HomeMy WebLinkAbout602 S Cedar St - Building
.
.
.
~
CITY OF PORT ANGELES
LIGHT DEPARTMENT
PERMIT NO.
ELECTRICAL PERMIT
DATE
o READY FOR
INSPECTION
License Number:
Site Address:
Installed By:
>
Owne'r/Business:
I
Owner/Business Address:
D Residential
Heat KW
D, Baseboard D Furnace/Boiler
D Heatpump D Other
D' Commercialllndustrialload
Total Connected load
(attach breakdown)
Total Motor load
(attach breakdown)
D New Construction
D Remodel
D Service update/alter/repair
D Overhead
D Underground
Voltage
D 10 D 30
Service size
D Temporary
/7.3/
A'WILL CALL FOR
INSPECTION
Phone:
Phone:
Sq. Ft.
D Add/alter circuits
D Auxiliary power
(list below)
D Special equipment
(list below)
DetailslDescription:
Amps
~4- I ~~
t (
W.S. No. Service
Capacity: D O.K. D Not O.K.
D Ditch inspection O.K.
D Rough-in/cover O.K.
D O.K. to connect service
D Finai O.K.
Hold for: D Easement D Letter
Date
Size
Comments
D Signed up for service/meter
D Meter Department notified for installation
D Fire Department notified of inspection
D Plan Review approved/pending
Permit/Receipt No.
/73/
New Meters
C)
Installer:
'1
Notify the Department of City Light by Street Address and Permit Number when ready for Inspection. Work
must not be covered or electrically energized before inspection and O.K. for covering or service has been given
by the Inspector in Writing on the Wiring Report or the Building Permit. PHONE 457-0411, EXT.158 or EXT. 224.
~~ ......--- NO OCCUPANCY OR USE ESTABLISHED UNDER THIS PERMIT /' ~
, Inspector Amount paid
WHITE - file by address YELLOW - file by number PINK - Top: Eng, Bottom: Customer GREEN - Top: Inspector, Bottom: City Hall
OLY'!!'pIC PRINTERS. INC.
CITY OF PORT ANGELES
,
LIGIq DEPARTMENT
ELECTRICAL PERMIT
N? 16143
. ,--
v- .~-' r' ~. .
"--.'.,, ",{- k.. ' (,.~
Port Angeles, Washlngtonm........=::m...!.....mm.....m..mm.........m.. 19:....000
In accordance with the City Ordinance to regulate the installation, extension, or repair of elec-
trical equipment In, on, or about any building or other structure in the City of Port Angeles, per-
mission is hereby granted to do electrical work as listed below.
Address .m.(..r?...<!?.-:._d!~..(!l~~~m...____.......mm.....m. Occupancy.m..A._I!....~2..m.,m.....m..........
Owner ....!p..1;~:f:!.-i'.;~~1f1P..~I!J2.m........m.7?u T(~nt........m.m.m.........::..._...m..__..m...........m..........
Wiring Contractor u~_t.n'"~j~~_l:~~._...:t..l~.:'J;.~___.h;:._'Q._c~-~__.n Byh...__muu_nnnmmnnnmm_nh__n..___umm...u....
~ .
Llgh~ Outlets......................................... Service. volts -I'~?/--f..;f.f..':.~:..
Receptacle Outlets..__..............__.._..n_... No. wires ............_................y......_
. . 1# IJ <tJ./
Dryer1 KW........_n______.....__......__..h.._.__ Size wlres....n...m_~"_:!.______.....__u..._..
F'-'I,?!) 4
MaIn fuse .!::~m__n!.m.'..m....n...
- ..".
::J
Enclosure ...................._._...._.____....00
Range. KW..__m..
Water Heater:
I
KW......mm......................m.. ....
j .-7 J(, ~t1
Heat: Kw....~~....l~!.!.L.l~L..!...m..u..
Motors: size, volts and phase:
Type of wiring:
Entrance Cable __00
Rigid Conduit ...............................
Metallic Tubing _m......__...______..____
Current transformers:
~..._-_...__._---------_._-_._----...-------._....._...-...
No. & Size....................................._.
Ser. NO._._.__..._......n_..........................
Ser. NO..........__..__..____....._......_nn...n..
Ser. No. ..n_......_u..............._...............
Total Load__...n__....m_____...m..
Ser. NO.._.....___..__...___.._...nn.__.n__.......
Type 01 Wiring:
Armored Cable .m__........................
Non-Metallic ........._.............00_.__..__
Knob & Tubenn...___......................_
Rigid Conduit ...............................
Metallic Tubing ...........__.__m_..n...
Raceway .........._......._............_._..._
Circuits, Llght.mn...................__..........__
Utility...........................,.................
Heat -.._........_____._...................._......
Range ....._....._._.._.__.........................
Water Heater ............._.__._.m_.......
Motor ..._..........._..____.000000_....00........
Dryer __...._nnn___......h_................_......_
Furnace .........................'_................._.
Total _.._nnh_.nn...__n................
Remarks: ........m...............h__.:'.'::h1..c.~:r.~(.:::!?.m.........m...m....m.m....m...........m.m.m.mmm.......m.
m......mmhm...mn......mm.m....h.hmnhm...m...h......m......m...m.m...m.....~......."h...':.....m.m....m.m...m.......__
;~':'~~h~~~.....mm.mm. ::~~.~:..:~.~:~~.~....... By ')...~~~..~(.,!.:.~:~.~?:'. ~-~~
NOTICE-Current must not be turned on until Certificate of Inspection has been issued. It work is to be con-
cealed due notice must be given the Inspector so that work may be inspected before concealment.
NOTIFY THE INSPECTOR BY PERMIT NUMBER WHEN READY FOR INSPECTION
ELECTRICAL PERMIT
N?
16143
Address....._............__....................___......................._......_.___.....___...__......__._......._......._....._.___..._....Date..._......__._.._.._.........._._...._......__._......
Ow-ner ._....._..........................._......_.__......_......__.__......................._........._.........._.....00__.... Tenantn__n____.._...........____....._._....___......__........_........
Wiring Contractor...._..._.nn.._._.._............._.............__......._........_.....__....._..............................._.nh.. . By.n..n.....n_...n____.__nn..n___....nn__....____..n..
NOTICE--Current must not be turned on until Certificate of Inspection has been issued. If work is to be con-
cealed due notice must be given the Inspector so that work may be inspected betore concealment.
l\.
,....,'.........l... 'D,.;nl"'''A_ Tn,.,.