HomeMy WebLinkAbout128 E 8th St - Engineering
s
~~
CITY OF PORT ANGELES
PUBLIC WORKS - UTILITIES DIVISION
321 EAST 5TH STREET, PORT ANGELES, WA 98362
LaseI'D
CED,;r,
o
-J
I
~
.~
;..t:-
Appllcatlon Number
Appllcatlon pin number
Property Address
ASSESSOR PARCEL NUMBER:
Application type descriptlon
Subdlvision Name
Property Use
Property Zoning . . .
Appllcation valuation
07-00000424 Date 4/23/07
625992
128 E 8TH ST
06-30-00-0-2~6800-0000-
PUBLIC WORKS UTILITES
COMMUNITY SHOPPING DISTR
o
Owner
Contractor
SHORT ALISON M/CRAIGM
342 BILLY SMITH RD
PORT ANGELES WA 98362
AFFORDABLE SERVICES
258663 HI - WAY 101
SEQUIM WA 98382
(360) 683-9619
Permit . . . . .
Additional desc .
Permlt pln number
Permit Fee
Issue Date
Explratlon Date
RIGHT OF WAY
RUP #07-16
100057
70.00
4/23/07
10/20/07
Plan Check Fee
Valuation
.00
o
BASE FEE
Extension
70.00
,
I
1--
!~
Qty Unit Charge Per
Fee summary Charged Paid Credited Due
----------------- ---------- ---------- ---------- ----------
Permlt Fee Total 70.00 70.00 .00 .00
Plan Check Total .00 .00 .00 .00
Grand Total 70.00 70.00 .00 .00
m
~
:?
<..f'\
-"\
Separate Permits are required for electrical work, SEPA, Shoreline, ESA, utilities, private and public improvements. This permit becomes
null and void if work or construction authorized is not commenced within 180 days, if construction or work is suspended or abandoned
for a period of 180 days after the work as commenced, or if required inspections have not been requested within 180 days from the last
inspection. I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of
laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to violate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
:A:>
G~
;::r
-r
c,
-h
2-
'?
""-<::
Signature of Contractor or Authorized Agent
Date
Signature of Owner (if owner is builder)
Date
T:\Policles\1102.1SR [1105]
PERMIT INSPECTION RECORD
CALL 417-4807 FOR UTILITY INSPECTIONS. PLEASE PROVIDE A MINIMUM 24 HOUR NOTICE. IT IS UNLAWFUL TO COVER,
INSULATE OR CONCEAL ANY WORK BEFORE INSPECTED AND ACCEPTED. POST PERMIT IN A CONSPICUOUS LOCATION.
KEEP PERMIT CARD AND APPROVED PLANS AT JOB SITE
INSPECTION TYPE DATE ACCEPTED COMMENTS
I YES NO
PW UTILITIES (Engineering DiVIsion)
WATERLINE / METER
SEWER CONNECTION
SANITARY
STORM
SITE DRAINAGE
SITE EROSION CONTROL
PARKING
SIDEWALK
CURB & GUTTER
DRIVEWAY APPROACH
BACK-FLOW DEVICE I I
I
FINAL INSPECTIONS REQUIRED PRIOR TO OCCUPANCYIUSE
RESIDENTIAL DATE YES NO COMMERCIAL DATE ACCEPTED
YES NO
CONSTRUCTION R. W.I PWI CONSTRUCTION - R. W.
ENGINEERING 417-4807 PW / ENGINEERING
FIRE 417-4653 FIRE DEPT.
PLANNING DEPT. 417-4750 PLANNING DEPT.
BUILDING 417-4815 BUILDING -
T:\Policies\1102.15R [1/05]
CITY OF PORT ANGELES
DEPARTMENT OF COMMUNITY DEVELOPMENT - BUILDING DIVISION
321 EAST 5TH STREET, PORT ANGELES, W A 98362
Laser~r
Cc- >
cD
\j
~
\
~
~
Applicatlon Number
Applicatlon pin number
Property Address
ASSESSOR PARCEL NUMBER:
Appllcation type description
Subdlvision Name
Property Use
Property Zonlng .
Applicatlon valuatlon
3/29/07
07-00000326 Date
435706
128 E 8TH ST
06-30-00-0-2-6800-0000-
RE-ROOF
COMMUNITY SHOPPING DISTR
5640
Owner
Contractor
SHORT ALISON M/CRAIGM
342 BILLY SMITH RD
PORT ANGELES WA 98362
AFFORDABLE SERVICES
258663 HI - WAY 101
SEQUIM WA 98382
(360) 683-9619
Permit . . . . .
Addltional desc
Permlt pin number
Permlt Fee
Issue Date
Expiration Date
BUILDING PERMIT - NO PR FEE
TEAR-OFF, 15# FELT, COMP
98376
151.75 Plan Check Fee
3/29/07 Valuatlon
9/25/07
.00
5640
Qty Unlt Charge Per
Extension
95.75
56.00
BASE FEE
4.00 14.0000 THOU BL-2001-25K (14 PER K)
Other Fees
STATE SURCHARGE
4.50
Fee summary Charged Paid Credited Due
----------------- ---------- ---------- ---------- ----------
Permlt Fee Total 151.75 151.75 .00 .00
Plan Check Total .00 .00 .00 .00
Other Fee Total 4.50 4.50 .00 .00
Grand Total 156.25 156.25 .00 .00
~
7V{
Of ~
%
~~
0)
~
n\
~
:1-
Separate Permits are reqUired for electrical work, SEPA, Shoreline, ESA, utilities, pnvate and public Improvements ThiS permit becomes
null and void If work or construction authorized IS not commenced within 180 days, If construction or work is suspended or abandoned
for a period of 180 days after the work as commenced, or If required inspections have not been requested within 180 days from the last
inspection. I hereby certify that I have read and examined thiS application and know the same to be true and correct All provisions of
laws and ordinances governing thiS type of work Will be complied with whether specified herein or not. The granting of a permit does not
presume to give uthority to v olate or cancel the provisions of any state or local law regulating construction or the performance of
construction.
Signature of Owner (If owner IS bUilder)
T IPohelesll 102_15 buIldmg pCllnJt mspectlOn rceOld05 wpd [1/4/2005J
Date
<."