HomeMy WebLinkAbout1016 W 9th St - Building
.
CITY OF PORT ANGELES LIGHT DEPARTMENT
321 E. Fifth Street
Port Angeles, WA 98362
(206) 457-0411
PERMIT NO.
:;Jrf7Z
DATE
//-/?- yZ-
Installed By:
ELECTRICAL PERMIT
9f-t,
~
~ READY FOR
INSPECTION
License Number:
o WILL CALL FOR
INSPECTION
Phone:
Site Address:
Owner/Business:
Phone:
Owner/Business Address:
Sq. Ft.
/
'El- RESIDENTIAL
'0 COMMERCIAL
o BASEBOARD KW _
o FURNACE KW _
o FAN/WALL KW _
o HEAT PUMP KW_
o SIGN
o TEMPORARY SERVICE
o PERMANENT SERVICE
o NEW CONSTRUCTION
o REMODEL
1;>f ADD/ALTER CIRCUITS
o SERVICE UPGRADE/REPAIR
o SPECIAL EQUIPMENT
(LIST BELOW)
o OVERHEAD SERVICE
o UNDERGROUND SERVICE
VOLTAGE:
o SINGLE PHASE
o THREE PHASE
SERVICE SIZE AMPS
DetailslDescription:
~f
" f}
AMvv9d/d
.
W.S. No. SERVICE SIZE
CAPACITY:
o O.K. NOT O.K.
ACTION REQUIRED: 0 CHANGE TRANSFORMER
o INSTALL SERVICE POLE
DATE
ENGR.
o CHANGE SERVICE WIRE
o OTHER
o Ditch Inspection O.K.
AtJIVI- 'rjJ Rough-in/cover O.K.
o O.K. to connect service
4Af'1' )ll Final O.K.
Site Address:
Permit/Receipt No.
~37c.
.
Installer: 0 ~ New Meters
Notify Port An~eles ity Light by Street Address and Permit Number when ready for inspection. Work must not be covered
before inspection and O.K. for covering has been given by the electrical inspector in writing on either the Wiring Report
or on the Building Permit. PHONE 457-0411, EXT. 224.
--(8'MJ
NO OCCUPANCY OR USE ESTABLISHED UNDER THIS PERMIT
$
&0
,::;:<'0 -
Electrical Inspector
Permit Fee
WHITE - File by address
YELLOW - file by number
PINK - Top: Eng, Bottom, Customer
GREEN - Top: Meter Dept., Bottom: City Hall
OLYMPIC PRINTERS INC
CITY OF PORT ANGELES
LIGHT DEPARTMENT
ELECTRICAL PERMIT
N?
15455
7-'(, - )::.
Port Angeles, WasWngtonnmnnn_n__nm_nm___nm._mnm.__mm_m____' 19__m___
In accordance with the City Ordinance to regulate the installation, extension, or repair of elec-
trical equipment in, on, or about any building or other structure In the City of Port Angeles, per-
mission is hereby granted to do electrical work as listed below.
Address _mL()j_kn._m--!i;f;!otf!{_nnn____m_.nnnnmm___ Occupancy____mnnm_______m_____n__.m_n____n__
:;: ;;.;;~.".,.:2ii;Pg:J~~T<::;;=~~~~~~-~~
Light OUtletB.___________________________________..:.~ Service, volts A-J.__?L::)_l~?! Type of Wiring:
,3 /
No. wires ..._..nmmnn____m_n__n....~'.._ Armored Cable _..mm__._n
<L.'A _/1
Size wlres----/,j.'Z'.u-tfJ./..---
Main fuse __t.;.?:__..~2.~/__..n__._._mm
'"
Enclosure _._.._:_~mnnnn.
Receptacle Outlets,n..,__________....nnn_....
Dryer, KWI_mm_m_m_______mm_
Non-Metallic _..____.....___n___._......___n
Knob & Tube__.__.....n________.n.....___n
Range, KW .
Rigid Conduit _m_______..n___.____.....___
Water Heater:
Metallic TubIng ___mn___.n________.....
KW_____________m_mm______mmm_____
Heat RW _____._/;2(__2=__..13/:/
TyPe of wiring:
Entrance Cable .mn_____________._________
Raceway .um..._______
Rigid Conduit ...._______m_
Circuits, Light
Motors: size, volts and phase:
Utility _.___
Metallic Tubing __m_.m___m_'n.._____
Current transfonners:
No. & Size._________m______.___n___.
Heat
Ser. NO._.._.'nmn_.nnuu__unu_nnn__n___
Range .______.________,_.._______..__....__________
Water Heater ____n.___._______..n..Wuu
Motor n_...____.nnnn.....n__nnnnhUn___
Ser. NO..nnn..nn____._nn__.............nn_...
Dryer._____..____..nnn__..._nnnn__'n_..........
Furnace ._.__n.nn__n___......._...'n.
Ser. No..___,_____________._._.....___._______________
Total Load_n___________n___..........
Ser. NO.n___n____nn.......n.nnun._.___n____
Total ....n_n..nnnn.n_...__nnn_....
or-
Remarks: _nmn_n____.?A.~~d""'~_mnn___nn_nn_mnn_n____.______m_nnn__.____n.m__.mn_nmn_n___.mn._mmm
-i.~_~~:_~~~:_:_~-_-_--_~.~~-:_-_-__-:_n-mm-i~~~_~:-:_~~_~~~_~~:_-:~-_~_mnnmnnnn:~-.--~:l:::z~~l{:J;~
NOTICE-Current must not; be turned on until Certificate of Inspection has been issued. If work is to be con-
cealed due notice must be given the Inspector so that work may be inspected before concealment.
NOTIFY THE INSPECTOR BY PERMIT NUMBER WHEN READY FOR INSPECTION
;j15
;/
"I .
. /(-t.r-
c-
~_l?~ .<..-.( >~--::^_ \c'
ELECTRICAL PERMIT
N?
15455
19/';; eu- {?L/
Datecalledforln~pectlon------------..~;!.---------:..7.::.__.i....____...______....._..______________.____________._____._....._._._............___.n_____._____._._.............._____._...........
. _ ;{) c>>"Jo.....Q?..iJ ~
~::;:::::yc~:p:e:::~__da(2~~i::::f~.~::~(~..(~':--~~:::-::::::::::::::::::_:::::::::::_::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::
'.....
Total Load ....__nnnn......__nnnnn.n_..__nnn_nnnn........nn..._n ..__n.......". ..n
1M 3-72 Olympic Printers, Inc.