HomeMy WebLinkAbout1710 E St - Building
CITY OF PORT ANGELES
LIGHT DEPARTMENT
ELECTRICAL PERMIT
N'?
16938
Port Angeles, washlngton___...l..=___.._;;d....1n___...._________....___...., 19___7...1
In accordance with the City Ordinance to regulate the Installation, extension, or repair of elec-
t~lcal equipment in, on, or about any building or other structure In the City of Port Angeles. per-
n~isslon is hereby granted to do electrical work as listed below.
Andress ...lq.;-t.__GL~.!~--.-----.-----..-----.-----....-- occupancy__.._____~__...________..__.__
~,::~ ~~:~~~::i:g~.:.f~:~~~;:::..:::....:..:..:.~~~.~~:::::::::~::::::::::::::::~=::::::::~:::::::::
L:ght outlets.........L.~................_..... Service, volt, ..I."i?:.o/..."?:..~..o...... Type of Wiring:
. Il.,ceplacie OUtlels.......~..~=........ No. wires ..........2...................... Armored Cabl. ..............................
~ Si 1 '7"/0 II / Non-Metallic _......m......._..........._.__
D'yer: KWm.........mm......m............... ze w r.'....rr" .....~....._..
R,nge, KW ....m...l...~............. Main luae ...QlJr.P.....It::..........
S
Enclosure __...__...__.........__......_.........
'Vater Heater:
KW__m.........H.~....~=
H'n" KW...........!..1?,...!...'lo...~.=G'B
Type of wirIng:
Entrance Cable ..mm....mnm__....._.
Motors: sIze. volts and phase:
Rigid Conduit .....mm....................
Metalllc TubIng ........m........___...__
Current transformers:
No. & Size.__........._______......_.............
Ser. No.....--........-....-........--............... '....
Ser. No.........-..........--.-...........-........-.
Ser. No......_.................__............___.....
Knob &0 Tub...................................
Rigid Conduit ..........................-..
Metalllc Tubing ...........................
Raceway _........._............_......__..._
CIrcuits, Llght..._........9__......m...........
~:~:ly..::::::::::::::::r.::::::::~:~::=
'2....
Range ..........__.___........___.......__._.......
Water Heater ....--~...........--...
Motor ...__..........____._..._....__.............
Dryer _____..h...._____......~.....__._..__
Furnace ..._......................_....._____....._.
\
Total wad............___..__.......... Ser. No........__.............___...._......_....... Total ....~h_Q.__..........._____
Remarks,: ____.~..___~___...________.......______.__...___________..___________.._____n______.._________.___.._________...__
-.-..--..-.--.-.....-..-..---.--.--..-..-------.--.....-...--........-.-...---....-.....--..--........-.............---------.....--------.---..-...----..-.--........-....-....
.n....nn.__..nnn._.n.unn.......__nnn.nn._.._.n.nn.n._.n..nnnh....nnn.nn..__n__nn..n..._unn.n..u____u__.nn.n._....nnn...nn__nn_n
Permit Fee
$....~.!...IR.___9..________.m___.
Treas. Receipt
No.._________......___.........
By ___.!1.).~....__~~.~~.
NOTICE-Current must not be turned on until Certificate of Inspection has been issued. If work is to be con.
cenled due notice must be given the Inspector so that work may be inspected before concealment.
NOTIFY THE INSPECTOR BY PERMIT NUMBER WHEN READY FOR INSPECTION
ELECTRICAL PERMIT
Address
...........----....---.....................----.._...............---..-...-.................-..-...-..........-..-...-.--.-...........
OwtIer.__...._._........................._.........._....____....._.._.__....__....._........__........_.___.____................Tenant................_______.........._......------............-...--.--.
Date..._.........._..__._.........._......_......_......__
N?
16938
Wil'ingContractor....___............................_...........____......._....__...............__....______..................____......By............._____...__...........-...........................
NOTICE-Current must not be turned on until Certlflcate of Inspection has been Issued. If work is to be con.
cealed due notice must be given the Inspector so that work may be Inspected before concealment.
1M Olympic Printers. Inc.