HomeMy WebLinkAbout3703 Canyon Edge Dr - Building
CITY OF PORT ANGELES
LIGHT DEPARTMENT
ELECTRICAL PERMIT
N?
15333
- y . /
Port Angeles, Washlngton__m________n,,;L__=____m______mm__mmmmm, 19_>_)
In accordance with the City Ordinance to regulate the Installation, extension, or repair of elec-
trical equipment In, on, or about any building or other structure in the City of Port Angeles, per-
mission is hereby granted to do electrical work as listed below.
Address n3-Z(LJm-m-a::"L,1:!.~.c"":'.-------(:P;I"'~:-mmm Occupancy____/_C~_~nmn________n__m___
o~er n-;-71y~~j2]);1:,) ~~nanL----nnn----nn-------m------m---nm---n----mn---m---n
Wirmg Contractor _____nL_n_____nn_.<'''<2.___n__m__nn___'!?:_C?:'n_____n By____m___m____n_nm_m_m_m____nn__________m____________
/0
Light Outlets.................m_mn..____......._
yo
Receptacle Outlets....mnnn........_.........
t
Dryer, KWI__nm___nnn____h___nm____nn____
/' _'1.
Range, KW m..L.....__m... u..._mm.._._..
Water Heater:
~-/.. ")
KW________n._-'_h___.m_n_____hh____ _
/ch Y /3/3 n___
Ileal: RW ,....~........n.......n..............n...
Motors: size, volts and phase:
Total Loadm..mn..mm____.m...
Service, volts ./-:,?:~L~?...~::.......
No. wires .mn!..nmmm....:..............
- y/ (ltfJV
Size WlreSm..........n...nn_~mm__n.....
/" "
- de:> ;;J//.
Mam fuse __.nm..__.....___nmnn__nmm
.5
Enclosure ..........._..n___mmnmmnnn
Type of wiring:
Entrance Cable ......m.._....__nh.
Rigid Conduit ....nn..__....mnmnnm
Metallic Tubing n_m.....................
Current transformers:
No. & Size...n__.......................__.......
Ser. NO...n.__.___..nnnnn...nn.n.nnnnn.
Ser. N 0._.............................................
Ser. NO.................................n.....nn...
Ser. NO....m.......
Type of Wiring:
Armored Cable ..................mmnm.
Non.Metallic mmmnmn.","'.".'.''''
Knob & Tube..
Rigid Conduit .______n______hhhhn...n
Metallic Tubing ...._.....n...
Raceway ....__m.~:..m....m.....___m......
Circuits, LighL)m.mm....m................
;-
Utility __h__..._____h___________n___m___nm__
Heat .bnn.....................................
-)
Range ..~...................................._..
Water Heater n~m..m.nmnmn....
Motor ..._........._........................n_...
.,
Drycr......:-....................._....._...............
Furnace .........................'_.m.. __.__.._,.
;1~
Total nn..nnn_n.nnnnn.n..........
Remarks : __u__-:;1_~_e___::::~.~.c.::.nn.~::...:#:;::::::~.:'H~'!~.~nn...u.-..nnnu.uuUU'.._hhnn.unnunn...nn.nUh.'h.hhnduu.n..hUUU
,
__humhmmnmummm_nm___h___mu__nm____m_m___d__n___nm_mu_m___m---~~)--/'-/-mj7m]-m-n7..--mnm-m-
~~-d~--~~.---------mnm_ ~~~_~_~:__~~_~_~~_~~_mm_ By ~n~_~___jh.~n~'e:m~ccf.~"__-_.~=h
, ,
NOTICE--Current must not be turned on until Certificate of Inspection has been issued. If work is to be con.
cealed due notice must be given the Inspector so that work may be inspected before concealment.
NOTIFY THE INSPECTOR BY PERMIT NUMBER WHEN READY FOR INSPECTION
,
I () f 'i /ft:r /J13
ELECTRICAL PERMIT
N?
15333
,?'-,o~ ~ (~ y . ------'
~:~::~~iP;z;:=:==~-=_~:::
1M 3.72 Olympic Printers, Inc.
Total Load n__..nn..nn..........................................n.......nnhnnn.n.n..._ ._.....n..nn.n.__................n.n