HomeMy WebLinkAbout909 W 10th St - Building
I
.
Site Address:
Installed By:
(/(/.
/~
3
Owner/Business:
Owner/Business Address:
ELECTRIC HEAT
o BASEBOARD KW _
o FURNACE KW
o HEAT PUMP KW----zr-
~ FAN/WALL KW ---F--
;.
CITY OF PORT ANGELES LIGHT DEPARTMENT
321 E. Fifth Street
Port Angeles. WA 98362
(206) 457-0411
PERMIT NO. -7'172
<9-/2/7 tj
DATE
ELECTRICAL PERMIT
D READY FOR
INSPECTION
License Number:
D WILL CALL FOR
INSPECTION
Phone:
7O/l~
Phone:
Sq. Ft.
tS( RESIDENTIAL
tf COMMERCIAL
D NEW CONSTRUCTION
D REMODEL
~ ADD/ALTER CIRCUITS
Y'C SERVICE UPGRADE/REPAIR
D TEMPORARY SERVICE
D RISER
)>'l' OVERHEAD SERVICE
D UNDER~R9!J...ND SERVICE
VOLTAGE~
~q\ D3s6
SERVICE SIZE ~J20 AMPS
FEEDER SIZE AMPS
""";,,,",~,;p~;," ~~, I. ~~, ~ "fe:t:.
IA llJ ' t4I! W-r j!. L,
I' . / '
.
W.S. No. SERVICE SIZE
CAPACITY:
D O.K. D NOT O.K.
ACTION REQUIRED: D CHANGE TRANSFORMER
D INSTALL SERVICE POLE
DATE
ENGR.
D OVERHEAD SERVICE APPROVED
o CHANGE SERVICE WIRE
D OTHER
D Ditch Inspection O.K.
D Rough-in/cover O.K.
D O.K. to connect service
MFinalo.K. t~~,~~I.-....Q-t"A2/
/tJ >L4
~ ~. 'r'I(
/l f zA (
Site Address:
Permit/Receipt No.
4.97 L
Installer:
New Meters
Notify Port Angeles City Light by Street Address and Permit Number when ready for inspection. Work must not be covered
before inspection and O.K. for covering has been given by the electrical inspector in writing on either the Wiring Report
or on the Building Permit. PHONE 457-0411, EXT. 224. 8'
.~ NO OCCUPANCY OR USE ESTABLISHED UNDER THIS PERMIT ~ SO
, ~ $
Eleclricallnspector Permit Fee
.
WHITE - File by address
OLYMPIC PRINTERS INC
PINK - Top: Eng, Bottom, Customer
GREEN - Top: Meter Dept., Bottom: City Hall
~
-~
..
PORT ANGELES HOUSING REHABILITATION PROGRAM
129 E 1st St
Port Angeles, WA 98362
rei ephone #452. ..2023
October 14, 1994 (revised November 4 and Oecember 27, 1994)
Worklist specifications for:
Jean Tolliver (94PA48)
909 W 10th
Port Angeles, WA 98362
rei ephone # 457....J 484
PROJECT A (REQUIRED HEALTH AND SAFETY REPAIRS)
0200 1)House: Complete pest inspection and extermination of powder
post beetles and other wood destroying insects and organisms.
0500 1)Rear entry: Install (2) wood handrails on the rear entry
steps.
0600 1)Garage: Install new treated wood steps and handrailing at
the garage entry.
2)Basement: Replace (2) support posts near the bottom of the
basement stairway. Use pressure treated structural support
posts. Shim and level the beam as much as possible.
3)Basement: Replace (1) support post located near the furnace
and chimney, and (2) additional support posts in the rear
basement area. Use pressure treated structural support posts.
4)Basement: Replace (1)
basement steps. Use a
post.
support post directly in front of the
pressure treated structural support
5)Basement stairwell: Install a proper handrail.
0700 1)Tear off, resheath, and reroof the entire house with 25 year
three-tab composition seal down shingles. Shim and level roof
as much as possible. Remove chimney to below the roof line and
patch the roof. Install new metal trim around perimeter gable
and eave areas.
1
".
,
0900 l)Kitchen, rear hallway, utility and bathroom areas: Install
tapered thresholds and metal strips as required to repair and
secure the seams in the floor covering and eliminate trip
hazard.
2)Living room: Repair the damaged wall areas near the south
and east windows. Homeowner to complete painting.
1500 l)Install a
pressure/temp
1600v1lInstall new
proper extension pipe on the
valve.
water
heater
overhead service to the garage.
~
~)Rear entry: Install a new exterior dusk to dawn or motion
~ detector security light (homeowner choice).fconnect to a new
1P switch to be located _i!JJ>,uethe entry} f;..
~Bathroom: Insure that existing outlet located near the sink
has GFI protection.
~Install new 200 amp service complete.
5)Safe up all wiring, outlets, fixtures, switches and
connections throughout the house. Insure that all fixtures
and connections have proper junction boxes. All three prong
outlets to have proper grounding and all other outlets to have
proper polarity. Insure proper bonding of all water lines. All
outlets, switches, and junction boxes to have proper cover
plates.
v6lNE bedroom: Install (1) additional outlet.
~SW TV room: Replace defective outlet On the west wall.
~SW TV room: Install (1) additional outlet to be located on
the south wall.
~iVing room: Replace (2) defective outlets near the front
entry.
~0)LiVing room: Install (2) additional outlets. Homeowner to
designate location.
y"ll)Kitchen: Insure that the existing outlets near the sink
have GFI protection.
02)Kitchen: Split out the kitchen circuit and install (1)
additional outlet.
~~)Kitchen: Install a new separate circuit and outlet for the
m1.crowave oven.
2
'-.'
U)Install new hardwired smoke alarms with battery
V'throughout the house to code. Include one (1) in the
room. All smoke alarms to be inter-tied.
backup
SW TV
~)Basement: Install (4) new porcelain keyless ceiling light
?/fixtures and connect to a new switch to be located near the
top of the stairs.
~)Insure that the oil furnace has been disconnected from the
electrical service panel.
~7)Rear hallway: Install a new outlet for the refrigerator.
18)Oining/kitchen: Install a new F/A electric wall heater with
~ thermostat switch, sized to adequately heat this area.
19)NE bedroom: Install a
lJftater/light combination. The
~switched separate from light.
new
new
F/A electric ceiling
thermostat switch to be
~)Bathroom: Install a new F/A electric wall
thermostat switch, sized to adequately heat this
heater
area.
with
PROJECT B (HEALTH AND SAFETY/REMOVAL OF ARCHITECTURAL BARRIERS)
0400 1) Remove the concrete slab and porch floor framing and decking
at the front of the house, and install a new continuous
concrete slab. Include replacement of the dry rot damaged rim
joist on the south side of the house and installation of new
support posts, framing and T-111 siding and trim, on the porch
only, to match the existing configuration. Install flashing
along the exposed south wall of the house. Primer paint the
new siding and trim. Homeowner to comp1et:e all other painting.
0800 1) Front entry: Modify the front door opening and install a new
36" prehung embossed panel steel insulated door package with
a deadbolt, lock, and a window in the upper half. Trim and
finish the interior and exterior. Stain and finish or paint
the interior door and trim. Primer the exterior. Homeowner to
complete all other pa1nting.
PROJECT C (COST EFFECTIVE ENERGY CONSERVATION)
0800 l)Rear entry: Install a new prehung steel flush panel
insulated door package with a deadbolt, lock, and window in
the upper half. Trim and finish the interior and exterior.
Stain and finish or paint the interior door and trim. Primer
the exterior. Homeowner to complete all other paint:1ng.
3
'."
. . -
2)Rear entry: Install a
storm/screen door package.
new aluminum framed combination
Mat:erJal allowance $16iJ. iJiJ.
3) Front entry: Install a
storm/screen door package.
new aluminum framed combination
Mat:erJal allowance $16iJ.iJiJ.
4)NE bedroom: Install (1) new vinyl framed casement window
with insulating glass and (1) new vinyl framed single hung
window with insulating glass. Trim and finish the interior and
exterior. Stain and finish or paint the interior trim. PrJmer
rho exterior. Homeowner 1:0 complete all other painCing~ Not:e:
t:he casemen t: window mus t: be a proper egress wi ndow~
5)Utility area: Install a new vinyl framed slide-by window
with insulating glass on the north wall. Trim and finish the
interior and exterior. Stain and finish or paint the interior
trim. Primer the exterior. Homeowner eo complet:e all ot:her
paJnt:Jng.
6)Bathroom: Install a new vinyl framed slide-by window with
insulating obscured and tempered glass on the west wall. Trim
and finish the interior and exterior. Stain and finish or
paint the interior trim. Primer the exterior. Homeowner to
complet:e all ot:her paJnt:Jng. Slope the interior sill for
drainage and wrap the interior window frame with plastic
laminant.
7)SW TV room: Install a new vinyl framed fixed window with
insulating glass on the west wall. Trim and finish the
interior and exterior. Stain and finish or paint the interior
trim. Primer the exterior. Homeowner 1:0 compiet:e all oCher
pa'1nt:ing.
8)Living room: Install (2) new vinyl framed fixed windows with
insulating glass. Trim and finish the interior and exterior.
Stain and finish or paint the interior trim. Primer the
exterior. Homeowner to complete all other painting.
9)Dining room/kitchen: Install (1) new vinyl framed picture
window with slide-by vent windows on the bottom. Trim and
finish the interior and exterior. Stain and finish or paint
the interior trim. Primer the exterior. Homeowner 1:0 complet:e
all ocher pa.inl-ing~
10)Center storage room: Install a new vinyl framed slide-by
window with insulating glass. Trim and finish the interior and
exterior. Stain and finish or paint the interior trim. Primer
the exterior. H'lmeOWller 1:0 complet:e all ot:her pa-int:ing.
4
'.
,0 .
11)Basement: Replace (2) damaged window subsills and frames
with treated wood and install new metal window wells with rock
and gravel base for drainage. Units to be repaired are located
on the west side of the house. Primer the exterior. Homeowner'
1:0 complet:e all ot:her paint:ing.
PROJECT D (EXTERIOR DETERIORATION AND BLIGHTING)
1800 l)Properly prepare the exterior of the house for painting.
Complete spot priming of all new and bare wood. Homeowner t:o
complet:e all ot:ller pa.int:.ing. Include caulking and minor repair
of siding around the perimeter of the house.
PROJECT E (BUILDING CONSERVATION)
0500 l)Tighten up and properly install the existing rain gutters.
Connect downspouts to the new drainage system.
1700 2)Basement: Remove the chimney flu pipe and seal off two (2)
chimney breaching.
PROJECT F (HEALTH AND SAFETY AND EXTERIOR DETERIORATION/DETACHED
GARAGE)
0200 l)Garage: Remove vegetation around perimeter of garage and'
eliminate earth/wood contact.
0600 l)Garage: Straighten the exterior walls as much as possible
and install new diagonal shear bracing on all walls.
2)Garage: Install additional roof bracing to support, secure,
and level the roof as much as possible.
0700 l)Garage: Re-roof the garage with 20 year 3-tab composition
seal down shingles(color is homeowners choice). Include gable
and eave trim and adequate overhang on the eaves.
Not:e t:o cont:ract:ors: Please b1d all project:s separat:ely. Include
app11cable t:ax and perm1t: Tees 1n b1ds.
5