t:o be provided by cont:ract:or and inst:al1ed
by homeowner'5' S'on (a profeS'5'ioni.~l window 1ns'ta11erJ'. working- for
l'Iat:hews Glass).
PROJECT D (OPTIONAL ENERGV CONSERVATION)
0B00 l)Living room: Reglaze the window on the west side of the
front entry with insulating glass. Trim and finish the
interior and exterior. Homeowner t:o sti.~in and finish or
paint: t:he t:rim.
2)Living room: Reglaze the window on the east side of the
front entry with insulating glass. Trim and finish the
interior and exterioro Homeowner t:o stain and finish or
pa'i n t.: t:he t:rim~
3)Front entry: Install a new aluminum framed combination
storm/screen door package. (material allowance $200)
4)Rear main floor entry: Install a new aluminum framed
combination storm/screen door package. (material allowance
$200)
5)Dining area: Reglaze the window on the east wall with
insulating glass. Trim and finish the interior and exterior.
Homeowner to st:a1n and finish or pa1nt t:he t:rim~
6)Front entry: Reglaze (2) windows with insulating glass.
Trim and finish the interior and exterior. Homeowner t:o
st:ain and finish or paint: t:he Crim.
PROJECT E (EXTERIOR DETERIORATION AND BLIGHTING)
0400 l)Complete foundation footings and concrete wall around the
perimeter of the house and front entry area. Homeowner to
excavate and remove dirt to grade.
2)Install new proper footings and support posts throughout
the basement and crawl space areas. Include elimination of
all earth/wood contact throughout this area.
0600 l)Install new support beams, sill plate and rim and end
joist around the perimeter of the front porch.
0700 l)Complete installation of metal flashing and frieze board
around perimeter foundation area. Include replacement of
damaged sill plate and rim joist on the east side of the
house.
5
.. . . ~
. . .
2)Complete siding installation on the north and west sides
of the house. Match existing as close as possible. Include
installation of metal flashing. Homeowner to complete
painting.
PROJECT F (BUILOING CONSERVATION)
0500 1)Install new seamless aluminum raingutters, downspouts, and
splash blocks around the perimeter of the house. Confirm
drainage requirement:s wit:11 cit:y.
0600 1)Rear main floor entry area: Patch the hole in the siding
near the entry door.
1100 1)Kitchen: Install a new ceiling exhaust fan. Insure proper
venting to the exterior.
PROJECT G (OPTIONAL-BUILDING CONSERVATION)
0B00 1)Basement utility area: Install a new prehung hollow core
door package. Trim and finish both sides. Homeowner to stain
and finish or paint the door and trim.
0900 1)Basement utility area: Sheetrock, tape, finish and make
ready for paint the wall and ceiling areas. Fir out
perimeter walls and install insulation. Homeowner t:o
complete painting.
PROJECT H (ADDITIONAL EXTERIOR DETERIORATION)
0200 1)Refer to the attached Paratex pest inspection report of
September 14, 1995. Contractor to complete repairs outlined
in projects #1,#3, and #11. All other projects on the pest
report are specifically included in this worklist (#5, #7,
and #9), will be completed through the weatherization
program (#4 and #6), or will be completed by the homeowner
(#B and #10).
NOTE TO CONTRACTORS: Please bid eacl1 project: separat:ely and
include applicable t:ax and permit: fees.
6
CITY OF PORT ANGELES
LIGHT DEPARTMENT
ELECTRICAL PERMIT
N?
15344
----
3 -If . ~<,
Port Angeles. Washlngton...oo..oom.oo.....oooo......oo...oo.....................m.. 190000.00.
In accordance with the City Ordinance to regulate the installation. extension. or repair of elec-
trical equipment in, on. or about any building or other structure in the City of Port Angeles. per-
mission is hereby granted to diftrical work as listed below.
~:::su:~::~~i::::~~~;::::u..;:=~~~:::m~::~~~~.:~:::::~~::=:=::::::::::::::::::::::::::
Wiring Contractor .u-;{;;..AL':f'""0':!'.-:.:-::-::.m.oooom__oooooooo....... By__..oommoooom....oom..m.moomooum.u..ooum__.......
Light Outlets..........................................
Receptacle Outlets...m.........................
Drye,. KWloo..m...................................
Range, KW....m...
\Vater Heater:
KW..................oo...
Heat: RW,...........m.......
Motors: size, volts and phase:
Total Load...n..nmn........m....
/",,0/"'/(:1
Service, volts .....................?:L.m.......
3.
No. wires .....m.......:........mm..m....
. . /ffJ .
SIze WIreS..._mm............m___..m..m
Main fuse ...~1!.p.?..A...............
s:::
Enclosure mm..mm.m.....................
Type of wiring:
Entrance Cable ....................___mm
Rigid Conduit ..n..nm....
Metallic Tubing ..nmm...m...........
Current transformers:
No. & Size.n....n.....___..m.mn...........
Ser. NO..............................n..............
Ser. No...............................................
Ser. NO.................._............n......n....
Ser. No. ......nn......................nn......n.
Type of 'Wiring:
Armored Cable .............m....m......
Non-Metallic ....mnm..n........m......
Knob~ & Tube..
Rigid Conduit .n....mn...................
Metnll1c Tubing m..........m...nm...
Raceway
Circuits, Light
Utility.....
Heat ..........n......n....n.....n..............
Range .............................................
Water Heater ....n.........................
Motor .n....n....................................
Dryer_............n.................n................
Furnace .......00................'....00.............
Total n.....n...n.............n..........
Remarks : __..uu_u::::?.___~.~____~.__n.__..~~_g:-::-..-!.~___~.__".!2.__~~.._:n...urf?:::2~2z.-(..nn__.__.__...uuuu_u.U__u._h.un_uu._.uuu
-- rT
.___nnUnnUU.__UU.Un.UU__hU_h______.n__n..n.nh____n..n.._uUh..__.......nn..___u____.:~nnnu__..n...__..u_u.n_____uuh.uunnhnu.u__u.
.;::;~.;~:m.moooooom.m....moo;~~~...;::~~~~oo..mmoo--.h...m....oo......h;roo~:lloo4mm.2h.h---moo....
$.mm.mmmmmm.....m.... NO..m.m...__m___m_... By oo.___'.___..rt..:..L....~__~__Y.2__.mC.:?'__L...oo...
/
NOTICE-Current must not be turned on until Certificate of Inspection has been issued. If work is to be con.
cealed due notice must be given the Inspector so that work may be inspected before concealment.
NOTIFY THE INSPECTOR BY PERMIT NUMBER WHEN READY FOR INSPECTION
~
/
ELECTRICAL PERMIT
N?
15344
Date called for Insp8ction............n.......n......u..n......n.....n....nnu..._....................................................nn..............nn........n............................
Preliminary inspection dates............................ .............................._..................................................u.........................................................._
Inspectioncompleted..._..................................................................._...................................................................__.................._.........._......._
,
j
Total Load nn.n.....~.............n....nnn.......n.n......n....... .....-;:_.. ..........._ nn....... ..............nnn.un........................................._..........__......._......_
, \
1M -3.72 Olympic Printers, Inc.
"