HomeMy WebLinkAbout07-23RESOLUTION NO. V 1 -Z-✓
A RESOLUTION of the City Council of the City of Port Angeles,
Washington, adopting the City of Port Angeles Fee Schedule.
WHEREAS, the City of Port Angeles charges various fees for services, permits, licenses,
and other costs; and
WHEREAS, the City Council for the City of Port Angeles has determined it is in the best
interests of the City of Port Angeles to provide a single, efficient, and convenient listing of all
fees charged by the Cit
WHEREAS, such a listing better facilitates the updating and uniform review of such fees
on a periodic basis
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Port
Angeles that:
That the Fee Schedule of the City of Port Angeles is adopted as set forth in Attachment A.
PASSED by the CityCouncil of the City of Port Angeles at a regular meeting of said
Council held on the dY a of34k023.
Kate Dexter, Mayor
ATT,EST:
Kari Martinez -Bailey, Cityerk
APPROVED AS TO FORM:
14
William E. Bloor, City Attorney
P&
Attachment A
CITY OF PORT ANGELES
MASTER FEE SCHEDULE
Effective , 2022
Resolution No. 001"'3
Contents
Animal Licenses, Permits, and Other Related Fees.............................................................................1
Animallicense fees................................................................................................................................1
Dangerous dog registration fees..........................................................................................................1
Impoundfees and costs........................................................................................................................ 2
BusinessLicense Fees............................................................................................................................. 3
Businesslicenses...................................................................................................................................3
PBIASpecial Assessment Fees..........................................................................................................
4
OceanView Cemetery Fees.....................................................................................................................4
Development Fees and Charges — Building..........................................................................................5
BuildingPermit Fees..............................................................................................................................5
Building Inspections and Other Fees..................................................................................................6
Plumbing Permit, Inspections, and other related fees......................................................................7
PlumbingUnit Fees................................................................................................................................8
MechanicalUnit Fees............................................................................................................................9
Electric Permits and Inspections........................................................................................................10
Development Fees and Charges — Fire................................................................................................11
Development Fees and Charges — Land Use......................................................................................12
Department of Community and Economic Development fees......................................................12
SignPermit............................................................................................................................................14
Grading Permit and Plan Review Fees.............................................................................................15
Right -of -Way Fees...................................................................................................................................16
Permit for construction or excavation work in the City right-of-way.............................................16
Buildingmove permit fees...................................................................................................................16
Right-of-way license, master permit or facilities lease...................................................................16
Right -of -Way Use Permit Fees..........................................................................................................17
Utility Service and Connection Fees.....................................................................................................17
Finance Department Utility Charges.................................................................................................17
Industrial Wastewater Pretreatment fees.........................................................................................18
ElectricUtility Service..........................................................................................................................19
Water service connection fees...........................................................................................................22
Sewer..................................................................................................................................................... 23
Stormsewer connection fees.............................................................................................................24
Stormdrain connections.....................................................................................................................24
Underground utility work performed by the Public Works Department........................................24
MiscellaneousUtility Fees.................................................................................................................. 25
Miscellaneous Public Works and Utilities Department fees............................................................... 25
Recreation Facility Fees and Charges.................................................................................................. 26
Recreationfees..................................................................................................................................... 26
CityFacilities Rental Fees.................................................................................................................. 28
SpecialEvent Permits......................................................................................................................... 31
Police and Fire Fees (non -land use).....................................................................................................32
PoliceFees............................................................................................................................................32
FalseEmergency Alarms....................................................................................................................32
Ambulance Transportation and Mileage Fees.................................................................................33
Copying Costs and Other Miscellaneous Fees................................................................................... 33
Feesfor copying records.....................................................................................................................33
Miscellaneous Fees and Charges..................................................................................................... 36
Animal Licenses, Permits, and Other Related Fees
Animal license fees.'
Neutered or spayed dog —One-year license........................................................................$10.00
Neutered or spayed and micro -chipped dog's lifetime license
........................................$75.00
Neutered or spayed cat —One-year license..........................................................................$8.00
Neutered or spayed and micro -chipped cat's lifetime license
.........................................$60.00
Unaltered dog or cat —One-year license.............................................................................$35.00
Certified assist dog for the disabled........................................Free if RCW 49.60.380 applicable
Unlicensed dogs or cats that are impounded.......................................................2x licensing fee
Latepenalty (all licenses)........................................................................................................$5.00
Additional fee for replacement tag.......................................................................................$5.00
Service fee (private licensing outlet).....................................................................................$3.00
Deposit non -current rabies vaccinations.........................................................................$100.00
Dangerous dog registration fees.
Potentially dangerous dog —Initial registration (does not include licensing) ..............$100.00
Potentially dangerous dog —Annual renewal (includes licensing)..................................$50.00
Dangerous dog —Initial registration (does not include licensing).................................$150.00
Dangerous dog —Annual renewal (includes licensing)....................................................$100.00
Latepenalty...........................................................................................................................$50.00
Additional fee for replacement tag.......................................................................................$5.00
1 Note: Rabies vaccination required for licensing.
1
Impound fees and costs.
Animal impound fees:
1 st redemption within a 12-month period....................................................................$25.00
2nd redemption within a 12-month period...................................................................$50.00
3rd or subsequent redemption within a 12-month period.........................................$75.00
Potentially dangerous dog...............................................................................................$50.00
Dangerousdog................................................................................................................$100.00
Livestock per each animal.............................................................................................$100.00
Inherently dangerous animals .........................................................costs
($100.00 minimum)
Transportation costs:
Animals transported by a City Animal Control Officer, per mile....................................$3.00
Animals transported by others.....................................................................Reasonable
Costs
Daily boarding costs:
Animals boarded at the animal shelter................................................................up
to $20.00
Animals requiring specialized care.......................................................................up to $40.00
Animals boarded by others...........................................................................Reasonable
Costs
Euthanasia costs:
Animals humanely euthanized at animal shelter................................................up
to $45.00
Animals humanely euthanized by others ....................................................Reasonable Costs
Disposal costs:
Animals disposed of at the animal shelter:
0 to 30 pounds................................................................................................$20.00
2
31 to 70 pounds..............................................................................................$30.00
71 to 100 pounds............................................................................................$45.00
101 to 300 pounds..........................................................................................$60.00
Greater than 300 pounds, per pound............................................................$1.00
Animals disposed of by others.....................................................................Reasonable Costs
Veterinarian costs (includes medications)........................................................ Reasonable Costs
Rabies vaccination.................................................................As negotiated w/ local veterinarians
Business License Fees
Business licenses.
Annual business license fee....................................................................................................$25.00
Prorated business license fee.............................................................................$10.00 (minimum)
Temporary business license......................................................................................$10.00/month
Reissuance of a lost, stolen or destroyed business license..................................................$5.00
Additional business license z.............................................................................................$5.00/year
Adult entertainment business.....................................................................................$100.00/year
For -hire vehicle business licenses.................................................................................$50.00/year
Outdoormusic festival.............................................................................................................$10.00
Horse taxi driver's licenses..............................................................................................$5.00/year3
z Same person conducting the same type of business at two or more permanent locations.
3 Plus costs for Washington State Identification Section inquiry and the Police Department's fee for
fingerprints, photo I.D., local records check, and lamination of the license.
3
PBIA Special Assessment Fees
New business assessment (one-time initial fee)..............................................................$100.00
Annual Assessment Business
$160.00 Less than 1,000 sq. ft.
i
$266.00
$400.00
1,000-5,000 sq. ft.
5,000 or more sq. ft.
Ocean View Cemetery FeeS4
Site acquisition:
Adultlot.......................................................................................................................$1,000.00
Urngarden.....................................................................................................................$350.00
Memorialgarden..........................................................................................................$300.00
Opening and closing:
Adultlot..........................................................................................................................$650.00
Infantlot.........................................................................................................................$300.00
Cremation......................................................................................................................$300.00
Entombment.................................................................................................................$550.00
Memorial marker setting:
Memorial setting, individual...............................................................................$200.00
Memorial setting, companion............................................................................$300.00
Cremation niches:5
15% discount to fees for residents of the City of Port Angeles.
5 Sold out - prices are for niches that have been resold to the City and available for resale.
4
Bronze niches:
Individual.................................................................................................................$450.00
Individual and companion.....................................................................................$650.00
Granite niches:
Eyelevel and below..................................................................................................$750.00
Aboveeye level.........................................................................................................$650.00
Columbarium niches (sold as packages):
Withoutvase..........................................................................................................$2,450.00
Withvase................................................................................................................$2,500.00
Graveside or chapel service.................................................................................................$200.00
Saturdayservice....................................................................................................................$600.00
Disinterment:
Body......................................................................................................................$1,700.00
Crematedremains..................................................................................................$500.00
Merchandise' pricing...................................................................... 2x wholesale cost paid by City
Development Fees and Charges - Building
ConstructionCode Appeal...................................................................................................... $75.00
Building Permit Fees
Total Valuation Fee
$1.00 to $500.00$50.00
6 Memorial markers, marker setting, bases, urns, etc.
5
$501.00 to $2,000.00 $50.00 for the first $500.00 plus $3.05 for each additional
$100.00 or fraction thereof
$2,001.00 to $95.75 for the first $2,000.00 plus $14.00 for each additional
$25,000.00 $1,000.00 or fraction thereof
$25,001.00 to $417.75 for the first $25,000.00 plus $10.10 for each additional
$50,000.00 $1,000.00 or fraction thereof
$50,000.01 to $670.25 for the first $50,000.00 plus $7.00 for each additional
$100,000.00 $1,000.00 or fraction thereof
$100,001.00 to $1,020.25 for the first $100,000.00 plus $5.60 for each additional
$500,000.00 $1,000.00 or fraction thereof
$500,001.00 to ' $3,260.25 for the first $500,000.00 plus $4.75 for each additional
$1,000,000.00 '$1,000.00 or fraction thereof
E
$1,000,000.00 and up 1$5,635.25 for the first $1,000,000.00 plus $3.65 for each
additional $1,000.00 or fraction thereof
Building Inspections and Other Fees'
Plan review fees:
Residential
Commercial
Inspections outside of normal business hours
(minimum charge - two hours)
Reinspection fees
(minimum charge - one hour)
65% of the building permit fee
65% of the building permit fee
$65.00/hr
$50.00/hr
Hourly costs are as listed or the total hourly cost to the City, whichever is the greater. This cost shall
include supervision, overhead, equipment, hourly wages and fringe benefits of the employees
involved. Actual costs include administrative and overhead costs.
Inspections for which no fee is specifically $50.00/hr
indicated (minimum charge - one hour)
Additional plan review required by changes,
additions, or revisions to approved plans $50.00/hr
(minimum charge - one hour)
For use of outside consultants for plan review, Actual costs
inspections, or both
State surcharges per RCW 19.27.085 $4.50 for each building permit, plus
$2.00 for each additional residential unit
Inspection of manufactured or mobile home $230.00, plus $57.00 for water supply
installation line inspection
i
Certificate of occupancy $50.00 3
Plumbing Permit, Inspections, and other related fees$
Permit issuance
$ 50.00
Each supplemental permit for which the original permit has not expired,
$10.00
been cancelled, or finaled
pInspections outside of normal business hours (minimum charge - two
hours)
$65.00/hr
Reinspection fees (minimum charge - one hour) $50.00/hr'
Inspections for which no fee is specifically indicated (minimum charge - $50.00/hr
one hour)
Additional plan review required by changes, additions, or revisions to
approved plans (minimum charge - one hour)
$50.00/h r
8 Hourly costs are as listed or the total hourly cost to the City, whichever is the greater. This cost shall
include supervision, overhead, equipment, hourly wages and fringe benefits of the employees
involved. Actual costs include administrative and overhead costs.
7
Plumbing Unit Fees
Plumbingtrap..........................................................................................................................$7.00
Waterheater............................................................................................................................$7.00
Waterline.................................................................................................................................$7.00
Sewerline...............................................................................................................................$15.00
Private sewage disposal system..........................................................................................$40.00
Cesspool (where permitted)................................................................................................$25.00
Industrial waste pretreatment interceptor..........................................................................$7.00
Graywater system................................................................................................................$40.00
Reclaimedwater system......................................................................................................$30.00
Annual cross -connection testing of a reclaimed water system........................................$7.00
Rainwater systems - per drain (inside building).................................................................
$7.00
Ventpiping...............................................................................................................................$7.00
Fuelgas piping, 1 to 5 outlets..............................................................................................$10.65
Fuel gas piping, each additional outlet over five.................................................................$5.00
Medical gas piping, 1 to 5 outlets........................................................................................$50.00
Medical gas piping, each additional outlet over five...........................................................$5.00
Lawn sprinkler system backflow protection device............................................................$7.00
Atmospheric -type vacuum breakers, 1 to 5.........................................................................$5.00
Atmospheric -type vacuum breakers, each additional vacuum breaker over five ............$1.00
Backflow protection device <_ 2-inch9.......................................................................................$7.00
Backflow protection device > 2-inch10...................................................................................$15.00
9 other than atmospheric -type vacuum breakers.
10 other than atmospheric -type vacuum breakers.
8
Mechanical Unit Fees
Furnace or heat pump or forced air unit:5 5 ton..............................................................$14.80
Furnace or heat pump or forced air unit > 5 ton..............................................................$18.20
Heater (suspended, recessed wall, floor-mounted)...........................................................$14.80
Boiler, compressor, absorption system:
<_ 3 hp, 100,000 Btu/h.......................................................................................................$14.70
> 3-15 hp, > 100,000-500,000 Btu/h..........................................................................$27.15
> 15-30 hp, > 500,000-1,000,000 Btu/h.....................................................................$37.25
> 30-50 hp, > 1,000,000-1,750,000 Btu/h..................................................................$55.45
> 50 hp, 1,750,000.............................................................................................................$92.65
Airhandler <_ 10,000 cfm........................................................................................................$10.65
Airhandler > 10,000 cfm........................................................................................................$18.10
Evaporative cooler (attached, not portable)........................................................................$10.65
Heating or cooling appliance repair or alteration...............................................................$13.70
Ventilation fan connected to a single duct.............................................................................$7.25
Ventilation system (not part of a heating or air conditioning system).............................$10.65
Appliancevent...........................................................................................................................$7.25
Hood and ducts served by mechanical exhaust.................................................................$10.65
Fuelgas piping, 1 to 5 outlets................................................................................................$10.65
Fuel gas piping, each additional outlet over five...................................................................$5.00
Hazardous/non-hazardous process piping system, 1 to 4 outlets...................................$10.65
Hazardous/non-hazardous process piping system, each add'I outlet over 4..................$15.00
0
Pellet stove, wood -burning stove, gas fireplace, gas heating stove, gas cooking stove, and
other misc. appliance vent or equipment (not otherwise listed)' ....................................$10.65
Electric Permits and Inspections
Specialblock permits............................................................................................................$35.00
Electrical permit application plan review .......................actual labor/materials costs plus 15%
for administrative expenses13
Transformer charge for previously unserved residential lot with underground electric
service, including all applicable taxes..............................................................................$770.0014
Transformer charge for previously unserved residential lot with overhead electric service,
includingtaxes....................................................................................................................$440.00"
Charge for all other locations that require new distribution facilities...... see PAMC 13.12.010
Installation and removal of a temporary service..............................................................$145.00
Service calls on customer's equipment..............................................................................$145.00
Service calls on customer's equipment after regular working hours.............................$250.00
Labor billing rate for line crew personnel.....................................................................$55.00/hr16
Overtime.............................................................................................................$85.00/h r1 7
Contract and administration charge:
Projects less than 500 kw......................................................................................$405.00
Projects500 kw and larger.................................................................................$1,350.00
11 Gas appliances may require a $50.00 second inspection fee and a $10.65 gas line fee.
12 See Chapter 14.05 PAMC.
13 Deposit equivalent to the estimated full amount of the fee required.
14 Applies to all lots established after January 1, 2005, and to lots established prior to January 1, 2000,
with no prior history of electric service.
16 Applies to all lots established after January 1, 2005, and to lots established prior to January 1, 2000,
with no prior history of electric service.
16 Plus $27.00 billing charge.
17 Plus $27.00 billing charge.
10
Installation of a single or three-phase smart meter.......................................................$375.00
Residential service cancellation fee18.................................................................................$250.00
Additional review, when required ................................................................................... $55.00/hr
Work without a permit.................................................................................................2x permit fee
Development Fees and Charges - Fire
Welding and cutting inspections for activities of the following duration:21
Upto 5 days............................................................................................................$50.00
6 to 30 days...........................................................................................................$100.00
31 to 90 days.........................................................................................................$200.00
91 to 180 days......................................................................................................$300.00
181 to 365 days....................................................................................................$500.00
Marine fueling operation s:21
Individualpermit....................................................................................................$25.00
Reinspections..........................................................................................................$15.00
Annual permit .....................................................................................................
$100.00*
Place of assembly inspections.............................................................................................$25.00
Liquid petroleum gas tank and piping installation and inspection................................$35.00
Underground storage tank removal and installation inspection:
Commercial...........................................................................................................$100.00
18 See PAMC 13.12.010(D).
19A third or subsequent review of any application or any part of any application.
20 Welding and cutting activities extending beyond one year shall be required to renew any required
permits and pay inspection fees in accordance with the above schedule.
21 Subject to periodic spot inspections.
11
Residential...............................................................................................................$15.00
Automatic fire sprinkler installation, plan review, inspection, and testing:"
Multi-family.............................................................................................................$50.00
Commercial...........................................................................................................$100.00
Automaticfire sprinkler appeals.............................................................................................$50.00
Firealarm plan review23............................................................................................................$50.00
Fire alarm installation inspection and testing ..................................................................... $100.00
Plus $10.00 for each additional zone
Hood/duct system plan review..............................................................................................$15.00
Hood/duct system inspection and test.................................................................................$25.00
Inspections (non -uniformed personnel outside normal business hours) ................. $35.00/hr21
Reinspections for non-compliance with International Fire Code ................................ $35.00/hr26
Additional review, when required27..................................................................................$55.00/hr
Development Fees and Charges - Land Use
Department of Community and Economic Development fees
Annexation under ten acres - $500.00, over ten acres.....................................................$700.00
22 There is no automatic fire sprinkler plan review, inspection and testing fee for a system installed
voluntarily when installation is not required by ordinance.
23 There is no fire alarm plan review fee for a system installed voluntarily when installation is not
required by ordinance.
24 There is no fire alarm inspection and testing fee for a system installed voluntarily when installation
is not required by ordinance.
2s Minimum charge one hour in addition to above fees.
26 After first two inspections; minimum charge one hour in addition to above fees.
27A third or subsequent review of any application or any part of any application.
12
Appeals...................................................................................................................................$400.00
Boundaryline adjustment...................................................................................................$200.00
Comprehensive Plan or map amendment........................................................................$750.00
Conditional use permits:
Conditional use administrative............................................................................$200.00
Conditional use extension....................................................................................$100.00
Conditionaluse permit..........................................................................................$500.00
Environmental checklist for other than administrative CUPs.........................................$350.00
Environmental impact statement review28........................................................................$500.00
Environmental checklist for administrative CUPs.............................................................$125.00
Overlay Zones (Planned Residential Development, Infill Overlay, and Planned Low Impact
Development):
Preliminary...........................................................................................................$1,500.00
Final......................................................................................................................$1,000.00
Modifications..........................................................................................................$400.00
Openspace exemption..........................................................................................................$50.00
Parkingvariance....................................................................................................................$300.00
Plats:
Preliminary short plats (1-5 lots)................................................................................$200.00
Final short plats, per lot...........................................................................................$200.00
Amendment to short plats........................................................................................$75.00
Preliminary subdivision plats (6+ lots)......................................................................$1,500.00
Finalsubdivision plats...........................................................................................$1,000.00
Preliminary binding site improvement plan.............................................................$1,500.00
Final binding site improvement plan..................................................................$1,000.00
28 Any costs beyond the basic charge incurred by the City shall be charged to the applicant.
13
Rezone and zoning code amendments..............................................................................$500.00
SEPA appeals under PAMC 15.04.280................................................................................$400.00
Shoreline substantial development permit.......................................................................$750.00
Shoreline permit revision.....................................................................................................$250.00
Streetvacation......................................................................................................................$325.00
Temporary use permit:
Morethan one year........................................................................................................$225.00
Oneyear or less................................................................................................................$75.00
Extension or amendment of temporary use permit....................................................$75.00
Transportation demand review - Parking...........................................................................$350.00
Variance..................................................................................................................................$300.00
Wetlandspermit....................................................................................................................$350.00
Wireless telecommunications towers and/or telecommunications
facilities.....................................................$850.00 or $500.00 if co -locating on existing structure
Archaeologicalreview...........................................................................................................$200.00
Archaeological survey/special studies, per hour plus cost................................................$65.00
Additional review, when required29..................................................................................$55.00/hr
Sign Permit
All signs less than or equal to 25 sq. ft................................................................................. $47.00
Wall sign or marquees, over 25 sq. ft................................................................................... $85.00
Freestanding sign or projecting sign, over 25 sq. ft.......................................................... $115.00
Expired permit renewal fee...................................................................... one-half the original fee
Penalty for failure to obtain a permit......................................................................... 2x permit fee
29A third or subsequent review of any application or any part of any application.
14
Grading Permit and Plan Review Fees
Grading and filling:
1,001 to 10,000 cubic yards or more �$110.00
plus $15.00 for each additional 10,000 cubic yards or fraction thereof. _
Additional plan review for required changes, additions, or revisions to $55.00/hr
approved plans (minimum one hour)30
Clearing and drainage:
Estimated area of clearing
Fee
Less than one acre
$40.00
One acre to five acres
�$75.00 I
i
Over five acres $15.00/acre
Additional plan review for required changes, additions, or revisions to�$55.00/hr
approved plans (minimum one hour)31
Additional review, when required32...........................................................................$55.00/hour
30 Hourly cost includes supervision, overhead, equipment, hourly wages and fringe benefits of the
employees involved.
31 Hourly cost includes supervision, overhead, equipment, hourly wages and fringe benefits of the
employees involved.
32A third or subsequent review of any application or any part of any application.
15