HomeMy WebLinkAbout729 Georgiana St - Building
CITY OF PORT ANGELES
LIGHT DEPARTMENT
ELECTRICAL PERMIT
N?
15291
I .. I (( ,
Port Angeles, Washlngton__ooo_.Luu___u_..__ooo__oooooom____ooo.._oooooo_ooo_m, 19:'______
In accordance with the City Ordinance to regulate the installation, extension, or repair of elec- ,
trical equipment in, on, or about any building or other structure in the City of Port Angeles, per-
mission is hereby granted to do electrical work as listed below_
- ' .
Address _..ooo7__Zm2.__m:_m____~um_u__.uuuumu,'-___mmu....ooo_____ Occupancy_uoooc:u..:_uooo:_._oooL:_u..__...ooo__u
(,/"; ,/ ':~ ' ~' J "--.--
Owner u__~~____..___~___~~_~~_u.:.u__.~__u~.__u_~u..nn;~uu.__u._____ Tellantn__h_____h_______________u_____.____.___~________.u._u___~n.h____
.- C -~,_r:\ B
WIrIng ontractor um.,uu.u-m'umuu----..--uu-uuummu-uu--_---- y_uuum_umm________..oooooo.uu________.__ooo.uuu_u_uu
Light Outlets___________________...............__.___.
Service, volts _u.....m.nmmm._.__u.........
Receptacle Outletsm_____................m....
No. wires .....h..nnn_nunn........n__...
Drye" KWI.______.mm_muummmuumuu
Range, KW nm__n_
Water Heater:
Size wiresm_m_..mnm..__m.....mmn.
Main fuse nu.un.....nun_nunn__...._...
KW'mu
Enclosure _mmmnnu_mm___m.__...nn
Type of wiring:
Entrance Cable ____m_.mn_m_n.m__u
IIeat: RW.._hnnn.nn_nn___uu.u__n__n._._
Rigid Conduit m__m_mnm_
Metallic Tubing m.__........n.m..n...
Current transformers:
No, & Size...mmm_mm_.......___..m.._.
Motors: size, volts and pha.se:
Ser. NO..nnnn..._..nnnnu..nn....nn......
Ser. NO.,.._.......nn_nnn_nn_nnn..n_...
Ser. No._..____.._....._______________u__..._....___
Total Load...___.mu__...............
Ser. NO.___u__nuun...__u_u___._........h___._
Type of Wiring;
Armored Cable
Non-Metallic u_uum.nm___mumnun
Knob & Tubeuu.um._mm___mm.__m
Rigid Conduit nn_.mm_umm___m_...
Metallic Tubing mmunn.m...........
Raceway ...m...u____________..........___.m..
Circuits, LighL_:u_.m:;:m.um_mnmmn.u
Utility ___nm_m.mmmn..mm__nh_......
Heat
Range __._nnnu.un_n_.nnn_n.__nnn.un
Water Heater nnm.....nm___m__..un
Motor ..._........__..__.h.....____.___.__....._
Dryer..nnnn_.nnn.n.nn__nnn_nnn_n_nn.
Furnace n.........._n.._.......'__nnnn.........
Total nn...nnnuuuuu....uuuu.u_
Remarks: _:__;.:::.~__m:_._.u_;__.:.._.~________:________~---___----------.--..---m.---~.:.._____:_u__~_.c:~.___--h.:~.~.-m___m__n~~~':'n/~_______~~___,_:...L... .
._.~_~._~~~_.___..~~~"!.~:~~_.:~~___.;_.;s:.._~.:._.~'_~_n_~~_~..~~_.__.______~__________________.~__~_.~_~_._.____.________....~_.~..________________.....~_~~.~_n_._~~~~~~.~_
.I
F ermit Fee
$____________000000.___.0.____.______.
Treas. Receipt
NO.__u.__.n._.._____________
By nooo_ooo._.uu.:__n_____~__ooo..____o.___~n____n_n______o.._____
NOTICE--Current must n()t be turned on until Certificate of Inspection has been issued. If work is to be con.
c, aled due notice must be given the Inspector so that work may be inspected before concealment.
NOTIFY THE INSPECTOR BY PERMIT NUMBER WHEN READY FOR INSPECTION
,
./ .-----
I
"
\.
,
I
I
ELECTRICAL PERMIT
i.'
N<<!
15291
_ . ~ f., . / /'/_ ~ (
D Lte called for ~n:pectlonm--n.h- ).....:.m:--;1): :..;_:;_.m.n:u_'_..._.......nmum___....... nmun h ___ _ _......hm.......L.m:_mm...._u........._m........__
P 'eUminary inspection dates....................":................____.;;._....__ _____..__ ....._ ____........_. .._ __...__..._......___...._...._n_______......_________....._.......__...._...___
T,Jtal Load nu.ndn._nuu_u__..nuu__u_n._uuu___uun_u_nuun_un_.........hun. un
IIlspectioncompleted..._.__.........__..._.............._......................-........~_____.........._____._...._....__..______.._......._______........__________...............n.________._.___..
1M 3-72 Olympic Printers, Inc.