WHEELING AGREEMENT - BENT CEDARS WAY
This AGREEMENT is made and entered into this /4:1::.. day of May 1996, by and between Port Angeles City
Light, hereinafter called "City Light", and who has requested wheeling services, and the Public Utility District
No. 1 of Clallam County, Washington, hereinafter called the "District", who will be providing wheeling services.
WITNESSETH that:
WHEREAS, City Light and the District concur that the best interests of their respective customers is served by
optimizing electrical facilities; and
WHEREAS, situations exist where extensive electrical facilities would be required to provide electrical service to
certain customers due to agreed upon service territory boundaries and physical terrain features; and
WHEREAS, both City Light and District customers could benefit from the wheeling of power over the facilities
of one utility to the facilities and customers of the other utility; and
WHEREAS, City Light and District representatives have met and reached agreement on the terms and conditions
under which power would be wheeled consistent with the Wheeling Principles set forth in the Electrical Service
Area Agreement which the parties entered into on December 30, 1992;
NOW, THEREFORE, IT IS AGREED between the parties hereto as follows:
1. Term of Agreement:
This Agreement shall be effective from midnight May 31, 1996 until midnight May 31, 2021.
2. Termination of Agreement:
City Light may terminate the Agreement at any time by giving the District written notice at least sixty (60) days
prior to termination. The District may terminate the Agreement either upon receiving the consent of City Light or
if City Light does not timely elect to participate in capacity expansion or make payment pursuant to Section 6 of
this Agreement.
3. Changes to the Agreement:
Changes in the terms and conditions of this Agreement may be made at any time upon the mutual written consent
of both parties. Either party desiring a change shall give the other party one hundred eighty (180) days' written
notice. The notice shall contain the desired changes and a full explanation of the reasons for the change. If, at the
end of the one hundred eighty day period, the parties hereto cannot mutually agree to the proposed changes, the
Agreement shall remain unchanged.
4. Wheeling Areas:
The area to be provided with wheeling services is shown on Exhibit "A" attached hereto and made a part of this
Agreement. For descriptive purposes this area shall be known as Bent Cedars Way.
5. Facility Costs in Order to Provide Wheeling Service:
In accordance with the Wheeling Principles the District has determined that existing District facilities are capable
of handling the additional loads to be imposed by City Light and that the cost to modify or upgrade the necessary
facilities is $ - 0 - . City Light by signing this Agreement, agrees to pay to the District the above mentioned
sum within thirty (30) days of invoice by the District upon completion of the modification or upgrade. City Light
also agrees to pay its proportionate share of any costs required to upgrade or modify District facilities during the
life of the Agreement should future loading conditions require such upgrade or modification.
"-
>.
6. Insufficient Capacity Due to Load or Customer Growth:
In June of each year excess capacity calculations shall be made by the District for all facilities involved in
providing wheeling services using the Scott and Scott DPAG software or equivalent. If any facilities have become
overloaded, the District shall prepare a cost estimate to upgrade the necessary facilities. The cost of the upgrade
shall be split proportionately between City Light and the District based upon each parties load served through the
line section or facility as previously determined. City Light shall then have ninety (90) days to decide whether to
terminate the wheeling agreement or pay its share of the costs to upgrade the facilities. Payment of costs by City
Light shall be within thirty (30) days of invoice by the District upon completion of the upgrade.
7. Wheeling Charges:
City Light shall provide monthly statements to the District of the metered consumption and total unmetered
consumption of all customers in the areas where wheeling services are being provided. City Light further agrees
that it will pay the District for all metered and unmetered consumption based on 110 % of the Districts average
system cost. Compensation as calculated above shall be billed monthly and be due and payable within twenty (20)
days of receipt of invoice.
8. Hold Harmless:
City Light agrees, upon completion of the interconnection of City Light and District facilities, to indemnify,
defend, and hold harmless the District and its officials, employees, and agents, from and against any and all
claims for damages or any other relief due to property damages, personal injury, or any other form of loss arising
from accidents or injuries occurring after the date wheeling of power commences.
The District agrees, upon completion of the interconnection of City Light and District facilities, to indemnify,
defend, and hold harmless City Light and its officials, employees, and agents, from and against any and all
claims for damages or any other relief due to property damages, personal injury, or any other form of loss arising
from accidents or injuries occurring after the date wheeling of power commences.
9. Authority:
Each party warrants that the undersigned representative has full and complete legal authority to sign for it and to
commit it to the performance of the agreements set forth herein.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be duly signed and executed in two
counterparts as of the day and year first above written.
ATTEST:
ATTEST:
R~
PORT ANGELES CITY LIGHT
DQ~1P,~. 1J~
Becky J. Upt" Ci Clerk /
:.,
- ( -
"
/
"
\\' J....
\. '
PORT ANGELES CITY LIGHT
ST AKING SHEET
ACT, NO. - PROJ. NO.
U/G CONSTRUCTION
DESCRIPTION
9800 - 8178
PRIORITY, 3 PROJECT NUMBER, 8178 ENGINEERED B~ '
SPECIAL INSTRUCTIONS' COORDINATE TRENCHING W'ITH JOHN IE KEY - 452-9063 CHECKED BY, ~
LOCATIONI BENT CEDARS W' A Y OFF MT, ANGELES ROAD DATE ISSUED'
DESCRIPTION OF 'WORK I U/G POW'ER LINE EXTENSION FOREMAN'
DAm 4/11/96
DAm 4- } \~ '~b
,
REVISED'
SUBST A TION/FEEDER,
PUD
COMPLETED,
GRID MAP, 69
FEEDER MAP,
START DA TEl
LOCATE COMPLETION DAm BY CONTRACTOR TIME,
COPIES, PUD, ----L-INSP' -L CRE'W, -1- TElt 11
NUMBER,
TV' 1
DP'W 1
FILE' 1
GEORGE' LOPS. MGR,' --1-TDTi\L,2-
POLE NUMBER
SPAN
FT.
EZ t> 69 DR 01 100
'WIRE SIZE
POLE
H/C
40
PRIMARY FRAMING UNIT
O.H, URD,
PUD 3;(
GUY
ANCHOR SECONDARY O.H.lU.G. SERVICE O.H.lU,G,
SPAN (FT.) 'WIRE SIZE SPAN (FT'> 'WIRE SIZE
MISC. 8. REMARKS
TRANSFORMER
KV A No,
MISC.
IJ'
PUD 30"
A 11> 69 DR 01
U 1 O? (~~"" P L S \::. "
I~
III 1 03
A 2) 69 DR 03
215 1-110 ALCN CABLE j 1557
U 1 04
75
A UM 6 03 UM 0 06
UM 0 08
UM 6 01 100 350 DB PX
UM 6 01 120 350 DB PX
111M h nl 50 350 DB PX
S 0 01 I us equlrecl 3-#10 cu
5372 PUD PUD 70, 85
UM 4 01
A 3) 69 DR 01
A <0 69 DR 02
A 5) 69 DR 04
A 6) 69 DR 05
E 7/ 69 DR 06
PUD POLE
A 7) 69 DR 06
PUD 3;(
100 PUD 3~
3006,l.4~305
40
15
.~
PUD
15m
15
LOT 3
"7/
LOT 1
LOT 2
SET PEDESTAL 2 1/2 FEET ABOVE
EX IS ING GRADE I ~
Yk 3805 f5\ ~4}
~ I :;:/..J ~ SET PEDESTAL 1 FOOT ABOVE
I -r (;\'<;J; '\ EXISTING GRADE
J' 1 ? ~'S ' 'v A Y \iu \, '
0_ - - v::;\ ef!'\\ crD~ 3' I?~C 350 tpx "
3822 ~ \J.; p.\..C~:r\O...-1 - - -, '- _ /'
o ~ \-\.I~-
<> :0 ~~~ce) ~ 3
\~L SET XF~~~FOOT ABPVE
EXIST! G GRADE
LOT 6 LOT 5 LOT 4
...----'Lj""---
r 1 aT'( UMIT5
1 200', 3'PVC SCH 40
~
185'-3' PVC SCH 49
100' - 3' PVC SCH 40
120' - 3' PVC SCH 40
50'-3' PVC SCH 40
I' sch 40 PVC us requred
#2 TPX
175' 3' PVC FUTURE
COORDINATE ~ITH DAVE PROEBSTE~ PUD
452-9771 EXT 217
BILLING INFORMA TIDN.
BILL LABOR 8. MATERIAL TOI
,
JOHNIE KEY 452-9063
P.O. BOX 2151
PORT ANGELES ~A, 98362
COORDINATE TRENCHING W'ITH JOHNIE KEY - 452-9063
-
-----
SYMBOLS'
o E~
4-FILL-IN IJORK
~PUD 3 ph
\
LXISllNG RESIOCNCE
lIE-REMOVE
A-ADD
2-NORMAL SCHEDUL
3-CALL TO SCHEDULE
PRIORITY,
I-EMERGENCY
I
~
9/1195
-u
^'
o
L
fT1
(I
--i
Z
C
3:
b;j
fT1
~
co
.......
"-..J
co
RECORDS
Pencil Mo.p
Field
Mutl. Sheets
Xfl"lr. Curds
TLM
Grid Mo.ps
Fdr, Mups
Dlst. Mo.ps
Str. Ltg,
GIS
Engr. Check
JOB BRIEFING I T AILGA TE MEETING
DATE FOREMAN DATE FOREMAN
HAZARDS
o HIGH VOLTAGE 0 LO'W VOLT AGE
o TRAFFIC CONTROL 0 PCB'S
o LOCK OUT ITAG OUT 0 S'JITCHING
o CONFINED SPACES 0 TREE TRIMMING
o EXCAVATION 0 'WIRE PULLING
o
o
o
"
,1
.' ~ < .
m &@&aW& m
,
,
U248
PORT ANGELES
PLANNING DEPARTMENT
MAUD
(VACATED)
/
/ STREET
I
. ....... .
,
.1.
- "\
A ~ ~t :,/;'/) / . ~ /l
' I S /~ /./~ / '\
j;/ss s~ I~ . JJ~ / \
I s ~/ ., ^_ ~
' '/.J ! ,;r.i1.~ I~'
Ii (' I~~
i SEmAa<
~ ~ \ ~1'CP ~
';1:" \ L/~
\ .~.,r--l - 1 -
\~.... ,
STREET
1&70'
/
/
HOUSTON
SHORT PLAT
Vol. 9. Pg. 63
('7
~
~
g
I
LOT 3
L.
t _
~
\\
I
J
~
1
f
I
!
LOT 1
4,}.313 "'" It.
. 0.99 _
"- .
~1larT~
KEY, LEfLER, TYLER
SHORT PLAT
Vol. 24, Pg. 88
-\
L' .,
["/1//)
~ < / '
PropOHCl 60ft. .."t.
. .
"" - ..;
- -
':'
~ ~
PROPOSED
SHORT PLAT
OF A PORTION OF
N.E.1 /4 S.W.1 /4,Sec.14,T.30N.,R.6W.,W.M.
Cl.A1.1.AM COUNTY, WASHINGTON
LEGEND
BuOdlng ..tback Iln. JMl" RS-SOOO Zon"9
E>aat.n; 30ft. .."t. _ Short Plot
Vol 24. "9- Bll.
GRAPlUC SCALE
-
~
( .. ra:r )
'_.80 IL
for
Mr. Johnl. S. Key
Prepared By
David Cummins and Aanoclates, Inc.
Sequim, Walhlngton March,
Job No. 2-14-30-6-1471
1993
,
1- - .......
I - - ""t
,_ ...... _I
PropoHd 25ft. utlfny .....t.